JP3334415B2 - Production control device - Google Patents

Production control device

Info

Publication number
JP3334415B2
JP3334415B2 JP7965995A JP7965995A JP3334415B2 JP 3334415 B2 JP3334415 B2 JP 3334415B2 JP 7965995 A JP7965995 A JP 7965995A JP 7965995 A JP7965995 A JP 7965995A JP 3334415 B2 JP3334415 B2 JP 3334415B2
Authority
JP
Japan
Prior art keywords
progress information
work progress
update
work
job
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7965995A
Other languages
Japanese (ja)
Other versions
JPH08249044A (en
Inventor
寿浩 奥村
政人 高橋
純二 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP7965995A priority Critical patent/JP3334415B2/en
Publication of JPH08249044A publication Critical patent/JPH08249044A/en
Application granted granted Critical
Publication of JP3334415B2 publication Critical patent/JP3334415B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)
  • Control By Computers (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、複数の作業工程を経て
製品の製造を行うための製造工程に適用される生産制御
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production control apparatus applied to a manufacturing process for manufacturing a product through a plurality of working steps.

【0002】[0002]

【従来の技術】従来、製造工程に適用される生産制御装
置に関するものとして、例えば、特開平4−27045
9号公報などに記載されるものがある。図5に示される
ように、特開平4−270459号公報に開示されてい
る生産制御装置200は、生産状況受信手段51、ジョ
ブ優先度算出手段52、着手ジョブ算出手段53及び着
手ジョブ算出結果送信手段54から構成される。
2. Description of the Related Art A conventional production control apparatus applied to a manufacturing process is disclosed in, for example, Japanese Patent Application Laid-Open No. Hei 4-27045.
No. 9 publication. As shown in FIG. 5, the production control device 200 disclosed in Japanese Patent Application Laid-Open No. 4-270559 includes a production status receiving unit 51, a job priority calculating unit 52, a start job calculating unit 53, and a start job calculation result transmission. Means 54.

【0003】この装置200では、まず、生産状況受信
手段51において、生産計画55、作業進捗情報56、
設備稼働情報57及び設備稼働履歴情報58を受信す
る。次に、生産計画55や作業進捗情報56などの生産
状況データや基礎情報59を基に、ジョブ優先度算出手
段52にて、生産システム全体の設備稼働状況やジョブ
の進捗状況などを考慮して、各時点の生産状況に応じた
ジョブ優先度60を動的に更新する。さらに、着手ジョ
ブ算出手段53にて、生産システム内のある設備で処理
が終了し、設備が空いた時点で、その優先度と設備での
処理効率を考慮して、次にその設備で処理すべき着手ジ
ョブ61を決定するというものである。
In this apparatus 200, first, a production plan 55, work progress information 56,
The equipment operation information 57 and the equipment operation history information 58 are received. Next, based on the production status data such as the production plan 55 and the work progress information 56 and the basic information 59, the job priority calculation means 52 takes into consideration the equipment operation status of the entire production system, the job progress status, and the like. And dynamically updates the job priority 60 according to the production situation at each point in time. Further, the start job calculating means 53 completes processing at a certain facility in the production system, and when the facility is vacant, takes into account its priority and processing efficiency at the facility, and then performs processing at that facility. The job to be started 61 is determined.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記に
示される開示技術などでは、通常、作業進捗情報56の
収集や、ジョブ優先度60の算出にある程度の時間を必
要とするために、特に取り扱うデータの量が多い場合に
は、ジョブ優先度60の算出中に対象の処理が開始さ
れ、さらに、終了してしまうと、実際の作業進捗状況と
ジョブ優先度60の算出結果とに差異が生じるという問
題がある。
However, in the disclosed technology and the like described above, it usually takes a certain amount of time to collect the work progress information 56 and calculate the job priority 60. Is large, the target process is started during the calculation of the job priority 60, and when it is completed, a difference occurs between the actual work progress status and the calculation result of the job priority 60. There's a problem.

【0005】従って、本発明の目的は、ジョブ優先度を
算出中に、対象の処理が開始され、さらに終了してしま
った場合において、実際の作業進捗状況とジョブ優先度
の算出結果とが一致する生産制御装置を提供することで
ある。
[0005] Therefore, an object of the present invention is to provide a method for calculating the job priority, in which the actual work progress status and the job priority calculation result coincide with each other when the target process is started and ended. The purpose of the present invention is to provide a production control device.

【0006】[0006]

【課題を解決するための手段】上記の課題を解決するた
め、本発明の構成は、作業工程の工程順序及び工程内容
を記述した工程フローを記憶する記憶装置と、工程フロ
ーを基にロットの進行管理及び各種装置の制御を行うロ
ット進行・制御サブシステムとを用い、複数の作業工程
を経て複数の製品を形成する生産制御装置であって、作
業計画に基づき、着手ジョブを算出し、各種装置に該着
手ジョブを指示する着手ジョブ算出手段と、その着手ジ
ョブ算出手段により算出された着手ジョブの進捗状況に
応じて、工程の作業進捗情報を更新する作業進捗情報更
新手段と、その作業進捗情報更新手段による作業進捗情
報の更新を停止するための更新停止信号を出力する更新
停止通知手段と、作業進捗情報の更新の停止の通知を予
告する更新停止予告手段と、作業進捗情報を収集する作
業進捗情報収集手段と、その収集された作業進捗情報と
生産計画とから作業計画を作成する作業計画生成手段と
を備えたことを特徴とする。
In order to solve the above-mentioned problems, a configuration of the present invention comprises a storage device for storing a process flow describing a process sequence and process contents of a work process; A production control device that forms a plurality of products through a plurality of work processes using a lot progress / control subsystem that performs progress management and control of various devices. Start job calculating means for instructing the apparatus to start the job, work progress information updating means for updating the work progress information of the process according to the progress of the start job calculated by the start job calculating means, and the work progress Update stop notifying means for outputting an update stop signal for stopping the update of the work progress information by the information updating means , and notification of stop of the update of the work progress information is scheduled.
Update stop notification means for notifying, work progress information collecting means for collecting work progress information, and work plan generating means for creating a work plan from the collected work progress information and the production plan. I do.

【0007】また、第二の発明の構成は、着手ジョブ算
出手段は、着手ジョブの算出を一定時間間隔で行い、所
定時間後に作業進捗情報更新手段に対し着手ジョブを出
力することを特徴とする。
In a second aspect of the invention, the start job calculating means calculates the start job at regular time intervals, and outputs the start job to the work progress information updating means after a predetermined time. .

【0008】第三の発明の構成は、更新停止通知手段に
よる更新停止信号の出力によって、作業進捗情報更新手
段が作業進捗情報の更新を停止した後に、作業進捗情報
収集手段は作業進捗情報を収集することを特徴とする。
According to a third aspect of the present invention, the work progress information collecting means collects the work progress information after the work progress information updating means stops updating the work progress information by outputting the update stop signal by the update stop notifying means. It is characterized by doing.

【0009】第四の発明の構成は、更新停止通知手段に
よる更新停止信号の出力は、所定の時間間隔で行われる
ことを特徴とする。
A fourth aspect of the invention is characterized in that the output of the update stop signal by the update stop notifying means is performed at predetermined time intervals.

【0010】[0010]

【0011】第五の発明の構成は、更新停止予告手段
は、着手ジョブ算出手段による新たな着手ジョブの算出
の開始を停止することを特徴とする。
In a fifth aspect of the invention, the update stop notice means stops the start of calculation of a new start job by the start job calculation means.

【0012】第六の発明の構成は、更新停止予告手段
は、更新停止通知手段による更新停止信号の出力の1分
乃至15分前に予告を行うことを特徴とする。
A sixth aspect of the invention is characterized in that the update stop notifying means gives a notice 1 minute to 15 minutes before the output of the update stop signal by the update stop notifying means.

【0013】第七の発明の構成は、着手ジョブ算出手段
は、更新停止予告手段より作業進捗情報の更新の停止の
通知を予告されるまでは、着手ジョブの計算を一定時間
間隔で行い、所定の時間後に作業進捗情報更新手段に着
手ジョブを通知し、着手ジョブの計算終了前に作業進捗
情報の更新停止の通知が予告された場合には、そのまま
計算を続行し、その計算結果を作業進捗情報更新手段に
通知し、作業進捗情報の更新停止の通知が予告された時
刻以降には新たに着手ジョブの計算を行わないことを特
徴とする。
According to a seventh aspect of the invention, the start job calculating means calculates the start job at regular time intervals until the update stop notifying means notifies the user of the stop of the update of the work progress information. The start job is notified to the work progress information update means after the time of, and if the notification of the stop of the update of the work progress information is notified before the end of the calculation of the start job, the calculation is continued as it is, and the calculation result is used as the work progress. A new start job is not calculated after the time when the information update unit is notified and the notification of the stop of the update of the work progress information is notified in advance.

【0014】第八の発明の構成は、作業進捗情報更新手
段は、更新停止予告手段より作業進捗情報の更新の停止
の通知が予告されても、作業進捗情報の更新を継続し、
更新停止通知手段より更新停止信号が出力された以降に
作業進捗情報の更新を停止することを特徴とする。
According to an eighth aspect of the present invention, the work progress information updating means continues to update the work progress information even if a notice of the stop of the update of the work progress information is notified by the update stop notifying means.
The update of the work progress information is stopped after the update stop signal is output from the update stop notifying means.

【0015】[0015]

【作用及び効果】上記構成から成る本発明の第一の作用
は、作業工程の工程順序及び工程内容を記述した工程フ
ローを記憶する記憶装置と、工程フローを基にロットの
進行管理及び各種装置の制御を行うロット進行・制御サ
ブシステムとを用い、複数の作業工程を経て複数の製品
を形成する生産制御装置であって、作業計画に基づき、
着手ジョブを算出し、各種装置に該着手ジョブを指示す
る着手ジョブ算出手段と、その着手ジョブ算出手段によ
り算出された着手ジョブの進捗状況に応じて、工程の作
業進捗情報を更新する作業進捗情報更新手段と、その作
業進捗情報更新手段による作業進捗情報の更新を停止す
るための更新停止信号を出力する更新停止通知手段と、
作業進捗情報の更新の停止の通知を予告する更新停止予
告手段と、作業進捗情報を収集する作業進捗情報収集手
段と、その収集された作業進捗情報と生産計画とから作
業計画を作成する作業計画生成手段とを備えたことであ
る。そしてその効果は、更新停止通知手段により作業計
画生成手段の作業計画を作成中において、更新停止通知
手段により作業進捗情報の更新を停止させることがで
き、新たに計算された作業計画と実際の作業進捗情報と
の間の食い違いの発生を防止することができる。さら
に、作業進捗情報の更新停止の予告により、より円滑な
作業進捗情報の更新を行うことができる。(請求項1)
The first operation of the present invention having the above-mentioned structure is as follows: a storage device for storing a process flow describing a process sequence and process contents of a work process; a lot progress management and various devices based on the process flow. A production control device that forms a plurality of products through a plurality of work processes using a lot progress / control subsystem that performs control of the
Start job calculating means for calculating a start job and instructing the start job to various devices, and work progress information for updating the work progress information of the process in accordance with the progress of the start job calculated by the start job calculating means Update means, update stop notifying means for outputting an update stop signal for stopping update of work progress information by the work progress information updating means,
Update stop schedule for notifying of notification of stoppage of update of work progress information
Notification means, work progress information collection means for collecting work progress information, and work plan generation means for creating a work plan from the collected work progress information and the production plan.
You. And the effect is, in creating a work plan work plan generating means by the update stop notification means, an update of the work progress information by the update stop notification means can be stopped, the actual work with newly calculated work plan It is possible to prevent occurrence of a discrepancy with the progress information. Further
Notice of a suspension of updating work progress information
Work progress information can be updated. (Claim 1)

【0016】また、第二の作用は、着手ジョブ算出手段
は、着手ジョブの算出を一定時間間隔で行い、所定時間
後に作業進捗情報更新手段に対し着手ジョブを出力する
ことであり、その効果は、着手ジョブの算出にムラがな
く、安定した出力を行うことができる。(請求項2)
A second effect is that the start job calculating means calculates the start job at regular time intervals, and outputs the start job to the work progress information updating means after a predetermined time. The effect is as follows. In addition, it is possible to perform stable output without unevenness in the calculation of the start job. (Claim 2)

【0017】第三の作用は、更新停止通知手段による更
新停止信号の出力によって、作業進捗情報更新手段が作
業進捗情報の更新を停止した後に、作業進捗情報収集手
段は作業進捗情報を収集することであり、その効果は、
収集時の作業進捗情報と実際の進捗情報とに差異を生じ
ることがない。(請求項3)
The third effect is that the work progress information collecting means collects the work progress information after the work progress information updating means stops updating the work progress information by the output of the update stop signal by the update stop notifying means. And the effect is
There is no difference between the work progress information at the time of collection and the actual progress information. (Claim 3)

【0018】第四の作用は、更新停止通知手段による更
新停止信号の出力は、所定の時間間隔で行われることで
あり、その効果は、作業進捗情報の更新の停止をムラな
く行うことができる。(請求項4)
A fourth effect is that the output of the update stop signal by the update stop notifying means is performed at predetermined time intervals, and the effect is that the update of the work progress information can be stopped evenly. . (Claim 4)

【0019】[0019]

【0020】第五の作用は、更新停止予告手段は、着手
ジョブ算出手段による新たな着手ジョブの算出の開始を
停止することであり、その効果は、作業進捗情報の更新
停止の予告を容易に行うことができる。(請求項5)
A fifth effect is that the update stop notice means stops the start of calculation of a new start job by the start job calculation means. The effect is that the update stop notice of the work progress information can be easily notified. It can be carried out. (Claim 5)

【0021】第六の作用は、更新停止予告手段は、更新
停止通知手段による更新停止信号の出力の1分乃至15
分前に予告を行うことであり、その効果は、更新停止の
予告から更新停止通知までの間に着手ジョブの算出を完
了させることができ、より効果的である。(請求項6)
A sixth effect is that the update stop notifying means outputs the update stop signal of one minute to 15 minutes by the update stop notifying means.
It is to give a notice in minutes before, and the effect is that the calculation of the start job can be completed between the notice of the update stop and the notice of the update stop, which is more effective. (Claim 6)

【0022】第七の作用は、着手ジョブ算出手段は、更
新停止予告手段より作業進捗情報の更新の停止の通知を
予告されるまでは、着手ジョブの計算を一定時間間隔で
行い、所定の時間後に作業進捗情報更新手段に着手ジョ
ブを通知し、着手ジョブの計算終了前に作業進捗情報の
更新停止の通知が予告された場合には、そのまま計算を
続行し、その計算結果を作業進捗情報更新手段に通知
し、作業進捗情報の更新停止の通知が予告された時刻以
降には新たに着手ジョブの計算を行わないことであり、
その効果は、着手ジョブの算出後に作業進捗情報の更新
が停止し、その更新が行われないという状況を防止する
ことができる。(請求項7)
A seventh operation is that the start job calculating means performs the start job calculation at a predetermined time interval until the update stop notice means gives a notice of the stop of the update of the work progress information, at a predetermined time interval. Later, the work progress information updating unit is notified of the start job, and if a notification of the stop of the update of the work progress information is given before the end of the calculation of the start job, the calculation is continued and the calculation result is updated to the work progress information. Means to notify the means, and do not calculate a new start job after the time when the notification of the stop of the update of the work progress information is announced in advance.
This effect can prevent a situation in which the update of the work progress information is stopped after the calculation of the start job and the update is not performed. (Claim 7)

【0023】第八の作用は、作業進捗情報更新手段は、
更新停止予告手段より作業進捗情報の更新の停止の通知
が予告されても、作業進捗情報の更新を継続し、更新停
止通知手段より更新停止信号が出力された以降に作業進
捗情報の更新を停止することであり、その効果は、更新
中の作業進捗情報を更新した後に、更新の停止を行うこ
とができ、作業進捗情報の更新を途中で終わらせること
なく、確実に行うことができる。(請求項8)
Eighth operation is that the work progress information updating means includes:
Even if the notification of the stop of the update of the work progress information is notified by the update stop notification means, the update of the work progress information is continued, and the update of the work progress information is stopped after the update stop signal is output from the update stop notification means. The effect is that after updating the work progress information being updated, the update can be stopped, and the update of the work progress information can be reliably performed without ending the update. (Claim 8)

【0024】[0024]

【実施例】本発明者等は、上記課題に対して、鋭意研究
を重ねてきた。その結果、作業計画を起動するに先立っ
て、作業進捗情報収集手段により作業進捗情報を収集す
る前に、作業進捗情報更新手段に対して作業進捗情報の
更新の停止を通知することで、実際の作業進捗状況とジ
ョブ優先度算出結果とが一致するということを明らかに
することができた。以下、本発明を具体的な実施例に基
づいて説明する。
The present inventors have intensively studied the above problems. As a result, before the work progress information is collected by the work progress information collecting means before the work plan is started, the work progress information updating means is notified of the stop of the update of the work progress information, so that the actual work progress information is stopped. It was possible to clarify that the work progress status matches the job priority calculation result. Hereinafter, the present invention will be described based on specific examples.

【0025】図1は、本発明の第一実施例における生産
制御装置100のハードウェア構成並びに生産制御装置
100と半導体製造工場との関係を示した構成図であ
る。半導体製造工場20は、製造装置19a〜19dと
それぞれの製造装置19a〜19dを繋ぐ搬送路18a
〜18cから成り、各製造装置19a〜19dの作業進
捗情報はロット進行・制御サブシステム17に出力さ
れ、また、各製造装置19a〜19dの制御信号はロッ
ト進行・制御サブシステム17から入力される。
FIG. 1 is a configuration diagram showing the hardware configuration of the production control device 100 and the relationship between the production control device 100 and a semiconductor manufacturing plant in the first embodiment of the present invention. The semiconductor manufacturing plant 20 includes a transport path 18a connecting the manufacturing apparatuses 19a to 19d and the respective manufacturing apparatuses 19a to 19d.
18c, the work progress information of each of the manufacturing devices 19a to 19d is output to the lot progress / control subsystem 17, and the control signal of each of the manufacturing devices 19a to 19d is input from the lot progress / control subsystem 17. .

【0026】生産制御装置100は、ロット進行・制御
サブシステム17とのデータの入出力を行う入出力イン
ターフェイス1と、制御プログラムが記憶されたROM
4と、入出力インターフェイス1から入力された時々刻
々の作業進捗情報や生産計画等が記憶され、書き換え可
能なRAM3と、RAM3に記憶されたデータを用い
て、ROM4に記憶されたプログラムに基づいて、作業
計画を作成し、着手ジョブの算出を行う演算処理装置2
とから構成される。
The production control device 100 includes an input / output interface 1 for inputting / outputting data to / from the lot progress / control subsystem 17, and a ROM storing a control program.
4, a rewritable RAM 3, which stores instantaneous work progress information, a production plan, and the like input from the input / output interface 1, and data stored in the RAM 3, based on a program stored in the ROM 4. Processing unit 2 that creates a work plan and calculates a start job
It is composed of

【0027】次に、生産制御装置100内におけるRA
M3と演算処理装置2の詳細について図2を用いて説明
する。演算処理装置2は、着手ジョブを算出し、各製造
装置19a〜19dに対してジョブの着手を指示すると
共に、作業進捗情報更新部15にジョブの着手を通知す
る着手ジョブ算出部11(着手ジョブ算出手段に相当)
と、着手ジョブ算出部11により算出された着手ジョブ
の進捗状況に応じて工程作業進捗情報を更新する作業進
捗情報更新部15(作業進捗情報更新手段に相当)と、
工程作業進捗情報の更新の停止を通知する更新停止通知
部12(更新停止通知手段に相当)と、工程作業進捗情
報31を収集する作業進捗情報収集部14(作業進捗情
報収集手段に相当)と、作業進捗情報収集部14にて収
集された全体作業進捗情報と生産計画とにより作業計画
を作成する作業計画生成部16(作業計画生成手段に相
当)と、更新停止の1分乃至15分前に更新停止の予告
を着手ジョブ算出部11に通知する更新停止予告部13
(更新停止予告手段に相当)とから構成される。
Next, the RA in the production control device 100
Details of M3 and the processing unit 2 will be described with reference to FIG. The arithmetic processing unit 2 calculates a start job, instructs each of the manufacturing apparatuses 19a to 19d to start a job, and notifies the work progress information updating unit 15 of the start of the job. (Equivalent to calculating means)
A work progress information update unit 15 (corresponding to a work progress information update unit) that updates the process work progress information according to the progress status of the start job calculated by the start job calculation unit 11;
An update stop notifying unit 12 (corresponding to an update stop notifying unit) for notifying the stop of the update of the process work progress information; a work progress information collecting unit 14 (corresponding to the work progress information collecting unit) for collecting the process work progress information 31; A work plan generation unit 16 (corresponding to a work plan generation unit) that creates a work plan based on the overall work progress information collected by the work progress information collection unit 14 and the production plan, and 1 minute to 15 minutes before the update is stopped Stop notice unit 13 notifying the start job calculation unit 11 of a notice of update stop
(Corresponding to the update suspension notice means).

【0028】また、RAM3は、各工程作業の時々刻々
の進捗情報を記憶する工程作業進捗情報記憶部31と、
作業進捗情報収集部14にて収集された全体の作業進捗
情報を記憶する全体作業進捗情報記憶部32と、作業工
程の工程順序及び工程内容を記述した工程フローを記憶
する工程フロー記憶部33と、予め定められた生産計画
を記憶する生産計画記憶部34と、作業計画生成部16
にて作成された作業計画を記憶する作業計画記憶部35
とから構成される。上記のうち、工程作業進捗情報記憶
部31に記憶される作業進捗状況のデータ及び生産計画
記憶部34に記憶される生産計画データは、それぞれ図
4(a)、(b)に示されるような構成である。
The RAM 3 has a process work progress information storage unit 31 for storing progress information of each process work every moment;
An overall work progress information storage unit 32 for storing the overall work progress information collected by the work progress information collection unit 14, a process flow storage unit 33 for storing a process flow describing the process sequence and process contents of the work process; , A production plan storage unit 34 for storing a predetermined production plan, and a work plan generation unit 16
Work plan storage unit 35 for storing the work plan created in
It is composed of Among the above, the work progress data stored in the process work progress information storage 31 and the production plan data stored in the production plan storage 34 are as shown in FIGS. 4A and 4B, respectively. Configuration.

【0029】上記構成から成る生産制御装置100の処
理手順について図3のフローチャートを用いて説明す
る。まず、着手ジョブ算出部11にて着手ジョブの算出
を行い(ステップ210)、更新停止予告部13からの
更新停止予告信号があればステップ220にてYESと
判定し、ステップ230に進み、新たな着手ジョブの算
出の開始を停止する尚、本実施例では、この更新停止予
告信号は更新停止の通知の5分前に出力される構成とし
た。
The processing procedure of the production control device 100 having the above configuration will be described with reference to the flowchart of FIG. First, a start job is calculated by the start job calculating unit 11 (step 210). If there is an update stop notice signal from the update stop notice unit 13, YES is determined in step 220, the process proceeds to step 230, and a new process is performed. In this embodiment, the update stop notice signal is output five minutes before the update stop notification.

【0030】着手ジョブ算出部11は、この着手ジョブ
算出開始の停止の後、更新停止予告信号の受信する以前
に算出を開始していた着手ジョブの算出結果をロット進
行・制御サブシステム17に通知すると共に、着手ジョ
ブ算出部11は作業進捗情報更新部15に算出された着
手ジョブを通知する(ステップ240)。着手ジョブが
通知されると、ロット進行・制御サブシステム17は各
製造装置19a〜19dに着手ジョブの開始を指示する
(ステップ250)。
After the start of the calculation of the start job, the start job calculation unit 11 notifies the lot progress / control subsystem 17 of the calculation result of the start job whose calculation has started before the update stop notice signal is received. At the same time, the start job calculating unit 11 notifies the work progress information updating unit 15 of the calculated start job (Step 240). When the start job is notified, the lot progress / control subsystem 17 instructs each of the manufacturing apparatuses 19a to 19d to start the start job (step 250).

【0031】続いて、作業進捗情報更新部15では、工
程作業進捗情報記憶部31に記憶された作業進捗情報を
更新する(ステップ260)。この作業進捗情報の更新
の後、更新停止通知部12からの更新停止信号がある場
合にはステップ270にてYESと判定され、ステップ
280に進み、作業進捗情報更新部15では、作業進捗
情報の更新を停止する。作業進捗情報の更新の停止の
後、作業進捗情報収集部14では作業進捗情報を収集す
る(ステップ290)。
Subsequently, the work progress information updating unit 15 updates the work progress information stored in the process work progress information storage unit 31 (Step 260). After the update of the work progress information, if there is an update stop signal from the update stop notification unit 12, YES is determined in step 270, the process proceeds to step 280, and the work progress information update unit 15 Stop updating. After the update of the work progress information is stopped, the work progress information collection unit 14 collects the work progress information (Step 290).

【0032】この後、上記の更新された作業進捗情報に
基づいて作業計画生成部16にて作業計画を作成し(ス
テップ300)、着手ジョブ算出部11に作業計画を出
力し(ステップ310)、ステップ210に戻り、着手
ジョブの算出を行い、以下同様の処理を行う。上記のス
テップ220において、更新停止予告部13からの更新
停止予告信号がない場合には、NOと判定され、ステッ
プ240に進み、また、ステップ270において、更新
停止通知部12からの更新停止信号がない場合には、N
Oと判定され、ステップ290に進む。
Thereafter, based on the updated work progress information, a work plan is created by the work plan generator 16 (step 300), and the work plan is output to the start job calculator 11 (step 310). Returning to step 210, the start job is calculated, and the same processing is performed thereafter. In step 220 described above, if there is no update stop notice signal from the update stop notice unit 13, the determination is NO, and the process proceeds to step 240, and in step 270, the update stop signal from the update stop notice unit 12 is output. Otherwise, N
It is determined as O and the process proceeds to step 290.

【0033】上記のなかで、着手ジョブ算出部11は、
更新停止予告部13からの更新停止予告信号が通知され
るまで、着手ジョブの算出を一定時間間隔で行い、所定
の時間後に作業進捗情報更新部15に着手ジョブを通知
するものとする。また、ステップ230において、新た
な着手ジョブの算出の開始を停止する際には、まだ着手
ジョブ算出部11が着手ジョブの計算の途中である場合
には、そのまま計算を継続することとする。
In the above description, the start job calculating section 11
Until the update stop notice unit 13 notifies the update stop notice signal, the start job is calculated at regular time intervals, and the start job is notified to the work progress information update unit 15 after a predetermined time. In step 230, when the start of the calculation of a new start job is stopped, if the start job calculating unit 11 is still in the process of calculating the start job, the calculation is continued as it is.

【0034】尚、作業進捗情報の更新の停止が行われな
い通常の場合は、まず、ステップ210で着手ジョブの
算出後、更新停止通知部12からの更新停止信号がない
ためステップ220においてNOと判定し、ステップ2
40に進む。続いて、着手ジョブをロット進行・制御サ
ブシステム17及び作業進捗情報更新部15に通知し
(ステップ240)、着手ジョブの開始をロット進行・
制御サブシステム17は各製造装置19a〜19dに着
手ジョブの開始を指示する(ステップ250)。着手ジ
ョブの開始の指示の後、作業進捗情報更新部15にて作
業進捗情報の更新を行い(ステップ260)、作業進捗
情報の収集(ステップ290)、作業計画の算出(ステ
ップ300)、作業計画の通知(ステップ310)と順
次行われる。
In the normal case in which the update of the work progress information is not stopped, first, after the start job is calculated in step 210, since there is no update stop signal from the update stop notifying section 12, NO is returned in step 220. Judge, step 2
Proceed to 40. Subsequently, the start job is notified to the lot progress / control subsystem 17 and the work progress information update unit 15 (step 240), and the start of the start job is notified to the lot progress / control subsystem 17.
The control subsystem 17 instructs each of the manufacturing apparatuses 19a to 19d to start a start job (step 250). After the start job is instructed, the work progress information updating unit 15 updates the work progress information (Step 260), collects the work progress information (Step 290), calculates the work plan (Step 300), and performs the work plan. (Step 310).

【0035】上記に示されるように、本実施例では作業
進捗情報収集部14が動作を開始してから作業計画が着
手ジョブ算出部11に通知されるまでの間は、作業進捗
情報更新部15の動作が停止するので、作業計画生成部
16にて作業計画を作成中に作業進捗情報が更新される
ことがなく、新たに計算された作業計画と実際の作業進
捗情報との間の食い違いの発生を防止することができ
る。
As described above, in the present embodiment, the work progress information updating unit 15 is provided from the start of the operation of the work progress information collection unit 14 to the notification of the work plan to the start job calculation unit 11. Is stopped, the work progress information is not updated during the creation of the work plan by the work plan generation unit 16, and the discrepancy between the newly calculated work plan and the actual work progress information is determined. Generation can be prevented.

【0036】また、更新停止予告部13より更新停止予
告が通知された以降は、着手ジョブ算出部11は新たな
着手ジョブの算出の開始を停止し、作業進捗情報更新部
15は作動を継続させると共に、更新停止予告の通知か
ら更新停止の通知までの間に着手ジョブの算出を完了さ
せるようにセットすることにより、実際の進捗状況と作
業進捗情報との間の食い違いの発生を防止することがで
きる。
After the update stop notice unit 13 is notified of the update stop notice, the start job calculation unit 11 stops the start of the calculation of a new start job, and the work progress information update unit 15 continues the operation. At the same time, by setting the calculation of the start job to be completed between the notification of the update stop notice and the notification of the update stop, it is possible to prevent a discrepancy between the actual progress status and the work progress information. it can.

【0037】即ち、更新停止予告部13を備えていない
場合には、更新停止通知部12からの更新停止の通知に
より、着手ジョブ算出部11が停止するが、更新停止の
通知の前に着手ジョブの算出を開始していて、着手ジョ
ブの算出が未完了である場合には、更新停止の通知の到
着後に算出された着手ジョブがロット進行・制御サブシ
ステム17と作業進捗情報更新部15に通知される。こ
の場合、作業進捗情報更新部15は停止していて、該ロ
ットの作業進捗情報の更新は実施されないが、ロット進
行・制御サブシステム17は停止しないために該ロット
の着手ジョブは実際に実施されるために、実際の作業進
捗状況と作業進捗情報との間に食い違いを発生するとい
う問題があったが、上記構成とすることにより、実際の
作業進捗状況と作業進捗情報とを一致させることができ
る。
In other words, when the update stop notifying unit 13 is not provided, the start job calculating unit 11 is stopped by the update stop notification from the update stop notifying unit 12, but the start job When the calculation of the start job is not completed, the start job calculated after the arrival of the update stop notification is notified to the lot progress / control subsystem 17 and the work progress information update unit 15. Is done. In this case, the work progress information update unit 15 is stopped, and the work progress information of the lot is not updated. However, the lot progress / control subsystem 17 is not stopped, so the start job of the lot is actually executed. Therefore, there is a problem that a discrepancy occurs between the actual work progress status and the work progress information. However, with the above configuration, it is possible to match the actual work progress status with the work progress information. it can.

【0038】尚、本実施例では、更新停止予告部13に
よる更新停止予告信号の出力は、更新停止通知部12に
よる更新停止通知の5分前に行う構成としたが、本発明
ではこれに限定されるものではなく、更新停止の予告通
知と更新停止通知との間隔は、着手ジョブの算出が完了
できる程度の間隔であればよく、例えば、1分乃至15
分前でもよい。
In this embodiment, the output of the update stop notice signal by the update stop notice unit 13 is performed five minutes before the update stop notice by the update stop notice unit 12. However, the present invention is not limited to this. However, the interval between the update stop notice and the update stop notification may be an interval that can complete the calculation of the start job, for example, 1 minute to 15 minutes.
Minutes ago.

【0039】本実施例では、半導体製造工場20を複数
の製造装置19a〜19dと複数の搬送路18a〜18
cとから構成したが、その製造装置の台数及び搬送路の
本数はこれに限定されるものではない。また、本実施例
では、生産制御装置100の適用対象を半導体製造工場
20としたが、本発明はこれに限定されるものではな
く、液晶ディスプレイ等の製造工場を適用対象としても
よい。
In this embodiment, the semiconductor manufacturing plant 20 is connected to a plurality of manufacturing apparatuses 19a to 19d and a plurality of transport paths 18a to 18d.
However, the number of manufacturing apparatuses and the number of transport paths are not limited thereto. Further, in the present embodiment, the application target of the production control device 100 is the semiconductor manufacturing plant 20, but the present invention is not limited to this, and the manufacturing control device 100 may be applied to a manufacturing plant of a liquid crystal display or the like.

【0040】上記に示されるように、本発明によれば、
作業進捗情報収集手段の動作の開始時から作業計画生成
手段が作業計画を着手ジョブ算出手段に対して通知する
までの間、作業進捗情報更新手段の動作を停止させるこ
とにより、作業計画生成手段にて作業計画を作成中に作
業進捗情報が更新されることがなく、新たに計算された
作業計画と実際の作業進捗情報との間の食い違いの発生
を防止することができる。また、更新停止予告手段より
更新停止予告が通知された以降は、着手ジョブ算出手段
は新たな着手ジョブの算出の開始を停止し、作業進捗情
報更新手段は作動を継続させると共に、更新停止予告の
通知から更新停止の通知までの間に着手ジョブの算出を
完了させるようにセットすることにより、実際の進捗状
況と作業進捗情報との間の食い違いの発生を防止するこ
とができる。
As indicated above, according to the present invention,
By stopping the operation of the work progress information updating means from the start of the operation of the work progress information collecting means to the time when the work plan generating means notifies the start job calculating means of the work plan, the work plan generating means Thus, the work progress information is not updated while the work plan is being created, and it is possible to prevent occurrence of a discrepancy between the newly calculated work plan and the actual work progress information. Further, after the update stop notice is notified from the update stop notice means, the start job calculation means stops the start of calculation of a new start job, the work progress information update means continues to operate, and the update stop notice is issued. By setting the calculation of the start job to be completed between the notification and the notification of the update stop, it is possible to prevent a discrepancy between the actual progress and the work progress information.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係わる第一実施例のハードウェアの構
成を示した構造図。
FIG. 1 is a structural diagram showing a hardware configuration of a first embodiment according to the present invention.

【図2】本発明に係わる第一実施例の生産制御装置の詳
細を示した模式図。
FIG. 2 is a schematic diagram showing details of a production control device according to the first embodiment of the present invention.

【図3】本発明に係わる第一実施例の作業計画作成時の
処理の流れを示したフローチャート。
FIG. 3 is a flowchart showing the flow of processing when creating a work plan according to the first embodiment of the present invention.

【図4】本発明に係わる第一実施例で用いられる作業進
捗情報を表すデータ(a)と生産計画を表すデータ
(b)の構成を示した模式図。
FIG. 4 is a schematic diagram showing a configuration of data (a) representing work progress information and data (b) representing a production plan used in the first embodiment according to the present invention.

【図5】従来の生産制御装置の構成を示した構成図。FIG. 5 is a configuration diagram showing a configuration of a conventional production control device.

【符号の説明】[Explanation of symbols]

1 入出力インターフェイス 2 演算処理装置 3 RAM 4 ROM 11 着手ジョブ算出部 12 更新停止通知部 13 更新停止予告部 14 作業進捗情報収集部 15 作業進捗情報収集部 16 作業計画生成部 17 ロット進行・制御サブシステム 20 半導体製造工場 31 工程作業進捗情報記憶 32 全体作業進捗情報記憶部 33 工程フロー記憶部 34 生産計画記憶部 35 作業計画記憶部 100 生産制御装置 REFERENCE SIGNS LIST 1 input / output interface 2 arithmetic processing unit 3 RAM 4 ROM 11 start job calculation unit 12 update stop notification unit 13 update stop notification unit 14 work progress information collection unit 15 work progress information collection unit 16 work plan generation unit 17 lot progress / control sub System 20 Semiconductor manufacturing plant 31 Process work progress information storage 32 Overall work progress information storage unit 33 Process flow storage unit 34 Production plan storage unit 35 Work plan storage unit 100 Production control device

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−108138(JP,A) 特開 平5−73574(JP,A) (58)調査した分野(Int.Cl.7,DB名) G05B 15/00 - 15/02 G06F 17/60 B23Q 41/08 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-5-108138 (JP, A) JP-A-5-73574 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) G05B 15/00-15/02 G06F 17/60 B23Q 41/08

Claims (8)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】作業工程の工程順序及び工程内容を記述し
た工程フローを記憶する記憶装置と、前記工程フローを
基にロットの進行管理及び各種装置の制御を行うロット
進行・制御サブシステムとを用い、複数の作業工程を経
て複数の製品を形成する生産制御装置であって、 作業計画に基づき、着手ジョブを算出し、前記各種装置
に該着手ジョブを指示する着手ジョブ算出手段と、 前記着手ジョブ算出手段により算出された前記着手ジョ
ブの進捗状況に応じて、前記工程の作業進捗情報を更新
する作業進捗情報更新手段と、 前記作業進捗情報更新手段による前記作業進捗情報の更
新を停止するための更新停止信号を出力する更新停止通
知手段と、前記作業進捗情報の更新の停止の通知を予告する更新停
止予告手段と、 前記作業進捗情報を収集する作業進捗情報収集手段と、 前記収集された前記作業進捗情報と生産計画とから前記
作業計画を作成する作業計画生成手段とを備えたことを
特徴とする生産制御装置。
1. A storage device for storing a process flow describing a process sequence and process contents of a work process, and a lot progress / control subsystem for controlling a lot progress and controlling various devices based on the process flow. A production control device for forming a plurality of products through a plurality of work processes, wherein the start control device calculates a start job based on a work plan and instructs the various devices to start the start job; A work progress information update unit that updates work progress information of the process in accordance with a progress status of the undertaking job calculated by a job calculation unit; and stopping the update of the work progress information by the work progress information update unit. Update stop notifying means for outputting an update stop signal for updating the work progress information;
Stop notice means, work progress information collecting means for collecting the work progress information, and work plan generating means for creating the work plan from the collected work progress information and production plan. Production control equipment.
【請求項2】前記着手ジョブ算出手段は、前記着手ジョ
ブの算出を一定時間間隔で行い、所定時間後に前記作業
進捗情報更新手段に対し前記着手ジョブを出力すること
を特徴とする請求項1に記載の生産制御装置。
2. The start job calculating unit calculates the start job at regular time intervals and outputs the start job to the work progress information updating unit after a predetermined time. The production control device as described.
【請求項3】前記更新停止通知手段による前記更新停止
信号の出力によって、前記作業進捗情報更新手段が前記
作業進捗情報の更新を停止した後に、前記作業進捗情報
収集手段は前記作業進捗情報を収集することを特徴とす
る請求項1に記載の生産制御装置。
3. The work progress information collecting means collects the work progress information after the work progress information updating means stops updating the work progress information according to the output of the update stop signal by the update stop notifying means. The production control device according to claim 1, wherein
【請求項4】前記更新停止通知手段による前記更新停止
信号の出力は、所定の時間間隔で行われることを特徴と
する請求項1に記載の生産制御装置。
4. The production control device according to claim 1, wherein the output of the update stop signal by the update stop notifying means is performed at predetermined time intervals.
【請求項5】前記更新停止予告手段は、前記着手ジョブ
算出手段による新たな前記着手ジョブの算出の開始を停
止することを特徴とする請求項1に記載の生産制御装
置。
5. The production control apparatus according to claim 1 , wherein the update stop notice unit stops the start of the calculation of the new start job by the start job calculation unit.
【請求項6】前記更新停止予告手段は、前記更新停止通
知手段による前記更新停止信号の出力の1分乃至15分
前に予告を行うことを特徴とする請求項1に記載の生産
制御装置。
6. The production control apparatus according to claim 1 , wherein said update stop notice means gives a notice 1 minute to 15 minutes before output of said update stop signal by said update stop notifying means.
【請求項7】前記着手ジョブ算出手段は、 前記更新停止予告手段より前記作業進捗情報の更新の停
止の通知を予告されるまでは、前記着手ジョブの計算を
一定時間間隔で行い、所定の時間後に前記作業進捗情報
更新手段に前記着手ジョブを通知し、 前記着手ジョブの計算終了前に前記作業進捗情報の更新
停止の通知が予告された場合には、そのまま計算を続行
し、その計算結果を前記作業進捗情報更新手段に通知
し、 前記作業進捗情報の更新停止の通知が予告された時刻以
降には新たに前記着手ジョブの計算を行わないことを特
徴とする請求項1に記載の生産制御装置。
7. The start job calculating means calculates the start job at regular time intervals until a notice of the stop of updating of the work progress information is notified by the update stop notifying means at a predetermined time interval. Later, the work progress information updating unit is notified of the start job, and if a notification of the stop of the update of the work progress information is notified before the end of the calculation of the start job, the calculation is continued as it is, and the calculation result is obtained. 2. The production control according to claim 1 , wherein the work progress information updating unit is notified, and the start job is not newly calculated after the time when the notification of the update stop of the work progress information is announced. 3. apparatus.
【請求項8】前記作業進捗情報更新手段は、 前記更新停止予告手段より前記作業進捗情報の更新の停
止の通知が予告されても、前記作業進捗情報の更新を継
続し、 前記更新停止通知手段より前記更新停止信号が出力され
た以降に前記作業進捗情報の更新を停止することを特徴
とする請求項1に記載の生産制御装置。
8. The work progress information updating means continues to update the work progress information even when a notice of the stop of the update of the work progress information is notified from the update stop notifying means in advance. 2. The production control device according to claim 1 , wherein the update of the work progress information is stopped after the update stop signal is output.
JP7965995A 1995-03-10 1995-03-10 Production control device Expired - Fee Related JP3334415B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7965995A JP3334415B2 (en) 1995-03-10 1995-03-10 Production control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7965995A JP3334415B2 (en) 1995-03-10 1995-03-10 Production control device

Publications (2)

Publication Number Publication Date
JPH08249044A JPH08249044A (en) 1996-09-27
JP3334415B2 true JP3334415B2 (en) 2002-10-15

Family

ID=13696285

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7965995A Expired - Fee Related JP3334415B2 (en) 1995-03-10 1995-03-10 Production control device

Country Status (1)

Country Link
JP (1) JP3334415B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7221993B2 (en) 2003-01-27 2007-05-22 Applied Materials, Inc. Systems and methods for transferring small lot size substrate carriers between processing tools
US7218983B2 (en) 2003-11-06 2007-05-15 Applied Materials, Inc. Method and apparatus for integrating large and small lot electronic device fabrication facilities
US7274971B2 (en) 2004-02-28 2007-09-25 Applied Materials, Inc. Methods and apparatus for electronic device manufacturing system monitoring and control
US7177716B2 (en) 2004-02-28 2007-02-13 Applied Materials, Inc. Methods and apparatus for material control system interface
JP7211062B2 (en) * 2018-12-19 2023-01-24 株式会社デンソー production system

Also Published As

Publication number Publication date
JPH08249044A (en) 1996-09-27

Similar Documents

Publication Publication Date Title
JPH11235648A (en) Manufacturing plan control device, manufacturing plan controlling method and storage medium recorded with manufacturing plan control program capable of reading by computer
JP2000077289A (en) Production predicting control system
JP3334415B2 (en) Production control device
JP2710568B2 (en) Production line management method
JPH10118896A (en) Schedule preparation support system
JP6754823B2 (en) Production planning support equipment and methods
JPH03251351A (en) Production progress management device
WO2022014048A1 (en) Scheduler system, scheduler management device, and machine learning device
JP2978778B2 (en) Production line management method
JP3472060B2 (en) Batch process plant operation support equipment
JPH06187355A (en) Method and device for supporting process control
JPH06303B2 (en) Job shop scheduling method using distributed processing system
JPH07182420A (en) Production planning device
JPS63306861A (en) System for creating and correcting production program
JP3388118B2 (en) Simulation equipment for plant control programs
JP2002055710A (en) Process chart editing system
JPH08221479A (en) Job shop plant scheduler
JP3226582B2 (en) System simulation equipment
JP2778306B2 (en) Equipment fixed rescheduling equipment
JP2000317779A (en) Simulation system for discrete phenomena
JPS63312050A (en) Production condition forecasting type production control system
JPH05108138A (en) Producing plan preparing device
JPH11156679A (en) Production scheduling device and recording medium recording production scheduling program
JPH06332909A (en) Plan managing system
JP2020194587A (en) Production planning support device and method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080802

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120802

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130802

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees