Method for drilling and completing a hydrocarbon production well Download PDFInfo
- Publication number
- AU2418699A AU2418699A AU24186/99A AU2418699A AU2418699A AU 2418699 A AU2418699 A AU 2418699A AU 24186/99 A AU24186/99 A AU 24186/99A AU 2418699 A AU2418699 A AU 2418699A AU 2418699 A AU2418699 A AU 2418699A
- Authority
- AU
- Australia
- Prior art keywords
- borehole
- casing
- tubing
- casings
- expanded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
Description
WO99/35368 PCT/EP98/08549 METHOD FOR DRILLING AND COMPLETING A HYDROCARBON PRODUCTION WELL Background of the Invention The invention relates to a method for drilling and completing a hydrocarbon production well, such as a well for the production of oil and/or gas. 5 Traditionally hydrocarbon production wells are created by first drilling a large borehole section in which a large diameter casing is inserted and cemented in place to stabilize the borehole wall. Subsequently a borehole extension of a smaller diameter is drilled and a 0 casing is inserted into said extension such that said further casing extends from the bottom of said extension to the top of the borehole whereupon said further casing is cemented in place inside the borehole extension and also inside the previously set casing. 5 This process is repeated until the borehole reaches the vicinity of the hydrocarbon bearing formation. If that formation is unstable the casing is extended into that formation and subsequently perforated to enable inflow of hydrocarbons. If the hydrocarbon bearing 0 formation is stable an essentially open hole is created in which a permeable production liner is inserted and surrounded by for example a gravel pack. The production liner is normally connected to the lower end of a production tubing which is lowered through 5 the casing string such that it spans the length of the borehole from the wellhead until the vicinity of the hydrocarbon bearing formation, where the tubing is sealingly secured to the casing by means of a production packer.
WO 99/35368 PCT/EP98/08549 - 2 Since the borehole wall and the inner surface of a previously installed casing may be irregular and the borehole may be curved significant clearances are required between the various casings and production 5 tubing which results in a significant amount of unproductive annular space and redundant drilling work to be done. Typically in a hydrocarbon production well the diameter of the upper part of the borehole near the earth 0 surface and internal diameter of the upper casing part may well exceed half a metre, whereas the internal diameter of the production tubing through which hydrocarbons are produced is between 10 and 25 centimetres. 5 Numerous attempts have been made to reduce the amount of unproductive annular space in wells. US patent specifications Nos. 3,162,245; 3,203,483 and 5,014,779 disclose the use of originally corrugated tubulars which are expanded into a cylindrical shape against the inside 0 of a casing by an expansion mandrel or sphere. A disadvantage of the use of corrugated tubulars is that they are difficult to manufacture and that the wall of the expanded tubulars may have non-uniformity of strength around their circumference which reduce their 5 reliability. International patent application, publication No. WO 93/25799 discloses the use of an essentially cylindrically shaped casing which is expanded against the borehole wall by an expansion mandrel so as to induce 0 compressive force between the casing and surrounding formation. This known expandable casing may be located between a surface casing arranged in an upper part of the wellbore and a production casing arranged in a lower part of the WO99/35368 PCT/EP98/08549 wellbore. Since the surface and production casings are not expanded downhole this known well casing technique still either involves the use of conventional casing parts that require the drilling of an oversized borehole or the expansion of a casing string which is inserted and expanded after the full length of the borehole has been drilled, which is not always possible. It is an object of the present invention to provide a method for drilling and completion of a hydrocarbon ) production well in which a casing can be installed or extended to protect the borehole wall against caving in during various phases of the drilling process and where installation of both the casing and production tubing can be achieved in such a way that along at least a 5 substantial part of the length of the borehole the accumulated width of the annular spaces between the tubing, casing or casings and the surrounding formation is kept to a minimum. It is a further object of the present invention to 0 provide a method for creating a well in which the amount of steelwork required for casing and completing the well is kept to a minimum. Summary of the Invention The method according to the invention comprises the 5 steps of: A) drilling a section of a borehole into an underground formation; inserting a casing into the drilled borehole section and radially expanding and securing the casing within said borehole section; 0 B) lowering a drill bit through the expanded casing and drilling a subsequent section of the borehole; inserting a next casing into said subsequent section of the borehole and radially expanding and securing said next casing within said subsequent borehole section; and WO99/35368 PCT/EP98/08549 -4 C) repeating, if required, step B a number of times until the borehole has reached the vicinity of a hydrocarbon bearing formation. Preferably only the first casing extends from the earth surface into the borehole and any subsequent casing only partly overlaps a previously set casing. In such case it is preferred that the length along which subsequent casing sections overlap each other is less than 10% of the length of each casing itself and 3 also that along at least a substantial part of the length of the borehole from the earth surface to the vicinity of the hydrocarbon bearing formation the variation in diameter of the borehole is less than 10%. In that case a slim borehole of an almost uniform 5 diameter along its entire length is created, which is drilled with a minimal amount of drilling effort and steelwork installed within the well. In some circumstances, however, it may still be required that at least two casings that are subsequently 0 inserted into the borehole each extend to the wellhead. Furthermore, it is preferred that after installing said casings a production tubing is inserted into the borehole such that the production tubing extends from the earth surface to the vicinity of the hydrocarbon 5 formation; and the tubing is radially expanded inside the string of expanded casings. Suitably the casings and optionally the tubing are plastically expanded in radial direction by moving an expansion mandrel therethrough in a longitudinal 0 direction and they are made of a formable steel grade which is subject to strain hardening without incurring any necking and ductile fracturing as a result of the expansion process and wherein an expansion mandrel is used which has along part of its length a tapering non- WO99/35368 PCT/EP98/08549 metallic surface. In such case it is preferred that the expansion mandrel has a tapering ceramic surface and that the tubing and casings are made of a formable steel grade Shaving a yield strength-tensile strength ratio which is lower than 0.8 and a yield strength of at least 275 MPa. It is also preferred that the production tubing and at least one of the casings consists of a tubular which is inserted into the borehole by reeling the tubular from ) a reeling drum. Alternatively, the production tubing and/or at least one of the casings may be made up of a series of pipe sections that are interconnected at the wellhead by screw joints, welding or bonding to form an elongate pipe of a 5 substantially cylindrical shape that can be expanded and installed downhole in accordance with the method according to the invention. Brief Description of the Drawings The invention will be described in more detail with 0 reference to the accompanying drawings, in which Fig. 1 is a longitudinal sectional view of a well comprising a series of radially expanded casings of substantially uniform diameter that have been installed using the method according to the present invention; 5 Fig. 2 shows the well of Fig. 1 in which a production tubing has been expanded within the series of casings; Fig. 3 is a longitudinal sectional view of a series of telescoping expanded casings and of a production tubing that have been installed in accordance with the 0 method according to the invention; and Fig. 4 is a longitudinal sectional view of a production tubing which is expanded downhole by an expansion mandrel.
WO 99/35368 PCT/EP98/08549 -6 Detailed description of the Invention Referring now to Fig. 1 there is shown a borehole 1 that extends from the earth surface 2 through a number of underground formation layers 3, 4, 5 and 6 into an oil 5 and/or gas bearing formation layer 7. In the example shown it is assumed that a casing 8, 9, 10 or 11 needs to be inserted to protect the borehole 1 against caving in each time when the borehole 1 has passed an interface 12, 13, 14 or 15 0 between different formation layers 3, 4, 5, 6 or 7. Accordingly, initially the first and upper section 1A of the borehole 1 is drilled and after the interface 12 has been reached the upper casing 8 is inserted into the upper borehole section 1A and radially expanded by means 5 of an expansion mandrel 16. The expanded casing 8 may be secured to the borehole wall by means of an annular body (not shown) of cement or a bonding agent. Alternatively, the expanded casing 8 may be secured to the borehole wall by friction. Such friction may be generated by providing 0 the outer surface of the casing 8 with spikes (not shown) and/or by radially pressing the casing into the formation 3. Subsequently, the drill bit is lowered through the upper casing 8 to the bottom of the first borehole 5 section 1A and the second section lB of the borehole 1 is drilled. After the next interface 13 has been reached, the second casing 9 is lowered through the first casing 8 to the bottom of the second borehole section 1B and radially expanded by means of the expansion mandrel 16. 30 When the expansion mandrel 16 reaches the area where the casings 8 and 9 co-axially overlap each other the second casing 9 will further expand the first casing 8 which generates a strong bond and seal generated by frictional and compressive forces. In order to alleviate WO99/35368 PCT/EP98/08549 - 7 the increased expansion forces at the area of overlap the length over which the casings 8 and 9 overlap each other is relatively small, preferably less than 10% of the length of the shortest casing 8 and 9 and the bottom of the upper casing 8 may be pre-expanded and/or provided with slits or grooves (not shown) which widen up or break open during the expansion process. The second casing 9 is secured to the borehole wall in the same way as the first casing 8. Furthermore the ) second and any further borehole sections 1B, 1C and 1D are drilled by means of an underreamer bit which is able to drill the whole length of the borehole 1 at substantially the same diameter. Subsequently, the third and fourth borehole sections 5 1C and 1D are each drilled and cased in the same manner as described with reference to the second borehole section lB. At the bottom of section 1D there is shown the expansion mandrel 16 which is moved downwardly in 0 longitudinal direction through the lowermost casing 11, thereby radially expanding the casing 11 in a manner which is described in more detail with reference to Fig. 4. Referring now to Fig. 2 there is shown the borehole 1 5 of Fig. 1 in which a production tubing 17 is being installed by longitudinally moving an expansion mandrel 18 therethrough. The tubing 17 is expanded to an outer diameter which is substantially equal to the inner diameter of the 0 expanded casings so that the production tubing 17 forms an internal cladding to the casings 8, 9, 10 and 11 and the walls of the tubing 17 and casings 8, 9, 10 and 11 mutually reinforce each other. The lower end of the production tubing that extends beyond the lower end of WO99/35368 PCT/EP98/08549 -8 the lowermost casing 11 into the oil and/or gas bearing formation 7 may be provided with staggered axial slots (not shown) which open up to a diamond shape as a result of the pipe expansion process in order to permit inflow of oil and/or gas from the formation 7 into the borehole 1, which fluids then flow up through the interior of the tubing 17 to the earth surface 2. Instead of providing the inflow section at the lower end of the production tubing 17 with axial slots, it may be provided with non-slotted apertures as well. These apertures may be circular, oval or square holes that are punched into, or cut away from, the tubing wall and which are arranged in an overlapping or non-overlapping pattern which may be staggered or not. The presence of such non-slotted apertures creates a tubing which will, after expansion thereof, generally have a higher strength than an expandable tubing with overlapping staggered axial slots. Also the expandable casings 8, 9, 10 and 11 may be ) provided with at least some slotted or non-slotted apertures in order to alleviate the forces required to expand these casings, in particular in the areas where the casings 8, 9, 10 and 11 overlap each other and in other areas, such as curved sections of the borehole 1, 5 where expansion forces are high. It will be understood that in such case the production tubing 17 is not perforated in the areas where any of the casings 8, 9, 10 and 11 is perforated so as to retain a fluid tight seal between the interior of the 0 tubing 17 and the surrounding formation layers 3, 4, 5 and 6. Referring now to Fig. 3 there is shown a borehole 20 that has been drilled into an underground formation 21. In the upper part of the borehole 20A a first WO99/35368 PCT/EP98/08549 - 9 casing 22 is installed and expanded. In the example shown the upper part of the borehole 20A has an internal diameter of about 25.4 cm. The unexpanded first casing 22 has an outer diameter of about 18.8 cm when it is lowered into the borehole. The expanded first casing 22 has an outer diameter of about 23.4 cm so that a small annulus is left around the expanded first casing 22 which is filled with cement 23. Subsequently the second part of the borehole 20B is ) drilled to an internal diameter of about 21 cm and a second casing 24 is inserted in unexpanded form into the borehole such that it extends from the top of the borehole 20 to the bottom of the second part 20B thereof. The unexpanded second casing 24 has an outer diameter of 5 15.7 cm and is expanded inside the borehole 20 to an outer diameter of 19.5 cm. The second casing 24 is cemented inside the second part of the borehole 20B and inside the first casing by an annular body of cement 23. 0 Then a third borehole section 20C having an internal diameter of 17.8 cm is drilled from the bottom of the second borehole section 20B into the formation 21, whereupon a third casing section 25 is inserted into the borehole 20 and expanded. The unexpanded third casing 25 5 has an outer diameter of about 13 cm and is expanded to an outer diameter of about 16.3 cm. Thereafter a fourth borehole section 20D having an internal diameter of about 14.2 cm is drilled and a fourth casing 26 is inserted into the borehole 20 and 0 subsequently expanded from an outer diameter of 10.1 cm to an outer diameter of about 13 cm. Inside the fourth casing 26 a production tubing 27 is inserted and expanded against the inner surface of said casing 26 to form a clad tubing 27.
WO99/35368 PCT/EP98/08549 - 10 To facilitate injection of service and/or kill fluids into the well and to permit installation of conduits for measuring or other equipment a coiled service conduit 28 is inserted into the production tubing 27 and sealingly connected near the bottom of the tubing 27 by a production packer 29. The service conduit 28 contains perforations 30 just above the production packer so that oil and/or gas can be produced from the inflow region of the well, the bottom of the service conduit 28 and the perforations 30 into the production tubing 27. As a result of the expansion of the casings 22, 24, 25 and 26 and of the production tubing 27 it is possible that a production tubing having an internal diameter of more than 10 cm is installed in a borehole 20 of which the upper section 20A has an internal diameter of about 25 cm. It will be understood by those skilled in the art of drilling of oil and/or gas production wells that the method according to the invention facilitates the use of ) a larger diameter production tubing 27 inside a smaller diameter borehole 20 than conventional well drilling and completion techniques. It will also be understood that instead of using only expanded casings inside the borehole one or more casings 5may still be an unexpandable conventional casing. For example the upper casing may be a conventional casing, in which one or more telescoping expandable casing sections, as shown in Fig. 3, are inserted and the lower part of the borehole may be equipped with monobore casings as ) shown in Fig. 1 and 2. Now referring to Fig. 4, there is shown a borehole traversing an underground formation 41 and a casing 42 that is fixed within the borehole by means of an annular body of cement 43.
WO99/35368 PCT/EP98/08549 - 11 A production tubing 44 which is made of a dual phase, high-strength low-alloy (HSLA) steel or other formable high-strength steel is suspended within the casing 42. An expansion mandrel 45 is moved in longitudinal direction through the tubing 44 thereby expanding the tubing 44 such that the outer diameter of the expanded tubing is slightly smaller than, or is about equal to, the internal diameter of the casing 42. The expansion mandrel 45 is equipped with a series of ceramic surfaces 46 which restrict frictional forces between the pig and tubing 44 during the expansion process. In the example shown the semi top angle A of the conical ceramic surface that actually expands the tubing is about 250. It has been found that zirconium oxide is a ) suitable ceramic material which can be formed as a smooth conical ring. Experiments and simulations have shown that if the semi cone top angle A is between 200 and 300 the pipe deforms such that it obtains an S-shape and touches the tapering part of the ceramic surface 46 essentially ) at the outer tip or rim of said conical part and optionally also about halfway the conical part. The experiments also showed that it is beneficial that the expanding tubing 44 obtains an S-shape since this reduces the length of the contact surface between 5 the tapering part of the ceramic surface 46 and the tubing 44 and thereby also reduces the amount of friction between the expansion mandrel 45 and the tubing 44. Experiments have also shown that if said semi top angle A is smaller than 150 this results in relatively 3 high frictional forces between the tube and pig, whereas is said top angle is larger than 300 this will involve redundant plastic work due to plastic bending of the tubing 44 which also leads to higher heat dissipation and to disruptions of the forward movement of the pig 45 WO99/35368 PCT/EP98/08549 - 12 through the tubing 44. Hence said semi top angle A is preferably selected between 150 and 300 and should always be between 50 and 450 Experiments have also shown that the tapering part of 5 the expansion mandrel 45 should have a non-metallic outer surface to avoid galling of the tubing during the expansion process. The use of a ceramic surface for the tapering part of the expansion mandrel furthermore caused the average roughness of the inner surface of the 0 tubing 44 to decrease as a result of the expansion process. The experiments have also shown that the expansion mandrel 45 provided with a ceramic tapering surface 46 could expand a tubing 45 made of a formable steel such that the outer tubing diameter D2 after 5 expansion was at least 20% larger than the outer diameter D1 of the unexpended tubing and that suitable formable steels are dual phase (DP) high-strength low alloy (HSLA) steels known as DP55 and DP60; ASTM A106 HSLA seamless pipe, ASTM A312 austenitic stainless steel pipes, grades 0 TP 304 L and TP 316 L and a high-retained austenite high strength hot rolled steel, known as TRIP steel manu factured by the Nippon Steel Corporation. The mandrel 45 is provided with a pair of sealing rings 47 which are located at such a distance from the 5 conical ceramic surface 46 that the rings 47 face the plastically expanded section of the tubing 44. The sealing rings serve to avoid that fluid at high hydraulic pressure would be present between the conical ceramic surface 46 of the mandrel 45 and the expanding tubing 44 0 which might lead to an irregularly large expansion of the tubing 44. The expansion mandrel 45 is provided with a central vent passage 47 which is in communication with a coiled vent line 48 through which fluid may be vented to the WO99/35368 PCT/EP98/08549 - 13 surface. After completion of the expansion process the pig 45 may be pulled up to surface by the vent line and a coiled kill and/or service line (not shown) may be lowered into the expanded tubing 44 to facilitate injection of kill and/or treatment fluids towards the hydrocarbon fluid inflow zone which is normally be done via the annulus between the production tubing and the well casing. However, if the tubing 44 is expanded to a smaller diameter then the residual annular space between the casing 42 and expanded tubing 44 can be used for venting of fluids during the expansion process and for injection of fluids during the production process, in which case there is no need for using a vent line 48 and kill and/or service lines. In conventional wells it is often necessary to use a production tubing having an outer diameter which is less than 50% of the inner diameter of the innermost well casing to enable a smooth insertion of the tubing even if the well is deviated and the casing has an irregular inner surface. Therefore it is apparent that the in-situ tubing expansion method according to the present invention enhances an efficient use of the wellbore. It will be understood that instead of moving the expansion mandrel 45 through the tubing 44 by means of hydraulic pressure, the mandrel can also be pulled through the tubing by means of a cable or pushed through the tubing by means of pipe string or rod. It will also be understood that the casing 42 and the casings 8, 9, 10, 11, 22, 24, 25 and 26 that are shown in ) Fig. 1, 2 and 3 can be expanded using a similar expansion process as described for the expansion of the tubing 44 with reference to Fig. 4, if these casings are also made of a formable steel grade. Preferably the expandable production tubing and WO99/35368 PCT/EP98/08549 - 14 expandable casings are made of a formable steel grade having a yield strength-tensile strength ratio which is lower than 0.8 and a yield strength which is at least 275 MPa. The invention will now be further described on the basis of the following comparative experiments. Experiment 1 An expansion mandrel having a conical ceramic surface (semi top angle A of cone = 200) was moved through a ) conventional oil field tubular, known as casing grade L80 13% Cr, which is a widely used casing type, having an initial outer diameter of 101.6 mm (4"), an initial wall thickness of 5.75 mm, a burst pressure of 850 bar and a strain hardening exponent n = 0.075. The expansion 5 mandrel was designed such that the outer diameter of the expanded tubular would be 127 mm, so that the increase in diameter would be 20%. The tubular burst during the expansion process. Analysis showed that the ductility limit of the material had been exceeded so that ductile 0 fracturing occurred. Experiment 2 An experiment was carried out with a coiled tubing of the type QT-800 which is increasingly used as a pro duction tubing in oil or gas wells. The tubing had an 5 initial outer diameter of 60.3 mm, a wall thickness of 5.15 mm, a burst pressure of 800 bar and a strain hardening exponent n = 0.14. An expansion mandrel was moved through the tubing which mandrel comprised a conical ceramic surface such that the semi top angle A of 0 a cone enveloping the conical surface was 50 and which was designed such that the outer diameter of the expanded tubing would be 73 mm (increase of about 21%). This tubing burst during the expansion process. Analysis revealed that due to high friction forces the expansion WO99/35368 PCT/EP98/08549 - 15 pressure had exceeded the burst pressure of the pipe during the expansion process. Experiment 3 An experiment was carried out with a seamless pipe made of a formable steel grade known as ASTM A 106 Grade B. The pipe had an initial outer diameter of 101.6 mm (4"), an initial wall thickness of 5.75 mm and a strain hardening exponent n = 0.175. An expansion mandrel was pumped through the pipe, which mandrel comprised a ceramic conical surface such that the semi top angle A of a cone enveloping the conical surface was 200 and such that the outer diameter of the expanded pipe was 127 mm (5") and the outer diameter increased by 21%. The pipe was expanded successfully and the hydraulic pressure exerted to the mandrel to move the mandrel through the pipe was between 275 and 300 bar. The burst pressure of the expanded pipe was between 520 and 530 bar.
Claims (9)
1. A method for drilling and completing a hydrocarbon production well, the method comprising the steps of: A) drilling a section of a borehole into an underground formation; inserting a casing into the drilled borehole section and radially expanding and securing the casing within said borehole section; B) lowering a drill bit through the expanded casing and drilling a subsequent section of the borehole; inserting a next casing into said subsequent section of the ) borehole and radially expanding and securing said next casing within said subsequent borehole section; and C) repeating, if required, step B a number of times until the borehole has reached the vicinity of a hydrocarbon bearing formation. 5
2. The method of claim 1, wherein only the first casing extends from the earth surface into the borehole and any subsequent casing only partly overlaps a previously set casing.
3. The method of claim 2, wherein the length along which 0 subsequent casing sections overlap each other is less than 10% of the length of each casing itself.
4. The method of claim 3, wherein along at least a substantial part of the length of the borehole from the earth surface to the vicinity of the hydrocarbon bearing 5 formation the variation in diameter of the borehole is less than 10%.
5. The method of claim 1, wherein at least two casings that are subsequently inserted into the borehole each extend to the wellhead. 0
6. The method of claim 1, wherein after installing said WO99/35368 PCT/EP98/08549 - 17 casings a production tubing is inserted into the borehole such that the production tubing extends from the earth surface to the vicinity of the hydrocarbon formation; and radially expanding the tubing inside the string of 5 expanded casings.
7. The method of claim 1 or 6, wherein the casings and optionally the tubing are plastically expanded in radial direction by moving an expansion mandrel therethrough in a longitudinal direction and are made of a formable steel 0 grade which is subject to strain hardening without incurring any necking and ductile fracturing as a result of the expansion process and wherein an expansion mandrel is used which has along part of its length a tapering non-metallic surface. 5
8. The method of claim 7, wherein the expansion mandrel has a tapering ceramic surface and the tubing and casings are made of a formable steel grade having a yield strength-tensile strength ratio which is lower than 0.8 and a yield strength of at least 275 MPa. 0
9. The method of claim 6, wherein the production tubing and at least one of the casings consists of a tubular which is inserted into the borehole by reeling the tubular from a reeling drum.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP97204157 | 1997-12-31 | ||
EP97204157 | 1997-12-31 | ||
PCT/EP1998/008549 WO1999035368A1 (en) | 1997-12-31 | 1998-12-28 | Method for drilling and completing a hydrocarbon production well |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2418699A true AU2418699A (en) | 1999-07-26 |
AU740213B2 AU740213B2 (en) | 2001-11-01 |
Family
ID=8229153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU24186/99A Expired AU740213B2 (en) | 1997-12-31 | 1998-12-28 | Method for drilling and completing a hydrocarbon production well |
Country Status (15)
Country | Link |
---|---|
EP (1) | EP1044316B1 (en) |
JP (1) | JP4085403B2 (en) |
AU (1) | AU740213B2 (en) |
BR (1) | BR9814563A (en) |
CA (1) | CA2316978C (en) |
DE (1) | DE69808139T2 (en) |
DK (1) | DK1044316T3 (en) |
EA (1) | EA002563B1 (en) |
GC (1) | GC0000041A (en) |
MY (1) | MY129529A (en) |
NO (1) | NO322486B1 (en) |
NZ (1) | NZ505059A (en) |
OA (1) | OA11527A (en) |
UA (1) | UA71905C2 (en) |
WO (1) | WO1999035368A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU770008B2 (en) * | 1999-02-25 | 2004-02-12 | Shell Internationale Research Maatschappij B.V. | Mono-diameter wellbore casing |
Families Citing this family (65)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2356651B (en) * | 1998-12-07 | 2004-02-25 | Shell Int Research | Lubrication and self-cleaning system for expansion mandrel |
GB2380214B (en) * | 1998-12-07 | 2003-08-13 | Shell Int Research | Wellbore casing |
GB2344606B (en) * | 1998-12-07 | 2003-08-13 | Shell Int Research | Forming a wellbore casing by expansion of a tubular member |
EP1147287B1 (en) | 1998-12-22 | 2005-08-17 | Weatherford/Lamb, Inc. | Procedures and equipment for profiling and jointing of pipes |
AU771884B2 (en) * | 1999-02-11 | 2004-04-08 | Shell Internationale Research Maatschappij B.V. | Wellhead |
GB2384804B (en) * | 1999-02-25 | 2003-10-01 | Shell Int Research | Wellbore casing |
AU2003257881B2 (en) * | 1999-02-25 | 2007-04-19 | Shell Internationale Research Maatschappij B.V. | Mono-diameter wellbore casing |
GB2385354B (en) * | 1999-02-26 | 2003-10-08 | Shell Int Research | A method of controlling a flow of fluidic material |
AU770359B2 (en) * | 1999-02-26 | 2004-02-19 | Shell Internationale Research Maatschappij B.V. | Liner hanger |
AU3818500A (en) | 1999-04-09 | 2000-11-14 | Shell Internationale Research Maatschappij B.V. | Method of creating a wellbore in an underground formation |
CA2306656C (en) * | 1999-04-26 | 2006-06-06 | Shell Internationale Research Maatschappij B.V. | Expandable connector for borehole tubes |
GB2374622B (en) * | 1999-11-01 | 2003-12-10 | Shell Oil Co | Wellbore casing repair |
IT1316157B1 (en) * | 2000-01-05 | 2003-04-03 | Eni Spa | IMPROVED METHOD FOR DRILLING PETROLEUM WELLS |
GB2361725B (en) | 2000-04-27 | 2002-07-03 | Fmc Corp | Central circulation completion system |
GB0010378D0 (en) | 2000-04-28 | 2000-06-14 | Bbl Downhole Tools Ltd | Expandable apparatus for drift and reaming a borehole |
FR2811056B1 (en) | 2000-06-30 | 2003-05-16 | Vallourec Mannesmann Oil & Gas | TUBULAR THREADED JOINT SUITABLE FOR DIAMETRIC EXPANSION |
GB0023032D0 (en) | 2000-09-20 | 2000-11-01 | Weatherford Lamb | Downhole apparatus |
EP1324855B1 (en) | 2000-10-13 | 2004-08-18 | Shell Internationale Researchmaatschappij B.V. | A method for interconnecting adjacent expandable pipes |
US6845820B1 (en) | 2000-10-19 | 2005-01-25 | Weatherford/Lamb, Inc. | Completion apparatus and methods for use in hydrocarbon wells |
GB0026063D0 (en) | 2000-10-25 | 2000-12-13 | Weatherford Lamb | Downhole tubing |
GB2403971B8 (en) * | 2001-02-20 | 2005-09-21 | Enventure Global Technology | Mono-diameter wellbore casing |
MXPA03008006A (en) * | 2001-03-09 | 2005-06-20 | Sumitomo Metal Ind | Steel pipe for use as embedded expanded pipe, and method of embedding oil-well steel pipe. |
GB0304335D0 (en) * | 2003-02-26 | 2003-04-02 | Weatherford Lamb | Tubing expansion |
GB0109993D0 (en) * | 2001-04-24 | 2001-06-13 | E Tech Ltd | Method |
GB0111413D0 (en) * | 2001-05-09 | 2001-07-04 | E Tech Ltd | Apparatus and method |
CA2449302C (en) | 2001-06-18 | 2010-03-02 | Richard S. Polizzotti | Hydrothermal drilling method and system |
WO2003006788A1 (en) | 2001-07-13 | 2003-01-23 | Shell Internationale Research Maatschappij B.V. | Method of expanding a tubular element in a wellbore |
GB0119977D0 (en) | 2001-08-16 | 2001-10-10 | E2 Tech Ltd | Apparatus and method |
US7066284B2 (en) | 2001-11-14 | 2006-06-27 | Halliburton Energy Services, Inc. | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell |
GB0130849D0 (en) | 2001-12-22 | 2002-02-06 | Weatherford Lamb | Bore liner |
GB0131019D0 (en) * | 2001-12-27 | 2002-02-13 | Weatherford Lamb | Bore isolation |
FR2844331B1 (en) | 2002-01-03 | 2004-11-26 | Vallourec Mannesmann Oil & Gas | PROCESS FOR PRODUCING A SEALED TUBULAR JOINT WITH PLASTIC EXPANSION |
FR2834326A1 (en) | 2002-01-03 | 2003-07-04 | Vallourec Mannesmann Oil & Gas | High performance tubular joint, has threaded section of shape ensuring seal after joint has been expanded |
FR2834325B1 (en) | 2002-01-03 | 2004-03-26 | Vallourec Mannesmann Oil & Gas | TUBULAR THREADED JOINT HAVING SEALING SURFACES |
FR2841626B1 (en) | 2002-06-28 | 2004-09-24 | Vallourec Mannesmann Oil & Gas | REINFORCED TUBULAR THREADED JOINT FOR IMPROVED SEALING AFTER PLASTIC EXPANSION |
GB0215107D0 (en) | 2002-06-29 | 2002-08-07 | Weatherford Lamb | Bore-lining tubing |
GB0215918D0 (en) | 2002-07-10 | 2002-08-21 | Weatherford Lamb | Expansion method |
CA2507413C (en) | 2002-11-26 | 2012-08-21 | Shell Canada Limited | Method of installing a tubular assembly in a wellbore |
US7886831B2 (en) | 2003-01-22 | 2011-02-15 | Enventure Global Technology, L.L.C. | Apparatus for radially expanding and plastically deforming a tubular member |
USRE42877E1 (en) | 2003-02-07 | 2011-11-01 | Weatherford/Lamb, Inc. | Methods and apparatus for wellbore construction and completion |
WO2004079150A2 (en) * | 2003-03-05 | 2004-09-16 | Weatherford/Lamb, Inc. | Full bore lined wellbores |
GB2436484B (en) * | 2003-03-05 | 2007-11-07 | Weatherford Lamb | Full bore lined wellbores |
AU2004234548B2 (en) | 2003-04-25 | 2007-05-31 | Shell Internationale Research Maatschappij B.V. | Method of creating a borehole in an earth formation |
GB0412131D0 (en) | 2004-05-29 | 2004-06-30 | Weatherford Lamb | Coupling and seating tubulars in a bore |
RU2006110933A (en) * | 2003-09-05 | 2007-10-10 | Инвенчер Глобал Текнолоджи, Ллс (Us) | EXPANDABLE TUBULAR ELEMENTS |
US7712522B2 (en) | 2003-09-05 | 2010-05-11 | Enventure Global Technology, Llc | Expansion cone and system |
WO2005052318A1 (en) * | 2003-11-26 | 2005-06-09 | Tullamarine Holdings Pty Ltd | Method of sinking and lining a shaft |
AU2004293489B2 (en) * | 2003-11-26 | 2009-08-27 | Rapallo Pty Ltd | Method of sinking and lining a shaft |
NO325291B1 (en) * | 2004-03-08 | 2008-03-17 | Reelwell As | Method and apparatus for establishing an underground well. |
WO2006020960A2 (en) | 2004-08-13 | 2006-02-23 | Enventure Global Technology, Llc | Expandable tubular |
CA2617498C (en) | 2005-07-22 | 2014-09-23 | Weatherford/Lamb, Inc. | Apparatus and methods for creation of down hole annular barrier |
US7503396B2 (en) | 2006-02-15 | 2009-03-17 | Weatherford/Lamb | Method and apparatus for expanding tubulars in a wellbore |
AU2008250002A1 (en) * | 2007-05-15 | 2008-11-20 | Shell Internationale Research Maatschappij B.V. | System for drilling a wellbore |
US20080302539A1 (en) * | 2007-06-11 | 2008-12-11 | Frank's International, Inc. | Method and apparatus for lengthening a pipe string and installing a pipe string in a borehole |
CA2663723C (en) | 2008-04-23 | 2011-10-25 | Weatherford/Lamb, Inc. | Monobore construction with dual expanders |
FR2956466B1 (en) | 2010-02-17 | 2012-06-08 | Vallourec Mannesmann Oil & Gas | EXPANDABLE THREAD JOINT AND METHOD OF MAKING SAME |
BR112014009621A2 (en) | 2011-10-25 | 2017-05-09 | Shell Int Research | wellbore lining scheme, wellbore, and method for drilling and boring a wellbore |
US9453393B2 (en) | 2014-01-22 | 2016-09-27 | Seminole Services, LLC | Apparatus and method for setting a liner |
AU2015279247B2 (en) | 2014-06-25 | 2017-10-19 | Shell Internationale Research Maatschappij B.V. | Assembly and method for expanding a tubular element |
AU2015279244B2 (en) | 2014-06-25 | 2017-07-20 | Shell Internationale Research Maatschappij B.V. | System and method for creating a sealing tubular connection in a wellbore |
MY186119A (en) | 2014-08-13 | 2021-06-23 | Shell Int Research | Assembly and method for creating an expanded tubular element in a borehole |
AU2015359408A1 (en) | 2014-12-12 | 2017-06-01 | Shell Internationale Research Maatschappij B.V. | Anchor system and method for use in a wellbore |
AU2015359407B2 (en) | 2014-12-12 | 2018-06-14 | Shell Internationale Research Maatschappij B.V. | Expanding a tubular element in a wellbore |
WO2018125230A1 (en) * | 2016-12-30 | 2018-07-05 | Halliburton Energy Services, Inc. | Expansion assembly for expandable liner hanger |
CN107313747A (en) * | 2017-08-17 | 2017-11-03 | 李建峰 | One kind only takes hot ground hot hole pore-fixing device and the method for not fetching water |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5337823A (en) * | 1990-05-18 | 1994-08-16 | Nobileau Philippe C | Preform, apparatus, and methods for casing and/or lining a cylindrical volume |
MY108743A (en) * | 1992-06-09 | 1996-11-30 | Shell Int Research | Method of greating a wellbore in an underground formation |
WO1995003476A1 (en) * | 1993-07-23 | 1995-02-02 | Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti | Method of finishing wells |
FR2741907B3 (en) * | 1995-11-30 | 1998-02-20 | Drillflex | METHOD AND INSTALLATION FOR DRILLING AND LINERING A WELL, IN PARTICULAR AN OIL DRILLING WELL, BY MEANS OF INITIALLY FLEXIBLE BUTTED TUBULAR SECTIONS, AND HARDENED IN SITU |
MY116920A (en) * | 1996-07-01 | 2004-04-30 | Shell Int Research | Expansion of tubings |
-
1998
- 1998-12-28 BR BR9814563-0A patent/BR9814563A/en active IP Right Grant
- 1998-12-28 DE DE69808139T patent/DE69808139T2/en not_active Expired - Lifetime
- 1998-12-28 EA EA200000724A patent/EA002563B1/en not_active IP Right Cessation
- 1998-12-28 AU AU24186/99A patent/AU740213B2/en not_active Expired
- 1998-12-28 WO PCT/EP1998/008549 patent/WO1999035368A1/en active IP Right Grant
- 1998-12-28 EP EP98966700A patent/EP1044316B1/en not_active Expired - Lifetime
- 1998-12-28 OA OA1200000196A patent/OA11527A/en unknown
- 1998-12-28 JP JP2000527736A patent/JP4085403B2/en not_active Expired - Lifetime
- 1998-12-28 DK DK98966700T patent/DK1044316T3/en active
- 1998-12-28 NZ NZ505059A patent/NZ505059A/en not_active IP Right Cessation
- 1998-12-28 UA UA2000074570A patent/UA71905C2/en unknown
- 1998-12-28 CA CA002316978A patent/CA2316978C/en not_active Expired - Lifetime
- 1998-12-29 GC GCP199856 patent/GC0000041A/en active
- 1998-12-29 MY MYPI9805924 patent/MY129529A/en unknown
-
2000
- 2000-06-29 NO NO20003402A patent/NO322486B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU770008B2 (en) * | 1999-02-25 | 2004-02-12 | Shell Internationale Research Maatschappij B.V. | Mono-diameter wellbore casing |
Also Published As
Publication number | Publication date |
---|---|
EP1044316B1 (en) | 2002-09-18 |
EP1044316A1 (en) | 2000-10-18 |
AU740213B2 (en) | 2001-11-01 |
NZ505059A (en) | 2003-03-28 |
DE69808139T2 (en) | 2003-06-05 |
CA2316978C (en) | 2008-01-29 |
NO20003402L (en) | 2000-08-25 |
DE69808139D1 (en) | 2002-10-24 |
WO1999035368A1 (en) | 1999-07-15 |
OA11527A (en) | 2004-02-04 |
JP4085403B2 (en) | 2008-05-14 |
UA71905C2 (en) | 2005-01-17 |
DK1044316T3 (en) | 2002-11-04 |
MY129529A (en) | 2007-04-30 |
NO322486B1 (en) | 2006-10-09 |
NO20003402D0 (en) | 2000-06-29 |
JP2002500306A (en) | 2002-01-08 |
GC0000041A (en) | 2004-06-30 |
EA200000724A1 (en) | 2001-02-26 |
EA002563B1 (en) | 2002-06-27 |
CA2316978A1 (en) | 1999-07-15 |
BR9814563A (en) | 2000-10-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2316978C (en) | Method for drilling and completing a hydrocarbon production well | |
US6070671A (en) | Creating zonal isolation between the interior and exterior of a well system | |
CA2365966C (en) | Method of creating a wellbore in an underground formation | |
EP1485567B1 (en) | Mono-diameter wellbore casing | |
US7798223B2 (en) | Bore isolation | |
CA2492981C (en) | Monobore wellbore and method for completing same | |
CN101868593B (en) | Method of drilling wellbore | |
AU2008317729B2 (en) | Method of radially expanding a tubular element | |
NZ253124A (en) | Forming wellbore; comprises drilling a borehole, lowering a malleable casing into the hole and radially expanding the casing | |
US8316932B2 (en) | Wellbore system | |
NO344339B1 (en) | Expandable liner hanger with high axial load capacity | |
US8387709B2 (en) | Method of expanding a tubular element in a wellbore | |
WO2009074573A1 (en) | System for drilling a wellbore | |
AU2002240366A1 (en) | Mono-diameter wellbore casing | |
WO2002066783A1 (en) | Mono-diameter wellbore casing | |
GB2403970A (en) | Mono - diameter wellbore casing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) | ||
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |