AR083444A1 - Procedimiento y dispositivo para determinar una planificacion optima de proceso de produccion para la implementacion de un proceso de produccion - Google Patents
Procedimiento y dispositivo para determinar una planificacion optima de proceso de produccion para la implementacion de un proceso de produccionInfo
- Publication number
- AR083444A1 AR083444A1 ARP110103807A AR083444A1 AR 083444 A1 AR083444 A1 AR 083444A1 AR P110103807 A ARP110103807 A AR P110103807A AR 083444 A1 AR083444 A1 AR 083444A1
- Authority
- AR
- Argentina
- Prior art keywords
- production process
- cost
- planning
- predefined
- procedure
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- General Factory Administration (AREA)
Abstract
La presente se refiere a un procedimiento para determinar una planificación óptima de producción (PAPopt), el cual comprende las siguientes etapas: crear una primera planificación de proceso de producción (PAP1) de acuerdo a una primera función predefinida de coste (KF1) y a un modelo predefinido de proceso de producción (M), estando la primera función de coste (KF1) diseñada para determinar la primera variable de coste (K1), la cual indica los costes de energía de la primera planificación de producción (PAP1); crear una o más segundas planificaciones de proceso de producción (PAP2) de acuerdo a una respectiva segunda función predefinida de coste (KF2) y al modelo predefinido de proceso de producción (M), estando una o más de las segundas funciones de coste (KF2, KF3) diseñadas para determinar una o más segundas variables de coste (K2, K3); determinar una variable de coste total (KG) en base a la primera variable de coste (K1) y a una o más segundas variables de coste (K2, K3) para cada una de las planificaciones de proceso de producción (PAP1, PAP2, PAP3); seleccionar aquella planificación de proceso de producción cuya variable de coste total es la más baja, como planificación óptima de producción (PAPopt).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201010048409 DE102010048409A1 (de) | 2010-10-15 | 2010-10-15 | Verfahren und Vorrichtung zur Optimierung eines Produktionsprozesses |
Publications (1)
Publication Number | Publication Date |
---|---|
AR083444A1 true AR083444A1 (es) | 2013-02-27 |
Family
ID=44872258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP110103807 AR083444A1 (es) | 2010-10-15 | 2011-10-13 | Procedimiento y dispositivo para determinar una planificacion optima de proceso de produccion para la implementacion de un proceso de produccion |
Country Status (5)
Country | Link |
---|---|
US (1) | US20130226648A1 (es) |
CN (1) | CN103348364A (es) |
AR (1) | AR083444A1 (es) |
DE (1) | DE102010048409A1 (es) |
WO (1) | WO2012048808A1 (es) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110989540B (zh) | 2012-07-04 | 2023-04-25 | 诺尔斯海德公司 | 用于优化工业过程的产品特性和生产成本的方法 |
WO2014032743A1 (en) | 2012-09-03 | 2014-03-06 | Abb Technology Ag | Systems and methods for optimized operation of an energy-intensive industrial batch production facility |
EP2894426A1 (en) * | 2014-01-14 | 2015-07-15 | ABB Technology AG | Method for scheduling a production process |
US9441936B2 (en) * | 2014-07-29 | 2016-09-13 | Plethora Corporation | System and method for automated object measurement |
CN107077130B (zh) * | 2014-11-13 | 2020-01-14 | 西门子公司 | 用于规划产品的制造的方法和具有自我描述信息的生产模块 |
DE102015202412A1 (de) * | 2015-02-11 | 2016-08-11 | Siemens Aktiengesellschaft | Betriebsverfahren zum Lastmanagement einer Anlage und zugehöriger Betriebsmittelagent |
CN105159072A (zh) * | 2015-08-17 | 2015-12-16 | 宁波伟吉电力科技有限公司 | 基于随机规划的非确定调度模型的调度方法 |
EP3602432A1 (en) * | 2017-03-24 | 2020-02-05 | Siemens Aktiengesellschaft | Flexible product manufacturing planning |
DE102018211104A1 (de) * | 2018-07-05 | 2020-01-09 | Thyssenkrupp Ag | Verfahren und Einrichtung zum Betrieb einer Produktionsanlage |
WO2023150514A1 (en) * | 2022-02-04 | 2023-08-10 | C3.Ai, Inc. | Resource-task network (rtn)-based templated production schedule optimization (pso) framework |
CN116382219B (zh) * | 2023-05-16 | 2023-08-11 | 苏州海卓伺服驱动技术有限公司 | 一种基于在线测量技术的电机生产工艺优化方法及系统 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4744028A (en) * | 1985-04-19 | 1988-05-10 | American Telephone And Telegraph Company, At&T Bell Laboratories | Methods and apparatus for efficient resource allocation |
US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US20090210081A1 (en) * | 2001-08-10 | 2009-08-20 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
DE10334397A1 (de) * | 2003-07-28 | 2005-03-10 | Siemens Ag | Verfahren zur Reduzierung der Energiekosten in einem industriell geführten Betrieb |
JP2007264704A (ja) * | 2006-03-27 | 2007-10-11 | Yokogawa Electric Corp | エネルギー管理システム |
-
2010
- 2010-10-15 DE DE201010048409 patent/DE102010048409A1/de not_active Ceased
-
2011
- 2011-10-05 WO PCT/EP2011/004954 patent/WO2012048808A1/de active Application Filing
- 2011-10-05 CN CN201180060273XA patent/CN103348364A/zh active Pending
- 2011-10-13 AR ARP110103807 patent/AR083444A1/es unknown
-
2013
- 2013-04-15 US US13/862,785 patent/US20130226648A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
WO2012048808A1 (de) | 2012-04-19 |
DE102010048409A1 (de) | 2012-04-19 |
US20130226648A1 (en) | 2013-08-29 |
CN103348364A (zh) | 2013-10-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR083444A1 (es) | Procedimiento y dispositivo para determinar una planificacion optima de proceso de produccion para la implementacion de un proceso de produccion | |
CL2016002759A1 (es) | Método para hacer una película laminada elástica y respirable; y artículo derivados de la misma. | |
UY4147Q (es) | Golosina para mascota | |
UY4175Q (es) | Reloj pulsera | |
BR112014006707A2 (pt) | artigos retrorrefletivos que incluem uma marca de segurança | |
BR112015015014A2 (pt) | laminado elástico e processo para a fabricação de laminado elástico. | |
IN2014DN09567A (es) | ||
BR112014006699A2 (pt) | artigos retrorrefletivos que incluem uma marca de segurança | |
CO6571889A2 (es) | Antidotos anticoagulantes | |
UY4281Q (es) | Juguera | |
WO2015050891A3 (en) | Methods for assessing status of post-transplant liver and determining and administering specific treatment regimens | |
BR112014003806A2 (pt) | polímeros de adsorção de sujeira | |
MX2015017319A (es) | Predicción de múltiples en datos de levantamiento. | |
BR112015009042A8 (pt) | Método para identificar uma população de célula renal heterogênea adequada para implantação e/ou desencadeamento de uma resposta regenerativa | |
WO2014022086A3 (en) | Note atlas | |
EA201400940A1 (ru) | Способ получения медетомидина | |
DE102011101585A8 (de) | Verfahren zur Herstellung von Leuchtdioden oder photovoltaischen Elementen | |
FI20125700A (fi) | Yhteisdata suhdetiedolla | |
JP2013083044A5 (es) | ||
MX2016013395A (es) | Seguimiento del rendimiento de un sistema de almacenamiento de energia electrica. | |
USD721774S1 (en) | Basketball court | |
UY34127A (es) | ?zapato con plantilla reconfigurable y método | |
BR112015000887A2 (pt) | unidade de luva, e, método de acionar uma unidade de luva instalada na tubulação de produção". | |
PE20150225A1 (es) | Sistema de produccion de energia por medio de la accion de olas | |
IN2012DE00811A (es) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FB | Suspension of granting procedure |