AU2009334602B2 - Regulated supply of treated water for regional supply networks - Google Patents

Regulated supply of treated water for regional supply networks Download PDF

Info

Publication number
AU2009334602B2
AU2009334602B2 AU2009334602A AU2009334602A AU2009334602B2 AU 2009334602 B2 AU2009334602 B2 AU 2009334602B2 AU 2009334602 A AU2009334602 A AU 2009334602A AU 2009334602 A AU2009334602 A AU 2009334602A AU 2009334602 B2 AU2009334602 B2 AU 2009334602B2
Authority
AU
Australia
Prior art keywords
pressure
water
regional
supply network
supplied
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2009334602A
Other versions
AU2009334602A1 (en
Inventor
Andrew Burrows
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
I2O Water Ltd
Original Assignee
I2O Water Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by I2O Water Ltd filed Critical I2O Water Ltd
Publication of AU2009334602A1 publication Critical patent/AU2009334602A1/en
Application granted granted Critical
Publication of AU2009334602B2 publication Critical patent/AU2009334602B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/006Water distributors either inside a treatment tank or directing the water to several treatment tanks; Water treatment plants incorporating these distributors, with or without chemical or biological tanks
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/008Control or steering systems not provided for elsewhere in subclass C02F
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/02Public or like main pipe systems
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D16/00Control of fluid pressure
    • G05D16/20Control of fluid pressure characterised by the use of electric means
    • G05D16/2006Control of fluid pressure characterised by the use of electric means with direct action of electric energy on controlling means
    • G05D16/2066Control of fluid pressure characterised by the use of electric means with direct action of electric energy on controlling means using controlling means acting on the pressure source
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D21/00Control of chemical or physico-chemical variables, e.g. pH value
    • G05D21/02Control of chemical or physico-chemical variables, e.g. pH value characterised by the use of electric means
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/68Treatment of water, waste water, or sewage by addition of specified substances, e.g. trace elements, for ameliorating potable water
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/72Treatment of water, waste water, or sewage by oxidation
    • C02F1/76Treatment of water, waste water, or sewage by oxidation with halogens or compounds of halogens
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/003Downstream control, i.e. outlet monitoring, e.g. to check the treating agents, such as halogens or ozone, leaving the process
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/005Processes using a programmable logic controller [PLC]
    • C02F2209/006Processes using a programmable logic controller [PLC] comprising a software program or a logic diagram
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/005Processes using a programmable logic controller [PLC]
    • C02F2209/008Processes using a programmable logic controller [PLC] comprising telecommunication features, e.g. modems or antennas
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/02Temperature
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/03Pressure
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/29Chlorine compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/40Liquid flow rate
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/44Time
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/04Disinfection
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2307/00Location of water treatment or water treatment device
    • C02F2307/14Treatment of water in water supply networks, e.g. to prevent bacterial growth

Abstract

Water is supplied from a mains water supply station (6) to a main supply- conduit (12) which feeds a plurality of regional supply networks (14,16,18), via respective pressure reducing valves (20, 22, 24), at respective regional pressures. Each regional supply network has a boundary value for a parameter related to a property of the water, which may be water pressure or concentration of a water treatment agent. Each network has a critical point at which the value of the parameter is deemed least acceptable. Water supply characteristics in respect of each regional supply network (14,16,18) are monitored and the water supplied into the main supply conduit is processed to ensure acceptable values of the parameter are maintained at each critical point. Processing of the water may comprise controlling the output of one or more pumps arranged to pressurize the water supplied into the main supply conduit (12), or it may comprise controlling the addition of water treatment agent. Moreover, the processing of the water may be dependent on any one or more of : time, hour of the day, season, ambient air temperature.

Description

WO 2010/076558 PCT/GB2009/002963 Mains Water Supply Processing This invention relates to the supply of mains water and particularly to the control of parameters of the water supply at critical points in a distribution system. 5 The pressure in a mains water distribution system is created by pumps and / or the gravity head of water in a reservoir, water tower or the like. The pressure in the main arterial supply conduits is significantly higher than that required by consumers, whether domestic, agricultural or industrial. In a typical distribution system, a 10 number of consumers are arranged in a region to which water is supplied from the main arterial supply network by a pressure reducing valve (PRV). Typically, this region is referred to as a district metering area (DMA). Historically, the output pressure of the PRV for a particular region was fixed. 15 Although there are several variations in design of PRV, a globe diaphragm actuated valve is the industry standard in the United Kingdom. Some PRVs are set up to create a fixed reduction in pressure. Others are fitted with pilot valves, which alter the position of the valve such that it automatically gives a fixed outlet pressure regardless of inlet pressure or flow rate. The fixed output pressure must be 20 sufficiently high to ensure adequate pressure throughout the DMA, and in particular at the position which is subjected to the greatest head loss under maximum anticipated flow rates, which may be the highest and / or furthest point from the PRV in the DMA. Generally, the point where the pressure is lowest for a given output pressure from the PRV is known as the critical point and will normally be the 25 highest and / or furthest point away from the PRV. However, it should be appreciated that within a particular DMA there may be more than one critical point, and that the critical point may vary. A problem with such an arrangement is that at certain times or under certain 30 conditions within the DMA, the fixed pressure may be higher than that necessary to ensure an adequate pressure at the or each Critical Point. It is known that there is a relationship between system pressure and both leakage flow rates and burst rates in a DMA. Thus, if the output pressure can be lower than the fixed pressure whilst WO 2010/076558 PCT/GB2009/002963 -2 still providing adequate pressure at the Critical Point, there will a reduced risk of leakage and burst occurrences. It has been proposed that the output of the PRV should be variable so that the 5 pressure can be varied depending on demand, thus reducing the average pressure within the DMA and reducing problems with leakages and bursts. Other advantages of controlling the pressure actively include reduced fatigue on the pipe network, the provision of more constant supply pressure to consumers, and a reduction in pressure related consumption. 10 One system in which a PRV is controlled by a pilot valve is disclosed in GB 2405957. There is a pressure feedback stage including a gate valve that creates a head loss which increases with flow through the PRV. The head loss causes water to flow in a bypass pipe that incorporates a venturi. The pilot valve is controlled by 15 pressure at the venturi. This pressure decreases as flow rate increases, thereby causing the pilot valve to increase the output pressure of the PRV as flow rate increases. It has also been proposed that a pilot valve should be controlled electrically, using a 20 controller. EP-0574241 discloses a system which varies the PRV output pressure in accordance with a pressure-time profile generated from historical data. This pressure-time modulation system is based on an assumption that demand is cyclically predictable over time. EP-0574241 also refers to an alternative arrangement, in which, instead of the output pressure being controlled as a function 25 of time, it is controlled as a function of flow rate. In WO 2008/090359 there is disclosed a controller for adjusting the output pressure of a pressure reducing valve supplying water to a consumer region, in which the controller includes a clock and a processor is configured to use time data, stored 30 parameters and flow rate, so that the pressure reducing valve is adjusted to provide the required output pressure corresponding to both the flow rate and the time. In a preferred implementation of the system in WO 2008/090359 a remote data processing facility receives logged data from the controller and critical point 35 pressure data from a pressure sensor adjacent the critical point. The remote data WO 2010/076558 PCT/GB2009/002963 -3 facility calculates parameters to be transmitted to the controller using the logged data received from the controller and the critical point pressure data. Preferably, the parameters transmitted to the controller cover a period of time which is greater than the intervals between the controller and the remote data processing facility 5 being in data communication. WO 2008/090359 thus discloses systems for controlling the water pressure within a DMA so that a required pressure is maintained at the critical pressure, whilst the output pressure from the PRV is not kept at an unnecessarily high level. Of course, 10 it is necessary to ensure that the input pressure to the PRV from the main arterial supply is at a sufficient level to provide the output pressure required from the PRV. The water pressure from a main pumping station supplying the arterial network is therefore kept sufficiently high to ensure that, for each DMA supplied by the network, the input pressure is sufficiently high to satisfy the needs of that DMA. 15 One aspect of the present invention is concerned with controlling the output pressure of the pumping station so that, whilst meeting the pressure requirements of all of the DMAs, it is not unnecessarily high. 20 Within a DMA there are other parameters of the water supply which can be controlled, apart from pressure, and there are other types of critical point. Consider, for example, the treatment of water to destroy bacteria by the addition of chlorine or other disinfecting agents to the water. There will be a minimum concentration of the disinfectant required for effective disinfection, as well as a 25 critical point for disinfectant concentration where the concentration is lower than anywhere else in the DMA (which may not be the same critical point as that used for pressure). However, the use of disinfectant must be controlled carefully to ensure that, whilst there is adequate disinfection, excessive use of disinfectant is avoided. Excessive use of disinfectant will result in complaints from consumers 30 about taste, odour or skin irritation; possible health risks; and causes unnecessary expense in the purchase of chemicals. Treatment of water by the addition of disinfectant is traditionally carried out before water is fed into the main arterial network. Thus, another aspect of the invention 35 concerns controlling the centralised addition of disinfectant or other water treating -4 agents to ensure that, whilst meeting the agent concentration requirements of the DMAs which are supplied, the concentration is not unnecessarily or undesirably high. 5 It will be appreciated that, for disinfection monitoring purposes at a critical point within a DMA, it would be possible to monitor the concentration of disinfectant and / or the concentration of bacteria at the critical point. A reference herein to a patent document or other matter which is given as prior art 10 is not to be taken as an admission that the document or matter was known or that the information it contains was part of the common general knowledge as at the priority date of any the claims. In its broadest aspect, the invention encompasses a method of controlling the 15 pressure of water that is supplied from a mains water supply station to a main supply conduit, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: 20 for each regional supply network, there is a regional boundary value for the water pressure within that regional supply network which represents a boundary between acceptable and unacceptable values of the water pressure within the regional supply network; and 25 for each regional supply network, there is designated a pressure critical point within the regional supply network at which the value of the water pressure is deemed to be the least acceptable compared with the values at other points in the same regional supply network; 30 and wherein the method comprises: monitoring water pressure in respect of each regional supply network to provide monitoring data that relate to an output pressure of the respective -5 pressure reducing valve required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; using (i) the monitoring data in respect of each regional supply network, and 5 (ii) the characteristics of the respective pressure reducing valve, to calculate a respective minimum input pressure for each of the pressure reducing valves required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; 10 using the minimum input pressures for the pressure reducing valves to establish control data for governing the pressure of the water that is supplied into the main supply conduit from the main water supply station so as to ensure that there can be maintained at the pressure critical point within each regional supply network a respective acceptable value of the water 15 pressure; and controlling the pressure of the water which is supplied into the main supply conduit in accordance with the control data. 20 In some arrangements, the parameter is the water pressure, the critical point in each regional supply network is a pressure critical point, processing water which is supplied into the main supply conduit comprises controlling the pressure of the water supplied into the main supply conduit, and the control data govern the pressure of the water. 25 Thus, assume for example that there are three regional supply networks. For each network, the required output pressure P2 of the respective pressure reducing valve in order to provided the required water pressure at the critical pressure is calculated. Given the characteristics of a particular pressure reducing valve, the 30 minimum input pressure from the main supply conduit P1 can be calculated to realise a PRV output pressure of at least P2. Each of the regional supply networks may require a different minimum input pressure value, and the required minimum input pressure for any given network may vary as a function of flow rate into that network and / or time and / or other factors. The mains pressure provided by the 35 mains water supply station can then be controlled to maintain at least these - 5a minimum values. By determining the mains supply pressure actually required to ensure that each of the regional supply networks can meet its requirement to maintain a minimum pressure at its critical point, greater control can be exerted. Instead of the mains pressure being maintained at an unnecessarily high value, it 5 can be maintained at a value just sufficient to meet consumers' needs. This means that water pumping requirements can be controlled to a minimum; for example, by switching pumps on or off, or controlling their individual outputs. As well as saving energy and the associated costs thereof, the lifetime of the pumps and the pipes carrying water away from the mains water supply station may be increased by 10 avoiding generating unnecessarily high pressures. Furthermore, both the incidence and the severity of leaks in the water distribution pipes may be reduced.
WO 2010/076558 PCT/GB2009/002963 -6 In such arrangements, the monitoring data will be related to the required output pressure of a PRV to ensure that the minimum acceptable pressure is maintained at the critical point within the regional supply network concerned. From this and the characteristics of the PRV the minimum input pressure can be calculated. 5 From monitoring the regional supply networks over a suitable period, it may be determined that there is one regional supply network where the inlet pressure of the PRV at all times has to be higher than that for any other PRV. Alternatively, it may be determined that there is one regional supply network where the inlet pressure of 10 the PRV typically has to be higher than that for any other PRV for a particular time period (e.g. a given hour of the day, day of the week, month, season, etc.) and / or flow rate into the regional supply network and / or other usage characteristic (e.g. during half-time on televised sports matches) and / or other relevant factor (e.g. temperature). In either case, such a pressure reducing valve could be designated 15 as a permanent or temporary critical pressure reducing valve and the water pressure at the pumping station controlled so that the pressure of the water supplied to that PRV is acceptable. It may therefore no longer be necessary to monitor the other regional supply networks after the suitable period. Preferably, however, monitoring of all regional supply networks is maintained so as to 20 guarantee that each PRV is supplied with a sufficient pressure of water. In other arrangements, the parameter is the concentration of a water treatment agent (or the concentration of impurities in the water if the effect of the treating agent is to remove such impurities), the critical point in each regional supply 25 network is a treatment-agent critical point, the processing of the water comprises controlling the addition of a treatment agent to the water supplied into the main supply conduit, and the control data govern the addition of the treatment agent. This may be done at the pumping station itself or elsewhere, for example at a treatment plant which supplies treated water to the pumping station. The water 30 treatment agent is not limited to any particular agent and may, for example, comprise: a dye; a flavour enhancer; or a health additive, such as fluoride. In preferred embodiments, however, the treatment agent comprises a disinfectant agent, such as bromine, iodine, copper ions, silver ions, hydrogen peroxide, or, especially, chlorine. 35 WO 2010/076558 PCT/GB2009/002963 -7 The two type of monitoring and process control may both be used, and in general any number of different characteristics of the water and its supply may be controlled. 5 In general, although the regional boundary values may differ from one another, in preferred embodiments they will be the same as each other (since, for example, the same minimum chlorine concentration, or minimum water pressure, may be required across an entire water region or even across an entire country). 10 The monitoring of water supply characteristics in respect of each regional supply network may comprise continuous monitoring, with the monitoring data being real time data, but it preferably comprises intermittent monitoring, at intervals that may be regular or irregular. The monitoring data may comprise a continuously-sampled value of the parameter at each critical point; but they preferably comprise an 15 intermittently-sampled value of the parameter at each critical point. In this way it is not necessary for monitoring equipment to be in continuous or real-time communication with a controller or central server (remote data processing facility), which may be difficult or impossible to achieve (since, for example, a permanent power supply and / or wired communication link are not necessarily available at the 20 critical point). Rather, in preferred embodiments, at each critical point there is located a monitoring device that is self-powered (e.g. by battery, solar cell or fuel cell) and arranged for wireless communication (e.g. GSM, GPRS or 3G) with a controller or central server. 25 Preferred embodiments comprise the further step of processing water which is supplied into the main supply conduit in dependence on the flow rate of water from the main supply station into the main supply conduit. Thus there may be further steps of determining data representative of the flow rate of water from the main supply station into the main supply conduit, and further using the flow rate data to 30 establish the control data. Water at the main supply station may additionally or alternatively be processed in dependence on any one or more of: time; hour of the day; day of the week; month of the year; season; current or recent ambient air temperature; current or recent water temperature; current or recent rainfall; or any other relevant factor. 35 WO 2010/076558 PCT/GB2009/002963 Yet further arrangements may be envisaged; for example, where the parameter is the concentration of microbes in the water, the critical point in each regional supply network is a microbe critical point, processing water which is supplied into the main supply conduit comprises controlling the addition of the treatment agent to the water 5 supplied into the main supply conduit or of controlling the application of an antimicrobial treatment such as treatment with UV light, ozone, gamma rays, sound or heat to the water. The various possible arrangements described above can be combined, either using 10 the same critical point in each regional supply network for multiple purposes, or using different critical points. At least one regional supply network could use the same critical point for multiple purposes. At least one regional supply could use different critical points for different purposes. In general within a regional supply network any number of parameters could be controlled for, using shared critical 15 points, different critical points, some critical points shared and others separate, and so forth. Any number of water processing features could be applied and, in appropriate cases, a particular processing feature could be applied in accordance with a plurality of different controlled parameters in a regional supply network. 20 In some preferred embodiments both chlorine treatment (or any other antimicrobial treatment) and water pressure are controlled at the main water supply station, having regard to the values in each regional supply network of both pressure at a pressure critical point and chlorine concentration at a chlorine critical point. While the chlorine critical point might be the same point as the pressure critical point in 25 any given regional supply network (e.g. a point that is the highest within the regional supply network and / or the most distant from the PRV), in general they are likely to be at different points. The pressure critical point may, for example, be close to the highest outlet in the regional supply network, since pressure is dependent on height (although other energy loses such as frictional loses in the pipe may also play a 30 significant part in determining the choice of a pressure critical point), but it is often at the most distant point from the PRV, or may swap between the two points depending upon flow rates. Chlorine concentrations typically deplete with time and exposure to temperature, and thus the chlorine critical point is likely to be a point in the network that typically contains the "oldest" water - i.e. water which has been in 35 the regional supply network the longest; this may mean that the chlorine critical WO 2010/076558 PCT/GB2009/002963 -9 point is far removed from the PRV, or its position may be determined by a particularly low rate of consumption from a certain part of the network. From moment to moment, in any given regional supply network, the precise point 5 having the least acceptable value for the parameter compared with the values at other points in the same regional supply network may shift location by relatively small amounts (when, for example, a customer opens a tap in a property); its location may therefore, for practical purposes, be indeterminate beyond a certain degree of precision. Thus the designation of a critical point in the present invention 10 is to be understood as a designation of a point deemed to exhibit or approximate such least acceptable characteristics on average over a period of time. Of course, the need to find suitable locations to install monitoring equipment, as well as other practical considerations, may mean that the designation can at best only be an estimate of the instantaneous actual point of least acceptable value of the 15 parameter. However, the need in some situations to approximate does not detract from the usefulness of the present invention. Furthermore, the actual point having the least acceptable value for the parameter compared with the values at other points in the same regional supply network may 20 also shift location by relatively large amounts from time to time. Thus, in some embodiments, for one or more regional supply networks there may be designated a plurality of potential critical points within that regional supply network at each of which the value of the parameter is deemed from time to time to be the least acceptable compared with the values at other points in the same regional supply 25 network. Preferably, at any one time, precisely one of the potential critical points is designated as the critical point for that regional supply network, and is thus the critical point in respect of which the aforesaid control data are established. However, in certain embodiments, more than one critical point of the same type (e.g. two pressure critical points) may, temporarily or permanently, be designated 30 simultaneously for a given regional supply network; when, for example, the parameter values at both points are nearly identical to one another (e.g. sufficiently close that measuring equipment in use cannot resolve the difference between them). In such circumstances, control data may be established such that processing of the water that is supplied into the main supply conduit from the main 35 water supply station is controlled so as to ensure that there can be maintained at a -10 plurality of critical points within one regional supply network a respective acceptable value of the parameter. It will be appreciated that, in some cases, one or more regional supply networks 5 supplied by the main water supply station may not be provided with suitable monitoring arrangements, for example when the system is first being introduced. In that event, manual measurements may have to be taken in order to ensure that, for example, water pressure and chlorine concentration are acceptable in such regional supply networks. Preferably, however, monitoring means are permanently located 10 at each critical point. In some embodiments, there may be monitoring means situated at each critical point that are arranged to provide continuous or frequent monitoring of the value of the parameter at the respective critical point. However, for reasons given above, 15 such continuous or frequent monitoring may not be possible or desirable. When only intermittent monitoring data are available - for example, consisting of an hourly update of the value of the parameter at each critical point - there is a risk that the value of the parameter moves to an unacceptable level in the periods for which no monitoring data are available. However, factors such as the flow rate of water 20 entering the main supply conduit, the time of day, week, month or year, the ambient air temperature and / or the temperature of water entering the main supply conduit may have a relationship with the value of the parameter at each critical point. Processing of the water which is supplied into the main supply conduit may preferably also be in according with data relating to such factors and said 25 relationships. In this way, the risk that the value of the parameter moves to an unacceptable level in the periods for which no monitoring data are available may be mitigated. From another aspect the invention provides a controller for controlling the pressure 30 of water that is supplied from a mains water supply station to a main supply conduit, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: 35 - 11 for each regional supply network there is a regional boundary value for the water pressure within that regional supply network which represents a boundary between acceptable and unacceptable values of the water pressure within the regional supply network; and 5 for each regional supply network, there is designated a pressure critical point within the regional supply network at which the value of the water pressure is deemed to be the least acceptable compared with the values at other points in the same regional supply network; 10 wherein the controller is arranged to: receive monitoring data in respect of each regional supply network that relates to an output pressure of the respective pressure reducing valve 15 required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; use (i) the monitoring data in respect of each regional supply network, and (ii) the characteristics of the respective pressure reducing valve, to calculate 20 a respective minimum input pressure for each of the pressure reducing valves required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; and use the minimum input pressures for the pressure reducing valves to 25 establish control data for governing the pressure of the water that is supplied into the main supply conduit from the main water supply station so as to ensure that there can be maintained at the pressure critical point within each regional supply network a respective acceptable value of the water pressure, 30 and wherein the controller comprises: a control output for providing a control signal to adjust the pressure of water which is supplied into the main supply conduit; 35 - 11a data storage means storing the control data; and processing means configured to process the stored control data to cause a control signal to be provided from the control output in order to adjust the 5 pressure of water which is supplied into the main supply conduit in accordance with the control data. As previously, the parameter may be water pressure, or concentration of a water treatment agent, or any other suitable parameter.
WO 2010/076558 PCT/GB2009/002963 - 12 Preferably the stored parameters represent a time-dependent relationship between the flow rate of water and the required processing of water that is supplied into the main supply conduit; preferably the controller then further comprises a clock 5 providing data representative of time; and the processing means is configured to access the data representative of time, in addition to the stored parameters and the data representative of the flow rate, so that the signal which is provided from the control output causes the processing of water which is supplied into the main supply conduit to be adjusted corresponding to the flow rate and the time. 10 The time dependency of the relationship between flow rate and the required processing of water which is supplied into the main supply conduit can be such as to define the processing for a given flow rate at a particular time of day, and / or day in the week, and / or time of year. There could be a calendar representing a 15 number of days, and within each day a number of periods. The number of days could correspond to a week, or a number of weeks, or a month, or a number of months, or a year. Within each day, the periods may for example be individual hours, or multiples of hours. In one embodiment, by way of example only, there is a calendar covering every day of the year, and for each day there are eight 3 hour 20 periods, giving a total of 2920 periods in a standard calendar year and 2928 in a leap year. For each period there will be one or more parameters which will define the relationship between the measured flow rate and the required processing of water which is supplied into the main supply conduit. This could be done by having separate values stored for each period or, for example, by having default values 25 which are used unless there is an entry for a particular period when the relationship needs to vary from the default relationship. The rate of change of concentration of certain water treatment agents such as chlorine can be affected by the temperature of the water. It may therefore be 30 advantageous to consider water temperature in parts or all of the supply network when determining the dosing of treatment agent at the main supply station. Thus, especially in embodiments in which the parameter is concentration of a water treatment agent (but also in some other embodiments), it is preferred that: the controller comprises a water temperature input for receiving a water temperature 35 signal from a temperature sensor and means adapted to provide data WO 2010/076558 PCT/GB2009/002963 -13 representative of the water temperature in accordance with the water temperature signal; the data storage means stores parameters representing a relationship between the temperature of water and a required processing of water which is supplied into the main supply conduit in order to maintain at the critical point within 5 each regional supply network a respective acceptable value of the parameter; and the processing means is configured to process (i) the data representative of the water temperature and (ii) the stored parameters, so that a control signal is provided from the control output in order to adjust the processing of water which is supplied into the main supply conduit corresponding to the water temperature. 10 More than one temperature sensor may be provided, each providing a water temperature signal for water at a different point in the supply network. Some or all of these signals may be averaged across the whole supply network (i.e. across all the regional supply networks), or averaged for a regional supply network, or they 15 may be processed separately or in combination in any suitable way so that a control signal is provided from the control output in order to adjust the processing of water which is supplied into the main supply conduit corresponding to the water temperature at a plurality of points in the supply network. 20 In particular, a temperature sensor may be arranged to provide a temperature signal for water entering the main supply conduit. Preferably at least one temperature sensor is arranged to provide a temperature signal for water entering at least one, preferably all, of the regional supply networks. These latter temperature sensors may be conveniently situated adjacent the PRVs of each 25 region. In some embodiments, a temperature sensor is situated adjacent the critical point of one or more regional supply networks. In particularly preferred embodiments, temperature sensors are located adjacent the PRV and adjacent the critical point (e.g. pressure and / or water treatment agent critical points) of each regional supply network and the controller is arranged to receive a water 30 temperature signal from each temperature sensor. Temperature sensors may be located at or near any one or more of: an or the entry point of water into the main supply conduit; one or more regional supply network PRVs; one or more water treatment agent critical points; one or more pressure critical points; one or more regional supply network average zone points (AZP). 35 WO 2010/076558 PCT/GB2009/002963 -14 The controller may be situated at a distance from the water supply network; for example, at a remote data processing facility, or may be located at the main supply station from where water is supplied into the main supply conduit. 5 The flow rate signal and / or water temperature signal and / or any other relevant signals may be communicated wirelessly or over a wired connection from the respective sensor directly to the controller. Alternatively, it or they may be communicated by wireless or wired means to a data processing facility (e.g. central server), which may be remote from both the sensor and the controller, for storage 10 or processing and onward transmission, again by wire or wirelessly, to the respective input of the controller. The sensor(s) may comprise logging means arranged to log collected data before intermittently transmitting them to the controller or a remote data processing facility. 15 At any particular time, the stored parameters may cover for example an entire year or a shorter time, the arrangement being that as time moves on additional parameters are stored and, optionally, previously used parameters removed. In the preferred arrangement, the parameters are maintained unless replaced by updated values. 20 When the controller is first commissioned it could be programmed with a basic set of parameters based on experience in previous installations and / or by taking measurements during a trial period. Those parameters can be varied and additional parameters added for further periods of time, by analysing data from use 25 of the controller in practice. This will require a critical point parameter sensor at each critical point. The output from these critical point parameter sensors will be processed together with corresponding data relating to the flow rate. For synchronisation purposes all data will be time stamped (which includes time / date stamping, using times codes and so forth). The data from the critical point 30 parameter sensor could be logged at the critical point and then collected or transmitted for analysis. The calculation of the parameters could be carried out within the controller using suitable software and / or firmware routines, in which case critical point data would 35 be transmitted to the controller from the critical point or relayed from a central -15 location. However, in some preferred arrangements, the calculation of the parameters is carried out at a remote data processing facility and then the parameters will be transmitted to the controller. This arrangement provides advantages because the processing can be done continuously without draining the 5 battery of the controller where it is battery powered, greater processing power can be employed, and data from other sources can be taken into account readily. For example, the parameters could depend on experience gained from other regions with similar systems whose data can be processed at the central data processing facility. Actual or predicted environmental factors can be taking into account, such 10 as weather forecasts, temperature, rainfall, whether or not there is a hose pipe or sprinkler ban, upcoming sports events or other occasions, television listings, and so forth. In some embodiments, the controller resides at a remote data processing facility and the control signal is communicated to an adjuster located at the mains water supply station and arranged to adjust the processing of water which is 15 supplied into the main supply conduit in response to the control signal. In general, as regards features of the controller, in preferred embodiments the stored parameters are representative of a relationship between the flow rate of water into the main supply conduit and the required processing of the water which 20 is supplied into the main supply conduit, which varies as a function of the time of day and / or the day of the week and / or the time of the year. The relationship may also advantageously be between the temperature of water and the said required processing of the water; this is particularly advantageous when the parameter is concentration of a water treatment agent such as chlorine which is affected by 25 water temperature. Preferably the stored parameters are in respect of discrete intervals covering an entire day, for each of a number of successive days. Preferably the controller comprises a communications module and is configured to use the communications module at intervals to establish communication with a 30 remote data processing facility and to receive parameters which are stored in the data processing means. Preferably, the communications module is adapted for wireless communication. In accordance with another aspect of the invention, there is provided a system for 35 controlling the pressure of water that is supplied from a mains water supply station -16 to a main supply conduit, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: 5 for each regional supply network there is a regional boundary value for the water pressure within that regional supply network which represents a boundary between acceptable and unacceptable values of the water pressure within the regional supply network; and 10 for each regional supply network, there is designated a pressure critical point within the regional supply network at which the value of the water pressure is deemed to be the least acceptable compared with the values at other points in the same regional supply network; 15 the system comprising a controller and a remote data processing facility, wherein the data processing facility is arranged to: receive monitoring data in respect of each regional supply network that 20 relate to an output pressure of the respective pressure reducing valve required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; use (i) the monitoring data in respect of each regional supply network, 25 and (ii) the characteristics of the respective pressure reducing valve, to calculate a respective minimum input pressure for each of the pressure reducing valves required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; 30 use the minimum input pressures for the pressure reducing valves to establish control data for governing the pressure of the water that is supplied into the main supply conduit from the main water supply station so as to ensure that there can be maintained at the pressure critical point within each regional supply network a respective acceptable value of the 35 water pressure; and -17 transmit the control data to the controller, and wherein the controller comprises: 5 a control output for providing a control signal to adjust the pressure of water which is supplied into the main supply conduit; data storage means storing control data received from the data 10 processing facility; and processing means configured to process the stored control data to cause a control signal to be provided from the control output in order to adjust the pressure of water which is supplied into the main supply conduit in 15 accordance with the control data. The system may comprise a remote data processing facility arranged to carry out steps described above. In particular, the remote data processing facility may generate the aforesaid parameters representing a relationship between the flow 20 rate of water and a required processing of water, and communicate these to the controller. The monitoring of water supply characteristics in respect of each regional supply network preferably comprises monitoring characteristics, such as the value of the 25 parameter, at the critical point in each regional supply network, but it may also comprise monitoring characteristics elsewhere, such as at or adjacent the pressure reducing valve of one or more of the regional supply networks. In addition to relating to the value of the parameter, the monitoring data may also relate to other factors such as the water temperature, pressure, pH, microbe levels, etc. 30 In embodiments in which the pressure of water supplied into a main supply conduit is controlled, the processing of the water may comprise controlling the output of one or more pumps arranged to pressurise the water supplied into the main supply conduit. This control may be expressed as a percentage of the maximum power 35 consumption of the pump or pumps.
- 17a In embodiments in which the concentration of a water treatment agent in water supplied into a main supply conduit is controlled, the processing of the water may comprise controlling the rate of addition of the water treatment agent to the water. 5 There may be provided a method of controlling the pressure of water supplied into a main supply conduit from a main water supply station, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective 10 regional pressure, wherein: for each regional supply network, there is a regional boundary value for the water pressure which represents a boundary between acceptable and unacceptable water pressures within the regional supply network; and 15 for each regional supply network, there is designated a pressure critical point within the regional supply network at which the water pressure is deemed to be the least acceptable compared with the water pressures at other points in the same regional supply network; 20 and wherein the method comprises: monitoring water supply characteristics in respect of each regional supply network to provide monitoring data; 25 using the monitoring data to establish control data such that the pressure of water that is supplied into the main supply conduit from the main water supply station is controlled so as to ensure that there can be maintained at the pressure critical point within each regional supply network a respective acceptable water pressure; and 30 controlling the pressure of water supplied into the main supply conduit as so determined. There may be provided a method of controlling the addition of a water treatment 35 agent to water supplied into a main supply conduit from a main water supply - 17b station, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: 5 for each regional supply network, there is a regional boundary value for the concentration of the water treatment agent which represents a boundary between acceptable and unacceptable concentrations of the water treatment agent within the regional supply network; and WO 2010/076558 PCT/GB2009/002963 -18 for each regional supply network, there is designated a treatment-agent critical point within the regional supply network at which the concentration of the water treatment agent is the least acceptable compared with the 5 concentrations at other points in the same regional supply network; and wherein the method comprises: monitoring water supply characteristics in respect of each regional supply 10 network to provide monitoring data; using the monitoring data to establish control data such that the addition of water treatment agent to water that is supplied into the main supply conduit from the main water supply station is controlled so as to ensure 15 that there can be maintained at the treatment-agent critical point within each regional supply network a respective acceptable concentration of water treatment agent; and controlling the addition of water treatment agent to water supplied into 20 the main supply conduit as so determined. Optional or preferred features of any aspect of the present invention are not to be understood as being limited necessarily to that aspect only, but as being applicable to the other aspects of the invention as appropriate. 25 A preferred embodiments of the invention will now be described, by way of example only, with reference to the accompanying drawing, in which Figure 1 is a schematic diagram of water supply system arranged to carry out a process in accordance with the present invention. 30 Figure 1 schematically shows a water supply system fed from a reservoir 2. Water from the reservoir passes along a pipeline 4 to a main supply station 6. The main supply station 6 comprises a chlorine treatment unit 8 and two pumps 10 each connected to a main supply conduit 12. The main supply conduit 12 feeds three WO 2010/076558 PCT/GB2009/002963 -19 regional supply networks 14, 16, 18 via respective pressure reducing valves (PRV) 20, 22, 24. Within the first regional supply network 14, there is designated a pressure critical 5 point 26 and a chlorine critical point 28. These points are close to one another and are, for example, near the top of the highest hill in the geographic region served by the regional supply network 14. Also shown is an Average Zone Point (AZP) 35 for the region, which is a point at which the water pressure is typically near the average pressure across the whole regional supply network. The second regional supply 10 network 16 also has designated a pressure critical point 30 and a chlorine critical point 32, but these are further apart than the corresponding points of the first regional supply network 14. This may be because the highest point in the region is close to the PRV 22 and is the pressure critical point 30, while the chlorine critical point 32 is at the farthest point in the region away from the PRV 22, but this point is 15 not particularly high up. In the third regional supply network 18, the pressure critical point and the chlorine critical point are at the very same point 34, which may be at the highest point in the supply network. Also located in the main supply station 6 is a flow rate sensor 7 for measuring the 20 flow rate M into the main supply conduit 12 and a control unit 36. The measured flow rate M is transmitted from the control unit 36 over a communications network (which may be wireless but is preferably wired) to a remote central control station 38 where there is a data processing facility. In wireless communication with the central control station 38 are critical point sensor units 40, 42, 44, 46, 48, located 25 one at each critical point 26, 28, 30, 32, 34. These critical point sensor units comprise a pressure sensor and / or chlorine concentration sensor (which may measure the residual free chlorine or the total chlorine); a water temperature sensor; a data logger and a communications unit. Sensor readings are time stamped and stored on the data logger. Information stored on the data logger 30 might be retrieved manually by an engineer, who will connect to the logger by any suitable wired or short- or long-range wireless means. However, preferably the communications unit, at intervals, transmits data from the logger by SMS or other suitable wireless means to the central control station 38, which processes the pressure / chlorine concentration data, together with the flow rate M data received 35 from the control unit 36, in order then to transmit suitable control parameters to the WO 2010/076558 PCT/GB2009/002963 - 20 control unit 36 so that the pumps 10 and the chlorine treatment unit 8 can be controlled to provide the required pressure / chlorine concentrations at the critical points. 5 Other information may also be factored into the processing of the control parameters, such as the time information contained in the time-stamps of the sensor readings, water temperature recorded at the critical point sensor units 40, 42, 44, 46, 48, rainfall sensors, etc. In order to obtain a detailed picture of water temperatures across the whole distribution network, there may be additional water 10 temperature sensors located adjacent one or more of the PRVs 20, 22, 24 and at other appropriate points in the distribution network, such as at one or more of the Average Zone Points (AZPs) of the regional supply networks, and in the main supply conduit. 15 The control parameters transmitted to the control unit 36 might be direct control commands such as "increase the pumps to 80% power"; or "decrease the chlorine concentration to 0.2 mg/L" (or 0.2 ppm), requiring almost immediate action. This may be appropriate where the critical point sensor units 40-48 are able to transmit frequent updates of the value of the parameter(s) they are monitoring. However, 20 the standard mode of operation in the present embodiment is for the control unit 36 to control the pumps 10 and chlorine treatment unit 8 based on the measured flow rate M and the time T output by a clock (not shown), as well as any other relevant environmental sensor inputs (e.g. air temperature, water temperature, recent rainfall), in accordance with parameters stored in the control unit 36, which have 25 been retrieved from the central control station 38. A preferred arrangement for the control unit 36 to use these stored parameters is via a lookup table having axes for flow rate bands, time bands, and possibly other bands such as average regional supply network water temperature, and having 30 numerical entries giving appropriate pump control levels (relating, for example, to the power consumption of the pumps) and chlorine concentration levels. The lookup tables might be three- or multi-dimensional, including axes for light intensity, a rain sensor, water temperature, air temperature, or other local environmental inputs. An alternative to using one or more lookup tables is for a processor in the 35 control unit 36 to evaluate a function which involves measured values and WO 2010/076558 PCT/GB2009/002963 - 21 constants which are stored parameters. In either case, the control unit 36 sends appropriate control commands to the pumps 10 and the chlorine treatment unit 8. The speed of response to changes in flow rate M may be controlled by a damping 5 variable to limit the speed of change in pressure and / or chlorine concentrations into the main supply conduit 12. The stored parameters are generated and loaded into the control unit 36 as follows. 10 Especially in an initial setup phase, an engineer could manually determine the parameters based on the size of the regional supply networks, historical flow rates, distances and height differences to the critical points, and load these onto the control unit 36. Simple rules could be used to estimate the relationship variables. The engineer could use suitable software to assist in determining the parameters. 15 In normal usage, and optionally even at initial installation, the parameters, or incremental updates thereto, are transmitted from the central server 38. This communication may be intermittent; for example initiated by the control unit 36 over a wireless link. Preferably, however, there is a permanent wired communications 20 link between the controller (36) and the server (38) allowing real-time communication between the two. The parameters preferably take the form of one or more discrete lookup tables, as already described. They may, however, describe or parameterise a continuous 25 curve or multi-dimensional surface, or parameterise some other relationship model, such as a neural network. Although in some embodiments, the control unit 36 itself may generate appropriate parameters from raw data, in the present embodiment, the primary analysis of data 30 is conducted on the central server 38. This may allow for efficiencies of scale if the central server 38 is arranged to control several main supply stations. Typically initial training data will be gathered over a one or two week time period, but this period may be longer to capture seasonal effects, or several distinct sets of training data may be gathered. The measurements of the flow rate M are transmitted at WO 2010/076558 PCT/GB2009/002963 - 22 intervals to the central facility 38. The pressure and chlorine concentrations at the respective critical points 26-34 are logged on the critical point sensor units 40-48. The critical point sensor units are synchronised with the control unit 36, directly or 5 indirectly - by both being synchronised with a clock at the central facility 38 - before the data gathering period to ensure both units have synchronised clocks. After the data gathering period, the critical point sensor units 40-48 send pressure / chlorine concentration data by SMS or other means to the central server 38. The central server 38 analyses the relationship of pressure and chlorine concentrations to 10 differing flow rates M and times T, optionally also taking into account other factors that may be relevant, such as weather conditions, sports fixtures, factory usage information, etc. and derives parameter values using regression or any other suitable statistical algorithm to establish a best fit curve, best fit multi-dimensional surface plot or other appropriate relationship model, which may be discrete or 15 continuous. A supervised learning approach may be used; for example, a neural network, Bayesian classifier, etc. In this way, the relative importance of input factors such as sports fixtures, weather, season, etc. need not be assumed in advance, but can rather be learned and weighted appropriately by the software on the central server 38. 20 If the software is unable to determine an appropriate relationship, it will alert the operator who can interrogate the data and override with a manual curve or other relationship. 25 A modelled relationship on the central server 38 may be continuous or discrete over the input variables (flow rate, time, water temperature, air temperature, etc.). Although parameters fully describing a continuous, possibly multi-dimensional relationship could be loaded directly onto the control unit 36, in the present embodiment, a simplified lookup table is generated by the central server 38, in 30 which flow, time, etc. are divided into appropriately-sized discrete intervals. This lookup table is loaded onto the control unit 36 and used as described above. The table may be loaded incrementally over time, and may be updated periodically as the central server 38 revises the simplified lookup table to take account of predicted weather patterns for the next 24 hours or week, or future sports fixtures, such as a 35 golf tournament, for example.
WO 2010/076558 PCT/GB2009/002963 - 23 The parameters supplied to the control unit 36 from the central facility 38 are such that if there is an interruption in communications for any time, before updated parameters can be loaded, there will be sufficient parameters to adjust the output 5 pressure appropriately over expected periods such as days of the week, weekends and so forth. The central server 38 may control several independent mains water supply areas, each with its own main supply station. Where there are appropriate similarities 10 between the water supply areas, the central server 38 preferably uses the data obtained from one main supply area to improve the accuracy of the parameters determined for a different main supply areas. By way of example only, it may be determined from data logged in respect of a first main supply area that hours of sunshine has a more significant effect than month of the year in determining the 15 optimal relationship between flow rate M, time T and the required chlorine concentration of water entering the main supply conduit 12; this knowledge could be used in the optimising of parameters for a second main supply area which may not be equipped with a light meter. In this way, optimal use is made of the available training data. 20 The control unit 36 in any particular main supply area may have the facility to temporarily override an existing relationship manually - i.e. to toggle between any existing automatically derived or manually set parameters to a new temporary set of parameters, with the ability to revert back to the original. 25 Sensor units (not shown) similar to the critical point sensor units may optionally be installed at the PRVs 20, 22, 24. These would measure input and output pressure at the respective PRV and may also measure flow rate through the PRV, as well as other variables such as water temperature and air temperature, which they would 30 communicate to the central server 38 to be used as further inputs for determining the parameters to be supplied to the control unit 36. In summary, the preferred embodiments of the invention provide a method, system and controller for a mains water supply station whereby acceptable values of one or 35 more parameters may be maintained in a plurality of district metering areas - 24 supplied by the main supply station while avoiding unnecessary consumption of resources such as electricity or chemical additives. Where the terms "comprise", "comprises", "comprised" or "comprising" are used in 5 this specification (including the claims) they are to be interpreted as specifying the presence of the stated features, integers, steps or components, but not precluding the presence of one or more other features, integers, steps or components, or group thereof.

Claims (21)

1. A method of controlling the pressure of water that is supplied from a mains water supply station to a main supply conduit, the main supply conduit feeding the 5 water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: 10 for each regional supply network, there is a regional boundary value for the water pressure within that regional supply network which represents a boundary between acceptable and unacceptable values of the water pressure within the regional supply network; and for each regional supply network, there is designated a pressure critical 15 point within the regional supply network at which the value of the water pressure is deemed to be the least acceptable compared with the values at other points in the same regional supply network; and wherein the method comprises: 20 monitoring water pressure in respect of each regional supply network to provide monitoring data that relate to an output pressure of the respective pressure reducing valve required to maintain an acceptable pressure at the pressure critical point within the respective regional 25 supply network; using (i) the monitoring data in respect of each regional supply network, and (ii) the characteristics of the respective pressure reducing valve, to calculate a respective minimum input pressure for each of the pressure reducing valves required to maintain an acceptable pressure at the 30 pressure critical point within the respective regional supply network; using the minimum input pressures for the pressure reducing valves to establish control data for governing the pressure of the water that is supplied into the main supply conduit from the main water supply station so as to ensure that there can be maintained at the pressure critical point - 26 within each regional supply network a respective acceptable value of the water pressure; and controlling the pressure of the water which is supplied into the main supply conduit in accordance with the control data. 5
2. A method as claimed in claim 1 comprising controlling the pressure of the water which is supplied into the main supply conduit by controlling the output of one or more pumps arranged to pressurise the water supplied into the main supply conduit. 10
3. A method as claimed in claim 1 or 2 comprising calculating the minimum input pressure for each pressure reducing valve as a function of flow rate into the main supply conduit from the mains water supply station. 15
4. A method as claimed in any preceding claim wherein one of the pressure reducing valves is permanently or temporarily designated as a critical pressure reducing valve, and the water supplied into the main supply conduit is controlled so that the pressure of the water supplied to the critical pressure reducing valve is acceptable. 20
5. A method as claimed in any preceding claim wherein the regional boundary values are all the same value.
6. A method as claimed in any preceding claim wherein the monitoring of water 25 pressure in respect of each regional supply network comprises intermittent monitoring, at intervals; and the monitoring data comprise intermittently-sampled values of the water pressure at each pressure critical point.
7. A method as claimed in any preceding claim comprising determining data 30 representative of the flow rate of water from the main supply station into the main supply conduit, and using the flow rate data to establish the control data, such that the controlling of the pressure of the water which is supplied into the main supply conduit is further dependent on the flow rate. - 27
8. A method as claimed in any preceding claim wherein the controlling of the pressure of the water which is supplied into the main supply conduit is further dependent on any one or more of: time; hour of the day; day of the week; month of the year; season; current ambient air temperature; recent ambient air temperature; 5 current water temperature; recent water temperature; current rainfall; and recent rainfall.
9. A method as claimed in any preceding claim wherein, for each regional supply network, there is designated a plurality of pressure critical points within the regional 10 supply network at which the value of the water pressure is deemed to be less acceptable compared with the values at other points in the same regional supply network, and the pressure of the water that is supplied into the main supply conduit from the main water supply station is controlled so as to ensure that there can be maintained at every pressure critical point within each regional supply network a 15 respective acceptable value of the water pressure.
10. A controller for controlling the pressure of water that is supplied from a mains water supply station to a main supply conduit, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the 20 main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: for each regional supply network there is a regional boundary value for 25 the water pressure within that regional supply network which represents a boundary between acceptable and unacceptable values of the water pressure within the regional supply network; and for each regional supply network, there is designated a pressure critical point within the regional supply network at which the value of the water 30 pressure is deemed to be the least acceptable compared with the values at other points in the same regional supply network; wherein the controller is arranged to: - 28 receive monitoring data in respect of each regional supply network that relates to an output pressure of the respective pressure reducing valve required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; 5 use (i) the monitoring data in respect of each regional supply network, and (ii) the characteristics of the respective pressure reducing valve, to calculate a respective minimum input pressure for each of the pressure reducing valves required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; and 10 use the minimum input pressures for the pressure reducing valves to establish control data for governing the pressure of the water that is supplied into the main supply conduit from the main water supply station so as to ensure that there can be maintained at the pressure critical point within each regional supply network a respective acceptable value of the 15 water pressure, and wherein the controller comprises: a control output for providing a control signal to adjust the pressure of 20 water which is supplied into the main supply conduit; data storage means storing the control data; and processing means configured to process the stored control data to cause a control signal to be provided from the control output in order to adjust the pressure of water which is supplied into the main supply conduit in 25 accordance with the control data.
11. A controller as claimed in claim 10 wherein the processing means is configured to provide a control signal to control the output of one or more pumps arranged to pressurise the water supplied into the main supply conduit. 30
12. A controller as claimed in claim 10 or 11 wherein the control data represents a relationship between the flow rate of water into the main supply conduit and a required pressure of water which is supplied into the main supply conduit in order to supply each pressure reducing valve with the respective minimum input pressure. 35 - 29
13. A controller as claimed in any of claims 10 to 12, further comprising: a flow rate input for receiving a flow rate signal from a flow rate sensor for water flowing into the main supply conduit; processing means adapted to provide data representative of the flow rate of water flowing into the main supply conduit in 5 accordance with the flow rate signal; and processing means configured to process (i) the data representative of the flow rate and (ii) the stored control data, to cause a control signal to be provided from the control output in order to adjust the pressure of water which is supplied into the main supply conduit corresponding to the flow rate.. 10
14. A controller as claimed in any of claims 10 to 13 configured to receive the flow rate signal wirelessly.
15. A system for controlling the pressure of water that is supplied from a mains 15 water supply station to a main supply conduit, the main supply conduit feeding the water to a plurality of regional supply networks, each of which is connected to the main supply conduit by means of a respective pressure reducing valve which supplies the water to the regional supply network at a respective regional pressure, wherein: 20 for each regional supply network there is a regional boundary value for the water pressure within that regional supply network which represents a boundary between acceptable and unacceptable values of the water pressure within the regional supply network; and 25 for each regional supply network, there is designated a pressure critical point within the regional supply network at which the value of the water pressure is deemed to be the least acceptable compared with the values at other points in the same regional supply network; 30 the system comprising a controller and a remote data processing facility, wherein the data processing facility is arranged to: receive monitoring data in respect of each regional supply network that 35 relate to an output pressure of the respective pressure reducing valve - 30 required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; use (i) the monitoring data in respect of each regional supply network, and (ii) the characteristics of the respective pressure reducing valve, to 5 calculate a respective minimum input pressure for each of the pressure reducing valves required to maintain an acceptable pressure at the pressure critical point within the respective regional supply network; use the minimum input pressures for the pressure reducing valves to establish control data for governing the pressure of the water that is 10 supplied into the main supply conduit from the main water supply station so as to ensure that there can be maintained at the pressure critical point within each regional supply network a respective acceptable value of the water pressure; and transmit the control data to the controller, 15 and wherein the controller comprises: a control output for providing a control signal to adjust the pressure of water which is supplied into the main supply conduit; 20 data storage means storing control data received from the data processing facility; and processing means configured to process the stored control data to cause a control signal to be provided from the control output in order to adjust 25 the pressure of water which is supplied into the main supply conduit in accordance with the control data.
16. A system as claimed in claim 15 wherein the processing means on the controller are configured to provide a control signal to control the output of one or 30 more pumps arranged to pressurise the water supplied into the main supply conduit.
17. A system as claimed in claim 15 or 16 wherein the control data represents a relationship between the flow rate of water into the main supply conduit and a - 31 required pressure of water which is supplied into the main supply conduit in order to supply each pressure reducing valve with the respective minimum input pressure.
18. A system as claimed in any of claims 15 to 17, wherein the controller further 5 comprises: a flow rate input for receiving a flow rate signal from a flow rate sensor for water flowing into the main supply conduit; processing means adapted to provide data representative of the flow rate of water flowing into the main supply conduit in accordance with the flow rate signal; and processing means configured to process (i) the data representative of the flow rate and (ii) the stored control data, to 10 cause a control signal to be provided from the control output in order to adjust the pressure of water which is supplied into the main supply conduit corresponding to the flow rate.
19. A method of controlling the pressure of water substantially as hereinbefore 15 described with reference to any one of the embodiments illustrated in the examples
20. A controller for controlling the pressure of water substantially as hereinbefore described with reference to any one of the embodiments illustrated in the accompanying drawings. 20
21. A system for controlling the pressure of water substantially as hereinbefore described with reference to any one of the embodiments illustrated in the accompanying drawings.
AU2009334602A 2008-12-30 2009-12-29 Regulated supply of treated water for regional supply networks Ceased AU2009334602B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GB0823656.4 2008-12-30
GBGB0823656.4A GB0823656D0 (en) 2008-12-30 2008-12-30 Mains water supply processing
PCT/GB2009/002963 WO2010076558A2 (en) 2008-12-30 2009-12-29 Mains water supply processing

Publications (2)

Publication Number Publication Date
AU2009334602A1 AU2009334602A1 (en) 2011-07-28
AU2009334602B2 true AU2009334602B2 (en) 2015-06-25

Family

ID=40352539

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2009334602A Ceased AU2009334602B2 (en) 2008-12-30 2009-12-29 Regulated supply of treated water for regional supply networks

Country Status (10)

Country Link
EP (1) EP2382161A2 (en)
CN (2) CN103663575A (en)
AU (1) AU2009334602B2 (en)
BR (1) BRPI0923916A2 (en)
CA (1) CA2748573A1 (en)
GB (4) GB0823656D0 (en)
IL (1) IL213846A (en)
MY (1) MY154185A (en)
WO (1) WO2010076558A2 (en)
ZA (1) ZA201104817B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385313B (en) * 2011-06-17 2013-01-16 上海市供水调度监测中心 Real-time hydraulic information based dynamic division and control method of city water supply zone
US20130262068A1 (en) * 2012-03-28 2013-10-03 International Business Machines Corporation Sensor placement for leakage location in liquid distribution networks
EP2778296B1 (en) 2013-03-11 2018-04-25 Grundfos Holding A/S Pump system
BR102014023699A2 (en) * 2014-09-24 2016-05-24 Otto Kierulff Da Costa set of hydraulic pipelines with capsules for transporting heavy loads and irrigation systems in diverse geographical regions
ITUA20163336A1 (en) * 2016-05-11 2017-11-11 Fincantieri Spa METHOD OF CHLORINATION OF DRINKING WATER ON A SHIP, IN PARTICULAR A PASSENGER SHIP
CN105807801A (en) * 2016-05-12 2016-07-27 大连理工大学 DMA partition optimization operation control system of urban water supply pipeline
AU2017333493B2 (en) 2016-09-29 2022-12-22 Cywat Technologies Ltd. A system and method for constant online water quality and safety monitoring of a fluid system
US11280696B2 (en) * 2017-01-10 2022-03-22 Sensus Spectrum Llc Method and apparatus for model-based leak detection of a pipe network
EP3422122B1 (en) 2017-06-29 2022-09-28 Grundfos Holding A/S Model formation module for creating a model for controlling a pressure regulating system of a water supply network
US11499299B2 (en) 2017-10-09 2022-11-15 Viega Technology Gmbh & Co. Kg Drinking water supply system having an acoustic sensor or a presence detector, method for controlling the same, and computer program
EP3588234B1 (en) * 2018-06-21 2021-03-17 Grundfos Holding A/S Control system and method for controlling a water supply from at least two separate input lines into a sector of a water supply network
CN110136026A (en) * 2019-04-30 2019-08-16 佛山水业集团高明供水有限公司 A kind of control method and its control system of water factory's water distribution
GB2618591A (en) * 2022-05-12 2023-11-15 Utonomy Ltd Computing device, pressure control station, system and methods for controlling fluid pressure in a fluid distribution network
CN116629562B (en) * 2023-05-30 2024-02-09 南京新高智联信息技术有限公司 Gate pump station group water source joint scheduling method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4200911A (en) * 1976-10-20 1980-04-29 Hitachi, Ltd. Control of the flow rate and fluid pressure in a pipeline network for optimum distribution of the fluid to consumers
JPH06303677A (en) * 1993-04-12 1994-10-28 Hitachi Ltd Pipe network management method and system utilizing the same
US5460196A (en) * 1992-06-09 1995-10-24 Technolog Limited Fluid supply pressure control method and apparatus
US6017193A (en) * 1997-09-11 2000-01-25 Kabushiki Kaisha Toshiba Distribution pressure control apparatus
WO2008114036A1 (en) * 2007-03-22 2008-09-25 I2O Water Limted Pilot valve for a pressure reducing valve

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3451959B2 (en) * 1998-09-17 2003-09-29 株式会社日立製作所 Tap water quality management system
US6919019B2 (en) * 2002-03-14 2005-07-19 Saltech Corporation Laser water detection, treatment and notification systems and methods
IL147506A (en) * 2002-01-08 2008-11-26 Optimus Water Technologies Ltd Water supply system
EP1649278B1 (en) * 2003-07-11 2007-10-31 PDA Security Solutions, Inc. Remote contamination monitoring system for water supply network
GB2405957A (en) 2003-09-03 2005-03-16 Fluid Controls U K Ltd Pressure reducing valve system
US20050199483A1 (en) * 2004-03-15 2005-09-15 Hach Company System and method for the on-demand on-line treatment of water
US20070090059A1 (en) * 2005-07-22 2007-04-26 Plummer Robert J Remote water quality monitoring systems and techniques
MY146695A (en) 2007-01-24 2012-09-14 I20 Water Ltd Controller and control system for a pressure reducing valve
FR2915755B1 (en) * 2007-05-04 2011-04-29 Suez Environnement METHOD AND INSTALLATION FOR REAL-TIME CONTROL OF THE QUALITY OF WATER OF A DISTRIBUTION NETWORK.

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4200911A (en) * 1976-10-20 1980-04-29 Hitachi, Ltd. Control of the flow rate and fluid pressure in a pipeline network for optimum distribution of the fluid to consumers
US5460196A (en) * 1992-06-09 1995-10-24 Technolog Limited Fluid supply pressure control method and apparatus
JPH06303677A (en) * 1993-04-12 1994-10-28 Hitachi Ltd Pipe network management method and system utilizing the same
US6017193A (en) * 1997-09-11 2000-01-25 Kabushiki Kaisha Toshiba Distribution pressure control apparatus
WO2008114036A1 (en) * 2007-03-22 2008-09-25 I2O Water Limted Pilot valve for a pressure reducing valve

Also Published As

Publication number Publication date
CN103663575A (en) 2014-03-26
CN102341352B (en) 2014-01-08
IL213846A0 (en) 2011-07-31
GB2503362A (en) 2013-12-25
GB201112796D0 (en) 2011-09-07
GB201400333D0 (en) 2014-02-26
GB201314227D0 (en) 2013-09-25
WO2010076558A3 (en) 2010-09-10
CN102341352A (en) 2012-02-01
GB2478693B (en) 2014-05-14
EP2382161A2 (en) 2011-11-02
WO2010076558A2 (en) 2010-07-08
IL213846A (en) 2015-09-24
GB2506787A (en) 2014-04-09
MY154185A (en) 2015-05-15
WO2010076558A8 (en) 2010-10-21
AU2009334602A1 (en) 2011-07-28
GB2478693A (en) 2011-09-14
GB0823656D0 (en) 2009-02-04
BRPI0923916A2 (en) 2016-01-12
GB2506787B (en) 2014-07-09
ZA201104817B (en) 2012-09-26
CA2748573A1 (en) 2010-07-08
GB2503362B (en) 2014-05-07

Similar Documents

Publication Publication Date Title
AU2009334602B2 (en) Regulated supply of treated water for regional supply networks
US9493931B2 (en) Mains water supply processing
EP2115546B1 (en) Controller and control system for a pressure reducing valve
US7317972B2 (en) Management of peak water use
US20090043427A1 (en) Systems and Methods of Reducing Peak Water Usage
US20060122736A1 (en) Irrigation controller water management with temperature budgeting
US20070293990A1 (en) Irrigation water conservation with temperature budgeting and time of use technology
US20120273704A1 (en) Valve System
JP7418288B2 (en) Water supply and distribution management systems, field water management equipment, and irrigation water management equipment
WO2001050212A1 (en) Irrigation accumulation controller
CN103162346A (en) Central heating monitoring system based on cloud service and adjustment method thereof
US20160014983A1 (en) Rainfall prediction and compensation in irrigation control
Stambouli et al. Water and energy management in an automated irrigation district
WO2008057314A2 (en) Method of and system for improving sprinkler system efficiency
CN111340316B (en) Intelligent water supply management method and system
KR102096489B1 (en) System and method for smart control of irrigation
CN115183318B (en) Heat supply adjusting method based on load prediction and heat progress consistency and related equipment
JP3974294B2 (en) Water and sewage monitoring and control system
JP2009183861A (en) Method for management of chlorine concentration
WO2003038539A1 (en) Management of peak water use
JP7005689B2 (en) Water supply and distribution management system, field water management device and irrigation water management device
JP4830777B2 (en) Operation method of hot water storage hot water supply system and hot water storage hot water supply system
NL2032652B1 (en) SYSTEM AND METHOD FOR CONTROLLING A LOCAL ENERGY NETWORK
JP7358230B2 (en) Field water management system, wide field water supply management system, and irrigation water management system
WO2023218196A1 (en) Computing device, pressure control station, system and methods for controlling fluid pressure in a fluid distribution network

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired