AT2255U1 - MB-KÜNETTEN filling material 0/16, 0/32 - Google Patents

MB-KÜNETTEN filling material 0/16, 0/32 Download PDF

Info

Publication number
AT2255U1
AT2255U1 AT0008898U AT8898U AT2255U1 AT 2255 U1 AT2255 U1 AT 2255U1 AT 0008898 U AT0008898 U AT 0008898U AT 8898 U AT8898 U AT 8898U AT 2255 U1 AT2255 U1 AT 2255U1
Authority
AT
Austria
Prior art keywords
sep
filling material
filling
künetten
pipe
Prior art date
Application number
AT0008898U
Other languages
German (de)
Original Assignee
Brunner Karl Heinz
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brunner Karl Heinz filed Critical Brunner Karl Heinz
Priority to AT0008898U priority Critical patent/AT2255U1/en
Publication of AT2255U1 publication Critical patent/AT2255U1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Fließfähiges Füllmaterial für Künetten, wobei die Fließfähigkeit sowohl durch mineralogisch-petrographische Optimierung als auch durch optimale Wasserzugabe erzielt wird, vorzugsweise durch die Verwendung von Dolomit- und Kalkgestein. Die Fließfähigkeit kann auch durch die entsprechende Wahl der Granulometrie zusätzlich optimiert werden.Flowable filling material for curettes, where the flowability is achieved both by mineralogical-petrographic optimization and by optimal water addition, preferably through the use of dolomite and limestone. The flowability can also be optimized by the appropriate choice of granulometry.

Description

       

   <Desc/Clms Page number 1> 
 



  Der vorliegenden Erfindung liegt die Aufgabenstellung zugrunde, Leitungsgräben (Künetten) unterschiedlicher Provenienz inkl. der darin befindlichen Einbauten derart zu verfüllen, sodass sowohl die Einbauten (wie Kabel, Rohrstränge) satt umhüllt sind als auch der gesamte hergestellte Hohlraum ebenfalls satt ausgefüllt wird. 



  Der Stand der Technik bespielsweise beim Einbetten einer Rohrleitung wird wie folgt in Fig. 



  1 dargestellt : Nach entsprechender Fertigstellung der Künette wird auf die Sohle eine Sauberkeitsschicht (1) z. B. Brechsand 0/4 mm in einer Dicke von ca. 2, 0 cm unverdichtet eingebracht. 



  Auf diese Sauberkeitsschicht wird die gegenständliche Rohrleitung (3) verlegt. Die Leitungszone   (;   wird anschliessend mit Brechsand 0/4   verfüllt ;   eine maschinelle Verdichtung der Leitungszone wird nicht durchgeführt, um den vorhandenen Rohrstrang nicht zu beschädigen. 



  In die   Verfüllzone   (4) wird gemäss der einschlägigen Vorschriften Künettenverfüllmaterial 0/32 bis 0/45 eingebracht und maschinell   verdichtet ; abschliessend   wird in die Instandsetzungszone (5) komgestuftes Gemisch   0/32 - gemäss   einer oberen Tragschicht eingebracht und ebenfalls maschinell verdichtet. 



  Der Nachteil der gegenwärtigen Methode zur Verfüllung der Leitungszone besteht in der Gefahr des Auftretens mangelhaft verfüllter Bereiche (6) bzw. des Entstehens von grösseren Hohlräumen nach Entfernung der Pölzung, die nachträglich nicht gefüllt bzw. verdichtet werden können. Mit der vorliegenden Erfindung tritt diese Gegebenheit nicht auf, und eine optimale Einbettung des Rohrstranges in die Leitungszone ist gewährleistet. 



  Der erfindungsgemässe Vorgang des Verfüllen von Leitungsgräben (Künetten) besteht nun dann, dass ein mineralogisch optimiertes   Komgemisch - vorzugsweise   aus Dolomit bzw. 



  Kalkgestein - einen entsprechenden Füllergehalt aufweist und   zusätzlich   mit Wasser versetzt wird. 



  Dieses sogenannte fliessfähige   Füllmaterial,   ist nun in der Lage, aufgrund seiner steuerbaren, rheologischen Eigenschaften (Konsistenz, Fliessstabilität) Leitungsgräben (Künetten) Inkl. aller entstandenen   Hohlräume   satt   auszufüllen   und die darin befindlichen Einbauten (wie Kabel, Rohrstränge) satt zu umhüllen. 



  Zusätzlich ist es aber nun möglich die in Fig. 1 beschriebenen Arbeitsvorgänge durch einen einzigen bzw. zweimaligen   Füllvorgang   zu bewerkstelligen ; für diese Vorgangsweise wird aber je nach Anwendungsfall das erfindungsgemässe Mischgut mit einem jeweils entsprechenden Grösstkom und einer optimierten   Fliessfähigkeit (d. s.   optimierte rheologische Eigenschaften) ausgestattet. 



  Somit weist das erfindungsgemässe Mischgut in der Regel ein Grösstkom von 4 bis ca. 32 mm auf und eine Konsistenz (Fliessfähigkeit) bestimmt mit dem Ausbreitmass a"nach (3) und (4) von a = 40 - ca. 50 cm (K4 - K5) auf. Der grösste Vorteil besteht darin, dass keine Irgendwie geartete mechanische Verdichtung erforderlich ist. Sämtliche   Hohlräume   werden ausgefüllt und als unmittelbare Folge davon wird eine hohe Tragfähigkeit der   verfüllten   Künette erzielt. Derartige hohe Tragwerte können durch   konventionelle Verfüllungen   und Verdichtungsmethoden nicht erzielt werden. 

 <Desc/Clms Page number 2> 

 



  Literatur 
 EMI2.1 
 für Rohrleitungen (Verdichtungsgrad) /3/ ON B 4200-10 Beton Herstellung, Verwendung und   Gütenachweis     /4/ON   B 3303 Betonprüfung 

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 
<tb> 
<tb> Technische <SEP> Richtlinie <SEP> MB-Künettenfüllmaterial
<tb> Konsistenz <SEP> K4-K5
<tb> gem. <SEP> ON <SEP> B <SEP> 4200 <SEP> - <SEP> 10 <SEP> 
<tb> Erhöhung <SEP> bzw.

   <SEP> Änderung <SEP> Wasserzugabe <SEP> an <SEP> der <SEP> Baustelle
<tb> der <SEP> Konsistenz <SEP> (zusätzliche <SEP> bis <SEP> K <SEP> 5 <SEP> (fliessfähig) <SEP> möglich
<tb> Wasserzugabe)
<tb> Vermerke <SEP> am <SEP> Lieferschein <SEP> Durch <SEP> den <SEP> Lieferanten <SEP> ist <SEP> die
<tb> zusätzliche <SEP> Wasserzugabe <SEP> am
<tb> Lieferschein <SEP> zu <SEP> vermerken
<tb> Sicherung <SEP> der <SEP> Rohre <SEP> und <SEP> Gegen <SEP> seitliches <SEP> Verschieben <SEP> und
<tb> Leitungen <SEP> bauseits <SEP> Auftrieb
<tb> Hydrauliches <SEP> Erhärten
<tb> bis <SEP> zur <SEP> Weiterbefüllung <SEP> der
<tb> Künette
<tb> von <SEP> 10 <SEP>  C <SEP> aufwärts <SEP> ca. <SEP> 24 <SEP> Std. <SEP> Konsistenz <SEP> K <SEP> 4
<tb> von <SEP> 10 <SEP>  C <SEP> bis <SEP> unter <SEP> 0 C <SEP> ca. <SEP> 36 <SEP> Std.

   <SEP> Konsistenz <SEP> K <SEP> 4
<tb> Kann <SEP> das <SEP> hydraulische <SEP> Erhärten
<tb> ausnahmsweise <SEP> nicht <SEP> abgewartet
<tb> werden <SEP> (Schlechtwetter, <SEP> Regen
<tb> oder <SEP> dringende <SEP> Terminarbeiten)
<tb> so <SEP> ist <SEP> die <SEP> Rohrzone <SEP> wie <SEP> bisher <SEP> mit
<tb> Brechsand <SEP> 0/4 <SEP> zu <SEP> verfüllen.
<tb> 



  Überdeckung <SEP> Rohroberkante <SEP> mind. <SEP> 10 <SEP> cm
<tb> empfohlen <SEP> 15 <SEP> cm
<tb> Abruf <SEP> der <SEP> Lieferung <SEP> 36 <SEP> -48 <SEP> Std. <SEP> vor <SEP> Einbau
<tb> 




   <Desc / Clms Page number 1>
 



  The present invention is based on the task of filling pipe trenches (cunettes) of different provenance, including the internals therein, in such a way that both the internals (such as cables, tubing strings) are fully covered and the entire hollow space is also filled in full.



  The prior art, for example when embedding a pipeline, is shown in Fig.



  1 shown: After appropriate completion of the bezel, a cleanliness layer (1) z. B. crushed sand 0/4 mm introduced in a thickness of about 2.0 cm undensified.



  The pipeline in question (3) is laid on this cleanliness layer. The pipe zone (; is then filled with crushed sand 0/4; the pipe zone is not mechanically compacted in order not to damage the existing pipe string.



  In accordance with the relevant regulations, filler material 0/32 to 0/45 is introduced into the filling zone (4) and compressed by machine; Finally, 0/32 - stepped mixture 0/32 is introduced into the repair zone (5) according to an upper base layer and is also compacted by machine.



  The disadvantage of the current method of backfilling the line zone is the risk of poorly filled areas (6) or the formation of larger cavities after removal of the bulge, which cannot subsequently be filled or compacted. This fact does not occur with the present invention, and optimal embedding of the pipe string in the line zone is ensured.



  The process according to the invention of backfilling pipe trenches (cunettes) now consists of a mineralogically optimized grain mixture - preferably of dolomite or



  Lime rock - has a suitable filler content and water is also added.



  This so-called flowable filling material is now able, due to its controllable, rheological properties (consistency, flow stability), pipe trenches (culettes) incl. Fill in all voids and fill in the internals (such as cables, pipe strings).



  In addition, however, it is now possible to carry out the work processes described in FIG. 1 by a single or double filling process; for this procedure, however, depending on the application, the mixture according to the invention is equipped with an appropriate size and an optimized flowability (i.e. optimized rheological properties).



  Thus, the mixture according to the invention generally has a maximum size of 4 to approx. 32 mm and a consistency (flowability) determined with the slump a "according to (3) and (4) of a = 40 - approx. 50 cm (K4 - The greatest advantage is that no mechanical compression of any kind is required. All cavities are filled in and, as a direct result, the capacity of the filled ring is achieved. Such high capacities cannot be achieved by conventional filling and compression methods.

 <Desc / Clms Page number 2>

 



  literature
 EMI2.1
 for pipes (degree of compaction) / 3 / ON B 4200-10 concrete production, use and quality certificate / 4 / ON B 3303 concrete test

 <Desc / Clms Page number 3>

 
 EMI3.1
 
<tb>
<tb> Technical <SEP> guideline <SEP> MB cigarette filler material
<tb> consistency <SEP> K4-K5
<tb> acc. <SEP> ON <SEP> B <SEP> 4200 <SEP> - <SEP> 10 <SEP>
<tb> increase <SEP> or

   <SEP> Change <SEP> water addition <SEP> to <SEP> at the <SEP> construction site
<tb> of <SEP> consistency <SEP> (additional <SEP> to <SEP> K <SEP> 5 <SEP> (flowable) <SEP> possible
<tb> water addition)
<tb> Note <SEP> on the <SEP> delivery note <SEP> By <SEP> the <SEP> supplier <SEP> is <SEP>
<tb> additional <SEP> water addition <SEP> on
Note <tb> delivery note <SEP> to <SEP>
<tb> Securing <SEP> of the <SEP> pipes <SEP> and <SEP> against <SEP> laterally <SEP> moving <SEP> and
<tb> Lines <SEP> on site <SEP> buoyancy
<tb> Hydraulic <SEP> hardening
<tb> to <SEP> for <SEP> further filling <SEP> the
<tb> kink
<tb> from <SEP> 10 <SEP> C <SEP> upwards <SEP> approx. <SEP> 24 <SEP> hours <SEP> consistency <SEP> K <SEP> 4
<tb> from <SEP> 10 <SEP> C <SEP> to <SEP> under <SEP> 0 C <SEP> approx. <SEP> 36 <SEP> hours

   <SEP> consistency <SEP> K <SEP> 4
<tb> Can <SEP> harden <SEP> hydraulic <SEP>
<tb> exceptionally <SEP> not <SEP> waited
<tb> become <SEP> (bad weather, <SEP> rain
<tb> or <SEP> urgent <SEP> appointment work)
<tb> so <SEP> <SEP> is the <SEP> pipe zone <SEP> like <SEP> so far <SEP> with
Fill <tb> crushed sand <SEP> 0/4 <SEP> to <SEP>.
<tb>



  Overlap <SEP> upper tube edge <SEP> at least <SEP> 10 <SEP> cm
<tb> recommended <SEP> 15 <SEP> cm
<tb> Call <SEP> of <SEP> delivery <SEP> 36 <SEP> -48 <SEP> hours <SEP> before <SEP> installation
<tb>



    

Claims (2)

EMI4.1 FhessfÅahlges Füllmaterialals auch durch optimale Wasserzugabe erzielt wird, und ein sattes Verfüllen der Künette inkl. aller Einbauten gewährleistet wird.  EMI4.1   FhessfÅahlges filling material is also achieved by optimal water addition, and a full filling of the All inclusions are guaranteed. 2. Fliessfähiges Füllmaterial für Künetten (Leitungsgräben), dadurch gekennzeichnet, dass durch die erfindungsgemässe mineralogisch - petrographische Optimierung - vorzugsweise durch die Verwendung von Dolomit- und Kalkgestein - eine Erhärtung des Füllmaterials durch hydraulische Effekte auftritt. EMI4.2 2. Flowable filler material for cunettes (pipe trenches), characterized in that hardening of the filler material by hydraulic effects occurs due to the mineralogical - petrographic optimization according to the invention - preferably through the use of dolomite and limestone.  EMI4.2
AT0008898U 1998-02-17 1998-02-17 MB-KÜNETTEN filling material 0/16, 0/32 AT2255U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT0008898U AT2255U1 (en) 1998-02-17 1998-02-17 MB-KÜNETTEN filling material 0/16, 0/32

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0008898U AT2255U1 (en) 1998-02-17 1998-02-17 MB-KÜNETTEN filling material 0/16, 0/32

Publications (1)

Publication Number Publication Date
AT2255U1 true AT2255U1 (en) 1998-07-27

Family

ID=3481202

Family Applications (1)

Application Number Title Priority Date Filing Date
AT0008898U AT2255U1 (en) 1998-02-17 1998-02-17 MB-KÜNETTEN filling material 0/16, 0/32

Country Status (1)

Country Link
AT (1) AT2255U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT521538A1 (en) * 2018-07-25 2020-02-15 Rohrdorfer Transp Gmbh Künetten filling material and process for its reprocessing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3345553A1 (en) * 1983-12-16 1985-07-04 Steag-Entsorgungs-GmbH, 4220 Dinslaken Flowable infilling mass for infilling trenches and other working areas where lines have been laid
DE3413602C2 (en) * 1984-04-11 1986-04-24 Bergwerksverband Gmbh, 4300 Essen Method for relocating the cavities of a fracture field
US5294255A (en) * 1992-09-23 1994-03-15 Specrete-Ip Incorporated Pumpable backfill grout
AT84U2 (en) * 1994-10-19 1995-01-25 Brunner Karl Heinz Brunner Kar MB-KUENETTENFUELLMATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FOR KUENETTEN

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3345553A1 (en) * 1983-12-16 1985-07-04 Steag-Entsorgungs-GmbH, 4220 Dinslaken Flowable infilling mass for infilling trenches and other working areas where lines have been laid
DE3413602C2 (en) * 1984-04-11 1986-04-24 Bergwerksverband Gmbh, 4300 Essen Method for relocating the cavities of a fracture field
US5294255A (en) * 1992-09-23 1994-03-15 Specrete-Ip Incorporated Pumpable backfill grout
AT84U2 (en) * 1994-10-19 1995-01-25 Brunner Karl Heinz Brunner Kar MB-KUENETTENFUELLMATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FOR KUENETTEN

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT521538A1 (en) * 2018-07-25 2020-02-15 Rohrdorfer Transp Gmbh Künetten filling material and process for its reprocessing
AT521538B1 (en) * 2018-07-25 2020-04-15 Rohrdorfer Transp Gmbh Künetten filling material and process for its reprocessing

Similar Documents

Publication Publication Date Title
US4050261A (en) Method of backfilling
KR101115950B1 (en) Controlled low strength materials compound and its manufacturing method
DE102007031418B3 (en) Dry mortar for a pressing material for pressing intermediate spaces between geothermal probes and the ground comprises cement, quartz sand and a clay mineral mixture
DE3215777A1 (en) Fluid cement mortar
WO2005108325A1 (en) Dry mixture
AT2255U1 (en) MB-KÜNETTEN filling material 0/16, 0/32
DE19717763C1 (en) Filler production from crushed recycled building material
DE10332249B4 (en) Process for the preparation of Bodenverfüllmassen, produced by the process Bodenverfüllmasse and their use
DE2658128C3 (en) Flowable concrete mix
DE102011002115B4 (en) Screed composition and method of making a screed composition
AT84U2 (en) MB-KUENETTENFUELLMATERIAL 0/4, MADE FROM DOLOMITE AND LIMESTONE, FLOWABLE FILLING MATERIAL FOR KUENETTEN
DE10213396B4 (en) Mortar and method for the compaction-free filling of trenches, channels and cavities in earthworks, road construction and foundation engineering
CN111704402A (en) Application method of concrete for road
DE2163347C3 (en) Mixed building material for road construction and civil engineering from combustion residues from coal-fired power plants and conventional building materials
DE102008050175A1 (en) Producing a temporarily flowable fill material comprises mixing a combination of processed mineral material, bentonite and an accelerator in a concrete mixer truck together with water
KR102349609B1 (en) Admixture Composition for Self-Healing Concrete, Manufacturing Method thereof, and Self-Healing Concrete Composition having such Admixture Composition
AT358997B (en) METHOD FOR PRODUCING A SLOT WALL
DE2242545C3 (en) Process for casting post-tensioned tendons in prestressed concrete or other prestressed materials
DE2501312A1 (en) High strength, frost resistant bottoming and ballast - obtd. by granulating waste ash and mixing with binders
AT409008B (en) Mineral debris heap, method of producing it, drainage filling material, and drainage fillings
DE19858133A1 (en) Shaft backfill process and use of aggregates therefor
DE685836C (en) Process for sealing permeable or loose soil layers, earthy and stony masses, masonry and the like. like
AT352604B (en) METHOD OF MANUFACTURING LIGHTWEIGHT CONCRETE
AT521538B1 (en) Künetten filling material and process for its reprocessing
DE102022207088A1 (en) Process for producing a temporarily flowable backfill building material, especially for installation in excavations

Legal Events

Date Code Title Description
MM9K Lapse due to non-payment of renewal fee