- Publication number
- BE826630R BE826630R BE154284A BE154284A BE826630R BE 826630 R BE826630 R BE 826630R BE 154284 A BE154284 A BE 154284A BE 154284 A BE154284 A BE 154284A BE 826630 R BE826630 R BE 826630R
- Authority
- BE
- Belgium
- Prior art keywords
- emi
- traffic
- zone
- intersection
- roads
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/02—Crossings, junctions or interconnections between roads on the same level
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Traffic Control Systems (AREA)
- Shielding Devices Or Components To Electric Or Magnetic Fields (AREA)
- Instructional Devices (AREA)
Description
" Verkeerskneoppunt ".
<EMI ID=1.1>
I) Het verkeersknooppunt voorgesteld door figuur I van mijn vorig verbeteringsootrooi nr.788.853 beter te besohrijven daar in de tekeningen reeds alles aangetoond werd.
2) Conolusies I,2,3 en 4 van mijn uitvindingsootrooi ( ook herhaald in vorig verbeteringsoctrooi ) te vervangen door de hierbijgevoegde-verbeterde oonolusies I en 2 � 3.
<EMI ID=2.1>
van mijn verbeteringsoctrooi 788.853 vergeten werden aan te duiden op bijgevoegde verbeterde figuur 3 .
<EMI ID=3.1>
vierkant) waar aan elke hoek eenriohtingswegen uitmonden. (Het
<EMI ID=4.1>
gedeelten waar het verkeer in de riohting van het plein rijdt in twee zones 50 en 51 , klaar afgescheiden van elkaar. Die soheiding loopt voort door op het plein in de riohting van het verkeer .
Zone 51 is bestemd voor het verkeer dat op het kruispunt niet van richting verandert en strekt zioh uit langs de buitenste rand van het plein. Zone 50 is bestemd voor het verkeer dat op het kruispunt naar links gaat en ligt diohtst bij de middenzone 2 langsheen een zijde 54 van die vierhoekige middenzone 2 om aan het einde van die zijde in de richting van het verkeer zich in een booht 53 te verwijderen van de middenzone 2 en over te lopen op
<EMI ID=5.1>
Wij nemen bijvoorbeeld zone 50 van de weg 5 die op die wijze met een booht 53 overgaat op zone 51 van weg 6.
Dezelfde redenering is vanzelfsprekend ook van toepassing voor
<EMI ID=6.1>
Het verkeer gesohiedt zoals in de beschrijving van vorig
<EMI ID=7.1>
We stellen hier nogmaals dia 2 phazen schematisch voor:
Figuur I stelt de Iste phase voor en figuur 2 is dezelfde als figuur I maar stelt de 2de phase voor.
<EMI ID=8.1>
<EMI ID=9.1>
Dit verkeersknooppunt voorgesteld door figuur I en fig. is nieuw en zeer doelmatig door het samenspel van de volgende
<EMI ID=10.1>
goede bochten te bekomen.
<EMI ID=11.1>
plein voor de richtingen links en reohtdoor.
3) De driehoekige soheidingszones (35 a,b,o,en
die per 2 asymmetrisch (versohoven) tegenove elkaar liggen om de richtingen links en reohtdoor ideaal te leggen.
4) Vermeerderd en dikwijls meer dan verdubbeld
<EMI ID=12.1>
5) De speoiale inriohting en werking van de 8 (
signaallichten (de andere signaalliohten nas reohts zijn niet altijd noodzakelijk bij mir drukke wegen )
"Traffic junction point".
<EMI ID = 1.1>
I) To better describe the traffic junction represented by figure I of my previous improvement plot No. 788.853 as everything has already been shown in the drawings.
2) Replace Conolusions I, 2, 3, and 4 of my inventive patent (also repeated in previous improvement patent) with the attached enhanced annulus I and 2 � 3.
<EMI ID = 2.1>
of my improvement patent 788,853 were forgotten to indicate the enclosed improved figure 3.
<EMI ID = 3.1>
square) where at each corner exit roads end. (It
<EMI ID = 4.1>
sections where traffic in the riohting of the square runs in two zones 50 and 51, clearly separated from each other. This freedom continues on the square in the direction of traffic.
Zone 51 is intended for traffic that does not change direction at the intersection and extends along the outer edge of the square. Zone 50 is intended for traffic going to the left at the intersection and is located closest to the central zone 2 along a side 54 of that quadrangular central zone 2 in order to move away in a curve 53 at the end of that side in the direction of traffic. from the middle zone 2 and to walk on
<EMI ID = 5.1>
For example, we take zone 50 of road 5, which thus changes with a curve 53 to zone 51 of road 6.
The same reasoning obviously applies to
<EMI ID = 6.1>
The traffic is as described in previous description
<EMI ID = 7.1>
Here we again present slide 2 phases schematically:
Figure I represents the 1st phase and Figure 2 is the same as Figure I but represents the 2nd phase.
<EMI ID = 8.1>
<EMI ID = 9.1>
This traffic junction represented by figure 1 and figure is new and very efficient due to the interplay of the following
<EMI ID = 10.1>
obtain good turns.
<EMI ID = 11.1>
square for directions left and straight through.
3) The triangular smoothing zones (35 a, b, o, and
which lie opposite each other asymmetrically (versohoven) to make the directions ideal to the left and right through.
4) Increased and often more than doubled
<EMI ID = 12.1>
5) The special device and operation of the 8 (
signal lights (the other signal lights next to right are not always necessary on very busy roads)
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE154284A BE826630R (en) | 1975-03-13 | 1975-03-13 | TRAFFIC Node |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE154284A BE826630R (en) | 1975-03-13 | 1975-03-13 | TRAFFIC Node |
BE826630 | 1975-03-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
BE826630R true BE826630R (en) | 1975-06-30 |
Family
ID=25648451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BE154284A BE826630R (en) | 1975-03-13 | 1975-03-13 | TRAFFIC Node |
Country Status (1)
Country | Link |
---|---|
BE (1) | BE826630R (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011150740A1 (en) * | 2010-06-02 | 2011-12-08 | Xiong Jianping | Non-interfering urban road traffic network facility |
CN104294724A (en) * | 2014-11-04 | 2015-01-21 | 吴小平 | Designing scheme for loop intersections with primary and secondary phase positions |
-
1975
- 1975-03-13 BE BE154284A patent/BE826630R/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011150740A1 (en) * | 2010-06-02 | 2011-12-08 | Xiong Jianping | Non-interfering urban road traffic network facility |
CN104294724A (en) * | 2014-11-04 | 2015-01-21 | 吴小平 | Designing scheme for loop intersections with primary and secondary phase positions |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Newell | A moving bottleneck | |
DE69101256D1 (en) | Primary flight display for displaying proposed decision information provided by a traffic warning and anti-coalition system. | |
Coifman et al. | Estimating median velocity instead of mean velocity at single loop detectors | |
OA02174A (en) | Oil recovery from tar sands. | |
CN106683450A (en) | Recognition method for key paths of urban signal control intersection groups | |
BE826630R (en) | TRAFFIC Node | |
FR1450923A (en) | Traffic sign post for roads | |
FR1432696A (en) | Tracking system on a moving web | |
Nagatani et al. | Tour time in a two-route traffic system controlled by signals | |
CN101024933B (en) | Simple fly-over T-shape crossing | |
Ferrari | The instability of motorway traffic | |
Nagatani | Effect of bypasses on vehicular traffic through a series of signals | |
FR2640654B1 (en) | DEVICE FOR SIGNALING A PARTICULAR POINT OR BARRIING A PASSAGE TO ROAD USERS | |
CN205636387U (en) | Three branch road systems of no traffic lights | |
US3380396A (en) | Vehicle conveying means | |
GB1408816A (en) | Guide device for the direction and protection of traffic | |
NL7500800A (en) | GUARDRAIL CONSTRUCTION ALONG A ROAD. | |
Piatkowski | Safe, efficient self‐driving cars could block walkable, livable communities | |
FR2660170B1 (en) | VERSATILE LUGGAGE WITH VARIABLE CAPACITY. | |
BE754762A (en) | DEVICE FOR LAUNCHING A ROPE OR A WIRE THROUGH AT LEAST ONE TUBULAR ELEMENT, | |
Vuchic | Pedestrian crossing time in determining widths of signalized traffic arterials | |
SU510957A1 (en) | Method of coordination control of traffic streams | |
Filip et al. | Traffic Optimization in Urban Area-Roundabout Versus Lights Case Studies | |
EP0886251A2 (en) | Running light system | |
FR1428042A (en) | Blockade control system for road traffic |