AU2012222851A1 - An integrated terrain modelling system - Google Patents

An integrated terrain modelling system

Info

Publication number
AU2012222851A1
AU2012222851A1 AU2012222851A AU2012222851A AU2012222851A1 AU 2012222851 A1 AU2012222851 A1 AU 2012222851A1 AU 2012222851 A AU2012222851 A AU 2012222851A AU 2012222851 A AU2012222851 A AU 2012222851A AU 2012222851 A1 AU2012222851 A1 AU 2012222851A1
Authority
AU
Australia
Prior art keywords
site
geodetic data
format
data
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2012222851A
Other versions
AU2012222851B2 (en
Inventor
Craig Anthony ROBERTSON
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leica Geosystems AG
Original Assignee
Leica Geosystems AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Leica Geosystems AG filed Critical Leica Geosystems AG
Priority to AU2012222851A priority Critical patent/AU2012222851B2/en
Priority claimed from PCT/AU2012/000170 external-priority patent/WO2012116392A1/en
Publication of AU2012222851A1 publication Critical patent/AU2012222851A1/en
Application granted granted Critical
Publication of AU2012222851B2 publication Critical patent/AU2012222851B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

TITLE
"AN INTEGRATED TERRAIN MODELLING SYSTEM" FIELD OF THE INVENTION
The invention relates to an integrated terrain modelling system. In particular, although not exclusively, the invention relates to an integrated terrain modelling system which seamlessly integrates geodetic data from different measuring devices such as GNSS survey rovers, total stations, laser scanners, machine guidance systems, autonomous machines, radar devices and aerial photogrametery apparatus. The geodetic data updates a digital terrain model of a mine site in real time or near-real time.
BACKGROUND TO THE INVENTION
Terrain modelling of a changing terrain is well known in the open pit mining industry. A mine site, or at least part of it, is surveyed from time to time (usually end of month) using site survey equipment such as laser scanners and total stations to build a terrain model of the mine site. The terrain model is used by engineers and planners to manage the mine and to accurately determine the volume of material moved.
OBJECT OF THE INVENTION
It is an object of the invention to overcome or at least alleviate one or more of the above problems and/or provide the consumer with a useful or commercial choice.
DISCLOSURE OF THE INVENTION
In one form, although it need not be the only or indeed the broadest form, the invention resides in an integrated terrain modelling system, the system including:
a site module including a database having a terrain model of a site; a first field unit including a sensor operable to generate geodetic data of the site formatted in a first format;
a further field unit including a sensor operable to generate geodetic - - data of the site formatted in a further format;
an integration system operable to manipulate the geodetic data of the different field units to be in a common format, thereby to provide seamless integration of the geodetic data at the site module to update the terrain model; and
a communications system adapted to provide data communication between the site module and the different field units via a network.
The integration system preferably includes a conversion module located on-board the field units, the conversion module operable to convert the geodetic data generated by the field units into the common format.
The conversion module may be located at the central server and be operable to receive geodetic data of different formats from the different field units and convert the geodetic data into the common format at the site module in real or near-real time.
Suitably, the integration system is configured to provide a weighting when manipulating the geodetic data of the different field units when using that data to update the terrain model.
Preferably, the geodetic data of field units that provide higher accuracy geodetic data will have a higher weighting than the geodetic data of field units that provide lower accuracy geodetic data when the geodetic data, once converted to the common data formant, is used to update the terrain model of the site.
The field units preferably include GNSS survey rovers, total stations, laser scanners, machine guidance systems, autonomous machines, radar devices and aerial photogrametery apparatus.
The site module is preferably located at a central server.
The field units preferably each include a database storing a terrain model and wherein the integrated terrain modelling system includes a distributed database management system to keep the terrain model in the databases of the field units current and the terrain model in the site module current.
The communications system and integration system are preferably adapted so that terrain model at the site module is updated in real or near- - - real time as the geodetic data is received at the central server.
The integrated terrain modelling system may include the field units.
The network is preferably a wireless network and the communications system is preferably adapted to provide wireless data communication.
The communications system preferably comprises a wireless communications module at the central server and a wireless communications module at each of the field units.
In another form, the invention resides in a method of updating an integrated terrain model of a site, the method including:
generating geodetic data of the site in a first format from a measuring device of a first field unit;
generating geodetic data of the site in a further format from a measuring device of a further field unit, the measuring device of the further field unit of a different type to the measuring device of first field unit;
manipulating the geodetic data of the different formats to be in a common format; and
integrating the geodetic data in the common format to seamlessly update the terrain model.
The method preferably includes manipulating the geodetic data onboard the field units to be in the common format before transmission of the geodetic data to the central server.
The method may include transmission of the geodetic data from the field units in the different formats and then manipulating the geodetic data at the site module to be in the common format.
The method preferably includes distributing the updated integrated terrain model from the site module to each of the field units.
In another form, the invention resides in a conversion module located on-board a field unit generating geodetic data in a first format, the conversion module operable to format geodetic data of the first format to be intergrateable in real or near-real time with geodetic data of a further format generated by a further field unit.
In yet another form, the invention resides in a conversion module located at a central sever and operable to receive geodetic data from a number of different field units in different formats, the conversion module operable to manipulate the geodetic data of the different field units to be in a common format, thereby to provide seamless integration of the geodetic data at the site module to update the terrain model.
In still a further form, the invention relates to an integrated terrain modeling system comprising:
a site module, the site module including a database having a terrain model of a site;
a first field unit, the first field unit including a sensor operable to generate geodetic data of the site formatted in a first format;
a further field unit, the further filed unit including a sensor operable to generate geodetic data of the site formatted in a further format; and an integration system operable to manipulate the geodetic data generated by the first filed unit and the further filed unit to be in a common format, thereby to provide seamless integration of the geodetic data at the site module to update the terrain model.
In a further form still, the invention relates a method of updating an integrated terrain model of a site, the method including the steps of:
generating geodetic data of at least a portion of the site in a first format at a measuring device of a first field unit;
generating geodetic data of at least a portion of the site in a further format at a measuring device of a further field unit, the measuring device of the further field unit;
manipulating the geodetic data generated by the first filed unit and the further filed unit to each be in a common format; and
integrating the geodetic data in the common format to update the integrated terrain model at a site module.
BRIEF DESCRIPTION OF THE DRAWINGS
To assist in understanding the invention and to enable a person skilled in the art to put the invention into practical effect, preferred embodiments of the invention will be described by way of example only with reference to the accompanying drawings, wherein:
FIG 1 shows a diagram of an integrated terrain modelling system in accordance with one embodiment of the invention;
FIG 2 shows a front view of GNSS survey rover of the integrated terrain modelling system of FIG 1 ;
FIG 3 shows a perspective view of a total station of the integrated terrain modelling system of FIG 1 ;
FIG 4 shows a perspective view of a laser scanner of the integrated terrain modelling system of FIG 1 ;
FIG 5 shows a side view of earth moving equipment including a precision machine guidance system of the integrated terrain modelling system of FIG 1 ;
FIG 6 shows a diagrammatic view of one embodiment of the integrated terrain modelling system of FIG 1 and the flow of data in the integrated terrain modelling system;
FIG 7 shows a diagrammatic view of another embodiment of the integrated terrain modelling system of FIG 1 and the flow of data in the integrated terrain modelling system;
FIG 8 shows a diagrammatic flow diagram of a method of integrated terrain modelling in accordance with an embodiment of the invention; and
FIG 9 shows a diagram of distributing an updated integrated terrain model from a central server to different field units of the integrated terrain modelling system of FIG 1.
DETAILED DESCRIPTION OF THE INVENTION
Referring to FIG 1 , an integrated terrain modelling system 10 includes a central server 20 and four types of field units 30. Any reference in this patent specification to a field unit must be interpreted broadly to include a rover unit, an autonomous machines, radar apparatus and aerial photogrametry apparatus. By way of example different types of field units 30 shown in FIG 1 are GNSS survey rovers 200, total stations 300, laser scanners 400 and precision machine guidance systems 500. Two of each of the different types of field units 200, 300, 400, 500 are shown. The field units 30 are in wireless communication with a site module 21 of the central server 20 via a wireless network 50. The system 10 includes a wireless communications module 40 at the central server 20 facilitating wireless communication between the site module 21 and the field units 30. Wireless communication may be over any of Wi-Fi, CDMA, GSM, 3G, 4G or other networks. As such, the wireless communications module 40 may be a data modem and wireless communications modules of the field units 30 are also data modems.
Each field unit 30 is operable to upload geodetic data generated by the field unit 30 to the central server 20 via the wireless network 50. The geodetic data may be uploaded in real or near-real time or upload may depend on the wireless communication connection. Mine sites may not have network coverage over the entire site. The geodetic data recorded by the field units 30 may be stored onboard the field units 30 until such a time as a wireless data connection with the central server 20 is established, at which time the stored data is transmitted to the site module 21 at the central server 20.
The site module 21 includes a database having a digital terrain model 22 of the mine site on which the field units 30 operate. The digital terrain model 22 is saved in the database in a memory of the site module 21. The terrain model 22 is updated with geodetic data received from the field units 30 as described.
Each of the field units 30 has a measuring device in the form of a sensor operable to generate raw geodetic data, usually in the form of point data. The different types of field units have different types of sensors generating geodetic data in different formats. Point data is generally raw XYZ co-ordinates which are formatted and/or converted into geodetic data of one or a number of different formats. The different formats of geodetic data are not easily integrateable. For this reason, the system 10 includes data conversion modules 24 at each of the field units 30. The data conversion modules 24 are operable to convert the geodetic data of different formats in real or near-real time into integrateable data of a common format to update the terrain model 22. The data conversion modules 24 together form part of an integration system operable to manipulate the geodetic data of the different formats in real or near-real time to be in the common format to update the terrain model 22. - -
Conversion of the geodetic data of the different types of field units 30 is more specifically described hereinbelow with reference to the GNSS survey rovers 200, total stations 300, laser scanners 400 and precision machine guidance systems 500.
FIG 2 shows a front view of the GNSS survey rover 200. The
GNSS survey rover 200 comprises a sensor in the form of a GNSS receiver 202, a controller 204, wireless communication module 206 and data conversion module 24. The GNSS receiver 202 is operable to receive GNSS signals from GNSS satellites. The GNSS signals are communicated to the controller 204 where the signals are used to generate accurate location point data of the rover 200. The location point data is formatted into geodetic data of, for example, the dbx format. The geodetic data is converted by the conversion module 24 as described and transmitted to the central server 20 by the wireless communication module 206. The dbx format may be the common format for the field units 30, in which case the geodetic data is not further converted by the conversion module 24.
The controller 204 includes a memory having a database in which a terrain model of the site is stored. The terrain model is updated by the location point data surveyed by the rover 200 and also by updated terrain model data received from the server 20.
FIG 3 shows a perspective view of the total station 300. The total station 300 comprises a sensor in the form of an electronic transit and electronic distance measuring device (EDM) 302. The total station 300 is used to determine angles and distances from the total station 300 to points to be surveyed. With the aid of trigonometry, the angles and distances may be used to calculate raw geodetic data in the form of point data (x, y, and z or northing, easting and elevation) of surveyed points in absolute terms. The total station 300 also includes a controller 304, wireless communication module 306 and data conversion module 24. The point data is commonly formatted in dbx format as geodetic data. The geodetic data is uploaded to the central server 20 via the wireless communication module 306. The geodetic data is converted to the common format by the conversion module 24 before being transmitted. If the common format for integration of data is the dbx format then the conversion module may not convert the geodetic data.
The controller 304 includes a memory in which a terrain model of the site is stored. The terrain model is updated by the point data surveyed by the total station 300 and also by the updated terrain model data received from the server 20. In one example, the total station 300 is a model Leica TPS 1200+ total station.
FIG 4 shows a perspective view of the laser scanner 400. The laser scanner 400 has a sensor in the form of a rotatable head 402 which is operable to scan the mine site to collect distance information about surfaces within the head's 402 field of view. The scanner 400 generates geodetic data in the form of point clouds. The point clouds are formatted in pts 3D point cloud data format. The scanner 400 includes a controller 404, wireless communication module 406 and data conversion module 24. The data in pts format is converted to a common format by the data conversion module 24. The geodetic data is transmitted to the central server 20 over the wireless network 50. In one example, the laser scanner 400 is a Leica HDS4400 scanner specifically developed for mining survey.
The controller 404 includes a memory having a database in which a terrain model of the site is stored. The terrain model is updated by the point cloud data generated by the scanner 400 and also by updated terrain model data received from the central server 20.
FIG 5 shows a side view of an earth moving vehicle 550 having the precision machine guidance system 500. The precision machine guidance system 500 includes a GNSS receiver, controller, wireless communication module and data conversion module. The guidance system 500 has a memory having a database storing a terrain model in the form of a dynamic surface (referred to as the "as built surface") which updates as the vehicle 550 passes through the as built surface. The guidance system generates and stores point data in custom ASCII data output format. The data in ASCII format is converted to the common format by the data conversion module of the machine guidance system 500. The geodetic data is transmitted to the central server 20 over the wireless network 50.
The dynamic surface is updated by the point data generated via the GNSS receiver and also by updated terrain model data received from the central server 20.
The GNSS receiver 202, EDM 302 and head 402 and GNSS receiver of the guidance system 500 are all different types of sensors.
Referring to FIG 6, a block diagram of the integrated terrain modelling system 10 and the flow of data in the system 10 is shown. A first type of field unit 30.1 generates geodetic data of a first format at step 602. The geodetic data of the first format is manipulated by data format conversion on-board the first type of field unit 30.1 by the conversion module 24 at step 604. The geodetic data of the first format is converted to the common format for updating the terrain model 22. Similarly, a second type of field unit 30.2 generates geodetic data of a second format at step 606. The geodetic data of the second format is manipulated by data format conversion on-board the second type of field unit 30.2 by the conversion module 24 at step 608. The raw geodetic data of the second format is converted to be data of the common format for updating the terrain model 22.
The geodetic data of the first format is generated by either the
GNSS survey rover 200, the total station 300, the laser scanner 400 or the machine guidance system 500. The geodetic data of the second fomnat is generated by one of the GNSS survey rover 200, the total station 300, the laser scanners 400 or the machine guidance systems 500 other than the geodetic data generating equipment which generated the geodetic data of the first format. It will be appreciated that each type of field unit 30 may generate a different format of geodetic data from a different type of sensor, although only two formats of geodetic data are described with reference to FIG. 6.
The integrateable data of the two different types of geodetic data generating equipment 30.1 , 30.2 is wirelessly transmitted to the central server 20 as indicated by blocks 610, 612 respectively.
The integrated terrain model 22 is updated in real or near-real time when received at the central server 20 at step 614 with the commonly - - formatted data of the two different types of field units 30.1, 30.2.
The block diagram of Fig 6 describes the integrated terrain modeling system 10 with reference to conversion of geodetic data onboard the field units 30. It will be appreciated by those skilled in the art that the conversion of the geodetic data into the common format to be seamlessly integrateable may be performed at the central server 20.
Fig 7 shows a block diagram of the central server 20 including a conversion module 26 which converts geodetic data of different formats to integrateable data of a common format at the central server 20.
The first type of field unit 30.1 generates geodetic data of the first format at step 602.
The geodetic data of the first format is manipulated by data format conversion on-board the first type of field unit 30.1 by the conversion module 24 at step 604. The second type of field unit 30.2 generates geodetic data of the second format at step 606. The geodetic data of the different formats is wirelessly transmitted 611 , 613 to the central server 20 without on-board processing at the field units 30.1 , 30.2. The geodetic data is received at the conversion module 26 at the central server 20, where the geodetic data is manipulated to be in a common format. The geodetic data in the common format updates the integrated terrain model at step 614.
FIG. 8 is a diagrammatic flow diagram of the method 700 of updating the integrated terrain model 22.
The method 700 comprises generating geodetic data of the first format at step 702. The geodetic data of the first format is generated using the first type of field unit 30.1 referred to in FIG's 6 and 7.
Geodetic data of the second format is generated at step 704. The geodetic data of the second format is generated using the second type of field unit 30.2 referred to in FIG' 6 and 7.
The geodetic data of the first format and the second format is manipulated by data format conversion at step 706 to be integrateable geodetic data which is in a common format. The geodetic data of the different formats may be manipulated on-board the respective field units 30.1 and 30.2 as described with reference to FIG 6 or be manipulated at - - the central server 20 as described with reference to FIG 7.
The integrated terrain model 22 is seamlessly updated at the central server 20 with the commonly formatted geodetic as the data is received at the server 20.
The updated terrain model 22 as updated is distributed back from the central server 20 to each of the field units 30 at step 712. Distribution may be scheduled or event triggered.
The integrated terrain model 22 on the central server 20 is a master terrain model which is duplicated to the field units 30. The central server 20 includes a distributed database management system which manages distribution of the master terrain model 22 (or part thereof) to the field units 30 and the update of the integrated terrain model of the central server 20. Distribution of the terrain model 22 to all of the field units 30 keeps the terrain model current in all the field units 30.
The advantage of using a distributed database system is that the field units 30 are able to continue updating the terrain models in their own databases as required when the field units are out of communication range with the central server 20. The terrain model 22 is only updated from the central server 22 to the field units 30 as required to reduce unnecessary data replication.
FIG 9 shows a diagram of how the updated terrain model 22 saved in a database of the central server 20 is distributed by duplication to the field units 30. The terrain model 22 is wirelessly transmitted to each of the survey rover 200, total station 300, laser scanner 400 and the machine guidance system 500. The updated terrain model 22 is saved in the database of each of the field units 30.
The integrated terrain modelling system 10 provides real time or near-real time data exchange of geodetic data between the office and the field. This has the benefit that an accurate updated digital terrain model 22 is continuously maintained, which negates the need for end of month surveys. Using the updating of the terrain model 22, volumetric productivity of the mine can be calculated in real time. The geodetic data sets from the field units is seamlessly merged in real or near-real time rather than the cumbersome and time consuming manual merging of - 1 - multiple data sets of different formats as is presently known. The terrain model 22 is distributed to the field units 30 to allow field operators, planners, engineers, and surveyors up to date information of the mine site.
In further forms still falling within the scope of this document the integration system is configured to provide a weighting when manipulating the geodetic data of the different field units when using that data to update the terrain model.
Preferably, the geodetic data of field units that provide higher accuracy geodetic data will have a higher weighting than the geodetic data of field units that provide lower accuracy geodetic data when the geodetic data, once converted to the common data formant, is used to update the terrain model of the site. For example, aerial photogrametery may only be used to update the site model once a month but will be assigned a higher weighting that, for example, position information from a vehicle or the like.
In this specification, the terms "comprise", "comprises",
"comprising" or similar terms are intended to mean a non-exclusive inclusion, such that a system, method or apparatus that comprises a list of elements does not include those elements solely, but may well include other elements not listed.
The reference to any prior art in this specification is not, and should not be taken as, an acknowledgement or any form of suggestion that the prior art forms part of the common general knowledge.

Claims (12)

1. An integrated terrain modeling system comprising:
a site module, the site module including a database having a terrain model of a site;
a first field unit, the first field unit including a sensor operable to generate geodetic data of the site formatted in a first format;
a further field unit, the further filed unit including a sensor operable to generate geodetic data of the site formatted in a further format; and an integration system operable to manipulate the geodetic data generated by the first filed unit and the further filed unit to be in a common format, thereby to provide seamless integration of the geodetic data at the site module to update the terrain model.
2. The integrated terrain modeling system of claim 1 further comprising a conversion module located on-board each of the field units, the conversion module operable to manipulate the geodetic data generated by a respective field unit to be in the common format.
3. The integrated terrain modeling system of claim 1 further comprising a conversion module located at the site module, the conversion module operable to receive geodetic data of the first format and geodetic data of the further and convert the geodetic data into the common format at the site module in real or near-real time.
4. The integrated terrain modeling system of claim 1 further comprising a communications system adapted to provide data communication between the site module, the first field unit and the further field unit.
5. The integrated terrain modeling system of claim 1 , wherein the field units are of the form of one of GNSS survey rovers, total stations, laser scanners or machine guidance systems.
6. The integrated terrain modeling system of claim 1 further comprising one or more of the further field units.
7. The integrated terrain modeling system of claim 1, wherein the site module is located at a central server of the integrated terrain modeling system.
8. The integrated terrain modeling system of claim 1 , wherein each field unit includes a database storing a terrain model and wherein the integrated terrain modeling system includes a distributed database management system configured to keep the terrain model in each database of the filed units current and further configured to keep the terrain model of the site in the site module current.
9. A method of updating an integrated terrain model of a site, the model including the steps of:
generating geodetic data of at least a portion of the site in a first format at a measuring device of a first field unit;
generating geodetic data of at least a portion of the site in a further format at a measuring device of a further field unit, the measuring device of the further field unit;
manipulating the geodetic data generated by the first filed unit and the further filed unit to each be in a common format; and
integrating the geodetic data in the common format to update the integrated terrain model at a site module.
10. The method of claim 8 further including the step of communicating the geodetic data which has been manipulated to be in a common format to the site module prior to integrating the geodetic data in the common format to update the integrated terrain model.
11. The method of claim 8 further including the step of communicating the geodetic data in the first format from the first field unit and in the further format from the further field unit to the site module prior to manipulating the geodetic data to be in the common format.
12. The method of claim 8 further including the step of communicating the updated integrated terrain module from the site module to each of the field units.
AU2012222851A 2011-02-28 2012-02-22 An integrated terrain modelling system Active AU2012222851B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2012222851A AU2012222851B2 (en) 2011-02-28 2012-02-22 An integrated terrain modelling system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AU2011900689A AU2011900689A0 (en) 2011-02-28 An integrated terrain modelling system
AU2011900689 2011-02-28
PCT/AU2012/000170 WO2012116392A1 (en) 2011-02-28 2012-02-22 An integrated terrain modelling system
AU2012222851A AU2012222851B2 (en) 2011-02-28 2012-02-22 An integrated terrain modelling system

Publications (2)

Publication Number Publication Date
AU2012222851A1 true AU2012222851A1 (en) 2013-08-08
AU2012222851B2 AU2012222851B2 (en) 2015-11-19

Family

ID=46757285

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2012222851A Active AU2012222851B2 (en) 2011-02-28 2012-02-22 An integrated terrain modelling system

Country Status (13)

Country Link
US (1) US20140081611A1 (en)
EP (1) EP2681719B1 (en)
CN (1) CN103392192A (en)
AR (1) AR085506A1 (en)
AU (1) AU2012222851B2 (en)
BR (1) BR112013021073B1 (en)
CA (1) CA2825406A1 (en)
CL (1) CL2013002466A1 (en)
MX (1) MX338416B (en)
PE (1) PE20141716A1 (en)
RU (1) RU2612625C2 (en)
WO (1) WO2012116392A1 (en)
ZA (1) ZA201307054B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10557709B2 (en) 2012-11-27 2020-02-11 Technological Resources Pty Ltd Method of surveying and a surveying system
US10311045B2 (en) * 2015-01-26 2019-06-04 Microsoft Technology Licensing, Llc Aggregation/evaluation of heterogenic time series data
CN106446349B (en) * 2016-08-31 2019-10-18 中国一冶集团有限公司 A kind of calculation method of the earthwork original place amortization based on revit software
EP3894785A1 (en) * 2018-12-13 2021-10-20 Leica Geosystems AG Measurement method, measurement systems and auxiliary measurement instruments
US11953636B2 (en) 2022-03-04 2024-04-09 Fleet Space Technologies Pty Ltd Satellite-enabled node for ambient noise tomography

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5359526A (en) * 1993-02-04 1994-10-25 Hughes Training, Inc. Terrain and culture generation system and method
US6985903B2 (en) * 2002-01-25 2006-01-10 Qualcomm, Incorporated Method and system for storage and fast retrieval of digital terrain model elevations for use in positioning systems
EP1400784A1 (en) * 2002-09-14 2004-03-24 Leica Geosystems AG Methods and devices for using data in data formats which are not directly processable
US8818076B2 (en) * 2005-09-01 2014-08-26 Victor Shenkar System and method for cost-effective, high-fidelity 3D-modeling of large-scale urban environments
US20070123249A1 (en) * 2005-11-30 2007-05-31 Hao Sun Field device management
EP1868009A1 (en) * 2006-06-13 2007-12-19 Leica Geosystems AG Calculation method for network specific values in a network of reference stations for a satellite based positioning system
AU2008309133B8 (en) * 2007-10-04 2014-02-20 Sungevity System and method for provisioning energy systems
US8351684B2 (en) * 2008-02-13 2013-01-08 Caterpillar Inc. Terrain map updating system
CA2657161C (en) * 2008-03-04 2016-07-12 The University Of Sydney Scanning system for 3d mineralogy modelling
CN101702245B (en) * 2009-11-03 2012-09-19 北京大学 Extensible universal three-dimensional terrain simulation system
US8665266B2 (en) * 2010-06-23 2014-03-04 The United States Of America, As Represented By The Secretary Of The Navy Global visualization process terrain database builder

Similar Documents

Publication Publication Date Title
JP6839078B2 (en) Construction management system and construction management method
CN101005375B (en) System and method for sharing terrain data among multiple machines
CN111125135B (en) Map updating method, map fusion updating method, terminal and server
AU2012222851B2 (en) An integrated terrain modelling system
EP2132530B1 (en) System and method for position determination
KR100997084B1 (en) A method and system for providing real time information of underground object, and a sever and method for providing information of the same, and recording medium storing a program thereof
CN106796760A (en) Communication equipment for the vehicles and the method for communicating
Carvajal et al. Surveying a landslide in a road embankment using unmanned aerial vehicle photogrammetry
AU2012222851A1 (en) An integrated terrain modelling system
CN103743383A (en) Automatic extraction method for road information based on point cloud
EP3535690A1 (en) System and method for automatically acquiring two-dimensional images and three-dimensional point cloud data of a field to be surveyed
CN114667434A (en) Method and mobile capturing device for capturing infrastructure elements of an underground line network
KR101674073B1 (en) Railway facilities spatial information bulid system and method
CN115184863B (en) Positioning method, positioning device, electronic equipment and storage medium
CN114365117A (en) Image-based productivity tracking system
Fotinopoulos Baloon photogrammetry for archaeological surveys
CN213932506U (en) Oblique photography unmanned aerial vehicle surveying and mapping system and device
Saponaro et al. Influence of co-alignment procedures on the co-registration accuracy of multi-epoch SFM points clouds
KR20050098111A (en) Apparatus and method for generating digital elevation model with high accuracy by using laser scanning data
CN117367429B (en) Remote sensing image-based working base map and unmanned aerial vehicle technology-based route image control point distribution algorithm
RU95441U1 (en) DEVELOPMENT DEVICE FOR MOBILE GEOINFORMATION SYSTEM OF THE DESIGNER OF RAILWAY SITES
Montaser et al. OUTDOOR AUTOMATED DATA ACQUISITION FOR PROGRESS REPORTING
Miranda et al. Employment of RPA (Remotely Piloted Aircraft) in Identifying Imperfections in the Asphalt Pavement of the Transoeste Bus Rapid Transit (BRT) System
KR100952403B1 (en) Geodetic survey confirmation method
CN117636287A (en) Method for collecting and processing high-precision map of open-air mining area based on crowdsourcing