AR092189A1 - Prueba de inyeccion de fractura natural - Google Patents
Prueba de inyeccion de fractura naturalInfo
- Publication number
- AR092189A1 AR092189A1 ARP130102959A ARP130102959A AR092189A1 AR 092189 A1 AR092189 A1 AR 092189A1 AR P130102959 A ARP130102959 A AR P130102959A AR P130102959 A ARP130102959 A AR P130102959A AR 092189 A1 AR092189 A1 AR 092189A1
- Authority
- AR
- Argentina
- Prior art keywords
- pressure
- information
- time interval
- formation
- injection
- Prior art date
Links
- 238000002347 injection Methods 0.000 title abstract 5
- 239000007924 injection Substances 0.000 title abstract 5
- 230000015572 biosynthetic process Effects 0.000 abstract 4
- 239000012530 fluid Substances 0.000 abstract 4
- 238000005259 measurement Methods 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
Abstract
Un método para la estimación de una propiedad de una formación terrestre penetrada por un pozo incluye: la realización de una prueba de integridad del pozo, a una presión inferior a una presión de gradiente de fractura de la formación, de manera de proporcionar información de pérdida de derrame; la inyección de un fluido en la formación, a una primera presión mayor que la presión de gradiente de fractura, durante un primer intervalo de tiempo de inyección usando un inyector de fluido; la medición de la presión frente al tiempo, usando un sensor de presión y un cronómetro durante un primer intervalo de tiempo de prueba a fin de proporcionar primera información de presión; la inyección de un fluido en la formación, con un segundo caudal mayor que el primer caudal durante un segundo intervalo de tiempo de inyección usando el inyector de fluido; la medición de la presión frente al tiempo, usando el sensor de presión y el cronómetro durante un segundo intervalo de tiempo de prueba a fin de proporcionar segunda información de presión: y la estimación de la propiedad usando la primera información de presión, la segunda información de presión y la información de pérdida de derrame.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/591,745 US9366122B2 (en) | 2012-08-22 | 2012-08-22 | Natural fracture injection test |
Publications (1)
Publication Number | Publication Date |
---|---|
AR092189A1 true AR092189A1 (es) | 2015-04-08 |
Family
ID=49036430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP130102959A AR092189A1 (es) | 2012-08-22 | 2013-08-21 | Prueba de inyeccion de fractura natural |
Country Status (4)
Country | Link |
---|---|
US (1) | US9366122B2 (es) |
EP (1) | EP2700785B1 (es) |
CN (1) | CN103628865B (es) |
AR (1) | AR092189A1 (es) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9611737B2 (en) * | 2013-09-17 | 2017-04-04 | Husky Oil Operations Limited | Method for determining regions for stimulation along a wellbore within a hydrocarbon formation, and using such method to improve hydrocarbon recovery from the reservoir |
CA2959593A1 (en) * | 2014-12-17 | 2016-06-23 | Halliburton Energy Services Inc. | Optimizing matrix acidizing treatment |
GB2539056A (en) * | 2015-06-03 | 2016-12-07 | Geomec Eng Ltd | Improvements in or relating to injection wells |
GB2539001B (en) * | 2015-06-03 | 2021-04-21 | Geomec Eng Ltd | Improvements in or relating to hydrocarbon production from shale |
CN105545271A (zh) * | 2015-12-22 | 2016-05-04 | 中国石油化工股份有限公司 | 一种低渗透凝析气藏压裂液返排控制方法 |
GB2546335B (en) | 2016-01-18 | 2021-08-04 | Equinor Energy As | Method and apparatus for pressure integrity testing |
US10415382B2 (en) * | 2016-05-03 | 2019-09-17 | Schlumberger Technology Corporation | Method and system for establishing well performance during plug mill-out or cleanout/workover operations |
CA3025188A1 (en) * | 2016-07-07 | 2018-01-11 | Hppe, Llc | Cross-linked levan blends as lost circulation materials |
CA3045879C (en) | 2017-01-13 | 2022-07-12 | Halliburton Energy Services, Inc. | Determining wellbore parameters through analysis of the multistage treatments |
RU173763U1 (ru) * | 2017-04-04 | 2017-09-11 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский государственный нефтяной технический университет" | Установка для моделирования газопроявлений в скважине в период ожидания затвердевания цемента |
CN108956052B (zh) * | 2018-05-04 | 2020-01-03 | 中国石油化工股份有限公司 | 一种橡胶密封圈耐二氧化碳性能试验方法 |
CN109372498B (zh) * | 2018-09-29 | 2021-09-21 | 中国石油大学(北京) | 确定岩层中破碎带的方法及装置 |
WO2020117248A1 (en) | 2018-12-06 | 2020-06-11 | Halliburton Energy Services, Inc. | Interpretation of pumping pressure behavior and diagnostic for well perforation efficiency during pumping operations |
US11268365B2 (en) | 2019-05-17 | 2022-03-08 | Halliburton Energy Services, Inc. | Estimating active fractures during hydraulic fracturing operations |
CA3139663C (en) | 2019-06-21 | 2024-01-02 | Halliburton Energy Services, Inc. | Evaluating hydraulic fracturing breakdown effectiveness |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3636762A (en) | 1970-05-21 | 1972-01-25 | Shell Oil Co | Reservoir test |
US4192182A (en) * | 1978-11-16 | 1980-03-11 | Sylvester G Clay | Method for performing step rate tests on injection wells |
US4378845A (en) * | 1980-12-30 | 1983-04-05 | Mobil Oil Corporation | Sand control method employing special hydraulic fracturing technique |
CA1202882A (en) * | 1982-03-01 | 1986-04-08 | Owen Richmond | Method of removing gas from an underground seam |
CN1019520B (zh) * | 1985-09-25 | 1992-12-16 | 施卢默格海外有限公司 | 估计一个储油层中至少两层地层的渗透性及表层系数的方法 |
US4793413A (en) * | 1987-12-21 | 1988-12-27 | Amoco Corporation | Method for determining formation parting pressure |
US5163321A (en) * | 1989-10-17 | 1992-11-17 | Baroid Technology, Inc. | Borehole pressure and temperature measurement system |
US6378363B1 (en) * | 1999-03-04 | 2002-04-30 | Schlumberger Technology Corporation | Method for obtaining leak-off test and formation integrity test profiles from limited downhole pressure measurements |
NO313923B1 (no) * | 2001-04-03 | 2002-12-23 | Silver Eagle As | FremgangsmÕte for Õ hindre et fluid i Õ strömme i eller omkring et brönnrör ved hjelp av lösmasse |
US6705398B2 (en) * | 2001-08-03 | 2004-03-16 | Schlumberger Technology Corporation | Fracture closure pressure determination |
US7054751B2 (en) | 2004-03-29 | 2006-05-30 | Halliburton Energy Services, Inc. | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
ITMI20060995A1 (it) * | 2006-05-19 | 2007-11-20 | Eni Spa | Procedimento per testare pozzi di idrocarburi a zero emissioni |
US8056630B2 (en) * | 2007-03-21 | 2011-11-15 | Baker Hughes Incorporated | Methods of using viscoelastic surfactant gelled fluids to pre-saturate underground formations |
US20090204328A1 (en) * | 2008-02-12 | 2009-08-13 | Precision Energey Services, Inc. | Refined analytical model for formation parameter calculation |
US8087292B2 (en) * | 2008-04-30 | 2012-01-03 | Chevron U.S.A. Inc. | Method of miscible injection testing of oil wells and system thereof |
US9303508B2 (en) * | 2009-01-13 | 2016-04-05 | Schlumberger Technology Corporation | In-situ stress measurements in hydrocarbon bearing shales |
US9790788B2 (en) * | 2009-05-05 | 2017-10-17 | Baker Hughes Incorporated | Apparatus and method for predicting properties of earth formations |
-
2012
- 2012-08-22 US US13/591,745 patent/US9366122B2/en active Active
-
2013
- 2013-08-21 AR ARP130102959A patent/AR092189A1/es active IP Right Grant
- 2013-08-21 EP EP13181146.5A patent/EP2700785B1/en active Active
- 2013-08-22 CN CN201310463542.8A patent/CN103628865B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
EP2700785A3 (en) | 2017-08-16 |
CN103628865A (zh) | 2014-03-12 |
US20140058686A1 (en) | 2014-02-27 |
CN103628865B (zh) | 2017-07-28 |
EP2700785B1 (en) | 2023-10-04 |
US9366122B2 (en) | 2016-06-14 |
EP2700785A2 (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR092189A1 (es) | Prueba de inyeccion de fractura natural | |
EA201200864A1 (ru) | Способ измерения смачиваемости горных пород | |
AR087411A1 (es) | Metodos para el monitoreo de la formacion y el transporte de un fluido de fracturacion usando dispositivos opticoanaliticos | |
AR072304A1 (es) | Metodos para estimar la permeabilidad de la formacion utilizando las mediciones de intervalos de tiempo | |
WO2012121769A3 (en) | Method and systems for reservoir modeling, evaluation and simulation | |
CO6731110A2 (es) | Sistema y método para el control del paso de fluído en el fondo del pozo, teniendo resistencia de flujo dependiente de la dirección | |
AR081027A1 (es) | Barreras para flujos subterraneos que contienen trazadores | |
AR078110A1 (es) | Metodos mejorados de desviacion y colocacion de fluidos en formaciones subterraneas | |
WO2013177161A3 (en) | Methods and systems for testing the integrity of components of a hydrocarbon well system | |
AR087013A1 (es) | Colocacion en el fondo del pozo de polimeros hinchables en agua | |
AR096088A1 (es) | Operaciones de facturación que emplean dióxido de cloro | |
BR112012029011A2 (pt) | sistema para monitorar um fluxo de líquido em um poço de hidrocarboneto, método para monitorar um fluxo de líquido em um furo de poço, método para monitorar um fluxo de água em uma região de interesse, e dispositivo de monitoramento de líquido passivo | |
AR096173A1 (es) | Rompedores que contienen composiciones de hierro y sus métodos de uso | |
EA201101204A1 (ru) | Способ секвестрации флюидов в геологических формациях | |
BR112014001373A2 (pt) | viscômetro para uso em fundo de poço | |
GB201303095D0 (en) | Method and system for running barrier valve on production string | |
GB2506569A (en) | An apparatus, system and method for injecting a fluid into a formation downhole | |
AR068290A1 (es) | Metodo y sistema para la interpretacion de ensayos de descarga usando regresion no lineal | |
BR112016010056A8 (pt) | método de gerar ácidos fortes em furo descendente | |
DK2032794T3 (da) | Topfyldning af rørledning | |
AR099021A1 (es) | Productos de refuerzo para agentes reductores de la viscosidad que contienen compuestos de hierro y sus procedimientos de uso | |
BR112014018019A8 (pt) | Método de teste da resistência de um pneu a uma perda de pressão | |
BR112014006671A2 (pt) | aparelho provador de pequeno volume, e método para medir um fluxo de fluido | |
EA201490692A1 (ru) | Способ и устройство для определения температурного состояния топлива в системе определения утечки в линии | |
AR090635A1 (es) | Aparato, metodos y sistemas de correccion de la velocidad de compresion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant, registration |