Prior art keywords
bricks
brick
building
row
hole
Prior art date
Application number
BR102018003399-9A
Other languages
Portuguese (pt)
Other versions
BR102018003399A2 (en
Inventor
Fernandes Dos Reis Celmo
Schuetz Jardim Marcelo
Original Assignee
Fernandes Dos Reis Celmo
Schuetz Jardim Marcelo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fernandes Dos Reis Celmo, Schuetz Jardim Marcelo filed Critical Fernandes Dos Reis Celmo
Priority to BR102018003399-9A priority Critical patent/BR102018003399B1/en
Publication of BR102018003399A2 publication Critical patent/BR102018003399A2/en
Priority to PCT/BR2019/050048 priority patent/WO2019161468A1/en
Publication of BR102018003399B1 publication Critical patent/BR102018003399B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • E04B2/44Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/14Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
    • E04B2/16Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position
    • E04B2/18Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position by interlocking of projections or inserts with indentations, e.g. of tongues, grooves, dovetails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/14Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
    • E04B2/16Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position
    • E04B2/20Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position by filling material with or without reinforcements in small channels in, or in grooves between, the elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • E04B2/52Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities the walls being characterised by fillings in some of the cavities forming load-bearing pillars or beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0204Non-undercut connections, e.g. tongue and groove connections
    • E04B2002/021Non-undercut connections, e.g. tongue and groove connections of triangular shape
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0204Non-undercut connections, e.g. tongue and groove connections
    • E04B2002/0215Non-undercut connections, e.g. tongue and groove connections with separate protrusions
    • E04B2002/0219Non-undercut connections, e.g. tongue and groove connections with separate protrusions of pyramidal shape
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0243Separate connectors or inserts, e.g. pegs, pins or keys
    • E04B2002/0245Pegs or pins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0243Separate connectors or inserts, e.g. pegs, pins or keys
    • E04B2002/0254Tie rods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

edificação com tijolos pré-fabricados e processo de montagem dessa edificação. a presente invenção refere-se a uma edificação (1) com tijolos pré-fabricados e ao processo de montagem da mesma, a edificação (1) compreendendo uma laje de fundação (2), hastes constituídas por parafusos bipartidos (7) conectados um ao outro por meio de porcas (8), a extremidade inferior de cada haste sendo fixada à laje de fundação (2), paredes verticais (3) fixadas à laje de fundação (2) por meio dos parafusos bipartidos (7), as paredes (3) compreendendo tijolos pré-fabricados (9) que compreendem um orifício principal central (10), um orifício secundário direito (11), um orifício secundário esquerdo (12), uma reentrância lateral esquerda (13) e uma reentrância lateral direita (14), um rebaixamento da superfície superior (15) e um rebaixamento da superfície inferior, sendo que o orifício principal central (10) e os orifícios secundários (11, 12) desembocam nos rebaixamentos (15) da superfície superior e da superfície inferior, essas paredes (3) compreendendo chaminés verticais (17) formadas pelo alinhamento dos orifícios principais (10) com as regiões de encontro das reentrâncias dos tijolos (13, 14) de fiadas adjacentes, e passagens senoidais (18) formadas pela comunicação entre os rebaixamentos (15) dos tijolos lateralmente adjacentes, sendo que as passagens senoidais (18) se comunicam com as chaminés (17) no interior das paredes.prefabricated brick building and assembly process of this building. The present invention relates to a building (1) with prefabricated bricks and the process of assembling it, building (1) comprising a foundation slab (2), rods consisting of split screws (7) connected to one another. another by means of nuts (8), the lower end of each rod being fixed to the foundation slab (2), vertical walls (3) fixed to the foundation slab (2) by means of the split bolts (7), the walls ( 3) comprising prefabricated bricks (9) comprising a central main hole (10), a right secondary hole (11), a left secondary hole (12), a left side recess (13) and a right side recess (14 ), a lowering of the upper surface (15) and a lowering of the lower surface, with the central main hole (10) and the secondary holes (11, 12) leading into the lower surface (15) of the upper surface and the lower surface. walls (3) compreen giving vertical chimneys (17) formed by aligning the main holes (10) with the adjacent recesses of the adjacent row (13, 14) and sine passages (18) formed by the communication between the recesses (15) of the bricks laterally adjacent, with the sinusoidal passages (18) communicating with the chimneys (17) within the walls.

Description

Relatório Descritivo da Patente de Invenção para EDIFICAÇÃO COM TIJOLOS PRÉ-FABRICADOS E PROCESSO DE MONTAGEM DESSA EDIFICAÇÃO.Description of the Invention Patent for BUILDING WITH PREFABRICATED BRICKS AND ASSEMBLY PROCESS FOR THIS BUILDING.

[001] A presente invenção refere-se a uma edificação construída com tijolos pré-fabricados e um processo de montagem da referida edificação com os referidos tijolos pré-fabricados.[001] The present invention relates to a building constructed with prefabricated bricks and a process for assembling said building with said prefabricated bricks.

DESCRIÇÃO DO ESTADO DA TÉCNICA [002] Diversas formas de construção de edificações são conhecidas do estado da técnica, como, por exemplo, edificações de madeira, concreto armado, aço, tijolos etc. Os tijolos são blocos amplamente utilizados na construção civil e fabricados geralmente em forma de um prisma retangular. Seu posicionamento sequencial em conjunto com argamassas permite a construção de diversos tipos de alvenarias utilizadas na construção de edificações.DESCRIPTION OF THE STATE OF THE TECHNIQUE [002] Various forms of building construction are known from the state of the art, such as, for example, buildings made of wood, reinforced concrete, steel, bricks, etc. Bricks are blocks widely used in civil construction and generally manufactured in the form of a rectangular prism. Its sequential placement in conjunction with mortars allows the construction of several types of masonry used in the construction of buildings.

[003] Com a evolução dos métodos de construção civil, foram desenvolvidos métodos de construção de edificações com tijolos que dispensam o uso de argamassas. Esses tijolos geralmente apresentam métodos de se encaixarem uns aos outros para promover a construção de paredes de maneira prática e rápida.[003] With the evolution of civil construction methods, methods of building buildings with bricks have been developed that do not require the use of mortar. These bricks often have methods of fitting together to promote the construction of walls in a practical and quick way.

[004] Um exemplo de tijolo para construção de edificações que utiliza diferentes meios de encaixe para fixação de um tijolo no outro e que dispensa o uso de argamassas é descrito no documento PI0621718-4. O tijolo descrito em tal documento é um bloco retangular com protuberâncias horizontais e verticais, além de cavidades que permitem encaixes horizontais e verticais com os tijolos adjacentes da parede. O encaixe dos tijolos forma um orifício vertical contínuo onde é instalada uma haste que atravessa toda a altura da parede.[004] An example of a brick for construction of buildings that uses different means of attachment for fixing one brick on the other and that does not require the use of mortars is described in document PI0621718-4. The brick described in this document is a rectangular block with horizontal and vertical protuberances, as well as cavities that allow horizontal and vertical insertions with the adjacent bricks on the wall. The fitting of the bricks forms a continuous vertical hole where a rod is installed that crosses the entire height of the wall.

[005] O documento GB 2394730 B também apresenta edificações com paredes constituídas por tijolos paralelepipedais, em que os tijolos são fixados por hastes que atravessam orifícios presentes nos[005] The document GB 2394730 B also presents buildings with walls made of parallelepiped bricks, in which the bricks are fixed by rods that pass through holes present in the

Petição 870180014088, de 21/02/2018, pág. 6/45Petition 870180014088, of 02/21/2018, p. 6/45

2/20 tijolos. Os orifícios não utilizados para fixação das hastes permitem a passagem de fiação e tubulação na vertical através das paredes. Esse método de montagem dispensa a utilização de argamassas e facilita a construção da edificação.2/20 bricks. The unused holes for fixing the rods allow the passage of wiring and piping vertically through the walls. This assembly method eliminates the use of mortar and facilitates the construction of the building.

[006] No entanto, os tijolos pré-fabricados, como os descritos no estado da técnica, geralmente apresentam superfícies com imperfeições, o que resulta em paredes com alinhamento defeituoso, tendo em vista que são encaixados e aparafusados. Isso dificulta o processo de construção da edificação, exigindo a presença de mão-de-obra qualificada e equipamentos ou métodos de alinhamento para construção das paredes.[006] However, prefabricated bricks, such as those described in the state of the art, generally have imperfect surfaces, which results in faulty alignment walls, since they are fitted and screwed. This complicates the building construction process, requiring the presence of qualified labor and equipment or alignment methods for building the walls.

[007] Além disso, as edificações constituídas por tijolos cerâmicos geralmente necessitam de placas de gesso para aumentar a eficiência do isolamento térmico de sua área interna, principalmente quando localizadas em regiões muito quentes. Como consequência, há um aumento dos custos de construção com material e mão-de-obra especializada, além da geração de resíduos e necessidade de eventual manutenção.[007] In addition, buildings made of ceramic bricks generally require plasterboard to increase the efficiency of the thermal insulation of their internal area, especially when located in very hot regions. As a consequence, there is an increase in construction costs with material and specialized labor, in addition to the generation of waste and the need for eventual maintenance.

OBJETIVOS DA INVENÇÃO [008] Um objetivo da edificação com tijolos pré-fabricados da presente invenção é possibilitar um isolamento térmico mais eficaz do que o descrito no estado da técnica.OBJECTIVES OF THE INVENTION [008] An objective of the building with prefabricated bricks of the present invention is to enable thermal insulation more effective than that described in the state of the art.

[009] Outro objetivo da edificação da presente invenção é disponibilizar paredes com passagens para fiação e tubulação tanto na vertical quanto na horizontal.[009] Another objective of the building of the present invention is to provide walls with passages for wiring and piping both vertically and horizontally.

[0010] Um objetivo do processo de montagem da edificação construída com tijolos pré-fabricados da presente invenção é possibilitar uma montagem mais rápida do que a montagem de edificações do estado da técnica.[0010] An objective of the assembly process of the building constructed with prefabricated bricks of the present invention is to enable a faster assembly than the assembly of state-of-the-art buildings.

[0011] Outro objetivo do processo de montagem da presente in[0011] Another objective of the process of assembling this in

Petição 870180014088, de 21/02/2018, pág. 7/45Petition 870180014088, of 02/21/2018, p. 7/45

3/20 venção é possibilitar a montagem de uma edificação sem a necessidade de contratação de mão-de-obra especializada.3/20 vention is to make it possible to assemble a building without the need to hire specialized labor.

[0012] Outro objetivo do processo de montagem da presente invenção é proporcionar um processo de montagem de edificação sem geração de resíduos, garantindo uma obra limpa ao não utilizar argamassa na ligação entre os blocos.[0012] Another objective of the assembly process of the present invention is to provide a building assembly process without generating waste, ensuring a clean work by not using mortar in the connection between the blocks.

[0013] Outro objetivo do processo de montagem da presente invenção é proporcionar um processo de montagem de edificação sem geração de ruídos.[0013] Another objective of the assembly process of the present invention is to provide a building assembly process without generating noise.

BREVE DESCRIÇÃO DA INVENÇÃO [0014] A edificação com tijolos pré-fabricados da presente invenção compreende uma laje de fundação com superfície superior horizontal compreendendo meios para recepção de parafusos bipartidos; uma pluralidade de hastes, sendo que cada haste é constituída por uma série de parafusos bipartidos conectados um ao outro por meio de porcas, e a extremidade inferior de cada haste é fixada aos meios de recepção de parafusos bipartidos na laje de fundação; paredes verticais fixadas acima da laje de fundação por meio de parafusos, as paredes verticais compreendendo tijolos pré-fabricados paralelepipedais padrão que compreendem um orifício principal central, um orifício secundário direito, um orifício secundário esquerdo, uma reentrância lateral esquerda e uma reentrância lateral direita, um rebaixamento da superfície superior e um rebaixamento da superfície inferior, sendo que o orifício principal central e os orifícios secundários desembocam nos rebaixamentos da superfície superior e da superfície inferior.BRIEF DESCRIPTION OF THE INVENTION [0014] The building with prefabricated bricks of the present invention comprises a foundation slab with a horizontal upper surface comprising means for receiving split screws; a plurality of rods, each rod being constituted by a series of split bolts connected to each other by means of nuts, and the lower end of each rod is fixed to the receiving means of split bolts on the foundation slab; vertical walls fixed above the foundation slab by means of screws, the vertical walls comprising standard prefabricated parallelepiped bricks comprising a central main hole, a right secondary hole, a left secondary hole, a left lateral recess and a right lateral recess, a lowering of the upper surface and a lowering of the lower surface, the central main hole and the secondary holes leading to the lowering of the upper surface and the lower surface.

[0015] A edificação compreende ainda uma cinta de coroamento fixada na superfície superior das paredes, a cinta de coroamento compreendendo orifícios posicionados concentricamente com as chaminés dessas paredes; e um telhado pré-fabricado posicionado na superfície superior da cinta de coroamento.[0015] The building also comprises a crowning brace fixed to the upper surface of the walls, the crowning brace comprising holes positioned concentrically with the chimneys of those walls; and a prefabricated roof positioned on the top surface of the crown strap.

Petição 870180014088, de 21/02/2018, pág. 8/45Petition 870180014088, of 02/21/2018, p. 8/45

4/20 [0016] Na edificação da presente invenção, os tijolos sendo dispostos em fiadas, nas quais: o orifício secundário direito de um tijolo é posicionado concentricamente com o orifício secundário esquerdo de outro tijolo da fiada adjacente, o orifício principal de cada tijolo é posicionado concentricamente com a união das reentrâncias laterais de dois tijolos vizinhos da fiada adjacente, formando chaminés, uma região oca formada no rebaixamento da superfície superior de um tijolo está em comunicação com uma região oca formada no rebaixamento da superfície inferior de outro tijolo da fiada adjacente, a comunicação de uma pluralidade de regiões ocas dos rebaixamentos dos tijolos formam uma passagem senoidal no interior das paredes; sendo que os tijolos são unidos verticalmente pelos referidos parafusos bipartidos e porcas que constituem as hastes, as quais atravessam verticalmente cada parede através dos orifícios secundários alinhados das fiadas de tijolos.4/20 [0016] In the construction of the present invention, the bricks being arranged in rows, in which: the right secondary hole of a brick is positioned concentrically with the left secondary hole of another brick of the adjacent row, the main hole of each brick it is positioned concentrically with the union of the side recesses of two neighboring bricks of the adjacent row, forming chimneys, a hollow region formed in the lowering of the upper surface of a brick is in communication with a hollow region formed in the lowering of the lower surface of another brick in the row adjacent, the communication of a plurality of hollow regions of the lowering of the bricks form a sinusoidal passage within the walls; the bricks being joined vertically by the said split bolts and nuts that make up the rods, which vertically cross each wall through the aligned secondary holes of the rows of bricks.

[0017] A parede da edificação da presente invenção compreende ainda tijolos do tipo canto, em que cada tijolo do tipo canto compreende um orifício principal central, um orifício secundário direito, um orifício secundário esquerdo, uma reentrância lateral esquerda, uma reentrância lateral direita, um rebaixamento da superfície superior e um rebaixamento da superfície inferior, em que uma das reentrâncias laterais fica posicionada na superfície frontal ou na superfície traseira.[0017] The building wall of the present invention further comprises corner bricks, in which each corner brick comprises a central main hole, a right secondary hole, a left secondary hole, a left lateral recess, a right lateral recess, a lowering of the upper surface and a lowering of the lower surface, in which one of the side recesses is positioned on the front surface or on the rear surface.

[0018] A parede da edificação da presente invenção compreende ainda tijolos do tipo mata canto, em que cada tijolo do tipo mata canto compreende um orifício principal central, um orifício secundário direito, um orifício secundário esquerdo, uma reentrância lateral, um rebaixamento da superfície superior e um rebaixamento da superfície inferior, em que a superfície lateral oposta à superfície que compreende a reentrância lateral é uma superfície reta.[0018] The building wall of the present invention further comprises corner bricks, in which each corner bricks comprise a central main hole, a right secondary hole, a left secondary hole, a lateral recess, a lowering of the surface upper and a lowering of the lower surface, wherein the lateral surface opposite the surface comprising the lateral recess is a straight surface.

[0019] A parede da edificação da presente invenção compreende[0019] The building wall of the present invention comprises

Petição 870180014088, de 21/02/2018, pág. 9/45Petition 870180014088, of 02/21/2018, p. 9/45

5/20 ainda tijolos do tipo meio, em que cada tijolo do tipo meio compreende um orifício secundário, uma reentrância lateral, um rebaixamento da superfície superior e um rebaixamento da superfície inferior, em que a superfície lateral oposta à superfície que compreende a reentrância lateral é uma superfície reta, e em que o comprimento do tijolo do tipo meio é metade do comprimento do tijolo padrão.5/20 also bricks of the middle type, in which each brick of the middle type comprises a secondary orifice, a side recess, a lowering of the upper surface and a lowering of the lower surface, wherein the lateral surface opposite to the surface comprising the lateral recess it is a straight surface, and the length of the half brick is half the length of the standard brick.

[0020] A parede da edificação da presente invenção compreende ainda tijolos do tipo L, em que cada tijolo do tipo L compreende um orifício principal, três orifícios secundários, duas reentrâncias laterais, um rebaixamento da superfície superior e um rebaixamento da superfície inferior, em que o tijolo do tipo L possui um corpo em forma de “L”.[0020] The wall of the building of the present invention also comprises bricks of type L, in which each brick of type L comprises a main hole, three secondary holes, two lateral recesses, a lowering of the upper surface and a lowering of the lower surface, in that the L-type brick has an “L” shaped body.

[0021] A parede da edificação da presente invenção compreende ainda tijolos do tipo calha, em que cada tijolo do tipo calha compreende um orifício principal central, um orifício secundário direito, um orifício secundário esquerdo, uma reentrância lateral esquerda, uma reentrância lateral direita, um rebaixamento da superfície superior, um rebaixamento da superfície inferior e um furo passante horizontal longitudinal.[0021] The building wall of the present invention further comprises gutter-type bricks, in which each gutter-type brick comprises a central main hole, a right secondary hole, a left secondary hole, a left lateral recess, a right lateral recess, a lowering of the upper surface, a lowering of the lower surface and a longitudinal horizontal through hole.

[0022] Os tijolos da presente invenção compreendidos nas paredes compreendem ainda sulcos nas superfícies que entram em contato com outros tijolos, onde é aplicado poliuretano, em que os sulcos de cada tijolo ficam alinhados com os sulcos dos tijolos verticalmente e lateralmente adjacentes.[0022] The bricks of the present invention comprised on the walls also comprise grooves on the surfaces that come in contact with other bricks, where polyurethane is applied, in which the grooves of each brick are aligned with the grooves of the vertically and laterally adjacent bricks.

[0023] O telhado pré-fabricado da presente invenção compreende treliças de madeira, elementos de ligação e telhas, em que as telhas são posicionadas sobre as treliças de madeira que são unidas pelos elementos de ligação. Alternativamente o telhado pré-fabricado da presente invenção compreende uma laje de concreto pré-moldada.[0023] The prefabricated roof of the present invention comprises wooden trusses, connecting elements and tiles, in which the tiles are positioned on the wooden trusses which are joined by the connecting elements. Alternatively, the prefabricated roof of the present invention comprises a precast concrete slab.

[0024] O processo de montagem de uma edificação com tijolos pré-fabricados da presente invenção compreende as etapas de prepa[0024] The process of assembling a building with prefabricated bricks of the present invention comprises the stages of preparation

Petição 870180014088, de 21/02/2018, pág. 10/45Petition 870180014088, of 02/21/2018, p. 10/45

6/20 rar uma laje de fundação com superfície superior horizontal compreendendo meios de recepção de parafusos bipartidos; montar paredes verticais da edificação com os tijolos pré-fabricados; preparar uma cinta de coroamento em todo o perímetro das alvenarias da edificação; e posicionar um telhado pré-fabricado na superfície superior da cinta de coroamento.6/20 to create a foundation slab with a horizontal top surface comprising means for receiving split screws; assemble vertical walls of the building with prefabricated bricks; prepare a crowning belt around the perimeter of the building's masonry; and positioning a prefabricated roof on the top surface of the crown strap.

[0025] A etapa de montar paredes da presente invenção compreende as etapas de: (a) fixar em uma primeira fiada os parafusos bipartidos nos meios de recepção da laje de fundação por meio de rosqueamento, (b) posicionar os tijolos na primeira fiada conforme uma planta predeterminada para a edificação, de modo que os parafusos bipartidos fixados nos meios de recepção da laje de fundação estejam inseridos nos orifícios secundários dos tijolos, e de modo que o encontro da reentrância lateral de um tijolo com a reentrância lateral de um tijolo adjacente forme uma região idêntica à região do orifício principal dos tijolos, (c) inserir prismas nos orifícios principais e nas regiões de encontro das reentrâncias dos tijolos, alinhando os tijolos lateralmente adjacentes entre si, (d) rosquear porcas nas roscas expostas dos parafusos bipartidos até o travamento dos tijolos, sendo que metade da rosca da porca continua livre para recepcionar um parafuso de uma fiada superior, (e) retirar os prismas dos orifícios principais e das regiões de encontro das reentrâncias dos tijolos, (f) fixar parafusos bipartidos na metade livre das porcas que travam os tijolos da fiada inferior, (g) posicionar os tijolos na fiada superior com os orifícios secundários recepcionando de forma passante os parafusos bipartidos fixados na rosca da fiada inferior, e de modo que os orifícios principais dos tijolos da dita fiada superior fiquem alinhados concentricamente com as regiões de encontro das reentrâncias laterais dos tijolos da fiada inferior, (h) repetir as etapas (c), (d), (e) e (f) para os tijolos posicionados na etapa (g), e (i) repetir as etapas (g) e (h) até que a parede atinja a altu[0025] The step of assembling walls of the present invention comprises the steps of: (a) fixing the split screws in a first row in the reception means of the foundation slab by means of threading, (b) positioning the bricks in the first row as a predetermined plan for the building, so that the split screws fixed in the receiving means of the foundation slab are inserted in the secondary holes of the bricks, and so that the meeting of the side recess of a brick with the side recess of an adjacent brick form a region identical to the region of the main hole in the bricks, (c) insert prisms into the main holes and in the regions where the brick recesses meet, aligning the bricks laterally adjacent to each other, (d) thread nuts on the exposed threads of the split screws until locking the bricks, half of the nut thread remaining free to receive a screw from an upper row , (e) remove the prisms from the main holes and the regions where the brick recesses meet, (f) fix split screws on the free half of the nuts that lock the bricks in the lower row, (g) position the bricks in the upper row with the secondary holes passively receiving the split screws fixed on the thread of the lower row, and so that the main holes of the bricks of said upper row are aligned concentrically with the regions where the side recesses of the bricks of the lower row are, (h) repeat steps (c), (d), (e) and (f) for the bricks positioned in step (g), and (i) repeat steps (g) and (h) until the wall reaches the height

Petição 870180014088, de 21/02/2018, pág. 11/45Petition 870180014088, of 02/21/2018, p. 11/45

7/20 ra desejada, sendo que os tijolos da fiada superior em uma etapa (g) são os tijolos da fiada inferior na etapa (g) subsequente.7/20 desired ra, the bricks of the upper course in one step (g) being the bricks of the lower course in the subsequent step (g).

[0026] A etapa de preparar a cinta de coroamento da presente invenção compreende: (j) posicionar blocos calha na superfície superior dos tijolos da última fiada, (l) obstruir os orifícios principais e as regiões de encontro das reentrâncias laterais dos tijolos da última fiada com obstrutores removíveis, (m) preencher os blocos calha com uma mistura de concreto, e (n) retirar os obstrutores removíveis dos orifícios principais e das regiões de encontro das reentrâncias dos tijolos da última fiada, conectando as chaminés da região interna das paredes com a área externa da edificação [0027] O processo de acordo com a presente invenção compreende ainda uma etapa de aplicar poliuretano em sulcos presentes nas superfícies dos tijolos antes da etapa de posicionar os tijolos na fiada superior.[0026] The step of preparing the crowning brace of the present invention comprises: (j) positioning gutter blocks on the upper surface of the bricks of the last row, (l) obstructing the main holes and the regions where the lateral recesses of the bricks of the last row with removable obstructions, (m) fill the gutter blocks with a mixture of concrete, and (n) remove the removable obstructions from the main holes and from the regions against the brick recesses of the last row, connecting the chimneys of the inner region of the walls with the external area of the building [0027] The process according to the present invention also comprises a step of applying polyurethane in grooves present on the surfaces of the bricks before the step of positioning the bricks in the upper row.

[0028] Além disso, os tijolos da etapa de montar paredes são selecionados dentre tijolos do tipo padrão, tijolos do tipo canto, tijolos do tipo mata canto, tijolos do tipo meio, tijolos do tipo “L” e tijolos do tipo calha.[0028] In addition, the bricks of the wall mounting stage are selected from standard bricks, corner bricks, corner bricks, middle bricks, “L” bricks and gutter bricks.

[0029] O telhado pré-fabricado do processo de montagem de uma edificação com tijolos pré-fabricados de acordo com a presente invenção compreende treliças de madeira, elementos de ligação e telhas, em que as telhas são posicionadas sobre as treliças de madeira que são unidas pelos elementos de ligação. Alternativamente o telhado pré-fabricado compreende uma laje de concreto pré-moldada.[0029] The prefabricated roof of the building assembly process with prefabricated bricks according to the present invention comprises wooden trusses, connecting elements and tiles, in which the tiles are positioned on the wooden trusses that are joined by the connecting elements. Alternatively, the prefabricated roof comprises a precast concrete slab.

BREVE DESCRIÇÃO DOS DESENHOS [0030] A presente invenção será, a seguir, descrita mais detalhadamente com base em um exemplo de execução representado nos desenhos. As figuras mostram:BRIEF DESCRIPTION OF THE DRAWINGS [0030] The present invention will now be described in more detail on the basis of an embodiment shown in the drawings. The figures show:

[0031] Figura 1 - é uma vista em perspectiva da edificação com[0031] Figure 1 - is a perspective view of the building with

Petição 870180014088, de 21/02/2018, pág. 12/45Petition 870180014088, of 02/21/2018, p. 12/45

8/20 tijolos pré-fabricados de acordo com a presente invenção;8/20 prefabricated bricks according to the present invention;

[0032] Figura 2 - é uma vista em perspectiva de parte da laje de fundação de acordo com a presente invenção;[0032] Figure 2 - is a perspective view of part of the foundation slab according to the present invention;

[0033] Figura 3 - é uma vista lateral do parafuso bipartido e porca de acordo com a presente invenção;[0033] Figure 3 - is a side view of the split bolt and nut according to the present invention;

[0034] Figura 4 - é uma vista em perspectiva da parede de acordo com a presente invenção em um estado parcialmente montado;[0034] Figure 4 - is a perspective view of the wall according to the present invention in a partially assembled state;

[0035] Figura 5.1 - é uma vista superior do tijolo do tipo padrão de acordo com a presente invenção;[0035] Figure 5.1 - is a top view of the brick of the standard type according to the present invention;

[0036] Figura 5.2 - é uma vista superior do tijolo do tipo canto de acordo com a presente invenção;[0036] Figure 5.2 - is a top view of the corner brick according to the present invention;

[0037] Figura 5.3 - é uma vista superior do tijolo do tipo mata canto de acordo com a presente invenção;[0037] Figure 5.3 - is a top view of the corner-type brick according to the present invention;

[0038] Figura 5.4 - é uma vista superior do tijolo do tipo meio de acordo com a presente invenção;[0038] Figure 5.4 - is a top view of the medium type brick according to the present invention;

[0039] Figura 5.5 - é uma vista superior do tijolo do tipo L de acordo com a presente invenção;[0039] Figure 5.5 - is a top view of the L-type brick according to the present invention;

[0040] Figura 5.6 - é uma vista superior do tijolo do tipo calha de acordo com a presente invenção;[0040] Figure 5.6 - is a top view of the gutter-type brick according to the present invention;

[0041] Figura 6.1 - é uma vista em perspectiva e em corte da parede de acordo com a presente invenção;[0041] Figure 6.1 - is a perspective and sectional view of the wall according to the present invention;

[0042] Figura 6.2 - é uma vista frontal e em corte da parede de acordo com a presente invenção;[0042] Figure 6.2 - is a front and sectional view of the wall according to the present invention;

[0043] Figura 7 - é uma vista em perspectiva da cinta de coroamento de acordo com a presente invenção;[0043] Figure 7 - is a perspective view of the crowning strap according to the present invention;

[0044] Figura 8 - é um fluxograma das etapas principais de montagem da edificação de acordo com a presente invenção;[0044] Figure 8 - is a flow chart of the main stages of assembly of the building according to the present invention;

[0045] Figura 9 - é um fluxograma das etapas de montar as paredes da edificação de acordo com a presente invenção; e [0046] Figura 10 - é um fluxograma das etapas de preparar a cinta[0045] Figure 9 - is a flow chart of the steps of assembling the walls of the building according to the present invention; and [0046] Figure 10 - is a flow chart of the steps to prepare the belt

Petição 870180014088, de 21/02/2018, pág. 13/45Petition 870180014088, of 02/21/2018, p. 13/45

9/20 de coroamento da edificação de acordo com a presente invenção. DESCRIÇÃO DETALHADA DAS FIGURAS [0047] A Figura 1 mostra uma edificação 1 com tijolos préfabricados de acordo com a presente invenção. A edificação compreende uma laje de fundação 2, paredes verticais 3 fixadas acima da laje de fundação 2, uma cinta de coroamento 4 fixada na superfície superior das paredes e um telhado pré-fabricado 5 posicionado na superfície superior da cinta de coroamento 4.9/20 crowning of the building according to the present invention. DETAILED DESCRIPTION OF THE FIGURES [0047] Figure 1 shows a building 1 with prefabricated bricks according to the present invention. The building comprises a foundation slab 2, vertical walls 3 fixed above the foundation slab 2, a crown strap 4 fixed to the top surface of the walls and a prefabricated roof 5 positioned on the top surface of the crown strap 4.

[0048] A superfície superior da laje de fundação 2 é preferencialmente horizontal, sendo que a laje compreende meios para recepção 6 de parafusos bipartidos 7. Tal característica pode ser observada na figura 2. Os meios de recepção 6 de parafusos bipartidos 7 são preferencialmente porcas fixadas na laje 2 posicionadas de forma que permita o rosqueamento de parafusos em sua rosca interna. No entanto, os meios de recepção 6 não estão limitados a porcas, podendo se tratar também de roscas formadas na própria laje 2, orifícios que se adaptam à rosca do parafuso ou outros meios de fixação que resultem no mesmo efeito.[0048] The upper surface of the foundation slab 2 is preferably horizontal, the slab comprising means for receiving 6 split screws 7. Such a characteristic can be seen in figure 2. The receiving means 6 for split screws 7 are preferably nuts fixed on slab 2 positioned in a way that allows the threading of screws in its internal thread. However, the receiving means 6 are not limited to nuts, they can also be threads formed in the slab 2 itself, holes that adapt to the screw thread or other fixation means that result in the same effect.

[0049] Os parafusos bipartidos 7 são parafusos cilíndricos que apresentam roscas em ambas as extremidades e estão representados na Figura 3. Quando conectados um ao outro em série por meio de porcas 8, os parafusos bipartidos 7 formam uma haste. A extremidade inferior de cada haste é fixada nos meios de recepção 6 de parafusos bipartidos 7 na laje de fundação 2, fixando, assim, as paredes verticais 3 à laje de fundação 2 sem a necessidade de utilização de argamassa ou outros meios geradores de resíduos. As porcas 8 utilizadas para a formação das hastes são porcas de rosqueamento rápido dimensionadas para recepcionar as extremidades de dois parafusos bipartidos 7. Para isso, essas porcas de rosqueamento rápido 8 possuem um comprimento maior do que o comprimento da rosca na extremidade dos[0049] Bipartite screws 7 are cylindrical screws that have threads at both ends and are shown in Figure 3. When connected to each other in series by means of nuts 8, the split screws 7 form a rod. The lower end of each rod is attached to the receiving means 6 of split screws 7 on the foundation slab 2, thus fixing the vertical walls 3 to the foundation slab 2 without the need for using mortar or other waste generating means. The nuts 8 used for the formation of the shanks are quick-screw nuts sized to accommodate the ends of two split screws 7. For this purpose, these quick-screw nuts 8 are longer than the thread length at the ends of the screws.

Petição 870180014088, de 21/02/2018, pág. 14/45Petition 870180014088, of 02/21/2018, p. 14/45

10/20 parafusos 7, sendo preferivelmente no mínimo o dobro do comprimento dessas roscas.10/20 screws 7, preferably at least twice the length of these threads.

[0050] A figura 4 mostra um segmento de uma parede vertical 3 de acordo com a presente invenção que compreende tijolos préfabricados paralelepipedais 9. O posicionamento de uma pluralidade de tijolos pré-fabricados 9 em um mesmo plano forma uma fiada e a montagem de uma fiada sobre a outra forma as paredes verticais 3 da edificação. Os tijolos de uma fiada ficam normalmente deslocados em relação aos tijolos das fiadas verticalmente adjacentes acima ou abaixo. Assim, a parte central de um tijolo de uma fiada fica alinhada com as extremidades dos tijolos das fiadas acima e abaixo da mesma.[0050] Figure 4 shows a segment of a vertical wall 3 according to the present invention comprising prefabricated parallelepiped bricks 9. The positioning of a plurality of prefabricated bricks 9 in the same plane forms a row and the assembly of a vertical walls 3 of the building are spun on the other way. The bricks in a row are usually offset from the bricks in the vertically adjacent rows above or below. Thus, the central part of a row's brick is aligned with the ends of the bricks in the rows above and below it.

[0051] Os tijolos pré-fabricados 9 podem apresentar características distintas dependendo da finalidade de sua utilização ou posicionamento na fiada. O tijolo 9 que compõe a maior parte da parede é o tijolo pré-fabricado padrão 9a que compreende um orifício principal central 10, um orifício secundário direito 11, um orifício secundário esquerdo 12, uma reentrância lateral esquerda 13, uma reentrância lateral direita 14, um rebaixamento da superfície superior 15 e um rebaixamento da superfície inferior (não mostrado), e está representado na Figura 5.1. O orifício principal central 10 e os orifícios secundários direito 11 e esquerdo 12 são formados na região de rebaixamento das superfícies superior 15 e inferior.[0051] The prefabricated bricks 9 may have different characteristics depending on the purpose of their use or positioning in the row. The brick 9 that makes up most of the wall is the standard prefabricated brick 9a which comprises a central main hole 10, a right secondary hole 11, a left secondary hole 12, a left side recess 13, a right side recess 14, a lowering of the upper surface 15 and a lowering of the lower surface (not shown), and is shown in Figure 5.1. The central main hole 10 and the secondary right and left 11 holes are formed in the region of lowering of the upper and lower surfaces 15.

[0052] Uma das finalidades do orifício principal central 10 é facilitar o alinhamento de tijolos 9 posicionados em fiadas adjacentes. Isso porque, a união das reentrâncias laterais 13, 14 de dois tijolos vizinhos forma um orifício idêntico ao orifício principal central 10 dos tijolos 9. Esse alinhamento é realizado por meio de uma barra na forma de um prisma 16 que pode ser inserido tanto nos orifícios principais 10 quanto nas regiões de encontro das reentrâncias 13, 14 dos tijolos 9, alinhando os tijolos lateralmente adjacentes entre si e os tijolos das fiaPetição 870180014088, de 21/02/2018, pág. 15/45[0052] One of the purposes of the central main hole 10 is to facilitate the alignment of bricks 9 positioned in adjacent rows. This is because the joining of the side recesses 13, 14 of two neighboring bricks forms a hole identical to the central main hole 10 of the bricks 9. This alignment is carried out by means of a bar in the form of a prism 16 that can be inserted either in the holes main 10 and in the regions where the recesses 13, 14 of the bricks 9 meet, aligning the bricks laterally adjacent to each other and the bricks of the spinnerets 870180014088, of 02/21/2018, p. 15/45

11/20 das verticalmente adjacentes.11/20 of those vertically adjacent.

[0053] Como pode ser observado nas Figuras 6.1 e 6.2, o alinhamento vertical dos orifícios principais 10 com as regiões de encontro das reentrâncias 13, 14 dos tijolos 9 forma chaminés verticais 17 no interior de toda a extensão das paredes 3 após a retirada dos prismas 16, os quais são utilizados apenas no momento do alinhamento dos tijolos 9. Essas chaminés 17 melhoram significativamente o isolamento térmico entre as regiões interna e externa da edificação, possibilitando a manutenção de uma temperatura agradável no interior da casa mesmo em dias muito quentes. Isso ocorre porque o calor transferido da região externa para os tijolos 9 é transferido, também, para o ar presente no interior da chaminé 17. Como o ar quente é mais leve do que o ar frio, ele tende a subir, sendo expelido na região superior da parede. No entanto, esse efeito só é alcançado, pois a cinta de coroamento 4 da edificação 1 da presente invenção possui características distintas se comparada às cintas de coroamento conhecidas do estado da técnica, como será posteriormente explicado.[0053] As can be seen in Figures 6.1 and 6.2, the vertical alignment of the main holes 10 with the regions where the recesses 13, 14 of the bricks 9 meet form vertical chimneys 17 within the entire length of the walls 3 after removing the prisms 16, which are used only when bricks are aligned 9. These chimneys 17 significantly improve the thermal insulation between the internal and external regions of the building, enabling the maintenance of a pleasant temperature inside the house even on very hot days. This is because the heat transferred from the external region to the bricks 9 is also transferred to the air present inside the chimney 17. As the hot air is lighter than the cold air, it tends to rise, being expelled in the region top of the wall. However, this effect is only achieved, since the crowning strap 4 of building 1 of the present invention has different characteristics when compared to the crowning straps known from the state of the art, as will be explained later.

[0054] Os orifícios secundários direito 11 e esquerdo 12 são dimensionados para receber os parafusos bipartidos 7 que formam a haste. Em virtude do deslocamento entre os tijolos de fiadas verticalmente da parede da edificação, o orifício secundário direito 11 de um tijolo 9 é posicionado concentricamente com o orifício secundário esquerdo 12 de outro tijolo da fiada adjacente. Ao posicionar um tijolo sobre o outro, o parafuso bipartido 7 é inserido em um dos orifícios secundários 11, 12, sendo rosqueado na porca 8 posicionada abaixo do referido orifício secundário 11, 12. Após o alinhamento com os prismas 16, a rosca superior exposta do parafuso bipartido 7 recebe a porca 8 que é rosqueada até o travamento do tijolo 9, sendo que metade da rosca interna da porca 8 continua livre para recepcionar um parafuso 7 de uma fiada superior e continuar a montagem da parede 3.[0054] The secondary 11 right and left 12 holes are dimensioned to receive the split screws 7 that form the rod. Due to the displacement between the row bricks vertically from the building wall, the right secondary hole 11 of a brick 9 is positioned concentrically with the left secondary hole 12 of another brick of the adjacent row. When positioning one brick on the other, the split screw 7 is inserted into one of the secondary holes 11, 12, being threaded on the nut 8 positioned below the said secondary hole 11, 12. After aligning with the prisms 16, the upper thread exposed of the split screw 7 receives the nut 8 which is threaded until the locking of the brick 9, half of the internal thread of the nut 8 still free to receive a screw 7 of an upper row and continue the wall mounting 3.

Petição 870180014088, de 21/02/2018, pág. 16/45Petition 870180014088, of 02/21/2018, p. 16/45

12/20 [0055] Os rebaixamentos 15 das superfícies superior e inferior devem ser dimensionados de forma que seja possível posicionar pelo menos uma porca 8 entre dois tijolos 9, ou seja, o tamanho da profundidade de cada rebaixamento 15 deve ser pelo menos metade do comprimento da porca 8 utilizada para formar a haste. Além disso, a parede 3 deve ser montada de modo que uma região oca formada pelo rebaixamento 15 de um tijolo esteja em comunicação com uma região oca formada pelo rebaixamento 15 da superfície oposta de outro tijolo da fiada adjacente. Essa característica de montagem das paredes 3 permite a formação de uma comunicação entre as regiões ocas dos tijolos, em que a comunicação de uma pluralidade de regiões ocas dos rebaixamentos dos tijolos forma uma passagem senoidal 18 no interior das paredes, a qual é mostrada pelas setas na figura 6.2.12/20 [0055] The recesses 15 of the upper and lower surfaces must be dimensioned so that it is possible to position at least one nut 8 between two bricks 9, that is, the size of the depth of each recess 15 must be at least half of the length of the nut 8 used to form the rod. In addition, the wall 3 must be mounted so that a hollow region formed by the recess 15 of a brick is in communication with a hollow region formed by the recess 15 of the opposite surface of another brick of the adjacent row. This feature of mounting the walls 3 allows the formation of a communication between the hollow regions of the bricks, in which the communication of a plurality of hollow regions of the brick recesses forms a sinusoidal passage 18 inside the walls, which is shown by the arrows in figure 6.2.

[0056] A formação das passagens senoidais permite o fluxo de ar em uma direção horizontal no interior das paredes 3. Como pode ser visto na figura 6.2, essas passagens senoidais 18 interligam todas as chaminés verticais 17 presentes no interior das paredes 3, uma vez que os orifícios principais 10 desembocam justamente nos rebaixamentos 15 dos tijolos. Sendo assim, diferentemente das passagens formadas no interior de paredes descritas no estado da técnica, caso uma chaminé 17 seja bloqueada por qualquer motivo, como a presença de tubulação ou uma avaria estrutural, o fluxo de ar da referida chaminé 17 não é interrompido, mas desviado através das passagens senoidais 18 para outras chaminés 17, garantindo um isolamento térmico eficaz do interior da edificação 1.[0056] The formation of sinusoidal passages allows air to flow in a horizontal direction inside the walls 3. As can be seen in figure 6.2, these sinusoidal passages 18 interconnect all the vertical chimneys 17 present inside the walls 3, once that the main holes 10 flow into the lowering 15 of the bricks. Therefore, unlike the passages formed inside walls described in the prior art, if a chimney 17 is blocked for any reason, such as the presence of piping or a structural failure, the air flow of said chimney 17 is not interrupted, but deflected through sinusoidal passages 18 to other chimneys 17, ensuring effective thermal insulation of the interior of the building 1.

[0057] Outra vantagem das passagens senoidais 18 é a possibilidade de passar fiação entre quaisquer duas fiadas das paredes 3 da edificação 1 sem a necessidade da criação de uma passagem horizontal especificamente para esse propósito. Portanto, é dispensada a necessidade de quebrar paredes para a criação de uma nova passagem[0057] Another advantage of sinusoidal passages 18 is the possibility of passing wiring between any two rows of walls 3 of building 1 without the need to create a horizontal passage specifically for this purpose. Therefore, there is no need to break walls to create a new passageway.

Petição 870180014088, de 21/02/2018, pág. 17/45Petition 870180014088, of 02/21/2018, p. 17/45

13/20 de fiação após a finalização da edificação.13/20 wiring after completion of the building.

[0058] Em suma, as passagens senoidais 18 presentes no interior das paredes 3 viabilizam a construção das hastes a partir dos parafusos bipartidos 7 e das porcas de rosqueamento rápido 8 durante o processo de construção da edificação 1, devido à região oca formada entre as fiadas que permite o posicionamento das porcas 8. Isso elimina a necessidade de uso de hastes metálicas de longas com comprimentos definidos, cujo transporte é complicado, e as quais limitam a altura da edificação. A construção da haste a partir de porcas e parafusos permite que o construtor determine a altura desejada para a edificação da forma que preferir.[0058] In short, the sinusoidal passages 18 present inside the walls 3 enable the construction of the rods from the split screws 7 and the fast-screwing nuts 8 during the construction process of the building 1, due to the hollow region formed between the rows that allow the positioning of the nuts 8. This eliminates the need to use long metal rods with defined lengths, whose transport is complicated, and which limit the height of the building. The construction of the rod from nuts and bolts allows the builder to determine the desired height for the building in the way he prefers.

[0059] Essas passagens senoidais 18 também aumentam a eficiência do isolamento térmico da região interna da edificação 1 e permitem a passagem de fiações no interior das paredes de forma prática e rápida.[0059] These sinusoidal passages 18 also increase the efficiency of the thermal insulation of the internal region of building 1 and allow the passage of wiring inside the walls in a practical and fast way.

[0060] O tijolo padrão 9a compreende ainda sulcos estreitos 19 nas superfícies que ficam alinhados com os sulcos 19 dos outros tijolos 9 horizontalmente e verticalmente adjacentes, formando canais. Nesses sulcos 19 é aplicado poliuretano com o intuito de vedar a região interna da casa da região externa, protegendo a região interna contra a entrada de elementos indesejados como poeira, água, luz, ruído, vento, etc. Ao ser aplicado, o poliuretano reage instantaneamente com a umidade do ar, expandindo em até 80 vezes o seu volume original, proporcionando uma característica de estanqueidade às paredes 3 da edificação 1. Os canais formados pelos sulcos 19 permitem que esse poliuretano seja aplicado de forma simples, por exemplo, com bomba dosificadora, pois o poliuretano uma vez aplicado escoa através dos sulcos por dentro do canal, sem a formação de resíduos, diferentemente do que acontece com o uso de argamassa.[0060] The standard brick 9a also comprises narrow grooves 19 on the surfaces that are aligned with the grooves 19 of the other bricks 9 horizontally and vertically adjacent, forming channels. In these grooves 19 polyurethane is applied in order to seal the internal region of the house from the external region, protecting the internal region against the entry of unwanted elements such as dust, water, light, noise, wind, etc. When applied, the polyurethane reacts instantly with the humidity of the air, expanding up to 80 times its original volume, providing a tightness characteristic to the walls 3 of the building 1. The channels formed by the grooves 19 allow this polyurethane to be applied simple, for example, with a metering pump, since the polyurethane once applied flows through the grooves inside the channel, without the formation of residues, unlike what happens with the use of mortar.

[0061] Outra característica que garante a estanqueidade da edifi[0061] Another feature that guarantees the building's watertightness

Petição 870180014088, de 21/02/2018, pág. 18/45Petition 870180014088, of 02/21/2018, p. 18/45

14/20 cação 1 é o fato dos tijolos 9 possuírem propriedades hidrofugantes, devido ao acréscimo de materiais hidrofugantes à própria composição do tijolo 9. As propriedades hidrofugantes dos tijolos 9 impedem a penetração de água nas paredes e preservam a pintura externa da edificação em boas condições durante longos períodos de tempo.14/20 cation 1 is the fact that the bricks 9 have water repellent properties, due to the addition of water repellent materials to the brick composition 9. The water repellent properties of the bricks 9 prevent water from penetrating the walls and preserve the building's external paint in good condition. conditions for long periods of time.

[0062] Além do tijolo pré-fabricado padrão 9a, a parede da edificação 3 da presente invenção compreende, também, tijolos préfabricados com características específicas para uso em posições estratégicas. Tais tijolos apresentam basicamente as mesmas características descritas acima para os tijolos padrão 9a e o mesmo principio de montagem, porém com detalhamentos diferenciados.[0062] In addition to the standard prefabricated brick 9a, the wall of building 3 of the present invention also comprises prefabricated bricks with specific characteristics for use in strategic positions. Such bricks have basically the same characteristics described above for standard bricks 9a and the same assembly principle, but with different details.

[0063] O tijolo do tipo canto 9b, mostrado na Figura 5.2, possui as mesmas características do tijolo padrão 9a com a diferença de que uma das reentrâncias laterais 13 está posicionada na superfície frontal ou traseira, ao invés da superfície lateral. Essa característica permite posicioná-lo nas arestas da edificação 1 criando um ângulo de 90° entre duas paredes 3, garantindo a formação da chaminé vertical 17 onde a reentrância 13, 14 de um tijolo padrão 9a encontra a superfície frontal ou traseira do tijolo do tipo canto 9b.[0063] The corner brick 9b, shown in Figure 5.2, has the same characteristics as the standard brick 9a with the difference that one of the side recesses 13 is positioned on the front or rear surface, instead of the side surface. This feature allows it to be positioned on the edges of building 1 creating an angle of 90 ° between two walls 3, ensuring the formation of the vertical chimney 17 where the recess 13, 14 of a standard brick 9a meets the front or rear surface of the brick of type corner 9b.

[0064] O tijolo do tipo mata canto 9c, mostrado na Figura 5.3, também possui as mesmas características do tijolo padrão 9a,no entanto, esse tijolo possui reentrância lateral 14 em apenas um dos lados, formando uma superfície reta na outra lateral. Esse tijolo é utilizado em extremidades de paredes externas ou internas, dando acabamento às regiões onde serão instaladas portas e janelas. As portas e janelas são instaladas na edificação de forma convencional como conhecido do estado da técnica e, portanto, as reentrâncias 13, 14 do tijolo padrão 9a poderiam prejudicar essa instalação.[0064] The brick type kills corner 9c, shown in Figure 5.3, also has the same characteristics as the standard brick 9a, however, this brick has lateral recess 14 on only one side, forming a straight surface on the other side. This brick is used on the ends of external or internal walls, giving finish to the regions where doors and windows will be installed. Doors and windows are installed in the building in a conventional manner as known to the state of the art and, therefore, the recesses 13, 14 of the standard brick 9a could harm this installation.

[0065] O tijolo do tipo meio 9d, mostrado na Figura 5.4, é equivalente à metade de um tijolo do tipo canto 9b e também é utilizado em[0065] The medium 9d brick, shown in Figure 5.4, is equivalent to half a corner 9b brick and is also used in

Petição 870180014088, de 21/02/2018, pág. 19/45Petition 870180014088, of 02/21/2018, p. 19/45

15/20 extremidades das paredes externas ou internas. Esse tijolo é posicionado em fiadas diferentes das que utilizam o tijolo do tipo canto 9b, pois, como os tijolos que compõem a parede 3 encontram-se deslocados em meio tijolo para fiadas adjacentes, o tijolo do tipo meio 9d garante que a superfície de encaixe das portas e janelas seja uma superfície reta.15/20 ends of external or internal walls. This brick is positioned in different rows than the corner 9b brick, because, as the bricks that make up the wall 3 are displaced in half a brick for adjacent rows, the brick of the 9d type ensures that the interlocking surface of the doors and windows is a straight surface.

[0066] O tijolo do tipo L 9e, mostrado na Figura 5.5, é equivalente a um tijolo do tipo padrão 9a, porém com uma continuação semelhante a um tijolo do tipo meio 9d se estendendo a partir da superfície frontal ou traseira, de modo a formar um corpo essencialmente em forma de “L”. Esses tijolos são posicionados em regiões onde as paredes internas da casa encontram as paredes externas, garantindo uma fixação mais robusta entre as paredes.[0066] The L 9e type brick, shown in Figure 5.5, is equivalent to a standard 9a type brick, but with a continuation similar to a half 9d type brick extending from the front or rear surface, in order to to form an essentially L-shaped body. These bricks are positioned in regions where the internal walls of the house meet the external walls, ensuring a more robust fixation between the walls.

[0067] O tijolo do tipo calha 9f, mostrado na Figura 5.6, é um tijolo com as mesmas características do tijolo do tipo padrão 9a, porém com um furo passante horizontal longitudinal 20. Esse furo 20 permite a passagem de tubulações, cintas e vergas quando não for possível utilizar as passagens senoidais 18 presentes nas paredes 3.[0067] The gutter type 9f brick, shown in Figure 5.6, is a brick with the same characteristics as the standard type 9a brick, but with a longitudinal horizontal through hole 20. This hole 20 allows the passage of pipes, straps and lintels when it is not possible to use the sinusoidal passages 18 present in the walls 3.

[0068] Na Figura 7 é possível observar que, ao longo de todo o perímetro da edificação e acima das paredes 3 da edificação 1 da presente invenção, é fixada uma cinta de coroamento 4 para amarração das alvenarias. Essa cinta de coroamento 4 é composta, preferencialmente, por uma mistura de concreto fluido bem acentuado com granulometria fina, constituído por cimento, areia, pedrisco e água. No entanto, outras misturas com efeitos semelhantes também podem compor a cinta de coroamento 4.[0068] In Figure 7 it is possible to observe that, along the entire perimeter of the building and above the walls 3 of building 1 of the present invention, a crowning strap 4 is fixed for the masonry mooring. This crowning belt 4 is preferably composed of a mixture of fluid concrete well accented with fine granulometry, consisting of cement, sand, gravel and water. However, other mixtures with similar effects can also make up the crowning strap 4.

[0069] A cinta de coroamento 4 compreende orifícios verticais passantes 21 posicionados concentricamente com as chaminés verticais 17 das paredes 3. Essa característica é essencial para permitir que o ar quente que sobe pelas chaminés 17 seja expelido pela região[0069] The crowning strap 4 comprises vertical through holes 21 positioned concentrically with the vertical chimneys 17 of the walls 3. This characteristic is essential to allow the hot air that rises through the chimneys 17 to be expelled by the region

Petição 870180014088, de 21/02/2018, pág. 20/45Petition 870180014088, of 02/21/2018, p. 20/45

16/20 superior das paredes 3, garantindo o isolamento térmico da região interna da edificação 1. Sem os orifícios 21 da cinta de coroamento 4, não haveria uma circulação adequada do ar através das passagens senoidais 18 e das chaminés verticais 17 das paredes, pois o ar quente ficaria enclausurado no interior das paredes 3 prejudicando o isolamento térmico.16/20 top of the walls 3, guaranteeing the thermal insulation of the internal region of the building 1. Without the holes 21 of the crowning strap 4, there would not be an adequate air circulation through the sinusoidal passages 18 and the vertical chimneys 17 of the walls, because the hot air would be enclosed within the walls 3, impairing thermal insulation.

[0070] Para a criação dos orifícios 21 da cinta de coroamento 4 faz-se necessário obstruir os orifícios principais 10 e as regiões de encontro das reentrâncias laterais 13, 14 dos tijolos 9 da última fiada com um obstrutor removível. O obstrutor removível pode ser qualquer elemento similar ao prisma de alinhamento ou um tubo comum que permita obstruir os orifícios principais 10 e as regiões de encontro das reentrâncias laterais 13, 14 quando a cinta de coroamento 4 for preparada, para evitar o entupimento das chaminés 17 com a mistura de concreto que constitui a cinta de coroamento 4. Além disso, o obstrutor removível deve ter um comprimento maior que a altura da cinta de coroamento 4 garantindo que o orifício 21 da cinta de coroamento 4 seja um orifício passante.[0070] In order to create the holes 21 of the crowning strap 4, it is necessary to block the main holes 10 and the regions where the lateral recesses 13, 14 of the bricks 9 of the last row meet with a removable obstructor. The removable obstructor can be any element similar to the alignment prism or a common tube that allows to obstruct the main holes 10 and the regions where the lateral recesses 13, 14 meet when the crowning strap 4 is prepared, to prevent the chimneys from clogging 17 with the concrete mixture that constitutes the crowning strap 4. In addition, the removable obstructor must be longer than the height of the crowning strap 4 ensuring that the hole 21 of the crowning strap 4 is a through hole.

[0071] Para o preparo da cinta de coroamento 4, blocos calha (moldes) são posicionados na superfície superior dos tijolos da última fiada. Em seguida, os orifícios principais 10 e as regiões de encontro das reentrâncias laterais 13, 14 dos tijolos 9 da última fiada são obstruídos com os obstrutores removíveis, e os blocos calha são preenchidos com a mistura de concreto. Após o endurecimento do concreto, os obstrutores removíveis podem ser retirados criando uma conexão entre as chaminés 17 da região interna das paredes com a área externa da edificação. Por fim, os blocos calha devem ser retirados.[0071] For the preparation of the crowning belt 4, gutter blocks (molds) are positioned on the upper surface of the bricks of the last row. Then, the main holes 10 and the meeting regions of the side recesses 13, 14 of the bricks 9 of the last row are blocked with the removable obstructions, and the chute blocks are filled with the concrete mixture. After the concrete has hardened, the removable obstructions can be removed creating a connection between the chimneys 17 of the internal region of the walls and the external area of the building. Finally, the chute blocks must be removed.

[0072] Acima da cinta de coroamento 4 da edificação da presente invenção, encontra-se o telhado pré-fabricado 5 que compreende treliças de madeira, elementos de ligação e telhas. Os elementos de liga[0072] Above the crowning strap 4 of the building of the present invention, there is the prefabricated roof 5 comprising wooden trusses, connecting elements and tiles. Alloy elements

Petição 870180014088, de 21/02/2018, pág. 21/45Petition 870180014088, of 02/21/2018, p. 21/45

17/20 ção são preferencialmente de aço galvanizado e permitem a união das treliças de madeira sem o uso de pregos, parafusos, colas ou entalhes. As telhas são posicionadas sobre as treliças de madeira e são encaixadas utilizando práticas já conhecidas do estado da técnica. [0073] Alternativamente, o telhado 5 da edificação 1 pode ser composto por uma laje de concreto pré-moldada impermeabilizada com membrana vinílica e cobertura de argamassa, para proteção mecânica da membrana. A laje de concreto pré-moldada pode ser ainda revestida com cerâmica antiderrapante de alta resistência.17/20 tion are preferably galvanized steel and allow the joining of wooden trusses without the use of nails, screws, glues or notches. The tiles are positioned on the wooden trusses and are fitted using practices already known from the state of the art. [0073] Alternatively, the roof 5 of building 1 can be composed of a precast concrete slab waterproofed with a vinyl membrane and mortar cover, for mechanical protection of the membrane. The precast concrete slab can also be coated with high-strength non-slip ceramic.

[0074] A figura 8 apresenta as etapas do processo de montagem da edificação com tijolos pré-fabricados da presente invenção. O processo de montagem da edificação compreende as etapas de:[0074] Figure 8 shows the steps of the building assembly process with prefabricated bricks of the present invention. The building assembly process comprises the steps of:

[0075] preparar uma laje de fundação com superfície superior horizontal compreendendo meios de recepção de parafusos bipartidos; [0076] montar paredes verticais da edificação com os tijolos préfabricados;[0075] preparing a foundation slab with a horizontal top surface comprising receiving means for split screws; [0076] assemble vertical walls of the building with prefabricated bricks;

[0077] preparar uma cinta de coroamento em todo o perímetro das alvenarias da edificação; e [0078] posicionar um telhado pré-fabricado na superfície superior da cinta de coroamento.[0077] prepare a crowning belt around the perimeter of the building's masonry; and [0078] position a prefabricated roof on the top surface of the crowning brace.

[0079] A etapa de montar parede compreende as seguintes subetapas apresentadas na Figura 9:[0079] The wall mounting step comprises the following substeps shown in Figure 9:

(a) fixar em uma primeira fiada os parafusos bipartidos nos meios de recepção da laje de fundação por meio de rosqueamento, (b) posicionar os tijolos na primeira fiada conforme uma planta predeterminada para a edificação, de modo que os parafusos bipartidos fixados nos meios de recepção da laje de fundação estejam inseridos nos orifícios secundários dos tijolos, e de modo que o encontro da reentrância lateral de um tijolo com a reentrância lateral de um tijolo adjacente forme uma região idêntica à região do orifício principal(a) fix the split bolts to the foundation slab receiving means in a first row by threading, (b) position the bricks in the first row according to a predetermined plan for the building, so that the split bolts fixed in the media of reception of the foundation slab are inserted in the secondary holes of the bricks, and so that the meeting of the side recess of a brick with the side recess of an adjacent brick forms a region identical to the region of the main hole

Petição 870180014088, de 21/02/2018, pág. 22/45Petition 870180014088, of 02/21/2018, p. 22/45

18/20 dos tijolos, (c) inserir prismas nos orifícios principais e nas regiões de encontro das reentrâncias dos tijolos, alinhando os tijolos lateralmente adjacentes entre si e os tijolos, (d) rosquear porcas nas roscas expostas dos parafusos bipartidos até o travamento dos tijolos, sendo que metade da rosca da porca continua livre para recepcionar um parafuso de uma fiada superior, (e) retirar os prismas dos orifícios principais e das regiões de encontro das reentrâncias dos tijolos, (f) fixar parafusos bipartidos na metade livre das porcas que travam os tijolos da fiada inferior, (g) posicionar os tijolos na fiada superior com os orifícios secundários recepcionando de forma passante os parafusos bipartidos fixados na rosca da fiada inferior, e de modo que os orifícios principais dos tijolos da dita fiada superior fiquem alinhados concentricamente com as regiões de encontro das reentrâncias laterais dos tijolos da fiada inferior, (h) repetir as etapas (c), (d), (e) e (f) para os tijolos posicionados na etapa (g), e (i) repetir as etapas (g) e (h) até que a parede atinja a altura desejada, em que os tijolos da fiada superior em uma etapa (g) são os tijolos da fiada inferior na etapa (g) subsequente.18/20 of the bricks, (c) inserting prisms in the main holes and in the regions where the brick recesses meet, aligning the bricks laterally adjacent to each other and the bricks, (d) tapping nuts on the exposed threads of the split screws until the locking of the bricks bricks, with half of the nut thread still free to receive a screw from an upper row, (e) remove the prisms from the main holes and the regions where the brick recesses meet, (f) fix split screws on the free half of the nuts that lock the bricks of the lower row, (g) position the bricks in the upper row with the secondary holes, passing in passing the split screws fixed in the thread of the lower row, and so that the main holes of the bricks of said upper row are aligned concentrically with the regions where the lateral recesses of the bricks in the lower row meet, (h) repeat steps (c), (d), (e) and (f) pa for the bricks positioned in step (g), and (i) repeat steps (g) and (h) until the wall reaches the desired height, where the bricks of the upper row in one step (g) are the bricks of the lower row in the subsequent step (g).

[0080] Adicionalmente, a etapa de montar parede compreende também uma sub-etapa de aplicar poliuretano nos sulcos presentes nas superfícies dos tijolos antes da etapa de posicionar os tijolos na fiada superior. Essa vedação com poliuretano tem como finalidade vedar a região interna da casa da região externa, protegendo a região interna contra a entrada de elementos indesejados como poeira, água, luz, ruído, vento, etc., conforme já descrito anteriormente.[0080] Additionally, the wall mounting step also comprises a sub-step of applying polyurethane in the grooves present on the brick surfaces before the step of positioning the bricks in the upper row. This polyurethane seal is intended to seal the inner region of the house from the outer region, protecting the inner region from the entry of unwanted elements such as dust, water, light, noise, wind, etc., as previously described.

Petição 870180014088, de 21/02/2018, pág. 23/45Petition 870180014088, of 02/21/2018, p. 23/45

19/20 [0081] Já a etapa de preparar a cinta de coroamento compreende as seguintes sub-etapas apresentadas na Figura 10:19/20 [0081] The stage of preparing the crowning belt comprises the following sub-steps shown in Figure 10:

(j) posicionar blocos calha na superfície superior dos tijolos da última fiada das paredes da edificação, (l) obstruir os orifícios principais e as regiões de encontro das reentrâncias laterais dos tijolos da última fiada com obstrutores removíveis, (m) preencher os blocos calha com uma mistura de concreto, e (n) retirar os obstrutores removíveis dos orifícios principais e das regiões de encontro das reentrâncias dos tijolos da última fiada, conectando as chaminés da região interna das paredes com a área externa da edificação.(j) positioning gutter blocks on the top surface of the bricks of the last row of the building walls, (l) obstructing the main holes and the regions of the side recesses of the bricks of the last row with removable obstructions, (m) filling the gutter blocks with a mixture of concrete, and (n) remove the removable obstructions from the main holes and the regions where the recesses of the bricks of the last row meet, connecting the chimneys of the internal region of the walls with the external area of the building.

LISTAGEM DE REFERÊNCIAS edificação 1 laje de fundação 2 parede vertical 3 cinta de coroamento 4 telhado 5 meios de recepção 6 parafusos bipartidos 7 porcas 8 tijolos pré-fabricados 9 tijolo pré-fabricado padrão 9a tijolo do tipo canto 9b tijolo do tipo mata canto 9c tijolo do tipo meio 9d tijolo do tipo L 9e tijolo do tipo calha 9f orifício principal 10REFERENCE LISTING building 1 foundation slab 2 vertical wall 3 crowning strap 4 roof 5 receiving means 6 split bolts 7 nuts 8 prefabricated bricks 9 standard prefabricated brick 9a corner brick 9b corner brick brick 9c brick type 9d brick type L 9e gutter brick type 9f main hole 10

Petição 870180014088, de 21/02/2018, pág. 24/45Petition 870180014088, of 02/21/2018, p. 24/45

20/20 orifício secundário direito 11 orifício secundário esquerdo 12 reentrância lateral esquerda 13 reentrância lateral direita 14 rebaixamento 15 prisma 16 chaminé vertical 17 passagem senoidal 18 sulcos 19 furo passante horizontal longitudinal 20 orifícios verticais passantes 2120/20 right secondary orifice 11 left secondary orifice 12 left lateral recess 13 right lateral recess 14 drawdown 15 prism 16 vertical chimney 17 sinusoidal passage 18 grooves 19 longitudinal horizontal through hole 20 vertical through holes 21

Claims (14)

REIVINDICAÇÕES 1. Edificação (1) com tijolos pré-fabricados, caracterizada pelo fato de que compreende:1. Building (1) with prefabricated bricks, characterized by the fact that it comprises: uma laje de fundação (2) com superfície superior horizontal compreendendo meios para recepção (6) de parafusos bipartidos (7);a foundation slab (2) with a horizontal top surface comprising means for receiving (6) split screws (7); uma pluralidade de hastes, sendo que cada haste é constituída por uma série de parafusos bipartidos (7) conectados um ao outro por meio de porcas (8), e a extremidade inferior de cada haste é fixada aos meios de recepção (6) de parafusos bipartidos (7) na laje de fundação (2);a plurality of rods, each rod consisting of a series of split screws (7) connected to each other by means of nuts (8), and the lower end of each rod is fixed to the screw receiving means (6) split (7) on the foundation slab (2); paredes verticais (3) fixadas acima da laje de fundação (2) por meio de parafusos (7), as paredes verticais (3) compreendendo tijolos pré-fabricados paralelepipedais padrão (9a) que compreendem um orifício principal central (10), um orifício secundário direito (11), um orifício secundário esquerdo (12), uma reentrância lateral esquerda (13) e uma reentrância lateral direita (14), um rebaixamento da superfície superior (15) e um rebaixamento da superfície inferior, sendo que o orifício principal central (10) e os orifícios secundários (11, 12) desembocam nos rebaixamentos (15) da superfície superior e da superfície inferior, os tijolos (9a) sendo dispostos em fiadas, nas quais:vertical walls (3) fixed above the foundation slab (2) by means of screws (7), the vertical walls (3) comprising standard prefabricated parallelepiped bricks (9a) comprising a central main hole (10), a hole right secondary (11), one left secondary hole (12), one left side recess (13) and one right side recess (14), a lower surface recess (15) and a lower surface recess, the main hole being center (10) and the secondary holes (11, 12) lead to the recesses (15) of the upper and lower surfaces, the bricks (9a) being arranged in rows, in which: - o orifício secundário direito (11) de um tijolo é posicionado concentricamente com o orifício secundário esquerdo (12) de outro tijolo da fiada adjacente,- the right secondary hole (11) of a brick is positioned concentrically with the left secondary hole (12) of another brick in the adjacent row, - o orifício principal (10) de cada tijolo é posicionado concentricamente com a união das reentrâncias laterais (13, 14) de dois tijolos vizinhos da fiada adjacente, formando chaminés (17),- the main hole (10) of each brick is positioned concentrically with the union of the lateral recesses (13, 14) of two neighboring bricks of the adjacent row, forming chimneys (17), - uma região oca formada no rebaixamento da superfície superior (15) de um tijolo está em comunicação com uma região oca formada no rebaixamento da superfície inferior de outro tijolo da fiada- a hollow region formed in the lowering of the upper surface (15) of a brick is in communication with a hollow region formed in the lowering of the lower surface of another brick in the row Petição 870180014088, de 21/02/2018, pág. 26/45Petition 870180014088, of 02/21/2018, p. 26/45 2/6 adjacente,2/6 adjacent, - a comunicação de uma pluralidade de regiões ocas dos rebaixamentos (15) dos tijolos formam uma passagem senoidal (18) no interior das paredes;- the communication of a plurality of hollow regions of the recesses (15) of the bricks form a sinusoidal passage (18) inside the walls; sendo que os tijolos (9a) são unidos verticalmente pelos referidos parafusos bipartidos (7) e porcas (8) que constituem as hastes, as quais atravessam verticalmente cada parede através dos orifícios secundários (11, 12) alinhados das fiadas de tijolos, a edificação (1) compreendendo ainda uma cinta de coroamento (4) fixada na superfície superior das paredes (3), a cinta de coroamento (4) compreendendo orifícios (21) posicionados concentricamente com as chaminés (17) dessas paredes; e um telhado pré-fabricado (5) posicionado na superfície superior da cinta de coroamento (4).the bricks (9a) are joined vertically by the said split bolts (7) and nuts (8) that make up the rods, which vertically cross each wall through the secondary holes (11, 12) aligned with the rows of bricks, the building (1) further comprising a crowning strap (4) attached to the upper surface of the walls (3), the crowning strap (4) comprising holes (21) positioned concentrically with the chimneys (17) of those walls; and a prefabricated roof (5) positioned on the top surface of the crowning strap (4). 2. Edificação de acordo com a reivindicação 1, caracterizada pelo fato de que a parede (3) compreende ainda tijolos do tipo canto (9b), em que cada tijolo do tipo canto (9b) compreende um orifício principal central (10), um orifício secundário direito (11), um orifício secundário esquerdo (12), uma reentrância lateral esquerda (13), uma reentrância lateral direita (14), um rebaixamento da superfície superior (15) e um rebaixamento da superfície inferior, em que uma das reentrâncias laterais (13, 14) fica posicionada na superfície frontal ou na superfície traseira.2. Building according to claim 1, characterized by the fact that the wall (3) also comprises bricks of the corner type (9b), in which each brick of the corner type (9b) comprises a central main hole (10), a right secondary hole (11), one left secondary hole (12), one left side recess (13), one right side recess (14), a lower surface recess (15) and a lower surface recess, where one of the side recesses (13, 14) are positioned on the front or rear surface. 3. Edificação de acordo com a reivindicação 1 ou 2, caracterizada pelo fato de que a parede (3) compreende ainda tijolos do tipo mata canto (9c), em que cada tijolo do tipo mata canto (9c) compreende um orifício principal central (10), um orifício secundário direito (11), um orifício secundário esquerdo (12), uma reentrância lateral (13), um rebaixamento da superfície superior (15) e um rebaixamento da superfície inferior, em que a superfície lateral oposta à superfície que com-3. Building according to claim 1 or 2, characterized by the fact that the wall (3) further comprises bricks of the corner-kill type (9c), in which each brick of the corner-kill type (9c) comprises a central main hole ( 10), a right secondary orifice (11), a left secondary orifice (12), a side indentation (13), a lowering of the upper surface (15) and a lowering of the lower surface, where the lateral surface opposite the surface that with- Petição 870180014088, de 21/02/2018, pág. 27/45Petition 870180014088, of 02/21/2018, p. 27/45 3/6 preende a reentrância lateral (13) é uma superfície reta.3/6 holds the lateral recess (13) is a straight surface. 4. Edificação de acordo com qualquer uma das reivindicações antecedentes, caracterizada pelo fato de que a parede (3) compreende ainda tijolos do tipo meio (9d), em que cada tijolo do tipo meio (9d) compreende um orifício secundário (11), uma reentrância lateral (13), um rebaixamento da superfície superior (15) e um rebaixamento da superfície inferior, em que a superfície lateral oposta à superfície que compreende a reentrância lateral (13) é uma superfície reta, e em que o comprimento do tijolo do tipo meio (9d) é metade do comprimento do tijolo padrão (9a).4. Building according to any of the preceding claims, characterized by the fact that the wall (3) further comprises bricks of the middle type (9d), in which each brick of the middle type (9d) comprises a secondary hole (11), a lateral recess (13), a lowering of the upper surface (15) and a lowering of the lower surface, wherein the lateral surface opposite to the surface comprising the lateral recess (13) is a straight surface, and in which the length of the brick of the middle type (9d) is half the length of the standard brick (9a). 5. Edificação de acordo com qualquer uma das reivindicações antecedentes, caracterizada pelo fato de que a parede (3) compreende ainda tijolos do tipo L (9e), em que cada tijolo do tipo L (9e) compreende um orifício principal (10), três orifícios secundários (11), duas reentrâncias laterais (13, 14), um rebaixamento da superfície superior (15) e um rebaixamento da superfície inferior, em que o tijolo do tipo L (9e) possui um corpo em forma de “L”.5. Building according to any of the preceding claims, characterized by the fact that the wall (3) further comprises L-type bricks (9e), in which each L-type brick (9e) comprises a main hole (10), three secondary holes (11), two lateral recesses (13, 14), a lowering of the upper surface (15) and a lowering of the lower surface, in which the L-type brick (9e) has an “L” -shaped body . 6. Edificação de acordo com qualquer uma das reivindicações antecedentes, caracterizada pelo fato de que a parede (3) compreende ainda tijolos do tipo calha (9f), em que cada tijolo do tipo calha (9f) compreende um orifício principal central (10), um orifício secundário direito (11), um orifício secundário esquerdo (12), uma reentrância lateral esquerda (13), uma reentrância lateral direita (14), um rebaixamento da superfície superior (15), um rebaixamento da superfície inferior e um furo passante horizontal longitudinal (20).6. Building according to any of the preceding claims, characterized by the fact that the wall (3) further comprises gutter-type bricks (9f), in which each gutter-type brick (9f) comprises a central main hole (10) , a right secondary hole (11), a left secondary hole (12), a left side recess (13), a right side recess (14), a lower surface recess (15), a lower surface recess and a hole longitudinal horizontal bypass (20). 7. Edificação de acordo com qualquer uma das reivindicações antecedentes, caracterizada pelo fato de que os tijolos (9) compreendidos nas paredes (3) compreendem ainda sulcos (19) nas superfícies que entram em contato com outros tijolos (9), onde é aplicado poliuretano, em que os sulcos (19) de cada tijolo (9) ficam alinhados 7. Building according to any of the preceding claims, characterized by the fact that the bricks (9) included in the walls (3) also comprise grooves (19) on the surfaces that come into contact with other bricks (9), where it is applied polyurethane, in which the grooves (19) of each brick (9) are aligned Petição 870180014088, de 21/02/2018, pág. 28/45Petition 870180014088, of 02/21/2018, p. 28/45 4/6 com os sulcos (19) dos tijolos (9) verticalmente e lateralmente adjacentes.4/6 with the grooves (19) of the bricks (9) vertically and laterally adjacent. 8. Edificação de acordo com qualquer uma das reivindicações antecedentes, caracterizada pelo fato de que o telhado préfabricado (5) compreende treliças de madeira, elementos de ligação e telhas, em que as telhas são posicionadas sobre as treliças de madeira que são unidas pelos elementos de ligação.8. Building according to any of the preceding claims, characterized by the fact that the prefabricated roof (5) comprises wooden trusses, connecting elements and tiles, in which the tiles are positioned on the wooden trusses that are joined by the elements binding. 9. Edificação de acordo com qualquer uma das reivindicações 1 a 7, caracterizada pelo fato de que o telhado pré-fabricado (5) compreende uma laje de concreto pré-moldada.Building according to any one of claims 1 to 7, characterized by the fact that the prefabricated roof (5) comprises a precast concrete slab. 10. Processo de montagem de uma edificação (1) com tijolos pré-fabricados como definida em qualquer uma das reivindicações 1 a 9, caracterizado pelo fato de que compreende as etapas de:10. Assembly process for a building (1) with prefabricated bricks as defined in any one of claims 1 to 9, characterized by the fact that it comprises the steps of: preparar uma laje de fundação (2) com superfície superior horizontal compreendendo meios de recepção (6) de parafusos bipartidos (7);preparing a foundation slab (2) with a horizontal upper surface comprising receiving means (6) of split screws (7); montar paredes verticais (3) da edificação (1) com os tijolos pré-fabricados, em que a etapa de montar paredes compreende:assemble vertical walls (3) of the building (1) with the prefabricated bricks, in which the step of assembling walls comprises: (a) fixar em uma primeira fiada os parafusos bipartidos (7) nos meios de recepção (6) da laje de fundação (2) por meio de rosqueamento, (b) posicionar os tijolos (9) na primeira fiada conforme uma planta predeterminada para a edificação (1), de modo que os parafusos bipartidos (7) fixados nos meios de recepção (6) da laje de fundação (2) estejam inseridos nos orifícios secundários (11, 12) dos tijolos (9), e de modo que o encontro da reentrância lateral (13) de um tijolo (9) com a reentrância lateral (14) de um tijolo (9) adjacente forme uma região idêntica à região do orifício principal (10) dos tijolos (9), (c) inserir prismas (16) nos orifícios principais (10) e nas regiões de encontro das reentrâncias (13, 14) dos tijolos (9), alinhando(a) fix the split screws (7) to the receiving means (6) of the foundation slab (2) in a first row by threading, (b) position the bricks (9) in the first row according to a predetermined plan for the building (1), so that the split screws (7) fixed in the receiving means (6) of the foundation slab (2) are inserted in the secondary holes (11, 12) of the bricks (9), and so that the meeting of the side recess (13) of a brick (9) with the side recess (14) of an adjacent brick (9) forms a region identical to the region of the main hole (10) of the bricks (9), (c) insert prisms (16) in the main holes (10) and in the regions where the recesses (13, 14) of the bricks (9) meet, aligning Petição 870180014088, de 21/02/2018, pág. 29/45Petition 870180014088, of 02/21/2018, p. 29/45 5/6 os tijolos (9) lateralmente adjacentes entre si, (d) rosquear porcas (8) nas roscas expostas dos parafusos bipartidos (7) até o travamento dos tijolos (9), sendo que metade da rosca da porca (8) continua livre para recepcionar um parafuso (7) de uma fiada superior, (e) retirar os prismas (16) dos orifícios principais (10) e das regiões de encontro das reentrâncias dos tijolos (13, 14), (f) fixar parafusos bipartidos (7) na metade livre das porcas (8) que travam os tijolos (9) da fiada inferior, (g) posicionar os tijolos (9) na fiada superior com os orifícios secundários (11, 12) recepcionando de forma passante os parafusos bipartidos (7) fixados na rosca (8) da fiada inferior, e de modo que os orifícios principais (10) dos tijolos (9) da dita fiada superior fiquem alinhados concentricamente com as regiões de encontro das reentrâncias laterais (13, 14) dos tijolos (9) da fiada inferior, (h) repetir as etapas (c), (d), (e) e (f) para os tijolos (9) posicionados na etapa (g), e (i) repetir as etapas (g) e (h) até que a parede (3) atinja a altura desejada, sendo que os tijolos (9) da fiada superior em uma etapa (g) são os tijolos (9) da fiada inferior na etapa (g) subsequente;5/6 the bricks (9) laterally adjacent to each other, (d) thread nuts (8) into the exposed threads of the split screws (7) until the bricks lock (9), half of the nut thread (8) still free to receive a screw (7) from an upper row, (e) remove the prisms (16) from the main holes (10) and from the regions where the brick recesses (13, 14) meet, (f) fix split screws ( 7) in the free half of the nuts (8) that lock the bricks (9) of the lower row, (g) position the bricks (9) in the upper row with the secondary holes (11, 12) by passing the split bolts ( 7) fixed in the thread (8) of the lower row, and so that the main holes (10) of the bricks (9) of said upper row are aligned concentrically with the regions where the side recesses (13, 14) of the bricks ( 9) from the lower row, (h) repeat steps (c), (d), (e) and (f) for the bricks (9) positioned in step (g), and (i) repeat steps (g) and (h) until the wall (3) reaches the desired height, with the bricks (9) of the upper course in one step (g) being the bricks (9) of the course lower in the subsequent step (g); preparar uma cinta de coroamento (4) em todo o perímetro das alvenarias da edificação (1), em que a etapa de preparar a cinta de coroamento (4) compreende:prepare a crowning belt (4) around the perimeter of the building's masonry (1), in which the stage of preparing the crowning belt (4) comprises: (j) posicionar blocos calha na superfície superior dos tijolos (9) da última fiada, (l) obstruir os orifícios principais (10) e as regiões de encontro das reentrâncias laterais (13, 14) dos tijolos (9) da última fiada com obstrutores removíveis, (m) preencher os blocos calha com uma mistura de concreto, e(j) position gutter blocks on the upper surface of the bricks (9) of the last row, (l) obstruct the main holes (10) and the regions where the side recesses (13, 14) meet the bricks (9) of the last row with removable obstructors, (m) fill the gutter blocks with a concrete mix, and Petição 870180014088, de 21/02/2018, pág. 30/45Petition 870180014088, of 02/21/2018, p. 30/45 6/6 (n) retirar os obstrutores removíveis dos orifícios principais (10) e das regiões de encontro das reentrâncias (13, 14) dos tijolos (9) da última fiada, conectando as chaminés (17) da região interna das paredes (3) com a área externa da edificação; e posicionar um telhado pré-fabricado (5) na superfície superior da cinta de coroamento (4).6/6 (n) remove the removable obstructions from the main holes (10) and the regions where the recesses (13, 14) meet the bricks (9) of the last row, connecting the chimneys (17) of the internal region of the walls (3 ) with the external area of the building; and position a prefabricated roof (5) on the top surface of the crowning strap (4). 11. Processo de acordo com a reivindicação 10, caracterizado pelo fato de que compreende uma etapa de aplicar poliuretano em sulcos (19) presentes nas superfícies dos tijolos (9) antes da etapa de posicionar os tijolos (9) na fiada superior.Process according to claim 10, characterized in that it comprises a step of applying polyurethane in grooves (19) present on the surfaces of the bricks (9) before the step of positioning the bricks (9) in the upper row. 12. Processo de acordo com a reivindicação 10 ou 11, caracterizado pelo fato de que os tijolos (9) da etapa de montar paredes (3) são selecionados dentre tijolos do tipo padrão (9a), tijolos do tipo canto (9b), tijolos do tipo mata canto (9c), tijolos do tipo meio (9d), tijolos do tipo “L” (9e) e tijolos do tipo calha (9f), como definidos em qualquer uma das reivindicações 1 a 7.12. Process according to claim 10 or 11, characterized by the fact that the bricks (9) of the wall-mounting step (3) are selected from standard bricks (9a), corner bricks (9b), bricks corner kills (9c), middle bricks (9d), "L" bricks (9e) and gutter bricks (9f), as defined in any of claims 1 to 7. 13. Processo de acordo com qualquer uma das reivindicações 10 a 12, caracterizado pelo fato de que o telhado pré-fabricado (5) compreende treliças de madeira, elementos de ligação e telhas, em que as telhas são posicionadas sobre as treliças de madeira que são unidas pelos elementos de ligação.Process according to any one of claims 10 to 12, characterized in that the prefabricated roof (5) comprises wooden trusses, connecting elements and tiles, in which the tiles are positioned on the wooden trusses that are joined by the connecting elements. 14. Processo de acordo com qualquer uma das reivindicações 10 a 12, caracterizado pelo fato de que o telhado pré-fabricado compreende uma laje de concreto pré-moldada.Process according to any one of claims 10 to 12, characterized in that the prefabricated roof comprises a precast concrete slab.
BR102018003399-9A 2018-02-21 2018-02-21 prefabricated brick building and assembly process of this building BR102018003399B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
BR102018003399-9A BR102018003399B1 (en) 2018-02-21 2018-02-21 prefabricated brick building and assembly process of this building
PCT/BR2019/050048 WO2019161468A1 (en) 2018-02-21 2019-02-20 Building made of prefabricated bricks and method for constructing said building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BR102018003399-9A BR102018003399B1 (en) 2018-02-21 2018-02-21 prefabricated brick building and assembly process of this building

Publications (2)

Publication Number Publication Date
BR102018003399A2 BR102018003399A2 (en) 2018-09-18
BR102018003399B1 true BR102018003399B1 (en) 2019-11-05

Family

ID=63638421

Family Applications (1)

Application Number Title Priority Date Filing Date
BR102018003399-9A BR102018003399B1 (en) 2018-02-21 2018-02-21 prefabricated brick building and assembly process of this building

Country Status (2)

Country Link
BR (1) BR102018003399B1 (en)
WO (1) WO2019161468A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000722A (en) * 2021-09-28 2022-02-01 上海建为历保科技股份有限公司 Structural repairing and method for dry hanging of outer wall brick building

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4726567A (en) * 1986-09-16 1988-02-23 Greenberg Harold H Masonry fence system
US6088987A (en) * 1995-12-21 2000-07-18 Simmons; Scott Modular building materials
US6758020B2 (en) * 1997-09-08 2004-07-06 Cercorp Initiatives Incorporated Flexible interlocking wall system
US20070245673A1 (en) * 1997-09-08 2007-10-25 Dominic Cerrato Flexible interlocking wall system
JP3749825B2 (en) * 2000-09-06 2006-03-01 独立行政法人科学技術振興機構 Brick masonry structure, brick masonry construction method and brick
US6735913B2 (en) * 2002-08-01 2004-05-18 Sanders & Associates Geostructural Engineering, Inc. Block wall system
US20040237445A1 (en) * 2003-01-31 2004-12-02 Kliethermes John C. Materials and methods for constructing a block wall
US7934345B2 (en) * 2005-11-10 2011-05-03 Marsh Roger F Systems for building construction by attaching blocks with bolts and vertically spaced flat bars
US8061095B2 (en) * 2008-06-20 2011-11-22 Larry Bucheger Wall system
WO2012040789A1 (en) * 2010-10-01 2012-04-05 University Of Western Australia Construction block
EP2758611A2 (en) * 2011-08-09 2014-07-30 Tie-Cast Systems, Inc. Masonry reinforcement system

Also Published As

Publication number Publication date
WO2019161468A1 (en) 2019-08-29
BR102018003399A2 (en) 2018-09-18

Similar Documents

Publication Publication Date Title
US2920475A (en) Building panel
US4319440A (en) Building blocks, wall structures made therefrom and methods of making the same
BG61821B1 (en) Modular wall structure made of concrete and foam plastic, and a method and device for building it
EP1544368A1 (en) Formwork element
AU2010201055A1 (en) Vertical construction joints
BR102018003399B1 (en) prefabricated brick building and assembly process of this building
NO864389L (en) Prefabricated, reinforced concrete elements for residential and industrial buildings.
EP2644794B1 (en) System of formwork blocks, structure constructed with same and method for constructing a structure
KR101020395B1 (en) A warm brick set an assembling type and method of manufacturing
KR100585284B1 (en) Curing pannel and curing system for concreting tunnel
SU1097767A1 (en) Ventilation duct unit
EP1094166A2 (en) Improved brick for construction
BR202022015600U2 (en) WALL CONSTRUCTION SYSTEM WITH BLOCKS AND FITTING PARTS WITHOUT THE USE OF PLATING, PLASTERING AND PLASTERING
RU83783U1 (en) MODULAR DESIGN
CN217602209U (en) Fixing device for embedded box of indoor distribution box of residence
CN219569334U (en) Assembled tube sealing prefabricated plate
GB2400617A (en) Insulating concrete form
US1719261A (en) Building stone
JP2834663B2 (en) Equipment centralized unit that is also used for formwork
SU1203220A1 (en) Arrangement for reinforcing brick connection walls
BR102021014266A2 (en) SYSTEM OF INTERLOCKED ELEMENTS FOR PERFORMING VERTICAL SEALING IN CIVIL CONSTRUCTION WORKS
WO2021221542A1 (en) Form system
BR202022022545Y1 (en) CONSTRUCTIVE ARRANGEMENT INTRODUCED IN A HOLLOW BLOCK FOR PRECAST CONSTRUCTIONS
RU94247U1 (en) KIT FOR FIXED FORMWORK FOR BUILDING WALLS, STRUCTURES
US4580300A (en) Combined wall construction form and plumbing fixture mounting device for fire rated wall construction

Legal Events

Date Code Title Description
B03B Publication of an application: anticipated publication
B27A Filing of a green patent (patente verde)
B15K Others concerning applications: alteration of classification

Free format text: A CLASSIFICACAO ANTERIOR ERA: E04B 2/20

Ipc: E04B 2/18 (1968.09), E04B 2/20 (1968.09), E04B 1/7

B09A Decision: intention to grant
B16A Patent or certificate of addition of invention granted

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 21/02/2018, OBSERVADAS AS CONDICOES LEGAIS.