BE882205A - INSPECTION CHAMBER FOR DRAINAGE SYSTEM - Google Patents

INSPECTION CHAMBER FOR DRAINAGE SYSTEM Download PDF

Info

Publication number
BE882205A
BE882205A BE0/199780A BE199780A BE882205A BE 882205 A BE882205 A BE 882205A BE 0/199780 A BE0/199780 A BE 0/199780A BE 199780 A BE199780 A BE 199780A BE 882205 A BE882205 A BE 882205A
Authority
BE
Belgium
Prior art keywords
inspection chamber
end piece
seal
emi
installation according
Prior art date
Application number
BE0/199780A
Other languages
French (fr)
Original Assignee
Reed Internat Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Reed Internat Ltd filed Critical Reed Internat Ltd
Publication of BE882205A publication Critical patent/BE882205A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/024Manhole shafts or other inspection chambers; Snow-filling openings; accessories made of plastic material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/124Shaft entirely made of synthetic material
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/021Connection of sewer pipes to manhole shaft

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Gasket Seals (AREA)

Description

       

  "Chambre d'inspection pour installation de drainage"

  
Priorité de deux demandes de brevet déposées en Grande-Bretagne,

  
 <EMI ID=1.1> 

  
N[deg.] 7915727. 

  
La présente invention concerne une chambre d'inspection préfabriquée, pour l'usage dans une installation de drainage ou un système d'égout, cette chambre comportant un trou d'homme et-une base pourvue d'au moins un canal s'étendant entre une ouverture d'entrée et une ouverture de sortie.

  
Normalement, une telle chambre comporte un canal principal s'étendant en travers de la base, entre une ouverture d'entrée principale et une ouverture d'écoulement principale, et une série de canaux auxiliaires traversant la:_base pour relier respectivement une ouverture d'entrée au canal principal.

  
Le but de la présente invention est de réaliser un perfectionnement destiné à connecter les tuyaux d'arrivée et d'écoulement à la chambre d'inspection.

  
Selon la présente invention, la chambre d'inspection préfabriquée susmentionnée est caractérisée en ce que la base est réalisée en un matériau synthétique et comprend une structure intégrale des parois latérales, des ouvertures circulaires ménagées dans ladite structure intégrale pour constituer lesdits orifices d'entrée et de sortie, en ce que des embouts séparés, agencés pour s'adapter sur les tuyaux d'entrée et de sortie, sont disposés à chacune desdites ouvertures, et en ce que chacun desdits embouts

  
 <EMI ID=2.1> 

  
té le long de la surface extérieure d'un tuyau introduit dans l'embout, cet orifice d'étanchéité servant simultanément à assurer l'étanchéité de l'embout avec la surface intérieure de la chambre d'inspection.

  
Lesdits embouts peuvent être disposés dans des poches qui équipent la surface interne de ladite structure intégrale à parois latérales, chacun de ces embouts définissant, avec ladite surface interne, une gorge annulaire dans laquelle est logé un joint

  
 <EMI ID=3.1>   <EMI ID=4.1> 

  
également en contact avec les parois de ladite gorge, au moins lorsqu'un tuyau est introduit dans ledit embout, pour assurer effectivement l'étanchéité entre ledit embout et la chambre d'inspection. Grâce à cette réalisation, il n'est plus nécessaire de recourir à de la soudure liquide ou à tout autre moyen de scellement pour solidariser, de façon étanche, l'embout à la chambre d'inspection. 

  
Selon une variante, les ouvertures circulaires peuvent être définies par des portions cylindriques, lesdits embouts constituant

  
 <EMI ID=5.1> 

  
lindriques, et chacun desdits embouts étant pourvu d'un organe d'étanchéité qui se prolonge comme un rebord par-dessus l'extérieur de l'embout et assure son étanchéité avec la surface intérieure de la portion cylindrique, en s'étendant comme une joue annulaire dans l'embouchure de l'embout, afin de sceller, de façon étanche, un  tuyau engagé dans ledit embout.

  
 <EMI ID=6.1> 

  
description d'un exemple de réalisation et des dessins annexés, dans lesquels : 
- la figure 1 est une vue en plan d'une forme de réalisation d'une chambre d'inspection,
- la figure 2 est une vue de côté en élévation de l'extrémité <EMI ID=7.1> 
- la figure 3 est une vue en coupe selon la ligne A-A de la <EMI ID=8.1> 
- la figure 4 est une vue en coupe en élévation d'une forme de réalisation d'un embout qui diffère de celle des embouts des <EMI ID=9.1> 
- la figure 5 est une vue en perspective vue par en-dessous de la base d'une seconde forme de réalisation d'une chambre d'inspection,
- la figure 6 est une vue en plan de la chambre d'inspection correspondant à celle de la fige 59
- la figure 7 est une vue en coupe agrandie selon la ligne B-B de la fige 6; et
- la figure 8 est une vue en, perspective partiellement coupée <EMI ID=10.1> 

  
position sur l'une des ouvertures, et un volet d'obturation adapté sur l'extrémité intérieure de l'orifice fermé.

  
En référence aux fig. 1 à 3 des dessins, la chambre d'inspection comporte un corps principal 1 réalisé par moulage d'un matériau synthétique renforcé par des fibres de verre. Les parois latérales du corps 1 ont une section transversale circulaire légèrement conique vers l'intérieur, l'angle de conicité étant de trois degrés depuis son bord supérieur 2 vers sa base 3. La base 3 comporte un canal de drainage principal 4 (fig. 1) qui la traverse, et qui présente une pente appropriée entre l'ouverture d'entrée 5 et l'orifice d'évacuation 6. La base comporte également quatre canaux auxiliaires 7 qui raccordent, sous une pente appropriée, le canal

  
 <EMI ID=11.1> 

  
Les ouvertures d'entrée 5 et 8 et l'orifice d'évacuation 6 sont formés dans les côtés extérieurs de poches 9 (fige 2), qui sont réalisés au cours du moulage du corps principal 1. Les parois intérieures des poches 9 s'ouvrent respectivement dans les canaux 4 et 7. Les poches 9 sont ouvertes vers le haut et chacune loge un embout identique 10, qui est introduit depuis le haut de chaque poche et qui s'adapte de façon étanche à cette poche. L'embout 10 est dimentionné de telle manière que lorsque l'extrémité mâle 11

  
 <EMI ID=12.1>  interne arrive à fleur de la surface du canal associé.

  
En se référant plus particulièrement à la fig. 3, l'embout 10 est constitué par deux parties encastrables 12 et 13. La partie 12 comporte "ne ouverture circulaire, dont la périphérie 14 est à fleur avec la surface du canal associé à un manchon 15 de diamètre supérieur à celui de l'ouverture circulaire, pour permettre l'introduction par poussées d'un tronçon 16 d'une partie 13. Un épaulement 17, disposé entre la périphérie 14 du manchon 15 de la partie
12, constitue une butée limitant le déplacement vers l'intérieur de l'extrémité mâle 11. La partie 12 de l'embout 10 se prolonge vers le haut, pour constituer un épaulement incliné 18 aligné avec les épaulements inclinés 19 (fig. 2) formés dans le corps principal 1 entre les poches 9, afin d'éviter des crevasses à l'intérieur desquelles des matériaux solides pourraient être accumulés.

   La partie 12 de la poche 9 est renforcée par des nervures 20 qui relient le manchon 15 et l'épaulement 18.

  
A l'extrémité extérieure de son tronçon 16, la partie 13 de l'embout 10 se décale radialement vers l'extérieur, pour constituer un épaulement 21 s'étendant axialement sous la forme d'un secteur annulaire 22 disposé à son extrémité extérieure. Le bord extérieur
23 du secteur annulaire 22 est profilé de telle manière que lorsque l'embout est logé dans la poche 9, le bord extérieur 23 s'adapte

  
 <EMI ID=13.1> 

  
tronçons 15 et 16 des parties 12 et 13 de le embout comportent un verrouillage par clef et fente, tel qu'ils ne puissent être ajustés que dans une seule orientation et ne puissent tourner relativement l'un par rapport à l'autre, afin d'assurer un ajustage correct du bord 23 contre la surface intérieure de la poche 9.

  
Comme le montrent les figures, l'épaulement 21 de la surface intérieure du tronçon annulaire 22 et la surface intérieure de la poche 9 définissent une gorge annulaire, dans laquelle est logé un joint annulaire 24 destiné à assurer l'étanchéité avec l'extrémité mâle 11. Le joint annulaire 24 est suffisamment encastré dans cette gorge pour se déformer, au moins lorsque l'extrémité mâle 11 est introduite dans l'embout 10, cette déformation entraînent l'étanchéité avec les parois de la gorge, ce qui a pour conséquence un scellement étanche de l'embout 10 avec la surface intérieure du corps principal 1.

  
La figure 4 représente une forme différente de l'embout 25 destiné à être introduit dans les poches 9 d'une façon exactement identique à la mise en place des embouts 10, dont ils conservent la <EMI ID=14.1> 

  
qu'il est réalisé d'une pièce en un matériau synthétique par moulage. Un joint annulaire 26, destiné à assurer l'étanchéité du raccordement avec l'extrémité mâle d'un tuyau, est logé en position à l'extrémité extérieure de l'embout 25. L'extrémité extérieure de l'embout 26 comporte un seuil 27 et le joint annulaire 26 est logé dans la partie en retrait. Le joint annulaire 26 est positionné par une languette 28 formée d'une pièce avec l'embout 25, et qui s'engage dans une gorge périphérique ménagée dans le joint annu-

  
 <EMI ID=15.1> 

  
pas déformé et légèrement proéminent par rapport à l'extrémité extérieure de l'embout 25, de sorte que lorsque l'embout 25 est engagé dans la poche 9, le joint annulaire 26 forme un contact étanehe avec .la surface intérieure du corps principal 1 de la chambre d'inspection, opérant de façon similaire au joint annulaire .

  
Les fige 5 à 8 illustrent plus .particulièrement une chambre  d'inspection comportant une section de base qui comprend une base et des parois latérales, le tout réalisé d'une pièce par moulage

  
de matière synthétique.

  
Pour constituer la chambre d'inspection dans toute sa hauteur, des sections de parois latérales sont montées les unes sur les autres par-dessus la section de base. La section de base est circulaire, vue en plan, et comporte un rebord supérieur 31 solidaire d'une jupe 32. Le fond 33 de la base s'étend à partir de la partie inférieure du bord 31. à l'intérieur de la jupe 32. Le fond 33 comprend un canal de drainage principal 34 qui le traverse de part en part, entre une ouverture d'entrée principale 35 et une ouverture

  
 <EMI ID=16.1> 

  
pour que le canal ait une chute appropriée. Il comporte également quatre canaux auxiliaires 37 qui relient, sous une pente appropriée, le canal principal 34 à quatre ouvertures d'entrée 38.

  
Les ouvertures d'entrée 35 et 38 et l'orifice d'évacuation 36 sont constitués pendant l'opération de moulage, et comportent des tronçons cylindriques 39 agencés pour loger des embouts 40 réalisés séparément, qui sont également fabriqués en matière synthétique par une technique de moulage par injection. Les embouts 40 sont fixés par encliquetage dans les tronçons cylindriques 39. Pour réaliser cet encliquetage, la surface intérieure de chaque tronçon cylindrique 39 comporte, à son extrémité intérieure, une rampe annulaire 41 qui se termine par un épaulement: 42 défini par un côté d'une gorge
43, constituée à l'extrémité intérieure du tronçon cylindrique 39, et l'embout 40 comporte un flasque extérieur 44.

   De ce fait, lorsque l'embout 40 est poussé dans le tronçon cylindrique 39, il subit une déformation élastique lorsque le flasque se déplace le long de la rampe 41, jusqu'à ce qu'il s'emboîte derrière l'épaulement 42, comme le montre plus particulièrement la fige 7. 

  
L'extrémité extérieure, c'est-à-dire l'embouchure de l'embout
40, est fixée au moyen d'un organe d&#65533;étanchéité 45 en caoutchouc.  L'organe d'étanchéité 45 comporte.un rebord 46 qui se rabat autour  de l'extrémité extérieure de l'embout 40 et bute contre le flasque extérieur 47 de cet embout. Le rebord 46 de l'organe d'étanchéité
45 comporte également une section plus épaisse 48, logée dans une  gorge annulaire peu profonde 49 ménagée autour de la périphérie de  l'embout 40. Cette supépaisseur du rebord 46 est telle qu'elle se  trouve en état de compression, lorsque l'embout 40 est poussé dans le tronçon cylindrique 39 , de sorte que cet embout 40 soit scellé de façon étanche à l'intérieur de ladite portion cylindrique.

   L'organe d'étanchéité 45 s'étend du rebord 46 par-dessus un nez arrondi 50 de l'embouchure de l'embout 40, jusqu'à la jupe 53 qui s'étend dans l'embouchure de l'embout 40, pour se terminer par un bourrelet 51 disposé à son extrémité libre. Lorsque l'extrémité mâle d'un. tuyau (non représentée) est poussée dans l'embout jusqu'à l'épaulement intérieur 52, de sorte que sa surface intérieure soit alignée avec le canal de drainage correspondant, l'extrémité mâle est raccordée de façon étanche dans l'embout, à l'aide de l'organe d'étanchéité 45.

  
Lorsque seules quelques-unes des ouvertures 8 sont utilisées pour le raccordement de tuyaux, les autres ouvertures sont obturées par des obturateurs 54 tels que représentés par la fig. 8. Toutefois, pour-éviter l'accumulation de débrits dans les canaux non utilisés, des radiers ou déflecteurs 55 peuvent être placés pardessus les extrémités intérieures des embouts dans les gorges 43, comme le montre la fig. 8.

  
Bien que la base de la chambre d'inspection soit représentée avec un petit rebord 1, ce rebord pourrait être remplacé par une paroi s'étendant sur toute la longueur de la chambre d'inspection pour installation de drainage.

REVENDICATIONS.

  
1) Chambre d'inspection pour installation de drainage, du

  
type comprenant un trou d'homme et une base comportant au moins un canal compris entre un orifice d'entrée et un orifice de sortie, caractérisée en ce que la base est réalisée en un matériau synthétique et comprend une structure intégrale de parois latérales, des ouvertures circulaires ménagées dans ladite structure intégrale pour constituer lesdits orifices d'entrée et de sortie, en ce que des embouts séparés, agencés pour s'adapter sur les tuyaux d'entrée et de sortie, sont disposés à chacune desdites ouvertures, et en ce que chacun desdits embouts comprend un organe d'étanchéité élastique pour assurer l'étanchéité le long de la surface extérieure d'un tuyau introduit dans l'embout, cet orifice d'étanchéité servant simultanément à assurer l'étanchéité de l'embout avec la surface intérieure de la chambre d'inspection.

  
2) Chambre d'inspection pour installation de drainage selon la



  "Inspection chamber for drainage installation"

  
Priority of two patent applications filed in Great Britain,

  
 <EMI ID = 1.1>

  
N [deg.] 7915727.

  
The present invention relates to a prefabricated inspection chamber, for use in a drainage installation or a sewer system, this chamber comprising a manhole and a base provided with at least one channel extending between an inlet opening and an outlet opening.

  
Normally, such a chamber comprises a main channel extending across the base, between a main inlet opening and a main flow opening, and a series of auxiliary channels crossing the: _base to connect respectively an opening of entry to the main channel.

  
The object of the present invention is to provide an improvement intended to connect the inlet and outlet pipes to the inspection chamber.

  
According to the present invention, the aforementioned prefabricated inspection chamber is characterized in that the base is made of a synthetic material and comprises an integral structure of the side walls, circular openings formed in said integral structure to constitute said inlet orifices and outlet, in that separate end pieces, arranged to fit on the inlet and outlet pipes, are arranged at each of said openings, and in that each of said end pieces

  
 <EMI ID = 2.1>

  
tee along the outside surface of a pipe inserted into the end piece, this sealing orifice simultaneously serving to seal the end piece with the inside surface of the inspection chamber.

  
Said end fittings can be arranged in pockets which equip the internal surface of said integral structure with side walls, each of these end fittings defining, with said internal surface, an annular groove in which a seal is housed

  
 <EMI ID = 3.1> <EMI ID = 4.1>

  
also in contact with the walls of said groove, at least when a pipe is introduced into said tip, to effectively ensure the seal between said tip and the inspection chamber. Thanks to this embodiment, it is no longer necessary to resort to liquid solder or any other sealing means to secure, in a sealed manner, the nozzle to the inspection chamber.

  
Alternatively, the circular openings may be defined by cylindrical portions, said end pieces constituting

  
 <EMI ID = 5.1>

  
lindric, and each of said end pieces being provided with a sealing member which extends like a rim over the outside of the end piece and seals it with the inner surface of the cylindrical portion, extending as a annular cheek in the mouth of the nozzle, in order to seal, in a leaktight manner, a pipe engaged in said nozzle.

  
 <EMI ID = 6.1>

  
description of an exemplary embodiment and the attached drawings, in which:
FIG. 1 is a plan view of an embodiment of an inspection chamber,
- Figure 2 is a side elevation view of the end <EMI ID = 7.1>
- Figure 3 is a sectional view along line A-A of the <EMI ID = 8.1>
- Figure 4 is a sectional elevational view of an embodiment of a tip which differs from that of the tips of <EMI ID = 9.1>
FIG. 5 is a perspective view seen from below of the base of a second embodiment of an inspection chamber,
- Figure 6 is a plan view of the inspection chamber corresponding to that of the freeze 59
- Figure 7 is an enlarged sectional view along line B-B of fig 6; and
- Figure 8 is a partially cut perspective view, <EMI ID = 10.1>

  
position on one of the openings, and a shutter adapted on the inner end of the closed orifice.

  
With reference to fig. 1 to 3 of the drawings, the inspection chamber comprises a main body 1 produced by molding a synthetic material reinforced with glass fibers. The side walls of the body 1 have a circular cross section slightly conical towards the inside, the angle of conicity being three degrees from its upper edge 2 towards its base 3. The base 3 comprises a main drainage channel 4 (fig. 1) which passes through it, and which has an appropriate slope between the inlet opening 5 and the discharge orifice 6. The base also includes four auxiliary channels 7 which connect, under an appropriate slope, the channel

  
 <EMI ID = 11.1>

  
The inlet openings 5 and 8 and the discharge orifice 6 are formed in the outer sides of pockets 9 (FIG. 2), which are produced during the molding of the main body 1. The interior walls of the pockets 9 are open respectively in channels 4 and 7. The pockets 9 are open upwards and each houses an identical end piece 10, which is introduced from the top of each pocket and which adapts tightly to this pocket. The end piece 10 is dimensioned in such a way that when the male end 11

  
 <EMI ID = 12.1> internal arrives flush with the surface of the associated canal.

  
With particular reference to FIG. 3, the end piece 10 is constituted by two built-in parts 12 and 13. The part 12 comprises a circular opening, the periphery of which is flush with the surface of the channel associated with a sleeve 15 of diameter greater than that of the circular opening, to allow the introduction by pushes of a section 16 of a part 13. A shoulder 17, disposed between the periphery 14 of the sleeve 15 of the part
12, constitutes a stop limiting the movement towards the inside of the male end 11. The part 12 of the end piece 10 extends upwards, to form an inclined shoulder 18 aligned with the inclined shoulders 19 (fig. 2) formed in the main body 1 between the pockets 9, in order to avoid crevices inside which solid materials could be accumulated.

   The part 12 of the pocket 9 is reinforced by ribs 20 which connect the sleeve 15 and the shoulder 18.

  
At the outer end of its section 16, the part 13 of the endpiece 10 shifts radially outward, to form a shoulder 21 extending axially in the form of an annular sector 22 disposed at its outer end. The outer edge
23 of the annular sector 22 is profiled so that when the tip is housed in the pocket 9, the outer edge 23 fits

  
 <EMI ID = 13.1>

  
sections 15 and 16 of the parts 12 and 13 of the endpiece include a key and slot locking, such that they can only be adjusted in one orientation and cannot rotate relatively with respect to each other, in order to '' ensure correct adjustment of the edge 23 against the inner surface of the pocket 9.

  
As shown in the figures, the shoulder 21 of the inner surface of the annular section 22 and the inner surface of the pocket 9 define an annular groove, in which is housed an annular seal 24 intended to seal with the male end 11. The annular seal 24 is sufficiently embedded in this groove to deform, at least when the male end 11 is introduced into the end piece 10, this deformation cause sealing with the walls of the groove, which has the consequence a tight seal of the end piece 10 with the inner surface of the main body 1.

  
FIG. 4 represents a different shape of the end piece 25 intended to be introduced into the pockets 9 in an exactly identical way to the positioning of the end pieces 10, of which they retain the <EMI ID = 14.1>

  
it is made in one piece from a synthetic material by molding. An annular seal 26, intended to seal the connection with the male end of a pipe, is housed in position at the outside end of the end piece 25. The outside end of the end piece 26 has a threshold 27 and the annular seal 26 is housed in the recessed portion. The annular seal 26 is positioned by a tongue 28 formed in one piece with the end piece 25, and which engages in a peripheral groove formed in the annular seal.

  
 <EMI ID = 15.1>

  
not deformed and slightly protruding with respect to the outer end of the end-piece 25, so that when the end-piece 25 is engaged in the pocket 9, the annular seal 26 forms etane contact with the internal surface of the main body 1 of the inspection chamber, operating similarly to the annular seal.

  
FIGS. 5 to 8 illustrate more particularly a inspection chamber comprising a base section which comprises a base and side walls, the whole produced in one piece by molding.

  
synthetic material.

  
To form the entire inspection chamber, side wall sections are mounted on top of each other over the base section. The base section is circular, seen in plan, and has an upper rim 31 secured to a skirt 32. The bottom 33 of the base extends from the lower part of the edge 31. inside the skirt 32. The bottom 33 includes a main drainage channel 34 which passes right through it, between a main entrance opening 35 and an opening

  
 <EMI ID = 16.1>

  
so that the channel has an appropriate drop. It also comprises four auxiliary channels 37 which connect, under an appropriate slope, the main channel 34 to four inlet openings 38.

  
The inlet openings 35 and 38 and the discharge orifice 36 are formed during the molding operation, and comprise cylindrical sections 39 arranged to accommodate end pieces 40 produced separately, which are also made of synthetic material by a technique injection molding. The end pieces 40 are fixed by snap-fastening in the cylindrical sections 39. To achieve this snap-fastening, the internal surface of each cylindrical section 39 comprises, at its internal end, an annular ramp 41 which ends in a shoulder: 42 defined by a side d 'a throat
43, formed at the inner end of the cylindrical section 39, and the end piece 40 includes an outer flange 44.

   Therefore, when the end piece 40 is pushed into the cylindrical section 39, it undergoes an elastic deformation when the flange moves along the ramp 41, until it fits behind the shoulder 42, as shown more particularly in fig. 7.

  
The outer end, i.e. the mouth of the nozzle
40, is fixed by means of a rubber sealing member 45. The sealing member 45 comprises a rim 46 which folds around the outer end of the end piece 40 and abuts against the outer flange 47 of this end piece. The rim 46 of the sealing member
45 also has a thicker section 48, housed in a shallow annular groove 49 formed around the periphery of the end piece 40. This thickness of the rim 46 is such that it is in the state of compression when the end piece 40 is pushed into the cylindrical section 39, so that this end piece 40 is sealed in a sealed manner inside said cylindrical portion.

   The sealing member 45 extends from the rim 46 over a rounded nose 50 of the mouth of the end piece 40, up to the skirt 53 which extends in the mouth of the end piece 40, to end with a bead 51 disposed at its free end. When the male end of a. pipe (not shown) is pushed into the end piece up to the internal shoulder 52, so that its internal surface is aligned with the corresponding drainage channel, the male end is tightly connected in the end piece, using the sealing member 45.

  
When only some of the openings 8 are used for the connection of pipes, the other openings are closed by shutters 54 as shown in FIG. 8. However, to avoid the accumulation of debris in the unused channels, rafts or deflectors 55 can be placed over the inner ends of the end pieces in the grooves 43, as shown in FIG. 8.

  
Although the base of the inspection chamber is shown with a small flange 1, this flange could be replaced by a wall extending over the entire length of the inspection chamber for drainage installation.

CLAIMS.

  
1) Inspection chamber for drainage installation,

  
type comprising a manhole and a base comprising at least one channel between an inlet and an outlet, characterized in that the base is made of a synthetic material and comprises an integral structure of side walls, circular openings formed in said integral structure to constitute said inlet and outlet orifices, in that separate end pieces, arranged to fit on the inlet and outlet pipes, are arranged at each of said openings, and in that that each of said end pieces comprises an elastic sealing member for sealing along the outer surface of a pipe introduced into the end piece, this sealing orifice simultaneously serving to seal the end piece with the inner surface of the inspection chamber.

  
2) Inspection chamber for drainage installation according to


    

Claims (1)

revendication 1, caractérisée en ce que lesdits embouts sont logés dans des poches prévues sur la surface extérieure de la structure de paroi, chacun de ces embouts définissant, avec ladite surface intérieure, une gorge annulaire pour loger un joint annulaire constituant ledit organe d'étanchéité, ledit joint annulaire étant. en contact avec les côtés de ladite gorge, au moins lorsqu'un tuyau est introduit dans l'embout, de façon à assurer effectivement l'étanchéité entre l'embout et la chambre d'inspection. <EMI ID=17.1> claim 1, characterized in that said end pieces are housed in pockets provided on the exterior surface of the wall structure, each of these end pieces defining, with said interior surface, an annular groove for housing an annular seal constituting said sealing member , said annular seal being. in contact with the sides of said groove, at least when a pipe is introduced into the end piece, so as to effectively ensure the seal between the end piece and the inspection chamber. <EMI ID = 17.1> revendication 2, caractérisée en ce que les poches sont ouvertes vers le haut et en ce que les embouts sont introduits par le haut de ces poches. claim 2, characterized in that the pockets are open upwards and in that the end pieces are introduced from the top of these pockets. 4) Chambre d'inspection pour installation de drainage selon la revendication 1, caractérisée en ce que lesdites ouvertures circulaires sont définies par des portions cylindriques, lesdits 4) Inspection chamber for drainage installation according to claim 1, characterized in that said circular openings are defined by cylindrical portions, said <EMI ID=18.1> <EMI ID = 18.1> <EMI ID=19.1> <EMI ID = 19.1> lindrique et se prolongeant comme une joue annulaire dans l'embouchure de l'embout, pour assurer l'étanchéité avec un tuyau engagé dans ledit embout. lindric and extending like an annular cheek in the mouth of the nozzle, to seal with a pipe engaged in said nozzle. 5) Chambre d'inspection pour installation de drainage selon la revendication 4, caractérisée en ce que la fixation par encliquetage est réalisée à une extrémité de l'embout et en ce que l'organe d'étanchéité est disposé à l'autre extrémité. 5) Inspection chamber for drainage installation according to claim 4, characterized in that the snap-fastening is carried out at one end of the nozzle and in that the sealing member is arranged at the other end. 6) Chambre d'inspection pour installation de drainage selon la revendication 4 ou 5, caractérisée en ce que la fixation par encliquetage est constituée par une rampe chevauchée par un flasque de l'embout, pour forcer l'embout en raison de sa propre élasticité, vers une position dans laquelle le flasque se rabat derrière un épaulement disposé à l'extrémité de la rampe. 6) Inspection chamber for drainage installation according to claim 4 or 5, characterized in that the snap-fastening consists of a ramp overlapped by a flange of the end piece, to force the end piece due to its own elasticity , towards a position in which the flange folds behind a shoulder disposed at the end of the ramp. 7) Chambre d'inspection pour installation de drainage selon l'une quelconque des revendications 4 à 6, caractérisée en ce que l'un des embouts est fermé par un tampon qui s'adapte comme un tuyau dans ledit embout, l'étanchéité étant assurée par ladite joue de l'organe d'étanchéité, et en ce qu'un radier est ajusté pardessus la surface intérieure de l'embout fermé et s'incline à partir des extrémités dudit embout fermé; pour éviter l'accumulation de débris dans le canal correspondant à l'embout fermé. 7) Inspection chamber for drainage installation according to any one of claims 4 to 6, characterized in that one of the end pieces is closed by a buffer which fits like a pipe in said end piece, the seal being provided by said cheek of the sealing member, and in that a raft is adjusted over the inner surface of the closed end piece and tilts from the ends of said closed end piece; to avoid the accumulation of debris in the channel corresponding to the closed nozzle. 8) Chambre d'inspection pour installation de drainage selon la revendication 7, caractérisée en ce que le radier est disposé, à son extrémité supérieure, dans des gorges ménagées dans la chambre d'inspection. 8) Inspection chamber for drainage installation according to claim 7, characterized in that the slab is disposed, at its upper end, in grooves formed in the inspection chamber.
BE0/199780A 1979-03-13 1980-03-13 INSPECTION CHAMBER FOR DRAINAGE SYSTEM BE882205A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB7908782 1979-03-13

Publications (1)

Publication Number Publication Date
BE882205A true BE882205A (en) 1980-07-01

Family

ID=10503835

Family Applications (1)

Application Number Title Priority Date Filing Date
BE0/199780A BE882205A (en) 1979-03-13 1980-03-13 INSPECTION CHAMBER FOR DRAINAGE SYSTEM

Country Status (3)

Country Link
BE (1) BE882205A (en)
MT (1) MTP866B (en)
ZA (1) ZA801221B (en)

Also Published As

Publication number Publication date
ZA801221B (en) 1981-03-25
MTP866B (en) 1984-02-13

Similar Documents

Publication Publication Date Title
EP0499561B1 (en) A multi-piece collar, installation procedure and sealing element for same
FR2891886A1 (en) CLAMP CONTROL DEVICE AND ADMISSION MANIFOLD COMPRISING AT LEAST ONE SUCH DEVICE
EP2882487B1 (en) Connector for medical use
LU84542A1 (en) SEALED CONTAINER CLOSURE
EP1273843A1 (en) Reusable coupling for connecting the ends of a reinforced hose
EP0444982A1 (en) Product dispensing assembly in which the product to be dispensed is contained within a flexible pouch
FR2509343A1 (en) Sewer system inspection point - comprises semi-rigid plastics element which secure together to form sealed chamber
EP0856117B1 (en) Modular sleeve for protecting, repairing or renovating a pipe
BE1008296A6 (en) Way valve disc.
CA2186396C (en) Packaging and distribution means
EP0499754B1 (en) Closure for securely fixing an electrical cable to an opening and protective cable sleeve comprising such closures
WO2005035336A1 (en) Closure for the hollow part of a motor vehicle
EP2432707A1 (en) Anti-drip cap with an elastically returned mobile cover
EP0913616B1 (en) Ball coupling for sealingly connecting two pipe sections
WO2017051127A1 (en) Valve for an end piece having a shut-off means
BE882205A (en) INSPECTION CHAMBER FOR DRAINAGE SYSTEM
EP1360436A1 (en) Seal for assembling fluid-circuit tubular elements
EP0373989A1 (en) Cap closure for a container provided with pivoting means for dispensing the contents of this container
FR2905159A1 (en) Valve controlling device for vehicle`s internal combustion engine, has annular support body with functional segments of bushing, which are situated with respect to contour of projection plane of passage in fluid flow direction
BE1018968A3 (en) ASSEMBLY OF A COVER AND A CONNECTING MEMBER TO BE PART OF A FLUID GUN.
FR2653654A1 (en) ROTATING CONNECTION HOUSING FOR VACUUM CLEANER.
EP1553229A1 (en) Manhole and water tight seal therefor
FR2554538A1 (en) Sealing joint for the connection of a tubular element to a pipe of larger diameter.
FR2488369A3 (en) One piece U=bend for pipe - has partition extending towards bottom of curved section and removable access caps
FR2756580A3 (en) Tubular connector between lavatory pan and wall socket

Legal Events

Date Code Title Description
CH Change of patent owner

Owner name: *CARADON TERRAIN LTD

Effective date: 19880531

RE Patent lapsed

Owner name: CARADON TERRAIN LTD

Effective date: 19910331