AU1428401A - Casting of tank - Google Patents
Casting of tank Download PDFInfo
- Publication number
- AU1428401A AU1428401A AU14284/01A AU1428401A AU1428401A AU 1428401 A AU1428401 A AU 1428401A AU 14284/01 A AU14284/01 A AU 14284/01A AU 1428401 A AU1428401 A AU 1428401A AU 1428401 A AU1428401 A AU 1428401A
- Authority
- AU
- Australia
- Prior art keywords
- joint
- concrete
- joints
- tank
- elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/02—Containers for fluids or gases; Supports therefor
- E04H7/18—Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material
- E04H7/20—Prestressed constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Making Paper Articles (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
- Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
Abstract
Method for casting together a plurality of prestressed concrete elements (103) to a tank (100) with joints (1-19) between each respective concrete element (103) and pre-stress cables (43) guided through the concrete elements (103), where a first joint (1) starts to be filled and then, with a time delay, the subsequent respective joints (2, 3), etc., until all the joints (1-19) are filled. The joints are formed in such a way that joint concrete rises in a transcend hole positioned beside an embedded tube going through the concrete elements. Further, a tank comprising concrete elements prestressed both horizontally and vertically.
Description
WO 01/51740 PCT/SEOO/02207 CASTING OF TANK FIELD OF INVENTION The present invention generally relates to casting concrete elements together and particularly to casting prestressed 5 concrete elements together into a tank. BACKGROUND There is today a need of a tank, which is easy to assemble. It is easier and less labour-intensive to guide pre-stress cables internally in concrete elements than externally 10 through holes in ribs, by using mechanical equipment, so called push-through machines. Further, the risk is less that the pre-stress cables break or are cut off through sabotage, if the pre-stress cables run inside the concrete elements instead of outside the concrete elements. 15 Prestressed concrete elements for tanks are described in EP 0514583 (Parenti) and in BFT No. 4/89 "Concrete precasting plant and technology", pages 90-93 by Josef Imkamp. Prestressed concrete elements are normally manufactured in whole parts. When these later are cast together to a tank, 20 which should be able to contain e.g. liquid without leaking, on one hand prestressed cables are used to keep the concrete elements together and on the other hand the joints between the concrete elements are cast together. The pre-stress cables running through the concrete elements are guided 25 through embedded tubes, e.g. plastic tubes. The pre-stress cables need to be protected against corrosion, which among other things implies that they should not have contact with air. In order to protect the pre-stress cables against corrosion they are provided with a plastic cover containing 30 grease.
WO 01/51740 PCT/SEOO/02207 2 The joint between two concrete elements needs to be shaped to solve several problems. Because the tank is formed of straight concrete elements, the pre-stress cables will, when guided around the tank, risk getting stuck in the joints, 5 unless they are guided straight to the next pipe inlet. The joints between the concrete elements are at assembly not solid in themselves, which they suitably should be, since joint concrete to be cast in the joints is very fluent. If having problems with regular casting of the joints it could 10 be necessary to separately re-cast each joint individually. It is complicated to cast from above and simultaneously get rid of air that could weaken the cast. SUMMARY OF THE INVENTION An object of the present invention is to manufacture a solid 15 tank. Another object of the present invention is to manufacture a tank, where protection against corrosion and mechanical damage of the pre-stress cables is improved. Still another object of the present invention is to 20 manufacture concrete elements with vertical sections facilitating mechanical joint cast from below and up by means of a pump. Yet another object of the present invention is to manufacture a tank with improved structural strength. 25 In accordance with the present invention there are provided a tank according to the characteristics in claim 1, a method to cast together a plurality of concrete elements according to the characteristics in claim 2, a joint between two concrete elements in a tank according to the characteristics in claim 30 13, and a tank according to the characteristics in claim 16.
WO 01/51740 PCT/SE00/02207 3 In order to further protect the pre-stress cables against corrosion, the embedded tubes guiding the pre-stress cables are also filled with joint concrete when casting the joints. In order to prevent air pockets from arising when filling 5 joint concrete a method is utilized, where a first joint starts filling up and after a time delay filling of the closest joints on each side of the first joint starts. After another time delay filling of the subsequent joints starts and so on until filling of all joints have started. By 10 casting the joints together a solid tank is obtained. The plastic tubes used to guide the pre-stress cables around the tank inside the concrete elements has a funnel-shaped design at one end in order to easier be able to receive the pre-stress cable in that end when it is guided around the 15 tank. Sealing devices are preferably inserted in the outer parts of the joint in order to prevent the joint concrete from leaking at casting. A transcend hole positioned at the side of the track of the 20 pre-stress cable is intended partly for conveying the joint concrete at casting of the tank and partly as a safety channel for manual filling of joint concrete if something should go wrong at the ordinary filling of joint concrete. Further features and advantages of the present invention will 25 be evident form the following description. BRIEF DESCRIPTION OF THE DRAWINGS The present invention will become more fully understood from the detailed description of embodiments given below and the accompanying figures, which are given by way of illustration WO 01/51740 PCT/SE00/02207 4 only, and thus, are not limitative of the present invention, wherein: Fig. 1 shows a tank with a pump for filling of joint concrete; 5 Fig. 2 shows a part of a pipe line system for filling of joint concrete in a tank according to a preferred embodiment; Fig. 3 shows a float for marking that a joint is filled; Fig. 4 shows a cross-section through a joint between two concrete elements; and 10 Fig. 5 shows a system for filling of joint concrete into a tank according to another embodiment. DETAILED DESCRIPTION OF EMBODIMENTS In the following description, for purpose of explanation and not limitation, specific details are set forth, such as 15 particular techniques and applications in order to provide a thorough understanding of the present invention. However, it will be apparent for a person skilled in the art that the present invention may be practiced in other embodiments that depart from these specific details. In other instances, 20 detailed description of well-known methods and apparatuses are omitted so as not to obscure the description of the present invention with unnecessary details. The invention will now be described by illustrative examples with reference to the figures. 25 First, a preferred embodiment will be closer described. A tank 100 comprising nineteen concrete elements 103 is shown in Fig. 1. Further, a pump 101 and a pipe line system 102 connected to each joint 1-19 are shown. Each concrete element WO 01/51740 PCT/SEOO/02207 5 103 comprises a plurality of embedded tubes 42, plastic tubes, which are intended to guide pre-stress~cables 43, e.g. steel cables, around the tank 100. The pre-stress cables 43 are used to keep the concrete elements 103 together, when the 5 joints 1-19 are cast together. In order to be able to obtain an even filling, without air pockets, of joint concrete in all joints 1-19 and in all embedded tubes 42 in a tank 100 a method is used, where the filling up of joint concrete is at first filled in joint 1. After a time delay filling of joints 10 2 and 3 is started and then after still another time delay filling of the joints 4 and 5 starts, and so on until filling of all joints 1-19 with joint concrete has started. The joint concrete is filled from the lower edge of the joints under pressure. 15 A pump 101 and pipe lines 102, for distribution of joint concrete under pressure, are lifted into the tank 100. A system of pipes, Fig. 2 showing a part of the pipe system, for distribution of the joint concrete to the different joints 1-19 is put together so that a first pipe leads from 20 the pump 101 to a three-way fork 20 close to the concrete elements 103. The two subsequent pipes in the three-way fork 20 leads further around the inside of the concrete elements 103. At each joint a three-way fork 20 is placed, which leads further around the inside of the concrete elements and into a 25 nozzle in the joint. At each joint a valve 21 is placed, e.g. a ball valve or a sliding valve, which is used as a cut-off valve 21 for each respective joint. Further, valves 22 are shown, such as e.g. ball valves, positioned in the pipe system 102 between the respective joint 1-19 and used for 30 time delaying the start of supply of joint concrete into the different joints 1-19. When the pump 101 shown in Fig. 1 is started and mixing of the joint concrete begins, the pump 101 is disconnected from WO 01/51740 PCT/SEOO/02207 6 the pipe system 102, all valves 22 between the respective joint 1-19 is closed and all non-return valves 21 is open. When the joint concrete in the pump 101 is of an acceptable quality, the pump 101 is mounted together with the pipe 5 system 102 and the joint concrete is pushed out into the pipe system 102. First, the joint concrete arrives to a three-way fork 20 and, since the valves 21, 22 are set in such a way, is led to the first joint 1. The joint concrete is led into each joint through an embedded bent pipe. The bent pipe is 10 embedded in the lower edge of the concrete elements 103. The joint concrete fills the joint 1 and the pipes 42, which are used to guide the pre-stress cables 43 to the adjacent concrete elements, and when the joint concrete reaches the upper edge of the joint 1 a float 34, shown in Fig. 3, rises 15 indicating that the first joint 1 is filled. The float 34 is arranged in an upper sealing and is further used to prevent the joint concrete from leaking out. A lower sealing of the joints is effectively obtained if casting is performed around the bottom of the concrete 20 elements, otherwise a temporary sealing has to be obtained, which is performed by inserting a sealing device held up against the bottom of the joint with wedges. For the air in the system being able to depart there are holes around the floats in each joint. As the float 34 rises 25 due to. the joint concrete reaching the joint 1 there is a sealing ring 33 on the float 34, which seals against the upper part of the joint 1 and prevents the joint concrete from leaking out. When the float 34 rises and seals the upper part of the joint 1, it is an indication that the joint 1 is 30 filled. The uppermost part 35 of the float 34 could e.g. be painted in order clearly to indicate when it moves upwards.
WO 01/51740 PCT/SEOO/02207 7 The air in the system should also be able to depart from each embedded tube. For this to be possible each embedded tube is provided with a ventilation pipe 105 at the holes where the pre-stress cables are guided into the concrete elements. The 5 ventilation pipes 105 emerge at the inside of the tank 100. Each ventilation pipe 105 is provided with a cut-off valve, e.g. a ball valve. When the joint concrete comes out through a ventilation pipe 105, it indicates that the pipe is filled and its cut-off valve is closed. 10 An alternative method to bring the air to depart from each embedded tube is to utilize small holes instead of ventilation pipes. With a small hole, having a diameter of approximately 3 mm, air and water will depart from the embedded tubes, while the concrete remains. 15 After a delay of a couple of minutes after the first joint 1 having started to fill up the two valves 22 are opened admitting the joint concrete further to the joints 2 and 3. After still another delay of some minutes the valves admitting the joint concrete further to the joints 4 and 5 20 are opened, etc. This goes on until the joint concrete has started to fill all the joints 1-19. As the floats 34 in the upper part of the joints rises and indicates that each respective joint is filled, each respective non-return valve 21 is closed. The closing of the non-return valves 21 takes 25 place with a certain delay. When the joints 2 and 3 have been indicated to be filled, and also the joint 1, the non-return valve 21 at the joint 1 is closed. This prevents the joint concrete form sinking back. Then, as the next float indicates that its joint is full, the non-return valve 21 belonging to 30 the adjacent joint, the float of which has earlier indicated a filled joint, is closed. When finally all floats indicate that their respective joint is filled, all valves 21, 22 are closed.
WO 01/51740 PCT/SEOO/02207 8 If a problem should arise preventing complete casting of the tank 100, the joints could be filled afterwards. By lowering a pipe into the transcend hole 41 and filling joint concrete from above continuing where the incomplete casting ended, and 5 rising the filling pipe as the joint concrete rises, air pockets can be avoided. The pipe system is now disassembled and cleaned, which implies that it could be re-used. Fig. 4 shows a cross-section through a joint between two 10 concrete elements 103. The joint is designed to be able to guide pre-stress cables 43 safely past the joint when the pre-stress cable 43 is led around the tank 100. The pipe 42 guiding the pre-stress cable 43 in the direction towards the insert, out of the joint into the subsequent concrete 15 element, of the pre-stress cable 43 has a funnel, which catches the pre-stress cable 43. The pipe 42 guiding the pre stress cable into the joint is intended to be aligned with the pipe 42, which guides the pre-stress cable out of the joint. If at the manufacture of a concrete element a pipe 20 ends up a little askew the above-mentioned funnel is especially important, as at the assembly a pre-stress cable therein is not guided straight to the inlet of the next pipe. To prevent joint concrete from leaking out at the filling of joint concrete sealing devices 40 are positioned, e.g. 25 precompressed compress bands or a sealing compound, in the outer parts of the joint and sealing plates are fastened in the upper and lower edges of the joint. This additional sealing device 40 is preferred, since the joint concrete is supplied under pressure. 'Further, a cavity (transcend hole) 30 41 is formed beside the paths of the pre-stress cables 43 in order for the joint concrete being able to rise in the joint and fill out also the pipes 42 with joint concrete (each WO 01/51740 PCT/SEOO/02207 9 concrete element has a plurality of pipes 42 distributed on different levels in dependence on the height of the concrete element). The positioning of the transcend hole 41 beside the path of the pre-stress cable is important if a problem should 5 arise during casting. In order to be able easily to continue the casting of the tank 100, even if part of the joint concrete has already been filled into the tank 100, a pipe can be put down into the transcend hole 41 and joint concrete be filled from the upper part of the joint but still joint 10 concrete is filled from below (continuing where the casting was interrupted). If the transcend hole 41 was positioned at the pre-stress cable a pipe would not be able to be put down the transcend hole. The distance between the concrete elements at the transcend 15 hole 41 is larger than the distance at the pre-stress cable 43, in order to minimize the amount of joint concrete that is needed for casting the tank. The transcend hole 41 preferably has a diameter of approximately 40 mm, for receiving joint concrete from below or refill pipe from above. The distance 20 between the concrete elements at the pre-stress cables is preferably 10-15 mm, which besides minimizes the amount of joint concrete facilitates guiding, of pre-stress cables through a joint. Further, the joint has sockets for allowing easy insertion of sealing devices 40, and protruding and 25 respective recessing parts that engage each other that keep the concrete elements positioned during assembly. The protruding and recessing parts are convex respectively concave, which lessen the strain from the pre-stress on the concrete elements. 30 The float 34 used to prevent the joint concrete from emerging out of the upper edge of the joint and used to indicate a filled joint is closer shown in Fig. 4. The float comprises a plastic tube with a sealing 31 at the bottom side, which WO 01/51740 PCT/SEOO/02207 10 prevents the joint concrete from leaking through the pipe and instead involving that the pipe rises, when the joint concrete rises to the top in the joint. Around the pipe the air is allowed to be pushed out; it is pushed out by the 5 inpouring joint concrete. Further, the pipe has a sealing ring 33, which seals the space letting out the air, so that the joint concrete will not leak out when it reaches the top of the joint. The sealing ring 33 is kept in place by a container 32. When the float 34 rises, a flag 35 is raised, 10 i.e. the end of the pipe, which e.g. could be painted, and indicates that the joint is filled. Another embodiment will now be described more closely with reference to Fig. 5. In this embodiment, the joint concrete is guided into the 15 concrete elements through only one inlet pipe 23. This pipe preferably guides the joint concrete through joint 1, opposite to the concrete element with the ventilation pipes 105. In this embodiment an additionally coarse embedded tube is utilized in the lowermost part of the concrete elements to 20 allow the joint concrete to easily be spread to all the concrete elements. After the lowermost pipe having been filled, the joint concrete rises in joints 1-19 in the same manner as has been described above without any valves needing to be opened. This embodiment does not utilize feeding valves 25 except at the only inlet pipe. In the same way as described above ventilation valves are closed as the joints are filled. Using- this method the only pipe system necessary in order to distribute the joint concrete between the joints is that inside the concrete elements, and the pump can be positioned 30 quite close to joint 1. With the need of only one inlet pipe this pipe could be positioned outside the tank and a pump will not be required to be lifted inside the tank but could WO 01/51740 PCT/SEOO/02207 11 instead be connected from the outside of the tank. As a precautionary measure additional inlet pipes 24 can be positioned for instance at joints 12 and 13. If the pump is located outside the tank, the ventilation pipes are also 5 directed out from the tank. As the entire system shall be filled from one point, a higher pressure will be needed, which puts a higher demand on the sealing devices. In order to reduce the pressure backwards in the system it is possible to utilize non-return valves in the joints 1-19 between 10 different levels, e.g. where the pipes guiding the pre-stress cables are distributed. A non-return valve can e.g. simply be a horizontal lid, which is articulated at the one end and movable upwards from the vertical plane at its other end and also with a stopping 15 device, which prevents the movable part from moving downwards from the vertical plane. The pressure from the pump lifts the lid upwards and if the pressure should be greater from above the lid falls back and prevents the joint concrete from pouring back in the system. 20 In a further embodiment, not shown, the pipe system is built up so that a single person inside the tank could handle it. After the pump a three-way fork is positioned and on each further fork another three-way fork is placed. Each further fork has valves, e.g. ball valves, used to control the flow 25 of joint concrete to each separate joint. The filling of joint concrete takes place as according to the embodiment mentioned before but with the difference that the stopping of flow can now be performed with the same valve that opened the flow of the joint concrete. The non-return valves are closed 30 after the entire casting process having been completed and all the joints are filled with joint concrete.
WO 01/51740 PCT/SEOO/02207 12 Systems of the above kind may of course be easily automated. Instead of a flag being mechanically raised when a joint is filled a sensor could give a signal, e.g. an electric impulse, to a control unit which further controls the valves, 5 which after a suitable time delay stops further filling of joint concrete. And the same control unit could control the pump and valves to open as well as to close. In a preferred embodiment the concrete elements of the tank are prestressed both vertically and horizontally. Vertically 10 prestressed concrete elements are obtained by molding pre stress cables into the concrete elements during manufacturing. Horizontally prestressed concrete elements are obtained as described above. By pre-stressing the concrete elements in both horizontal and vertical direction, a 15 strongly improved structural strength is achieved. Elements for higher tanks, i.e. longer elements when cast, are more robust when handled. Such vertically prestressed elements are less sensitive to gradient forces, such as temperature differences or horizontal pre-stress. Further, the vertical 20 pre-stress cables are embedded in the concrete elements, while the horizontal pre-stress cables are anchored on one of the concrete elements. It will be obvious that the present invention may be varied in a plurality of ways. Such variations are not to be 25 regarded as departure from the scope of the present invention. All such variations as would be obvious for a person skilled in the art are intended to be included within the scope of the present invention.
Claims (16)
1. A tank comprising a plurality of concrete elements with castable joints between said concrete elements cha ra ct e ri z ed in that 5 said concrete elements are vertically prestressed and having horizontally embedded tubes for horizontal pre-stress cables, and wherein said joints and said embedded tubes forms a communicating vessel for filling of joint concrete from the lower edge of each joint. 10
2. A method for casting together a plurality of concrete elements (103) to a tank (100) with joints (1-19) between each respective concrete element (103), said joints (1-19) between the concrete elements (103) being filled with joint concrete, where each joint is filled from its lower edge, so 15 that the joint concrete rises vertically in a cavity (41) and horizontally in embedded tubes (42), and where said cavity (41) is positioned beside said embedded tube (42) starting at a first joint (1), said method being characterized b y the following 20 steps: a)- filling joint concrete in said joints (2,3) starting after a time delay at each side of said first joint (1); and b) filling joint concrete in the subsequent respective joints (4-19) starting after another time delay; and 25 c) repeating said step b) until filling joint concrete of all the joints (1-19) in the tank (100) have started.
3. The method as claimed in claim 2, wherein a respective float (34), which indicates that each respective joint is filled with joint concrete, is positioned at the WO 01/51740 PCT/SEOO/02207 14 upper edge of each joint, and said method further comprising the steps of: d) stopping filing joint concrete in said first joint (1) when the floats in the first three joints (1-3) indicate that 5 the respective joint is filled; e) stopping filling joint concrete in the adjacent previous joint when the next float indicates that another joint is filled; and f) repeating said step e) until all the floats indicate that 10 each respective joint is filled, and then stopping filling the remaining joints.
4. The method as claimed in claim 2 or 3, wherein a cut off valve (21), such as a ball valve or a sliding valve, is positioned at each joint. 15
5. The method as claimed in any of claims 2-4, wherein sealing devices (40) are inserted in the outer parts of each joint.
6. The method as claimed in claim 5, wherein said sealing devices (40) are precompressed compress bands or a 20 sealing compound.
7. The method as claimed in claim 3, wherein a space around each float (34) releases air, which is pushed forward by the inpouring joint concrete, whereby the space is sealed by a sealing ring (33) on each float, when the respective 25 float is lifted by the rising joint concrete.
8. The method as claimed in any of claims 2-7, wherein each embedded tube is provided with a ventilation pipe (105), and wherein each ventilation pipe is provided with a cut-off valve, preferably a ball valve, whereby the respective cut- WO 01/51740 PCT/SEOO/02207 15 off valve is closed, when joint concrete emerges out of the embedded tubes.
9. The method as claimed in any of claims 2-7, wherein air and water emerge out of the embedded tubes from cut out 5 holes in said concrete elements, which are of such a small size that emerging of joint concrete is essentially avoided.
10. The method as claimed in any of claims 2-9, wherein a pipe system (102) distributes the joint concrete from a pump (101) to each joint, whereby the pipe system (102) is 10 branched at each joint and after each branching a valve (22) is positioned, e.g. a ball valve, whereby each such valve (22) controls the further flow of joint concrete from the respective joints.
11. The method as claimed in any of claims 2-10, wherein 15 a first horizontal level in the concrete elements is filled with joint concrete through an additional coarse embedded tube via only one inlet point.
12. The method as claimed in claim 11, wherein said only one inlet point is positioned at the outside of said tank. 20
13. A joint between a first and a second concrete element (103) in a tank (100) comprising a plurality of concrete elements (103) wherein pre-stress cables (43), which are arranged in embedded tubes (42) in said plurality of concrete elements (103) 25 characteri zed in that said joint is shaped with a cavity (41) beside said pre stress cables (43), for rising of joint concrete and lowering of a filling pipe, wherein the distance between said first and second concrete elements (103) is larger at said cavity 30 (41) than at said pre-stress cables (43). WO 01/51740 PCT/SEOO/02207 16
14. The joint as claimed in claim 13, wherein said joint is shaped along a protruding part of said first concrete element and a recess of said second concrete element, which engage each other during assembly of said tank. 5
15. The joint as claimed in claim 13 or 14, wherein sealing devices (40), e.g. precompressed compress bands, are positioned in the outer parts of the joint.
16. A tank (100) comprising a plurality of concrete elements (103) with castable joints (1-19) between the 10 concrete elements (103) characteri zed in that said joints (1-19) are shaped as claimed in any of claims 13-15 and/or that said joints (1-19) are cast together as claimed in any of claims 2-12. 15
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE0000038 | 2000-01-10 | ||
SE0000038A SE522349C2 (en) | 2000-01-10 | 2000-01-10 | Casting method for producing concrete tank involves filling joints between prestressed concrete elements predetermined time delay |
SE0000686 | 2000-03-02 | ||
SE0000686A SE0000686D0 (en) | 2000-01-10 | 2000-03-02 | Method and apparatus for molding containers and such containers |
PCT/SE2000/002207 WO2001051740A1 (en) | 2000-01-10 | 2000-11-10 | Casting of tank |
Publications (2)
Publication Number | Publication Date |
---|---|
AU1428401A true AU1428401A (en) | 2001-07-24 |
AU778554B2 AU778554B2 (en) | 2004-12-09 |
Family
ID=26654938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU14284/01A Ceased AU778554B2 (en) | 2000-01-10 | 2000-11-10 | Casting of tank |
Country Status (10)
Country | Link |
---|---|
EP (1) | EP1246985B1 (en) |
AT (1) | ATE315701T1 (en) |
AU (1) | AU778554B2 (en) |
DE (1) | DE60025521T2 (en) |
EE (1) | EE04504B1 (en) |
ES (1) | ES2256061T3 (en) |
PL (1) | PL206445B1 (en) |
PT (1) | PT1246985E (en) |
SE (1) | SE0000686D0 (en) |
WO (1) | WO2001051740A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2007231C2 (en) * | 2011-08-05 | 2013-02-06 | Mecal B V | A method of assembling a wall from prefabricated wall parts and a wall assembly. |
JP6977927B2 (en) * | 2016-11-28 | 2021-12-08 | 株式会社昇和産業 | In-pipe excavator and in-pipe excavation method |
CN113494180A (en) * | 2020-03-18 | 2021-10-12 | 耐当科环境工程河北有限公司 | Filter plate mold convenient to assemble and disassemble and filter plate manufacturing method thereof |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH658492A5 (en) * | 1982-12-13 | 1986-11-14 | Brun Ag Elementwerk | CONTAINER MADE OF PRE-PREPARED CONCRETE ELEMENTS AND THEIR PRODUCTION. |
IT1247587B (en) * | 1990-04-18 | 1994-12-28 | Giuseppe Parenti | MANUFACTURES AND METHOD FOR THE CREATION OF CIRCULAR TANKS. |
ATE134245T1 (en) * | 1991-05-23 | 1996-02-15 | Giuseppe Parenti | ABOVE GROUND ROUND POOLS |
-
2000
- 2000-03-02 SE SE0000686A patent/SE0000686D0/en unknown
- 2000-11-10 WO PCT/SE2000/002207 patent/WO2001051740A1/en active IP Right Grant
- 2000-11-10 DE DE60025521T patent/DE60025521T2/en not_active Expired - Lifetime
- 2000-11-10 PL PL356330A patent/PL206445B1/en unknown
- 2000-11-10 AT AT00976521T patent/ATE315701T1/en not_active IP Right Cessation
- 2000-11-10 ES ES00976521T patent/ES2256061T3/en not_active Expired - Lifetime
- 2000-11-10 AU AU14284/01A patent/AU778554B2/en not_active Ceased
- 2000-11-10 EE EEP200200388A patent/EE04504B1/en not_active IP Right Cessation
- 2000-11-10 EP EP00976521A patent/EP1246985B1/en not_active Expired - Lifetime
- 2000-11-10 PT PT00976521T patent/PT1246985E/en unknown
Also Published As
Publication number | Publication date |
---|---|
EE04504B1 (en) | 2005-06-15 |
EP1246985B1 (en) | 2006-01-11 |
EE200200388A (en) | 2003-10-15 |
ES2256061T3 (en) | 2006-07-16 |
PL206445B1 (en) | 2010-08-31 |
EP1246985A1 (en) | 2002-10-09 |
AU778554B2 (en) | 2004-12-09 |
ATE315701T1 (en) | 2006-02-15 |
WO2001051740A1 (en) | 2001-07-19 |
PL356330A1 (en) | 2004-06-28 |
DE60025521D1 (en) | 2006-04-06 |
DE60025521T2 (en) | 2006-08-24 |
PT1246985E (en) | 2006-05-31 |
SE0000686D0 (en) | 2000-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100371551C (en) | Anticorrosive tension member, especially tension member of prestressing force concrete | |
US5173982A (en) | Corrosion protection system | |
CN208220000U (en) | A kind of prefabricated assembled component grout sleeve plug component | |
JP5371812B2 (en) | PC grout injection method | |
EP1246985B1 (en) | Casting of tank | |
CN108518067B (en) | Assembled wallboard grouting compensation device and construction method thereof | |
KR102012838B1 (en) | Method of protecting the end of a multi-tendon cable | |
JP4982666B2 (en) | Method of injecting grout into sheath for inserting PC tendon in PC structure | |
US4425932A (en) | Siphon ladling apparatus | |
CN217931287U (en) | Concrete impermeability test device | |
KR102079589B1 (en) | Operating method of fish cage buoyancy balance device | |
EP1907185B1 (en) | Moulding device | |
CN206636571U (en) | One kind can prestress steel structure concrete pipe sheet | |
WO2016050979A1 (en) | Tendons grouting with recirculation | |
CN211816313U (en) | Permanent roadbed side slope protective structure is filled to height | |
CN112362847A (en) | Building engineering quality detector and using method thereof | |
CN111764393A (en) | Pressure measurement inspection device for guide pipe for underwater concrete pouring and pouring method | |
CN110409451B (en) | Ground-connected wall concrete super-irrigation prevention device and using method thereof | |
KR102145129B1 (en) | Method for repairing grout of tendon tube of post-tensioned structures | |
CN110670632B (en) | Construction method for horizontal construction joint of side wall of underground structure reverse construction method | |
JP3219778B2 (en) | Method and apparatus for casting a metal object in a casting cavity adapted to be filled upward | |
SE522349C2 (en) | Casting method for producing concrete tank involves filling joints between prestressed concrete elements predetermined time delay | |
US5213140A (en) | Method and apparatus for filling drums with immiscible liquids such as white phosphorus and water | |
JPH0376908A (en) | Packer | |
CN215673987U (en) | Water stopping pipeline structure between floors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |