GB2539001B - Improvements in or relating to hydrocarbon production from shale - Google Patents
Improvements in or relating to hydrocarbon production from shale Download PDFInfo
- Publication number
- GB2539001B GB2539001B GB1509576.3A GB201509576A GB2539001B GB 2539001 B GB2539001 B GB 2539001B GB 201509576 A GB201509576 A GB 201509576A GB 2539001 B GB2539001 B GB 2539001B
- Authority
- GB
- United Kingdom
- Prior art keywords
- shale
- relating
- hydrocarbon production
- hydrocarbon
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004215 Carbon black (E152) Substances 0.000 title 1
- 229930195733 hydrocarbon Natural products 0.000 title 1
- 150000002430 hydrocarbons Chemical class 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Geophysics (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Priority Applications (26)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1509576.3A GB2539001B (en) | 2015-06-03 | 2015-06-03 | Improvements in or relating to hydrocarbon production from shale |
GB1513655.9A GB2539056A (en) | 2015-06-03 | 2015-08-03 | Improvements in or relating to injection wells |
PCT/GB2016/051621 WO2016193729A1 (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing |
MX2017015001A MX2017015001A (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing. |
PCT/GB2016/051624 WO2016193732A1 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
US15/573,997 US10570729B2 (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing |
EA201792189A EA201792189A1 (en) | 2015-06-03 | 2016-06-02 | DEVICE FOR MEASURING WELL PRESSURE WITH HIGH FREQUENCY DISCRETIZATION |
MX2017015000A MX2017015000A (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing. |
MX2017014999A MX2017014999A (en) | 2015-06-03 | 2016-06-02 | A downhole pressure measuring tool with a high sampling rate. |
AU2016272530A AU2016272530A1 (en) | 2015-06-03 | 2016-06-02 | A downhole pressure measuring tool with a high sampling rate |
AU2016272526A AU2016272526A1 (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing |
CA2986356A CA2986356A1 (en) | 2015-06-03 | 2016-06-02 | A downhole pressure measuring tool with a high sampling rate |
EA201792188A EA037344B1 (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing |
AU2016272529A AU2016272529A1 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
US15/576,832 US10570730B2 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
EP16736551.9A EP3303769A1 (en) | 2015-06-03 | 2016-06-02 | A downhole pressure measuring tool with a high sampling rate |
CN201680030166.5A CN107923239A (en) | 2015-06-03 | 2016-06-02 | The cracking initiation through hydrocarbon filling carried out before shale pressure break is tested |
EA201792190A EA036110B1 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
CA2986313A CA2986313A1 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
US15/574,695 US10641089B2 (en) | 2015-06-03 | 2016-06-02 | Downhole pressure measuring tool with a high sampling rate |
EP16736550.1A EP3303771A1 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
CN201680030129.4A CN108076649A (en) | 2015-06-03 | 2016-06-02 | Heat induces low flow rate pressure break |
EP16736548.5A EP3303768B1 (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing |
CA2986355A CA2986355A1 (en) | 2015-06-03 | 2016-06-02 | Thermally induced low flow rate fracturing |
CN201680030159.5A CN107923237A (en) | 2015-06-03 | 2016-06-02 | Down-hole pressure survey tool with high sampling rate |
PCT/GB2016/051625 WO2016193733A1 (en) | 2015-06-03 | 2016-06-02 | A downhole pressure measuring tool with a high sampling rate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1509576.3A GB2539001B (en) | 2015-06-03 | 2015-06-03 | Improvements in or relating to hydrocarbon production from shale |
Publications (3)
Publication Number | Publication Date |
---|---|
GB201509576D0 GB201509576D0 (en) | 2015-07-15 |
GB2539001A GB2539001A (en) | 2016-12-07 |
GB2539001B true GB2539001B (en) | 2021-04-21 |
Family
ID=53677679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB1509576.3A Active GB2539001B (en) | 2015-06-03 | 2015-06-03 | Improvements in or relating to hydrocarbon production from shale |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB2539001B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2563643B (en) * | 2017-06-22 | 2022-02-16 | Geomec Eng Ltd | Improvements in or relating to injection wells |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070083331A1 (en) * | 2005-10-07 | 2007-04-12 | Craig David P | Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures |
US20120267096A1 (en) * | 2007-11-30 | 2012-10-25 | Elena Mikhailovna Pershikova | Method of testing the operation of a producing pil well operated using the formation hydrofracturing process |
US20140058686A1 (en) * | 2012-08-22 | 2014-02-27 | Baker Hughes Corporation | Natural fracture injection test |
US20140238668A1 (en) * | 2011-10-06 | 2014-08-28 | Schlumberger Technology Corporation | Testing while fracturing while drilling |
-
2015
- 2015-06-03 GB GB1509576.3A patent/GB2539001B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070083331A1 (en) * | 2005-10-07 | 2007-04-12 | Craig David P | Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures |
US20120267096A1 (en) * | 2007-11-30 | 2012-10-25 | Elena Mikhailovna Pershikova | Method of testing the operation of a producing pil well operated using the formation hydrofracturing process |
US20140238668A1 (en) * | 2011-10-06 | 2014-08-28 | Schlumberger Technology Corporation | Testing while fracturing while drilling |
US20140058686A1 (en) * | 2012-08-22 | 2014-02-27 | Baker Hughes Corporation | Natural fracture injection test |
Also Published As
Publication number | Publication date |
---|---|
GB2539001A (en) | 2016-12-07 |
GB201509576D0 (en) | 2015-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB201415334D0 (en) | Improvement in or relating to crawlers | |
GB201513655D0 (en) | Improvements in or relating to injection wells | |
GB201410668D0 (en) | Improvements in or relating to stairlifts | |
GB201702982D0 (en) | Improvements in or relating to centralisers | |
GB201511915D0 (en) | Improvements in or relating to closures | |
GB2530912B (en) | Improvements in or relating to morphing tubulars | |
GB201413606D0 (en) | Improvement in or relating to closures | |
GB2536321B (en) | Improvements in or relating to morphing tubulars | |
AP2016009629A0 (en) | Shale gas extraction | |
GB201414603D0 (en) | Improvements in or relating to closures | |
GB2536314B (en) | Hydrocarbon exploitation | |
GB2531123B (en) | Improvements in or relating to morphing tubulars | |
GB2539002B (en) | Improvements in or relating to hydrocarbon production from shale | |
GB2529132B (en) | Improvements in or relating to stairlifts | |
GB2526621B (en) | Improvements in or relating to stairlifts | |
GB2539001B (en) | Improvements in or relating to hydrocarbon production from shale | |
GB201405174D0 (en) | Improvements in or relating to guttering | |
GB201400699D0 (en) | Improvements in or relating to servewear | |
GB201515238D0 (en) | Hydrocarbon production process | |
GB2526378B (en) | Improvements in or relating to geological logging | |
GB201419234D0 (en) | Hydrocarbon production process | |
GB201418307D0 (en) | Improvements in or relating to stairlifts | |
GB201408137D0 (en) | Improvements in or relating to mine ploughs | |
GB2524127B (en) | Asphalt production | |
GB201500789D0 (en) | Improvements in or relating to centralisers |