Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ivan V StojanovfiledCriticalIvan V Stojanov
Priority to BG101416UpriorityCriticalpatent/BG475Y1/en
Publication of BG101416UpublicationCriticalpatent/BG101416U/en
Publication of BG475Y1publicationCriticalpatent/BG475Y1/en
The biler is used for residential and indistrial needs forheating of different premises and buildings and as a chamber forsmoking foodstuffs. The heating boiler consists of a housing (2)and fuel chamber (1) in the form of two bodies, one inside theother, having flue ducts (3) between them connected to the chimneybody by means of a lower basic hole (9) and upper auxiliary hole(10) Housing (2) and fuel chamber (1) are built of double wallswhich form water jackets connected to a cold water source (5) andpipeline for supplying hot water (6). A mobile fuel cassette (13)is fitted in the fuel chamber.1 claim, 1 figure\!