AT505264A1 - CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ - Google Patents

CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ Download PDF

Info

Publication number
AT505264A1
AT505264A1 AT13552007A AT13552007A AT505264A1 AT 505264 A1 AT505264 A1 AT 505264A1 AT 13552007 A AT13552007 A AT 13552007A AT 13552007 A AT13552007 A AT 13552007A AT 505264 A1 AT505264 A1 AT 505264A1
Authority
AT
Austria
Prior art keywords
tiles
hsz
bsz
wooden
concrete
Prior art date
Application number
AT13552007A
Other languages
German (de)
Inventor
Herbert Ralf Zamecnik
Original Assignee
Herbert Ralf Zamecnik
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Herbert Ralf Zamecnik filed Critical Herbert Ralf Zamecnik
Priority to AT13552007A priority Critical patent/AT505264A1/en
Publication of AT505264A1 publication Critical patent/AT505264A1/en
Priority to ATGM8073/2012U priority patent/AT13223U1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/40Building elements of block or other shape for the construction of parts of buildings built-up from parts of different materials, e.g. composed of layers of different materials or stones with filling material or with insulating inserts
    • E04C1/41Building elements of block or other shape for the construction of parts of buildings built-up from parts of different materials, e.g. composed of layers of different materials or stones with filling material or with insulating inserts composed of insulating material and load-bearing concrete, stone or stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0204Non-undercut connections, e.g. tongue and groove connections
    • E04B2002/0215Non-undercut connections, e.g. tongue and groove connections with separate protrusions
    • E04B2002/0217Non-undercut connections, e.g. tongue and groove connections with separate protrusions of prismatic shape

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Finishing Walls (AREA)
  • Building Environments (AREA)

Description

• · · · ···· · ··· • · · ··· · · ··· · · • · · ··· ·······································································

KURZBESCHREIBUNG DES BETONSTECKZIEGELS (BSZ) UND DES HOLZSTECKZIEGELS (HSZ) durch den AnmelderBRIEF DESCRIPTION OF THE CONCRETE TILE (BSZ) AND WOODEN TILE (HSZ) by the applicant

Herbert Ralf Zamecnik, Pritschitz 9, 9210 Pörtschach/Ws. ,Was bedeuten dem Häuselbauer die Worte "ZEIT IST GELD"? ZEIT= Brauche ich für den Bau meines Eigenheimesilänger, so ist das Automatisch mit mehr Kosten (Geld) verbunden, weil eventuell noch z.B. für eine Wohnung Miete bezahlt werden muß und je länger am Hausbau gearbeitet wird, umso mehr kosten entstehen z.B. durch Bezahlung an den Baumeister oder den Helfern. GELD= In den meisten Fällen wenig vorhanden. Darum wieder Punkt 1 "ZEIT"Herbert Ralf Zamecnik, Pritschitz 9, 9210 Pörtschach / Ws. , What do the housebuilder mean by the words "TIME IS MONEY"? TIME = If I need to build a house for my own, this is automatically associated with more money, because it may still have something to do with it. for an apartment rent has to be paid and the longer one works on the house, the more cost arises e.g. by payment to the builder or the helpers. MONEY = Low in most cases. So again point 1 " TIME "

Beim herkömmlichen aufstellen des Hauses entstehen auch große Kosten durch das Ausgiesen der Mauersteine mit Beton oder das Mauern mit Mörtel.In the conventional setting up of the house, large costs are incurred by lining the bricks with concrete or mortar walls.

Wenn das Haus einmal steht, kommen sehr hohe Kosten durch die anstehende Wärmeisolierung zustande.Once the house is up, very high costs are incurred by the upcoming heat insulation.

Der Erfindung liegt daher die Aufgabe zugrunde,eine Maßnahme zur Selbsthilfe der eventuell explodierenden Kosten zu schaffen.The invention is therefore an object of the invention to provide a measure for self-help of possibly exploding costs.

Diese Aufgabe wird gemäß der Erfindung durch das zusammen= stecken des BSZ oder HSZ (KEIN Mauern,Mörteln, Betonieren oder Isolieren usw.)gelöst!This object is achieved according to the invention by the zusammen = stuck the BSZ or HSZ (NO walls, mortars, concreting or insulating, etc.)!

Durch die Erfindung dervler, 2er und 3er BSZ oder HSZ kann man Häuser aufstellen ohne mauern zu müssen.Through the invention of dervler, 2er and 3er BSZ or HSZ you can set up houses without having to fortify walls.

Bei der Erfindung des HSZ sogar ohne verputzen zu müssen. Zwischenwände werden in die Außenwände miteinbezogen.In the invention of the HSZ even without plastering. Partition walls are involved in the exterior walls.

Weitere Details entnehmen Sie bitte beigefügten Zeichnungen.Further details can be found in the attached drawings.

Claims (2)

• · · • · · • · · ·· · • ··· · · • · · · • ··· PATENTANSPRÜCHE , 1. 1er, 2er, 3er Betonsteckziegel lt. Zeichnungen mit in den Betonsteckziegel integrierter Wärme- und Schallisolierung.PATENT REQUIREMENTS, 1. 1, 2, 3 concrete blocks as per drawings with heat and sound insulation integrated in the concrete plug-in tile. 2. 1er, 2er,3er Holzsteckziegel lt. Zeichnungen mit in den Holzsteckziegel integrierter Wärme- und Schallisolierung2. 1, 2, 3 wooden planks as per drawings with integrated in the wooden tile heat and sound insulation
AT13552007A 2007-08-30 2007-08-30 CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ AT505264A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
AT13552007A AT505264A1 (en) 2007-08-30 2007-08-30 CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ
ATGM8073/2012U AT13223U1 (en) 2007-08-30 2011-09-20 Shielding apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT13552007A AT505264A1 (en) 2007-08-30 2007-08-30 CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ

Publications (1)

Publication Number Publication Date
AT505264A1 true AT505264A1 (en) 2008-12-15

Family

ID=40104755

Family Applications (2)

Application Number Title Priority Date Filing Date
AT13552007A AT505264A1 (en) 2007-08-30 2007-08-30 CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ
ATGM8073/2012U AT13223U1 (en) 2007-08-30 2011-09-20 Shielding apparatus

Family Applications After (1)

Application Number Title Priority Date Filing Date
ATGM8073/2012U AT13223U1 (en) 2007-08-30 2011-09-20 Shielding apparatus

Country Status (1)

Country Link
AT (2) AT505264A1 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4213987C2 (en) * 1992-04-29 2002-06-27 Herrenknecht Gmbh Conveying device for a shield tunneling machine for drilling tunnel sections
JP2742763B2 (en) * 1994-08-31 1998-04-22 株式会社福田組 Pipe member laying method

Also Published As

Publication number Publication date
AT13223U1 (en) 2013-08-15

Similar Documents

Publication Publication Date Title
WO2008012392A3 (en) Expanded polystyrene block with reinforcing anchors for construction enclosures
AU2015100669A4 (en) Hollow Wall
WO2006086626A3 (en) Masonry block wall system
JP2007132131A (en) Reinforcing structure and reinforcing method for concrete building
AT505264A1 (en) CONCRETE TILES = BSZ OR ALSO WOODEN TILES = HSZ
AT500456B1 (en) ANCHOR SYSTEM OF CONCRETE WALL FORMWORK
WO2007142974A3 (en) Exterior wall construction
WO2018143792A1 (en) Formwork structure for wall
RU2387763C1 (en) Method for erection of monolithic walls of residential buildings, housings and structures in combined curb
WO2016085324A1 (en) Light weight wall structure
WO2007118916B1 (en) Device for partitioning and closures of vertical type
BR102018003399B1 (en) prefabricated brick building and assembly process of this building
CN106193579A (en) Building template assembly
UA92378C2 (en) System for construction of half-assembled building
RU2644790C1 (en) Porcelain panel
KR200426159Y1 (en) a pipe connecting apparatus for slab
RU143759U1 (en) FENCING WALL DESIGN
RU164519U1 (en) FENCING WALL DESIGN
AU2009101085A4 (en) Concreteblockties
WO2015128786A1 (en) A cast structural element
US20040234693A1 (en) Procedure for screeding concrete walls using two thin walled 3/4 inch conduit linarly placed three feet from the floor and ceiling as screed guide after shotcrete concrete emplacement
RU140325U1 (en) WALL FRAME (OPTIONS)
HUP0104879A2 (en) Space-unit with removable shutter
WO2023223306A1 (en) External walls and methods of constructing and cladding same
Hoffmeyer et al. Housing and construction types country by country-Denmark

Legal Events

Date Code Title Description
REJ Rejection

Effective date: 20160515