AT84U2 - MB-KUENETTENFUELLMATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FOR KUENETTEN - Google Patents

MB-KUENETTENFUELLMATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FOR KUENETTEN Download PDF

Info

Publication number
AT84U2
AT84U2 AT0035494U AT35494U AT84U2 AT 84 U2 AT84 U2 AT 84U2 AT 0035494 U AT0035494 U AT 0035494U AT 35494 U AT35494 U AT 35494U AT 84 U2 AT84 U2 AT 84U2
Authority
AT
Austria
Prior art keywords
sep
consistency
filling material
flowable
hours
Prior art date
Application number
AT0035494U
Other languages
German (de)
Other versions
AT84U3 (en
Original Assignee
Brunner Karl Heinz Brunner Kar
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brunner Karl Heinz Brunner Kar filed Critical Brunner Karl Heinz Brunner Kar
Priority to AT0035494U priority Critical patent/AT84U3/en
Publication of AT84U2 publication Critical patent/AT84U2/en
Publication of AT84U3 publication Critical patent/AT84U3/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  Der Erfindung liegt die Aufgabenstellung zugrunde, die Leitungszone beim Wiederverfüllen von   Künetten   für Rohrleitungen derart zu verfüllen, so dass eine optimale Einbettung derselben, gewährleistet ist. 



  Der Stand der Technik zu dieser Aufgabenstellung wird wie folgt in Fig. 1 dargestellt : Nach entsprechender Fertigstellung der   Künette,   wird auf die Sohle eine Sauberkeitsschicht   (1)     z.     B.   Brechsand 0/4 mm in einer Dicke von ca.   2, 0   cm, unverdichtet eingebracht. 



  Auf diese Sauberkeitsschicht wird die gegenständliche Rohrleitung (2) verlegt. Die Leitungzone (3) wird anschliessend mit Brechsand 0/4 verfüllt, eine maschinelle Verdichtung der Leitungszone wird nicht durchgeführt, um den vorhandenen Rohrstrang nicht zu beschädigen. 



  In die   VerfülIzone (4)   wird   gemäss   der einschlägigen Vorschriften,   Künettenverfüllmaterial0/32   bis   0/45   eingebracht und maschinell   verdichtet ; abschliessend   wird in die   Instandsetzungs-   zone (5) komgestuftes Gemisch   0/32-gemäss   einer oberen Tragschicht - eingebracht und ebenfalls maschinell verdichtet. 



  Der Nachteil der gegenwärtigen Methode der Verfüllung der Leitungszone, besteht in der Gefahr des Auftretens mangelhaft verfüllter Bereiche   (6).   Mit der vorliegenden Erfindung tritt diese Gegebenheit nicht auf, und eine optimale Einbettung des Rohrstranges in die Leitungszone ist gewährleistet. 



  Der erfindungsgemässe Vorgang des Verfüllen der Leitungszone besteht nun darin, dass ein mineralogisch optimiertes   Korngemisch - vorzugsweise   aus   Dolomit bzw. Kalkgestein - einen   entsprechenden Füllergehalt aufweist, und zus tzlich mit Wasser versetzt wird. 



  Dieses sogenannte fliessfähige Füllmaterial, ist nun in der Lage aufgrund seiner steuerbaren, rheologischen Eigenschaften, Rohrstränge satt zu umhüllen. Weiters besitzt dieser Werkstoff die Eigenschaft, beruhend auf den hydraulischen Vorgängen nach der Wasserzugabe, derart zu erhärten, sodass eine rasche Begehbarkeit gegeben ist. 



  Literatur : 111 Vorschriften der MA 28 der Stadt Wien   /2/ON   5016 Überprüfung von Erdarbeiten für Rohrleitungen (Verdichtungsgrad)



   <Desc / Clms Page number 1>
 



  The invention is based on the problem of filling the line zone when refilling cuvettes for pipelines in such a way that optimum embedding thereof is ensured.



  The state of the art for this task is shown as follows in Fig. 1: After appropriate completion of the bezel, a cleanliness layer (1) z. B. crushed sand 0/4 mm in a thickness of about 2, 0 cm, introduced uncompressed.



  The pipeline in question (2) is laid on this cleanliness layer. The pipe zone (3) is then filled with crushed sand 0/4, the pipe zone is not mechanically compacted in order not to damage the existing pipe string.



  In the filling zone (4), in accordance with the relevant regulations, filler material 0/32 to 0/45 is introduced and mechanically compressed; Finally, the 0/32 mixture graded according to an upper base layer is introduced into the repair zone (5) and is also compacted by machine.



  The disadvantage of the current method of backfilling the pipeline zone is the risk of poorly filled areas (6). This fact does not occur with the present invention, and optimal embedding of the pipe string in the line zone is ensured.



  The process of filling the line zone according to the invention now consists in that a mineralogically optimized grain mixture - preferably made of dolomite or limestone - has a corresponding filler content, and water is additionally added.



  Thanks to its controllable, rheological properties, this so-called flowable filling material is now able to fully wrap pipe strings. Furthermore, this material has the property of hardening based on the hydraulic processes after the addition of water, so that it can be walked on quickly.



  Literature: 111 regulations of MA 28 of the City of Vienna / 2 / ON 5016 Checking earthworks for pipes (degree of compaction)


    

Claims (2)

Anspruch 1. Fliessfähiges Füllmaterial für Künetten dadurch gekennzeichnet, dass die Fliessfähigkeit sowohl durch mineralogisch - petrographische Optimierung - als auch durch optimale Wasserzugabe erzielt wird, und ein sattes Verfüllen im Rohrstrang gewährleistet wird. Claim 1. Flowable filling material for cuvettes characterized in that the flowability is both by mineralogical - petrographic optimization - and by optimal Water addition is achieved, and a full filling in the pipe string is guaranteed. 2. Fliessfähiges Füllmaterial für Künetten dadurch gekennzeichnet, dass durch die erfindungsgemässe mineralogisch - petrographische Optimierung - vorzugsweise durch die Verwendung von Dolomit- und Kalkgestein - eine. Erh rtung des Füllmaterials durch hydraulische Effekte auftritt. EMI3.1 <tb> <tb> 2. Flowable filler material for cuvettes characterized in that one by the mineralogical - petrographic optimization according to the invention - preferably by the use of dolomite and limestone. Hardening of the filling material occurs due to hydraulic effects.  EMI3.1   <tb> <tb> Technische <SEP> Richtlinie <SEP> MB-Runettenfüllmateria <SEP> 0/4, <SEP> 0/8 <tb> Konsistenz <SEP> K <SEP> 4 <SEP> (weich) <tb> gem. <SEP> ON <SEP> B <SEP> 4200/10. <SEP> Teil <SEP> <tb> Erhöhung <SEP> bzw. <SEP> Änderung <SEP> Wasserzugabe <SEP> an <SEP> der <tb> der <SEP> Konsistenz <SEP> (zusätzliche <SEP> Baustelle <SEP> bis <SEP> untere <tb> Wasserzugabe) <SEP> Grenze <SEP> K <SEP> 5 <SEP> (fliessfähig) <SEP> möglich <SEP> <tb> Vermerke <SEP> am <SEP> Lieferschein <SEP> Durch <SEP> den <SEP> Lieferanten <SEP> wird <SEP> die <tb> zusätzliche <SEP> Wasserzugabe <SEP> am <tb> Lieferschein <SEP> vermerkt <tb> Sicherung <SEP> der <SEP> Rohre <SEP> bauseits <SEP> Gegen <SEP> seitliches <SEP> Verschieben <tb> und <SEP> Auftrieb <tb> Abtrockenzeit <SEP> bis <SEP> zur <tb> Weiterbefüllung <SEP> der <SEP> Kunette <tb> von <SEP> 1. <SEP> 00C <SEP> aufwärts <SEP> : Technical <SEP> guideline <SEP> MB runette filling material <SEP> 0/4, <SEP> 0/8 <tb> consistency <SEP> K <SEP> 4 <SEP> (soft) <tb> acc. <SEP> ON <SEP> B <SEP> 4200/10. <SEP> part <SEP> <tb> Increase <SEP> or <SEP> Change <SEP> Add water <SEP> to <SEP> <tb> of the <SEP> consistency <SEP> (additional <SEP> construction site <SEP> to <SEP> lower <tb> water addition) <SEP> limit <SEP> K <SEP> 5 <SEP> (flowable) <SEP> possible <SEP> <tb> Note <SEP> on the <SEP> delivery note <SEP> By <SEP> the <SEP> supplier <SEP> becomes <SEP> <tb> additional <SEP> water addition <SEP> on <tb> Delivery note <SEP> noted <tb> Securing <SEP> of <SEP> pipes <SEP> on site <SEP> against <SEP> laterally <SEP> <tb> and <SEP> buoyancy <tb> drying time <SEP> to <SEP> for <tb> Refill <SEP> of the <SEP> Kunette <tb> from <SEP> 1. <SEP> 00C <SEP> upwards <SEP>: <SEP> ca. <SEP> 24 <SEP> Std. <SEP> Konsistenz <SEP> K <SEP> 4 <tb> von <SEP> 1. <SEP> 00C <SEP> bis <SEP> unter <SEP> 0 C <SEP> : <SEP> ca.36 <SEP> Std. <SEP> Konsistenz <SEP> K <SEP> 4 <tb> Kann <SEP> die <SEP> Austrocknung <tb> ausnahmsweise <SEP> nicht <SEP> abgewartet <tb> werden, <SEP> (Schlechtwetter, <SEP> Regen, <tb> oder <SEP> dringende <SEP> Terminarbeiten) <tb> so <SEP> ist <SEP> die <SEP> Rohrzohne <SEP> wie <SEP> bisher <tb> mit <SEP> Brechsand <SEP> 0/4 <SEP> zu <SEP> verfüllen. <tb>  <SEP> approx. <SEP> 24 <SEP> hours <SEP> consistency <SEP> K <SEP> 4 <tb> from <SEP> 1. <SEP> 00C <SEP> to <SEP> under <SEP> 0 C <SEP>: <SEP> approx. 36 <SEP> hours <SEP> consistency <SEP> K < SEP> 4 <tb> Can <SEP> dry out the <SEP> <tb> exceptionally <SEP> not <SEP> waited become <tb>, <SEP> (bad weather, <SEP> rain, <tb> or <SEP> urgent <SEP> appointment work) <tb> so <SEP>, <SEP> is the <SEP> pipe string <SEP> like <SEP> so far Fill <tb> with <SEP> crushed sand <SEP> 0/4 <SEP> to <SEP>. <tb> Überdeckung <SEP> Rohroberkante <SEP> mind. <SEP> 10 <SEP> cm <tb> empfohlen <SEP> 15 <SEP> cm <tb> Abruf <SEP> der <SEP> Lieferungen <SEP> 36 <SEP> - <SEP> 48 <SEP> Std. <SEP> vor <SEP> Einbau <tb> Overlap <SEP> upper tube edge <SEP> at least <SEP> 10 <SEP> cm <tb> recommended <SEP> 15 <SEP> cm <tb> Call <SEP> of <SEP> deliveries <SEP> 36 <SEP> - <SEP> 48 <SEP> hours <SEP> before <SEP> installation <tb>
AT0035494U 1994-10-19 1994-10-19 MB COOLING FILLING MATERIAL 0/4, MADE FROM DOLOMMB KÜNETTEN FILLING MATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FILLING AND CALCULATING FILLER, FLOWING FILLER AT84U3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT0035494U AT84U3 (en) 1994-10-19 1994-10-19 MB COOLING FILLING MATERIAL 0/4, MADE FROM DOLOMMB KÜNETTEN FILLING MATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FILLING AND CALCULATING FILLER, FLOWING FILLER

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0035494U AT84U3 (en) 1994-10-19 1994-10-19 MB COOLING FILLING MATERIAL 0/4, MADE FROM DOLOMMB KÜNETTEN FILLING MATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FILLING AND CALCULATING FILLER, FLOWING FILLER

Publications (2)

Publication Number Publication Date
AT84U2 true AT84U2 (en) 1995-01-25
AT84U3 AT84U3 (en) 1995-03-27

Family

ID=3488397

Family Applications (1)

Application Number Title Priority Date Filing Date
AT0035494U AT84U3 (en) 1994-10-19 1994-10-19 MB COOLING FILLING MATERIAL 0/4, MADE FROM DOLOMMB KÜNETTEN FILLING MATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FILLING AND CALCULATING FILLER, FLOWING FILLER

Country Status (1)

Country Link
AT (1) AT84U3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT2255U1 (en) * 1998-02-17 1998-07-27 Brunner Karl Heinz MB-KÜNETTEN filling material 0/16, 0/32

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT2255U1 (en) * 1998-02-17 1998-07-27 Brunner Karl Heinz MB-KÜNETTEN filling material 0/16, 0/32

Also Published As

Publication number Publication date
AT84U3 (en) 1995-03-27

Similar Documents

Publication Publication Date Title
DE2704438C2 (en) Procedure for repairing drain pipes
DE102007031418B3 (en) Dry mortar for a pressing material for pressing intermediate spaces between geothermal probes and the ground comprises cement, quartz sand and a clay mineral mixture
AT84U2 (en) MB-KUENETTENFUELLMATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FOR KUENETTEN
EP1289905B1 (en) Cement-bound active substance
DE202017005709U1 (en) Cabel Canal
DE202005015134U1 (en) Hydraulically-transportable, self-leveling mine backfilling material, used for filling underground rock salt caverns, contains residue from (quasi)dry flue gas desulfurization of coal-fired power station plus binder, salt and mixing water
DE202022000393U1 (en) Carrier made of weathered stone powder and tension-resistant material
DE2322271A1 (en) PROCESS FOR MECHANICAL STRENGTHENING OF MOLDABLE AND / OR HARDENABLE MASSES
AT2255U1 (en) MB-KÜNETTEN filling material 0/16, 0/32
DE102004023482A1 (en) dry mix
AT127245B (en) Sealing material for socket pipes.
EP1010855A2 (en) Method for filling a shaft and the use of additives therefor
DE2163347C3 (en) Mixed building material for road construction and civil engineering from combustion residues from coal-fired power plants and conventional building materials
DE102008050175A1 (en) Producing a temporarily flowable fill material comprises mixing a combination of processed mineral material, bentonite and an accelerator in a concrete mixer truck together with water
DE2330770A1 (en) Fuel (oil) tanks - consist of a plastics-cement mixt.
DE2448795A1 (en) INSULATING AND EMBEDDING MATERIAL FOR PIPES AND COVERED DISTRICT HEATING PIPE
EP0380492A1 (en) Process for repairing structures, objects, in particular sewers and pipes of defective stability and watertightness, without dismantling
DE202021002494U1 (en) Carrier made of weathered stone powder and tension-resistant material
DE330116C (en) Process for the production of rub strips for reinforced concrete ships
AT313151B (en) Corrosion protection compound for steel reinforcement in autoclave concrete
DE4332644A1 (en) Waterproof building material and process for its production
AT113003B (en) Building board.
DE202016003369U1 (en) Support pad with activatable filling for buried pipelines
CH337044A (en) Method for the production of corrosion protection on metal elements, in particular pipes
DE9204857U1 (en) Floor covering

Legal Events

Date Code Title Description
MN9K Cancelled due to lapse of time