BE728673A - - Google Patents

Info

Publication number
BE728673A
BE728673A BE728673DA BE728673A BE 728673 A BE728673 A BE 728673A BE 728673D A BE728673D A BE 728673DA BE 728673 A BE728673 A BE 728673A
Authority
BE
Belgium
Prior art keywords
mass
supports
slab
plastic
desc
Prior art date
Application number
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE19681659617 external-priority patent/DE1659617A1/en
Application filed filed Critical
Publication of BE728673A publication Critical patent/BE728673A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • E04F15/20Separately-laid insulating layers; Other additional insulating measures; Floating floors for sound insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)
  • Building Environments (AREA)

Description

  

   <Desc/Clms Page number 1> 
 
 EMI1.1 
 



  "Procédé de rose de revêtements de sol" 
 EMI1.2 
 LtinVèTI1on est relative àun procédé de pose de revêtements de sol sur sous-eol à l'état brut. 



  Les Xv9tement8 de sol nécessitent pour leur place- ment un souz-zol lisse et de préférence sans join'ture, qui doit en outre être ho=àz;Jntal au former un angle bien déterminé avec un plan hodzù:nt.:l. A cette fin, la surface "'brute est générale- 1"t ..::-':::h',,? : j. a-;:- le placement du. revêtement, d'ine chape qui &I. ,a*n les inégalités mais supprime égale- ,:,eml eeri, 1:.J jv1:nt.'. Suivant les matériaux utilisés et leur 

 <Desc/Clms Page number 2> 

 consistance, la surface de la chape peut- dévier quelque peu de l'horizontalité de sorte qu'il est possible de donner une certaine inclinaison au revêtement à poser.

   Pour la confection des chapes, on utilise généralement un béton de grains fins, travaillé à   -un   glacé de ciment.   On   utilise également dans ce but de   l'argile,   du plâtre, du mortier, de l'asphalte et du bitume. Les   propriétés   acoustiques   d'un   sol ainsi   confectionné   sont considérablement améliorées lorsque la chape est psée sur une sous-couche souple telle, par exemple, des coussins en fibre de verre. On peut alors poser sur la chape un revête- ment de son choix en différents matériaux. le désavantage de cette méthode comme est qu'avant de pouvoir   continuer   le travail, la chape doit être complète- ment isolée et doit sécher.

   Il en résulta que le travail est interrompu pendant un certain laps de temps dans les locaux fraîchement chapéa des bâtiments, ce qui ralentit considérable- ment son achèvement. En outre, la confection d'une chape devant répondre à certains critères, notamment être parfaitement homogène, d'équerre et   plane,   nécessite beaucoup de soin et une main-d'oeuvre qualifiée, principalement en ce qui concerne la réalisation du mélange, afin d' éviter d'éventuels   écaillements   et fissures. En plus du fait qu'il n'est pas toujours possible de pouvoir compter sur ce soin et ce savoir faire, le travail est encore beaucoup plus   onéreux.   



   D'après le procédé de l'invention, on évite la con- fection d'une chape sur une aire brute destinée à recevoir un revêtement de sol, en répendant une matière fluide et plastique, lors du traitement, mais qui se fige cependant immédiatement après, au même niveau que des supports répartis sur l'aire. 



  Un hourdis est alors fixé aux supports et le revêtement est placé dessus. 



   D'après ce procédé, l'aire est laissée sous sa forme 

 <Desc/Clms Page number 3> 

 brute et un hourdis est monté à faible intervalle. Ce hourdis peut être constitué par les matériaux les plus divers. Il sert uniquement à supporter la couche de revêtement suivante, par exemple ls couche de revêtement à poser. La rigidité de ce hourdis dépend également de la répartition des supports sur le sol, étant   donne     qu'il   doit couvire la surface entre deux supporte. A   cette     @,   l'emploi de panneaux à particules, qui sont   proporti@@@@     @@ment   meilleurmarché et faciles à manipuler, est à toute épreuve.

   A leur piace, on peut également utiliser des plaques métalliques, par exemple des treillis, des plaques acoustiques ou d'autres, pour autant qu'elles répondent aux normes de rigidité exigées.   De   toute façon, pour éviter une charge concentrée en certains endroits, chaque plaque   du   hourdis est reliée aux autres et, dans la mesure du possible, elles sont posées par grandes   omîtes.   



   La fixation du hourdis peut être réalisée de deux façons différentes, soit en le plaçant.dans la masse plastique lors de la confection des supports, soit en   le:reliant   à des plaques   d'ancrage   incorporées dans la masse plastique elle- même. Ces plaques d'ancrage peuvent être de simples plaquée de bis entourées par les supporte, et venant   même   se poser sur le support. Pour la confection de ces supports, on utilise avantageusement une matière adhésive, de sorte qu'il augmente encore ainsi sa force de traction. Il est même possible de redresser un hourdis qui a reçu cette application en le fixant plus solidement au support. 



   Afin d'obtenir des supports   d'égal   niveau, on utilise le matériel de nivellement bien   comm.   Pratiquement on opère comme suit: deux lattes   à   niveller, de grandeur adéquate, parallèles et distancées l'une de l'autre sont érigées sur le hourdis. Sur ces lattes et les traverses, on place une plaquette de nivellement. Le support est alors formé en 

 <Desc/Clms Page number 4> 

   remplissant   les espaces vides entre   l'aire   et ladite plaquette de nivellement.

   Par l'action de cette plaquette le long des deux lattes, l'espace resté vide est pourvu de supports, et ce 
 EMI4.1 
 procédé est con-tinué ensuite lez espaces con<1&w, Lorsque ces supporta sont repartis sur Ilentièreté de l'aire, on peut, ces supporta   s'étant   entre temps figés, remplir les espaces restés vides par une couche   d'isolation   thermique et/ou acoustique, ou encore par du sable.   Etant   donné que l'isolation ou le sable par exemple peut   atteindre,   sans plus, la hauteur du support, il supporte également une partie du hourdis, de sorte qu'il est possible d'utiliser pour la confection du sous-sol des matériaux moins Bolides.

   Après avoir enlevé la partie de l'isolation s'élevant plus haut que les   supports,   on pose le hourdis qui est ensuite rattacha à ces supporta. Ceci peut se réaliser au moyen de clous, de via ou de coller par exemple pour les treillis, en les vissant par des crochets aux supports. Le hourdis ainsi 
 EMI4.2 
 placé est 1Emédlatennt utilisable et peut recevoir, sans perte de temps, le revêtement 8our...1 té. 



   Il est très avantageux de confectionner les supports en une matière synthétique   Moussante.   La Bottera est versée 
 EMI4.3 
 à rette darîn un godet cr'''' ch1'/lue CI13P,:)Oa."t peut xéas1r avec les eu t .. 1'.<'\ .'.."q,r1\.t1f) est "int'i que la chaleur de ré!l.c :1f', , se atre atteinte it que cette mati .% bouillonne de T8niére souhaitée. Cet4.,c ;;}<\t1ère moussante vl je projeter contre la plaquette de 3iveA ?nt en propulsant plaque d' j3crag, et s'ettnï sur 1;s étant. retecya :r8 le haut par la p1s.c;.uette ire nivelle#::=± ;n question, Unr po> -faite fusion est ainsi a-7** le *' '* domié que ce aouase ar't1!iciel1"t s'y fixe auas-1- ""'"'1. <!uavec la vL% IfA...'"1crp.ge. 



  A la place d" ce ro'3'tit syt' ; tique mou.8urt, m .K égale- ment utii1..r une ;aa;t:1re the. jpla9tique ;,'0. certaine température qui a 1*avantaît @*   figer 4es .- acù avao 

 <Desc/Clms Page number 5> 

 le sol ou tout autre conducteur de chaleur. Ie support pourra se trouver Immédiatement à la bonne hauteur sans continuer à mousser davantage. 



   Il est également possible d'utiliser de la réside synthétique formée de plusieurs composants, à laquelle on ajoute un durcisseur lors de la confection. Le temps de durcis- sement est alors réglé de façon à ce qu'un laps de   te-mps   de -traitement suffisamment long soit laissé. L'emploi de cette résine synthétique permet à du sable ajouté   ultérieurement   de foncer un support se composant de sable et de résine synthétique agglomérés. 



     Aussi   bien dans ce procédé que dans   l'utilisation   de matière   thermoplastique   les supporta peuvent être rattachée au hourdis au moyen de forages de sorte qu'on peut renoncer au nivellement des supporta. De toute façon, le placement du revêtement souhaité est possible des que la chape est confec- tionnée. Il n'y a donc pas lien, comme   c'est   le cas pour le procédé   connu..   de craindre un   ralentissement   des travaux lors de l'achèvement du   bàtinent.   



   Le procédé selon l'invention est décrit ci-après en se référant aux   schémas   des   d     4sine     annexés   dans lesquels: la figure 1 représen le placement de supports de   mime   niveau; la figure 2 représenta la constitution du support an coupe traneversale; la figure 3   représen '  en vue perspective les   couchée   successives du sol et   du   revête ent; la figure 4 représent' en vue perspective et en   coupe,   un sel   parqueté.   



   Sur un sous-sol à   l'ét@et     brut   1 qui   n'est     pas   encore nivelé, comme clairement visib la figure 2, et dont la surface ne doit pas former un angle   dé@     @     avec   un plan   horizontal,   

 <Desc/Clms Page number 6> 

 on pose deux lattes à   niveler   parallèlement et à une certaine distance   l'une   de   l'autre.   Ces lattes à   niveler ?.   sont disposées, au moyen de petits morceaux de   bois 2.   placés en dessous, de manière que leur surface soit parallèle à la surface du revéte- ment   à   placer   ultérieurement.   Au-dessus de ces lattes à niveler 
2 on place,

   transversalement, une plaquette de nivellement! qui peut être coulissée par la poignée 5 le long des   lattes .   



   En   vue de   confectionner les supports, on place en dessous de la plaquette des petits godets 6 remplis de matière synthétique moussante 7. La surface inférieure de ces godets n'est pas   nécessairement   plane. Certains présentent, au contraire, trois points d'appui afin d'éviter de basculer sur le sol irrégulier. 



   Comme la mousse est retenue dans les godets 6 et que d'autre part aucune perte de chaleur notoire ne s'en suit, la chaleur de réaction pourra   s'établir   avec certitude, et cette   matière   synthétique moussante pourra augmenter jusqu'à   30   fois de   volume -   pour les matières connues   actuellement.   La mousse ne faisant son apparition qu'après dégagement de chaleur, on peut poser une plaque   d'ancrage   8 sur les godet,, 6.

   Cette plaque sera poussée par la mousse 7   vers   le haut et pressée contre la plaquette de nivellement 4.   Coasse   il n'est prévu. pour la mousse aucun   obstacle   latéral et comme d'autre part elle ne pourra pas   .soulever   la plaquette de nivellement, . le se dégagera latérialement et   remplira   l'espace entre la pl   @   d'ancrage 8 et l'aire 1. La mousse adhérant très bien à   @   matériaux, la plaque d'ancrage 8 sera simultanémant   rattachée   à   l'aire   1, de sorte qu'après s'être figée - environ 30   seco@@des     après -   la mousse, la plaque d'ancrage et l'aire seront inséparables. 



   L'écart entre chaque godet de matière   moussant-. '{   et entre les plaques d'ancrage 8 des supporta   ainsi   réa   @     @   

 <Desc/Clms Page number 7> 

 
 EMI7.1 
 dépend de la rig1d1i;-w-inmrdi  11 è Jloce:"-. r:!"---Y' M 1R charge présumée sur le revêtement. Si l'on ajoute un isolant, par exemple du sable dans l'espace entre les supports, et ce jusqu'à leur hauteur, ce matériau supportera également le hourdis et en particulier   lorsque   la mousse se déformera suite à une charge   importante.   Le hourdis 11 peut dans un cas pareil être moins solidement fixé et recevoir   un   revêtre plus solide. 



  Après achèvement de ce travail, le hourdis   11.   composé par exemple de panneaux   à   particules, est posé sur les   supporta 9   et, de préférence, collé. 



   Si ces panneaux à particules devaient travailler et se détacher des supports   ,   ils pourraient, lors du placement de la plaque d'ancrage 8 des   supports   être vissés ou cloués. 



  Etant donné que ces panneaux son;: généralement livrés en plaques de 100 à 200 cm x   200 à     300   cm et   qu'ils   sont en outre faciles A manipuler, cette opération ne nécessite que   peu   de temps. 



  Aussi simple est le placement des couches supérieures puisque l'on dispose, pour placer le revêtement, d'une surface bien dégagée qui permet, en outre, les possibilités de fixation lea plus diverses. 



   La pose du parquet est illustre aux figures 3 et 4. 
 EMI7.2 
 



  Pour simplifier et pour rati:m.a1iser le :.l'V3.il on pose de grande panneaux ë" parcuetSt par exem#l du parquet en ba...'1e, parquet préfabriqué et é14!!\e1ts préfab="in4n. T parquet est 

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 
 EMI1.1
 



  "Rose Flooring Process"
 EMI1.2
 LtinVèTI1on relates to a process for laying floor coverings on basements in the raw state.



  Floor Xv9tement8 require for their placement a smooth and preferably seamless souz-zol, which must also be ho = àz; Jntal to form a well-determined angle with a hodzù: nt .: l. To this end, the gross surface "'is general - 1" t .. :: -' ::: h ',,? : j. a -;: - the placement of. coating, of a screed which & I. , a * n the inequalities but suppress equal-,:, eml eeri, 1: .J jv1: nt. '. Depending on the materials used and their

 <Desc / Clms Page number 2>

 consistency, the surface of the screed may deviate somewhat from the horizontal so that it is possible to give a certain inclination to the covering to be laid.

   For the preparation of the screeds, a fine-grained concrete is generally used, worked with a cement glaze. Clay, plaster, mortar, asphalt and bitumen are also used for this purpose. The acoustic properties of a floor thus made are considerably improved when the screed is weighed on a flexible sub-layer such as, for example, fiberglass cushions. A coating of your choice in different materials can then be applied to the screed. the disadvantage of this method is that before work can be continued, the screed must be completely insulated and must dry.

   As a result, the work is interrupted for a certain period of time in the newly-capped rooms of the buildings, which considerably slows down its completion. In addition, the manufacture of a screed that must meet certain criteria, in particular be perfectly homogeneous, square and flat, requires great care and skilled labor, mainly with regard to the production of the mixture, in order to to avoid possible chipping and cracks. In addition to the fact that it is not always possible to be able to count on this care and this know-how, the work is even more expensive.



   According to the process of the invention, the construction of a screed on an untreated area intended to receive a floor covering is avoided, by spreading a fluid and plastic material, during the treatment, but which nevertheless freezes immediately. afterwards, at the same level as the supports distributed over the area.



  A slab is then fixed to the supports and the coating is placed on it.



   According to this process, the area is left in its form

 <Desc / Clms Page number 3>

 rough and a slab is mounted at short intervals. This slab can be made from the most diverse materials. It only serves to support the next coating layer, for example the coating layer to be laid. The rigidity of this slab also depends on the distribution of the supports on the ground, given that it must cover the surface between two supports. In this connection, the use of particle boards, which are proportionately better market and easy to handle, is foolproof.

   In their place, it is also possible to use metal plates, for example trellises, acoustic plates or others, as long as they meet the required standards of rigidity. In any case, to avoid a concentrated load in certain places, each slab of the slab is connected to the others and, as far as possible, they are laid in large omits.



   The slab can be fixed in two different ways, either by placing it in the plastic mass during the construction of the supports, or by: connecting it to anchoring plates incorporated in the plastic mass itself. These anchor plates can be simple bis plating surrounded by the supports, and even coming to rest on the support. For the production of these supports, an adhesive material is advantageously used, so that it further increases its tensile force. It is even possible to straighten a slab that has received this application by fixing it more firmly to the support.



   In order to obtain equal level supports, use the correct leveling material. Practically one operates as follows: two slats to be leveled, of adequate size, parallel and spaced from each other are erected on the slab. On these slats and cross members, a leveling plate is placed. The support is then formed into

 <Desc / Clms Page number 4>

   filling the empty spaces between the area and said leveling pad.

   By the action of this plate along the two slats, the empty space is provided with supports, and this
 EMI4.1
 The process is then continued lez spaces con <1 & w, When these supports are distributed over the entire area, it is possible, these supports having meanwhile frozen, fill the empty spaces with a layer of thermal insulation and / or acoustic, or by sand. Since the insulation or the sand for example can reach, without more, the height of the support, it also supports part of the slab, so that it is possible to use for the making of the basement less materials. Bolides.

   After removing the part of the insulation rising higher than the supports, the slab is placed which is then attached to these supports. This can be achieved by means of nails, via or glue for example for the trellises, by screwing them with hooks to the supports. The slab thus
 EMI4.2
 placed is 1Emédlatennt usable and can receive, without loss of time, the coating 8our ... 1 tee.



   It is very advantageous to make the supports in a foaming synthetic material. La Bottera is paid
 EMI4.3
 à rette darîn a bucket cr '' '' ch1 '/ read CI13P, :) Oa. "t can xéas1r with the eu t .. 1'. <'\.' .." q, r1 \ .t1f) is " If the heat of real! lc: 1f ',, is reached if this material is bubbling with the desired content. Cet4., c ;;} <\ t1 foaming vl I project against the plate of 3iveA? nt by propelling plate d 'j3crag, and s'ettnï on 1; s being. retecya: r8 the top by the p1s.c;. wand ire levels # :: = ±; n question, Unr po> -faite fusion is thus a -7 ** the * '' * dominated that this aouase ar't1! Hereel1 "t attaches itself to it auas-1-" "'"' 1. <! Uwith the vL% IfA ... '"1crp.ge .



  Instead of this soft sytic ro'3'tit.8urt, m .K also uses a; aa; t: 1st the. Jpla9tic;, '0. Certain temperature which has 1 * before @ * freeze 4th .- acù avao

 <Desc / Clms Page number 5>

 the ground or any other conductor of heat. The support can immediately be at the right height without continuing to foam further.



   It is also possible to use synthetic residue formed from several components, to which a hardener is added during the preparation. The hardening time is then set so that a sufficiently long processing time is allowed. The use of this synthetic resin allows sand added later to darken a support consisting of sand and synthetic resin agglomerated.



     Both in this process and in the use of thermoplastic material the supports can be attached to the slabs by means of drillings so that the leveling of the supports can be dispensed with. Either way, the placement of the desired coating is possible as soon as the screed is made. There is therefore no link, as is the case for the known process, to fear that the work will slow down when the building is completed.



   The method according to the invention is described below with reference to the diagrams of the attached d 4sine in which: FIG. 1 represents the placement of supports of the same level; FIG. 2 represents the constitution of the support in transverse section; FIG. 3 is a perspective view of the successive layers of the ground and of the covering; Figure 4 shows' in perspective view and in section, a floor salt.



   On a basement upstairs @ and rough 1 which is not yet leveled, as clearly visible in figure 2, and whose surface must not form an angle of @ @ with a horizontal plane,

 <Desc / Clms Page number 6>

 two slats to be leveled are laid parallel and at a certain distance from each other. These slats to level ?. are arranged, by means of small pieces of wood 2. placed underneath, so that their surface is parallel to the surface of the coating to be placed later. Above those slats to level
2 we place,

   transversely, a leveling pad! which can be slid by the handle 5 along the slats.



   In order to make the supports, small cups 6 filled with foaming synthetic material 7 are placed below the plate. The lower surface of these cups is not necessarily flat. Some have, on the contrary, three points of support in order to avoid tipping over on uneven ground.



   As the foam is retained in the cups 6 and that on the other hand no noticeable loss of heat follows, the heat of reaction can be established with certainty, and this foaming synthetic material can increase up to 30 times. volume - for currently known materials. As the foam does not appear until after heat has been released, an anchoring plate 8 can be placed on the cups ,, 6.

   This plate will be pushed by the foam 7 upwards and pressed against the leveling plate 4. Crack it is not provided. for the foam there is no lateral obstacle and as on the other hand it will not be able to lift the leveling plate,. The will release laterally and fill the space between the anchor plate 8 and the area 1. The foam adhering very well to the materials, the anchor plate 8 will simultaneously be attached to the area 1, so that 'after freezing - about 30 seconds after - the foam, the anchor plate and the area will be inseparable.



   The gap between each cup of foaming material-. '{and between the anchoring plates 8 of the supports thus réa @ @

 <Desc / Clms Page number 7>

 
 EMI7.1
 depends on rig1d1i; -w-inmrdi 11 è Jloce: "-. r:!" --- Y 'M 1R presumed load on the coating. If we add an insulation, for example sand in the space between the supports, and this up to their height, this material will also support the slab and in particular when the foam will deform following a significant load. The slab 11 can in such a case be less firmly fixed and receive a more solid revêtre.



  After completion of this work, the slab 11. composed for example of particle board, is placed on the supports 9 and, preferably, glued.



   If these chipboards were to work and become detached from the supports, they could, when placing the anchor plate 8 of the supports, be screwed or nailed.



  Since these panels are generally delivered in sheets of 100 to 200 cm x 200 to 300 cm and are also easy to handle, this operation does not require much time.



  Also simple is the placement of the upper layers since one has, for placing the coating, a well-cleared surface which also allows the most diverse fixing possibilities.



   The laying of the parquet is illustrated in Figures 3 and 4.
 EMI7.2
 



  To simplify and to rati: m.a1iser le: .l'V3.il one poses large panels ë "paruetSt for example # l parquet in ba ... '1e, parquet prefabricated and é14 !! \ e1ts prefab =" in4n. T parquet is

** ATTENTION ** end of DESC field can contain start of CLMS **.

 

Claims (1)

ensuite délimité par des plinthes 13 le long des murs 14. EMI7.3 "'"'IiCAT 4' 1.- Procédé pour la pose de r êtemente de sol sur une aire à l'état brut, caractérisé en )qu'au moyen d'une masse à l'état fluide ou plastique lors de la pose, Bais EMI7.4 se solidifiant immédlateYl1ent après, on )plique dos supports de même hauteur, répartis sur le sol, e que sur ces supports on fixe un hourdis sur lequel sera posé n revêtement. <Desc/Clms Page number 8> then delimited by plinths 13 along the walls 14. EMI7.3 "'"' IiCAT 4 ' 1.- Method for laying floor covering on an area in the raw state, characterized in) that by means of a mass in the fluid or plastic state during the laying, Bais EMI7.4 solidifying immediately afterwards, we) ply back supports of the same height, distributed over the ground, and on these supports we fix a slab on which will be placed a coating. <Desc / Clms Page number 8> 2.- Procédé suivant la revendication 1, caractérisé en ce que dans La masse plastique sont fixées des chevilles. 2. A method according to claim 1, characterized in that in the plastic mass are fixed dowels. 3. - Procédé suivant la revendication 1, caractérisé en ce que sur la amasse plastique sont fixées, à la partie supérieure des plaques d'encrage. 3. - Method according to claim 1, characterized in that the plastic mass are fixed to the upper part of the inking plates. 4.- Procédé suivant la revendication 1, caractérisé en ce qu'entre les supporta est prévue une couche thermique et/ou acoustique. 4. A method according to claim 1, characterized in that between the supporta is provided a thermal and / or acoustic layer. 5.- Procédé suivant la revendication 1, caractérisé en ce que les espaces intermédiaires entre les supports et le hou@@is sont remplis de sable. 5. A method according to claim 1, characterized in that the intermediate spaces between the supports and the hou @@ is are filled with sand. 6.- Procédé suivant la revendication 1, caractérisé en ce que la masse est une matière chimique moussante. 6. A method according to claim 1, characterized in that the mass is a foaming chemical material. 7.- Procédé suivant la revendication 1, caractérisé en ce que la masse est une matière thermoplastique. 7. A method according to claim 1, characterized in that the mass is a thermoplastic material. 8.- Procédé suivant la revendication 1, caractérisé en ce que la masse est une matière à base de résine synthétique à plusieurs composants. 8. A method according to claim 1, characterized in that the mass is a synthetic resin-based material with several components. 9.- Procédé suivant une ou plusieurs des revendica- tions précédentes,caractérisé en ce que la amasse est collante. 9. A method according to one or more of the preceding claims, characterized in that the mass is sticky. 10. - Procédé de pose de revêtements de sol, substan- tiellement tel que décrit précédemment. et illustré aux dessins annexés. 10. - Process for laying floor coverings, substantially as described above. and illustrated in the accompanying drawings.
BE728673D 1968-02-20 1969-02-20 BE728673A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19681659617 DE1659617A1 (en) 1968-02-20 1968-02-20 Method of laying floor coverings

Publications (1)

Publication Number Publication Date
BE728673A true BE728673A (en) 1969-08-01

Family

ID=5685604

Family Applications (1)

Application Number Title Priority Date Filing Date
BE728673D BE728673A (en) 1968-02-20 1969-02-20

Country Status (1)

Country Link
BE (1) BE728673A (en)

Similar Documents

Publication Publication Date Title
AU2008253759B2 (en) Composite cement panel
EP2582893A1 (en) Method for constructing a building using bricks connected using dry joints
EP3112331B1 (en) A method for manufacturing a layered tile and a product obtained with said method
FR2951206A1 (en) Prefabricated composite panel for constructing wall, roof panel and floor of building i.e. house, has solid core whose faces are covered with ceramics or cement layer, and plate formed with core and arranged in center part of insulator
BE728673A (en)
FR3066514B1 (en) LOST INSULATED FORMWORK AND ASSOCIATED METHOD FOR MAKING A WALL.
FR2694774A1 (en) Method for making partition panels spaced by cross-bars - and filled with poured or injected insulation materials
JP2023525456A (en) System and method for bonding cladding
WO2015142203A1 (en) Paving slab, paving slabs production method and paving slab obtained using the method
FR3030019A1 (en) SUPPORT DEVICE FOR AN EXTENDED ELEMENT AND HEATING FLOOR INCLUDING AT LEAST ONE SUCH DEVICE
TW461932B (en) Quick construction method for multiple-floor building and form employed in the method
EP1848673A1 (en) Composition for insulating concrete, a building element for producing a lost formwork produced with said concrete, a lost formwork made from said elements and a thus produced supporting wall
KR100467744B1 (en) Masonry stucture forming method using adhesive as bonding material
EP0208824B1 (en) Insulating building blocks
FR2530705A1 (en) Structural elements especially for the prefabrication of floors.
JPH0334443Y2 (en)
JP3047209U (en) Composite wood brick made of wood and concrete
FR2520419A1 (en) Floor for tennis playing surface - comprises blocks positioned on beams which extend between support feet
CH344095A (en) Hard tennis court
US20080120934A1 (en) Scratch board and method of manufacturing and using same
BE408952A (en)
JPH0228655B2 (en) HATSUHOPURASUCHIKUSUSEIKEIHINNOKONKURIITOKEIYUKAHENOFUSETSUHOHO
JPH0593404A (en) Construction method of wooden block tile
GB2205596A (en) A method of jointing concrete floor slabs
FR3100251A1 (en) COMPOSITE MATERIAL FOR SURFACE COATING AND ITS MANUFACTURING PROCESS