ATE387635T1 - Automatisches system zur modellierung von gestörten mehrwertigen horizonten - Google Patents

Automatisches system zur modellierung von gestörten mehrwertigen horizonten

Info

Publication number
ATE387635T1
ATE387635T1 AT02741905T AT02741905T ATE387635T1 AT E387635 T1 ATE387635 T1 AT E387635T1 AT 02741905 T AT02741905 T AT 02741905T AT 02741905 T AT02741905 T AT 02741905T AT E387635 T1 ATE387635 T1 AT E387635T1
Authority
AT
Austria
Prior art keywords
fault
horizon
patch
modeling
reverse
Prior art date
Application number
AT02741905T
Other languages
English (en)
Inventor
Apostol Vassilev
Original Assignee
Schlumberger Technology Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Bv filed Critical Schlumberger Technology Bv
Application granted granted Critical
Publication of ATE387635T1 publication Critical patent/ATE387635T1/de

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/30Analysis
    • G01V1/301Analysis for determining seismic cross-sections or geostructures
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00

Landscapes

  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • General Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Manipulator (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Control Of Conveyors (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Vending Machines For Individual Products (AREA)
  • Laser Surgery Devices (AREA)
AT02741905T 2001-06-06 2002-06-05 Automatisches system zur modellierung von gestörten mehrwertigen horizonten ATE387635T1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US29638501P 2001-06-06 2001-06-06

Publications (1)

Publication Number Publication Date
ATE387635T1 true ATE387635T1 (de) 2008-03-15

Family

ID=23141785

Family Applications (1)

Application Number Title Priority Date Filing Date
AT02741905T ATE387635T1 (de) 2001-06-06 2002-06-05 Automatisches system zur modellierung von gestörten mehrwertigen horizonten

Country Status (7)

Country Link
US (1) US7424415B2 (de)
EP (1) EP1397703B1 (de)
AT (1) ATE387635T1 (de)
CA (1) CA2449286C (de)
DE (1) DE60225277D1 (de)
NO (1) NO335854B1 (de)
WO (1) WO2002099464A1 (de)

Families Citing this family (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6853922B2 (en) * 2001-07-20 2005-02-08 Tracy Joseph Stark System for information extraction from geologic time volumes
US7899657B2 (en) * 2003-01-24 2011-03-01 Rockwell Automoation Technologies, Inc. Modeling in-situ reservoirs with derivative constraints
US7283911B2 (en) * 2004-10-22 2007-10-16 Landmark Graphics Corporation System and method for interpreting reverse faults and multiple z-valued seismic horizons
ATE402459T1 (de) * 2004-10-26 2008-08-15 Total Sa Verfahren und computerprogramm zur fehleroberflächenkonstruktion
BRPI0708449B1 (pt) * 2006-03-02 2019-01-22 Exxonmobil Upstream Res Co métodos para produção de hidrocarbonetos
US9074454B2 (en) 2008-01-15 2015-07-07 Schlumberger Technology Corporation Dynamic reservoir engineering
US9372943B2 (en) * 2008-05-05 2016-06-21 Exxonmobil Upstream Research Company Modeling dynamic systems by visualizing and narrowing a parameter space
US7916576B2 (en) 2008-07-16 2011-03-29 Westerngeco L.L.C. Optimizing a seismic survey for source separation
CA2743479C (en) 2008-11-14 2016-06-28 Exxonmobil Upstream Research Company Forming a model of a subsurface region
AU2009341850A1 (en) 2009-03-13 2011-09-29 Exxonmobil Upstream Research Company Method for predicting fluid flow
US8395966B2 (en) * 2009-04-24 2013-03-12 Westerngeco L.L.C. Separating seismic signals produced by interfering seismic sources
US8600708B1 (en) 2009-06-01 2013-12-03 Paradigm Sciences Ltd. Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
US8275593B2 (en) * 2009-07-16 2012-09-25 University Of Regina Reservoir modeling method
US8743115B1 (en) 2009-10-23 2014-06-03 Paradigm Sciences Ltd. Systems and methods for coordinated editing of seismic data in dual model
EP2317348B1 (de) * 2009-10-30 2014-05-21 Services Pétroliers Schlumberger Verfahren für den Aufbau eines Ablagerungsraumes entsprechend einem geologischen Bereich
CN102640163B (zh) 2009-11-30 2016-01-20 埃克森美孚上游研究公司 用于储层模拟的适应性牛顿法
US9594186B2 (en) 2010-02-12 2017-03-14 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
EP2564309A4 (de) 2010-04-30 2017-12-20 Exxonmobil Upstream Research Company Verfahren und system zur simulation eines flusses mit endlichem volumen
US20110310101A1 (en) * 2010-06-22 2011-12-22 Schlumberger Technology Corporation Pillar grid conversion
FR2962835B1 (fr) * 2010-07-16 2013-07-12 IFP Energies Nouvelles Methode pour generer un maillage hexa-dominant d'un bassin geometriquement complexe
EP2599032A4 (de) 2010-07-29 2018-01-17 Exxonmobil Upstream Research Company Verfahren und system zur reservoirmodellierung
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
WO2012015515A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
GB2502432B (en) 2010-09-20 2018-08-01 Exxonmobil Upstream Res Co Flexible and adaptive formulations for complex reservoir simulations
US9626466B2 (en) 2010-11-23 2017-04-18 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
EP2697669B1 (de) 2011-04-18 2018-07-11 Halliburton Energy Services, Inc. Verfahren zur echtzeit-bohrlochbearbeitung und zum nachweis von bettgrenzen für geosteering
US8688426B2 (en) 2011-08-02 2014-04-01 Saudi Arabian Oil Company Methods for performing a fully automated workflow for well performance model creation and calibration
US8731892B2 (en) 2011-08-02 2014-05-20 Saudi Arabian Oil Company Systems and program product for performing a fully automated workflow for well performance model creation and calibration
CA2843929C (en) 2011-09-15 2018-03-27 Exxonmobil Upstream Research Company Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
US9759826B2 (en) * 2012-04-03 2017-09-12 Paradigm Sciences Ltd. System and method for generating an implicit model of geological horizons
WO2014051903A1 (en) 2012-09-28 2014-04-03 Exxonmobil Upstream Research Company Fault removal in geological models
MX2016003912A (es) * 2013-11-26 2016-10-28 Landmark Graphics Corp Secuencia de eliminacion de fallas de construccion de una cuadricula global para topologias de red de fallas complejas.
EP3175265A1 (de) 2014-07-30 2017-06-07 ExxonMobil Upstream Research Company Verfahren zur erzeugung eines volumetrischen gitters in einem bereich mit heterogenen materialeigenschaften
US10359523B2 (en) 2014-08-05 2019-07-23 Exxonmobil Upstream Research Company Exploration and extraction method and system for hydrocarbons
WO2016069170A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
CA2963416A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
AU2015338996B2 (en) 2014-10-31 2018-03-22 Exxonmobil Upstream Research Company Managing discontinuities in geologic models
US10215886B2 (en) 2016-02-19 2019-02-26 Baker Hughes, A Ge Company, Llc Plane-surface intersection algorithm with consistent boundary support
US10466388B2 (en) 2016-09-07 2019-11-05 Emerson Paradigm Holding Llc System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
US11340369B2 (en) 2016-11-17 2022-05-24 Landmark Graphics Corporation Multi-Z horizon interpretation and editing within seismic data
FR3058798A1 (fr) * 2016-11-17 2018-05-18 Landmark Graphics Corporation Interpretation et visualisation d'horizon a valeurs z multiples a partir de donnees sysmiques
WO2018118374A1 (en) 2016-12-23 2018-06-28 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
US10209380B2 (en) * 2016-12-30 2019-02-19 Schlumberger Technology Corporation Methods and systems for juxtaposition across geological discontinuities
WO2018222331A1 (en) 2017-05-31 2018-12-06 Exxonmobil Upstream Research Company Constructing structural models of the subsurface
GB2578845B (en) * 2017-09-11 2022-05-04 Landmark Graphics Corp Topologically correct horizons for complex fault network
CN109519169A (zh) * 2018-10-25 2019-03-26 广东石油化工学院 复杂断块油藏分类评价方法
US10520644B1 (en) 2019-01-10 2019-12-31 Emerson Paradigm Holding Llc Imaging a subsurface geological model at a past intermediate restoration time
US11156744B2 (en) 2019-01-10 2021-10-26 Emerson Paradigm Holding Llc Imaging a subsurface geological model at a past intermediate restoration time
CN114114404B (zh) * 2020-08-25 2024-09-13 中国石油化工股份有限公司 一种用于挤压盆地的古地貌恢复方法
CN112505758B (zh) * 2020-11-17 2021-10-26 中国石油集团工程咨询有限责任公司 一种基于断层分叉结构模型的复杂地质构造地震断层图像处理方法
CN114519784B (zh) * 2022-02-14 2023-11-24 煤炭科学研究总院有限公司 三维断层的建模方法及其装置
EP4581404A4 (de) * 2022-09-19 2025-10-15 Services Petroliers Schlumberger Automatische maschinenlernfehlermodellierung mit gruppierung

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5740342A (en) * 1995-04-05 1998-04-14 Western Atlas International, Inc. Method for generating a three-dimensional, locally-unstructured hybrid grid for sloping faults
US6014343A (en) * 1996-10-31 2000-01-11 Geoquest Automatic non-artificially extended fault surface based horizon modeling system

Also Published As

Publication number Publication date
DE60225277D1 (de) 2008-04-10
CA2449286A1 (en) 2002-12-12
US20040193960A1 (en) 2004-09-30
EP1397703B1 (de) 2008-02-27
NO20035446D0 (no) 2003-12-05
NO335854B1 (no) 2015-03-09
CA2449286C (en) 2007-08-21
WO2002099464A1 (en) 2002-12-12
US7424415B2 (en) 2008-09-09
EP1397703A1 (de) 2004-03-17

Similar Documents

Publication Publication Date Title
ATE387635T1 (de) Automatisches system zur modellierung von gestörten mehrwertigen horizonten
ATE520045T1 (de) Verfahren und vorrichtung zur lösung von modellen mit finiten elementen unter verwendung von mehrphasiger physik
Kumar et al. Modelling urban noise in CityGML ADE: Case of the Netherlands
DE602007013530D1 (de) Verfahren, systeme und computerlesbare medien zur öl- und gasfeldproduktionsoptimierung in echtzeit mit einem proxy-simulator
DE60310431D1 (de) Verfahren zum erzeugen eines computerlesbaren modelles
DE602004014274D1 (de) Ablaufsteuerung und Verfahren zur Planung von Datenübertragung in einem Kommunikationsnetz
EA200800598A1 (ru) Способ и система интегрированного управления активами с использованием многоуровневого моделирования активов месторождения нефти
DK1393034T3 (da) Modelbaseret alarmering
MXPA05011175A (es) Modelado de hora pico para enrutar y programar.
CN104658040A (zh) 一种利用bim实现三维地形地貌建模的方法及装置
CN111985081B (zh) 一种测井曲线构建方法、系统、设备及可读存储介质
ATE421120T1 (de) Verfahren und vorrichtung zur modusumschaltung und zum signalvergleich bei einem rechnersystem mit wenigstens zwei verarbeitungseinheiten
EP1566770A3 (de) Entwicklungswerkzeug für das Definieren von Attributen innerhalb eines mehrdimensionalen Raumes
CN109635066A (zh) 一种地图符号标线的生成方法、存储器及系统
Popović et al. Models of landscape shaping in exploited quarries of urban area
Gora Designing urban areas using traffic simulations, artificial intelligence and acquiring feedback from stakeholders
Stoter et al. CityGML implementation specifications for a countrywide 3D data set
CN118191970A (zh) 基于gis的地质工程勘测系统及方法
ATE358852T1 (de) VERFAHREN ZUR IDENTIFIZIERUNG VON BINDUNGSSTELLEN MIT EINEM ßMULTI-SCALE APPROACHß
Thiry et al. PALAEOLITHIC MAP ENGRAVED FOR STAGING WATER FLOWS IN A PARIS BASIN SHELTER
CN119004716B (zh) 管道铺设规划方法和装置、电子设备及存储介质
CN118470173B (zh) 基于云渲染的地下管网显示方法、装置及计算机设备
ATE325369T1 (de) Objektbearbeitungssystem mit einem objektmodell
CN109269513B (zh) 电子地图中的智能道路识别方法及系统
CN120143302A (zh) 一种断层分段建模方法及系统

Legal Events

Date Code Title Description
RER Ceased as to paragraph 5 lit. 3 law introducing patent treaties