AU2005284068A1 - Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same - Google Patents
Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same Download PDFInfo
- Publication number
- AU2005284068A1 AU2005284068A1 AU2005284068A AU2005284068A AU2005284068A1 AU 2005284068 A1 AU2005284068 A1 AU 2005284068A1 AU 2005284068 A AU2005284068 A AU 2005284068A AU 2005284068 A AU2005284068 A AU 2005284068A AU 2005284068 A1 AU2005284068 A1 AU 2005284068A1
- Authority
- AU
- Australia
- Prior art keywords
- anode
- measurement system
- process according
- replacement
- sound
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C3/00—Electrolytic production, recovery or refining of metals by electrolysis of melts
- C25C3/06—Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C7/00—Constructional parts, or assemblies thereof, of cells; Servicing or operating of cells
- C25C7/06—Operating or servicing
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Electrolytic Production Of Metals (AREA)
Description
4jFC'est votre traduction ! Informatique- Web Adronautique Q Automobile Technitim- - iani l d-utilisation Q Medical - Pharmaceutique . Fi, ii Commercial - Marketing VERIFICATION OF TRANSLATION A.R.T. International - 26, rue Carnot 95410 Groslay, France declares as follows: 1. That we are well acquainted with both the English and French languages, and 2. That the attached document is a true and correct translation made by us to the best of our knowledge and belief of: International Patent Application PCT/FR2005/002188 filed on September 2, 2005 Dated this 2nd of February 2007 B.P. 18 95410 GROSLAY Tl: 01.39.34.70.70 Fax 01.30 | | 01 SA. au capital de 40 000 E - R.C.S. 13 392 830 337 -1 PROCESS FOR CHANGING ANODES IN AN ELECTROLYTIC ALUMINIUM PRODUCTION CELL INCLUDING ADJUSTMENT OF THE POSITION OF THE ANODE AND DEVICE FOR IMPLEMENTING THE PROCESS Field of the invention The invention relates to the Hall H6roult process for the production of aluminium by fused bath electrolysis. It is more particularly related to anode changes and tending assemblies designed to make anode 5 changes in aluminium production plants. State of the art Aluminium is produced industrially by fused bath electrolysis in electrolytic cells according to the 10 well-known Hall-Heroult process. French patent application FR 2 806 742 (corresponding to patent US patent No. 6 409 894) describes installations of an electrolysis plant intended for the production of aluminium. 15 With the most widespread technology, electrolytic cells are provided with a plurality of "prebaked" anodes made of a carbonaceous material that are consumed during electrolytic reduction reactions of aluminium. The progressive consumption of anodes 20 requires work on the electrolytic cells, particularly including the replacement of spent anodes by new anodes. When changing an anode, in order to limit disturbance to the operation of an electrolytic cell, 25 it is preferable to put the new anode into place such - 2 that its lower surface is at the same level as the other anodes in the cell. It is known that it is possible to proceed as described below to determine the level of new anodes 5 correctly. The rod of the spent anode is marked with a chalk-line at a location corresponding to a determined mark on the anode frame. The spent anode is extracted from the cell and is put down on a reference surface, typically a metallic plate. The level of the chalk-line 10 on the rod is recorded, the spent anode is withdrawn, and a new anode is put into place on the reference surface. A chalk-line is drawn on the rod of the new anode at the recorded level. The new anode is put into place on the anode frame such that the chalk-line is at 15 the same level as the determined mark on the anode frame. These essentially manual operations require action by an operator in the area in which the anode handling tools are being used, and expose the operator to the risks inherent to these operations such as risks 20 of the load becoming detached, or liquid metal splashes. It is also known that the anode handling tool can be fitted with a position sensor. In this case, the distance travelled by the tool when the spent anode 25 being picked up is measured, the spent anode is put down on a reference surface, and the distance travelled by the tool at the time that the anode is supported on the reference surface is measured. The spent anode is withdrawn, a new anode is placed on the reference 30 surface, and the distance travelled by the tool at the time that the anode is supported on the reference 3 surface is measured. The difference between the last two measured distances is added to the first measured distance to determine the remaining distance that the handling tool should travel when the new anode is put S into position in the electrolytic cell. These different manners of working require multiple anode manipulations and displacement of the reference surface from one working area to another. The time spent on these operations considerably lengthens 10 the durations of working cycles on electrolytic cells and the time period during which the hoods of pots remain open, which reduces the efficiency of collection means for effluents produced by electrolytic cells. Therefore the applicant searched for a procedure 15 and means of avoiding these disadvantages. Description of the invention An object of the invention is a process for changing an anode of a cell for the production of 20 aluminium by fused bath electrolysis comprising a plurality of anodes, the said cell containing an electrolytic bath and comprising at least one cathode block, each anode comprising at least one anode block and a metal rod and being fixed removably by mechanical 25 attachment means to a mobile metal frame, each anode block having a reference surface, wherein at least one determined spent anode is replaced by a replacement anode using at least one anode handling tool comprising a positioning device, a gripping device and a sensor to 30 determine the vertical position of the gripping device, and wherein the position sensor of the anode handling -4 tool or each anode handling tool is used to measure the vertical distances travelled by the gripping device or each gripping device relative to a reference level N, characterised in that at least one beam of sound or 5 electromagnetic waves is produced along a determined reference line or in a determined reference plane, and in that for each determined spent anode: - a gripping device is placed in the gripping position of the metal rod of the spent anode, and the 10 vertical distance A travelled by the gripping device to reach the said position is measured; - the spent anode is withdrawn from the electrolytic cell, the anode block of this anode is passed through the said beam in a vertical movement and 15 the vertical distance B travelled by the gripping device at the moment at which the reference surface of this anode passes through the said beam is measured; - the metal rod of a replacement anode is gripped using a gripping device, the anode block of this anode 20 is passed through the said beam in a vertical movement and the vertical distance C travelled by the gripping device at the moment at which the reference surface of this anode passes through the said beam is measured; - the vertical position of the replacement anode 25 in the cell is determined starting from values obtained for the said travelled distances A, B and C, and the replacement anode is put into this position in the place initially occupied by the spent anode. The invention allows for the measurements 30 necessary for the positioning of a replacement anode to be made during the handling movements that are 5 necessary for the replacement of an anode (that is, typically, taking a spent anode from an electrolysis cell, depositing the spent anode on a pallet or a vehicle, taking a replacement anode from a pallet or a 5 vehicle and placing the replacement anode in the cell), which is advantageous in that it does not require additional handling movements. The invention makes it possible, in particular, to avoid lengthening the duration of the opening of an electrolysis cell. 10 The beam or beams of sound waves or electromagnetic waves are advantageously placed, beforehand, in a location that enables a spent anode or a replacement anode to pass through the beam or beams during the normal handling movements of these anodes, 15 for example above an electrolysis cell, above a pallet or above a vehicle. The measurements may be taken manually, i.e. an operator records the data obtained at each step of the process, or in a partly or totally automated way, i.e. 20 a computerized apparatus takes all or part of the measurements in an automated way. Another object of the invention is a measurement system comprising a position sensor to measure vertical distances travelled by an anode gripping device, a beam 25 generator for generating sound or electromagnetic waves capable of generating at least one beam of sound or electromagnetic waves along a determined reference line or in a determined reference plane, at least one sound or electromagnetic wave detector capable of detecting 30 the passage of a determined part of an anode through the said beam and at least one positioning device to - 6 which the said generator and / or the said detector is fixed. Another object of the invention is a tending machine intended for anode replacement operations in a 5 series of cells for the production of aluminium by fused bath electrolysis, the said machine comprising at least one anode handling tool comprising a positioning device, a gripping device and a sensor to determine the vertical position of the gripping device, and being 10 characterised in that it further comprises the said measurement system. Another object of the invention is a tending assembly for a plant for the production of aluminium by fused bath electrolysis comprising a travelling crane 15 and at least one tending machine according to the invention. The invention is described in more detail in the following with reference to the attached Figures. Figure 1 is a sectional view illustrating a 20 typical potroom intended for the production of aluminium and comprising a diagrammatically shown tending assembly. Figure 2 is a cross-sectional view illustrating a typical electrolytic cell intended for the production 25 of aluminium. Figure 3 diagrammatically shows a side view of a tending machine. Figures 4 and 7 illustrate an embodiment of the anode replacement process according to the invention.
-7 Figures 8 to 10 diagrammatically show embodiments of the means for detecting the position of an anode according to the invention. Electrolytic plants for the production of 5 aluminium comprise a liquid aluminium production area that comprises one or several potrooms (1). As illustrated in Figure 1, each potroom (1) comprises electrolytic cells (2) and at least one tending assembly (4) . The tending assemblies are often called 10 Pot Tending Assemblies (PTA) or Pot Tending Machines. The electrolytic cells (2) are normally arranged in rows or lines, each row or line typically comprising more than a hundred cells, electrically connected in series by connecting conductors. The cells (2) are 15 arranged so as to leave circulation aisles (3) between the cells and along the potroom (1). As illustrated in Figure 2, each electrolytic cell (2) comprises a pot (2'), a support structure (35) called the "superstructure" and a plurality of anodes 20 (20, 20' ) . The pot (2' ) comprises a steel pot shell (26), an inner lining (27, 28) that is generally formed by blocks made of refractory materials, and a cathode assembly (29, 30) that includes blocks made of a carbonaceous material (29) called "cathode blocks", and 25 metal connection bars (30) to which the electrical conductors (31) that carry the electrolysis current are attached. The anodes (20, 20' ) comprise at least one anode block (21, 21') made of a prebaked carbonaceous material and a metal rod (22, 22' ) . The anode blocks 30 (21, 21') are typically parallelepiped shaped. The rod (22, 22') is typically fixed to the anode block(s) 8 (21, 21') through an attachment element (22a, 22a'), generally called a "multipode" that is anchored to the anode blocks (typically using cast iron) . The anodes (20, 20') are fixed removably to a metal frame (23) 5 called the "anode frame" by mechanical attachment means (24, 25), typically including a connector (24) and hooks (25) . The mobile frame (23) is supported by the superstructure (35) and is fixed to electrical conductors (not shown) used to carry the electrolysis 10 current. An electrolytic cell (2) generally comprises a hooding system (36), typically comprising a series of hoods, to confine effluents inside the cell, and means (not illustrated) of evacuating the effluents towards a 15 treatment centre. The inner lining (27, 28) and the cathode blocks (29) form a crucible inside the pot (2' ) , capable of containing the electrolytic bath (33) and a pad of liquid metal (32) when the cell is in operation. In 20 general, a blanket of alumina and solidified bath (34) covers the electrolytic bath and some or all of the anodes. The anodes (20, 20'), and more precisely the anode blocks (21, 21' ) are partially immersed in the 25 electrolytic bath (33) that contains dissolved alumina. The lower surface (21a, 21a') of the anodes is typically essentially plane and parallel to the upper surface (29') of the cathode blocks (29) that is generally horizontal. The distance between the lower 30 surface of the anodes and the upper surface of the cathode blocks is called the "anode - cathode distance" 9 and is an important parameter in the regulation of electrolytic cells. The anode - cathode distance is usually controlled very precisely. The anode blocks (21, 21') are progressively 5 consumed during use. Routine practice consists of progressively lowering the anodes (20, 20'), by moving the mobile frame (23) uniformly downwards in order to compensate for this wear. Furthermore, as illustrated in Figure 2, the anode blocks (21, 21') usually have 10 different degrees of wear. Consequently, the position of the replacement anode (20") usually called the "new anode", relative to the mobile frame (23), is generally adjusted every time that the anode is replaced. More precisely, the position of the anodes is adjusted so as 15 to bring the so-called "lower" surface (21a, 21a', 21a") of the anode blocks (21, 21', 21") (i.e. the surface of the anode blocks that will be immersed in the electrolytic bath (33) contained in the electrolytic cell (2) and parallel to the upper surface 20 (29') of the cathode block(s) (29)) into a same plane. In practice, the replacement anode (20") is placed such that when its operating temperature has been reached, its lower surface (21a") is located at the same level as the lower surface (21a') of the spent anode (20') 25 that it is replacing. The said lower surface (21a, 21a', 21a") of the anode blocks (21, 21', 21") is usually essentially plane. The tending assembly (4) is used to perform operations on cells (2) such as anode changes or 30 filling of electrolytic cell feed hoppers with crushed bath and AlF 3 . It can also be used to handle various 10 loads, such as pot elements, liquid metal ladles or anodes. The tending assembly (4) as illustrated in Figures 1 to 3 comprises a travelling crane (5) that can be 5 moved longitudinally above the electrolytic cells (2) and a tending machine (6). The tending machine (6) comprises a mobile trolley (7) and a tending module (8) equipped with several handling and work devices (10) such as tools (shovels, wrenches, crustbreakers, etc.). 10 The tending module (8) as illustrated in Figure 3 typically comprises a turret (8') mounted on the trolley (7) so that it can pivot about a vertical axis V during use. The handling and working devices (10) are typically fixed to the turret. The tending module (8) 15 may also comprise a control cab (16) for operators. The travelling crane (5) is supported on and circulates on running tracks (9, 9') arranged parallel to each other and to the main axis of the hall (and the row of cells) . The travelling crane (5) can thus move along 20 the entire length of the potroom. The trolley (7) can move along the length of the travelling crane (5). As illustrated in Figure 3, the tending machines (6) used for anode replacement operations are equipped with a determined set of tools (10), namely typically a 25 crustbreaker (lla), a bucket shovel (12a), an anode gripping device (called an "anode clamp") (13a) and a hopper (14) fitted with a retractable duct (15) . The crustbreaker (lla) is used to break the alumina crust and the solidified bath (34) that usually covers all or 30 some of the anodes in the cell; the bucket shovel (12a) is used to clear the position of the anode after the - 11 spent anode has been removed, by the removal of solid matters (such as pieces of crust and alumina) in this location; the anode clamp (13a) is used to grip and manipulate anodes by their rod, particularly to remove 5 spent anodes from an electrolytic cell and to put new anodes into the electrolytic cell; the retractable duct (15) is used to introduce alumina and / or crushed bath into the electrolytic cell so as to form a coating layer after a new anode has been put into place. The 10 crustbreaker (lla), the bucket shovel (12a) and the anode clamp (13a) are typically installed at the lower end of a positioning device (llb, 12b, 13b) such as a telescopic mast or arm. The expression "anode handling tool" (13) denotes the assembly comprising an anode 15 gripping device (13a) and a positioning device (13b). For implementation of the invention, the tending machine (6) comprises at least an anode handling tool (13) fitted with a positioning device (13b), a gripping device (13a) and a sensor (13c) to determine the 20 vertical position of the gripping device. The process for changing an anode in a cell (2) for the production of aluminium by electrolysis comprising a plurality of anodes (20, 20') typically includes the following basic steps: 25 - a tending machine is placed close to the determined spent anode (20'); - the hoods (36) located close to the spent anode (20') are removed; - the mobile frame (23) to which the anodes (20, 30 20' ) are fixed is immobilised; 12 - the metal rod of the spent anode (20') is gripped using an anode handling tool (13), and more precisely using a gripping device (13a); - the mechanical attachment (24) of the spent 5 anode is detached; - the spent anode (20') is removed from the electrolytic cell using the said handling tool (13); - the spent anode (20') is put down in a specific location; 10 - a replacement anode (20") is gripped using a handling tool (13), usually the same tool as that used for handling the spent anode; - a vertical position for the replacement anode (20") is determined; 15 - the replacement anode (20") is put into the determined vertical position in the space initially occupied by the spent anode; - the replacement anode (20") is fixed on the mobile frame (23) using a mechanical attachment means. 20 According to the invention, a vertical position for the replacement anode (20") is determined using measurements made while handling the anodes. These measurements relate firstly to the position of the anode handling tool, and secondly to the anodes passing 25 through a determined line or a determined plane outside the electrolytic cell. This is done by firstly creating a virtual reference line or reference plane delimited by sound or electromagnetic waves, and passage of the anodes through this line or this plane is detected 30 using a system for detection of sound or electromagnetic waves. An anode handling tool (13) 13 comprising a sensor (13c) for detecting the vertical position of the gripping tool (13a) is also used, and displacements of the gripping device during anode handling operations are measured. The vertical position 5 of the replacement anode is determined using measurements of the displacement of the gripping device at determined moments, namely when the spent anode is gripped, when the spent anode passes through the determined line or plane, and when the replacement 10 anode passes through the determined line or plane. For the embodiments of the invention illustrated in Figures 4 to 7, the process is as follows: - at least one beam of sound or electromagnetic waves (51) is produced along a determined reference 15 line or in a determined reference plane (50) (Figure 4); - an anode handling tool (13) is put into position, comprising a sensor (13c) detecting the vertical position of the gripping device (13a) at a 20 determined spent anode (20') and a gripping device (13a) is put into position to grip the metal rod (22') of this anode (20') (Figure 4); - the metal rod (22') of a determined spent anode (20') is gripped using the gripping device (13a) of an 25 anode handling tool (13) and a first vertical distance A travelled by the gripping device is measured using the position sensor (Figure 4); - the mechanical attachment (24) of the spent anode (20') is released, the spent anode (20') is 30 withdrawn from the electrolytic cell using the said handling tool (13), the anode block(s) (21') of this 14 anode are passed through the said beam in a vertical movement, and the said position sensor is used to measure a second vertical distance B travelled by the gripping device at the moment at which the reference 5 surface (21a') of the anode passes through the said beam (Figure 5); - the metal rod (22") of a replacement anode (20") is gripped using a gripping device (13a), the anode block(s) (21") of this anode is (are) passed through 10 the said beam in a vertical movement, and the said position sensor is used to measure a third vertical distance C travelled by the gripping device at the time at which the reference surface (21a") of the anode passes through the said beam (Figure 6); 15 - the vertical position of the replacement anode (20") in the cell is determined starting from values obtained for the said first, second and third distances travelled (A, B and C) and the replacement anode (20") is put into this vertical position at the location 20 initially occupied by the spent anode (Figure 7); - the replacement anode (20") is fixed on the mobile frame (23) using a mechanical attachment means (24). The said distance measurements may be made during 25 normal spent anode replacement manipulations. The invention can thus significantly limit handling operations required to determine the position of the replacement anode. The same gripping device (13a) is preferably used 30 to handle a determined spent anode (20') and the replacement anode (20") that will replace it. This 15 variant avoids calibration of separate tool sensors and differences in distance measurements inherent to the use of separate tools. In this case, the spent anode (20') is put down in a determined location before the 5 metal rod (22") of the replacement anode (20") is gripped with the gripping device (13a). The said first distance (A) can be measured before or after the rod (22' ) of the spent anode (20') is gripped. This distance is preferably measured after 10 gripping the rod (22' ) of the spent anode (20' ) and after putting the handling tool (13) under mechanical tension, so as to take up the mechanical play and improve the accuracy of the measurement. The reference surface (21a, 21a', 21a") of the 15 anodes is preferably the so-called "lower" surface of the anode block(s) (21, 21', 21"). The said vertical distance B is preferably measured during a downwards movement of a spent anode (20'), typically during deposition of the anode in the 20 determined location, which is usually a pallet or a vehicle (40, 40') that will be used to take it away, so as to limit anode handling movements. This is achieved by positioning the said beam at a determined height above the said determined location. 25 The said vertical distance C is preferably measured during an upwards movement of a replacement anode (20"), typically during removal of the anode from a temporary storage location, which is usually a pallet or a vehicle (40, 40") that will be used to bring it 30 into place, so as to limit anode handling movements.
16 This is achieved by positioning the said beam at a determined height above the said storage location. The vertical position of a replacement anode (20") corresponds to a vertical distance A' travelled by the 5 gripping device (13a) when the replacement anode is put into place in the location initially occupied by a determined spent anode. In practice, when the replacement anode is put into place, the lowering movement of the gripping device is stopped when the 10 distance travelled by the gripping device is equal to A'. The vertical distance A' is typically given by the relation A' = A - B + C + D, where D is a correction term to take account of the replacement anode reaching its normal operating rate in the cell. 15 According to one embodiment of the process according to the invention, the spent anodes (20') are replaced one by one by replacement anodes (20"). According to another embodiment of the process according to the invention, at least two spent anodes 20 (20' ) are replaced at the same time by the replacement anodes (20") . In this case, the said distances A, B and C are measured and the said distance A' is determined for each of the spent anode (20' ) / replacement anode (20") pairs. This embodiment of the invention is 25 advantageously implemented using a tending machine (6) comprising a number of anode handling tools (13) equal to at least the number of spent anodes that are replaced simultaneously. The position sensor (13c) is used to measure the 30 distance travelled vertically by the gripping device (13a) during anode handling operations. Distances are 17 given with respect to a reference level N that may be arbitrary. The reference level N is preferably the same for all distance measurements during the same anode change in order to simplify calculations and not 5 introduce uncertainties in the determination of the final position of the replacement anode. For example, the position sensor (13c) may be a cable encoder or a laser telemeter. The position sensor is advantageously integrated into the anode handling 10 tool (13). Typically, the position sensor (13c) is rigidly fixed to the fixed part of the positioning device (13b) of the anode handling tool (13); it is used to measure the relative distance from a determined point fixed to the gripping device. For example, the 15 position sensor may be fixed to the sliding part of a telescopic arm or mast to which the gripping device is fixed. In order to compensate for any clearances between the components of the anode handling tool (13) and 20 between the anode gripping device (13a) and an anode rod (22, 22'), it is advantageous to make the said first travelled distance measurement A in tension, in other words after tensioning the kinematic part of the tool (before loosening the connector (24) that holds 25 the anode rod in position on the mobile frame (23)), since the other distance measurements are made in tension within the context of the invention (the reference line or plane being virtual and the replacement anode being suspended from the gripping 30 device when its position is adjusted in the cell). It is advantageous that the anode handling tool (13) - 18 should be provided with a means of measuring the tension in the tool, such as an axial dynamometer, to determine the moment at which the kinematic part of the tool is in tension and to determine the moment at which 5 the mechanical clearances are all corrected in the same direction, so as to take account of the said clearances. The said sound waves are typically ultrasound waves. 10 The said electromagnetic waves are typically visible light, infrared or radio waves. It is advantageous to generate the said beam (51) using a laser. The lower surface (21a, 21a', 21a") of the anodes, 15 especially the spent anodes, may have irregularities coming, in particular, from surface defects, uneven wear of the anodes or deposits of matter (such as alumina) during the use of the anodes. In order to avoid making distorted measurements of the distance 20 travelled caused by irregularities in the reference surface (21a, 21a', 21a"), two or several (typically three) beams of sound or electromagnetic waves (51) are preferably generated so as to form a determined reference plane (50) . This variant of the invention is 25 typically implemented using a generator comprising two or several sound or electromagnetic wave sources, in other words each beam (51) is generated by a distinct wave source (in the case of electromagnetic waves, each source is typically a laser). In this variant, the 30 distances travelled (B and C) are advantageously given by the average of the distances travelled measured for 19 each beam (possibly after having eliminated one or more values that are considered to be aberrant). The said determined reference line or determined reference plane (50) is preferably substantially 5 horizontal. The angle between the horizontal and said reference line or plane (50) is preferably smaller than about 100, and more preferably smaller than about 5'. The moment at which the reference surface (21a', 21a") of an anode passes through the said beam may be 10 determined in different manners. According to one advantageous manner of proceeding that can be easily computerised, a sound or electromagnetic wave generator (or emitter) is used to produce the said beam and a detector (or receiver) is used to detect the said beam. 15 According to a first embodiment of this manner of proceeding that is shown diagrammatically in Figure 8, a sound or electromagnetic wave detector (54) is placed facing a sound or electromagnetic waves beam generator (52) such that the detector can detect the beam 20 produced by the generator (Figure 8a) . The moment at which the reference surface (21a', 21a") of an anode (20', 20") passes through the said beam is detected when the anode block (21', 21") interrupts transmission of the said beam to the detector (Figure 8b). 25 According to another embodiment of this manner of proceeding that is shown diagrammatically in Figure 9, a sound or electromagnetic wave detector (54) and a sound or electromagnetic waves beam generator (52) are placed facing a reflecting surface (55) such as a 30 mirror, such that the detector can detect the beam produced by the generator and reflected by the 20 reflecting surface (55) (Figure 9a). These elements may be arranged in a triangle so as to form a plane. The moment at which the reference surface (21a', 21a") of an anode (20', 20") passes through the said beam is 5 detected when the anode block (21', 21") interrupts the transmission of the said beam to the detector (Figure 9b). According to yet another embodiment of this manner of proceeding that is shown diagrammatically in Figure 10 10, a sound or electromagnetic wave detector (54) and a sound or electromagnetic waves beam generator (52) are arranged such that the detector can detect the beam produced by the generator and reflected by the anode block (21', 21") (Figure 10a). The moment at which the 15 reference surface (21a', 21a") of an anode (20', 20") passes through the said beam is detected when the anode block (21', 21") reflects all or part of the said beam towards the detector (Figure 10b). Trials have shown that the reflectivity of the surface of a new or spent 20 anode is sufficient to enable satisfactory working of this embodiment. This embodiment is advantageous in that it allows the detector and the generator to be easily put together on a single positioning device (53). 25 The process according to the invention can be implemented using a measurement system comprising a position sensor (13c) to measure vertical distances travelled by a gripping device (13a) of an anode handling tool (13), a sound or electromagnetic waves 30 beam generator (52) capable of producing at least one sound or electromagnetic waves beam (51) in a - 21 determined reference line or plane (50), at least one sound or electromagnetic wave detector (54) capable of detecting the passage of a determined part (21a, 21a', 21a") of an anode (20, 20', 20") through the said beam 5 and at least one positioning device (53) to which the said generator and / or the said detector are fixed. The position sensor (13c) is preferably integrated into the anode handling tool (13). The generator (52) typically comprises a source for each sound or 10 electromagnetic waves beam (52) . In the variant of the invention in which the beams are formed of electromagnetic waves, the generator advantageously includes at least one laser. In one embodiment of the invention, the 15 positioning device or each positioning device (53) in the measurement system is directly or indirectly fixed to or placed on a circulation aisle. In another embodiment of the invention, the measurement system is integrated into a tending 20 assembly (4) designed to be used for anode replacement operations. This embodiment of the invention facilitates displacement and positioning of the measurement system. It further allows for the measurements that are necessary for the positioning of 25 a replacement anode to be made during the normal handling movements of the spent anode and of the replacement anode. The measurement system according to the invention is preferably integrated into the tending machine (6) of the said tending assembly (4), and more 30 preferably into the module (8) of the said tending machine (6). In these cases, the sensor (13c) of the - 22 measurement system for determining the vertical position of the gripping device (13a) is typically the sensor fitted on the anode handling tool (13). In these variants, the positioning device or each positioning 5 device (53) of the measurement system is directly or indirectly fixed to a tending assembly (4), a tending machine (6) or to a tending module (8). The positioning device or each positioning device (53) of the measurement system is typically a 10 telescopic arm or mast. When the measurement system is integrated into a tending assembly (4), the generator (52) and / or the detector (54) are typically fixed in the lower part of the positioning device (53). Travelled distance measurements (A, B, C, A') can 15 be made with or without action by an operator. For example, the detector can emit an electrical, light or sound signal when the determined reference surface of an anode passes through the said beam(s) and an operator can record the value of the distance travelled 20 by the gripping device given by the position sensor at the time that the said signal is emitted. The distance A' corresponding to the position of the replacement anode can also be determined by an operator using values obtained for the first, second and third 25 distances travelled (A, B and C). The said distances (A, B, C, A') are advantageously entirely or partly measured by computer means, to simplify the task of operators and to avoid calculation mistakes. For example, passage of the anode reference surface (21a, 30 21a', 21a") through the said beam can electrically or electronically trigger the position sensor measurement 23 and recording of the corresponding distance. The measurement system advantageously comprises a device to record measurements made and to determine the said vertical position of the replacement anode (20"). 5 The generator (52) and the detector (54) can be located on the same positioning device (53) or on separate positioning devices. The generator (52) and the detector (54) could also be integrated into the same device.
Claims (37)
1. Process for changing an anode of a cell for the production of aluminium by fused bath electrolysis (2) comprising a plurality of anodes (20, 20', 20"), the said cell (2) containing an electrolytic bath (33) and 5 comprising at least one cathode block (29), each anode comprising at least one anode block (21, 21', 21") and a metal rod (22, 22', 22") and being fixed removably by mechanical attachment means (24, 25) to a mobile metal frame (23), each anode block having a reference surface 10 (21a, 21a', 21a"), wherein at least one determined spent anode (20') is replaced by a replacement anode (20") using at least one anode handling tool (13) comprising a positioning device (13b), a gripping device (13a) and a sensor to determine the vertical 15 position (13c) of the gripping device, and wherein the position sensor (13c) of the anode handling tool or each anode handling tool (13) is used to measure the vertical distances travelled by the gripping device or each gripping device (13a) relative to a reference 20 level N, characterised in that at least one beam of sound or electromagnetic waves (51) is produced along a determined reference line or in a determined reference plane (50), and in that for each determined spent anode (20'): 25 - a gripping device (13a) is placed in the gripping position of the metal rod (22') of the spent anode (20'), and the vertical distance A travelled by the gripping device (13a) to reach the said position is measured; 25 - the spent anode (20') is withdrawn from the electrolytic cell, the anode block (21') of this anode is passed through the said beam (51) in a vertical movement and the vertical distance B travelled by the 5 gripping device (13a) at the moment at which the reference surface (21a') of this anode passes through the said beam is measured; - the metal rod (22") of a replacement anode (20") is gripped using a gripping device, the anode block 10 (21") of this anode is passed through the said beam (51) in a vertical movement and the vertical distance C travelled by the gripping device (13a) at the moment at which the reference surface (21a") of this anode passes through the said beam is measured; 15 - the vertical position of the replacement anode (20") in the cell is determined starting from values obtained for the said travelled distances A, B and C, and the replacement anode (20") is put into this position in the place initially occupied by the spent 20 anode (20').
2. Process according to claim 1, characterised in that the same gripping device (13a) is used to handle the spent anode (20') and the replacement anode (20") that will replace it. 25
3. Process according to either of claims 1 and 2, characterised in that the anode reference surface (21a, 21a', 21a") is the so-called "lower" surface of the anode block (21, 21', 21"), that will be immersed in the electrolytic bath (33) contained in the 30 electrolytic cell (2) and that will be parallel to the upper surface (29') of the cathode block(s) (29). 26
4. Process according to any one of claims 1 to 3, characterised in that the said vertical distance B is measured during a downwards movement of the spent anode (20').
5 5. Process according to any one of claims 1 to 4, characterised in that the said vertical distance C is measured during an upwards movement of the replacement anode (20").
6. Process according to any one of claims 1 to 5, 10 characterised in that the said vertical position of the replacement anode (20") corresponds to a vertical distance A' travelled by the gripping device (13a) during placement of the replacement anode in the place initially occupied by the spent anode (20'). 15
7. Process according to claim 6, characterised in that the vertical distance A' is given by the relation A' = A - B + C + D, where D is a correction term to take account of the replacement anode reaching its normal operating rate in the cell. 20
8. Process according to any one of claims 1 to 7, characterised in that the position sensor (13c) is integrated into the anode handling tool (13).
9. Process according to any one of claims 1 to 8, characterised in that the anode handling tool (13) is 25 provided with a means of measuring the tension in the tool, such as an axial dynamometer.
10. Process according to any one of claims 1 to 9, characterised in that the said electromagnetic waves are chosen among the visible light, infrared or radio 30 waves. 27
11. Process according to any one of claims 1 to 10, characterised in that the said beam (51) is generated using a laser.
12. Process according to any one of claims 1 to 9, 5 characterised in that the said sound waves are ultrasound waves.
13. Process according to any one of claims 1 to 12, characterised in that two or several beams of sound or electromagnetic waves (51) are generated so as to 10 form a determined reference plane (50).
14. Process according to claim 13, characterised in that each beam (51) is generated by a distinct wave source.
15. Process according to any one of claims 1 to 15 14, characterised in that a sound or electromagnetic wave detector (54) is placed facing a sound or electromagnetic waves beam generator (52) such that the detector can detect the beam produced by the generator and in that the moment at which the reference surface 20 (21a', 21a") of an anode (20', 20") passes through the said beam is detected when the anode block (21' , 21") interrupts transmission of the said beam to the detector.
16. Process according to any one of claims 1 to 25 14, characterised in that a sound or electromagnetic wave detector (54) and a sound or electromagnetic waves beam generator (52) are placed facing a reflecting surface (55) such that the detector can detect the beam produced by the generator and reflected by the 30 reflecting surface (55) and in that the moment at which the reference surface (21a' , 21a") of an anode (20' , - 28 20") passes through the said beam is detected when the anode block (21', 21") interrupts transmission of the said beam to the detector.
17. Process according to any one of claims 1 to 5 14, characterised in that a sound or electromagnetic wave detector (54) and a sound or electromagnetic waves beam generator (52) are arranged such that the detector can detect the beam produced by the generator and reflected by the anode block (21', 21") and in that the 10 moment at which the reference surface (21a', 21a") of an anode (20', 20") passes through the said beam is detected when the anode block (21', 21") reflects all or part of the said beam towards the detector.
18. Process according to any one of claims 1 to 15 17, characterised in that the said determined reference line or plane (50) is substantially horizontal.
19. Process according to any one of claims 1 to 18, characterised in that the spent anodes (20') are replaced one by one by replacement anodes (20").
20 20. Process according to any one of claims 1 to 18, characterised in that at least two spent anodes (20') are replaced at the same time by replacement anodes (20").
21. Measurement system comprising a position 25 sensor (13c) to measure the vertical distances travelled by an anode gripping device (13a), a sound or electromagnetic waves beam generator (52) capable of generating at least one sound or electromagnetic waves beam (51) along a determined reference line or in a 30 determined reference plane (50), at least one sound or electromagnetic wave detector (54) capable of detecting 29 the passage of a determined part (2la, 21a', 2la") of an anode (20, 20', 20") through the said beam and at least one positioning device (53) to which the said generator and / or the said detector is fixed. 5
22. Measurement system according to claim 21, characterised in that the generator (52) and the detector (54) are located on the same positioning device (53).
23. Measurement system according to claim 21, 10 characterised in that the generator (52) and the detector (54) are located on separate positioning devices.
24. Measurement system according to any one of claims 21 to 23, characterised in that the anode 15 handling tool (13) is provided with a means of measuring the tension in the tool, such as an axial dynamometer.
25. Measurement system according to any one of claims 21 to 24, characterised in that the measurement 20 system comprises a device to record measurements made and to determine a vertical position for a replacement anode (20").
26. Measurement system according to any one of claims 21 to 25, characterised in that the positioning 25 device or each positioning device (53) is a telescopic arm or mast.
27. Measurement system according to any one of claims 21 to 26, characterised in that the positioning device or each positioning device (53) of the 30 measurement system is directly or indirectly fixed to or placed on a circulation aisle (3). 30
28. Measurement system according to any one of claims 21 to 27, characterised in that the positioning device or each positioning device (53) of the measurement system is directly or indirectly fixed to a 5 tending assembly (4), a tending machine (6) or a tending module (8).
29. Measurement system according to any one of claims 21 to 28, characterised in that the said determined reference line or plane (50) is 10 substantially horizontal.
30. Measurement system according to any one of claims 21 to 29, characterised in that the said electromagnetic waves are chosen among visible light, infrared or radio waves. 15
31. Measurement system according to claim 30, characterised in that the said generator (52) comprises at least one laser.
32. Measurement system according to any one of claims 21 to 31, characterised in that the said sound 20 waves are ultrasound waves.
33. Measurement system according to any one of claims 21 to 32, characterised in that the generator is capable of producing two or several sound or electromagnetic waves beams (51) so as to form a 25 determined reference plane (50).
34. Measurement system according to claim 33, characterised in that the generator comprises a distinct wave source for each beam (51).
35. Tending machine (6) intended for anode 30 replacement operations in a series of cells for the production of aluminium by fused bath electrolysis (2), - 31 comprising at least one anode handling tool (13) comprising a positioning device (13b) and a gripping device (13a) characterised in that it comprises a measurement system according to any one of claims 21 to 5 34.
36. Tending machine (6) according to claim 35, characterised in that the position sensor (13c) of the measurement system is integrated into the anode handling tool (13). 10
37. Tending assembly (4) in a plant for the production of aluminium by fused bath electrolysis comprising a travelling crane (5) and at least one tending machine (6) according to claim 35 or 36.
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US60775604P | 2004-09-08 | 2004-09-08 | |
US60/607,756 | 2004-09-08 | ||
FR0409508 | 2004-09-08 | ||
FR0409508A FR2874934B1 (en) | 2004-09-08 | 2004-09-08 | METHOD FOR CHANGING ANODE IN AN ELECTROLYTIC ALUMINUM PRODUCTION CELL INCLUDING ANODE POSITION ADJUSTMENT AND DEVICE FOR IMPLEMENTING THE SAME |
PCT/FR2005/002188 WO2006030092A2 (en) | 2004-09-08 | 2005-09-02 | Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2005284068A1 true AU2005284068A1 (en) | 2006-03-23 |
AU2005284068B2 AU2005284068B2 (en) | 2010-07-29 |
Family
ID=35911091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2005284068A Ceased AU2005284068B2 (en) | 2004-09-08 | 2005-09-02 | Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP1819847B1 (en) |
AR (1) | AR054403A1 (en) |
AU (1) | AU2005284068B2 (en) |
BR (1) | BRPI0515060A (en) |
CA (1) | CA2577921C (en) |
RU (1) | RU2375502C2 (en) |
WO (1) | WO2006030092A2 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2902113B1 (en) * | 2006-06-09 | 2008-08-08 | Ecl Soc Par Actions Simplifiee | METHOD OF MEASURING THE RISE OF THE HEIGHT OF AN ELECTROLYSIS ANODE |
CN102400184B (en) * | 2011-11-22 | 2014-05-07 | 中国铝业股份有限公司 | Method for realizing accurate replacement of electrode of aluminum electrolytic cell |
CN102400181B (en) * | 2011-11-22 | 2014-05-28 | 中国铝业股份有限公司 | Method for replacing electrode of aluminum electrolysis cell |
FR3016891B1 (en) * | 2014-01-27 | 2017-08-04 | Rio Tinto Alcan Int Ltd | DEVICE FOR STORING A CHARGE ABOVE AN ELECTROLYSIS TANK |
EP4293141A1 (en) | 2022-06-13 | 2023-12-20 | Dubai Aluminium PJSC | Anode servicing assembly for an aluminium electrolysis plant, and methods for operating the same |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5549682B2 (en) * | 1974-04-05 | 1980-12-13 | ||
DE2819351A1 (en) * | 1978-04-03 | 1979-10-04 | Alusuisse | METHOD FOR MEASURING ELECTRODES TO BE REPLACED, ARRANGEMENT FOR IMPLEMENTING THE METHOD AND DETECTOR FOR REGISTERING THE REACHER OF A PRESET POSITION |
US4540474A (en) * | 1984-06-04 | 1985-09-10 | Aluminum Company Of America | Light level electrode setting gauge and method of use |
NO162975C (en) * | 1987-12-30 | 1990-03-14 | Norsk Hydro As | PROCEDURE FOR SETTING ELECTRODES IN ELECTROLYCLE CELLS. |
US5152408A (en) * | 1988-05-18 | 1992-10-06 | Hans Tax | Container crane installation |
US7001497B2 (en) * | 2003-04-25 | 2006-02-21 | Alcoa,Inc. | Process and apparatus for positioning replacement anodes in electrolytic cells |
-
2005
- 2005-09-02 RU RU2007112948/02A patent/RU2375502C2/en not_active IP Right Cessation
- 2005-09-02 EP EP05800606.5A patent/EP1819847B1/en active Active
- 2005-09-02 CA CA2577921A patent/CA2577921C/en not_active Expired - Fee Related
- 2005-09-02 BR BRPI0515060-4A patent/BRPI0515060A/en not_active IP Right Cessation
- 2005-09-02 AU AU2005284068A patent/AU2005284068B2/en not_active Ceased
- 2005-09-02 WO PCT/FR2005/002188 patent/WO2006030092A2/en active Application Filing
- 2005-09-06 AR ARP050103722A patent/AR054403A1/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
CA2577921C (en) | 2014-05-27 |
EP1819847B1 (en) | 2017-11-29 |
RU2007112948A (en) | 2008-10-20 |
EP1819847A2 (en) | 2007-08-22 |
WO2006030092A3 (en) | 2006-12-07 |
CA2577921A1 (en) | 2006-03-23 |
AU2005284068B2 (en) | 2010-07-29 |
WO2006030092A8 (en) | 2007-04-05 |
AR054403A1 (en) | 2007-06-27 |
WO2006030092A2 (en) | 2006-03-23 |
RU2375502C2 (en) | 2009-12-10 |
BRPI0515060A (en) | 2008-07-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7422675B2 (en) | Process for changing anodes in an electrolytic aluminum production cell including adjustment of the position of the anode and device for implementing the process | |
US20080251392A1 (en) | Process For Changing an Anode In an Electrolytic Aluminium Production Cell Including Adjustment of the Position of the Anode and Pot Tending Machine For Implementing It | |
CN101052749B (en) | Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same | |
CA2523656C (en) | Process and apparatus for positioning replacement anodes in electrolytic cells | |
AU2005284068B2 (en) | Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same | |
US8273223B2 (en) | Handling device for hoods of a cell for electrolytic aluminium production | |
AU2004293726B2 (en) | A method and equipment for positioning when replacing anodes in an electrolysis cell | |
CN101501248A (en) | Method of measuring, on the fly, the height of an electrolysis anode | |
CN102666933B (en) | For being collected in the device of the solid fragment in the electrolysis bath producing aluminum | |
AU2015226002B2 (en) | System for carrying out operations linked to the use of cells of a facility for producing aluminium by means of electrolysis | |
EP4293141A1 (en) | Anode servicing assembly for an aluminium electrolysis plant, and methods for operating the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) | ||
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |