BE1001602A6 BE8800445A BE8800445A BE1001602A6 BE 1001602 A6 BE1001602 A6 BE 1001602A6 BE 8800445 A BE8800445 A BE 8800445A BE 8800445 A BE8800445 A BE 8800445A BE 1001602 A6 BE1001602 A6 BE 1001602A6
Authority
BE
Belgium
Prior art keywords
beach
geotextiles
sand
river
dike
Prior art date
Application number
BE8800445A
Other languages
Dutch (nl)
Original Assignee
Naamloze Vennootscbap Dredging
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naamloze Vennootscbap Dredging filed Critical Naamloze Vennootscbap Dredging
Priority to BE8800445A priority Critical patent/BE1001602A6/en
Priority to EP89870052A priority patent/EP0339010B1/en
Application granted granted Critical
Publication of BE1001602A6 publication Critical patent/BE1001602A6/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

De uitvinding betreft een werkwijze voor het door opspuiting van zand aanbrengen van een kunststrand of het verhogen van een bestaand strand in een rivier of aan zee, gekenmerkt doordat men op de bodem van de rivier, desgevallend op een kunstmatig uitgebaggerde bodem, een onderwaterdijk (2) realiseert uit materialen die bestand zijn tegen het wegschuiven langsheen de helling van de oorspronkelijke bodem van de rivier of de zee en men het nodige zand tussen deze onderwaterdijk en het land tot op de gewenste hoogte en volgens de gewenste helling door opspuitend aanbrengt.The invention relates to a method for applying an artificial beach by spraying sand or for raising an existing beach in a river or by the sea, characterized in that an underwater dike (2, if necessary on an artificially dredged bottom) ) realized from materials that are resistant to shearing along the slope of the original bottom of the river or the sea and that the necessary sand is applied between this underwater dike and the land to the desired height and according to the desired slope by spraying.

Description

       

   <Desc/Clms Page number 1> 
 



   "Werkwijze voor het aanbrengen van een kunststrand of het verhogen van een bestaand strand, en aldus bekomen strand" 
Deze uitvinding heeft betrekking op een werkwijze voor het door opspuiting van zand aanbrengen van een kunststrand of het verhogen van een bestaand strand in een rivier, riviermonding of aan zee, waarvan de oorspronkelijke helling van de bodem te groot is om het opgespoten zand te weerhouden. 



   Wanneer een kunstmatig strand langsheen een rivier of een riviermonding moet worden aangelegd, stellen zieh, vooral wanneer de rivier of riviermonding aan getijden is onderworpen, problemen die rechtstreeks verbonden zijn aan het in de vaargeul van de rivier of in de zee uitlopen van de teen van het nieuwe of kunstmatige zandstrand. 



   Het verhogen van bestaande stranden werd tot nog toe praktisch uitsluitend gerealiseerd door het opspuiten van vers zand. De resultaten zijn steeds op betrekkelijk korte termijn teleurstellend doordat onvermijdelijk een grote hoeveelheid vers opgespoten zand terug in de zee of in de vaargeul verdwijnt. Het opspuiten van zand moet dus meermaals herhaald worden wat financieel een niet te overkomen probleem kan stellen. 



   Wanneer het aanleggen in een rivier van een kunstmatig strand wordt overwogen, mag het opgespoten vers zand in geen geval terug naar de vaargeul afvioeien. Dit zal des te vlugger gebeuren naarmate de helling van de bodem langsheen de oever van de rivier een hoek vormt waarbij het opgespoten zand van deze helling zal uitlopen. 



   De uitvinding heeft nu tot doel een werkwijze voor te stellen die een nieuwe en originele oplossing aan de gestelde problemen verschaft en waardoor kunstmatige stranden met een geringe helling kunnen worden   aangeiegd,   en dit   zowel   aan zee als langsheen de oever van een rivier. 

 <Desc/Clms Page number 2> 

 



   Om dit volgens de uitvinding mogelijk te maken, realiseert men op de bodem van de rivier of van de zee een onderwaterdijk, bouwt men deze onderwaterdijk op uit materialen die bestand zijn tegen het wegschuiven langsheen de helling van de oorspronkelijke bodem van de rivier of de zee en brengt men, ter vorming van bedoeld strand, het nodige zand door opspuiten aan tussen deze onderwaterdijk en het land tot de gewenste hoogte en tot de gewenste helling is bereikt. 



   Steeds volgens de uitvinding en wanneer de rivier of de zee aan getijden is onderworpen, brengt men de kruin van hogerbedoelde onderwaterdijk nagenoeg ter hoogte van het gemiddeld laagwater aan. 



   Merkwaardig voor de uitvinding is het feit dat men hogerbedoelde onderwaterdijk realiseert door gebruik te maken van geotextielen waarvan men minstens   een     laag   op de oorspronkelijke bodem spreidt, men het gedeelte van deze geotextielen dat ter hoogte komt van de onderwaterdijk met stortsteen belast, en plooit men over deze massa stortsteen bedoeld geotextiel om die dan in het op te spuiten zand te verankeren. 



   De uitvinding heeft eveneens betrekking op een kunststrand of een verhoogd strand verwezenlijkt conform de werkwijze volgens de uitvinding. 



   Andere details en voordelen van de uitvinding zullen blijken uit de hiernavolgende beschrijving van een werkwijze voor het door opspuiten van zand aanbrengen van een kunststrand of het verhogen van een bestaand strand, en van het aldus bekomen strand, volgens de uitvinding. 



  Deze beschrijving wordt uitsluitend bij wijze van voorbeeld gegeven en beperkt de uitvinding niet. De verwijzingscijfers hebben betrekking op de hieraan toegevoegde figuur. 



   De hierbijgaande figuur is een dwarsdoorsnede door een strand bekomen volgens de uitvinding. 



   In de hiernavolgende tekst zal steeds het woord rivier worden gebruikt, hoewel het duidelijk is dat het hier eveneens kan gaan om een riviermonding of een zee. 

 <Desc/Clms Page number 3> 

 



   De vaargeul van de rivier wordt met een sterk hellende bodem   1   voorgesteld. De hier voorgestelde hellingshoek is uiteraard totaal willekeurig. 



   De bodem van het   oospronkelijke   strand kan overeenstemmen met de rechte A-B. Meestal is dit zuiver theo- retisch. In werkelijkheid kan de bodem van het oorspronkelijke strand overeenstemmen of nagenoeg overeenstemmen met de punt-streeplijn   C-D.   In een dergelijk geval wordt het nodige zand eerst weggebaggerd tot een bodem wordt bekomen die overeenstemt met de rechte A-B. 



   Ook de voorstelling van de gebogen lijn C-D is totaal willekeurig. 



   In elk geval wordt, waar de onderwaterdijk
2 moet worden aangebracht, eerst een vlakke bodem B-D door baggeren gecreëerd. 



   Wanneer, omwille van de natuurlijke of plaatselijke omstandigheden, de oorspronkelijke bodem reeds de horizontaliteit van de rechte   B-D   benadert, moet niet noodzakelijk worden gebaggerd. 



   Het aanleggen van de onderwaterdijk 2 geschiedt door gebruik te maken van geotextielen. Met de verwijzing 3 wordt dit gedeelte van de   geotextlelen   duidelijk gemaakt die eerst op, hetzij de oorspronkelijke bodem, hetzij de nieuw gecreëerde bodem wordt uitgestrekt. De geotextielen die zich dus voor het grootste deel over deze bodem uitstrekken, strekken zich verder nog uit onder de onderwaterdijk 2. De onderwaterdijk wordt aangelegd door het aanbrengen van stortsteen 4,   terwijl   de geotextielen 3 om deze eerste massa stortsteen wordt geplooid om dan terug een tweede laag geotextiel te vormen tot een hoogte die in werkelijkheid willekeurig is. 



   De onderwaterdijk 2 kan nog verhoogd worden door   een   of meerdere lagen stortsteen   5,   gewikkeld in geo-   textiele   6 waarvan de twee naar het land gerichte stroken boven de eerste laag 3 worden gelegd. Pas dan kan het verse zand 7 door baggeren worden opgespoten tot de gewenste helling wordt bekomen. 



   Het afwerken van de onderwaterdijk door stortmateriaal of door andere tot dit doel gebruikelijke stoffen behoort niet tot het wezen van de uitvinding. De laag afwerkingsmaterialen wordt met de verwijzing 8 duidelijk gemaakt. 

 <Desc/Clms Page number 4> 

 



   In de figuur bemerkt men dat de inwendige wapening van de onderwaterdijk 2 in lagen wordt opgebouwd door het uitvouwen van twee of meer lagen geotextielen. 



   De vereiste ankerlengte van deze geotex- tielen wordt in functie van de nodige interne stabiliteit van de onderwaterdijk berekend. De geotextielen dienen dus als verankering langsheen de oorspronkelijke bodem of de nieuw uitgebaggerde bodem. 



   De wrijving tussen zand en geotextiel vormt ook een belangrijke verankeringsfac tor. 



   In de structuur volgens de uitvinding is dus de wrijving W die opgewekt wordt door de verticale beiasting P van het vers opgespoten zand over de ankerlengte van de geotextielen. De nodige verankeringslengte wordt bepaald in functie van de nominale treksterkte van de geotextielen zelf. Dit heeft voor gevolg dat hoe schuiner de helling van de oorspronkelijke bodem of van de nieuwe bodem na wegbaggeren van een hoeveelheid zand, hoe belangrijker de verankeringslengte van de geotextielen onder het vers opgespoten zand zal ziin. 



   Geotextielen tot dit doel bruikbaar zijn uitsluitend hoogwaardige trekdoeken van het type dat in de handel wordt gebracht door de vennootschap UCO onder de   verwijzingen :     H5200/45   (44667)-UCO 20 52/60 (44615) - UCO 4
De werkwijze volgens de uitvinding maakt het gebruik van gewone persdijken mogelijk zonder deze te moeten verankeren met geboorde trekkers of damplanken. De werkwijze is daarom vooral, zoniet uitsluitend, aangewezen voor het herstellen of rehabiliteren van stranden met op te spuiten vers zand, in alle omstandigheden wanneer de helling van de   oorspronkelijke   bodem zodanig steil is dat het opspuiten met zand tot grote verliezen leidt. 



   De uitvinding is uiteraard niet beperkt tot de hierboven beschreven uitvoeringsvorm en vele wijzigingen zouden hieraan kunnen worden aangebracht zonder buiten het raam van de octrooiaanvrage te treden.



   <Desc / Clms Page number 1>
 



   "Method for installing an artificial beach or raising an existing beach, and thus the resulting beach"
This invention relates to a method for applying an artificial beach by sand-spraying or for raising an existing beach in a river, estuary or by the sea, the original slope of the bottom of which is too great to retain the sprayed-on sand.



   When an artificial beach is to be constructed along a river or estuary, especially when the river or estuary is subject to tides, it poses problems directly related to the toe of the fairway of the river or into the sea. the new or artificial sandy beach.



   Up to now, raising existing beaches has been practically exclusively achieved by spraying fresh sand. The results are always disappointing in the relatively short term because a large amount of freshly sprayed sand inevitably disappears back into the sea or into the fairway. Sand spraying must therefore be repeated several times, which can pose a financial problem that cannot be overcome.



   When the construction of an artificial beach in a river is envisaged, the fresh sand that has been injected may in no case flow back to the fairway. This will happen all the faster as the slope of the bottom along the bank of the river forms an angle at which the sprayed sand will run off this slope.



   The object of the invention is now to propose a method which provides a new and original solution to the problems posed and which makes it possible to construct artificial beaches with a slight slope, both on the sea and along the bank of a river.

 <Desc / Clms Page number 2>

 



   In order to make this possible according to the invention, an underwater dike is realized on the bottom of the river or of the sea, this underwater dike is built from materials that are resistant to sliding along the slope of the original bottom of the river or the sea. and, to form the said beach, the necessary sand is applied by spraying between this underwater dike and the land to the desired height and until the desired slope is reached.



   Always according to the invention and when the river or the sea is subjected to tides, the crown of the underwater dike referred to above is placed almost at the level of the average low tide.



   Remarkable for the invention is the fact that the above-mentioned underwater dyke is realized by using geotextiles of which at least one layer is spread on the original bottom, the part of these geotextiles that comes to the height of the underwater dyke is loaded with rock, and one is folded over this mass of rock meant geotextile to anchor it in the sand to be sprayed.



   The invention also relates to an artificial beach or a raised beach realized in accordance with the method according to the invention.



   Other details and advantages of the invention will become apparent from the following description of a method for applying an artificial beach or increasing an existing beach by spraying sand, and of the beach thus obtained, according to the invention.



  This description is given by way of example only and does not limit the invention. The reference numbers refer to the appended figure.



   The accompanying figure is a cross-section through a beach obtained according to the invention.



   In the following text the word river will always be used, although it is clear that this may also be a river mouth or a sea.

 <Desc / Clms Page number 3>

 



   The fairway of the river is represented with a strongly sloping bottom 1. The angle of inclination proposed here is of course completely arbitrary.



   The bottom of the original beach may correspond to the straight A-B. Usually this is purely theoretical. In reality, the bottom of the original beach may correspond to or nearly correspond to the dashed line C-D. In such a case, the necessary sand is first dredged until a bottom corresponding to line A-B is obtained.



   Also the representation of the curved line C-D is completely arbitrary.



   In any case, where is the underwater dike
2 must be fitted, first a flat bottom B-D created by dredging.



   If, due to natural or local conditions, the original soil already approaches the horizontality of the straight B-D, it is not necessary to dredge.



   The construction of the underwater dike 2 takes place by using geotextiles. Reference 3 illustrates this portion of the geotextile that is first stretched on either the original soil or the newly created soil. The geotextiles, which for the most part extend over this soil, extend even further under the underwater dike 2. The underwater dike is constructed by placing rock 4, while the geotextiles 3 are folded around this first mass of rock and then again second layer of geotextile to a height that is actually arbitrary.



   The underwater dike 2 can be raised further by one or more layers of rock 5, wrapped in textile 6, of which the two landward facing strips are placed above the first layer 3. Only then can the fresh sand 7 be sprayed on by dredging until the desired slope is obtained.



   Finishing the underwater dyke by pouring material or by other materials customary for this purpose does not fall within the scope of the invention. The finish materials layer is indicated by reference 8.

 <Desc / Clms Page number 4>

 



   In the figure it is noticed that the internal reinforcement of the underwater dike 2 is built up in layers by unfolding two or more layers of geotextiles.



   The required anchor length of these geotextiles is calculated in function of the necessary internal stability of the underwater dike. The geotextiles therefore serve as anchoring along the original soil or the newly dredged soil.



   The friction between sand and geotextile is also an important anchoring factor.



   Thus, in the structure of the invention, the friction W generated by the vertical loading P of the freshly sprayed sand is the anchor length of the geotextiles. The necessary anchorage length is determined in function of the nominal tensile strength of the geotextiles themselves. As a result, the more inclined the slope of the original soil or the new soil after dredging a quantity of sand, the more important the anchorage length of the geotextiles will be under the freshly sprayed sand.



   Geotextiles usable for this purpose are only high quality drapes of the type marketed by the company UCO under the references: H5200 / 45 (44667) -UCO 20 52/60 (44615) - UCO 4
The method according to the invention makes it possible to use ordinary press dikes without having to anchor them with drilled pullers or sheet piles. The method is therefore especially, if not exclusively, appropriate for the repair or rehabilitation of beaches with fresh sand to be sprayed, in all circumstances when the slope of the original soil is so steep that the spraying with sand leads to large losses.



   The invention is of course not limited to the above-described embodiment and many modifications could be made thereto without departing from the scope of the patent application.


    

Claims (6)

CONCLUSIES 1. Werkwijze voor het door opspuiting van zand aanbrengen van een kunststrand of het verhogen van een bestaand strand in een rivier, riviermonding of aan zee, waarvan de oorspronke- lijke helling van de bodem te groot is om het opgespoten zand te weerhouden, met het kenmerk dat men op de bodem van de rivier, desgevallend op een kunstmatig uitgebaggerde bodem, een onderwater- dijk (2) realiseert, men deze onderwaterdijk opbouwt uit materialen die bestand zijn tegen het wegschuiven langsheen de helling van de oorspronkelijke bodem van de rivier of de zee en men, ter vorming van bedoeld strand, het nodige zand tussen deze onderwaterdijk en het land tot op de gewenste hoogte en de gewenste helling door opspuiten aanbrengt.  CONCLUSIONS 1. Method for applying an artificial beach by spraying sand or for raising an existing beach in a river, estuary or sea, the original slope of the bottom of which is too great to withstand the sprayed sand, with the characterized in that an underwater dike (2) is realized on the bottom of the river, if necessary on an artificially dredged bottom, this underwater dike is built from materials that are resistant to sliding along the slope of the original bottom of the river or the sea and, in order to form the said beach, the necessary sand is applied between this underwater dike and the land to the desired height and the desired slope by spraying. 2. Werkwijze volgens conclusie i, met het kenmerk dat men, wanneer de rivier of de zee aan getijden is onderworpen, de kruin van hogerbedoelde onderwaterdijk (2) nagenoeg ter hoogte van het gemiddeld laag water aanbrengt.  Method according to claim 1, characterized in that, when the river or the sea has been subjected to tides, the crown of the above-mentioned underwater dike (2) is applied almost at the level of the average low water. 3. Werkwijze volgens een van de conclusies 1, 2, met het kenmerk dat men hogerbedoelde onderwaterdijk (2) op een afstand van het land die het realiseren van een zachte helling van het strand mogelijk maakt, aanbrengt.  Method according to any one of claims 1, 2, characterized in that the above-mentioned underwater dike (2) is arranged at a distance from the land which makes it possible to realize a gentle slope of the beach. 4. Werkwijze volgens een van de conclusies I - 3, met het kenmerk dat men hogerbedoelde onderwaterdijk (2) realiseert door gebruik te maken van geotextielen (3, 6) waarvan men minstens een laag op de oorspronkelijke bodem, desgevallend op een daartoe uitgebaggerde bodem, spreidt, het gedeelte van deze geotextielen dat ter hoogte komt van de onderwaterdijk met stortsteen belast, en men over de massa stortsteen bedoelde geotextielen omplooit, welke geotextielen dan in het op te spuiten zand worden verankerd.  Method according to one of Claims 1 to 3, characterized in that the above-mentioned underwater dike (2) is realized by using geotextiles (3, 6), of which at least one layer is on the original bottom, if necessary on a dredged bottom , spread, the part of these geotextiles that comes to the height of the underwater dike loaded with rock, and that geotextiles referred to over the mass of rock are folded over, which geotextiles are then anchored in the sand to be sprayed on. 5. Werkwijze volgens conclusie 4, met het kenmerk dat de verankering van hogerbedoelde geotextielen geschiedt door deze geotextielen (3, 6) over een voldoende lengte over de oorspronkelijke bodem, desgevallend de daartoe uitgebaggerde bodem uitspreidt. <Desc/Clms Page number 6>  Method according to claim 4, characterized in that the anchoring of geotextiles referred to above is effected by these geotextiles (3, 6) over a sufficient length over the original bottom, if necessary spreading the dredged bottom for this purpose.  <Desc / Clms Page number 6>   6. Kunststrand of verhoogd strand, gerealiseerd door toepassing van een van de conclusies !-4, met het kenmerk dat het, volgens een dwarsdoorsnede, bestaat uit een onderwaterdijk 2 die evenwijdig of nagenoeg evenwijdig loopt met het land en hoofdzakelijk bestaat uit stortsteen (4, 5) of een technisch equivalent materiaal, gewikkeld in geotextielen (3, 6) die over een lengte onder het vers opgespoten zand (7) ter vorming f ter verhoging van het strand dienst doet.  Artificial beach or elevated beach, realized by applying one of the claims! -4, characterized in that, according to a cross-section, it consists of an underwater dike 2 which runs parallel or almost parallel to the land and mainly consists of rock (4 , 5) or a technically equivalent material, wrapped in geotextiles (3, 6) which serves a length beneath the freshly sprayed sand (7) to form the beach.
BE8800445A 1988-04-19 1988-04-19 Method for applying an art beach or to raise an existing beach, and thus obtained beach. BE1001602A6 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
BE8800445A BE1001602A6 (en) 1988-04-19 1988-04-19 Method for applying an art beach or to raise an existing beach, and thus obtained beach.
EP89870052A EP0339010B1 (en) 1988-04-19 1989-04-14 Method for creating an artificial beach or for raising an existing beach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE8800445A BE1001602A6 (en) 1988-04-19 1988-04-19 Method for applying an art beach or to raise an existing beach, and thus obtained beach.

Publications (1)

Publication Number Publication Date
BE1001602A6 true BE1001602A6 (en) 1989-12-12

Family

ID=3883367

Family Applications (1)

Application Number Title Priority Date Filing Date
BE8800445A BE1001602A6 (en) 1988-04-19 1988-04-19 Method for applying an art beach or to raise an existing beach, and thus obtained beach.

Country Status (2)

Country Link
EP (1) EP0339010B1 (en)
BE (1) BE1001602A6 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1014863A5 (en) 2002-06-03 2004-05-04 Dredging Int Artificial dyke, has one slanting wall formed by stacked dyke bodies anchored by textile or film in sand forming central part of dyke and other slanting wall

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820675A (en) * 2019-11-29 2020-02-21 中交烟台环保疏浚有限公司 Construction method for forming artificial sand beach

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1019527A (en) * 1950-06-06 1953-01-22 Underwater dam changing a large and medium pebble beach into a beach of very small pebbles or sand and widening any beach by moving its shore
DE3530124A1 (en) * 1985-08-23 1987-03-05 Huesker Synthetic Gmbh & Co METHOD FOR PRODUCING A SLOPE WALL OR WALL, IN PARTICULAR A NOISE PROTECTION WALL
US4669913A (en) * 1985-09-26 1987-06-02 John Temple Method of raising and extending an ocean beach
US4729691A (en) * 1986-11-04 1988-03-08 Sample Jay W Backshore sill beach and dune erosion control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1014863A5 (en) 2002-06-03 2004-05-04 Dredging Int Artificial dyke, has one slanting wall formed by stacked dyke bodies anchored by textile or film in sand forming central part of dyke and other slanting wall

Also Published As

Publication number Publication date
EP0339010A1 (en) 1989-10-25
EP0339010B1 (en) 1993-03-24

Similar Documents

Publication Publication Date Title
US3373568A (en) System for reclamation of land
US11459721B2 (en) Erosion control apparatus
CN106930231B (en) A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
BE1001602A6 (en) Method for applying an art beach or to raise an existing beach, and thus obtained beach.
Bruun Common reasons for damage or breakdown of mound breakwaters
CN109083172A (en) Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences
CN209307794U (en) Low-level bog area hydraulic reclamation ultra fine sand road structure
US1112018A (en) Protection of levees, embankments, dams, and other natural or artificial structures.
JPH0885929A (en) Embankment constructing method with sack
CN109355990A (en) Low-level bog area hydraulic reclamation ultra fine sand road structure
JPS59122626A (en) Construction of underwater foundation
Collier Seawall and Revetment Effectiveness, Cost and Construction
d'Angremond et al. Use of asphalt in breakwater construction
JP2645673B2 (en) Seawall structure for clamming
JPH0827759A (en) Sand mound foundation construction method by mat covering
RU2625675C1 (en) Revetment
CA1295842C (en) Erosion control foundation mat and method
Brand Gabions and geogrids
Chane et al. Hydraulic Structures I
Haas et al. Bank stabilization by revetments and dikes
JPS61172921A (en) Builting method for road levee
Cox Paving block study
US3938339A (en) Means for showing and/or detouring water currents and the preparation thereof
KR100326596B1 (en) Method for constructing a river-fabric
SU1366581A1 (en) Dockside wall

Legal Events

Date Code Title Description
RE20 Patent expired

Owner name: DREDGING INTERNATIONAL N.V.

Effective date: 19940419