AU2015205047A1 - Uplink transmissions for dual connectivity - Google Patents

Uplink transmissions for dual connectivity

Info

Publication number
AU2015205047A1
AU2015205047A1 AU2015205047A AU2015205047A AU2015205047A1 AU 2015205047 A1 AU2015205047 A1 AU 2015205047A1 AU 2015205047 A AU2015205047 A AU 2015205047A AU 2015205047 A AU2015205047 A AU 2015205047A AU 2015205047 A1 AU2015205047 A1 AU 2015205047A1
Authority
AU
Australia
Prior art keywords
base station
power
transmission power
maximum
transmissions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2015205047A
Other versions
AU2015205047B2 (en
Inventor
Boon Loong Ng
Aris Papasakellariou
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Samsung Electronics Co Ltd
Original Assignee
Samsung Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/591,756 external-priority patent/US9900844B2/en
Application filed by Samsung Electronics Co Ltd filed Critical Samsung Electronics Co Ltd
Publication of AU2015205047A1 publication Critical patent/AU2015205047A1/en
Application granted granted Critical
Publication of AU2015205047B2 publication Critical patent/AU2015205047B2/en
Priority to AU2018278947A priority Critical patent/AU2018278947B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

UPLINK TRANSMISSIONS FOR DUAL CONNECTIVITY [Technical Field]
The present application relates generally to wireless communications and, more specifically, to uplink transmissions in dual connectivity operation.
[Background Art]
Wireless communication has been one of the most successful innovations in modern history. Recently, the number of subscribers to wireless communication services exceeded five billion and continues to grow quickly. The demand of wireless data traffic is rapidly increasing due to the growing popularity among consumers and businesses of smart phones and other mobile data devices, such as tablets, "note pad" computers, net books, eBook readers, and machine type of devices. In order to meet the high growth in mobile data traffic and support new applications and deployments, improvements in radio interface efficiency and coverage is of paramount importance.
[Disclosure]
-[Jechnical-Solution-]-
Embodiments of the present disclosure provide methods and an apparatus to support transmissions from a User Equipment (UE) in dual connectivity operation.
In a first embodiment, a method includes determining, by a first base station, a first percentage of a maximum UE transmission power for transmissions from a UE to the first base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station. The method additionally includes signaling, by the first base station to the UE, the first percentage of the maximum UE transmission power and the second percentage of the maximum UE transmission power.
In a second embodiment, a base station includes a controller and a transmitter. The controller is configured to determine a first subset of transmitter antennas from a set of transmitter antennas of a UE. The transmitter configured to transmit, to the UE, a configuration for the UE to communicate with the base station and with a second base station, and an indication for the UE to use the first subset of transmitter antennas for transmitting to the base station.
In a third embodiment, a User Equipment (UE) includes a receiver and a transmitter. The receiver is configured to receive a configuration to communicate with a first base station and with a second base station and an indication to use a first subset of transmitter antennas, from a set of transmitter antennas, for transmitting to the first base station. The transmitter is configured to transmit to the first base station using the first subset of transmitter antennas and to the second base station using transmitter antennas from the set of transmitter antennas that are not in the first subset of transmitter antennas.
In a fourth embodiment, a base station includes a controller and a transmitter. The controller is configured to determine a first percentage of a maximum UE transmission power for transmissions from a UE to the base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station. The transmitter is configured to transmit, to the UE, the first percentage of the maximum UE transmission power and the second percentage of the maximum UE transmission power.
In a fifth embodiment, a User Equipment (UE) includes a receiver and a transmitter. The receiver configured to receive a configuration for communication with a first base station and with a second base station, and a first percentage of a "ma cnnun UEl:ransmission power oYtransmissions from the UE to the first base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station. The transmitter is configured to transmit to the first base station and to the second base station. If in a transmission time interval of one subframe (SF) the UE either reduces a transmission power to the first base station or reduces a transmission power to the second base station, the UE does not reduce the transmission power to the first base station below the first percentage of the maximum UE transmission power in the SF or the UE does not reduce the transmission power to the second base station below the second percentage of the maximum UE transmission power in the SF, respectively.
Before undertaking the DETAILED DESCRIPTION below, it may be advantageous to set forth definitions of certain words and phrases used throughout this patent document. The term "couple" and its derivatives refer to any direct or indirect communication between two or more elements, whether or not those elements are in physical contact with one another. The terms "transmit," "receive," and "communicate," as well as derivatives thereof, encompass both direct and indirect communication. The terms "include" and "comprise," as well as derivatives thereof, mean inclusion without limitation. The term "or" is inclusive, meaning and/or. The phrase "associated with," as well as derivatives thereof, means to include, be included within, interconnect with, contain, be contained within, connect to or with, couple to or with, be communicable with, cooperate with, interleave, juxtapose, be proximate to, be bound to or with, have, have a property of, have a relationship to or with, or the like. The term "controller" means any device, system or part thereof that controls at least one operation. Such a controller may be implemented in hardware or a combination of hardware and software and/or firmware. The functionality associated with any particular controller may be centralized or distributed, whether locally or remotely. The phrase "at least one of," when used with a list of items, means that different combinations of one or more of the listed items may be used, and only one item in the list may be needed. For example, "at least one of: A, B, and C" includes any of the following combinations: A, B, C, A and B, A and C, B and C, and A and B and C.
Moreover, various functions described below can be implemented or supported by one or more computer programs, each of which is formed from computer readable program code and embodied in a computer readable medium. The terms "application" and "program" refer to one or more computer programs, software components, sets of instructions, procedures, functions, objects, classes, instances, related data, or a portion thereof adapted for implementation in a suitable computer readable program code. The phrase "computer readable program code" includes any type of computer code, including source code, object code, and executable code. The phrase "computer readable medium" includes any type of medium capable of being accessed by a computer, such as read only memory (ROM), random access memory (RAM), a hard disk drive, a compact disc (CD), a digital video disc (DVD), or any other type of memory. A "non- transitory" computer readable medium excludes wired, wireless, optical, or other communication links that transport transitory electrical or other signals. A non- transitory computer readable medium includes media where data can be permanently stored and media where data can be stored and later overwritten, such as a rewritable optical disc or an erasable memory device.
Definitions for other certain words and phrases are provided throughout this disclosure. Those of ordinary skill in the art should understand that in many if not most instances such definitions apply to prior as well as future uses of such defined words and phrases.
[Description of Drawings]
For a more complete understanding of the present disclosure and its advantages, reference is now made to the following description taken in conjunction with the accompanying drawings, in which like reference numerals represent like parts:
FIGURE 1 illustrates an example wireless communication network according to this disclosure;
FIGURE 2 illustrates an example user equipment (UE) according to this disclosure;
FIGURE 3 illustrates an example enhanced NodeB (eNB) according to this disclosure;
FIGURE 4 illustrates an example UL SF structure for PUSCH transmission according to this disclosure;
FIGURE 5 illustrates an example encoding process for a DCI format according to this disclosure;
FIGURE 6 illustrates an example decoding process for a DCI format according to this disclosure;
FIGURE 7 illustrates an example communication system using dual connectivity according to this disclosure;
FIGURE 8 illustrates an example selection of transmitter antenna ports for a UE with two transmitter antennas that is configured by a MeNB for operation with dual connectivity according to this disclosure;
FIGURE 9 illustrates an example UE transmitter antenna switching between a MeNB and a SeNB according to this disclosure;
FIGURE 10 illustrates a UE operation with single connectivity during measurement gap UL SFs and with dual connectivity in other UL SFs according to this disclosure;
FIGURE 11 illustrates a use of measurement gap UL SFs according to this disclosure;
FIGURE 12 illustrates a determination of a transmission power to a MeNB and of a transmission power to a SeNB in accordance to a first alternative according to this disclosure;
FIGURE 13 illustrates a determination for a transmission power from a UE antenna to a MeNB and for a transmission power from a UE antenna to a SeNB in accordance to the second alternative according to this disclosure;
FIGURE 14 illustrates a determination for a transmission power from a UE antenna transmitting to a MeNB and for a transmission power from a UE antenna transmitting to a SeNB in accordance to the third alternative according to this disclosure;
FIGURE 15 illustrates a determination for a transmission power from a UE antenna transmitting to a MeNB and for a transmission power from a UE antenna transmitting to a SeNB in accordance to a variation of the third alternative according to this disclosure; and
FIGURE 16 illustrates a determination for a transmission power from a UE antenna transmitting to a MeNB and for a transmission power from a UE antenna transmitting to a SeNB in SF 1 using a guaranteed power, CMIKLMCNB for transmission to the MeNB and a guaranteed power, CMIN-SeNB 5 for transmission to the SeNB according to this disclosure.
[Mode for Invention]
FIGURES 1 through 16, discussed below, and the various embodiments used to describe the principles of the present invention in this patent document are by way of illustration only and should not be construed in any way to limit the scope of the invention. Those skilled in the art will understand that the principles of the present disclosure may be implemented in any suitably arranged wireless communication system.
The following documents and standards descriptions are hereby incorporated into the present disclosure as if fully set forth herein: 3 GPP TS
36.211 vl 1.2.0, "E-UTRA, Physical channels and modulation" (REF 1); 3 GPP TS
36.212 vl 1.2.0, "E-UTRA, Multiplexing and Channel coding" (REF 2); 3 GPP TS
36.213 vl 1.2.0, "E-UTRA, Physical Layer Procedures" (REF 3); 3 GPP TS 36.321 vl 1.2.0, "E-UTRA, Medium Access Control (MAC) protocol specification" (REF 4); 3 GPP TS 36.331 vl 1.2.0, "E-UTRA, Radio Resource Control (RRC) Protocol Specification" (REF 5); 3 GPP TS 36.101 v 11.2.0, "Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) radio transmission and reception" (REF 6), and US Patent Publication 2014/0192738, filed on January 8, 2014 and entitled "UPLINK CONTROL INFORMATION TRANSMISSIONS/RECEPTIONS IN WIRELESS NETWORKS" (REF 7).
One or more embodiments of the present disclosure relate to uplink transmissions in dual connectivity operation. A wireless communication network includes a DownLink (DL) that conveys signals from transmission points, such as base stations or enhanced NodeBs (eNBs), to UEs. The wireless communication network also includes an UpLink (UL) that conveys signals from UEs to reception points, such as eNBs.
FIGURE 1 illustrates an example wireless network 100 according to this disclosure. The embodiment of the wireless network 100 shown in FIGURE 1 is for illustration only. Other embodiments of the wireless network 100 could be used without departing from the scope of this disclosure.
As shown in FIGURE 1, the wireless network 100 includes an eNB 101, an eNB 102, and an eNB 103. The eNB 101 communicates with the eNB 102 and the eNB 103. The eNB 101 also communicates with at least one Internet Protocol (IP) network 130, such as the Internet, a proprietary IP network, or other data network.
"Depending on the network type, other well-known terms may be used instead of "eNodeB" or "eNB," such as "base station" or "access point." For the sake of convenience, the terms "eNodeB" and "eNB" are used in this patent document to refer to network infrastructure components that provide wireless access to remote terminals. Also, depending on the network type, other well- known terms may be used instead of "user equipment" or "UE," such as "mobile station," "subscriber station," "remote terminal," "wireless terminal," or "user device." A UE, may be fixed or mobile and may be a cellular phone, a personal computer device, and the like. For the sake of convenience, the terms "user equipment" and "UE" are used in this patent document to refer to remote wireless equipment that wirelessly accesses an eNB, whether the UE is a mobile device (such as a mobile telephone or smart-phone) or is normally considered a stationary device (such as a desktop computer or vending machine).
The eNB 102 provides wireless broadband access to the network 130 for a first plurality of UEs within a coverage area 120 of the eNB 102. The first plurality of UEs includes a UE 111 , which may be located in a small business (SB); a UE 112, which may be located in an enterprise (E); a UE 113, which may be located in a WiFi hotspot (HS); a UE 115, which may be located in a first residence (R); a UE 116, which may be located in a second residence (R); and a UE 116, which may be a mobile device (M) like a cell phone, a wireless laptop, a wireless PDA, or the like. The eNB 103 provides wireless broadband access to the network 130 for a second plurality of UEs within a coverage area 125 of the eNB 103. The second plurality of UEs includes the UE 115 and the UE 116. In some embodiments, one or more of the eNBs 101-103 may communicate with each other and with the UEs 111-116 using 5G, LTE, LTE-A, WiMAX, or other advanced wireless communication techniques.
Dotted lines show the approximate extents of the coverage areas 120 and 125, which are shown as approximately circular for the purposes of illustration and explanation only. It should be clearly understood that the coverage areas associated with eNBs, such as the coverage areas 120 and 125, may have other shapes, including irregular shapes, depending upon the configuration of the eNBs and variations in the radio environment associated with natural and man-made obstructions.
As described in more detail below, various components of the network
transmissions in dual connectivity operation.
One or more of the eNBs 101-103 are configured to determine a first subset of UE transmitter antennas from a set of the transmitter antennas included in a respective UE. The respective eNB 101-103 configures the UE to use the first subset of transmitter antennas for transmitting to the first base station. In certain embodiments, one or more of the eNBs 101-103 are configured to determine a first percentage of a maximum UE transmission power for transmissions from a UE to the first base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station. The respective eNB 101-103 also signals to the UE the first percentage of the maximum UE transmission power and the second percentage of the maximum UE transmission power.
Although FIGURE 1 illustrates one example of a wireless network 100, various changes may be made to FIGURE 1. For example, the wireless network 100 could include any number of eNBs and any number of UEs in any suitable arrangement. Also, the eNB 101 could communicate directly with any number of UEs and provide those UEs with wireless broadband access to the network 130. Similarly, each eNB 102-103 could communicate directly between them or with the network 130 and provide UEs with direct wireless broadband access to the network 130. Further, the eNB 101, 102, and/or 103 could provide access to other or additional external networks, such as external telephone networks or other types of data networks.
FIGURE 2 illustrates an example UE 116 according to this disclosure. The embodiment of the UE 116 shown in FIGURE 2 is for illustration only, and the other UEs in FIGURE 1 could have the same or similar configuration. However, UEs come in a wide variety of configurations, and FIGURE 2 does not limit the scope of this disclosure to any particular implementation of a UE.
As shown in FIGURE 2, the UE 116 includes an antenna 205, a radio frequency (RF) transceiver 210, transmit (TX) processing circuitry 215, a microphone 220, and receive (RX) processing circuitry 225. The UE 116 also includes a speaker 230, a main processor 240, an input/output (I/O) interface (IF) 245, a keypad 250, a display 255, and a memory 260. The memory 260 includes a basic operating system (OS) program 261 and one or more applications 262.
The RF transceiver 210 receives, from the antenna 205, an incoming RF — signal_trafisTrlitted~by an eNB or another UE. The RF transceiver 210 down- converts the incoming RF signal to generate an intermediate frequency (IF) or baseband signal. The IF or baseband signal is sent to the RX processing circuitry 225, which generates a processed baseband signal by filtering, decoding, and/or digitizing the baseband or IF signal. The RX processing circuitry 225 transmits the processed baseband signal to the speaker 230 (such as for voice data) or to the main processor 240 for further processing (such as for web browsing data).
The TX processing circuitry 215 receives analog or digital voice data from the microphone 220 or other outgoing baseband data (such as web data, e-mail, or interactive video game data) from the main processor 240. The TX processing circuitry 215 encodes, multiplexes, and/or digitizes the outgoing baseband data to generate a processed baseband or IF signal. The RF transceiver 210 receives the outgoing processed baseband or IF signal from the TX processing circuitry 215 and up-converts the baseband or IF signal to an RF signal that is transmitted via the antenna 205.
The main processor 240 can include one or more processors or other processing devices and can execute the basic OS program 261 stored in the memory 260 in order to control the overall operation of the UE 116 and, if in a transmission time interval of one subframe (SF) the UE either reduces a transmission power to the first base station or reduces a transmission power to the second base station, the main processor 240 does not reduce the transmission power to the first base station below the first percentage of the maximum UE transmission power in the SF or the UE does not reduce the transmission power to the second base station below the second percentage of the maximum UE transmission power in the SF, respectively. For example, the main processor 240 could control the reception of forward channel signals and the transmission of reverse channel signals by the RF transceiver 210, the RX processing circuitry 225, and the TX processing circuitry 215 in accordance with well-known principles. In some embodiments, the main processor 240 includes at least one microprocessor or microcontroller.
The main processor 240 is also capable of executing other processes and programs resident in the memory 260. The main processor 240 can move data into or out of the memory 260 as required by an executing process. In some embodiments, the main processor 240 is configured to execute the applications 262 based on the OS program 261 or in response to signals received from eNBs, "othe UEs, or an operator. The main processor 240 is also coupled to the I/O interface 245, which provides the UE 116 with the ability to connect to other devices such as laptop computers and handheld computers. The I/O interface 245 is the communication path between these accessories and the main processor 240.
The main processor 240 is also coupled to the keypad 250 and the display unit 255. The operator of the UE 116 can use the keypad 250 to enter data into the UE 116. The display 255 may be a liquid crystal display or other display capable of rendering text and/or at least limited graphics, such as from web sites. The display 255 could also represent a touch-screen.
The memory 260 is coupled to the main processor 240. Part of the memory 260 could include a control or data signaling memory (RAM), and another part of the memory 260 could include a Flash memory or other read-only memory (ROM).
As described in more detail below, the transmit and receive paths of the UE 116 (implemented using the RF transceiver 210, TX processing circuitry 215, and/or RX processing circuitry 225) support UL transmissions in dual connectivity operation.
Although FIGURE 2 illustrates one example of UE 116, various changes may be made to FIGURE 2. For example, various components in FIGURE 2 could be combined, further subdivided, or omitted and additional components could be added according to particular needs. As a particular example, the main processor 240 could be divided into multiple processors, such as one or more central processing units (CPUs) and one or more graphics processing units (GPUs). Also, while FIGURE 2 illustrates the UE 116 configured as a mobile telephone or smart-phone, UEs could be configured to operate as other types of mobile or stationary devices. In addition, various components in FIGURE 2 could be replicated, such as when different RF components are used to communicate with the eNBs 101-103 and with other UEs.
FIGURE 3 illustrates an example eNB 102 according to this disclosure. The embodiment of the eNB 102 shown in FIGURE 3 is for illustration only, and other eNBs of FIGURE 1 could have the same or similar configuration. However, eNBs come in a wide variety of configurations, and FIGURE 3 does not limit the scope of this disclosure to any particular implementation of an eNB.
As shown in FIGURE 3, the eNB 102 includes multiple antennas 305a- 305n, multiple RF transceivers 310a-310n, transmit (TX) processing circuitry 315, "and receive~~(RX) processing circuitry 320. The eNB 102 also includes a controller/processor 325, a memory 330, and a backhaul or network interface 335.
The RF transceivers 310a-310n receive, from the antennas 305a-305n, incoming RF signals, such as signals transmitted by UEs or other eNBs. The RF transceivers 310a-310n down-convert the incoming RF signals to generate IF or baseband signals. The IF or baseband signals are sent to the RX processing circuitry 320, which generates processed baseband signals by filtering, decoding, and/or digitizing the baseband or IF signals. The RX processing circuitry 320 transmits the processed baseband signals to the controller/processor 325 for further processing.
The TX processing circuitry 315 receives analog or digital data (such as voice data, web data, e-mail, or interactive video game data) from the controller/processor 325. The TX processing circuitry 315 encodes, multiplexes, and/or digitizes the outgoing baseband data to generate processed baseband or IF signals. The RF transceivers 310a-310n receive the outgoing processed baseband or IF signals from the TX processing circuitry 315 and up-converts the baseband or IF signals to RF signals that are transmitted via the antennas 305a-305n.
The controller/processor 325 can include one or more processors or other processing devices that control the overall operation of the eNB 102. For example, the controller/processor 325 could control the reception of forward channel signals and the transmission of reverse channel signals by the RF transceivers 310a-310n, the RX processing circuitry 320, and the TX processing circuitry 315 in accordance with well-known principles. The controller/processor 325 could support additional functions as well, such as more advanced wireless communication functions. For instance, the controller/processor 325 could support beam forming or directional routing operations in which outgoing signals from multiple antennas 305a-305n are weighted differently to effectively steer the outgoing signals in a desired direction. Any of a wide variety of other functions could be supported in the eNB 102 by the controller/processor 325. In some embodiments, the controller/processor 325 includes at least one microprocessor or microcontroller.
The controller/processor 325 is also capable of executing programs and other processes resident in the memory 330, such as a basic OS. The controller/processor 325 can move data into or out of the memory 330 as required by an executing process. The controller/processor 325 is configured to determine -a-first"siib¾etnof~UE_transmitter antennas from a set of the transmitter antennas included in a respective UE. The controller/processor 325 configures the UE to use the first subset of transmitter antennas for transmitting to the first base station. In certain embodiments, controller/processor 325 is configured to determine a first percentage of a maximum UE transmission power for transmissions from a UE to the first base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station. The controller/processor 325 also signals to the UE the first percentage of the maximum UE transmission power and the second percentage of the maximum UE transmission power.
The controller/processor 325 is also coupled to the backhaul or network interface 335. The backhaul or network interface 335 allows the eNB 102 to communicate with other devices or systems over a backhaul connection or over a network. The interface 335 could support communications over any suitable wired or wireless connection(s). For example, when the eNB 102 is implemented as part of a cellular communication system (such as one supporting 5G, LTE, or LTE-A), the interface 335 could allow the eNB 102 to communicate with other eNBs, such as eNB 103, over a wired or wireless backhaul connection. When the eNB 102 is implemented as an access point, the interface 335 could allow the eNB 102 to communicate over a wired or wireless local area network or over a wired or wireless connection to a larger network (such as the Internet). The interface 335 includes any suitable structure supporting communications over a wired or wireless connection, such as an Ethernet or RF transceiver.
The memory 330 is coupled to the controller/processor 325. Part of the memory 330 could include a RAM, and another part of the memory 330 could include a Flash memory or other ROM.
As described in more detail below, the transmit and receive paths of the eNB 102 (implemented using the RF transceivers 310a-310n, TX processing circuitry 315, and/or RX processing circuitry 320) support UL transmissions in dual connectivity operation.
Although FIGURE 3 illustrates one example of an eNB 102, various changes may be made to FIGURE 3. For example, the eNB 102 could include any number of each component shown in FIGURE 3. As a particular example, an access point could include a number of interfaces 335, and the controller/processor 325 could support routing functions to route data between -different_network~addresses. As another particular example, while shown as including a single instance of TX processing circuitry 315 and a single instance of RX processing circuitry 320, the eNB 102 could include multiple instances of each (such as one per RF transceiver).
In some wireless networks, DL signals include data signals conveying information content, control signals conveying DL Control Information (DCI), and Reference Signals (RS), which are also known as pilot signals. An eNB, such as eNB 102, transmits DL signals using Orthogonal Frequency Division Multiplexing (OFDM). The eNB 102 can transmit data information through Physical DL Shared CHannels (PDSCHs). The eNB 102 can transmit DCI through Physical DL Control CHannels (PDCCHs) or through Enhanced PDCCHs (EPDCCHs) - see also REF 1. The eNB 102 can transmit one or more of multiple types of RS, including a UE-Common RS (CRS), a Channel State Information RS (CSI-RS), and a DeModulation RS (DMRS) - see also REF 1. The eNB 102 can transmit a CRS over a DL system BandWidth (BW). A CRS can be used by UEs, such as UE 116, to demodulate data or control signals or to perform measurements. To reduce CRS overhead, eNB 102 can transmit a C SIRS with a smaller density than a CRS in the time or frequency domain. For channel measurement, Non-Zero Power CSI-RS (NZP CSI-RS) resources can be used. For Interference Measurements (IMs), CSI-IM resources associated with a Zero Power CSI-RS (ZP CSI-RS) can be used. The eNB 102 transmits DMRS only in the BW of a respective PDSCH or EPDCCH. The UE 116 can use the DMRS to demodulate information in a PDSCH or EPDCCH. A RS is associated with a logical antenna port that is mapped to a physical antenna in an implementation specific manner (see also REF 1).
UL signals also include data signals conveying information content, control signals conveying UL Control Information (UCI), and RS. UE 116 transmits data information or UCI through a respective Physical UL Shared CHannel (PUSCH) or a Physical UL Control CHannel (PUCCH). If UE 116 simultaneously transmits data information and UCI, UE 116 can multiplex both in a PUSCH. UCI includes Hybrid Automatic Repeat reQuest ACKnowledgement (HARQ-ACK) information, indicating correct or incorrect detection of data Transport Blocks (TBs) in a PDSCH or detection of a DCI format indicating a release of a Semi-Persistently Scheduled (SPS) PDSCH, Scheduling Request (SR) indicating whether UE 116 has data in its buffer, and Channel State Information — (CSI)— enabling eNB~iO2 to select appropriate parameters for PDSCH transmissions to UE 116. HARQ-ACK information includes a positive ACKnowledgement (ACK) in response to a correct (E)PDCCH or data TB detection, a Negative ACKnowledgement (NACK) in response to an incorrect data TB detection, and an absence of a (E)PDCCH detection (DTX) which can be implicit (that is, UE 116 does not transmit a HARQ-ACK signal) or explicit if UE 116 can identify missed (E)PDCCHs by other means (it is also possible to represent NACK and DTX with a same NACK/DTX state). For initial access or for subsequent synchronization purposes, UE 116 can also be configured by eNB 102 to transmit a Physical Random Access CHannel (PRACH). UL RS includes DMRS and Sounding RS (SRS) - see also REF 1. UE 116 transmits DMRS only in a BW of a respective PUSCH or PUCCH and eNB 102 can use a DMRS to demodulate information in a PUSCH or PUCCH. UE 116 transmits SRS to provide eNB 102 with an UL CSI. Similar to DL RS, an UL RS type (DMRS or SRS) is identified by a respective antenna port. A transmission time unit for DL transmissions or UL transmissions is a Sub-Frame (SF). A transmission power for a PUSCH, or a PUSCH, or a SRS is determined according to a respective UL power control process (see also REF 3). A UE, such as UE 116, can inform an eNB, such as eNB 102, using a Power Headroom Report (PHR) of an available power UE 116 has beyond one for a PUSCH or PUCCH transmission in a respective SF, regardless of whether UE 116 has an actual PUSCH or PUCCH transmission (see also REF 3 and REF 4). UE 116 can trigger a PHR by a change in a path-loss beyond a threshold or by some periodic timer.
FIGURE 4 illustrates an example UL SF structure for PUSCH transmission according to this disclosure. The embodiment of the UL SF structure shown in FIGURE 4 is for illustration only. Other embodiments could be used without departing from the scope of the present disclosure.
UL signaling uses Discrete Fourier Transform Spread OFDM (DFT-S-
NUL
OFDM). An UL SF 410 includes two slots. Each slot 420 includes s>™b symbols 430 where a UE transmits data information, UCI, or RS. The UE uses one or more symbols in each slot to transmit DMRS 440. A transmission BW includes frequency resource units that are referred to as Resource Blocks (RBs),
PUSCH transmission BW. The UE is allocated 1 RB for a PUCCH transmission. A last SF symbol can be used to multiplex SRS transmissions 460 from one or more UEs. A number of UL SF symbols available for data/UCI/DMRS
_ Λ_ Ν
transmission is **"*> > SRS . SRS if a last UL symbol supports SRS transmissions from UEs that overlap at least partially in BW with a PUSCH transmission BW; otherwise, ^SRS = 0. A transmission unit of 1 RB over 1 SF is referred to as a Physical RB (PRB).
A PDSCH transmission to a UE or a PUSCH transmission from a UE, such as UE 116, can be triggered either by dynamic scheduling or by SPS. Dynamic scheduling is by a DCI format that is conveyed by a PDCCH or an EPDCCH and includes fields providing PDSCH or PUSCH transmission parameters. UE 116 always monitors a DCI format 1A for PDSCH scheduling and a DCI format 0 for PUSCH scheduling. These two DCI formats are designed to have a same size and can be jointly referred to as DCI Format 0/1 A. Another DCI format, DCI format 1C, in a respective (E)PDCCH can schedule a PDSCH providing System Information (SI) for network configuration parameters to a group of UEs, or a response to PRACH transmissions by UEs, or paging information to a group of UEs, and so on. Another DCI format, DCI format 3 or DCI format 3A (can be jointly referred to as DCI format 3/3A) can provide Transmission Power Control (TPC) commands to a group of UEs for transmissions of respective PUSCHs or PUCCHs.
A DCI format includes Cyclic Redundancy Check (CRC) bits in order for UE 116 to confirm a correct DCI format detection. A DCI format type is identified by a Radio Network Temporary Identifier (RNTI) that scrambles the CRC bits. For a DCI format scheduling a PDSCH or a PUSCH to a single UE (unicast scheduling), the RNTI is a Cell RNTI (C-RNTI). For a DCI format scheduling a PDSCH conveying SI to a group of UEs (broadcast scheduling), the RNTI is a SI-RNTI. For a DCI format scheduling a PDSCH providing a response to PRACH transmissions from a group of UEs, the RNTI is a RA-RNTI. For a DCI format scheduling a PDSCH that pages a group of UEs, the RNTI is a P- RNTI. For a DCI format providing TPC commands to a group of UEs, the RNTI is a TPC-RNTI. Each RNTI type is configured to UE 116 through higher layer signaling, such as Radio Resource Control (RRC) signaling (see also REF 5), by eNB 102 (and the C-RNTI is unique for each UE). SPS transmission parameters -arenconfrgOr^t^UE~lT¾~from eNB~T02 through higher layer signaling and, for a DCI format associated with a SPS release, the RNTI is a SPS-RNTI.
In all remaining descriptions, unless explicitly noted otherwise, a configuration of a parameter to UE 116 refers to higher layer signaling of the parameter to UE 116 and higher layer signaling refers to RRC signaling or MAC signaling.
FIGURE 5 illustrates an example encoding process for a DCI format according to this disclosure. The embodiment of the encoding process shown in FIGURE 5 is for illustration only. Other embodiments could be used without departing from the scope of the present disclosure.
The eNB 102 separately codes and transmits each DCI format in a respective (E)PDCCH. A RNTI for UE 116, for which a DCI format is intended for, masks a CRC of a DCI format codeword in order to enable the UE to identify that a particular DCI format is intended for the UE. The CRC of (non-coded) DCI format bits 510 is computed using a CRC computation operation 520, and the CRC is then masked using an exclusive OR (XOR) operation 530 between CRC and RNTI bits 540. The XOR operation 530 is defined as: XOR(0,0) = 0, XOR(0,1) = 1, XOR(1,0) = 1, XOR(l,l) = 0. The masked CRC bits are appended to DCI format information bits using a CRC append operation 550, channel coding is performed using a channel coding operation 560 (such as an operation using a convolutional code), followed by rate matching operation 570 applied to allocated resources, and finally, an interleaving and a modulation 580 operation are performed, and the output control signal 590 is transmitted. In the present example, both a CRC and a RNTI include 16 bits.
FIGURE 6 illustrates an example decoding process for a DCI format according to this disclosure. The embodiment of the decoding process shown in FIGURE 6 is for illustration only. Other embodiments could be used without departing from the scope of the present disclosure.
A received control signal 610 is demodulated and the resulting bits are de- interleaved at operation 620, a rate matching applied at the eNB 102 transmitter is restored through operation 630, and data is subsequently decoded at operation 640. After decoding the data, DCI format information bits 660 are obtained after extracting CRC bits 650, which are then de-masked 670 by applying the XOR operation with a UE RNTI 680. Finally, UE 116 performs a CRC test 690. If the CRC test passes and the contents of the DCI format are valid, the UE 116 "determines ttenrDCHbrmat corresponding to the received control signal 610 is valid and determines parameters for signal reception or signal transmission; otherwise, the UE 116 disregards the presumed DCI format.
One mechanism towards satisfying an ever increasing demand for network capacity and data rates is network densification. This is realized by deploying small cells in order to increase a number of network nodes and their proximity to UEs and provide cell splitting gains. As a number of small cells increases and deployments of small cells become dense, a handover frequency and a handover failure rate can also significantly increase. Simultaneous UE connectivity to a macro cell and one or more small cells, where a UE maintains its RRC connection to a macro cell that provides a large coverage area while having a simultaneous connection to a small cell for data offloading, can avoid frequent handovers while allowing for high data rates. By maintaining the RRC connection to the macro- cell, communication with the small cell can be optimized as control-plane (C- plane) functionalities such as mobility management, paging, and system information updates can be provided only by the macro-cell while a small-cell can be dedicated for user plane (U-plane) communications.
One important aspect of a UE communication with multiple cells is a latency of a backhaul link between, for example, an e B of a small-cell and an eNB of a macro-cell. If the latency of the backhaul link can be practically zero, scheduling decisions can be made by a central entity and conveyed to each network node. Also, feedback from a UE can be received at any network node and conveyed to the central entity to facilitate a proper scheduling decision for the UE. This type of operation is referred to as carrier aggregation (see also REF 3).
If the latency of the backhaul link is not zero, it is not feasible in practice to use a central scheduling entity as the latency of the backhaul link will accumulate each time there is communication between a network node and the central scheduling entity thereby introducing unacceptable delay for a UE communication. Then, it is necessary that scheduling decisions are individually performed at each of the network nodes that are connected by a backhaul link with non-zero latency. Also, feedback signaling from a UE associated with scheduling from a network node needs to be received by the same network node. This type of operation is referred to as dual connectivity.
Several realizations exist to achieve operation with dual connectivity. A determining factor can be availability at the UE of multiple transmitter antennas -to-enable~simultafleous transmission on two different carrier frequencies. For brevity, the specifics of each possible realization to support dual connectivity are not discussed.
FIGURE 7 illustrates an example communication system using dual connectivity according to this disclosure. The embodiment of dual connectivity shown in FIGURE 7 is for illustration only. Other embodiments could be used without departing from the scope of the present disclosure.
A first UE such as UE 114, UE1 710, communicates in single connectivity with an eNB of a macro-cell such as eNB 102, that is referred to as Master eNB (MeNB) 720, using a first carrier frequency fl 730. A second UE such as UE 116, UE2 740, communicates in dual connectivity both with MeNB 710 over carrier frequency fl 730 and with an eNB of a small cell such as eNB 103, that is referred to as Secondary eNB (SeNB) 750, over carrier frequency f2 760.
A UE, such as UE 116, with two transmitter antennas can support dual connectivity using one antenna to transmit to a MeNB, such as eNB 102, and the other antenna to transmit to a SeNB, such as eNB 103. One important aspect for this operation is for UE 116 to determine first and second transmitter antennas to transmit to MeNB 102 and to SeNB 103, respectively. If both transmitter antennas are exactly equivalent, UE 116 can arbitrarily select one. However, transmitter antennas are practically never equivalent as one can experience a much larger propagation loss than the other due to Antenna Gain Imbalance (AGI). For example, AGI can occur due to a user's body placement or due to an orientation relative to a location of MeNB 102 or a SeNB 103. An AGI in the order of 3 decibel (dB) or 6 dB is typical. Therefore, significant reductions in coverage can occur if UE 116 selects for communication with MeNB 102 a transmitter antenna experiencing an additional propagation loss in the order of 6 dB. Moreover, by increasing a transmission power from a first transmitter antenna, a transmission power from a second transmitter antenna may need to decrease in order to avoid exceeding a specific upper bound in a total transmission power. This can also be disadvantageous as decreasing a transmission power from a second transmitter antenna can result in reduced achievable data rates for communication with SeNB 103.
When a UE communicates with a single eNB, or when the UE communicates with multiple eNBs that are connected over ideal backhaul, it is possible for a scheduling entity to dynamically indicate to the UE to use a specific -antenna-poi1rTh¾¾ efelTe¾~to as closedloop antenna selection. Operation with closed loop antenna selection can be limited to PUSCH and is associated with operation in a same carrier frequency as multiple antennas share a same Radio- Frequency (RF) component. An eNB, such as eNB 102, can indicate to a UE, such as UE 114, an antenna port to use for a PUSCH transmission by applying an additional mask to scramble a CRC of a DCI format scheduling the PUSCH. The eNB 102 can apply the additional mask through an additional operation as in step 530 of FIGURE 5. The eNB 102 can indicate to UE 114 a first antenna port to transmit a PUSCH by using a mask of all binary zeros (effectively, no additional masking is applied to a CRC of a DCI format beyond the one by a C-RNTI as in FIGURE 5). The eNB 102 can indicate to UE 114 a second antenna port to transmit a PUSCH by using a mask with a last element being a binary one and all remaining elements being binary zeros. This additional masking operation requires eNB 102 to enable antenna port selection only to UEs having C-RNTIs with a zero value for the most significant bit. When antenna selection is configured to UE 114, SRS transmissions alternate consecutively among antenna ports in SFs configured to UE 114 from eNB 102 for SRS transmission. Antenna selection does not require UE 114 to have multiple transmitter antennas (multiple radio-frequency components such as filters or amplifier). Instead, antenna selection can apply among different antenna ports sharing a single RF chain.
Extending a conventional operation for closed loop antenna selection to different transmitter antennas is not possible in case of dual connectivity as a nonzero latency of a backhaul link between a MeNB and a SeNB necessitates respective independent and uncoordinated scheduling entities. Moreover, a MeNB and a SeNB typically operate in different carrier frequencies.
A power of an UL transmission by a UE, such UE 114, is controlled by an eNB, such as eNB 102, to achieve a desired target for a received Signal to
Interference and Noise Ratio (SINR) while reducing interference to neighboring cells and controlling Interference over Thermal (IoT) noise thereby ensuring respective reception reliability targets. UL Power Control (PC) can include an
Open-Loop (OL) component with cell-specific and UE-specific parameters and a
Closed-Loop (CL) component associated with Transmission Power Control (TPC) commands eNB 102 provides to UE 114 through transmission of DCI formats.
P (i)
In SF 1 , a PUSCH transmission power PUSCHc , a PUCCH transmission power PUCCH )j a SRS transmission power SRS(')? and a PRACH transmission power ^PRACH (*'") are determined according to respective UL power control processes (see also REF 3). A transmission power determined according to an UL power control process will be referred to as nominal transmission power.
For operation with carrier aggregation, if a total nominal transmission power from a UE, such as UE 114, in SF » is larger than a maximum transmission power CMAX0) for TJJ? 114 in SF ' , UE 114 first allocates power to a PRACH transmission, if any. If UE 114 does not have a PRACH transmission, UE 114 first allocates power to a PUCCH transmission, if any. Subsequently, denoting by P the linear value of a transmission power P in dB per milliwatt conveys UCI, if according to
MAX ) ^PUCCH O) AUSCHJ( > O ? UE 114 scales a nominal transmission power of each remaining PUSCH transmission by a same factor w^ so that Σ W( · AuSCH.cC ≤ ( MAX( - AuCCH (0 " ^PUSCHJ ( )
C≠J . UE 114 can also set w( = for one or more of remaining PUSCH transmissions (see also REF 3).
Similar to ensuring that a total UE transmission power in SF ' is not larger than PcMAX ^ in case of operation with carrier aggregation, it also needs to be ensured that a total UE transmission power in one or more cells of a MeNB and in one or more cells of a SeNB in SF ' is not larger than ^CMAX ) in case Gf operation with dual connectivity. If UE 116 is power limited (total nominal transmission power exceeds CMAX ( )? \j \ \ can prioritize power allocation to transmitted channels or signals in a similar manner as UE 114 operating with carrier aggregation. For example, power allocation to PRACH transmissions in one or more cells is prioritized over other transmissions. For example, HARQ- ACK/SR transmission to MeNB 102 is prioritized over transmissions other than PRACH (see also REF 7). Therefore, an allocation of power can be according to a function performed by each transmission with PRACH having the highest priority, followed by HARQ-ACK/SR, followed by CSI, followed by data, while power to SRS is allocated last (see also REF 3 and REF 7).
A UE can indicate to an eNB an amount of power it has in addition to the power used for a current transmission through a PHR - see also REF 3. A positive -PHR-value n^icate th¾nthe~UE can increase its transmission power. The PHR is included in a MAC CE that is transmitted from the UE as part of its data in a PUSCH (see also REF 4). For example, if the UE does not transmit PUSCH in SF ' for serving cell c , a type 1 PHR is computed as in Equation 1
PHtypel fi(i = -¾ A c(
[dB] ... (l) where (see also REF 3), CMAX ,C Js computed based on the
P (1)
requirements in REF 6, O_PUSCH,C V -s a parameter provided by higher layer signaling to the UE and controlling a mean received SINR at the eNB, α^ is a cell-specific parameter configured by higher layer signaling to the UE with 0< ac(l) < 1 ^ PLC js a path-loss estimate calculated at the UE for serving cell c in deciBel (dB), and is a function accumulating a CL TPC command δ puscH 0) included in a DCI format scheduling a PUSCH transmission to the UE in SF ' , or in a DCI Format 3, with being a first value after reset of accumulation. One or more embodiments of this disclosure provide mechanisms to enable a MeNB or a SeNB to measure a signal a UE transmits from a first antenna and a signal the UE transmits from a second antenna. One or more embodiments of this disclosure also provide mechanisms to support antenna selection for a UE operating with dual connectivity and to indicate to the UE a transmitter antenna for communication with a MeNB or with a SeNB. Finally, one or more embodiments of this disclosure provide mechanisms to avoid a total transmission power from a UE to a MeNB and to a SeNB exceeding a maximum transmission while avoiding penalizing coverage or achievable data rates.
In the following, for the first and the second embodiments, antenna selection is primarily considered between two UE transmitter antennas for operation dual connectivity with a MeNB and a SeNB. However, embodiments of this disclosure are not limited to two UE transmitter antennas or to two eNBs and can be applicable for more than two UE transmitter antennas or for more than two eNBs.
Embodiment 1: Indication of UE Transmitter Antennas for Dual Connectivity
The first embodiment illustrates that a UE capable for operation with dual connectivity, such as UE 116, first establishes initial connection with a MeNB, "such as eNB~lO27Subsequently, MeNB 102 configures UE 116 for operation with dual connectivity that includes a SeNB, such as eNB 103.
While UE 116 communicates with MeNB 102, the MeNB 102 can determine a propagation loss associated with each transmitter antenna of UE 116. For example, MeNB 102 can configure a SRS transmission from each antenna port of UE 116 and obtain an estimate of the propagation loss for each transmitter antenna port. It is also possible that MeNB 102 instructs UE 116 to perform such SRS transmissions to SeNB 103, after UE 116 is configured by MeNB 102 for operation with dual connectivity, and for SeNB 103 to inform MeNB 102 of respective measurements over a backhaul link. The MeNB 102 can then use this additional information in a selection of an antenna for transmissions from UE 116 to MeNB 102 or to SeNB 103. For example, based on the SRS receptions, a controller at MeNB 102 can determine a subset of the set of transmitter antennas for UE 116 for transmissions to MeNB 102 (or to SeNB 103).
Upon configuring initialization of dual connectivity to UE 116, MeNB 102 can include a configuration element, antenna selection SeNB, informing UE 116 of an antenna port to use for transmissions to SeNB 103. Equivalently, MeNB 102 can include a configuration element, antenna selection MeNB, informing UE 116 of an antenna port to use for transmissions to MeNB 102.
When UE 116 is equipped with two transmitter antennas, antenna selection SeNB can include one bit wherein a value of Ό' can correspond to a transmitter antenna port UE 116 associates with a first SRS transmission and a value of Ί ' can correspond to a transmitter antenna port UE 116 associates with a second SRS transmission. When UE 116 is equipped with four transmitter antennas, antenna selection SeNB can include two pairs of two bits (or four bits) and an association with the transmitter antenna ports of UE 116 can be according to respective SRS transmissions (see also REF 3).
FIGURE 8 illustrates an example selection of transmitter antenna ports for a UE with two transmitter antennas that is configured by a MeNB for operation with dual connectivity according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof serially rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is ~~ implemerited~by processing circuitry in a transmitter chain in, for example, a mobile station
MeNB 102 configures UE 116 having two transmitter antenna ports for dual connectivity operation with SeNB 103 using a configuration that includes a 1-bit configuration element antenna selection SeNB (or a 1-bit configuration element antenna selection MeNB) 810. UE 116 examines whether a binary value of antenna selection SeNB is equal to zero 820. If the binary value of antenna selection SeNB is equal to zero (or if the binary value of antenna selection MeNB is equal to one), UE 116 selects for communication with SeNB 103 a first transmitter antenna port 830 (and selects for communication with MeNB 102 a second transmitter antenna port). For example, the first transmitter antenna port can correspond to SRS transmission from the first antenna port when UE 116 operates in single connectivity with MeNB 102. If the binary value of antenna selection SeNB is equal to one (or if the binary value of antenna selection MeNB is equal to zero), UE 116 selects for communication with SeNB 103 a second transmitter antenna port 840 (and selects for communication with MeNB 102 a first transmitter antenna port). For example, the second transmitter antenna port can correspond to SRS transmission from the second antenna port when UE 116 operates in single connectivity with MeNB 102. A configuration of antenna selection SeNB (or of antenna selection MeNB) by MeNB 102 to UE 116 is by higher layer signaling in a PDSCH and a conventional eNB transmitter structure and UE receiver structure can apply - a respective description is not repeated for brevity.
Embodiment 2: Indication of Transmitter Antenna after Configuration of Dual Connectivity
The second embodiment illustrates an adaptation of a transmitter antenna port for a UE operating with dual connectivity, such as UE 116. Due to mobility or rearrangement of UE 116 position (orientation) relative to MeNB 102 or SeNB 103, a choice of UE 116 transmitter antenna port for communication with MeNB 102 or SeNB 103 can vary with time.
FIGURE 9 illustrates an example UE transmitter antenna switching between a MeNB and a SeNB according to this disclosure. The embodiment of UE transmitter antenna switching between a MeNB and a SeNB shown in FIGURE 9 is for illustration only. Other embodiments could be used without departing from the scope of the present disclosure.
Tn some UlrSFs7~UE-lT6 uses a first antenna port 910 to transmit to MeNB 102 920 and a second antenna port 930 to transmit to SeNB 103 940. In some other UL SFs, based for example on signaling from MeNB 102, UE 116 uses the second antenna port 930 to transmit to MeNB 102 920 and the first antenna 910 port to transmit to SeNB 103 940.
To enable adaptation of a transmitter antenna port for UE 116 operating with dual connectivity, UE 116 can be allocated UL measurement gaps. During measurement gap UL SFs, UE 116 transmits signals, such as SRS, that can be received by MeNB 102 (or SeNB 103) wherein SRS transmissions are at least from antenna ports UE 116 uses to transmit signals to SeNB 103 (or MeNB 102, respectively) in other UL SFs. Contrary to a conventional use of measurement gaps where measurements are performed by a UE based on signals, such as a CRS, from respective transmission points, measurement gaps to enable UE 116 antenna port selection for communication with MeNB 102 or SeNB 103 are performed by MeNB 102 or SeNB 103 based on signals transmitted by antennas ports from UE 116. Measurement gaps can be a number of consecutive UL SFs (or, in general, either DL SFs or UL SFs), such as for example 1 UL SF or 2 UL SFs, and have a periodicity in a number of frames, such as for example 8 frames, where a frame includes 10 SFs. A SF offset can also be configured to UE 116 for measurement gap UL SFs. Multiplexing SRS transmissions from multiple transmitter antenna ports of UE 116 can be in a same symbol of a same SF using means for an assignment of respective SRS transmission parameters (see also REF 3). Measurement gap UL SFs can be configured to coincide for MeNB 102 and SeNB 103 in order to reduce an impact on DL transmissions to UE 11 .
FIGURE 10 illustrates a UE operation with single connectivity during measurement gap UL SFs and with dual connectivity in other UL SFs according to this disclosure. The embodiment of UE operation shown in FIGURE 10 is for illustration only. Other embodiments could be used without departing from the scope of the present disclosure.
UE 116 is configured with two measurement gap UL SFs 1010. The two measurement gap UL SFs can be, for example, for a carrier frequency corresponding to MeNB 102. The measurement gap UL SFs can also be with an offset value 1020 relative to a frame with System Frame Number (SFN) of 0. For example, the offset value can range between 0 and the value of the repetition period 1030 minus the number of measurement gap UL SFs. During measurement "gl ^UlirSF^UE^l ^ntransmits^S S rom one or more antenna ports including at least the one or more antenna ports UE 116 uses to transmit to SeNB 103 in other UL SFs. A similar configuration can apply for SeNB 103 but a duplication of a description is omitted for brevity.
A configuration for measurement gap UL SFs can be communicated by MeNB 102 to both UE 116 and SeNB 103 so that SeNB 103 knows to avoid scheduling UE 116 in UL SFs that would require UL transmissions from UE 116 during measurement gap UL SFs. The configuration can include both UL SFs where UE 116 can transmit only to MeNB 102 and UL SFs where UE 116 can transmit only to SeNB 103 in case UE 116 is in an RRC CONNECTED state. It can also be possible to support such measurement gaps for UEs in a RRC IDLE state.
A separate configuration of parameters for SRS transmissions in measurement gaps UL SFs, compared to the configuration of parameters for SRS transmissions in other UL SFs, can be informed to UE 116. For example, a periodicity of SRS transmissions during measurement gaps UL SFs, if more than one, can be one UL SF while a periodicity of SRS transmissions in other SFs can be more than one UL SF. Alternatively, if a measurement gap UL SF coincides with an UL SF where a UE has a configured SRS transmission, a same configuration of parameters can be used for SRS transmission in the measurement gap UL SF but UE 116 transmits from a different antenna port. For example, if in a measurement gap UL SF UE 116 has configured SRS transmissions from a first antenna port to MeNB 102 and, with dual connectivity, UE 116 transmits to SeNB 103 using a second antenna port, the SRS transmission from the second antenna port can use the configured resources for the first antenna port.
Measurement gaps can also be dynamically triggered to UE 116 by MeNB 102, for example in response to a PHR from UE 116 indicating power limited operation. Then, instead of configuring measurement gaps UL SFs to occur periodically, UE 116 can be informed by MeNB 102, for example by higher layer signaling, a configuration of measurement gap UL SFs. Transmission parameters during measurement gap UL SFs, such as a starting SF after the triggering or a duration of measurement gap UL SFs, can be either predetermined in a system operation, or configured in advance to UE 116, or can be included in the higher layer signaling. Alternatively, instead of measurement gap UL SFs, MeNB 102 can direct UE 116 to switch transmitter antennas using either higher layer "signaling or~dynamic1signaiing as for antenna selection. Such capability may only be allowed to MeNB 102 (that is, SeNB 103 may not direct UE 116 to switch transmitter antennas).
FIGURE 11 illustrates a use of measurement gap UL SFs according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof serially rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is implemented by processing circuitry in a transmitter chain in, for example, a base station.
MeNB 102 configures UE 116 operating with dual connectivity that includes SeNB 103, with a number of one or more measurement gap UL SFs for MeNB 102 and SeNB 103 1110. An offset can also be configured. During measurement gap UL SFs for MeNB 102, UE 116 transmits SRS at least from antennas ports UE 116 uses to transmit signaling to SeNB 103 in other UL SFs 1120. During measurement gap UL SFs for SeNB 103, UE 116 transmits SRS at least from antenna ports UE 116 uses to transmit signaling to MeNB 102 in other UL SFs 1125. Based on measurements from SRS transmissions in step 1120 and in step 1125, MeNB 102 configures UE 116 a first antenna port for transmissions to MeNB 102 and a second antenna port for transmissions to SeNB 103 1130. This configuration can also be based on feedback, from SeNB 103 to MeNB 102 over a backhaul link, of the SRS measurements in step 1125.
Embodiment 3: Allocation of Transmission Power per Transmitter Antenna
The third embodiment illustrates setting a maximum guaranteed power for
UE transmissions to a MeNB, such as eNB 102, and setting a maximum guaranteed power for UE transmissions to a SeNB, such as eNB 103.
Alternatively, the third embodiment considers setting a minimum guaranteed power for UE transmissions to a MeNB, such as eNB 102, and setting a minimum guaranteed power for UE transmissions to a SeNB, such as eNB 103. A requirement for a total maximum transmission power in SF , PCMAX(i) , to both
MeNB and SeNB is considered to be either predefined or configured to UE 116 as for operation with single eNB connectivity (see also REF 3 and REF 6).
Due to independent schedulers at MeNB 102 and SeNB 103 and a non- — zero~lateffcy^f^b ickhauriini between MeNB 102 and SeNB 103, it is possible for UE 116 to have first transmissions to MeNB 102 and second transmissions to SeNB 103 in SF i . As the two transmissions are mutually independent, their respective nominal powers are independently determined and the total value can exceed a maximum UE transmission power PCMAX (i) .
If UE 116 transmits only to MeNB 102 or only to SeNB 102 in in SF a maximum transmission power can be ^CMAX ) por example, if MeNB 102 uses Frequency Division Duplexing (FDD) and SeNB 103 uses Time Division Duplexing (TDD), UE 116 can assume a maximum available power of ^CMAX ) for transmissions to MeNB 102, at least in SFs that fully overlap with DL SFs at SeNB 103 (for synchronous operation between MeNB 102 and SeNB 103 as defined in REF 3). Asynchronous operation occurs when SF overlapping exceeds a fraction of a SF symbol. For example, for asynchronous operation, UE 116 can assume a maximum available power of ^CMAX (') for transmissions to MeNB 102 in a SF when SeNB 103 uses TDD and the SF overlaps with two DL SFs in SeNB 103. Therefore, based on information from SeNB 103 to MeNB 102 of a UL/DL configuration used by SeNB 103 (possibly of multiple UL/DL configurations if UE 116 communicates in multiple respective cells of SeNB 103) over a backhaul link, MeNB 102 can use this information in scheduling UE 116. For example, a higher UL spectral efficiency associated with a larger data TB requiring a higher transmission power by UE 116 can be targeted in SFs that are DL SFs at SeNB 103. Similar, as MeNB 102 and SeNB 103 can configure different Discontinuous Reception (DRX) patterns for UE 116, where UE 116 does not transmit or receive signaling while on DRX mode, MeNB 102 and SeNB 103 can exchange DRX patterns over a backhaul link.
A conventional approach to satisfy a condition for a total transmission power in SF ' to not exceed ^CMAX C is to equally split ^CMAX ) among UE 116 transmissions to MeNB 102 and SeNB 103. However, such a partitioning of a maximum transmission power is suboptimal as it does not consider requirements for UE 116 transmission power to MeNB 102 or to SeNB 103. For example, always restricting to ^CMAX )/2 a maximum power for UE 116 transmissions to MeNB 102 results to a reduction in cell coverage by a factor of 2. Then, even though UE 116 can be located far from MeNB 102 (near an edge of a macro-cell) and near SeNB 103 and can benefit from dual connectivity, UE 116 may not be able to maintain a connection to MeNB 102 after it is configured to operate with ~dualn;onnectlvit3 duel;o coverage reduction. Conversely, as SeNB 103 typically serves a small-cell, restricting to ^ΜΑΧ ( /2 a maximum power for an antenna port UE 116 uses to transmit to SeNB 103 is of little consequence as a maximum transmission power required in practice is typically much smaller than ^CMAX . However, if UL throughput to SeNB 103 is to be maximized for UE 116 and UE 116 is not near coverage limiting conditions for MeNB 102, a larger power can be allocated for UL transmissions to SeNB 103 than when UE 116 is near coverage limiting conditions for MeNB 102. Therefore, configurability of a transmission power of UE 116 to MeNB 102 or to SeNB 103, while ensuring that UE 116 maintains a communication link with both MeNB 102 and SeNB 103, is beneficial.
In order to improve a use of available power for transmissions from UE 116 to MeNB 102 and to SeNB 103 in SF a maximum power for UE transmissions to MeNB 102 and a maximum power for UE transmissions to SeNB 103, < ΑΧ Μ«ΝΒ( AND respectively, can be configured to UE
higher layer signaling in a PDSCH and a conventional eNB transmitter structure and UE receiver structure can apply - a respective description is not repeated for brevity. Moreover, a controller at MeNB 102 can determine values for ^MeNB or /seNB based, for example, on UE 116 coverage considerations or target data rates as it was described in the previous paragraph.
Prior to a configuration of or cMAx_seNB (0? SeNB 103 can communicate over a backhaul link to MeNB 102 a required transmission power from UE 116 to SeNB 103. For UE 116, this required transmission power can be determined, for example, by a coverage area or interference characteristics -associated-with^eNB-l 03-for^
transmission power from UE 116 to SeNB 103, P CMIN^MB (Vi) ^ as jt js subsequently described) can be set so that this power requirement from UE 116 to SeNB 103 is satisfied. MeNB 102 can also communicate to SeNB 103 an allocation of
^cMAX MeNB ( and ^cMAx.seNB (0 for UE 116 (or, alternatively, an allocation of required transmission power from P (i)
UE 116 to MeNB 102, CMINJ^NB ^ AND OF P cMi _seNB ( wi) as ft js subsequently described). For example, MeNB 102 can allocate to UE 116 having CMAX(0 = 23 dB per mimwatt (dBm)
^CMAX.MeNB (0 = 22.5 ^ RCMAX SeNB ) = 13 ^ ^ cMAx_MeNB(0 + ^cMAx.seNB (0 = ^CMAX (0 ) This information can enable SeNB 103 to improve its scheduling decisions for UE 116 by knowing a value of CMA CNB V (or a value of cMiN_MeNB(0 ^ for MeNB 102
Method 1 : Setting a maximum UE transmission power for a MeNB and a maximum UE transmission power for a SeNB If, in SF , UE 116 has a first UL transmission with power RMENB( to MeNB 102 and a second UL transmission with power SENB( to SeNB 103 and Ι6ΝΒ( + 6ΝΒ( > ΜΑΧ( > a power reduction of a total transmission power, ιεΝΒ ) + ;βΝΒ( > to less than or equal to CMAX( can depend on the values of ^cMAX MeNB ') AND ^CMAX SENB( . or on the values of MENB( and
instead of being same for both MeNB 102 and SeNB 103 for a same information type transmission to MeNB 102 and SeNB 103. This is because, for example, applying a same amount of power reduction for transmissions to MeNB 102 and to SeNB 103 can have a more degrading effect to transmissions to SeNB 103 as -^CMAX SeNB (0 or PSem(i) can be much smaller than CMAX MENB( or ^MeNB ) > respectively. This power reduction can apply when UE 116 transmits a same information type, such as data information or HARQ-ACK information, to both MeNB 102 and SeNB 103, while when different information types are transmitter, power allocation can be according to a relative priority of each information type (see also REF 3 and REF 7).
In a first alternative, a total transmission power from a UE in SF to MeNB 102, RMENB( , is limited to not exceed CMAX m<;NB( and total transmission power from UE 116 to a SeNB, ^ENB( > is limited to not exceed ^cMAx_seNB( - In the first alternative, PCMAX _MeNB() and CMAX SENB( act as upper bounds for a transmission power from UE 116 to MeNB 102 and to SeNB 103, respectively, when UE 116 is power limited (PMem(i)+ s^B(i)>PCM/ i))- UE 116 determines, according to respective UL power control processes, a transmission power PMem(i) to MeNB 102 and a transmission power PSeiS&(i) to SeNB 103.
If ^MeNB( >-PCMAX_MeNB( °Γ if ^SeNB (0 > ^max_SeNB (0 > UE 116 first SetS
-^MeNB (0 = -^CMAX MeNB (0 or SeNB( = ^cMAx seNB( , respectively, according to whether power allocation is prioritized according to information UE 116 transmits to MeNB 102 or according to information UE 116 transmits to SeNB 103. The first alternative can also apply when PCMAX _Mi:NB( + PCMAX_Sem(i) = PCMAX( for asynchronous transmissions to MeNB and SeNB.
Denoting by CMAX(), ΜΑΧ_Μ«ΝΒ( » ^Μ^ΝΒ ') » ^( » a»d PSem(i) the linear values of pCUAX, CMAX MeNB, />CMAX SeNB, i>MeNB and pSeNB, respectively, if a reduction of P^u = PMeNB(i)+PSeNB(i - uAxi) in a total transmission power is required to avoid a total transmission power larger than PCMAX(i), then in a first approach of the first alternative, UE 116 can reduce a transmission power to MeNB 102 by duce( - #™J + )) (or by duce( --PCM β a transmissio (or bY dUce( - , a function of (0 311(1 ( m accordance to the first approach is to control a power scaling for channels conveying a same information type that UE 116 transmits to MeNB 102 and SeNB 103 in case a total transmission power exceeds PCM X(i) by acting as power scaling factors ( FCMAX MeNB (0 and PCMAX SeNB(i) are power scaling factors for determining a reduction in transmission power to MeNB 102 and SeNB 103, respectively, when M,m(i) + Ps^ (i) > PCUAX^ and each can a same value independently of SF /).
In a second approach of the first alternative, a reduction in transmission power from UE 116 to MeNB 102 can be computed as duce( - eNB( /( eNB( + ( ) and a reduction in transmission power to SeNB 103 can be computed as reduce( ) · PSem(i)/(pUeHB i) + ( ) ·
In a third approach of the first alternative, a reduction in transmission power to MeNB 102 can be computed as reduce(/ /MeNB and a reduction in transmission power to SeNB 103 can be computed as reduce(0 SeNB where /MeNB and /SeNB are configured to UE 116 by MeNB 102 through higher layer signaling
alternative realization of the first approach and the first and third approaches are functionally equivalent.
FIGURE 12 illustrates a determination of a transmission power to a
MeNB and of a transmission power to a SeNB in accordance to a first alternative according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof serially rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is implemented by processing circuitry in a transmitter chain in, for example, a mobile station.
In SF i , UE 116 determines a power MeNB(/') for transmissions of channels or signals (PUCCH, PUSCH, PRACH, SRS) to MeNB 102 and a power SeNB( for transmissions of channels or signals (PUCCH, PUSCH, PRACH SRS) and that ma ) or NB( > NB™( 1220 and, if so, UE 116 sets PMem(i) = PCUAXJA^Q) or 4NB( = MAx_seNB( > respectively 1230, according to a relative priority of information types UE 116 transmits to MeNB 102 or SeNB 103. CMAX MeNB( and MAX S.NBO can t>e configured to UE 116 by MeNB 102 by configuring respective fractions of CMAX( , fMem ∞-ά /SeNB , as it was previously described. Subsequently, if PCMAXMem(i) +4*ΑΧ_*ΝΙ#) > MAX( is enabled, UE 116 determines whether eNB ')+4NB( >4,Ax( 240· If 6ΝΒ( +4ΝΒ( > 1ΑΧ( > UE scales AtoNB( by a factor wMem and scales NB() by a factor wSeNB (when a same type of information is transmitted to both MeNB 102 and SeNB 103), so that *ΝΒ( + ΝΒ( ≤4ΜΑΧ( I250· The scaling factors wMeNB and wMeNB can be either configured to UE 116 by MeNB 102 or be determined by UE 116 using other parameters, such as CMAX MeNB( and CMAX SeNB( or MENB() and PSENB( ), as it was previously described for the three approaches of the first alternative. Finally, UE 116 transmits channels or signals to MeNB 102 with P m(i) transmission power and transmits channels-or-signals o--SeNB-l-03-with— transmission power 1260.
In a second alternative, a power for transmissions of channels or signals to MeNB 102 or to SeNB 103 is determined separately and independently for MeNB 102 and for SeNB 103. In SF /, UE 116 computes a power MeNB( f r transmissions of channels or signals to MeNB 102 and a power 4NB( f°r transmissions of channels or signals to SeNB 103 using respective UL power control processes. If *^(0 +4™(0> *AX( and if eNB(0> ^ MbNB( or ΝΒ( >4ΜΑΧ_!«®( » UE li6 either SetS 4eNB( = ,AX_MeNB( °Γ SetS
4NB( = MAX SeNB ( ' respectively, depending on whether UE 116 prioritizes power allocation to MeNB 102 or SeNB 103. Assuming, for example, that UE 116 prioritizes power allocation to MeNB 102 then, for MAX + MAX ≤ MAX( , UE 116 sets PMeNB( as the smaller of (a) a nominal eNB( and (b) the difference between PCMAX() and the smaller of NB( and 4ΜΑΧ &ΝΒ( · Therefore, Then,
FIGURE 13 illustrates a determination for a transmission power from a
UE antenna to a MeNB and for a transmission power from a UE antenna to a
SeNB in accordance to the second alternative according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof serially rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is implemented by processing circuitry in a transmitter chain in, for example, a mobile station.
MeNB 102 configures to UE 116 a power PCMAX MeNB(i) f°r transmissions to MeNB 102 and a power CMAX seNB( f°r transmissions to SeNB 103 1310. Using respective power control processes for transmissions of channels or signals to MeNB 102 and for transmissions of channels or signals to SeNB 103, UE 116 determines in SF a (nominal) transmission power MENB() and a (nominal) transmission power SI5NB( 1320. Assuming UE 116 prioritizes power allocation for transmissions to MeNB 102, UE 116 examines whether,
"¾^(0+¾NB( >¾MAX(0 1330. If Μ6ΝΒ( + ΝΒ( > ΜΑΧ('') , UE 116 sets eNB( = min(4MAx( - Π»» ¾ΜΑΧ_«ΝΒ(. ΝΒ (o) A*NB (o) 1340 and = ( ) 1345. Finally, UE 116 transmits to MeNB 102 using power PMENB() 1350 and transmits to SeNB 103 using power PSsm(j) 1355.
In a third alternative, in SF /, UE 116 uses MAX MeNB (0 as a maximum transmission power to MeNB 102 or uses CMAXSeNB(0 as a maximum transmission power to a SeNB 103 only if a total transmission power from UE 116 exceeds CMAX(/); otherwise, UE 116 does not limit its transmission power to MeNB 102 to PCMAX Mem(i) an(l does not limit its transmission power to SeNB
103 tO CMAX_SeNB( · If MAX_MeNB( + seNB( > MAx( ^ ^ limiting Ά transmission power to MeNB 102 to PCMAX MeNB( and to SeNB 103 to CMAX se e ") > a total transmission power from UE 116 still exceeds PCMAX(i), power reduction can apply so that for a final total transmission power from UE 116 to MeNB 102 (WO) and to SeNB 103( SeNB( )is W0+ NB(0≤ «AX(0- A benefit of the third alternative is that, for ^CMAX MeNB (0 + ^CMAX seNB (0 - zMAx ( ' ^ limits a transmission power from UE 116 to either MeNB 102 to be PCMAX Mem (i) or to SeNB 103 to be CMAX SeNB( (according to a respective prioritization of power allocation) only if PMem( + PSem(i) > PCMAX(i) and only if MeNB ) > ΜΑΧ_Μ6ΝΒ (0 or 4NB(0 > ΛΜΑΧ_&ΝΒ(0 » respectively. Then, unlike the first alternative where they serve as scaling factors for reducing a transmission power to not exceed PCMAX(i) , in the third alternative pCMAX MeNB ( ) and CMAX seNe( serve to distribute an available maximum power PCMAX(i) in SF to MeNB 102 and to SeNB 103 when nominal transmission powers by UE 116 (according to respective UL power control processes) are such that Ι6ΝΒ( + ΝΒ(')> ΜΑΧ( · This simplifies power allocation to MeNB 102 and to
SeNB 103 in case UE 116 is configured for UL transmissions in multiple cells served by MeNB 102 or in multiple cells served by SeNB 103.
FIGURE 14 illustrates a determination for a transmission power from a UE antenna transmitting to a MeNB and for a transmission power from a UE antenna transmitting to a SeNB in accordance to the third alternative according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof seriallv_ rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is implemented by processing circuitry in a transmitter chain in, for example, a mobile station.
In SF i , UE 116 determines a power eNB( for transmissions of channels or signals (such as PUCCH, PUSCH, PRACH, SRS) to MeNB 102 and a power ScNB(/') for transmissions of channels or signals (such as PUCCH,
PUSCH, PRACH, SRS) to SeNB 103 according to respective UL power control processes 1410. UE 116 then determines whether PMeNB(i) + PSem(i) > PCMAX(i) 1420. If eNB( + NB( > MAx( , UE 116 determines whether MeNB( ) > CMAX MeNB ( ) or ΝΒ( > ΜΑΧ_56ΝΒ( and, if so, UE 116 sets either MeNB(/) = CMAX MeNB ( ) or =NB = CMAX seNB (0 1430 (according to whether UE 116 prioritizes power allocation to SeNB 103 or MeNB 102, respectively). Subsequently, UE 116 determines if eNB( + NB( > MAx( 1450 and> if so> UE 1 16 sets
AfcNB ( = ^MeNB " AteNB ( Άη0 NB (0 = ^SeNB ' AeNB (0 » ¾t leaSt When 3 S£ime type of information is transmitted to both MeNB 102 and SeNB 103, so that 145°- Finally, after step 1450, or if at step 1420 or step 1450 it is PMeNB(i +PseNB(i ≤fc' MAx(i) ^ UE H6 transmits channels or signals to MeNB 102 with PMem( ) transmission power and transmits channels or signals to SeNB 103 with PSem(i) transmission power 1460.
In a variation of the third alternative, in SF , UE 116 can first examine whether reducing a transmission power to a first eNB, such as SeNB 103, to a first configured power avoids a total transmission power exceeding MAX(0 before reducing a transmission power to a second eNB, such as MeNB 102, to a second configured power. For example, UE 116 can first examine whether reducing a transmission power to a SeNB to PCMAX SeNB( ) avoids a total transmission power larger than PCMAX(i) before reducing a transmission power to MeNB 102 to MAX( ~ MAX seidi (when applicable). The eNB that UE 116 first considers reducing a transmission power to can be either predetermined according to a prioritization of respective information types (see also REF 3 and REF 7) with MeNB 102 being prioritized for a same information type, or be configured in conjunction with a configuration for operation with dual connectivity such as for example prioritizing an earlier transmission in case of asynchronous operation. Therefore, if PMe i) + , B<J) > MAX(0 » eNB(0 > MAX » and
a remaining power to MeNB 102 ( PUem(i) = MAX( - PcuAxja t )·
FIGURE 15 illustrates a determination for a transmission power from a UE antenna transmitting to a MeNB and for a transmission power from a UE antenna transmitting to a SeNB in accordance to a variation of the third alternative according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof serially rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is implemented by processing circuitry in a transmitter chain in, for example, a mobile station.
In SF , UE 116 determines a power MeNB(z) for transmissions of channels or signals (such as PUCCH, PUSCH, PRACH, SRS) to MeNB 102 and a power PSem(i) for transmissions of channels or signals (such as PUCCH,
PUSCH, PRACH, SRS) to SeNB 103 according to respective UL power control processes 1510. UE 116 then determines whether 6 ( + 4 ( > ( 1520. If eNB( + ( > ( , UE 116 determines whether SeNB( (0 and. if so, UE 116 sets 4 ( = PCMAX SeNB () 1530. Subsequently, UE 116 determines whether i> MeNB(/) + PSeNB() > 4 ( 1535 and, if so, UE 116 sets 1540. Subsequently, if
(+ ^/)> ( , UE 116 determines if 46 4 ( >4 ( 1545 and, if so, UE 116 sets PMem () = wMeNB · 4eNB (i) and AeNB (0 = wseNB " 4 (0 » at least when a same type of information is transmitted to both MeNB 102 and SeNB 103, so that = ( + (0 <4 (0 15 0. Finally, after step 1550, or if at step 1520 or step 1535, or step 1545 if 6 ( + ( ≤ ')> UE 116 transmits a channel to MeNB 102 with PMem(i transmission power and transmits a channel to SeNB 103 with 4 ( transmission power 1560.
If in SF UE 116 transmits data to MeNB 102 and to SeNB 103 in multiple cells served by MeNB 102 and in multiple cells served by SeNB 103, respectively, and if 4 ( +4 ( >4 ( with 4eNB() > 4MAX_MeNt) and
individually performed for MeNB 102 (for MeNB cells) and for SeNB 103 (for SeNB cells), subject to a total respective transmission power from UE 116 not exceeding (0 or 4 ( , respectively, when
( + 4 ( = 4 ( · Otherwise, if UE 116 is not configured by MeNB 102 values of 4MAX MeNB() and PCUAX Sem(i), UE 116 can jointly perform a power allocation for data transmission to each of the multiple cells for MeNB 102 and SeNB 103 by scaling each transmission power by a same value so that a total resulting transmission power does not exceed 4 ') (f°r example, as in the second approach of the first alternative).
Method 2: Setting a minimum UE transmission power for a MeNB and a minimum UE transmission power for a SeNB
For SF , UE 116 can be configured by MeNB 102 a minimum transmission power to MeNB 102, flN MeNB( > an£^ a minimum transmission power to SeNB 103, 4M[NSeNB( - As for configuring CMAX MeNB() and CMAX SeNB(), MeNB 102 can configure UE 116 respective fractions (percentages) /MeNB or /SeNB and UE 116 can derive a minimum guaranteed transmission power to MeNB 102 as cMiNjueNB (0 = MeNBMAX( ^ a minimum guaranteed transmission power to SeNB 103 as PCMM SeNB (i) = fSem - PCUAX(j) - Two alternatives are considered for a functionality of pCMiN _MeNB (/) and CMIN SeNB0') ·
In a first alternative, CMIN MENB ( ) and CMIN SeNB( serve as a lower bound beyond which a transmission power to MeNB 102 and SeNB 103, respectively, cannot be decreased (regardless of power prioritization according to information types). If power reduction is such that either wMem - P m(i) < PCMW _MeNB ( ) or wseNB - AeNB( < a transmission power is respectively set to either flN Mtfra (0 o respectively, and a transmission power to the other eNB is set such that either U ≤W " *NB ( or 6ΝΒ( <4ΜΑΧ( -4ΜΙΝ_¾ΝΒ( )' respectively. Therefore, for prioritization of power
+ PStm(i) > PCMAX(i) , and
FIGURE 16 illustrates a determination for a transmission power from a
UE antenna transmitting to a MeNB and for a transmission power from a UE antenna transmittingJo_a-S_eNB-in-SE-^
for transmission to the MeNB and a guaranteed power, CM[N SeNB (/) , for transmission to the SeNB according to this disclosure. While the flow chart depicts a series of sequential steps, unless explicitly stated, no inference should be drawn from that sequence regarding specific order of performance, performance of steps or portions thereof serially rather than concurrently or in an overlapping manner, or performance of the steps depicted exclusively without the occurrence of intervening or intermediate steps. The process depicted in the example depicted is implemented by processing circuitry in a transmitter chain in, for example, a mobile station.
MeNB 102 configures to UE 103 a minimum power CMIN Ι^ΝΒ ') available for transmissions to MeNB 102 and with a minimum power PCMJN SeNB( ) available for transmissions to SeNB 103 in SF 1610. Using respective power control processes for transmissions of channels or signals to MeNB 102 and for transmissions of channels or signals to SeNB 103, UE 116 determines a transmission power MeNB(/) and a transmission power SeNB( 1620. If UE 116 prioritizes power allocation to MeNB 102, UE 116 examines whether «ΝΒ( + ΝΒ( > ΜΑΧ( 1630 and, if so, UE 116 sets
transmits to MeNB 102 using power MeNB( 1650 and transmits to SeNB 103 using power SeNB( ) 1655.
In a second alternative, if after UE 116 scales a nominal power to MeNB 102 or a nominal power to SeNB 103 in order to reduce a total transmission power, such as wMeNB ■ > MeNB(/) or W NB( in FIGURE 12 or FIGURE 14, a resulting transmission power is smaller than ΜΙΝ_Μ6ΝΒ ( or > respectively, a corresponding transmission is dropped and all available power is allocated as available power to the other transmission. Although proper settings for values of CMIN MeNB (/') and CMIN SeNB( ) should not result to a possibility that both a reduced transmission power to MeNB 102 and a reduced transmission power to SeNB 103 are lower than PCMIN MeNB ( ) or PCUIN^m(i) , respectively, if this event occurs, a transmission to SeNB 103 can be dropped. Alternatively, based on a relative prioritization of information contents for each transmission, UE 116 can determine whether to drop a transmission_tOLMeNB-l-02-or-tQ-SeNB-l-03—
PHR for Operation with Dual Connectivity
To facilitate avoidance of exceeding a maximum power PCMAX(i) in SF by UE 116 for transmissions to MeNB 102 and to SeNB 103, for operation with dual connectivity UE 116 can report a new PHR type for a first eNB, such as
MeNB 102 or SeNB 103, to a second eNB, such as SeNB 103 or MeNB 102, respectively. As the second eNB may not know transmissions, such as PUSCH transmissions, if any, from UE 116 to the first eNB in SF then, unlike a conventional PHR type, the new PHR type for the second eNB is defined assuming that UE 116 does not transmit PUSCH in SF / in any serving cell c of the second eNB regardless of whether or not UE 116 actually transmits
PUSCH in SF . Moreover, unlike a conventional PHR type that is per cell of an eNB, the new PHR type is a combined PHR for all serving cells of an eNB and can be defined as P nev/ em(i) =∑PHtypel c( ) where c is an index ranging over all
c
serving cells of an eNB and / type] c ( ) is defined in Equation 1.
Alternatively, in order to avoid communicating values of PCMAX c (i) 1 as
(ΟΓ e, if report CMAX ( ) for the eNB in addition to the PHR for the eNB. A new MAC control element can be defined for UE 116 to provide the new PHR type. Unlike a conventional PHR type, triggering for the new PHR type can be based not only on a path-loss change but also on a change of how often UE 116 has PUSCH transmissions in a respective eNB. For example, if a number of PUSCH transmissions in a frame from UE 116 to a first eNB increases by a predetermined factor, UE 116 can trigger a PHR transmission to a second eNB.
UE 116 can also provide a Buffer Status Report (BSR) for data transmissions to a first eNB or to a second eNB. The BSR can serve for the second eNB to predict PUSCH scheduling for UE 116 at the first eNB and therefore, possibly in conjunction with a new PHR, predict a total transmission power range for UE 116 to the first eNB. A new MAC control element can be defined for UE 116 to provide the new BSR type for a first eNB, such as SeNB 103, to a second eNB such as MeNB 102. The new BSR type can be a combined BSR for all serving cells of a respective first eNB or can be a vector containing a BSR for each of the serving cells of a respective first eNB in order to provide more detailed information to a second eNB regarding potential power limitations a UE can have per cell of the first eNB.
Although the present disclosure has been described with example embodiments, various changes and modifications may be suggested to one skilled in the art. It is intended that the present disclosure encompass such changes and modifications that fall within the scope of the appended claims.

Claims (1)

  1. [CLAIMS]
    [Claim 1]
    A method comprising:
    determining, by a first base station, a first percentage of a maximum User Equipment (UE) transmission power for transmissions from a UE to the first base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station; and
    signaling, by the first base station to the UE, the first percentage of the maximum UE transmission power and the second percentage of the maximum UE transmission power.
    [Claim 2]
    The method of Claim 1, wherein the second base station signals to the first base station a suggested value for the second percentage over a backhaul link.
    [Claim 3]
    The method of Claim 1, wherein the first base station signals to the second base station the first percentage and the second percentage over a backhaul link.
    [Claim 4]
    The method of Claim 1, wherein if in a transmission time interval of one subframe (SF) the UE either reduces a transmission power to the first base station or reduces a transmission power to the second base station, the UE does not reduce the transmission power to the first base station below the first percentage of the maximum UE transmission power in the SF or the UE does not reduce the transmission power to the second base station below the second percentage of the maximum UE transmission power in the SF, respectively.
    [Claim 5]
    The method of Claim 1, wherein in a transmission time interval of one subframe (SF) and for synchronous UE transmissions to the first base station and to the second base station, the UE:
    determines, according to respective power control processes, a first total power for transmissions to cells of the first base station;
    determines, according to respective power control processes, a second total power for transmissions to cells of the second base station;
    determines, whether or not the sum of the first total power and of the second total power is larger than a maximum UE transmission power in the SF; transmits to the first base station with the first total power and to the second base station with the second total power if the sum of the first total power and of the second total power is not larger than the maximum UE transmission power in the SF; and
    transmits to the first base station with a third total power and to the second base station with a fourth total power if the sum of the first total power and of the second total power is larger than the maximum UE transmission power in the SF wherein, when the UE prioritizes power allocation to the first base station, the UE: determines the third total power as the smaller of:
    the first total power, and
    the difference between the maximum UE transmission power in the SF and the smaller of:
    the second percentage of the maximum UE transmission power in the SF, and
    "the secon Ttotal power; and- determines the fourth total power as the smaller of:
    the second total power, and
    the difference between the maximum UE transmission power in the SF and the smaller of:
    the first percentage of the maximum UE transmission power in the SF, and the third total power.
    [Claim 6]
    The method of Claim 1, wherein in a transmission time interval of one subframe (SF) for transmissions to the first base station and for asynchronous UE transmissions to the first base station and to the second base station, wherein the second base station uses Time Division Duplexing (TDD), the UE:
    determines that it cannot have any transmission to the second base station in two SFs that overlap with the SF; determines, according to respective power control processes, a first total power for transmissions to cells of the first base station;
    determines, whether or not the first total power is larger than a maximum UE transmission power in the SF;
    transmits to the first base station with the first total power if the first total power is not larger than the maximum UE transmission power in the SF; and
    transmits to the first base station with a second total power equal to the maximum UE transmission power if the first total power is larger than the maximum UE transmission power in the SF.
    [Claim 7]
    A base station comprising:
    a controller configured to determine a first subset of transmitter antennas from a set of transmitter antennas of a User Equipment (UE); and
    a transmitter configured to transmit to the UE:
    a configuration for the UE to communicate with the base station and with a second base station, and
    an indication for the UE to use the first subset of transmitter antennas for transmitting to the base station.
    [Claim 8]
    The base station of Claim 7, wherein the base station controller determines the first subset of transmitter antennas based at least on receptions of reference signals from each transmitter antenna in the set of transmitter antennas.
    [Claim 9]
    A User Equipment (UE) comprising:
    a receiver configured to receive:
    a configuration to communicate with a first base station and with a second base station, and
    an indication to use a first subset of transmitter antennas, from a set of transmitter antennas, for transmitting to the first base station; and
    a transmitter configured to transmit to the first base station using the first subset of transmitter antennas and to the second base station using transmitter antennas from the set of transmitter antennas that are not in the first subset of transmitter antennas.
    [Claim 10]
    The UE of Claim 9, wherein the base station controller is configured to determine the first subset of transmitter antennas based at least on receptions of reference signals from each transmitter antenna in the set of transmitter antennas.
    [Claim 11 ]
    A base station comprising:
    a controller configured to determine a first percentage of a maximum User Equipment (UE) transmission power for transmissions from a UE to the base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station; and
    a transmitter configured to transmit to the UE the first percentage of the maximum UE transmission power and the second percentage of the maximum UE transmission power.
    [Claim 12]
    The base station of Claim 11, wherein the base station further comprises a receiver configured to receive information from the second base station over a backhaul link of a suggested value for the second percentage.
    [Claim 13]
    The base station of Claim 11, wherein the controller further is configured to transmit to the second base station over a backhaul link the first percentage and the second percentage.
    [Claim 14]
    A User Equipment (UE) comprising:
    a receiver configured to receive:
    a configuration for communication with a first base station and with a second base station, and
    a first percentage of a maximum UE transmission power for transmissions from the UE to the first base station and a second percentage of the maximum UE transmission power for transmissions from the UE to a second base station; and a transmitter configured to transmit to the first base station and to the second base station wherein, if in a transmission time interval of one subframe (SF) the UE either reduces a transmission power to the first base station or reduces a transmission power to the second base station, the UE does not reduce the transmission power to the first base station below the first percentage of the maximum UE transmission power in the SF or the UE does not reduce the transmission power to the second base station below the second percentage of the maximum UE transmission power in the SF, respectively.
    [Claim 15]
    The UE of Claim 14, wherein the UE further comprises:
    a controller configured to determine:
    a first nominal total power for transmissions to cells of the first base station according to respective power control processes;
    a second nominal total power for transmissions to cells of the second base station;
    whether or not the sum of the first nominal total power and of the second nominal total power is larger than a maximum UE transmission power in the SF; a first total power for transmissions to cells of the first base station that is equal to the first nominal total power and a second total power for transmissions to cells of the second base station that is equal to the second nominal total power if the sum of the first nominal total power and of the second nominal total power is not larger than the maximum UE transmission power in the SF; and
    a third total power for transmissions to cells of the first base station and a fourth total power for transmissions to cells of the second base station if the sum of the first nominal total power and of the second nominal total power is larger than the maximum UE transmission power in the SF wherein, when power allocation to the first base station is prioritized, and wherein the controller is configured to:
    determine the third total power as the smaller of:
    the first total power, and
    the difference between the maximum UE transmission power in the SF and the smaller of:
    the second percentage of the maximum UE transmission power in the SF, and
    the second total power; and
    determines the fourth total power as the smaller of:
    the second total power, and
    the difference between the maximum UE transmission power in the SF and the smaller of:
    the first percentage of the maximum UE transmission power in the SF, and the third total power.
    [Claim 16]
    The UE of Claim 14, wherein the UE further comprises:
    the controller configured to determine:
    that the UE cannot have transmissions to the second base station in two SFs that overlap with the SF where the UE transmits to the first base station, wherein UE transmissions to the first base station and to the second base station are asynchronous and the second base station uses Time Division Duplexing (TDD)^
    a first nominal total power for transmissions to cells of the first base station according to respective power control processes;
    whether or not the first nominal total power is larger than a maximum UE transmission power in the SF;
    a first total power for transmissions to cells of the first base station that is equal to the first nominal total power if the first nominal total power is not larger than the maximum UE transmission power in the SF; and
    a second total power for transmissions to cells of the first base station that is equal to the maximum UE transmission power in the SF if the first nominal total power is larger than the maximum UE transmission power in the SF.
AU2015205047A 2014-01-13 2015-01-13 Uplink transmissions for dual connectivity Active AU2015205047B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2018278947A AU2018278947B2 (en) 2014-01-13 2018-12-13 Uplink transmissions for dual connectivity

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US201461926822P 2014-01-13 2014-01-13
US61/926,822 2014-01-13
US14/591,756 US9900844B2 (en) 2014-01-13 2015-01-07 Uplink transmissions for dual connectivity
US14/591,756 2015-01-07
PCT/KR2015/000337 WO2015105398A1 (en) 2014-01-13 2015-01-13 Uplink transmissions for dual connectivity

Related Child Applications (1)

Application Number Title Priority Date Filing Date
AU2018278947A Division AU2018278947B2 (en) 2014-01-13 2018-12-13 Uplink transmissions for dual connectivity

Publications (2)

Publication Number Publication Date
AU2015205047A1 true AU2015205047A1 (en) 2016-04-28
AU2015205047B2 AU2015205047B2 (en) 2018-09-13

Family

ID=53522541

Family Applications (2)

Application Number Title Priority Date Filing Date
AU2015205047A Active AU2015205047B2 (en) 2014-01-13 2015-01-13 Uplink transmissions for dual connectivity
AU2018278947A Active AU2018278947B2 (en) 2014-01-13 2018-12-13 Uplink transmissions for dual connectivity

Family Applications After (1)

Application Number Title Priority Date Filing Date
AU2018278947A Active AU2018278947B2 (en) 2014-01-13 2018-12-13 Uplink transmissions for dual connectivity

Country Status (7)

Country Link
US (5) US9900844B2 (en)
EP (3) EP3927032A1 (en)
JP (1) JP6494639B2 (en)
KR (2) KR102413825B1 (en)
CN (2) CN105934980B (en)
AU (2) AU2015205047B2 (en)
WO (1) WO2015105398A1 (en)

Families Citing this family (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9560559B2 (en) * 2013-02-08 2017-01-31 Innovative Sonic Corporation Method and apparatus for implementing small cell enhancements in a wireless communication system
US9900844B2 (en) * 2014-01-13 2018-02-20 Samsung Electronics Co., Ltd. Uplink transmissions for dual connectivity
US10313986B2 (en) * 2014-01-15 2019-06-04 Lg Electronics Inc. Method and apparatus for controlling uplink power in wireless
WO2015113624A1 (en) * 2014-01-31 2015-08-06 Nokia Solutions And Networks Oy Method, apparatus and computer program
WO2015139224A1 (en) * 2014-03-19 2015-09-24 Telefonaktiebolaget L M Ericsson(Publ) Uplink power sharing in dual connectivity
US9999002B2 (en) * 2014-03-21 2018-06-12 Avago Technologies General Ip (Singapore) Pte. Ltd. Uplink power scaling for dual connectivity
US20150282103A1 (en) * 2014-03-28 2015-10-01 Broadcom Corporation System, method, and apparatus for controlling dual connectivity uplink power
US9973901B2 (en) * 2014-03-28 2018-05-15 Blackberry Limited Enhancing group communication services
US9357510B2 (en) * 2014-03-31 2016-05-31 Qualcomm Incorporated Power sharing and power headroom reporting in dual connectivity scenarios
US10064142B2 (en) * 2014-04-18 2018-08-28 Ntt Docomo, Inc. User apparatus and uplink transmission power information transmission method
CN111954266B (en) * 2014-06-23 2024-04-09 北京三星通信技术研究有限公司 Data distribution method and device for split bearing in double connection
JP6585043B2 (en) * 2014-06-30 2019-10-02 株式会社Nttドコモ User terminal, radio base station, radio communication system, and radio communication method
US20160021618A1 (en) 2014-07-18 2016-01-21 Sharp Laboratories Of America, Inc. Systems and methods for uplink transmission power control
US10959193B2 (en) * 2014-08-04 2021-03-23 Sharp Kabushiki Kaisha Terminal device, base station device, and method
JP6084184B2 (en) * 2014-08-08 2017-02-22 株式会社Nttドコモ User terminal, radio communication system, and radio communication method
JP2018050089A (en) * 2015-01-29 2018-03-29 シャープ株式会社 Terminal device, base station device, integrated circuit and communication method
US10833784B2 (en) * 2015-04-03 2020-11-10 Ntt Docomo, Inc. User apparatus and base station
EP3316644B1 (en) * 2015-07-29 2020-12-02 Huawei Technologies Co., Ltd. Transmission device, receiving device and method for uplink data
US10536904B2 (en) * 2016-05-09 2020-01-14 Ofinno, Llc Parallel transmission in a wireless device and wireless network
WO2017222207A1 (en) * 2016-06-22 2017-12-28 엘지전자 주식회사 Method and wireless device for determining transmission power
CN116234037A (en) * 2016-08-05 2023-06-06 三菱电机株式会社 Communication system, auxiliary base station and user device
EP3500015A4 (en) * 2016-08-09 2020-04-01 Mitsubishi Electric Corporation Communication system
US10397924B2 (en) 2016-08-10 2019-08-27 Apple Inc. Robust downlink control information with flexible resource assignments
CN109691169B (en) * 2016-08-11 2022-06-07 Lg 电子株式会社 Method for performing measurement reporting in wireless communication system and apparatus supporting the same
US11012943B2 (en) * 2016-09-22 2021-05-18 Lg Electronics Inc. Method for reducing interference between uplink signal and downlink signal, and device therefor
WO2018057076A1 (en) * 2016-09-26 2018-03-29 Intel Corporation Splitting signal radio bearer enhancements for standalone 5g new rat multi-connectivity
CN109792358B (en) * 2016-09-30 2021-09-17 瑞典爱立信有限公司 System and method for configuring measurement gaps and sounding reference signal switching
US10530468B2 (en) * 2016-10-19 2020-01-07 Vector Launch Inc. State transfer among virtualized nodes in spaceborne or airborne systems
CN108024323B (en) * 2016-11-03 2020-09-08 华为技术有限公司 Power distribution method, power adjustment method, terminal and access network equipment
US10750569B2 (en) * 2017-03-03 2020-08-18 Qualcomm Incorporated Beam management for connected mode discontinuous reception operation
WO2018176396A1 (en) * 2017-03-31 2018-10-04 Nec Corporation Methods, terminal device, and apparatuses for uplink power control and receiving
WO2018176491A1 (en) * 2017-04-01 2018-10-04 Qualcomm Incorporated Enhanced power headroom report for feeding back beamformed srs power scaling
US11121828B2 (en) * 2017-05-04 2021-09-14 Intel IP Corporation Radio (NR) physical uplink structures and schemes
CN109495225A (en) * 2017-09-11 2019-03-19 中兴通讯股份有限公司 The indicating means and device of channel architecture
EP4258756A3 (en) * 2017-09-26 2023-12-20 Apple Inc. Beam-specific power control
EP4319035A3 (en) * 2017-11-17 2024-03-06 Lenovo (Singapore) Pte. Ltd. Power control configuration for uplink transmissions
CN109842926B (en) * 2017-11-27 2021-06-29 华为技术有限公司 Power control method, device and system
WO2019106603A1 (en) * 2017-12-01 2019-06-06 Telefonaktiebolaget Lm Ericsson (Publ) Configuring dual connectivity maximum transmit power
US10716023B2 (en) 2017-12-19 2020-07-14 Qualcomm Incorporated Multi-level slot format indicator
CN108513732B (en) * 2018-01-04 2022-07-01 北京小米移动软件有限公司 Data transmission method and device and user equipment
CN110149626B (en) * 2018-02-13 2022-02-25 华为技术有限公司 Method and device for determining sending mode of terminal equipment
CN113923799A (en) * 2018-02-14 2022-01-11 华为技术有限公司 Wireless backhaul communication processing method and related device
CN109347667B (en) * 2018-10-17 2021-11-05 中国电子科技集团公司第四十一研究所 5G terminal simulator protocol parameter configuration design method
KR20200062793A (en) 2018-11-27 2020-06-04 삼성전자주식회사 Electronic device for managing bearer and operation method thereof
CN111510269B (en) * 2019-01-11 2021-08-20 华为技术有限公司 Communication method and device
US11419169B2 (en) * 2019-03-21 2022-08-16 Qualcomm Incorporated Uplink power control for dual connectivity
US11516755B2 (en) 2019-08-16 2022-11-29 Qualcomm Incorporated Signaling and configuration of maximum transmit power using virtual ports
CN110690910B (en) * 2019-09-24 2021-05-25 Oppo广东移动通信有限公司 Antenna switching method, device, terminal and storage medium
EP4042584A4 (en) * 2019-10-02 2023-06-14 ZTE Corporation Time division multiplexing pattern for antenna configurations
KR20220156514A (en) 2020-03-19 2022-11-25 엘지전자 주식회사 Electronic device having an antenna
KR20210128767A (en) * 2020-04-17 2021-10-27 삼성전자주식회사 Method for controlling aperture switch in e-utra new radio dual connectivity and electronic device for supporting the same
US11259251B2 (en) 2020-05-20 2022-02-22 Nokia Technologies Oy Uplink power adjustment for packet data convergence protocol (PDCP) duplication
CN113747608B (en) * 2020-05-29 2024-03-01 中国电信股份有限公司 Method, network device and system for establishing multiple connections
US11375564B2 (en) * 2020-10-07 2022-06-28 Sprint Spectrum L.P. Dynamically transitioning a UE to standalone connectivity with an access node based on the UE having threshold low power headroom on a secondary connection with the access node
US11589317B2 (en) * 2020-11-25 2023-02-21 At&T Intellectual Property I, L.P. Allocating uplink power of user equipment between implementations of multiple radio access technologies in a fifth generation (5G) or other next generation network
US11588600B2 (en) 2021-01-25 2023-02-21 Qualcomm Incorporated Antenna selection for sounding reference signal antenna switching

Family Cites Families (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1715600A1 (en) * 2004-02-26 2006-10-25 Matsushita Electric Industrial Co., Ltd. Mobile station device and transmission antenna selection method in the mobile station device
KR100651447B1 (en) 2004-04-14 2006-11-29 삼성전자주식회사 System and method for reselecting antennas in a cellular mobile communication system using a plurality of antennas
CN101772906B (en) * 2007-08-03 2013-06-05 富士通株式会社 Wireless base station transmission power control method and the wireless base station
KR101388312B1 (en) * 2008-01-07 2014-04-29 엘지전자 주식회사 A method of controlling transmission power in a wireless communication system
KR101441500B1 (en) 2008-06-20 2014-11-04 삼성전자주식회사 Apparatus and method for transmission of sounding reference signal in uplink wireless communication systems with multiple antennas and sounding reference signal hopping
US20100177807A1 (en) * 2009-01-09 2010-07-15 Samsung Electronics Co., Ltd. Method and apparatus for relaying wireless traffic in a wireless network
TW201603611A (en) * 2009-02-09 2016-01-16 內數位專利控股公司 Apparatus and method for uplink power control for a wireless transmitter/receiver unit utilizing multiple carriers
KR20100091876A (en) 2009-02-11 2010-08-19 엘지전자 주식회사 Ue behavior for multi-antenna transmission
US20130153298A1 (en) * 2009-02-19 2013-06-20 Interdigital Patent Holdings, Inc. Method and apparatus for enhancing cell-edge user performance and signaling radio link failure conditions via downlink cooperative component carriers
CA2755825C (en) * 2009-03-17 2017-04-04 Samsung Electronics Co., Ltd. Uplink transmission power control in multi-carrier communication systems
US9288808B2 (en) * 2009-08-14 2016-03-15 Blackberry Limited Method and apparatus for power sharing carrier set for carrier aggregation
US8824968B2 (en) * 2009-12-10 2014-09-02 Lg Electronics Inc. Method and apparatus for reducing inter-cell interference in a wireless communication system
EP3537782A3 (en) * 2010-02-12 2019-11-06 InterDigital Patent Holdings, Inc. Method and apparatus for enhancing cell-edge performance and signaling radio link failure conditions via downlink cooperative component carriers
US9820273B2 (en) * 2010-03-02 2017-11-14 Xiaoxia Zhang Uplink coordinated multipoint communications in a wireless network
US8965442B2 (en) * 2010-05-07 2015-02-24 Qualcomm Incorporated Uplink power control in aggregated carrier communication systems
US8798663B2 (en) * 2010-10-01 2014-08-05 Acer Incorporated Method of performing power headroom reporting and communication device thereof
US9537555B2 (en) * 2011-02-22 2017-01-03 Qualcomm Incorporated Uplink transmit antenna selection in carrier aggregation
KR101830738B1 (en) * 2011-02-22 2018-04-04 엘지전자 주식회사 Method of controlling uplink transmission power at ue in wireless communication system and apparatus thereof
US9681401B2 (en) 2011-03-17 2017-06-13 Google Technology Holdings LLC Enhanced power headroom reporting in wireless communication networks
JP2013034111A (en) * 2011-08-02 2013-02-14 Sharp Corp Base station, terminal, communication system, and communication method
CN103733697B (en) * 2011-08-12 2018-01-12 交互数字专利控股公司 For Power Control and the method and apparatus of timing advance
US9521632B2 (en) * 2011-08-15 2016-12-13 Google Technology Holdings LLC Power allocation for overlapping transmission when multiple timing advances are used
WO2013048170A2 (en) * 2011-09-29 2013-04-04 엘지전자 주식회사 Method and apparatus for transmitting uplink
CN103139918B (en) * 2011-11-30 2016-05-18 华为技术有限公司 A kind of methods, devices and systems of realizing data dispatch
CN104106299B (en) 2012-02-02 2018-07-06 诺基亚通信公司 The signaling of uplink scheduling information under state of carrier aggregation
US9681397B2 (en) * 2012-03-27 2017-06-13 Qualcomm Incorporated Format dependent power control for coordinated multipoint transmission
US8964593B2 (en) * 2012-04-16 2015-02-24 Ofinno Technologies, Llc Wireless device transmission power
KR101882669B1 (en) * 2012-05-11 2018-07-30 노키아 솔루션스 앤드 네트웍스 오와이 Method for uplink-downlink interference mitigation in heterogeneous network
KR101896440B1 (en) * 2012-05-14 2018-09-11 삼성전자 주식회사 Method and appratus of handling the buffer status report in mobile communication system using inter-base station-carrier aggregation
US9867194B2 (en) 2012-06-12 2018-01-09 Qualcomm Incorporated Dynamic UE scheduling with shared antenna and carrier aggregation
WO2014075210A1 (en) * 2012-11-13 2014-05-22 华为技术有限公司 Method, base station and user equipment for transmitting data
EP3522669B1 (en) * 2013-01-03 2021-09-08 LG Electronics Inc. Method, processor and user equipment for transmitting uplink signals in wireless communication system
US9872256B2 (en) 2013-01-10 2018-01-16 Telefonaktiebolaget Lm Ericsson (Publ) User equipment and a method for power control of uplink transmissions
US9876620B2 (en) 2013-01-10 2018-01-23 Samsung Electronics Co., Ltd. Uplink control information transmissions/receptions in wireless networks
CN104349441B (en) * 2013-08-07 2020-03-17 夏普株式会社 Main base station, user equipment and control method thereof
JP2015080066A (en) * 2013-10-16 2015-04-23 株式会社Nttドコモ Mobile communication system
US9900844B2 (en) * 2014-01-13 2018-02-20 Samsung Electronics Co., Ltd. Uplink transmissions for dual connectivity
US10085265B2 (en) 2014-01-30 2018-09-25 Qualcomm Incorporated Uplink transmit power allocation and power headroom reporting by a user equipment in a multi-connectivity environment
JP2015216440A (en) * 2014-05-08 2015-12-03 株式会社Nttドコモ User terminal, radio base station, radio communication method and radio communication system
US10980045B2 (en) * 2014-10-02 2021-04-13 Qualcomm Incorporated Techniques for managing power on an uplink component carrier transmitted over a shared radio frequency spectrum band

Similar Documents

Publication Publication Date Title
US20210314874A1 (en) Uplink transmissions for dual connectivity
AU2015205047A1 (en) Uplink transmissions for dual connectivity
EP3152965B1 (en) Power control for transmission of uplink control information on two cells in carrier aggregation
JP7128307B2 (en) Transmit power control for uplink control channel
EP3430763B1 (en) Apparatus and method for transmitting sounding reference signals in communication systems
EP3471468B1 (en) Adaptations of dual connectivity operation to ue capability
KR102257707B1 (en) Method for performing power control, and user equipment
KR102156293B1 (en) Uplink power control in adaptively configured tdd communication systems
KR102177832B1 (en) Downlink signaling for adaptation of an uplink-downlink configuration in tdd communication systems
EP3472967A1 (en) Carrier aggregation with variable transmission durations
US20230247717A1 (en) Discontinuous reception alignment grouping for sidelink and cellular communication