AT37757B - Flushing pipe for recovery with one lining. - Google Patents

Flushing pipe for recovery with one lining.

Info

Publication number
AT37757B
AT37757B AT37757DA AT37757B AT 37757 B AT37757 B AT 37757B AT 37757D A AT37757D A AT 37757DA AT 37757 B AT37757 B AT 37757B
Authority
AT
Austria
Prior art keywords
lining
pipe
recovery
flushing pipe
cement
Prior art date
Application number
Other languages
German (de)
Inventor
Paul Schwartz
Original Assignee
Paul Schwartz
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Paul Schwartz filed Critical Paul Schwartz
Application granted granted Critical
Publication of AT37757B publication Critical patent/AT37757B/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



    Spülrohr   für Bergeversatz mit einem Futter. 
 EMI1.1 
 
 EMI1.2 
   benutzte bisher als Sandleitungsrohre entweder starkwandige gusseiserne Rohre oder dünnwandige Stahlrohre und hat man versucht der Abnutzung der Rohro dadurch zu begegnen,   
 EMI1.3 
 mittels   Heizrohre   hat sich gar nicht bewährt, da dieses Material gar nicht widerstandsfähig ist und haben praktische Versuche ergeben, dass ein Holzfutter in verhältnismässig kurzer Zeit 
 EMI1.4 
 
 EMI1.5 
 
 EMI1.6 
 
 EMI1.7 
 
 EMI1.8 
 
 EMI1.9 
 
 EMI1.10 
 rohre oder Rinnen an der Verwendungsstelle in bekannter Weise durch Stampfen hergestellt werden, ebenfalls ein Vorteil, der für den hier in Frage kommenden Verwendungszweck nicht unerheblich ist.

   Es ist zwar schon ein Rohrkrümmer mit ausgebauchter, abnehmbarer Rückwand in 
 EMI1.11 
 
 EMI1.12 
 
 EMI1.13 
 nehmbaren,   ausgebauclten   Rückwand gerade die durchscheuernde Wirkung, ganz besonders an der Übergangsstelle, direkt wesentlich verstärkt wird. 



   Die zur Anwendung kommenden Futterungsrohre aus Zementbeton können als einzelne 
 EMI1.14 
 rohre durch Stampfen mit einem Betonfutterrohre versehen werden. Werden   einzelne Rdhr-   stücke in die Leitungsrohre eingesetzt, so ist es infolge dessen, dass das Rohrfutter aus 

 <Desc/Clms Page number 2> 

 Beton besteht, ermöglicht, die Stossfugen mit Zement zu vergiessen und durch einen Zement-   vergues   d, as Rohrfutter am Aussenrohre zu befestigen, sodass eine günstige Befestigung und ein ununterbrochener Sandleitungs-Rohrstrang geschaffen wird, wie es mit keinem anderen Material möglich ist.



   <Desc / Clms Page number 1>
 



    Flushing pipe for recovery with one lining.
 EMI1.1
 
 EMI1.2
   previously used either thick-walled cast iron pipes or thin-walled steel pipes as sand pipes and attempts have been made to counter the wear and tear of the pipe
 EMI1.3
 using heating pipes has not proven itself at all, since this material is not at all resistant and practical tests have shown that a wood lining in a relatively short time
 EMI1.4
 
 EMI1.5
 
 EMI1.6
 
 EMI1.7
 
 EMI1.8
 
 EMI1.9
 
 EMI1.10
 Pipes or gutters are made at the point of use in a known manner by tamping, also an advantage that is not insignificant for the purpose in question here.

   It is indeed a pipe bend with a bulged, removable back wall in
 EMI1.11
 
 EMI1.12
 
 EMI1.13
 removable, expanded rear wall, the chafing effect, especially at the transition point, is directly and significantly reinforced.



   The lining pipes made of cement concrete can be used as individual
 EMI1.14
 pipes are provided with a concrete lining pipe by ramming. If individual thread pieces are inserted into the line pipe, it is as a result that the pipe lining

 <Desc / Clms Page number 2>

 Concrete is made, enables the butt joints to be grouted with cement and to be attached to the outer pipe by means of a cement grout d, as pipe lining, so that a favorable fastening and an uninterrupted sand pipe pipe string is created that is not possible with any other material.

 

Claims (1)

PATENT-ANSPRUCH : Spülrohr für Bergeversatz mit einem Futter, dadurch gekennzeichnet, dass dieses Futter aus Zement oder Zementbeton hergestellt ist, in welches Material beliebiges Gestein oder Material einbetoniert skin kann, wobei die Stossfugen der einzelnen Rohre mit Zement vergossen werden, um ein einheitliches Ganzes des Rohrfutters zu bilden. PATENT CLAIM: Flushing pipe for Bergeversatz with a lining, characterized in that this lining is made of cement or cement-concrete, in which material any rock or material can be concreted skin, the butt joints of the individual pipes being grouted with cement to form a uniform whole of the pipe lining .
AT37757D 1906-03-05 1907-10-05 Flushing pipe for recovery with one lining. AT37757B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT29157T 1906-03-05
AT37757T 1907-10-05

Publications (1)

Publication Number Publication Date
AT37757B true AT37757B (en) 1909-06-25

Family

ID=25599258

Family Applications (1)

Application Number Title Priority Date Filing Date
AT37757D AT37757B (en) 1906-03-05 1907-10-05 Flushing pipe for recovery with one lining.

Country Status (1)

Country Link
AT (1) AT37757B (en)

Similar Documents

Publication Publication Date Title
AT37757B (en) Flushing pipe for recovery with one lining.
DE2827314A1 (en) TENSIONABLE EARTH AND ROCK ANCHOR
CN107905222A (en) Pile foundation lining material and apply the lining material prefabricated band bellend prestressing pipe pile construction method
DE333207C (en) Flush offset pipe
Perner et al. New construction of Albula Tunnel II–Experience with steel fibre shotcrete
DE493111C (en) Reinforced concrete slab
DE921439C (en) Process for the production of a lining of pressure tunnels, pressure shafts or the like.
AT224319B (en) Process for the production of a thin-walled container made of prestressed concrete and container produced by this process, as well as formwork and armor for this container
AT49299B (en) Process for the production of a manhole lining from reinforced concrete without formwork.
AT163222B (en) Method for producing a lining of pressure tunnels, pressure shafts or the like.
DE497707C (en) Butt joint of shaped stones for pit lining
DE437873C (en) Reinforced concrete tunnel lining
AT153251B (en) Threshold for railways, trams or the like.
AT45285B (en) Device for fastening hollow, elastic rails used as floor sleepers in the concrete body of the ceiling.
DE327828C (en) Compound shafts and axles
DE479100C (en) Concrete pipes for introducing the flushing offset in mines underground
AT100316B (en) Molded stone with support pins for expanding manholes and the like like
AT84070B (en) Process for the production of artificial stone objects.
AT91673B (en) Pressure tunnel lining.
CN206956721U (en) A kind of attachment structure of anchor pile and structural concrete
DE602240C (en) Reinforced concrete beam ceiling
AT105167B (en) Process for the production of pipes lined with asphalt.
AT206163B (en) Fastening of crampons in thin-walled structures and method for producing this fastening
DE826305C (en) Concrete railway sleeper
AT304084B (en) Lattice girder