AU749773B2 - Air conditioner - Google Patents

Air conditioner Download PDF

Info

Publication number
AU749773B2
AU749773B2 AU11759/99A AU1175999A AU749773B2 AU 749773 B2 AU749773 B2 AU 749773B2 AU 11759/99 A AU11759/99 A AU 11759/99A AU 1175999 A AU1175999 A AU 1175999A AU 749773 B2 AU749773 B2 AU 749773B2
Authority
AU
Australia
Prior art keywords
delay time
air conditioner
timer
delay
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU11759/99A
Other versions
AU1175999A (en
Inventor
Kinji Kadobayashi
Takeshi Kitagawa
Yasunori Maekawa
Nobuyuki Yamaguchi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18203423&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=AU749773(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Publication of AU1175999A publication Critical patent/AU1175999A/en
Application granted granted Critical
Publication of AU749773B2 publication Critical patent/AU749773B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H11/00Emergency protective circuit arrangements for preventing the switching-on in case an undesired electric working condition might result
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Air Conditioning Control Device (AREA)

Description

-1-
DESCRIPTION
Air Conditioner TECHNICAL FIELD The present invention relates to an air conditioner which, after an operation stop due to power interruption during operation, restarts operation when the power supply is recovered.
BACKGROUND ART In regions where power interruption often occurs due to poor power supply circumstances, there has been provided an air conditioner which, after an operation stop due to power interruption during operation, restarts operation when a specified delay time is clocked after the power supply is recovered. In the air conditioner, the delay time is previously set. Therefore, after a plurality of air conditioners A, B, C as shown in Fig. 5 are all stopped during operation due to power interruption and then the power supply is recovered by resolving the power interruption, the individual-air conditioners restart operation by activating compressors simultaneously in the elapse of the delay time since the recovery of the power supply. As a result, there is a possibility that an overcurrent flows through a current feeder line, causing apower supply protective breaker to be operated, so that the feeder line may be interrupted.
DISCLOSURE OF THE INVENTION -2- An object of the present invention is to provide an air conditioner which is so designed that when a plurality of air conditioners are stopped during operation due to power interruption and then a power supply is recovered, the air conditioners are not restarted simultaneously upon the power recovery so that an overcurrent does not flow through feeder lines, by which a power supply protective breaker can be prevented from being operated.
In accordance with one aspect of the present invention, there is provided an air conditioner which restarts operation when power supply is recovered after an operation stop due to power interruption during operation, the air conditioner comprising: a delay time calculating section for calculating a delay time of said air conditioner based on an operating state thereof, which is different from that of another air conditioner operated .ong S" •from the power supply, when the power supply is recovered; a delay timer which, upon -the power recovery, starts to clock the delay time calculated by the delay time calculating section; and an operation control section for restarting the operation upon completion of the clocking by the delay timer.
Preferably, when a plurality of air conditioners are stopped during operation due to power interruption and then the power supply is recovered, the delay time calculating section of the respective air conditioners calculates the delay time which is different from that of another air conditioner and the delay time is set in the delay oo .o [R:\LIBE]03714.doc:mxl -3timer. The air conditioners individually restart operation at timing varying among the air conditioners, after the delay time beginning at power recovery is clocked by the delay timer.
Accordingly, no air conditioners are restarted simultaneously after power recovery so that an overcurrent does not flow through the feeder line, by which the power supply protective breaker can be prevented from being operated.
In an embodiment of the present invention, the air conditioner further comprises a storage section for storing set values representing operational information therein, wherein the delay time calculating section calculates the delay time from the power recovery until the operation restart based on the set values representing the operational information stored in the storage section.
According to the air conditioner of this embodiment, the set values representing operational information such as operational mode, air flow tap and set temperature are stored into the storage section, and the operational information is retained even if the power supply is interrupted. In this case, the set values representing operational information are generally different among the air conditioners and less likely to be equal to one another. Therefore, based on these set values representing operational information, the delay time from power recovery to operation restart are calculated by the delay time calculating section, by which the delay time varying among the
V
-4air conditioners can be easily set to the delay timer without setting the intentionally different delay time to every air conditioner.
In another embodiment of the present invention, the air conditioner further comprises temperature sensors for detecting temperatures representing operating state, wherein the delay time calculating section calculates the delay time from the power recovery until the operation restart based on the temperatures representing the operating state detected by the temperature sensors.
According to the air conditioner of this embodiment, temperatures representing operating state such as indoor temperature, outside air temperature, indoor heat exchanger temperature and outdoor heat exchanger temperature are detected by the temperature sensors. In this case, the temperatures representing an operating state of the air conditioner are generally different among the air conditioners and less likely to be equal to one another. Therefore, based on these temperatures representing the operating state, the delay time from power'recovery to operation restart are calculated by the delay time calculating section, by which the delay time varying among the air conditioners can be easily set to the delay timer without setting the intentionally different delay time to every air conditioner.
BRIEF DESCRIPTION OF THE DRAWINGS S Tt Fig. 1 is a block diagram of an air conditioner according to an embodiment of the present invention; Fig. 2 is a flowchart of a controller of the air conditioner; Fig. 3 is a flowchart relevant to Fig. 2; Fig. 4 is a timing chart showing restarts of the air conditioners; and Fig. 5 is a timing chart showing restarts of air conditioners according to the prior art.
BEST MODE FOR CARRYING OUT THE INVENTION Hereinbelow, the air conditioner of the present invention is described in detail by an embodiment thereof illustrated in the accompanying drawings.
Fig. 1 is a block diagram of an air conditioner according to an embodiment of the present invention, where reference numeral 10 denotes an indoor unit and 20 denotes an outdoor unit. The indoor unit 10 has an indoor heat exchanger 1. The outdoor unit 20 has a compressor 2 the suction side of which is connected to one end of the indoor heat exchanger 1 of the indoor unit 10, an outdoor heat exchanger 3 one end of which is connected to the discharge side of the compressor 2, and expansion means 4 one end of which is connected to the other end of the outdoor heat exchanger 3 and the other end of which is connected to the other end of the indoor heat exchanger 1 of the indoor unit 10. The indoor heat exchanger 1, the compressor 2, -6the outdoor heat exchanger 3 and the expansion means 4 constitute a refrigerant circuit. Refrigerant discharged from the compressor 2 is condensed as a result of radiating heat outdoors at the outdoor heat exchanger 3, and is expanded by the expansion means 4. Thereafter, the refrigerant evaporates at the indoor heat exchanger 1, absorbing the indoor heat. Thus, the room is cooled.
The indoor unit 10 also includes a relay 5 which turns on and off a drive voltage for the compressor 2, a controller 6 for controlling the relay 5 and the like, and a fan motor 8 which is driven into rotation by a drive signal from the controller 6. The indoor unit 10 further includes, near the fan motor 8, an indoor temperature sensor D1 for detecting indoor temperature and an indoor heat exchanger temperature sensor D2 for detecting temperature of the indoor heat exchanger 1.
Also, the controller 6, which is made up of a microcomputer, I/O circuits and the like, has a receiver section 6a for receiving an operation signal from a remote controller 7, and an EEPROM (Electrically Erasable and Programmable Read Only Memory) 6b as a storage section for storing set values representing operational information set by the remote controller 7. The controller 6 further includes a delay time calculating section 6c for calculating a delay time T based on the set values representing operational information stored in the EEPROM 6b, a delay timer 6d for clocking the delay time T -7calculated by the delay time calculating section 6c, and an operation control section 6e for restarting operation upon completion end of the clocking by the delay timer 6d.
Fig. 2 is a flowchart of a main routine showing the process to be performed by the controller 6 after power recovery.
Fig. 3 is a flowchart of a subroutine for the calculation process of the compressor-startup delay time T at step S3 of Fig. 2.
Now, operation of the controller 6 is explained below with reference to Figs. 2 and 3.
First, when the process is started after power recovery in Fig. 2, it is decided at step S1 whether or not the microcomputer of the controller 6 has been reset. When it is decided that the microcomputer has been reset, the program goes to step S2. On the other hand, when it is decided that the microcomputer has not been reset, this process is ended. In other words, when the state before power interruption was an operating state, the microcomputer is reset and the program goes to a process of restarting operation shown in steps S2 and the followings. On the other hand, when the state before the power interruption wasa stopped state, the microcomputer is not reset and this process is ended.
Then, when the program goes to step S2, data is read from the EEPROM 6b. That is, set values (air flow set value) representing operational information in the state before the operation stop due to the power interruption are read.
1 -8- Next, the program goes to step S3, where a calculation process of the startup delay time T of the compressor 2 is performed.
A subroutine for this calculation process of the startup delay time T of the compressor 2 is explained in detail with reference to Fig. 3. In addition, as the delay time T, a value corresponding to 3 minutes has previously been set.
First, at step S31 shown in Fig. 3, indoor temperature is determined by the indoor temperature sensor D1, and the determined indoor temperature is added to the delay time T.
Next, the program goes to step S32, where temperature of the indoor heat exchanger 1 is determined by the indoor heat exchanger temperature sensor D2, and the determined indoor heat exchanger temperature is added to the delay time T.
Next, the program goes to step S33, where the air flow set value is added to the delay time T.
Next, the program goes to step S34, where a count value of a 1-second timer (not shown) is added to the delay time T.
Next, the program goes to step S35, where a count value of a power supply synchronous timer (not shown) is added to the delay time T.
In addition, the 1-second timer and the power supply synchronous timer start clocking at the timing when the microcomputer starts up after power recovery. Because the timing at which the microcomputer starts up varies among the -7 o z -9individual air conditioners, the count values of the 1-second timer and the power supply synchronous timer vary thereamong.
Then, at step S36, the delay time T is set to the delay timer 6d, where the program returns to the main routine of Fig.
2.
In the calculation process of the startup delay time T of the compressor 2, with 3 minutes added to the delay time T, a 3-minute standby is ensured so that the refrigerant circuit is equalized in internal pressure. As a result of this, the compressor 2 is reduced in load, thus facilitating the restart of the compressor 2.
Next, the program goes to stepS4 shown in Fig. 2, where the delay time T calculated at step S3 is set to the delay timer 6d and the clocking is started, by which the startup of the compressor 2 is delayed until the clocking of the delay timer 6d is ended.
Then, at an end of the clocking of the delay timer 6d, the program goes to step S5, where the compressor 2 is started up by the operation control section 6e, by which the operation is restarted. Thus, this process is ended.
Whereas concrete numerical value computations have been omitted in the description about the calculation process for delay time in Fig. 3 for an easier explanation, an example therefor is described below concretely.
For example, assume that individual parameters can take values of: Air flow set value: auto=0, L tap=3, ML tap=4, M tap=5, HM tap=6, H tap=7 Count value of 1-second timer: 0 59 Count value of power supply synchronous timer: 0 99 (for 50 Hz power supply frequency) 0 119 (for 60 Hz power supply frequency) Then, with both indoor temperature and indoor heat exchanger temperature assumed as 18 0 C, 8-bit operations are performed by the microcomputer. First, a sum between an indoor temperature of 12h (inhexadecimal) and an indoor heat exchanger temperature of 12h (in hexadecimal) is determined, and further 40h (in hexadecimal) is added to the resulting sum, by which a timer set value TN is determined: TN 12h 12h +40h 64h.
It is noted that adding 40h for determination of the timer set value TN is a process necessary for operating the delay timer 6d. Then, after the count value of the 1-second timer and the count value of the power supply synchronous timer are added, the highest-order 2 bits are set to Os. Next, if the timer set value TN is zero, the timer set value TN is made to be 3h; if the timer set value TN is a value which is divided by 3 with a remainder of 1, 2 is added to the timer set value TN; and if the timer set value TN is a value which is dividedby 3 with a remainder 7, ID ZA ~n-c \c2~ -11of 2, 1 is added to the timer set value TN so that the timer set value TN is made to be a multiple of 3. Then, with 40h added to the timer set value TN, the resulting value is set to the delay timer 6d. In this way, the timer set value TN to be set to the delay timer 6d becomes a multiple of 3, where setting a minimum count value of the delay timer 6d to 100 msec makes the timer set value TN set in steps of the delay time T of 300 msec. This value of 300 msec is a minimum time lag that prevents any overlap of peak currents when the compressor is started up at operation restart of the air conditioner in this case. Accordingly, delay times T different in steps of 300 msec are set to the delay timer.
In the case where a plurality of-air conditioners having the above constitution are installed, for example, when the plurality of air conditioners A, B, C as shown in Fig. 4 are all stopped during operation due to power interruption and then the power supply is recovered, the air conditioners A, B, C are set to delay times TA, TB, TC, which vary among the air conditioners, by their respective controllers 6. Then, the air conditioners A, B, C restart operation at timings varying thereamong after the delay times TA, TB, TC have elapsed since power recovery.
Therefore, the air conditioners are not restarted simultaneously after the power supply is recovered, so that an overcurrent does not flow through the feeder line, by which the C, -12power supply protective breaker can be prevented from being operated.
Also, the set values (air flow set value) representing operational information are stored into the EEPROM 6b, and the operational information is retained even if the power supply is interrupted. Besides, indoor temperature and the temperature of the indoor heat exchanger 1 representing operating state are detected by the indoor temperature sensor D1 and the indoor heat exchanger temperature sensor D2, respectively. In this air conditioner, delay times T from power recovery to operation restart are calculated by the delay time calculating section 6c based on the set values representing the operational information, the indoor temperature and the temperature of the indoor heat exchanger 1 representing the operating state detected after the power recovery, and the count values of the 1-second timer and the power supply synchronous timer. As a result of this, delay times T of different values can be easily set to the delay timer 6d without setting different delay times to the air conditioners.
Further, the delay times T to be set to the delay timer 6d may also be calculated based on the following setting items and various kinds of temperatures representing operating state without being limited to the aforementioned parameters: Setting items: S TP,/ I -13- Operational mode: auto=l, dry=2, cooling=3, heating=4, Air flow set value: auto=0, L tap=3, ML tap=4, M tap=5, HM tap=6, H tap=7 Set temperature Various temperatures: Indoor temperature Outside air temperature Indoor heat exchanger temperature Outdoor heat exchanger temperature For example, given operational mode: cooling=3 air flow tap: M indoor temperature: 29 0
C
outside side temperature: 33 0
C
indoor heat exchanger temperature: 26 0
C
outdoor heat exchanger temperature: 36 0
C
set temperature: 26 0
C,
then the delay time T is T 3+5+29+33+26+36+26 158 (sec) where the initial value of the delay time T is zero.
In the above embodiment, it has been arranged that the delay time T is determined by the delay time calculating section 6c based on set values representing operational information and temperatures representing operating state. However, the delay -14time may also be calculated by the delay time calculating section based on either one of the set values representing operational information or the temperatures representing operating state.
Also, different delay times T may be set for the individual air conditioners in advance or set after installation, or the delay times may be calculated by random number generation.
Further, in the above embodiment, it has also been arranged that a standby time of 3 minutes is previously set to the delay time T for equalizing the pressure of the refrigerant circuit, and various parameters are added thereto. However, with a 3-minute standby timer additionally provided, the delay time may be clocked upon an expiration of the 3-minute standby timer after power recovery.
Furthermore, the above embodiment has been described with regard to an air conditioner that performs cooling operation only. However, as a matter of course, the present invention may be applied to air conditioners which perform both cooling and heating operations. Also, whereas anair conditioner in which the indoor unit 10 and the outdoor unit 20 are provided separately from each other, the invention may also be applied to air conditioners in which the indoor unit and the outdoor unit are integrated together.
INDUSTRIAL APPLICABILITY As shown above, the present invention is applicable to a plurality of air conditioners which are simultaneously operated, and useful for preventing a power supply protective breaker being operated by allowing no overcurrent to flow through a feeder line.
IcO /13r,

Claims (4)

1. An air conditioner which restarts operation when power supply is recovered after an operation stop due to power interruption during operation, said air conditioner comprising: a delay time calculating section for calculating a delay time of said air conditioner based on an operating state thereof, which is different from that of another air conditioner operated from the power supply, when the power supply is recovered; a delay timer which, upon the power recovery, starts to clock the delay time calculated by said delay time calculating section; and an operation control section for restarting the operation upon completion of the clocking by the delay timer.
2. The air conditioner as set forth in claim 1, further comprising: Is a storage section for storing set values representing operational information therein, wherein the delay time calculating section calculates the delay time from the power recovery until the operation restart based on the set values representing the operational information stored in the storage section.
3. The air conditioner as set forth in claim 1, further comprising: temperature sensors for detecting temperatures representing operating state, wherein [R:\LIBE]03714.doc:mxl
17- the delay time calculating section calculates the delay time from the power recovery until the operation restart based on the temperatures representing the operating state detected by the temperature sensors. 4. An air conditioner substantially as described herein in relation to any one embodiment with reference to Figs. 1-4. DATED this seventh Day of May, 2002 Daikin Industries, Ltd Patent Attorneys for the Applicant SPRUSON FERGUSON [R:\LIBE]03714.doc:mxl
AU11759/99A 1997-11-28 1998-11-24 Air conditioner Ceased AU749773B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP9-327826 1997-11-28
JP32782697A JP3191750B2 (en) 1997-11-28 1997-11-28 Air conditioner
PCT/JP1998/005262 WO1999028683A1 (en) 1997-11-28 1998-11-24 Air conditioner

Publications (2)

Publication Number Publication Date
AU1175999A AU1175999A (en) 1999-06-16
AU749773B2 true AU749773B2 (en) 2002-07-04

Family

ID=18203423

Family Applications (1)

Application Number Title Priority Date Filing Date
AU11759/99A Ceased AU749773B2 (en) 1997-11-28 1998-11-24 Air conditioner

Country Status (5)

Country Link
JP (1) JP3191750B2 (en)
CN (1) CN1140727C (en)
AU (1) AU749773B2 (en)
HK (1) HK1034764A1 (en)
WO (1) WO1999028683A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1074797B1 (en) * 1999-02-16 2005-12-28 Matsushita Electric Industrial Co., Ltd. Operation control method for air conditioning system and air conditioning system
JP5440045B2 (en) * 2009-09-09 2014-03-12 ダイキン工業株式会社 Air conditioner and display device
JP5831071B2 (en) * 2011-09-14 2015-12-09 コニカミノルタ株式会社 Image forming apparatus, printing system, activation control method, and program
JP6186720B2 (en) * 2012-12-26 2017-08-30 ダイキン工業株式会社 Control device for equipment and energy management system provided with the same
JP6308035B2 (en) * 2014-06-06 2018-04-11 富士電機株式会社 Chiller / heater and method for controlling chiller / heater
KR102184740B1 (en) * 2014-06-16 2020-11-30 에스케이하이닉스 주식회사 Electronic device and electronic system with the same
JP6567354B2 (en) * 2015-07-31 2019-08-28 シャープ株式会社 refrigerator
JP6251429B2 (en) * 2017-02-28 2017-12-20 シャープ株式会社 Air conditioner
JP7338201B2 (en) * 2019-03-29 2023-09-05 株式会社富士通ゼネラル air conditioning system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0498645A2 (en) * 1991-02-06 1992-08-12 Sanyo Electric Co., Ltd A control apparatus for an air conditioner
JPH04363535A (en) * 1991-06-10 1992-12-16 Hitachi Ltd Air-conditioner
JPH0960952A (en) * 1995-08-28 1997-03-04 Yamatake Honeywell Co Ltd Air conditioning controller

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05322260A (en) * 1992-05-18 1993-12-07 Daikin Ind Ltd Operation controller for air conditioning apparatus
JPH1019338A (en) * 1996-07-02 1998-01-23 Mitsubishi Heavy Ind Ltd Refrigerating machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0498645A2 (en) * 1991-02-06 1992-08-12 Sanyo Electric Co., Ltd A control apparatus for an air conditioner
JPH04363535A (en) * 1991-06-10 1992-12-16 Hitachi Ltd Air-conditioner
JPH0960952A (en) * 1995-08-28 1997-03-04 Yamatake Honeywell Co Ltd Air conditioning controller

Also Published As

Publication number Publication date
JPH11159837A (en) 1999-06-15
HK1034764A1 (en) 2001-11-02
WO1999028683A1 (en) 1999-06-10
CN1284157A (en) 2001-02-14
CN1140727C (en) 2004-03-03
JP3191750B2 (en) 2001-07-23
AU1175999A (en) 1999-06-16

Similar Documents

Publication Publication Date Title
EP1074797B1 (en) Operation control method for air conditioning system and air conditioning system
KR100235213B1 (en) Defrosting control method for air conditioner
EP1953477B1 (en) Refrigerator compressor operating method and refrigerator
EP0570130B1 (en) Air conditioner
AU749773B2 (en) Air conditioner
USRE26596E (en) Heat pump controls
JP2008286419A (en) Air conditioning device
JP2005049022A (en) Air conditioner
JP2007212023A (en) Air conditioning system
JP3463427B2 (en) Internal / external separation type air conditioner
JPH023093Y2 (en)
JPH07120049A (en) Air conditioner
EP0789201B1 (en) Split type air conditioner
KR20060098299A (en) Air conditioner and defrost control method of the same
JP2004239537A (en) Control method of multiple room type air conditioner
JP2000234786A (en) Operation controlling method and apparatus for air conditioning
KR20030003057A (en) Air conditioning device
JP2003194438A (en) Controlling device for air-conditioner, and air- conditioner
JPS63273751A (en) Control of difrosting for air conditioner
JPH1183117A (en) Air conditioner
JP2000234787A (en) Operation controlling method and apparatus for air conditioning
JPH0678839B2 (en) Air conditioner
KR20000055144A (en) Method for preventing freezing of the heat exchanger in the air conditioner
JPH08193745A (en) Method for controlling air conditioner
JP2001263759A (en) Separation type air-conditioning device

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)