JP2023043740A - Business management system and program thereof - Google Patents

Business management system and program thereof Download PDF

Info

Publication number
JP2023043740A
JP2023043740A JP2021151523A JP2021151523A JP2023043740A JP 2023043740 A JP2023043740 A JP 2023043740A JP 2021151523 A JP2021151523 A JP 2021151523A JP 2021151523 A JP2021151523 A JP 2021151523A JP 2023043740 A JP2023043740 A JP 2023043740A
Authority
JP
Japan
Prior art keywords
work
business
content
daily report
contents
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021151523A
Other languages
Japanese (ja)
Inventor
輝行 尾藤
Teruyuki Bito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NOMURA KODENSHA KK
Original Assignee
NOMURA KODENSHA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NOMURA KODENSHA KK filed Critical NOMURA KODENSHA KK
Priority to JP2021151523A priority Critical patent/JP2023043740A/en
Publication of JP2023043740A publication Critical patent/JP2023043740A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a business management system that enables companies that carry out multiple works and operations to immediately grasp the busyness of the companies while grasping the overall situation, and can facilitate adjustment of processes, allocation of personnel, and modification of the deployment of a facility for new work and operation orders, and a business management program.SOLUTION: A business management system 1b comprises: a process processing unit 5 that sets a construction period for ordered business content and creates a process chart; a work instruction creation unit 8a that creates a work instruction using operation content subdivided from the business content; a daily report creation unit 8b that creates a daily report for reporting completed operation content; a user device 32 capable of viewing the work instructions; and a busy season ratio calculation unit 7 that calculates a busy season ratio calculated by dividing an order amount of the business content by the construction period and adding busy season parameters for each date. The process processing unit 5 displays the busy season ratio on the process chart.SELECTED DRAWING: Figure 13

Description

本発明は、工事や保守あるいは修理等の作業に関する業務の受注から納品までの管理を行うシステムとそのプログラムに関する。 The present invention relates to a system and a program for managing work from acceptance of orders to delivery of work related to construction, maintenance, or repair work.

従来、工場等の生産現場において作業工程の進捗状況や生産量等を把握しながら管理することが可能な管理システムが開発されてきた。
例えば、特許文献1には、「工程管理システム及び工程管理プログラム」という名称で、複数の工程を経て製造される複数の製品を生産するために必要な人員や設備を管理するための工程管理システムに関する発明が開示されている。
この発明では、製品の部品毎に工程を管理し、それらの部品を組立・検査の工程までを工程表で管理し、必要な機械工、組立工、検査工の配置と必要な設備の配備を製造日程データベースとしてまとめることで、日程計画の変更を容易にしている。また、期日毎の累積計画工数と実績工数を比較する累積工数比較図を生成することで、工程消化の状況把握も容易にし、日程計画の変更の判断を機動的に行うことが可能である。
特許文献2には、「作業進捗管理方法」という名称で、EVM(Earned Value Management System)、すなわち、各単位作業の進捗状況を示す尺度としてコストを用い、各作業単位による成果物の生成の度合いを、その作業単位において成果物生成に要した実績コストに換算し、この実績コストの積分値と計画コストの積分値とを比較することにより、作業計画に対して実際の作業進捗が遅延しているかどうかを表す手法をベースとし、このEVMにWBS(Work Breakdown Structure)と呼ばれる木構造中の各ノードに相当する成果物を生成するための作業の進捗を管理することで、計画コストとコストの実績値を比較しながら、作業の進捗を管理する手法の発明が開示されている。
この発明では、計画コストに対する実績値の所定の比率をアラーム閾値として、比率が下回るとアラームを表示装置に表示させることでより効果的に作業の進捗を管理することが可能である。
特許文献3には、「生産管理システム及び方法」という名称で、リードタイムの短縮のために適した作業単位で分類した作業工程の進捗状況を資材毎に把握することが可能な生産管理システムに関する発明が開示されている。
この発明では、生産管理システムに実績積算価値算出部と目標積算価値算出部を備えて、それぞれで算出される価値を対比させ、それを管理者端末に表示することで作業工程の効率の高低を把握することが可能である。コストが価値を生むという考え方に基づき、工程毎に注入されたコストを表示して、資材の原価と作業工程の加工原価との和の時間積分値を示し、これを目標積算価値と比較することで、収益性・効率性を把握することができる。
Conventionally, a management system has been developed that enables management while grasping the progress of work processes, production volume, etc. at a production site such as a factory.
For example, Patent Literature 1 describes a process management system under the name of "process management system and process management program" for managing the personnel and equipment required to produce a plurality of products manufactured through a plurality of processes. An invention relating to is disclosed.
In this invention, the process is managed for each part of the product, the process of assembling and inspecting those parts is managed by a process chart, and the arrangement of the necessary mechanics, assemblers, and inspectors and the deployment of necessary equipment are performed. By putting together as a manufacturing schedule database, it is easy to change the schedule plan. In addition, by creating a cumulative man-hour comparison chart that compares the cumulative planned man-hours and actual man-hours for each deadline, it is possible to easily grasp the status of the process completion and to flexibly determine changes in the schedule plan.
Patent Document 2 describes an EVM (Earned Value Management System) under the name of "work progress management method". is converted into the actual cost required to generate deliverables in that work unit, and by comparing the integral value of the actual cost with the integral value of the planned cost, the actual work progress is delayed with respect to the work plan. Based on the method of expressing whether or not the An invention of a technique for managing the progress of work while comparing actual values is disclosed.
In this invention, it is possible to more effectively manage the progress of work by using a predetermined ratio of the actual value to the planned cost as the alarm threshold value and displaying an alarm on the display device when the ratio falls below.
Patent Document 3, titled "Production Management System and Method", relates to a production management system capable of grasping the progress of work processes classified into work units suitable for shortening lead times for each material. An invention is disclosed.
In this invention, the production management system is provided with an actual accumulated value calculation section and a target accumulated value calculation section, and the values calculated by each are compared and displayed on the manager's terminal to determine the efficiency of the work process. It is possible to grasp Based on the idea that cost creates value, display the cost injected into each process, show the time integral value of the sum of the material cost and the processing cost of the work process, and compare it with the target integrated value. In this way, profitability and efficiency can be grasped.

特開2003-303009号公報Japanese Patent Application Laid-Open No. 2003-303009 特開2004-287891号公報JP 2004-287891 A 特開2014-002705号公報JP 2014-002705 A

しかしながら、特許文献1乃至3に開示される発明では、1つの作業や業務における目標コストと実績コストを比較しながら、作業や業務における工程毎の収益性や効率性を把握することが可能であり、また、日程変更も可能であるものの、一般的な企業では複数の作業や業務が並行して進行することが多く、請け負う企業の人的、設備的なキャパシティとの関係を踏まえた上で最大効率化することが必要である。
その場合には、新規に受注しようとしている作業や業務の工程を受注済の作業や業務の工程の進行状態を踏まえた上で設定することが重要であり、個々の作業や業務の工程を統合して企業全体の繁忙状態を把握する必要があるが、特許文献1乃至3に開示される発明では、個々の工程の効率や利益率を把握することが可能であっても、企業内全体の作業や業務の繁忙状態を即座に把握することが困難であるという大きな課題があった。
本発明はかかる従来の事情に対処してなされたものであり、複数の作業や業務を同時に抱えて進行させる企業が、それら全体の状況を把握しながら企業の繁忙を即座に把握することができ、また、新規の作業や業務の受注に対して、その工程の調整や人員の配置や設備の配備の修正を容易に行うことが可能な業務管理システムと業務管理プログラムを提供することを目的とする。
However, in the inventions disclosed in Patent Documents 1 to 3, it is possible to grasp the profitability and efficiency of each process in a work or business while comparing the target cost and the actual cost in one work or business. Also, although it is possible to change the schedule, in general companies there are many cases in which multiple tasks and operations are progressing in parallel. It is necessary to maximize efficiency.
In that case, it is important to set the process of the work or business to be newly ordered based on the progress status of the work or business that has already been ordered, and integrate the process of each work or business However, in the inventions disclosed in Patent Documents 1 to 3, even if it is possible to grasp the efficiency and profit rate of individual processes, There was a big problem that it was difficult to immediately grasp the busy state of work and business.
The present invention has been made in response to such a conventional situation, and enables a company, which simultaneously carries out multiple tasks and tasks, to immediately grasp the busyness of the company while grasping the overall situation. Another object of the present invention is to provide a work management system and a work management program that make it possible to easily adjust the process, allocate personnel, and correct the deployment of equipment for new work and work orders. do.

上記目的を達成するため、第1の発明である業務管理システムは、客先から受注した事業内容に対して工期を設定する工程処理部と、前記事業内容を細分化して構成される業務内容を用いて作業指示書を作成する作業指示書作成部と、前記業務内容のうち完了した前記業務内容を報告する日報を作成する日報作成部と、前記作業指示書に記載された前記業務内容を閲覧可能なユーザー装置と、前記事業内容の受注金額を前記工期で除算して繁忙期パラメータを演算する繁忙期レシオ演算部と、を有し、前記工程処理部は、横欄に日付と縦欄に複数の前記事業内容を配置して複数の前記事業内容の前記工期を一覧表に統合し、前記繁忙期レシオ演算部は、各前記事業内容に対する前記繁忙期パラメータを前記日付毎に加算して繁忙期レシオを演算し、前記工程処理部は前記繁忙期レシオを前記一覧表に表示することを特徴とするものである。
上記構成の業務管理システムにおいては、繁忙期レシオ演算部が各事業内容に対する繁忙期パラメータを演算し、さらに各事業内容の繁忙期パラメータを日付毎に加算して繁忙期レシオを演算するように作用し、工程処理部は事業内容の工期を繁忙期レシオを含めて一覧表に表示するように作用する。
In order to achieve the above object, the business management system, which is the first invention, comprises a process processing unit that sets the work period for the business content ordered from the customer, and the business content that is configured by subdividing the business content. a work instruction creation unit that creates a work instruction using a work instruction; a daily report creation unit that creates a daily report reporting the completed work content of the work content; and browses the work content described in the work instruction and a busy period ratio calculation unit that calculates a busy period parameter by dividing the order amount of the business content by the construction period, and the process processing unit divides the date in the horizontal column and the date in the vertical column. The plurality of business contents are arranged and the construction periods of the plurality of business contents are integrated into a list, and the busy period ratio calculation unit adds the busy season parameter for each of the business contents for each date. A period ratio is calculated, and the process processing unit displays the busy period ratio on the list.
In the business management system having the above configuration, the busy season ratio calculation unit calculates the busy season parameter for each business content, and further adds the busy season parameter of each business content for each date to calculate the busy season ratio. On the other hand, the process processing section acts to display the construction period of the business content in a list including the busy period ratio.

第2の発明である業務管理システムは、第1の発明において、前記業務内容は前記事業内容の実行の時系列に沿って予め設定された進捗率が紐付けられており、前記日報に含まれる完了した前記業務内容に紐付けされた前記進捗率のうち最も高い進捗率を読み出す進捗率抽出部を有し、前記工程処理部は読み出された最も高い前記進捗率を前記一覧表に表示することを特徴とするものである。
上記構成の業務管理システムにおいては、進捗率抽出部が、日報作成部によって作成される日報に含まれる完了した業務内容に紐付けされた進捗率のうち最も高い進捗率を読み出すように作用し、工程処理部は、その最も高い進捗率を一覧表に表示するように作用する。
A second aspect of the invention is a business management system according to the first aspect, wherein the business content is associated with a preset progress rate along the time series of execution of the business content, and is included in the daily report. a progress rate extraction unit that reads the highest progress rate among the progress rates linked to the completed work content, and the process processing unit displays the read highest progress rate on the list; It is characterized by
In the work management system configured as described above, the progress rate extraction unit reads out the highest progress rate among the progress rates linked to the completed work content included in the daily report created by the daily report creation unit, The process handler acts to list its highest percentage of progress.

第3の発明である業務管理システムは、第1又は第2の発明において、前記作業指示書作成部は、前記業務内容に代えて前記業務内容をまとめて上位に構成される作業内容を用いて前記作業指示書を作成し、前記日報作成部は前記業務内容のうち完了した前記業務内容を報告する前記日報を作成し、前記作業内容は予めIDが付されており、前記日報で報告されるまとめられた下位の前記業務内容にも前記IDを付して紐付けておくことを特徴とするものである。
上記構成の業務管理システムにおいては、作業指示書作成部が業務内容に代えて作業内容を用いて作業指示書を作成するように作用し、日報作成部は業務内容を報告する日報を作成するように作用するが、予めIDを設けておき、このIDが作業内容と業務内容を紐付けるように作用する。
なお、本願発明では「業務内容」と「作業内容」とはいずれも受注した事業内容を実際に遂行される行動レベルに細分化したものを意味するが、「業務内容」は事業内容を遂行する現場の技術者(作業者)に理解が容易な具体的な行動を概念したものであり、「作業内容」は営業や管理部門で理解が容易となるように、複数の「業務内容」をまとめた上位の行動レベルを概念したものとして定義する。すなわち、1つの「作業内容」に対して細分化された複数の「業務内容」が対応する。したがって、「作業内容」を表す1つのIDに対して、「業務内容」を表すIDは複数存在し、枝番号等の添え字を備える場合も含まれる。
このようなIDによる紐付け管理は、作業指示書を作成する部門と現場で作業を行う部門が異なるような場合に、それぞれの部門で理解が容易な文言で行動レベルを把握できるようにしつつ、互換性を担保するためである。
A third aspect of the invention is a work management system according to the first or second aspect, wherein the work instruction sheet creating unit uses work contents organized at a higher level by summarizing the work contents instead of the work contents. The work instructions are created, and the daily report creation unit creates the daily report for reporting the completed work content among the work content, and the work content is assigned an ID in advance and is reported in the daily report. It is characterized in that the IDs are attached to the lower-level work contents that have been summarized and linked to each other.
In the work management system configured as described above, the work instruction preparation unit acts to prepare work instructions using the work content instead of the work content, and the daily report preparation unit prepares a daily report for reporting the work content. However, an ID is provided in advance, and this ID acts to associate the work content with the business content.
In the present invention, "work content" and "work content" both mean subdivided business content that has been ordered into action levels that are actually carried out, but "business content" means carrying out business content It is a concept of concrete actions that are easy for on-site engineers (workers) to understand. It is defined as a concept of a higher action level. That is, one "work content" corresponds to a plurality of subdivided "work content". Therefore, for one ID representing "work content", there are a plurality of IDs representing "work content", including cases where subscripts such as branch numbers are provided.
When the department that creates the work instructions and the department that performs the work on site are different, this kind of ID-based linking management enables each department to understand the action level in terms that are easy to understand. This is to ensure compatibility.

第4の発明である業務管理システムは、第1乃至第3のいずれか1つの発明において、前記工程処理部は、前記作業指示書の内容に応じた作業人員を前記日付毎に割り当ててその人数を前記一覧表又は別表に表示することを特徴とするものである。
上記構成の業務管理システムにおいては、工程処理部が作業指示書の内容に応じて作業人員を日付毎に割り当ててその人数を一覧表又は一覧表とは別の表に表示するように作用する。
A fourth aspect of the invention is a work management system according to any one of the first to third inventions, wherein the process processing unit allocates workers according to the contents of the work instruction for each date, and is displayed in the above list or separate table.
In the above-configured work management system, the process processing unit allocates workers for each date according to the contents of the work instructions, and displays the number of workers in a list or a table separate from the list.

第5の発明である業務管理プログラムは、コンピュータを用いて、客先から受注した事業内容に対して工期を設定する工期処理工程と、前記事業内容を細分化して構成される業務内容を用いて作業指示書を作成する作業指示書作成工程と、前記業務内容のうち完了した前記業務内容を報告する日報を作成する日報作成工程と、前記事業内容の受注金額を前記工期で除算して繁忙期パラメータを演算する繁忙期レシオ演算工程と、横欄に日付と縦欄に複数の前記事業内容を配置して複数の前記事業内容の前記工期を一覧表に統合する工期統合工程と、各前記事業内容に対する前記繁忙期パラメータを前記日付毎に加算して繁忙期レシオを演算する繁忙期レシオ演算工程と、演算された前記繁忙期レシオを前記一覧表に表示する繁忙期レシオ表示工程と、を実行させることを特徴とするものである。
上記構成の業務管理プログラムは、第1の発明をプログラム発明として捉えたものであるので、その作用は第1の発明の作用と同様である。
A business management program, which is a fifth invention, uses a computer to set a construction period for the business content ordered from a customer, and a business content that is configured by subdividing the business content. A work instruction creation process of creating a work instruction, a daily report creation process of creating a daily report reporting the completed work content of the work content, and a busy period by dividing the order amount of the business content by the work period A busy season ratio calculation process for calculating parameters, a schedule integration process for arranging dates in horizontal columns and multiple business contents in vertical columns to integrate the construction schedules of the multiple business contents into a list, and each business A busy period ratio calculation step of calculating a busy period ratio by adding the busy period parameter to the content for each of the dates, and a busy period ratio display step of displaying the calculated busy period ratio on the list are executed. It is characterized by
Since the business management program having the above configuration is obtained by treating the first invention as a program invention, its function is the same as that of the first invention.

第6の発明である業務管理プログラムは、第5の発明において、前記業務内容は前記事業内容の実行の時系列に沿って予め設定された進捗率が紐付けられており、前記日報に含まれる完了した前記業務内容に紐付けされた前記進捗率のうち最も高い進捗率を読み出す進捗率抽出工程と、読み出された前記進捗率を前記一覧表に表示する進捗率表示工程と、を実行させることを特徴とするものである。
上記構成の業務管理プログラムは、第2の発明をプログラム発明として捉えたものであるので、その作用は第2の発明の作用と同様である。
A sixth aspect of the invention is a business management program according to the fifth aspect, wherein the business content is associated with a preset progress rate along the time series of execution of the business content, and is included in the daily report. executing a progress rate extracting step of reading out the highest progress rate among the progress rates linked to the completed work content; and a progress rate display step of displaying the read progress rate in the list. It is characterized by
Since the business management program having the above configuration is obtained by treating the second invention as a program invention, its function is the same as that of the second invention.

第7の発明である業務管理プログラムは、第5又は第6の発明において、前記作業指示書作成工程は、前記業務内容に代えて前記業務内容をまとめて上位に構成される作業内容を用いて前記作業指示書を作成する工程であり、前記日報作成工程は前記業務内容のうち完了した前記業務内容を報告する前記日報を作成する工程であり、前記作業内容は予めIDが付されており、前記日報で報告されるまとめられた下位の前記業務内容にも前記IDを付して紐付けておくことを特徴とするものである。
上記構成の業務管理プログラムは、第3の発明をプログラム発明として捉えたものであるので、その作用は第3の発明の作用と同様である。
A seventh aspect of the present invention is a business management program according to the fifth or sixth aspect, wherein the work instruction creation step uses work content that is composed of a higher level of the business content in place of the business content. the step of creating the work instructions, the step of creating the daily report is a step of creating the daily report for reporting the content of the completed work among the content of the work, and the content of the work is assigned an ID in advance; It is characterized in that the ID is attached to and linked to the summarized lower-level business content reported in the daily report.
Since the work management program having the above configuration is obtained by treating the third invention as a program invention, its function is the same as that of the third invention.

第8の発明である業務管理プログラムは、第5乃至第7のいずれか1つの発明において、前記工期統合工程は、前記作業指示書の内容に応じた作業人員を前記日付毎に割り当ててその人数を前記一覧表又は別表に表示することを特徴とするものである。
上記構成の業務管理プログラムは、第4の発明をプログラム発明として捉えたものであるので、その作用は第4の発明の作用と同様である。
An eighth invention is a business management program according to any one of the fifth to seventh inventions, wherein the work period integration step allocates workers according to the content of the work order for each date, and is displayed in the above list or separate table.
Since the business management program having the above configuration is obtained by treating the fourth invention as a program invention, its function is the same as that of the fourth invention.

第1の発明に係る業務管理システムでは、受注した事業内容の受注金額と工期が定まれば繁忙期パラメータが演算され、事業内容全体に係る繁忙期レシオが演算されるので、日付毎に企業全体の繁忙の程度を一目で把握することが可能である。したがって、新規に受注する事業内容が企業全体に与える繁忙の程度も受注金額と工期を仮決めすることで容易に把握することができ、全体工程、作業人員の配置や事業を遂行する際に必要な重機や設備の配備の調整を速やかに実行することができ、企業で抱える事業全体の効率化と収益性の向上を図ることが可能である。 In the business management system according to the first invention, once the order amount and construction period of the received business content are determined, the busy season parameter is calculated, and the busy season ratio for the entire business content is calculated. It is possible to grasp the degree of busyness at a glance. Therefore, it is possible to easily grasp the degree of busyness caused by the content of a new order to the entire company by tentatively determining the order amount and the work period. It is possible to quickly adjust the deployment of heavy machinery and equipment, and to improve the efficiency and profitability of the entire business of the company.

第2の発明に係る業務管理システムは、予め遂行される業務内容に進捗率が紐付けてあるので、日報で報告された業務内容に基づき、自動的に事業の進捗状況が示されるので日報の作成を行うことで容易に進捗率を把握することが可能である。個別の進捗率を正確に把握することも重要であるが、進捗率を演算したり、検討するには労力と時間がかかり、多数の事業が同時に進行しているような企業では進捗率の管理が煩雑となり非効率であることから、たとえ大雑把であっても自動的にある程度の精度で進捗率が把握される方が企業全体の効率化や収益率の向上に寄与させることが可能である。 In the business management system according to the second aspect of the present invention, since the progress rate is linked to the content of the work to be performed in advance, the progress of the business is automatically indicated based on the content of the business reported in the daily report. It is possible to easily grasp the progress rate by creating it. Although it is important to accurately grasp individual progress rates, it takes time and effort to calculate and review progress rates, and management of progress rates is difficult in companies where many projects are progressing at the same time. is complicated and inefficient, it is possible to contribute to the improvement of the efficiency and profit rate of the entire company by automatically grasping the progress rate with a certain degree of accuracy, even if it is rough.

第3の発明に係る業務管理システムは、作業指示書作成部が下位の業務内容に代えて上位の作業内容を用いて作業指示書を作成するため、作業指示書を作成するシステム利用者は上位の作業内容を理解することで足りる。また、日報作成部はそのまま下位の業務内容を報告するように日報を作成するので、日報を作成するシステム利用者は下位の業務内容を理解することで足りる。そして、作業内容と業務内容はIDで紐付けされているので、事業を遂行して日報を作成するシステム利用者は作業指示書を閲覧しながら、日報を作成することで、作業指示書で指示された作業内容をそのまま遂行することが可能である。
本システムでは、作業指示書と日報を作成する部門の人員が異なるような場合であって、同一の業務内容よりも作業指示書の作成では現場での業務内容とは別の理解容易な上位の作業内容を採用することが望ましいと判断される場合に、より効率的で精度の高い事業の遂行を支援することが可能である。
In the business management system according to the third invention, since the work instruction creation unit creates the work instructions using the high-level work content instead of the low-level business content, the system user who creates the work instruction It is sufficient to understand the work content of In addition, since the daily report creation unit creates daily reports so as to report the details of lower-level work as they are, it is sufficient for the system user who creates the daily report to understand the details of lower-level work. Since the content of the work and the content of the work are linked by an ID, the system user who creates the daily report while performing the business can view the work instruction sheet and create the daily report, so that the work instruction sheet can be used to create the daily report. It is possible to carry out the work content as it is.
In this system, even if the personnel in the department that creates the work instructions and the daily report are different, rather than the same work content, the creation of the work instructions is different from the work content at the site and is easy to understand. When it is determined that it is desirable to adopt the work content, it is possible to support more efficient and highly accurate business execution.

第4の発明に係る業務管理システムは、作業指示書の内容に応じて作業人員の数を一覧表あるいは他の別表に表示することで、企業内全体で日付毎に必要な人工(にんく)を把握することが可能であり、企業内人員数を超えた工程を抑制し、期間内で適切な人員の配置計画を遂行することが可能である。
適切な人員の配置に対応可能とすることで企業の事業遂行の効率化と収益率の向上を図ることが可能である。
The business management system according to the fourth invention displays the number of workers in a list or other separate table according to the contents of the work instruction, thereby enabling the entire company to ), it is possible to suppress processes that exceed the number of personnel in the company, and to carry out an appropriate personnel allocation plan within the period.
It is possible to improve the efficiency of the company's business execution and the profit rate by making it possible to respond to the appropriate allocation of personnel.

第5の発明に係る業務管理プログラムは、第1の発明をプログラム発明として捉えたものであるので、その効果は第1の発明の効果と同様である。 Since the business management program according to the fifth invention is obtained by treating the first invention as a program invention, its effects are the same as those of the first invention.

第6の発明に係る業務管理プログラムは、第2の発明をプログラム発明として捉えたものであるので、その効果は第2の発明の効果と同様である。 Since the business management program according to the sixth invention is obtained by treating the second invention as a program invention, its effects are the same as those of the second invention.

第7の発明に係る業務管理プログラムは、第3の発明をプログラム発明として捉えたものであるので、その効果は第3の発明の効果と同様である。 Since the business management program according to the seventh invention is obtained by treating the third invention as a program invention, its effects are the same as those of the third invention.

第8の発明に係る業務管理プログラムは、第4の発明をプログラム発明として捉えたものであるので、その効果は第4の発明の効果と同様である。 Since the business management program according to the eighth invention is obtained by treating the fourth invention as a program invention, its effects are the same as those of the fourth invention.

本発明の第1の実施の形態に係る業務管理システムのシステムブロック図である。1 is a system block diagram of a business management system according to a first embodiment of the present invention; FIG. 企業における事業の受注から第1の実施の形態に係る業務管理システムによる工程の設定と遂行を説明するためのフロー図である。FIG. 2 is a flow chart for explaining the setting and execution of processes by the business management system according to the first embodiment from the receipt of an order for a business in a company; 第1の実施の形態に係る業務管理システムによって策定される統合工程表を示す概念図である。FIG. 2 is a conceptual diagram showing an integrated process chart formulated by the business management system according to the first embodiment; FIG. (a)及び(b)は第1の実施の形態に係る業務管理システムの客先マスタの概念図である。(a) and (b) are conceptual diagrams of a customer master of the business management system according to the first embodiment. 第1の実施の形態に係る業務管理システムの社内人員マスタの概念図である。3 is a conceptual diagram of an in-house personnel master of the business management system according to the first embodiment; FIG. (a)及び(b)は第1の実施の形態に係る業務管理システムの作業指示マスタの概念図である。4A and 4B are conceptual diagrams of a work instruction master of the work management system according to the first embodiment; FIG. 第1の実施の形態に係る業務管理システムによって作成される作業指示書の表示画面の概念図である。FIG. 4 is a conceptual diagram of a display screen for work instructions created by the work management system according to the first embodiment; 第1の実施の形態に係る業務管理システムによって作成される別表の概念図である。4 is a conceptual diagram of an attached table created by the business management system according to the first embodiment; FIG. 第1の実施の形態に係る業務管理システムにおいて演算される繁忙期パラメータと繁忙期レシオを説明するための概念図である。It is a conceptual diagram for demonstrating the busy season parameter and busy season ratio calculated in the business management system which concerns on 1st Embodiment. (a)及び(b)は第1の実施の形態に係る業務管理システムの業務内容マスタの概念図である。(a) and (b) are conceptual diagrams of a work content master of the work management system according to the first embodiment. (a)及び(b)は第1の実施の形態に係る業務管理システムの日報業務マスタの概念図である。4A and 4B are conceptual diagrams of a daily report business master of the business management system according to the first embodiment; FIG. 第1の実施の形態に係る業務管理システムによって作成される日報の表示画面の概念図である。FIG. 4 is a conceptual diagram of a daily report display screen created by the business management system according to the first embodiment; 本発明の第2の実施の形態に係る業務管理システムのマスタデータベースの概念図である。FIG. 8 is a conceptual diagram of a master database of the business management system according to the second embodiment of the present invention; 第2の実施の形態に係る業務システムによって作成される作業指示書の表示画面の概念図である。FIG. 11 is a conceptual diagram of a display screen for work instructions created by the business system according to the second embodiment;

(第1の実施の形態)
以下に本発明の第1の実施の形態に係る業務管理システムについて図1-図12を参照しながら説明する。
図1は第1の実施の形態に係る業務管理システムのシステムブロック図である。
図1において、業務管理システム1aは、処理部2、入出力インターフェース3、記憶部4及び広域通信網93に接続可能なユーザー装置類、具体的な例としては経理担当者29aが使用する経理ユーザー装置29、管理者30aが使用する管理ユーザー装置30、営業担当者31aが使用する営業ユーザー装置31及び作業担当者32aが使用する作業ユーザー装置32を有している。また、本業務管理システム1aは、ユーザー装置類を除いてコンピュータサーバ内でそれぞれの機能を発揮し得る演算回路や記憶装置を備えたシステムとして想定することが可能である。
また、入出力インターフェース3は、演算回路等の装置類、ファームウェア、又はTCP/IPドライバやPPPドライバ等の通信用ソフトウェア又はこれらの組合せとして実装される。業務管理システム1aは入出力インターフェース3を介して他の装置、特にユーザー装置類29-32とデータを送受信することができるし、別途、業務管理システム1aを運用する際はディスプレイ装置等の出力装置にも接続することが可能である。
(First embodiment)
A business management system according to a first embodiment of the present invention will be described below with reference to FIGS. 1 to 12. FIG.
FIG. 1 is a system block diagram of a business management system according to the first embodiment.
In FIG. 1, the business management system 1a includes a processing unit 2, an input/output interface 3, a storage unit 4, and user devices connectable to a wide area communication network 93, such as an accounting user used by an accounting staff 29a. It has a device 29, a management user device 30 used by an administrator 30a, a sales user device 31 used by a salesperson 31a, and an operation user device 32 used by a worker 32a. In addition, the business management system 1a can be assumed as a system provided with arithmetic circuits and storage devices capable of exhibiting their respective functions in a computer server, except for user devices.
The input/output interface 3 is implemented as a device such as an arithmetic circuit, firmware, communication software such as a TCP/IP driver or PPP driver, or a combination thereof. The business management system 1a can transmit and receive data to and from other devices, particularly user devices 29 to 32, via the input/output interface 3. When the business management system 1a is operated, an output device such as a display device can be used. can also be connected to

業務管理システム1aの構成内容について説明する。
処理部2は、工程処理部5、進捗率抽出部6、繁忙期レシオ演算部7、作業指示書作成部8a及び日報作成部8bから構成されている。
記憶部4は、マスタデータベース9a、工程データベース10、経理データベース11、作業指示書データベース12、日報データベース13及び統合データベース14から構成されている。
マスタデータベース9aは業務管理システム1a内で共通運用される客先情報を構成する客先マスタ15、同様に共通運用される企業内の作業員情報を構成する社内人員マスタ16、同様に共通運用される企業保有の重機や車両に関する情報を構成する重機・車両マスタ17、同じく企業保有の装置や治具に関する情報を構成する装置・治具マスタ18、作業指示書を作成する際に共通運用される作業内容を構成する作業指示マスタ19、日報を作成する際に共通運用される業務内容を構成する業務内容マスタ20及び作業内容と業務内容を予め定めたIDを用いて紐付けして構成する日報業務マスタ21を読み出し可能に格納している。
工程データベース10は企業が受注する事業として、工事、保守、修理の3つのカテゴリーを例示しつつ、それぞれ単発の事業に関する工程に関するデータとして、工事工程データ22、保守工程データ23及び修理工程データ24を格納している。したがって、事業として、これらに限定するものではなく、この他例えば点検や養生等を概念してそれらに関する工程データを格納してもよい。
経理データベース11は、企業が受注した事業に関する受注金額データ25を格納するデータベースであり、作業指示書データベース12は作業指示書作成部8aによって作成された作業指示書に関する作業指示書データ26を格納するデータベースであり、日報データベース13は日報作成部8bによって作成された日報に関する日報データ27を格納するデータベースである。
統合データベース14は、工程に関するデータ類22,23,24、作業指示書データ26及び日報データ27を統合させた工程表や別途作成された別表も統合させた統合工程表データ28を格納するデータベースである。
また、経理担当者29a、管理者30a、営業担当者31a及び作業担当者32aは、それぞれ経理ユーザー装置29、管理ユーザー装置30、営業ユーザー装置31及び作業ユーザー装置32を用いて入出力インターフェース3及び広域通信網93を介して、種々のデータベースに格納されるマスタやデータを入力、修正及び閲覧可能であり、工程処理部5を用いて工程表や統合工程表を作成したり、作業指示書作成部8aを用いて作業指示書を作成したり、日報作成部8bを用いて日報を作成することが可能である。
The configuration contents of the business management system 1a will be described.
The processing unit 2 is composed of a process processing unit 5, a progress rate extracting unit 6, a busy period ratio calculating unit 7, a work instruction sheet creating unit 8a, and a daily report creating unit 8b.
The storage unit 4 is composed of a master database 9a, a process database 10, an accounting database 11, a work instruction database 12, a daily report database 13, and an integrated database .
The master database 9a includes a customer master 15 that configures customer information that is commonly operated within the business management system 1a, an in-house personnel master 16 that configures worker information in a company that is commonly operated in the same manner, and an in-house personnel master 16 that is commonly operated. A heavy machinery/vehicle master 17, which constitutes information on heavy machinery and vehicles owned by a company, a device/jig master 18, which also constitutes information on devices and jigs owned by a company. A work instruction master 19 that constitutes the work content, a work content master 20 that constitutes the work content that is commonly used when creating a daily report, and a daily report that is configured by linking the work content and the business content using a predetermined ID. The business master 21 is stored in a readable manner.
The process database 10 exemplifies the three categories of construction, maintenance, and repair as projects for which a company receives an order, and includes construction process data 22, maintenance process data 23, and repair process data 24 as data related to each one-off project. Stored. Therefore, the business is not limited to these, and process data related to inspection, curing, etc. may be stored.
The accounting database 11 is a database that stores order amount data 25 relating to projects received by companies, and the work instruction database 12 stores work instruction data 26 relating to the work instructions created by the work instruction creating section 8a. The daily report database 13 is a database that stores daily report data 27 relating to the daily report created by the daily report creating section 8b.
The integrated database 14 is a database that stores a process chart that integrates data 22, 23, 24, work instruction sheet data 26, and daily report data 27 related to processes, and integrated process chart data 28 that also integrates separately prepared separate tables. be.
Accounting staff 29a, manager 30a, sales staff 31a, and work staff 32a use the accounting user device 29, management user device 30, sales user device 31, and work user device 32, respectively. Via the wide area communication network 93, it is possible to input, modify, and view masters and data stored in various databases, and use the process processing unit 5 to create a process chart and an integrated process chart, and create work instructions. It is possible to create work instructions using the unit 8a and to create daily reports using the daily report creating unit 8b.

以下、図2乃至図12を参照しながら、第1の実施の形態に係る業務管理システム1aの運用について説明する。
図2は企業における事業の受注から第1の実施の形態に係る業務管理システムによる工程の設定と遂行を説明するためのフロー図であり、図3は業務管理システムによって策定される統合工程表を示す概念図である。
図2は、本願発明の業務管理プログラムに対してはその実行工程を表すものでもあり、この図を参照しながら業務管理システム1aにおけるデータ処理の流れを説明することは業務管理プログラムの実施の形態について説明することと同義である。
なお、図2において、Sで示す工程に関する記載を覆うようにして破線で示しているのは図1に示される業務管理システム1aの構成要素であり、符号を同一に示している。また、Sで示す工程自体に付されている符号はその工程に関わるユーザー装置類を示している。
大きな流れとして、業務管理システム1aは図2に示される工程に沿って、工程処理部5が、記憶部4のデータベースに格納されるマスタやデータを参照しながら図3に示される統合工程表28aを作成し、その統合工程表28aに作業指示書作成部8aが作成した作業指示書に関する作業指示書データ26や日報作成部8bが作成した日報に関する日報データ27を含めて統合することで、企業が抱える全事業に亘る繁忙期を把握しながら、既に受注している事業における工程や新規事業の受注時の工程の調整、同様に人員や重機・車両等の調整を行い、複数の事業全体の効率化と収益率の向上を図るものである。
以下、図2に示される工程に沿って詳細に説明する。
図2において、企業が事業を受注すると、まず、ステップS1の受注金額入力工程として、経理担当者29aによって、経理ユーザー装置29を介して受注金額が入力され、工程処理部5は、マスタデータベース9aから図4(a)及び(b)にそれぞれ示される客先会社名表15aと客先ご担当者名表15bを有する客先マスタ15を読み出す。そして、工程処理部5は、図4(a)のコード列53からコードの選択を受けて会社名列54に示される客先会社名の特定を行い、同様に図4(b)のコード列55からコードの選択を受けて担当者名列56に示されるご担当者名の特定を行い、これら特定した情報と共に、経理担当者29aから入力される工事名等の事業名を付して受注金額データ25として経理データベース11に読み出し可能に格納する。
Operation of the business management system 1a according to the first embodiment will be described below with reference to FIGS. 2 to 12. FIG.
FIG. 2 is a flowchart for explaining the setting and execution of processes by the work management system according to the first embodiment from the receipt of a business order in a company. FIG. 3 shows an integrated work schedule formulated by the work management system. It is a conceptual diagram showing.
FIG. 2 also shows the execution process of the business management program of the present invention. It is synonymous with explaining about.
In FIG. 2, the components of the business management system 1a shown in FIG. 1 are indicated by dashed lines so as to cover the description of the process indicated by S, and the same reference numerals are used. Further, the reference numerals attached to the steps indicated by S indicate the user devices related to the steps.
As a general flow, the business management system 1a follows the steps shown in FIG. , and includes and integrates work instruction data 26 related to the work instructions created by the work instruction creation unit 8a and daily report data 27 related to the daily report created by the daily report creation unit 8b into the integrated process chart 28a. While grasping the busy season for all businesses, we adjust the processes in the projects that have already received orders and the processes at the time of receiving orders for new projects, as well as the personnel, heavy machinery, vehicles, etc. This is intended to improve efficiency and profitability.
A detailed description will be given below along the steps shown in FIG.
In FIG. 2, when a company receives an order for a project, first, as an order amount input step of step S1, the person in charge of accounting 29a inputs the order amount through the accounting user device 29, and the process processing unit 5 enters the order amount into the master database 9a. 4A and 4B, the customer master 15 having the customer company name table 15a and the customer person in charge name table 15b shown in FIGS. 4A and 4B, respectively. Then, the process processing section 5 receives the selection of the code from the code string 53 of FIG. 4(a), identifies the customer company name shown in the company name column 54, and similarly selects the code string of FIG. 4(b). After receiving the code selection from 55, the name of the person in charge shown in the name column 56 of the person in charge is specified, and together with the specified information, the business name such as the construction name entered by the accounting person 29a is added to receive the order. It is stored in the accounting database 11 as the amount data 25 in a readable manner.

次に、ステップS2の工程設定工程では、管理者30a又は営業担当者31aによって、管理ユーザー装置30又は営業ユーザー装置31を介して工程に関する情報、例えば、工事を特定するための工事番号、客先会社名、受注した工事内容を表す件名あるいは工事の対象となる品名、工程の社内完了日あるいは出荷予定日、さらには納品方法等が入力される。そして、工程処理部5は、マスタデータベース9aから図5に示される社内人員マスタ16を読み出して、コード列57に示されるコードの選択を受けて社内担当者名列58に示される企業内の担当者を特定し、その特定した情報や入力された情報を基に工程表を作成し、工事工程データ22として工程データベース10に読み出し可能に格納する。もちろん、受注した事業が保守事業であれば保守工程データ23として、修理事業であれば修理工程データ24として工程データベース10に読み出し可能に格納する。本実施の形態では事業として工事を受注した場合を主として説明する。
また、工程処理部5は、複数の工事工程データ22を統合して一覧表とした統合工程表データ28を統合データベース14に読み出し可能に格納する。
Next, in the process setting process of step S2, the manager 30a or the salesperson 31a sends information about the process, such as the construction number for specifying the construction work, the customer The name of the company, the title of the work that has been ordered or the name of the item to be worked on, the date of completion of the work within the company or the scheduled date of shipment, and the method of delivery are entered. Then, the process processing unit 5 reads the in-house personnel master 16 shown in FIG. A work schedule is created based on the specified information and the input information, and stored as construction process data 22 in the process database 10 in a readable manner. Of course, if the ordered business is the maintenance business, it is stored in the process database 10 as the maintenance process data 23, and if it is the repair business, it is stored as the repair process data 24 in the process database 10 in a readable manner. In this embodiment, a case where an order for construction work is received as a business will be mainly described.
In addition, the process processing unit 5 stores in the integrated database 14 readably integrated process chart data 28 that is a list of a plurality of construction process data 22 integrated.

図3に示される統合工程表28aにおいて、工事番号列33には、工事番号が表示されており、担当列34には社内人員マスタ16を用いて特定された担当者名が表示されており、客先列36には客先会社名表15aを用いて特定された客先名が表示されている。また、件名列37には件名、完了予定日列38及び出荷予定日列39には工程の終了時期に関する情報が表示され、納品方法列40には納品方法に関する情報が表示されている。なお、進捗率列35については後述する。
これらの情報は企業全体として受注した案件に関するものがすべて一覧できる統合工程表28aとしてまとめられている。
これら工程に関する情報に対応する工程の具体的なスケジュールについては、統合工程表28aの右側にスケジュール欄41と共に表示される。
より具体的には、2021年の6月上旬を例として、日付行42には1日から10日までの日付が表示され、曜日行43には日付に該当する曜日が表示され、その下に後述する総工事件数行44、作業人数行45及び繁忙期レシオ行46が示されている。
そして、繁忙期レシオ行46の下には、それぞれの工事に対する工程の状況表示欄47が示されている。
スケジュールとして日付毎に示される状況表示欄47では、符号48で示される横線のハッチングが施されているマスは休日表示、符号49で示される斜線のハッチングが施されているマスは工程の完了表示でその案件が完了案件であることを示し、符号50で示される濃いドットが施されているマスは現在進行している工程でかつ客先の現場での作業に人員が不要な工程の未完了表示、符号51で示される空欄のマスは工程の空き表示、符号52で示される薄いドットが施されているマスは現在進行している工程でかつ客先の現場での作業に数字で示されている人数の作業員が必要である工程の人振り表示として表現されている。
例えば、工事番号216322の工事では、6月3日に修理が終了してモーターを納入した完了案件であることが理解できる。工事番号216325の工事はまだ進行中の工程であり、1日に2名の現場作業員が、3日と4日にも1名の現場作業員が必要であることが理解できる。なお、担当列34に表示される担当者は社内の営業担当者又は管理者であり、現場の作業員とは異なる人員である。
In the integrated process chart 28a shown in FIG. 3, the construction number column 33 displays the construction number, and the person in charge column 34 displays the name of the person in charge specified using the in-house personnel master 16. The customer column 36 displays customer names specified using the customer company name table 15a. In addition, the subject column 37 displays the subject, the scheduled completion date column 38 and the scheduled shipping date column 39 display information regarding the end time of the process, and the delivery method column 40 displays information regarding the delivery method. Note that the progress rate column 35 will be described later.
These pieces of information are summarized as an integrated process chart 28a in which all items related to orders received by the company as a whole can be listed.
A specific schedule of the process corresponding to the information on these processes is displayed together with the schedule column 41 on the right side of the integrated process chart 28a.
More specifically, taking the beginning of June 2021 as an example, the dates from the 1st to the 10th are displayed in the date row 42, the days of the week corresponding to the dates are displayed in the day of the week row 43, and the A total number of construction work row 44, a number of workers row 45, and a busy period ratio row 46, which will be described later, are shown.
Below the busy period ratio row 46, a process status display column 47 for each construction is shown.
In the status display field 47 shown for each date as a schedule, the squares hatched with horizontal lines indicated by reference numeral 48 indicate holidays, and the squares indicated by reference numeral 49 hatched with oblique lines indicate the completion of the process. indicates that the case is a completed case, and the squares with thick dots indicated by reference numeral 50 are processes that are currently in progress and that do not require personnel for work at the customer's site. Blank squares indicated by reference numeral 51 indicate vacant processes. It is expressed as a staffing indication of a process that requires a certain number of workers.
For example, in the construction work with construction number 216322, it can be understood that the repair work was completed on June 3 and the motor was delivered. It can be understood that the construction of construction number 216325 is still in progress, and two field workers are required per day, and one field worker is required on the 3rd and 4th. The person in charge displayed in the person in charge column 34 is an in-house sales person or manager, who is different from the on-site worker.

次に、図2に戻って、ステップS3の作業指示書作成工程では、管理者30aによって管理ユーザー装置30を介して作業指示書の作成のための情報入力が実行される。作業指示書作成部8aは、マスタデータベース9aから図6(a)及び(b)にそれぞれ示される作業内容表19aと実施項目表19bを有する作業指示マスタ19を読み出す。そして、作業指示書作成部8aは、管理者30aによる管理ユーザー装置30を介した情報の入力の実行によって作業指示書を作成するため、管理ユーザー装置30に作業指示書表示画面を表示する。 Next, referring back to FIG. 2, in the work instruction creation process of step S3, the administrator 30a inputs information for creating the work instruction through the management user device 30. FIG. The work instruction sheet creating unit 8a reads the work instruction master 19 having a work content table 19a and an action item table 19b shown in FIGS. 6(a) and 6(b) from the master database 9a. Then, the work instruction sheet creation unit 8a displays a work instruction sheet display screen on the management user device 30 in order to create a work instruction sheet by executing information input via the management user device 30 by the manager 30a.

図7は業務管理システム1aによって作成される作業指示書の表示画面の概念図である。
図7において、作業指示書表示画面64aには業務インデックスデータ欄65に加えて図6(a)の作業指示マスタ19を構成する作業内容表19aに示された作業内容列61にチェック欄を備えた作業内容表66aと図6(b)の作業指示マスタ19を構成する実施項目表19bに示された実施項目列63にチェック欄を備えた実施項目表66bが設けられている。
この業務インデックスデータ欄65には管理者30aによって管理ユーザー装置30を介して、工事番号欄67に工事番号が入力されるか、あるいはプルダウンメニューアイコン67aが選択され、既にステップS2で登録された工事番号から該当する工事番号が選択されて入力されることも可能である。また、担当者名欄68には企業の営業等の担当者名が入力されるか同様にプルダウンメニューアイコン68aを選択され、既に登録されている担当者名から選択されることも可能である。
また、客先名欄69に客先名、客先の客先担当名欄72にご担当者名、件名欄70に工事等に関する件名、品名欄71に工事の対象となる品名、工事の工程の期間を特定するために工程開始日欄73と工程終了日欄74にそれぞれ日付が入力される。なお、これらの情報のいずれかについて既に登録されているものがあり、工事番号に紐付けされているような場合には、プルダウンメニューアイコン67aを選択して工事番号が特定された際に、紐付いている情報の欄が埋まるように表示されてもよい。
そして、作業指示書作成部8aは、図6(a)のコード列60から管理者30aによるコードの選択を受けて作業内容列61に示される作業内容の特定を行い、同様に図6(b)のコード列62からコードの選択を受けて実施項目列63に示される実施項目の特定を行う。その際には、図7に示されるようにチェック欄が選択されることでチェックマークが付されるようにし、さらに、その選択された作業内容や実施項目が薄墨色に着色されることで選択されたことが明確化されるように工夫されている。
このように作業指示書表示画面64aを用いて作業指示書作成部8aによって作成された作業指示書は作業指示書作成部8aによって読み出し可能に作業指示書データベース12に格納される。
FIG. 7 is a conceptual diagram of a work instruction display screen created by the work management system 1a.
In FIG. 7, a work instruction display screen 64a is provided with a check column in the work content column 61 shown in the work content table 19a constituting the work instruction master 19 of FIG. 6(a) in addition to the work index data column 65. An action item table 66b having check columns is provided in the action item column 63 shown in the work content table 66a and the action item table 19b forming the work instruction master 19 of FIG. 6(b).
In this work index data column 65, the administrator 30a enters a construction number in the construction number column 67 via the management user device 30, or selects the pull-down menu icon 67a, and the construction already registered in step S2 is displayed. It is also possible to select and input the corresponding construction number from the numbers. In addition, it is also possible to input the name of the person in charge of sales of the company in the name of person in charge column 68, or select the name of the person in charge who has already been registered by selecting the pull-down menu icon 68a.
In addition, the customer name column 69 contains the customer name, the customer contact name column 72 contains the name of the person in charge, the subject column 70 contains the subject related to construction, etc., and the product name column 71 contains the name of the item to be constructed and the construction process. Dates are entered in the process start date column 73 and the process end date column 74 in order to specify the period of . If any of this information has already been registered and is associated with the construction number, when the construction number is specified by selecting the pull-down menu icon 67a, the associated information will be displayed. It may be displayed so that the column of the information that is being used is filled.
Then, the work instruction sheet creating unit 8a receives code selection by the manager 30a from the code string 60 of FIG. ) in response to the selection of the code from the code column 62, the action item indicated in the action item column 63 is specified. In this case, as shown in FIG. 7, the check box is selected to add a check mark, and the selected work content or action item is colored in light black to select it. It is devised so that it is clarified that
The work instructions prepared by the work instruction preparation unit 8a using the work instruction display screen 64a are stored in the work instruction database 12 in a readable manner by the work instruction preparation unit 8a.

次に、図2に戻って、ステップS4の作業員割当て工程では、管理者30a又は営業担当者31aによって、管理ユーザー装置30又は営業ユーザー装置31を介して作業指示書で指示された作業内容に基づいて、現場で必要な作業員の割当てに関する入力が実行される。具体的には、工程処理部5は、マスタデータベース9aから図5に示される社内人員マスタ16を読み出して、コード列57に示されるコードの選択を受けて企業内の担当者を作業員として特定し、その特定した作業員情報を統合工程表データ28に含めて統合データベース14に読み出し可能に格納する。
また、ステップS5の重機・車両割当て工程及びステップS6の装置・治具割当て工程ではステップS4と同様に、管理者30a又は営業担当者31aによって、管理ユーザー装置30又は営業ユーザー装置31を介して作業指示書で指示された作業内容に基づいて、企業内の重機・車両及び装置・治具の割当てに関する入力が実行される。具体的には、工程処理部5はマスタデータベース9aからそれぞれ重機・車両マスタ17及び装置・治具マスタ18を読み出して、それぞれ特定し、その特定した重機・車両情報及び装置・治具情報を統合工程表データ28に含めて統合データベース14に読み出し可能に格納する。
統合工程表データ28に含められた作業員情報は、図3に作業人数行45として示される欄に表示されるようにして企業が受注した事業全体として日付毎に何人の作業員が必要であるかが数字で明示される。また、黒色で着色された部分は作業員全体を100%とした場合にどの程度の割合の作業員が現場で作業するかを示すインジケータである。なお、本実施の形態では統合工程表28aに現場作業員の人数に関する情報を表示したが、社内の工場等の作業員に関する情報も表示してもよいし、現場で必要な重機や車両、装置や治具に関する情報も表示してもよい。
Next, returning to FIG. 2, in the worker allocation process of step S4, the manager 30a or the sales person 31a, via the management user device 30 or the sales user device 31, complies with the work contents instructed by the work instruction sheet. Based on this, an input is made regarding the allocation of workers required on site. Specifically, the process processing unit 5 reads out the in-house personnel master 16 shown in FIG. Then, the specified worker information is included in the integrated process chart data 28 and stored in the integrated database 14 in a readable manner.
In addition, in the heavy equipment/vehicle allocation process of step S5 and the device/jig allocation process of step S6, the manager 30a or the sales person 31a performs work via the management user device 30 or the sales user device 31 in the same way as in step S4. Based on the work contents instructed in the instruction sheet, input regarding the allocation of heavy machinery/vehicles and devices/jigs in the company is executed. Specifically, the process processing unit 5 reads out the heavy equipment/vehicle master 17 and the equipment/jig master 18 from the master database 9a, identifies them, and integrates the identified heavy equipment/vehicle information and equipment/jig information. It is included in the process chart data 28 and stored in the integrated database 14 in a readable manner.
The worker information included in the integrated process chart data 28 is displayed in the column shown as the number of workers row 45 in FIG. is indicated numerically. In addition, the portion colored in black is an indicator showing what percentage of workers are working at the site when all workers are 100%. In the present embodiment, the integrated process chart 28a displays information about the number of field workers, but information about workers in the company's factory or the like may also be displayed. and information about jigs may also be displayed.

一方、特定した作業員情報を統合工程表28aではなく、統合工程表データ28から図8に示すような別表として表示してもよい。図8は業務管理システムによって作成される別表の概念図である。この図8は図3に示される工程に対応して示している。
図8の別表28bでは、工程に関するスケジュールの欄は示されず、月毎にまとめられている。最上の曜日行43の下に日付行42が示され、日付の下に現場での作業人数行45、現場有無・作業人数過半インジケータ45a及び現場重機・車両番号表示列45bが設けられている。
図8において、1日の現場有無・作業人数過半インジケータ45aに薄墨色の着色があることから、作業人数行45に示されている2人が現場での作業人数であることがわかる。また、現場重機・車両番号表示列45bに数字の「2」と付されているのは、2トントラックを意味しており、この情報はステップS5で入力された情報に基づくものである。そして、8日の現場作業員は6人とされ、その下の現場有無・作業人数過半インジケータ45aには濃墨色の着色があることから、この現場作業員の数が過半数であることを意味している。また、現場重機・車両番号表示列45bに数字の「9」が示されているのは、4トンユニック車を意味しており、この情報もステップS5における入力に基づくものである。このように符号・記号あるいはアイコンで示すことで簡潔に表示することができる。
なお、別表28bには装置・治具に関する表示がないが、現場重機・車両番号表示列45bの下等に欄を設けて符号等で表示してもよい。
また、特定した重機・車両情報及び装置・治具情報も統合工程表28aと別表28bの両方に表示されるようにしてもよいし、作業員情報も含めていずれか一方に表示されるようにしてもよい。
このような別表を設けることで、作業員や重機・車両及び装置・治具の配置のみを長い時間(図8では1ヶ月)単位で俯瞰することが可能であるので、これらの配置の修正や新規事業における配置計画においても迅速に対応が可能であり、業務効率を改善することが可能である。
On the other hand, the specified worker information may be displayed as a separate table as shown in FIG. 8 from the integrated process chart data 28 instead of the integrated process chart 28a. FIG. 8 is a conceptual diagram of an attached table created by the business management system. This FIG. 8 is shown corresponding to the steps shown in FIG.
In the separate table 28b of FIG. 8, the column of the schedule regarding the process is not shown, and the schedule is summarized by month. A date row 42 is shown below the uppermost day of the week row 43, and below the date, there are a number of workers row 45 at the site, an indicator 45a for presence/absence of a worker on site and a majority of workers indicator 45a, and a column 45b for displaying the heavy machine/vehicle number at the site.
In FIG. 8, since the day's site presence/number of workers indicator 45a is colored light black, it can be seen that two people shown in the number of workers row 45 are the number of workers at the site. The number "2" attached to the on-site heavy equipment/vehicle number display column 45b means a 2-ton truck, and this information is based on the information input in step S5. The number of field workers on the 8th is six, and the field presence/number of workers majority indicator 45a below it is colored in dark black, which means that the number of field workers is the majority. ing. Further, the numeral "9" indicated in the on-site heavy equipment/vehicle number display column 45b means a 4-ton unic vehicle, and this information is also based on the input in step S5. In this way, the symbols/symbols or icons can be used for simple display.
In addition, although there is no indication of devices/jigs in the attached table 28b, a column may be provided under the on-site heavy equipment/vehicle number display column 45b to indicate it with a code or the like.
In addition, the specified heavy equipment/vehicle information and equipment/jig information may be displayed in both the integrated process chart 28a and the separate table 28b, or may be displayed in either one including the worker information. may
By providing such a separate table, it is possible to overview only the layout of workers, heavy equipment, vehicles, equipment, and jigs in units of long time (one month in FIG. 8), so it is possible to correct these layouts and It is possible to respond quickly to layout plans for new businesses, and to improve operational efficiency.

次に、図2に戻って、ステップS7の繁忙期レシオ演算工程では、繁忙期レシオ演算部7が、経理データベース11から受注金額データ25及び統合データベース14から統合工程表データ28を読み出して、統合工程表データ28に含まれる事業毎の繁忙期パラメータと繁忙期レシオを演算し、統合工程表データ28に含めて統合データベース14に読み出し可能に格納する。
ステップS8の統合工程表策定工程では、工程処理部5が統合データベース14から繁忙期レシオが含められた統合工程表データ28を読み出して、統合工程表28aとして表示する。表示先は各ユーザー装置29-32や入出力インターフェース3及び広域通信網93を介して別途接続されるディスプレイ装置であってもよく、担当者(ユーザー)の求めに応じて表示するようにしてもよい。ステップS8では、ステップS2からステップS7までに実行処理されたデータが統合工程表データ28に反映されるので、統合工程表28aとして策定される。
Next, returning to FIG. 2, in the busy period ratio calculation step of step S7, the busy period ratio calculation unit 7 reads the order amount data 25 from the accounting database 11 and the integrated process chart data 28 from the integrated database 14, and integrates them. A busy season parameter and a busy season ratio for each business included in the process chart data 28 are calculated, included in the integrated process chart data 28 and stored in the integrated database 14 in a readable manner.
In the step S8, which is an integrated process chart formulation process, the process processing unit 5 reads the integrated process chart data 28 including the busy period ratio from the integrated database 14 and displays it as an integrated process chart 28a. The display destination may be a display device separately connected via each user device 29-32, input/output interface 3 and wide area communication network 93, or may be displayed at the request of the person in charge (user). good. In step S8, the data executed from step S2 to step S7 are reflected in the integrated process chart data 28, and are formulated as an integrated process chart 28a.

繁忙期パラメータと繁忙期レシオについて、図9を参照しながら説明する。図9は業務管理システム1aの繁忙期レシオ演算部7において演算される繁忙期パラメータと繁忙期レシオを説明するための概念図であり、図3に示される統合工程表28aの一部を基に作成したものであるので、表中に示される繁忙期パラメータと繁忙期レシオの計算式は業務管理システム1a中で表示されるものではない。
図9において、図3を用いて既に説明した構成については同一符号を付し説明を省略する。図9には3つの事業に関する工事番号が示され、そのうち1つは3つの枝番からなっている。工期列59にはそれぞれの枝番を含めた工事番号の工事に関する工程の工期(日)が示されている。
繁忙期パラメータは、工事の受注額を工事番号の枝番も含めた事業で数えた工期日数で除算したものである。具体的には、図9に示されるとおり、工事番号216326の場合では受注額が800万円に対し、工期日数は枝番3つの合計として62日であるので、繁忙期パラメータは12万9千円となる。同様に工事番号216327の繁忙期パラメータは7万6千円であり、工事番号216329の繁忙期パラメータは10万円となる。
繁忙期レシオは、日毎の繁忙期パラメータの加算であるため、図9に示される事業のみの場合には、6月1日から4日、7日ではそれぞれ30万5千円となり、6月8日から10日では工事番号216329の繁忙期パラメータが加算されないので、20万5千円となる。
このように繁忙期レシオ演算部7で演算された繁忙期レシオは、既に説明したとおり図3の統合工程表28aの繁忙期レシオ行46に数字とインジケータの両方で表示される。繁忙期レシオは事業の受注が決定した段階で、受注額と工程の日数のみで演算可能であることから、図2に示されるようなステップS7ではなく、ステップS2の直後に実行されてもよいし、仮工程で大雑把な計算でよい場合にはステップS2の前でもよい。なお、繁忙期レシオ行46のインジケータは繁忙期レシオの値の月間最大値を100%として示しているが、最大値を取る期間は適宜定めてよい。
The busy season parameter and busy season ratio will be described with reference to FIG. FIG. 9 is a conceptual diagram for explaining busy season parameters and busy season ratios calculated in the busy season ratio calculator 7 of the business management system 1a. Since it is created, the busy season parameters and the busy season ratio calculation formulas shown in the table are not displayed in the business management system 1a.
In FIG. 9, the same reference numerals are assigned to the components already described with reference to FIG. 3, and the description thereof will be omitted. FIG. 9 shows construction numbers relating to three projects, one of which consists of three branch numbers. The construction period column 59 shows the construction period (days) of the process related to the construction of the construction number including each branch number.
The busy period parameter is obtained by dividing the construction order amount by the construction period days counted by the project including the branch number of the construction number. Specifically, as shown in FIG. 9, in the case of construction number 216326, the order amount is 8 million yen, and the construction period is 62 days in total for the three branch numbers, so the busy season parameter is 129,000. becomes a circle. Similarly, the busy season parameter for construction number 216327 is 76,000 yen, and the busy season parameter for construction number 216329 is 100,000 yen.
Since the busy season ratio is the sum of daily busy season parameters, in the case of only the business shown in FIG. Since the busy season parameter of construction number 216329 is not added in 10 days from the day, it is 205,000 yen.
The busy season ratio calculated by the busy season ratio calculator 7 in this way is displayed in the busy season ratio row 46 of the integrated process chart 28a of FIG. 3 as both a number and an indicator as described above. Since the busy season ratio can be calculated only from the order amount and the number of days in the process at the stage when the order for the business is decided, it may be executed immediately after step S2 instead of step S7 as shown in FIG. However, if a rough calculation is sufficient in the provisional process, it may be performed before step S2. Although the indicator in the busy period ratio row 46 shows the monthly maximum value of the busy period ratio value as 100%, the period during which the maximum value is obtained may be determined as appropriate.

繁忙期レシオの演算は、事業の受注額が作業内容の労力や専門性の高さに基づくものであることを利用して実行されるものであることから、個別の作業員の配置や重機・車両あるいは装置・治具の要否といった詳細を決定せずとも、ある程度の繁忙度合を把握することができ、その演算も早い段階で容易に可能である。
したがって、複数の事業が同時に進行するような企業においては、既に受注した事業における人員配置の転換や重機・車両等のやり繰りの修正が早めに可能であり、企業全体の業務管理が迅速かつ効率的に可能である。また、新規の事業を受注するような場合にも、工程に沿って迅速に繁忙期レシオを統合工程表28aに表示することが可能であることから、既存の事業における工程の練り直しや作業人員や重機等の融通の見直しも含めて、対応することが可能である。
さらに、繁忙期レシオは日付毎に数字とインジケータで示されることから日毎に繁忙度合が理解でき、作業員等の休暇の取得計画も立て易く労務管理も容易となる。
なお、本実施の形態では繁忙期パラメータを事業の受注金額を工事番号の枝番も含めた事業で数えた工期日数で除算したが、この除算のみに限定するものではなく、受注金額と工期日程のみを用いて演算したパラメータであれば、例えば受注金額を工期日数の2乗で除算するパラメータであってもよい。受注金額と工期日程のみで繁忙度合を簡単に概略値として求めることに意義がある。
The busy season ratio is calculated using the fact that the amount of business orders received is based on the amount of work involved and the level of expertise involved in the work. It is possible to grasp the degree of busyness to a certain extent without determining the details such as the necessity of vehicles or devices/jigs, and it is possible to easily calculate the degree at an early stage.
Therefore, in a company where multiple projects are progressing at the same time, it is possible to quickly change the personnel allocation and modify the management of heavy machinery and vehicles in projects that have already received orders, and the business management of the entire company can be done quickly and efficiently. is possible. In addition, even when receiving an order for a new business, it is possible to quickly display the busy period ratio in the integrated process chart 28a along the process, so that it is possible to rework the process in the existing business, reduce the number of workers, etc. It is possible to respond, including reviewing the accommodation of heavy machinery.
Furthermore, since the busy period ratio is indicated by numbers and indicators for each date, the degree of busyness can be understood for each day, making it easier to plan vacations for workers and the like, and to facilitate labor management.
In the present embodiment, the busy period parameter is divided by the number of construction period days counted by the project including the order amount of the project, including the branch number of the construction number. If it is a parameter calculated using only, for example, it may be a parameter obtained by dividing the order amount by the square of the number of construction days. It is meaningful to simply calculate the degree of busyness as an approximate value only from the order amount and work schedule.

次に図2のステップS9の作業指示書閲覧工程は、ステップS3で作成された作業指示書を、作業担当者32aが作業ユーザー装置32を介して閲覧する工程である。具体的には、作業担当者32aは作業ユーザー装置32を介して作業指示書データベース12の作業指示書データ26を読み出して、その内容を閲覧することが可能である。
その作業指示書の内容に基づいて、自社内あるいは顧客企業指定の現場で業務を行う。
次に、図2に戻って、ステップS10の日報作成・報告工程では、作業担当者32aによって作業ユーザー装置32を介して日報作成のための情報入力が実行される。日報作成部8bは、マスタデータベース9aから図10(a)及び(b)にそれぞれ示される業務種別表20aと業務内容表20bを有する業務内容マスタ20及び図11(a)及び(b)にそれぞれ示される業務内容表21aと作業内容表21bを有する日報業務マスタ21を読み出す。
Next, in the work instruction reading step of step S9 in FIG. 2, the work instruction written in step S3 is read by the worker 32a via the work user device 32. FIG. Specifically, the worker 32a can read the work instruction sheet data 26 of the work instruction sheet database 12 via the work user device 32 and view the contents thereof.
Based on the contents of the work instructions, the work is performed within the company or at the site specified by the client company.
Next, returning to FIG. 2, in the daily report creation/reporting process of step S10, the operator 32a inputs information for creating the daily report via the user device 32. FIG. The daily report creation unit 8b creates a work content master 20 having a work type table 20a and a work content table 20b shown in FIGS. The daily report work master 21 having the work content table 21a and work content table 21b shown is read.

まず、図10(a),(b)に示される業務内容マスタ20について説明する。
業務内容マスタ20は業務種別表20aと業務内容表20bを備えており、業務種別表20aはコード列75と業務種別列76から構成されており、業務内容表20bは業務コード列77、業務内容列78及び進捗率列79から構成されている。業務コード列77に示される業務コードはアルファベット1文字と数字2文字から構成されており、アルファベット部分はコード列75に示されるコードと一致しており業務種別を示している。すなわち、業務種別表20aが業務内容表20bよりも上位に該当し、業務種別列76の業務種別を細分化した業務内容を業務コードで表現している。
業務内容表20bに含まれる進捗率は予め業務内容に対応させて設定される数値であり、その業務内容が完了した場合に予測される事業(案件)全体における進捗率を表している。このこともあって、業務種別を表すコードのアルファベットの順序は業務が実行される順序に対応しており、業務コードの数字も同様である。
First, the work content master 20 shown in FIGS. 10(a) and 10(b) will be described.
The work content master 20 has a work type table 20a and a work content table 20b. The work type table 20a is composed of a code column 75 and a work type column 76. The work content table 20b is composed of a work code column 77 and a work content. It consists of a column 78 and a progress rate column 79 . The business code shown in the business code string 77 is composed of one alphabetic character and two numeric characters, and the alphabetic portion matches the code shown in the code string 75 and indicates the business type. In other words, the work type table 20a is higher than the work content table 20b, and the work content obtained by subdividing the work type in the work type column 76 is represented by the work code.
The progress rate included in the work content table 20b is a numerical value set in advance corresponding to the work content, and represents the progress rate of the entire project (project) predicted when the work content is completed. For this reason, the alphabetical order of the code representing the business type corresponds to the order in which the business is executed, and the numbers of the business code are the same.

次に、図11を参照しながら、日報業務マスタ21について説明する。
図11は業務管理システムの日報業務マスタの概念図である。日報業務マスタ21は図11(a)に示される業務内容表21aと図11(b)に示される作業内容表21bから構成されている。これらはそれぞれ図10(b)に示される業務内容マスタ20の業務内容表20bと図6(a)に示される作業指示マスタ19の作業内容表19aをIDで紐付けするものである。
具体的には、業務内容表21aはコード列80と業務内容列81に加えてID列82を有し、作業内容表21bはID列83と作業内容列84を有しており、例えば、コード列80の「G01」に対する業務内容列81の業務内容「温水・スチーム洗浄」にはID列82にID「007」が付されており、この業務内容には作業内容列84の「コイル洗浄乾燥」が対応するので、ID列83にID「007」が付されている。
本実施の形態における業務管理システム1aでは、前述のとおり、作業指示書に記載される作業内容と日報に記載される業務内容を区別している。これは作業指示書を作成する担当者(ユーザー)と日報を作成する担当者(ユーザー)が異なり、それぞれの担当者が使用する用語として適しているものを別々に採用しているためである。
Next, the daily report business master 21 will be described with reference to FIG.
FIG. 11 is a conceptual diagram of the daily report business master of the business management system. The daily report business master 21 is composed of a business content table 21a shown in FIG. 11(a) and a work content table 21b shown in FIG. 11(b). Each of these links the work content table 20b of the work content master 20 shown in FIG. 10B and the work content table 19a of the work instruction master 19 shown in FIG.
Specifically, the work content table 21a has an ID column 82 in addition to a code column 80 and a work content column 81, and the work content table 21b has an ID column 83 and a work content column 84. For example, code ID "007" is attached to the ID column 82 for the work content "hot water/steam cleaning" in the work content column 81 corresponding to "G01" in the column 80, and this work content has the work content column 84 "coil cleaning and drying ” corresponds to ID “007” in the ID column 83 .
In the work management system 1a according to the present embodiment, as described above, the work contents described in the work instructions and the work contents described in the daily report are distinguished. This is because the person in charge (user) who creates the work instructions and the person in charge (user) who creates the daily report are different, and the terms suitable for each person in charge are adopted separately.

例えば、作業指示書は前述のとおり管理者30aが作成し、日報は現場で作業する後述の作業担当者32aが作成する場合、作業担当者32aは技術者である場合が多く、現場で使用する専門的で具体的な用語の方が理解容易であり、技術報告として日報を捉えると内容の精度も高くなると考えられる。一方、管理者30aは必ずしも技術者であるとは限らず、専門的で具体的な用語よりも包括的で上位概念的な用語に近い方が理解容易で作業指示も容易である。したがって、本願では「業務内容」と「作業内容」としての概念を前述のとおり定義している。
しかし、このように2種類の用語を用いると作業指示書の内容が理解できない場合や逆に日報の内容が理解できないという状況も発生する可能性がある。そして何より作業指示書で指示された作業内容が日報で報告される業務内容で実行されたか否かが確認できない。そこで、第1の実施の形態に係る業務管理システム1aでは、これらの用語をIDで紐付けることで、「業務内容」と「作業内容」の互換性を担保しているのである。図11では、IDは同一のものが付されているが、作業内容の方が上位であることから、複数の業務内容が1つの作業内容に対応する場合があるので、そのような場合には、業務内容のIDに対して添え字や枝番号を付して対応させておくとよい。
以上説明したような日報業務マスタ21を備えることで、作業指示書と作成するユーザーと日報を作成するユーザーが異なるような場合にも、それぞれのユーザーが理解容易な用語を用いることが容易に可能であり、作業指示書で指示された業務の遂行も漏れなく確認することが可能であり、管理が容易で業務効率を向上させることが可能である。
For example, when the work instructions are prepared by the manager 30a as described above, and the daily report is prepared by a worker 32a who works on-site (to be described later), the worker 32a is often an engineer and is used on-site. Technical and concrete terms are easier to understand, and if the daily report is regarded as a technical report, it is thought that the accuracy of the content will be higher. On the other hand, the manager 30a is not necessarily an engineer, and it is easier to understand and give work instructions if the manager 30a is closer to a comprehensive and broader term than a technical and specific term. Therefore, in this application, the concepts of "work content" and "work content" are defined as described above.
However, if two kinds of terms are used in this way, there is a possibility that the contents of the work instructions may not be understood, or conversely, the contents of the daily report may not be understood. Above all, it is not possible to confirm whether or not the work contents instructed in the work instructions have been executed according to the work contents reported in the daily report. Therefore, in the business management system 1a according to the first embodiment, these terms are associated with IDs to ensure compatibility between "business content" and "work content." In FIG. 11, the same ID is assigned, but since the work content is higher, there are cases where multiple work content corresponds to one work content. It is recommended that subscripts and branch numbers be assigned to IDs of business contents.
By providing the daily report work master 21 as described above, even if the user who creates the work instructions and the user who creates the daily report are different, each user can easily use terms that are easy to understand. It is possible to check the execution of the work instructed in the work instruction without omission, and it is possible to improve the work efficiency by facilitating management.

日報作成部8bは、作業担当者32aによる作業ユーザー装置32を介した情報入力の実行によって日報を作成すべく、作業ユーザー装置32に日報表示画面85を表示する。
図12は業務管理システムによって作成される日報の表示画面の概念図である。
図12において、日報表示画面85には作業日欄86があり、日報を作成する日が入力されるかカレンダー表示(図示せず)から該当する日が選択されるようにしてもよい。工事番号欄87には作成日に実施した工事番号を入力されるか、プルダウンメニューアイコン67aを用いて、既にステップS2で登録された工事番号の中から選択されることも工事工程データ22又は統合工程表データ28を読み出して工事番号が選択されることで対応可能であるし、ステップS3で作成した作業指示書データ26を読み出して工事番号が選択されてもよい。同様に担当者欄88では作業の担当者名が入力されるかプルダウンメニューアイコン68aを用いてマスタデータベース9aの作業員マスタ16から選択されることも可能であるし、工事工程データ22、統合工程表データ28あるいは作業指示書データ26を読み出して担当者が選択されることも可能である。さらに、例えば工事番号の選択によってデータとして紐付けで特定される担当者を表示させるようにしてもよい。
The daily report creation unit 8b displays a daily report display screen 85 on the work user device 32 so that the daily report is created by executing information input via the work user device 32 by the worker 32a.
FIG. 12 is a conceptual diagram of a daily report display screen created by the business management system.
In FIG. 12, the daily report display screen 85 has a work day column 86, and the day for creating the daily report may be entered or the corresponding day may be selected from a calendar display (not shown). In the work process data 22 or integrated work process data 22, the work number column 87 can be used to enter the work number executed on the date of creation or to select from among the work numbers already registered in step S2 using the pull-down menu icon 67a. The construction number can be selected by reading out the work schedule data 28, or the construction number may be selected by reading out the work instruction sheet data 26 created in step S3. Similarly, in the person in charge column 88, the name of the person in charge of the work can be entered or selected from the worker master 16 of the master database 9a using the pull-down menu icon 68a. It is also possible to select the person in charge by reading the table data 28 or the work order data 26 . Furthermore, for example, by selecting the construction number, the person in charge specified by the link may be displayed as data.

次に、日報表示画面85には、日報作成部8bが読み出した業務内容マスタ20の業務種別表20aを用いて生成する業務種別表89aが表示されると共に、業務内容表20bを用いて生成する業務内容表89bが表示されている。
この業務内容表89bでは2通りの着色がある。
1番目は薄墨色に着色された部分で、これは既に作業指示書で指示された作業内容に対応する業務内容が完了していることを意味している。日報作成部8bは、マスタデータベース9aから読み出した日報業務マスタ21を参照することで、業務内容に対応する作業内容を照合し、既に完了した業務内容に関連する欄を薄墨色に着色する。例えば、業務内容表89bの「現地下見」と「入構教育」は5月13日に完了しているので業務コードや最終作業日の欄も併せて薄墨色となっており、これは業務種別としては業務種別表89aで「引き合い」となることから、業務種別表89aにおいてもコードの欄と併せて薄墨色に着色されている。
2番目は濃墨色に着色された部分で、これは作業指示書で指示された作業内容に対応する業務内容が完了していないことを意味している。これも日報作成部8bによって日報業務マスタ21が参照され、日報を介して報告される業務内容が作業内容に対応していない場合に着色されることになる。例えば、業務内容表89bの「組立」はまだ最終作業日の記入もなく完了していないので、業務コードや最終作業日の欄も併せて濃墨色となっており、業務種別表89aにおける「組立」の欄もコードの欄も併せて濃墨色に着色されている。
さらに、図12に示されているとおり、作業担当者32aによる対象日に実施した業務内容は業務内容表89bに含まれるチェック欄が選択されることでチェックマークが入る。チェックマークを入れた後に完了した業務内容は完了した業務内容として薄墨色に変化する。
Next, on the daily report display screen 85, a work type table 89a generated using the work type table 20a of the work content master 20 read by the daily report creating unit 8b is displayed, and the work type table 89a is generated using the work content table 20b. A work content table 89b is displayed.
There are two ways of coloring in this work content table 89b.
The first part is colored light black, which means that the work contents corresponding to the work contents instructed in the work instructions have already been completed. The daily report creation unit 8b refers to the daily report work master 21 read from the master database 9a to check the work contents corresponding to the work contents, and colors the columns related to the already completed work contents in light black. For example, since "preliminary inspection" and "instruction training" in the work description table 89b were completed on May 13, the work code and final work date columns are also colored in light black, which is the work type. is "inquiry" in the work type table 89a, so it is colored light black together with the code column in the work type table 89a.
The second part is colored in dark black, which means that the work content corresponding to the work content instructed in the work instruction sheet has not been completed. The daily report creation unit 8b also refers to the daily report work master 21, and if the work content reported via the daily report does not correspond to the work content, it will be colored. For example, "Assembly" in the work content table 89b has not yet been completed because the final work date has not yet been entered. ” column and the code column are colored dark black.
Further, as shown in FIG. 12, the contents of work performed by the person in charge 32a on the target day are checked by selecting the check column included in the work contents table 89b. The contents of the work completed after the check mark is put in are changed to light black color as the contents of the completed work.

このように日報表示画面85では、作業指示書で指示された作業が完了しているのか未完了なのかを一目で確認可能であり、この業務種別表89aと業務内容表89bを確認するだけですべてのユーザー(経理担当者29a、管理者30a、営業担当者31a及び作業担当者32a)が事業(工事)単位での進捗状況や作業効率を把握することが可能である。また、作業漏れを確認することも可能であり、チェック機能を備えて工程の遅れを防止し、業務効率を向上させることが可能である。
日報表示画面85を用いることで、日報作成部8bによって作成された日報は、日報データ27として、日報データベース13に読み出し可能に格納される。
なお、日報表示画面85の下方には日報まとめ表92が表示されており、このまとめ表を構成する日報は、日報作成部8bが日報データベース13から日報データ27を読み出して表示することで表示される。
日報まとめ表92を表示することで、日報作成時までに作成された直近の日報をまとめてみることが可能であり、企業内全体としての事業の進捗状況を俯瞰することが可能である。また、日報まとめ表92の表示も作業日欄86に示される作業日毎として抽出してもよいし、工事番号欄87に示される工事番号毎として抽出してもよいし、担当者欄88に示される担当者毎として抽出してもよい。それらに絞ることで、絞った要素単位での進捗状況や作業効率を把握することが可能である。
As described above, on the daily report display screen 85, it is possible to confirm at a glance whether the work instructed in the work instruction sheet has been completed or not. All users (accounting staff 29a, manager 30a, sales staff 31a, and work staff 32a) can grasp the progress and work efficiency for each project (construction). It is also possible to check for work omissions, and by providing a check function, it is possible to prevent delays in the process and improve work efficiency.
By using the daily report display screen 85, the daily report created by the daily report creation unit 8b is stored as the daily report data 27 in the daily report database 13 in a readable manner.
Below the daily report display screen 85, a daily report summary table 92 is displayed. be.
By displaying the daily report summary table 92, it is possible to summarize the most recent daily reports created up to the time of daily report creation, and it is possible to overview the progress of the business in the company as a whole. In addition, the display of the daily report summary table 92 may be extracted for each work day indicated in the work date column 86, may be extracted for each construction number indicated in the construction number column 87, or may be extracted for each construction number indicated in the person in charge column 88. It may be extracted for each person in charge. By narrowing down to them, it is possible to grasp the progress status and work efficiency for each narrowed down element.

次に、ステップS11の進捗率抽出工程では、進捗率抽出部6が、業務内容表89bで最も後の工程として業務コードG02の「乾燥」までの業務が完了したとしてチェックされたのを受けて、図10(b)に示される業務内容表20bからG02乾燥に対応する進捗率56%を読み出し、この進捗率データを日報作成部8bが受けて、日報表示画面85の進捗率インジケータ90に表示し、日報データ27に含めて日報データベース13に格納する。
また、日報表示画面85には残り作業時間インジケータ91が示されている。残り作業時間インジケータ91は、受注金額(請求金額あるいは見積もり金額でもよい。)を人件費等の工事の時間単価で除して得られる収益率100%に対する作業時間Aから、工事番号単位の材料費合計額を工事の時間単価で除して得られる材料費合計相当の作業時間B、工事番号単位の外注費合計額を工事の時間単価で除して得られる外注費合計相当の作業時間C、工事番号単位で既に終了した作業時間Dを減算したものを残作業時間(=A-(B+C+D))とし、インジケータとして示すものである。
そして、この残り作業時間インジケータ91は、例えば残作業時間が収益率X%に相当する時間から+a時間あるいは-b時間等、ある収益率に相当する時間を中心として幅を持たせた範囲になった際に着色や濃淡で変化させるようにしてもよい。なお、Xは0から100の間で適宜選択される数字であり、a及びbはA以下で適宜選択される数字である。
Next, in the progress rate extraction step of step S11, the progress rate extraction unit 6 receives a check that the work up to "drying" of the work code G02 has been completed as the last process in the work content table 89b. , the progress rate of 56% corresponding to G02 drying is read out from the work content table 20b shown in FIG. are included in the daily report data 27 and stored in the daily report database 13 .
A remaining work time indicator 91 is also shown on the daily report display screen 85 . The remaining work time indicator 91 is calculated from the work time A for a 100% profit rate obtained by dividing the order amount (billed amount or estimated amount) by the hourly unit price of construction such as labor cost, and the material cost per construction number. Working time B equivalent to the total material cost obtained by dividing the total amount by the hourly unit price of construction, Working time C equivalent to the total outsourcing cost obtained by dividing the total outsourcing cost per construction number by the hourly unit price of construction, The remaining work time (=A-(B+C+D)) is obtained by subtracting the work time D that has already been completed for each construction number, and is shown as an indicator.
The remaining work time indicator 91 has a range centered on a time corresponding to a certain profit rate, for example, from the time corresponding to the profit rate X% to +a hours or -b hours. It may be changed by coloring or shading at the time of printing. In addition, X is a number appropriately selected from 0 to 100, and a and b are numbers that are appropriately selected below A.

さらに、ステップS12の統合工程表反映工程として、工程処理部5も、進捗率抽出部6によって抽出された進捗率データを受けて、図3の統合工程表28aの進捗率列35に表示し、統合工程表データ28に含めて統合データベース14に格納する。 Furthermore, as the step of reflecting the integrated process chart in step S12, the process processing unit 5 also receives the progress rate data extracted by the progress rate extraction unit 6, and displays it in the progress rate column 35 of the integrated process chart 28a of FIG. It is included in the integrated process chart data 28 and stored in the integrated database 14 .

以上のステップS1-S12によって、1つの事業を受注してから事業内容に応じて作業し、日報を報告するまでの一連の流れが完了し、統合工程表28aも更新されていく。したがって、図2中にステップS12の統合工程表反映工程からステップS2の工程設定工程の前まで矢印で伸ばして示すとおり、次に事業を受注する際、ステップS2の工程設定工程では、企業全体でその時点で進行している事業すべての進捗状況や繁忙度合いを統合工程表28aを参照することで容易に把握することが可能であり、状況に応じて人員や重機・車両、装置・治具の配備を適宜修正したり、工期を調整して企業全体における効率性と収益性を高めることが可能である。 Through the steps S1 to S12 described above, a series of steps from receiving an order for one business, working according to the content of the business, and reporting the daily report are completed, and the integrated process chart 28a is updated. Therefore, as shown by an arrow in FIG. 2 extending from the step S12 of reflecting the integrated process chart to the front of the process setting process of step S2, when the next business order is received, in the process setting process of step S2, the whole company By referring to the integrated process chart 28a, it is possible to easily grasp the progress and degree of busyness of all projects in progress at that time. Deployments can be modified accordingly and construction schedules can be adjusted to increase efficiency and profitability across the enterprise.

(第2の実施の形態)
次に、図13及び図14を参照しながら本発明の第2の実施の形態に係る業務管理システムについて説明する。図13は第2の実施の形態に係る業務管理システムのマスタデータベースの概念図であり、図14は第2の実施の形態に係る業務システムによって作成される作業指示書の表示画面の概念図である。
図13において、第2の実施の形態に係る業務管理システム1bは、マスタデータベース9aに代えて、作業指示マスタ19及び日報業務マスタ21を備えていないマスタデータベース9bを用いる。それ以外の構成要素は第1の実施の形態と同一であり、同一符号を付してその説明は省略する。
第2の実施の形態に係る業務管理システム1bでは、作業指示マスタ19に代えて業務内容マスタ20を用いて作業指示書を作成することのみが第1の実施の形態に係る業務管理システム1aと異なり、図2のフロー図に示される工程の設定と遂行の流れは基本的には同一である。
具体的な相違点としては、業務管理システム1bにおいては、図2のステップS3の作業指示書作成工程で、作業指示書作成部8aは、マスタデータベース9bから図10(a)及び(b)にそれぞれ示される業務種別表20aと業務内容表20bを有する業務内容マスタ20を読み出し、管理ユーザー装置30に作業指示書表示画面64bを表示する。
すなわち、本実施の形態では、第1の実施の形態で区別していた「作業内容」と「業務内容」に対し、「作業内容」を廃止し、すべて「業務内容」で処理するものである。よって、業務管理システム1aにおける図7の作業指示書表示画面64aで表示された作業内容表66a及び実施項目表66bに対し、業務管理システム1bでは図14に示すとおり、業務内容マスタ20から読み出された業務種別表66c及び業務内容表66dに変更する。
したがって、本実施の形態に図2のフロー図を適用すると、ステップS3では作業指示書作成部8aはマスタデータベース9bから業務内容マスタ20を読み出して作業指示書を作成する。また、ステップS10では日報作成部8bは日報業務マスタ21を読み出す必要がなく、日報業務マスタ21を参照しなくとも、日報の業務内容に対応する作業指示書内の業務内容を照合し、図12に示されるように既に完了した業務内容に関連する欄を薄墨色に着色することができるし、進捗率も表示することができる。
(Second embodiment)
Next, a business management system according to a second embodiment of the present invention will be described with reference to FIGS. 13 and 14. FIG. FIG. 13 is a conceptual diagram of the master database of the business management system according to the second embodiment, and FIG. 14 is a conceptual diagram of a work instruction display screen created by the business system according to the second embodiment. be.
In FIG. 13, the business management system 1b according to the second embodiment uses a master database 9b that does not have a work instruction master 19 and a daily report business master 21 instead of the master database 9a. Other constituent elements are the same as those in the first embodiment, and the same reference numerals are assigned to them, and descriptions thereof will be omitted.
The work management system 1b according to the second embodiment differs from the work management system 1a according to the first embodiment in that work instructions are created using the work content master 20 in place of the work instruction master 19. Unlike, the flow of setting up and performing the steps shown in the flow diagram of FIG. 2 is basically the same.
As a specific difference, in the work management system 1b, in the work instruction creation process of step S3 in FIG. The work content master 20 having the work type table 20a and the work content table 20b respectively indicated is read, and the work instruction sheet display screen 64b is displayed on the management user device 30. FIG.
In other words, in the present embodiment, "work content" is abolished in contrast to "work content" and "business content" that were distinguished in the first embodiment, and all processing is performed using "business content". . Therefore, in the work management system 1b, the work content table 66a and the action item table 66b displayed on the work instruction display screen 64a of FIG. The work type table 66c and the work content table 66d are changed.
Therefore, if the flow chart of FIG. 2 is applied to the present embodiment, in step S3 the work instruction sheet creating unit 8a reads the work content master 20 from the master database 9b and creates a work instruction sheet. Further, in step S10, the daily report creating unit 8b does not need to read out the daily report work master 21, and even without referring to the daily report work master 21, the work contents in the work instructions corresponding to the work contents of the daily report are collated. As shown in , columns related to already completed tasks can be colored in light black, and the progress rate can also be displayed.

以下、図14を参照しながら本実施の形態における作業指示書の作成について、図7と同一の構成要素に対しては同一符号を付してその説明を省略する。
図14において、作業指示書作成部8aは、図10(a)のコード列75から管理者30aによるコードの選択を受けて業務種別列76に示される業務種別の特定を行い、同様に図10(b)の業務コード列77からコードの選択を受けて業務内容列78に示される業務内容の特定を行う。その際には、図14の業務種別表66c及び業務内容表66dに示されるようにチェック欄が選択されることでチェックマークが付されるようにし、さらに、その選択された業務種別や業務内容が薄墨色に着色されることで選択されたことが明確化されるように工夫されている。
このように作業指示書表示画面64bを用いて作業指示書作成部8aによって作成された作業指示書は作業指示書作成部8aによって読み出し可能に作業指示書データベース12に格納される。
業務管理システム1bにおいては、作業指示マスタ19の「作業内容」に代えて日報の作成時に用いられる業務内容マスタ20の「業務内容」で作業指示書を作成するので、日報業務マスタ21が不要となり、すべてのユーザーが共通の用語で運用することができるので、業務管理システム1b内のみならず、現場や企業の事務所内のあらゆる場所ですべてのユーザーの用語が統一されることから用語の相違に基づく現場での勘違いやミスを防止することが可能で企業全体の業務効率や収益率の向上に寄与することができる。その他の効果は第1の実施の形態に係る業務管理システム1aと同様である。
In the following, with reference to FIG. 14, the same components as those in FIG. 7 are denoted by the same reference numerals, and the description thereof will be omitted.
In FIG. 14, the work instruction sheet creating unit 8a receives code selection by the manager 30a from the code column 75 of FIG. In response to the selection of the code from the business code column 77 of (b), the business content indicated in the business content column 78 is specified. At that time, as shown in the work type table 66c and the work content table 66d of FIG. is colored light black to clarify that it has been selected.
The work instructions prepared by the work instruction preparation unit 8a using the work instruction display screen 64b are stored in the work instruction database 12 in a readable manner by the work instruction preparation unit 8a.
In the business management system 1b, instead of the "work content" of the work instruction master 19, the "work content" of the business content master 20 used when creating the daily report is used to create the work instruction, so the daily report business master 21 is unnecessary. , since all users can operate with common terms, not only in the business management system 1b, but also in the field and in the company office, the terms of all users are unified. It is possible to prevent misunderstandings and mistakes at the site based on it, and it can contribute to improving the operational efficiency and profitability of the entire company. Other effects are the same as those of the business management system 1a according to the first embodiment.

なお、業務管理システム1a,1bにおける様々な表の欄では、ハッチングや着色が付されている旨を説明したが、それらの色については薄墨色等に限定するものではなく、様々な色彩及びその濃淡は適宜変更してもよい。また、これらのシステムのユーザーとして経理担当者29a、管理者30a、営業担当者31a及び作業担当者32aとしたが、便宜上定めただけであり、それぞれの担当者は限定することを意図するものではなく、いずれのユーザーが担当してもよい。 Although it has been explained that the columns of various tables in the business management systems 1a and 1b are hatched and colored, the colors are not limited to light black and the like, and various colors and colors are available. The shade may be changed as appropriate. The users of these systems are the accounting person 29a, the manager 30a, the sales person 31a, and the work person 32a. Any user may be in charge.

以上説明したとおり、本発明は複数の工事や保守あるいは修理等の作業に関する業務の受注から納品までを同時に管理するシステムあるいはプログラムとして利用可能である。 As described above, the present invention can be used as a system or a program for simultaneously managing a plurality of operations, such as construction work, maintenance work, or repair work, from order receipt to delivery.

1a,1b…業務管理システム 2…処理部 3…入出力インターフェース 4…記憶部 5…工程処理部 6…進捗率抽出部 7…繁忙期レシオ演算部 8a…作業指示書作成部 8b…日報作成部 9a,9b…マスタデータベース 10…工程データベース 11…経理データベース 12…作業指示書データベース 13…日報データベース 14…統合データベース 15…客先マスタ 15a…客先会社名表 15b…客先ご担当者名表 16…社内人員マスタ 17…重機・車両マスタ 18…装置・治具マスタ 19…作業指示マスタ 19a…作業内容表 19b…実施項目表 20…業務内容マスタ 20a…業務種別表 20b…業務内容表 21…日報業務マスタ 21a…業務内容表 21b…作業内容表 22…工事工程データ 23…保守工程データ 24…修理工程データ 25…受注金額データ 26…作業指示書データ 27…日報データ 28…統合工程表データ 28a…統合工程表 28b…別表 29…経理ユーザー装置 29a…経理担当者 30…管理ユーザー装置 30a…管理者 31…営業ユーザー装置 31a…営業担当者 32…作業ユーザー装置 32a…作業担当者 33…工事番号列 34…担当列 35…進捗率列 36…客先列 37…件名列 38…完了予定日列 39…出荷予定日列 40…納品方法列 41…スケジュール欄 42…日付行 43…曜日行 44…総工事件数行 45…作業人数行 45a…現場有無・作業人数過半インジケータ 45b…現場重機・車両番号表示列 46…繁忙期レシオ行 47…状況表示欄 48…休日表示 49…完了表示 50…未完了表示 51…空き表示 52…人振り表示 53…コード列 54…会社名列 55…コード列 56…担当者名列 57…コード列 58…社内担当者名列 59…工期列 60…コード列 61…作業内容列 62…コード列 63…実施項目列 64a,64b…作業指示書表示画面 65…業務インデックスデータ欄 66a…作業内容表 66b…実施項目表 66c…業務種別表 66d…業務内容表 67…工事番号欄 67a…プルダウンメニューアイコン 68…担当者名欄 68a…プルダウンメニューアイコン 69…客先名欄 70…件名欄 71…品名欄 72…客先担当名欄 73…工程開始日欄 74…工程終了日欄 75…コード列 76…業務種別列 77…業務コード列 78…業務内容列 79…進捗率列 80…コード列 81…業務内容列 82…ID列 83…ID列 84…作業内容列 85…日報表示画面 86…作業日欄 87…工事番号欄 88…担当者欄 89a…業務種別表 89b…業務内容表 90…進捗率インジケータ 91…残り作業時間インジケータ 92…日報まとめ表 93…広域通信網 DESCRIPTION OF SYMBOLS 1a, 1b... Business management system 2... Processing part 3... Input/output interface 4... Storage part 5... Process processing part 6... Progress rate extraction part 7... Busy period ratio calculation part 8a... Work instruction preparation part 8b... Daily report preparation part 9a, 9b... Master database 10... Process database 11... Accounting database 12... Work instruction database 13... Daily report database 14... Integrated database 15... Customer master 15a... Customer company name table 15b... Customer person in charge name table 16... In-house Personnel master 17 Heavy machinery/vehicle master 18 Device/jig master 19 Work instruction master 19a Work content table 19b Implementation item table 20 Work content master 20a Work classification table 20b Work content table 21 Daily report work master 21a... Work content table 21b... Work content table 22... Construction process data 23... Maintenance process data 24... Repair process data 25... Order amount data 26... Work instruction data 27... Daily report data 28... Integrated process chart data 28a... Integrated process Table 28b Attached table 29 Accounting user device 29a Accounting person 30 Management user device 30a Administrator 31 Sales user device 31a Sales person 32 Work user device 32a Work person 33 Construction number string 34 Responsible column 35 Progress rate column 36 Customer column 37 Subject column 38 Scheduled completion date column 39 Scheduled shipping date column 40 Delivery method column 41 Schedule column 42 Date row 43 Day of the week row 44 Total number of construction projects Row 45... Number of workers row 45a... On-site presence/number of workers majority indicator 45b... On-site heavy equipment/vehicle number display column 46... Busy season ratio row 47... Status display column 48... Holiday display 49... Completed display 50... Uncompleted display 51... Empty display 52 Person gesture display 53 Code string 54 Company name string 55 Code string 56 Person in charge name string 57 Code string 58 In-house person in charge name string 59 Work period string 60 Code string 61 Work content string 62... Code string 63... Action item string 64a, 64b... Work instruction display screen 65... Work index data column 66a... Work content table 66b... Action item table 66c... Work type table 66d... Work content table 67... Construction number column 67a … pull-down menu -Icon 68... Person in charge name column 68a... Pull-down menu icon 69... Customer name column 70... Subject name column 71... Product name column 72... Customer name column 73... Process start date column 74... Process end date column 75... Code column 76 …Business type column 77 … Business code column 78 … Business content column 79 … Progress rate column 80 … Code column 81 … Business content column 82 … ID column 83 … ID column 84 … Work content column 85 … Daily report display screen 86 … Work day Column 87... Construction number column 88... Person in charge column 89a... Work type table 89b... Work description table 90... Progress indicator 91... Remaining work time indicator 92... Daily report summary table 93... Wide area communication network

Claims (8)

客先から受注した事業内容に対して工期を設定する工程処理部と、前記事業内容を細分化して構成される業務内容を用いて作業指示書を作成する作業指示書作成部と、前記業務内容のうち完了した前記業務内容を報告する日報を作成する日報作成部と、前記作業指示書に記載された前記業務内容を閲覧可能なユーザー装置と、前記事業内容の受注金額を前記工期で除算して繁忙期パラメータを演算する繁忙期レシオ演算部と、を有し、
前記工程処理部は、横欄に日付と縦欄に複数の前記事業内容を配置して複数の前記事業内容の前記工期を一覧表に統合し、前記繁忙期レシオ演算部は、各前記事業内容に対する前記繁忙期パラメータを前記日付毎に加算して繁忙期レシオを演算し、前記工程処理部は前記繁忙期レシオを前記一覧表に表示することを特徴とする業務管理システム。
A process processing unit that sets a work period for the business content ordered from a customer, a work instruction creation unit that creates a work instruction sheet using the business content that is subdivided from the business content, and the business content a daily report creation unit that creates a daily report reporting the content of the completed work, a user device that can view the content of the work described in the work instruction sheet, and a division of the amount of the order received for the content of the business by the construction period and a busy season ratio calculation unit that calculates the busy season parameter,
The process processing unit arranges the dates in horizontal columns and the plurality of business contents in vertical columns to integrate the construction periods of the plurality of business details into a list, and the busy season ratio calculation unit performs each of the business details. to calculate a busy season ratio by adding the busy season parameter to each of the dates, and the process processing unit displays the busy season ratio on the list.
前記業務内容は前記事業内容の実行の時系列に沿って予め設定された進捗率が紐付けられており、前記日報に含まれる完了した前記業務内容に紐付けされた前記進捗率のうち最も高い進捗率を読み出す進捗率抽出部を有し、前記工程処理部は読み出された最も高い前記進捗率を前記一覧表に表示することを特徴とする請求項1記載の業務管理システム。 The business content is associated with a preset progress rate along the time series of execution of the business content, and the progress rate is the highest among the progress rates associated with the completed business content included in the daily report. 2. The business management system according to claim 1, further comprising a progress rate extraction unit for reading progress rates, wherein said process processing unit displays the read highest progress rate on said list. 前記作業指示書作成部は、前記業務内容に代えて前記業務内容をまとめて上位に構成される作業内容を用いて前記作業指示書を作成し、前記日報作成部は前記業務内容のうち完了した前記業務内容を報告する前記日報を作成し、前記作業内容は予めIDが付されており、前記日報で報告されるまとめられた下位の前記業務内容にも前記IDを付して紐付けておくことを特徴とする請求項1又は請求項2記載の業務管理システム。 The work instruction sheet creation unit creates the work instruction sheet using work contents configured at a higher level by summarizing the work contents instead of the work contents. The daily report for reporting the work content is created, the work content is assigned an ID in advance, and the summarized lower work content reported in the daily report is also attached with the ID and linked. 3. The business management system according to claim 1 or 2, characterized in that: 前記工程処理部は、前記作業指示書の内容に応じた作業人員を前記日付毎に割り当ててその人数を前記一覧表又は別表に表示することを特徴とする請求項1乃至請求項3のいずれか1項に記載の業務管理システム。 4. The process processing unit according to any one of claims 1 to 3, wherein the process processing unit allocates workers according to the contents of the work instructions for each of the dates, and displays the number of workers in the list or the separate table. The business management system according to item 1. コンピュータを用いて、客先から受注した事業内容に対して工期を設定する工期処理工程と、前記事業内容を細分化して構成される業務内容を用いて作業指示書を作成する作業指示書作成工程と、前記業務内容のうち完了した前記業務内容を報告する日報を作成する日報作成工程と、前記事業内容の受注金額を前記工期で除算して繁忙期パラメータを演算する繁忙期レシオ演算工程と、横欄に日付と縦欄に複数の前記事業内容を配置して複数の前記事業内容の前記工期を一覧表に統合する工期統合工程と、各前記事業内容に対する前記繁忙期パラメータを前記日付毎に加算して繁忙期レシオを演算する繁忙期レシオ演算工程と、演算された前記繁忙期レシオを前記一覧表に表示する繁忙期レシオ表示工程と、を実行させることを特徴とする業務管理プログラム。 A work schedule processing process of setting a work schedule for the business content ordered from the customer using a computer, and a work instruction creation process of creating work instructions using the work content configured by subdividing the business content. a daily report creation step of creating a daily report for reporting the completed work content among the work content; a busy season ratio calculation step of calculating a busy season parameter by dividing the order amount of the business content by the work period; a construction period integration step of arranging dates in horizontal columns and a plurality of business contents in vertical columns to integrate the construction periods of the plurality of business contents into a list, and setting the busy season parameter for each of the business contents for each date A business management program characterized by executing a busy period ratio calculation step of calculating a busy period ratio by addition and a busy period ratio display step of displaying the calculated busy period ratio in the list. 前記業務内容は前記事業内容の実行の時系列に沿って予め設定された進捗率が紐付けられており、前記日報に含まれる完了した前記業務内容に紐付けされた前記進捗率のうち最も高い進捗率を読み出す進捗率抽出工程と、読み出された前記進捗率を前記一覧表に表示する進捗率表示工程と、を実行させることを特徴とする請求項5記載の業務管理プログラム。 The business content is associated with a preset progress rate along the time series of execution of the business content, and the progress rate is the highest among the progress rates associated with the completed business content included in the daily report. 6. The business management program according to claim 5, causing execution of a progress rate extraction step of reading the progress rate and a progress rate display step of displaying the read progress rate in the list. 前記作業指示書作成工程は、前記業務内容に代えて前記業務内容をまとめて上位に構成される作業内容を用いて前記作業指示書を作成する工程であり、前記日報作成工程は前記業務内容のうち完了した前記業務内容を報告する前記日報を作成する工程であり、前記作業内容は予めIDが付されており、前記日報で報告されるまとめられた下位の前記業務内容にも前記IDを付して紐付けておくことを特徴とする請求項5又は請求項6記載の業務管理プログラム。 The work instruction sheet creation step is a step of creating the work instruction sheet using work contents that are arranged at a higher level by summarizing the work contents instead of the work contents. Of these, the step of creating the daily report for reporting the content of the completed work, the content of the work is assigned an ID in advance, and the ID is also assigned to the content of the summarized lower-level work reported in the daily report. 7. The business management program according to claim 5 or 6, characterized in that the business management program is linked as a group. 前記工期統合工程は、前記作業指示書の内容に応じた作業人員を前記日付毎に割り当ててその人数を前記一覧表又は別表に表示することを特徴とする請求項5乃至請求項7のいずれか1項に記載の業務管理プログラム。 8. The schedule consolidation step allocates workers according to the contents of the work instructions for each date, and displays the number of workers in the list or the separate table. 1. The business management program according to item 1.
JP2021151523A 2021-09-16 2021-09-16 Business management system and program thereof Pending JP2023043740A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021151523A JP2023043740A (en) 2021-09-16 2021-09-16 Business management system and program thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021151523A JP2023043740A (en) 2021-09-16 2021-09-16 Business management system and program thereof

Publications (1)

Publication Number Publication Date
JP2023043740A true JP2023043740A (en) 2023-03-29

Family

ID=85725374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021151523A Pending JP2023043740A (en) 2021-09-16 2021-09-16 Business management system and program thereof

Country Status (1)

Country Link
JP (1) JP2023043740A (en)

Similar Documents

Publication Publication Date Title
McKay et al. Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory
JP4675158B2 (en) Cost element management system
US20090024423A1 (en) System and Method for Automated Vehicle Tracking
KR102064490B1 (en) System for managing manufacturing and production process
US20200034798A1 (en) Planning and scheduling tool assistant
WO2014167555A2 (en) A computer implemented system and method for project controls
US20170169392A1 (en) Automatic bill of talent generation
US8688596B2 (en) Project activity reporting
JP2010282524A (en) Overhead cost distribution computing system
US20130138471A1 (en) Planning and scheduling tool assistant
JP2007323680A (en) Management decision support system
KR102238926B1 (en) Cost managent system and cost managent method using the same
KR100646181B1 (en) Visual bom building system for total materials management system
JP6741324B1 (en) Work schedule creation system
JP2007041799A (en) Project management support system
JP2023043740A (en) Business management system and program thereof
JP2007004386A (en) Business management program and management device using the same
TWI784311B (en) Management device, management system, and management program
EP4030364A1 (en) Management apparatus, management system, and program
JP5199795B2 (en) Forecast management system and program
JP2023115800A (en) Landing prediction value management device, landing prediction value management method, and landing prediction value management program
JP2001117983A (en) Cost managing device and recording medium
Rahman et al. Designing individual productivity measures in service sector
EP2330544A1 (en) System and method for planning work of a company
JP2004265385A (en) Method and device for supporting computer