AT159818B - Signaling system working with insulated rails, in particular crossing warning system. - Google Patents

Signaling system working with insulated rails, in particular crossing warning system.

Info

Publication number
AT159818B
AT159818B AT159818DA AT159818B AT 159818 B AT159818 B AT 159818B AT 159818D A AT159818D A AT 159818DA AT 159818 B AT159818 B AT 159818B
Authority
AT
Austria
Prior art keywords
relay
contact
rails
closed
signal system
Prior art date
Application number
Other languages
German (de)
Original Assignee
Pintsch Julius Kg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pintsch Julius Kg filed Critical Pintsch Julius Kg
Application granted granted Critical
Publication of AT159818B publication Critical patent/AT159818B/en

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Mit isolierten Sehienen arbeitende Signalanlage, insbesondere Überwegwarnanlage. 
 EMI1.1 
 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 Batterie   Bi. der Widerstand 1,   die Gleisrekais 1, 2, 3 und 4, sowie die   Hilfsrelais o   und 6 und die Signallampen argeordnet.   Eine einadrige Leitung   L führt vom Wegübergarg zu den   Einschaltsl'hienen (/1     und G2.   



   Fährt ein von links kommender Zug auf die isolierte Schiene G1, so wird durch die Zugaehsen 
 EMI2.2 
 Relais 1 auzieht und seine Kontakte 11, 12 usw. umschaltet. Der Kontakt 11 unterbricht die Stromzufuhr zu dem Relais 3, das also abfällt   ur.   d seine Kontakte 31, 32 usw. umschaltet ; Kontakt 31 schaltet das Betriebssignal   IF ab   und das Warnsignal R ein. Durch den   nunmehr   offenen Kontakt 32 bleibt das Relais 3 bis auf weiteres abgeschaltet. Kontakt 33 bereitet   einen Schaltvorgarg   vor, der erst wirksam wird, wenn auch das Relais 4 abgefallen ist und seinen Kontakt 43 geschlossen hat.

   Kontakt 34 unterbricht gleichzeitig die Stromzufuhr zu den Relais 1 und 2. so dass Relais 1 sogleich wieder abfällt und 
 EMI2.3 
 signal bestehen, da das Relais 3 weiterhin stromlos bleibt und demgemäss Kontakt 31 umgeschaltet hat. 



   Gelangen die ersten Zugachsen auf die isolierte Schiene   G's, so   wird die Batterie   BI   über den Widerstard W2 und die   Zugaehse   kurzgeschlossen. Hiedureh tritt ein starker Spannungsabfall an dem Widerstand W3 auf. so dass die Spannung für das Relais 4 zu klein wird und dieses abfällt. seine Kontakte   41,   42 usw. werden also   umgeschaltet.   Kontakt 41 schliesst einen   Umgehurgsstromkreis   
 EMI2.4 
 geschlossen worden : Hilfsrelais 5 spricht also an und schaltet seine Kontakte 51, 52 usw. um. Der   Kontakt J7   umgeht den   Sperrkontakt. 32 und führt   dem Relais 3 Strom zu, so dass Relais 3 anziehen könnte, wenn das der   Spannungsabfall an TVg nicht   verhinderte.

   Kontakt   52 schliesst   einen Haltekreis für das Relais 5 über den gesehlosseren Kontakt 62. Sobald die   Zugarhsen   die isolierte    Seliiere G"   verlassen haben, verschwindet der Spannungsabfall bei   '3. so   dass die Relais 3 und 4 wieder anziehen, ihre Kontakte 31, 32..., 41, 42... in die gezeichnete Lage zurücksehalten und dadurch das Warrsignal aus-und das Betriebssignal einschalten. Dieser Zustand bleibt so lange aufrecht erhalten, wie der vom   Überweg   kommende Zug sieh zwischen G3 und G2 befindet. 



   Gelangen die ersten Achsen des Zuges auf die isolierte Schiene G2, so zieht jetzt das Relais 2   an und schaltet so Kontakt 21, 22 usw. um. Über Kontakt 22 sowie den noch geschlossenen Kontakt 52   zieht jetzt das Hilfsrelais 6 an : die   Offr. urg   des Kontaktes 21 ist einstweilen wirkurgslos. da dieser Kontakt durch den Kontakt 61   überbrückt   ist. Relais 3 bleibt also argezogen und damit der Signal- 
 EMI2.5 
 seinen   Kontakt 27.   22 usw. in die gezeichnete Stellung zurück. Kontakt 22 unterbricht die Strom-   zufuhr   zu dem Relais 6. so dass dieses abfällt und die   Grundstellung   aller Relais wieder hergestellt ist. 



  Der Schaltvorgang für entgegengesetzte Fahrtrichtungen ist im wesentlichen der gleiche, da die Schaltung nahezu symmetrisch aufgebaut ist. 



   Eine weiteres   Ausführurgsbeispiel   zeigt Fig. 2. In dieser Schlatung ist die Schiene nicht als   Rückleitung   benutzt, sondern statt dessen eine weitere Freileiturgsader   L2 vorgesehen. Ausserdem   ist am Wegiibergang auf beiden Seiten eine isolierte Schiene vorgesehen, so dass in jedem Fall das Warn- 
 EMI2.6 
 schaltung liegen, sind bei der Anlage gemäss Fig. 2 mit jeder Einfahrt der Warnstreeke ein Sehwellstromrelais 1 bzw. 2 und ein Ruhestromrelais 3 bzw. 4 in Reihe verbunden. Jedes der beiden Ruhestromrelais 3, 4 liegt ausserdem an einer der isolierten Schienen bzw. Schienenpaare G4 bzw. G3 zu beiden Seiten   des Überweges.   Die   Schaltung   der Hilfsrelais 5, 6 ist gleich derjenigen der Anlage nach Fig. 1.

   Jedoch werden die Signallampen W, R kier nicht unmittelbar von diesen Hilfsrelais, sondern vielmehr unter Vermittlung eines weiteren Hilfsrelais 7 betätigt, welches seinerseits von den Relais 1, 2. 3,4, 6 abhängig ist. 



   Die Anlage arbeitet in folgender Weise :
Ein von links auf das isolierte Schienenpaar G1 auffahrender Zug schliesst den Widerstand W1 kurz, wodurch der Strom in Relais 1 so stark   a"St-hwi ! lt,   dass das Relais seinen Anker anzieht und 

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 das Warnsignal   R   ein. Der Kontakt   13 schliesst   über den geschlossenen Kontakt   63   eine Querverbindung zwischen den Relais 1 und 3, wodurch das letztere kurzgeschlossen wird, abfällt, und seine Kontakte M, 32 usw. umschaltet. Kontakt   3. 3 schliesst über   Kontakt 52 einen weiteren Kurzschlusskreis für Relais 3, vermöge dessen es auch noch nach Abfall des Relais 1 abgefallen bleibt. Das Schliessen des Kontaktes. 32 ist zunächst ohne Folge.

   Nachdem der Zug vollständig in die Warnstrecke eingefahren ist, und sich zwischen den isolierten Schienen G, und G4 befindet, wird Relais 1 wieder abfallen. Der Widerstand   lf.,   ist nämlich so gross bemessen, dass der Abfall zustande kommt, und anderseits so klein, dass das Relais. 3 bei Einfahrt des Zuges über Gl sicher abfällt. Obgleich der Kontakt 11 nun wieder geschlossen hat, wird das Warnsignal durch den Kontakt 31 des Relais 3 aufrecht erhalten. 



  Das Auffahren des Zuges auf die in der Fahrtrichtung vor dem Überweg liegenden isolierten Schienen G4 ändert nichts am Schaltzustand der Anlage. Erst sobald die ersten Zugachsen die Schienen   6*3 hinter   dem Überweg verbinden, ist Relais 4 kurzgeschlossen, fällt ab und schaltet seine Kontakte 41. 42 usw. um.   Kontakt 42 schliesst den Stromkreis des Relais 5, das jetzt anspricht, ebenfalls seine Kontakte J7,   52 usw. umschaltet und sich mit dem Kontakt 51 einen Haltekreis über den geschlossenen Kontakt 62 schafft.   Kontakt 52 unterbricht die Kurzschlüsse der Relais   3   und 4,   die   über deren eigene Kontakte : 33,   43 verlaufen.

   Infolgedessen ziehen diese Relais wieder an, sobald die letzten Zugaehsen die Schienen   G,   verlassen haben, also der   Gleiskurzschluss   ebenfalls beendet ist. Alsdann sind sämtliche Unterbrechungen des Stromkreises von Relais 7 aufgehoben. Letzteres spricht an und lässt am Überweg wieder Betriebssignal erscheinen. Berührt jetzt der aus der Warnstrecke ausfahrende Zug die Schienen G2, so spricht vorübergehend Relais 2 an und über dessen Kontakt 22 auch Relais 6. Beide legen ihre Kontakte   21,   22... und   61,   62... um, wobei Kontakt 63 das Zustandekommen eines Kurzschlusses von Relais 4 und Kontakt 61 den Abfall von Relais 7 verhirdert.

   Kontakt 62 unterbricht den über Kontakt 51 verlaufenden Haltestromkreis für Relais   5   und   sehliesst   gleichzeitig einen Haltekreis für Relais 6 über 22. 



  Sobald die letzten Zugachsen das Schienenpaar G2 verlassen haben, fällt Relais 2 wieder ab und bringt mit Kontakt 22 auch Relais 6 zum Abfall. Damit ist die Grundstellung der Anlage wieder hergestellt. 



   PATENT-ANSPRÜCHE :
1. Mit isolierten Schienen arbeiterde Signalanlage, insbesondere Überwegwarnanlage, dadurch 
 EMI3.2 
 [Fig. 1] L1, L2, [Fig. 2]) geschaltet ist.



   <Desc / Clms Page number 1>
 



  Signaling system that works with insulated rails, in particular crossing warning system.
 EMI1.1
 

 <Desc / Clms Page number 2>

 
 EMI2.1
 Battery Bi. The resistor 1, the track relays 1, 2, 3 and 4, as well as the auxiliary relays o and 6 and the signal lamps are arranged. A single-core cable L leads from the Wegübergarg to the switch-on rails (/ 1 and G2.



   If a train coming from the left drives onto the isolated rail G1, the accesses
 EMI2.2
 Relay 1 pulls out and switches its contacts 11, 12, etc. The contact 11 interrupts the power supply to the relay 3, which thus drops out. d switches its contacts 31, 32, etc.; Contact 31 switches off the operating signal IF and the warning signal R on. Due to the now open contact 32, the relay 3 remains switched off until further notice. Contact 33 prepares a Schaltvorgarg, which only takes effect when the relay 4 has dropped out and its contact 43 has closed.

   Contact 34 interrupts the power supply to relays 1 and 2 at the same time, so that relay 1 immediately drops out again and
 EMI2.3
 signal exist, since the relay 3 remains de-energized and has accordingly switched contact 31.



   If the first pull axles reach the insulated rail G's, the battery BI is short-circuited via the resistor W2 and the accesses. In this case, there is a strong voltage drop across resistor W3. so that the voltage for the relay 4 is too small and this drops. its contacts 41, 42 etc. are thus switched over. Contact 41 closes a Umgehurgsstromkreis
 EMI2.4
 closed: Auxiliary relay 5 responds and switches its contacts 51, 52, etc. over. Contact J7 bypasses the blocking contact. 32 and supplies current to relay 3 so that relay 3 could pick up if the voltage drop at TVg did not prevent it.

   Contact 52 closes a holding circuit for relay 5 via the closed contact 62. As soon as the pulling pins have left the isolated selector G ", the voltage drop at '3 disappears, so that relays 3 and 4 pick up again, their contacts 31, 32 .. ., 41, 42 ... look back into the position shown and thereby switch the warning signal off and the operating signal on This state is maintained as long as the train coming from the crossing is between G3 and G2.



   If the first axles of the train get onto the insulated rail G2, the relay 2 now picks up and switches contacts 21, 22, etc. over. The auxiliary relay 6 now picks up via contact 22 and the still closed contact 52: the Offr. urg of contact 21 is currently ineffective. since this contact is bridged by contact 61. Relay 3 remains pulled and thus the signal
 EMI2.5
 his contact 27. 22 etc. back to the position shown. Contact 22 interrupts the power supply to the relay 6 so that it drops out and the basic position of all relays is restored.



  The switching process for opposite directions of travel is essentially the same, since the circuit is almost symmetrical.



   A further exemplary embodiment is shown in FIG. 2. In this circuit, the rail is not used as a return line, but instead a further overhead line L2 is provided. In addition, an insulated rail is provided on both sides of the path crossing so that the warning
 EMI2.6
 circuit, a Sehwellstromrelais 1 or 2 and a quiescent current relay 3 or 4 are connected in series with the system according to FIG. Each of the two closed-circuit relays 3, 4 is also located on one of the isolated rails or pairs of rails G4 or G3 on both sides of the crossing. The circuit of the auxiliary relays 5, 6 is the same as that of the system according to FIG. 1.

   However, the signal lamps W, R kier are not actuated directly by these auxiliary relays, but rather through the intermediary of a further auxiliary relay 7, which in turn is dependent on the relays 1, 2, 3, 4, 6.



   The system works in the following way:
A train approaching the insulated pair of rails G1 from the left short-circuits the resistor W1, whereby the current in relay 1 is so strong that the relay attracts its armature and

 <Desc / Clms Page number 3>

 
 EMI3.1
 the warning signal R on. The contact 13 closes a cross-connection between the relays 1 and 3 via the closed contact 63, whereby the latter is short-circuited, drops out, and its contacts M, 32 etc. switches over. Contact 3. 3 closes another short circuit for relay 3 via contact 52, by virtue of which it remains open even after relay 1 has dropped out. Closing the contact. 32 is initially without consequence.

   After the train has completely entered the warning line and is between the isolated rails G and G4, relay 1 will drop out again. The resistance lf. Is so large that the drop occurs, and on the other hand so small that the relay. 3 drops safely when the train enters via Gl. Although contact 11 has now closed again, the warning signal is maintained by contact 31 of relay 3.



  When the train drives onto the insulated rails G4 in the direction of travel in front of the crossing, nothing changes the switching status of the system. Only as soon as the first pulling axles connect the rails 6 * 3 behind the crossing, relay 4 is short-circuited, drops out and switches its contacts 41, 42 and so on. Contact 42 closes the circuit of relay 5, which now responds, also switches its contacts J7, 52 etc. and creates a hold circuit with contact 51 via closed contact 62. Contact 52 interrupts the short circuits of relays 3 and 4, which run via their own contacts: 33, 43.

   As a result, these relays pick up again as soon as the last accesses have left the rails G, i.e. the track short circuit has also ended. Then all interruptions in the circuit of relay 7 are canceled. The latter responds and lets the operating signal appear again at the crossing. If the train leaving the warning section touches rails G2, relay 2 responds temporarily, and relay 6 via its contact 22, too A short circuit between relay 4 and contact 61 prevents relay 7 from dropping out.

   Contact 62 interrupts the holding circuit for relay 5 via contact 51 and at the same time closes a holding circuit for relay 6 via 22.



  As soon as the last pull axles have left the pair of rails G2, relay 2 drops out again and, with contact 22, also causes relay 6 to drop out. The basic position of the system is now restored.



   PATENT CLAIMS:
1. With isolated rails working earth signaling system, in particular crossing warning system, thereby
 EMI3.2
 [Fig. 1] L1, L2, [Fig. 2]) is switched.

 

Claims (1)

2. Signalanlage nach Anspruch 1. dadurch gekennzeichnet, dass der Zusatzwiderstand (Wl, W2) in unmittelbarer Nähe der isolierten Schiere bzw. Schienen (G1, G2) argeordnet ist. 2. Signal system according to claim 1, characterized in that the additional resistor (Wl, W2) is arranged in the immediate vicinity of the insulated rails or rails (G1, G2). 3. Signalanlage nach Anspruch 1, dadurch gekennzeichnet, dass der Zusatzwiderstard von den übrigen für die Signalanlagen berötigten Apparaten (Relais usw.) räumlich getrennt argeordnet ist. 3. Signal system according to claim 1, characterized in that the additional resistor is arranged spatially separated from the other devices required for the signal systems (relay, etc.). 4. Signalanlage nach Anspruch 1, dadurch gekennzeichnet, dass der Zusatzwiderstard so bemessen ist, dass das Verhältnis des Gesamtwiderstardes zum Zusatzwiderstard nicht mehr als 1 : 10 beträgt. 4. Signaling system according to claim 1, characterized in that the additional resistor is dimensioned such that the ratio of the total resistor to the additional resistor is not more than 1:10. 5. Signalanlage nach Anspruch 1, dadurch gekennzeichnet, dass an der isolierten Schiene am Eirgarg der Warnstrecke (G i bzw. ( ?) ein Schwellstromrelais bzw. 2), das erst bei Kurzschluss des Zusatzwiderstandes durch die Zugachsen anspricht und parallel hiezu ein Ruhestromrelais (3 bzw. 4, [Fig. 1]) liegt. EMI3.3 stromrelais (3 bzw. 4, [Fig. 2]) liegt. 5. Signal system according to claim 1, characterized in that on the insulated rail on the Eirgarg the warning section (G i or (?) A threshold current relay or 2), which only responds when the additional resistance is shorted by the tension axles and, in parallel, a closed-circuit relay ( 3 or 4, [Fig. 1]). EMI3.3 current relay (3 or 4, [Fig. 2]) is. 7. Signalanlage nach Anspruch 5, dadurch gekennzeichnet. dass unabhängig von der Zugrichtung das eine der beiden Ruhestromrelais (3 [Fig. 1]) stets bei Einfahrt eines Zuges in die Warnstrecke, das andere Ruhestromrelais (4 [Fig. 1]) stets bei Auffahrt des Zuges auf die isolierte Schiene (G3 [Fig. 1]) am Überweg abfällt. 7. Signal system according to claim 5, characterized. that regardless of the direction of the train, one of the two closed-circuit relays (3 [Fig. 1]) always when a train enters the warning line, the other closed-circuit relay (4 [Fig. 1]) always when the train enters the insulated rail (G3 [ Fig. 1]) falls on the crossing. 8. Signalanlage nach Anspruch 7, dadurch gekennzeichnet, dass dem einen Ruhestromrelais (3 EMI3.4 schaltet ist. 8. Signal system according to claim 7, characterized in that the one closed-circuit relay (3 EMI3.4 is switched. 10. Signalanlage nach Anspruch 6, dadruch gekennzeichnet, dass jedes der beiden Ruhestrom- relais (3, 4 [Fig. 2]) gleichzeitig in einer der isolierten Schienen neben dem Überweg liegt. 10. Signal system according to claim 6, characterized in that each of the two quiescent current relays (3, 4 [Fig. 2]) is located at the same time in one of the insulated rails next to the crossing.
AT159818D 1938-05-14 1938-05-14 Signaling system working with insulated rails, in particular crossing warning system. AT159818B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT159818T 1938-05-14

Publications (1)

Publication Number Publication Date
AT159818B true AT159818B (en) 1940-11-25

Family

ID=3650599

Family Applications (1)

Application Number Title Priority Date Filing Date
AT159818D AT159818B (en) 1938-05-14 1938-05-14 Signaling system working with insulated rails, in particular crossing warning system.

Country Status (1)

Country Link
AT (1) AT159818B (en)

Similar Documents

Publication Publication Date Title
AT159818B (en) Signaling system working with insulated rails, in particular crossing warning system.
DE819111C (en) Arrangement for the resolution of routes in the railway security system
DE671356C (en) Electrical relay arrangement
DE708626C (en) Monitoring of a warning signal system for road crossings
AT151065B (en) Circuit arrangement for railway safety devices.
DE898010C (en) Circuit for signal boxes with electrical locks
DE688918C (en)
DE689606C (en) railway crossings
DE670083C (en) Overhead signaling device
DE745531C (en) Overhead warning device for railway lines used in one or both directions
DE863666C (en) Set up for automatic railway signal systems
DE547913C (en) Overhead signaling device
DE744960C (en) Device for railway safety systems, in particular for the automatic route block with three-aspect signals
DE423169C (en) Arrangement for switching off lines, transformers, etc. Like. In electrical distribution systems with overcurrent
DE651680C (en) Line block circuit for two or more aspect signals
DE729001C (en) Device for remote control and monitoring of street lamps
DE641350C (en) Arrangement for displaying switching operations
DE711456C (en) Arrangement for the automatic control of signaling devices, especially for overhead warning systems
DE237928C (en)
AT160363B (en) Monitoring device for signal systems, in particular for crossing signal systems.
AT113042B (en) Circuit arrangement for block relays.
DE735470C (en) Warning signal system for railway crossings
DE937357C (en) Railway block system
DE696814C (en) Warning system for securing overpasses
DE749634C (en) Circuit arrangement for the transmission of messages, in particular for fire and police reporting systems