KR102064490B1 - System for managing manufacturing and production process - Google Patents

System for managing manufacturing and production process Download PDF

Info

Publication number
KR102064490B1
KR102064490B1 KR1020190080932A KR20190080932A KR102064490B1 KR 102064490 B1 KR102064490 B1 KR 102064490B1 KR 1020190080932 A KR1020190080932 A KR 1020190080932A KR 20190080932 A KR20190080932 A KR 20190080932A KR 102064490 B1 KR102064490 B1 KR 102064490B1
Authority
KR
South Korea
Prior art keywords
production
order
setting
work
manufacturing
Prior art date
Application number
KR1020190080932A
Other languages
Korean (ko)
Inventor
윤동진
Original Assignee
세아전자(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 세아전자(주) filed Critical 세아전자(주)
Priority to KR1020190080932A priority Critical patent/KR102064490B1/en
Application granted granted Critical
Publication of KR102064490B1 publication Critical patent/KR102064490B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a system for managing manufacturing and production processes. The purpose of the present invention is to computerize conventional component production process management which have been made manually to enable workers to check data related to warehousing, work instructions or process inspections in real time, thereby minimizing waste of manpower and the occurrence of errors and managing component production and the workers. As an example, the system for managing manufacturing and production processes comprises: a system management unit managing setting of schedules and holidays for pausing manufacturing and production processes; a basic data management unit managing setting of ordering companies and ordering forms required for registration of a contract of the manufacturing and production processes, and setting for each worker code, work team code, and work stop code; a process management unit registering production schedules for each company, issuing work instructions for the registered production schedules, and managing a step-by-step progress status for production schedules for which work instructions have been issued; and a product management unit registering shipping information and shipping schedules for products to complete processes for each company.

Description

제조 및 생산 공정 관리 시스템{SYSTEM FOR MANAGING MANUFACTURING AND PRODUCTION PROCESS}Manufacturing and production process management system {SYSTEM FOR MANAGING MANUFACTURING AND PRODUCTION PROCESS}

본 발명의 실시예는 제조 및 생산 공정 관리 시스템에 관한 것이다.Embodiments of the present invention relate to manufacturing and production process management systems.

공정 관리란 생산 공장에서 일정한 품질, 수량, 가격의 제품을 일정한 시간 안에 가장 효율적으로 생산하기 위해 공장의 모든 활동을 총괄적으로 관리하는 활동을 말한다.Process control refers to the overall control of the plant's activities in order to produce products of a certain quality, quantity and price in the most efficient manner within a given time.

일반적으로 공정관리란 생산공정을 의미하고, 상기 생산공정이란 원료나 재료로부터 제품이 완성되기까지 제조 과정에서 행하여지는 일련의 과정 예로, 설계, 기술 교육 등의 계획 공정과 노동력, 기계, 재료, 제품 완성 등의 제조, 작업 공정을 의미한다.In general, process control refers to a production process, and the production process is a series of processes performed in the manufacturing process from raw materials or materials to completion of the product, for example, planning processes such as design and technical training, labor, machinery, materials, and products. It means the manufacturing and working process such as completion.

따라서, 공정관리는 다음의 과정으로 이루어진다.Therefore, process control consists of the following processes.

우선, 생산계획에 따라서 각 제품의 제조에 필요한 공정과 작업 순서를 결정하고, 각 공정에 필요한 시간과 장소를 결정한다. 이 단계를 절차계획이라 하며, 절차표가 작성된다.First of all, according to the production plan, the process and work order required for the manufacture of each product are determined, and the time and place required for each process are determined. This step is called the procedural plan and a procedural table is drawn up.

다음으로 예정표에서 산출된 소요시간과 제품의 납기 등에 따라 필요한 일수를 일상생활에서 쓰는 연월일에 할당하여 일정계획을 작성한다. 또한, 각 작업에 일정을 매겨서 작업일정을 결정한다.Next, the schedule is prepared by allocating the required number of days according to the time required from the schedule and the delivery date of the product. In addition, each task is scheduled to determine the task schedule.

마지막으로, 일정계획에 따라 각각 작업의 진행상황을 정확히 파악하고, 공정의 진행을 계획대로 진행하도록 조정 및 촉진한다. 이를 공정통제라 한다.Finally, according to the schedule, each of the work is accurately identified and coordinated and promoted so that the process proceeds as planned. This is called process control.

즉, 상기와 같은 절차계획, 일정계획 및 공정통제의 전 과정을 공정관리라 할 수 있다.In other words, the entire process of the process planning, schedule planning and process control as described above can be referred to as process management.

그러나, 종래의 공정관리 시스템 및 방법은 사람의 정신적인 활동으로 공정계획을 수립하고 실적을 관리하기 때문에, 효율성이나 공정기준에 맞는 공정계획을 수립하기 어려웠을 뿐만 아니라, 공정정보가 신속하게 공정계획에 반영되지 못하므로 설비, 인력, 자재 등의 변동사항이 발생했을 때 신속한 작업이 이루어지지 못하는 단점이 있다.However, the conventional process management system and method is difficult to establish a process plan that meets the efficiency or process criteria because the process plan and the performance management by the mental activities of the human, it is difficult to process process information quickly Since it is not reflected in the equipment, personnel, materials, etc. changes occur quickly there is a disadvantage that can not be done.

등록특허공보 제10-1108121호(등록일자: 2012년01월13일)Registered Patent Publication No. 10-1108121 (Registration Date: January 13, 2012) 공개특허공보 제10-2015-0094342호(공개일자: 2015년08월19일)Publication No. 10-2015-0094342 (published date: August 19, 2015)

본 발명의 실시예는, 기존의 수작업으로 이루어지던 부품생산 공정관리를 전산화하여 입고, 작업지시, 공정검사에 관련한 자료를 실시간으로 확인 가능하도록 함으로써 인력 낭비 및 오류발생을 최소화하도록 창안한 부품생산과 더불어 작업자 관리를 위한 제조 및 생산 공정 관리 시스템을 제공한다.An embodiment of the present invention is to computerize the parts manufacturing process management was performed by the existing manual work, and to make the data related to the wearing, work orders, process inspection in real time by minimizing the waste of human resources and errors, It also provides manufacturing and production process management systems for worker management.

본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템은, 제조 및 생산 공정의 일시 중지를 위한 스케줄의 설정관리 및 공휴일의 설정관리를 위한 시스템 관리부; 제조 및 생산 공정의 수주 등록 시 필요한 발주처 및 발주서식의 설정관리, 및 작업자 코드, 작업팀 코드, 작업중지 코드 별 설정관리를 위한 기초자료 관리부; 업체 별 생산일정을 등록하고, 등록된 생산일정에 대한 작업지시를 발행하며, 작업지시가 발행된 생산일정에 대한 단계 별 진행현황을 관리하기 위한 공정 관리부; 및 생산제품에 대한 출하정보와 출하작업일정을 등록하여 업체 별 공정작업을 완료시키기 위한 생산제품 관리부를 포함한다.Manufacturing and production process management system according to an embodiment of the present invention, the system management unit for setting management of the schedule for the suspension of the manufacturing and production process and setting management of holidays; Basic data management unit for setting management of ordering company and order form required for registration of manufacturing and production process, and setting management for each worker code, work team code, and work stop code; A process management unit for registering production schedules for each company, issuing work orders for the registered production schedules, and managing step-by-step progress on production schedules for which work orders have been issued; And a product management unit for registering the shipment information and the shipment work schedule for the product to complete the process for each company.

또한, 상기 시스템 관리부는, 제조 및 생산 공정의 일시 중지 사유 별 중지코드가 할당되고, 공정 스케줄 별로 중지코드, 중지 시작 및 해지 시간, 중지 요일 정보를 입력 받아, 입력된 요일에 중지 시작 시간부터 해지 시간까지 공정이 일시 중지되도록 스케줄링 설정하고, 제조 및 생산 공정의 수동 일괄 중지 설정을 통해 상기 스케줄링 설정에 의한 동작을 강제 정지시키는 중지 스케줄부; 및 공휴일을 설정하고, 설정된 공휴일에 상기 스케줄링 및 수동 일괄 중지 설정에 의한 동작을 오프시키는 공휴일 설정부를 포함할 수 있다.In addition, the system manager is assigned a stop code for each pause reason of the manufacturing and production process, and receives a stop code, stop start and end time, stop day information for each process schedule, and terminates from the start start time on the input day A stopping schedule unit configured to set the scheduling so that the process is suspended until a time, and forcibly stop the operation by the scheduling setting through manual batch stop setting of the manufacturing and production processes; And a holiday setting unit for setting a holiday and turning off an operation by the scheduling and manual batch stop setting on the set holiday.

또한, 상기 기초자료 관리부는, 제조 및 생산 공정의 수주 등록 시 필요한 발주처 이름을 설정한 후 발주서식을 구분하여 발주처와 발주서식의 설정, 변경 및 추가 관리를 실시하는 발주처 관리부; 및 작업자, 작업팀, 작업중지 별로 식별문자를 각각 생성 및 할당하고, 생성된 각 식별문자에 대응하는 바코드 또는 QR 코드를 포함하는 식별코드를 각각 생성하여 할당하고, 생성된 작업자 코드를 선택한 후 변경하고자 하는 팀/부서 선택 시 해당 작업자의 팀/부서 이동이 가능하고, 작업자의 삭제 및 추가가 가능한 코드 관리부를 포함할 수 있다.The basic data management unit may include: an order management unit configured to set an ordering name necessary for registering an order of a manufacturing and production process, and then set, change, and additionally manage an ordering order and an ordering form; And generate and assign identification letters for each worker, work team, and job stop, generate and assign identification codes including barcodes or QR codes corresponding to each generated identification letter, select the generated worker codes, and change them. When selecting a team / department, the team / department of the worker can be moved and a code management unit capable of deleting and adding a worker can be included.

또한, 상기 공정 관리부는, 기 저장된 업체별 수주내역을 불러와 품목 별 공정 시작일, 완료일, 출하일과 공정단계와 지시량을 포함하는 생산일정을 등록하고, 등록된 생산일정에 대한 작업지시를 발행하는 작업지시 발행부; 및 상기 작업 지시부에 등록된 각 품목에 대한 공정단계 별 공정 시작시간과 완료시간에 대한 정보를 표시하는 작업지시결과 확인부를 포함할 수 있다.In addition, the process management unit retrieves the pre-stored order history for each company, registers the production schedule including the process start date, completion date, shipping date and process steps and instructions for each item, and issuing a work order for the registered production schedule Instruction issuing unit; And a work instruction result confirming unit displaying information on a process start time and a completion time for each process step for each item registered in the work instruction unit.

또한, 상기 생산제품 관리부는, 생산제품에 대한 생산구분, 발주처, 발주번호, 품번, 품명, 지시수량, 완료수량, 납기일자, 및 출하일자를 등록하고, 출하현황을 확인할 수 있다.In addition, the production product management unit, the production division, ordering company, order number, product number, product name, order quantity, completion quantity, delivery date, and date of shipment for the product can be registered, and can confirm the shipment status.

본 발명에 따르면, 기존의 수작업으로 이루어지던 부품생산 공정관리를 전산화하여 입고, 작업지시, 공정검사에 관련한 자료를 실시간으로 확인 가능하도록 함으로써 인력 낭비 및 오류발생을 최소화하도록 창안한 부품생산과 더불어 작업자 관리를 위한 제조 및 생산 공정 관리 시스템을 제공할 수 있다.According to the present invention, the computerized parts production process management, which was previously performed by hand, enables the user to check the data related to the wearing, work orders, and process inspections in real time, thereby minimizing the waste of human resources and errors. Manufacturing and production process control systems for management can be provided.

도 1은 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템의 구성을 나타낸 블록도이다.
도 2는 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템의 메인 화면을 나타낸 도면이다.
도 3은 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템의 메뉴 화면을 나타낸 도면이다.
도 4 및 도 5는 본 발명의 실시예에 따른 시스템 관리부의 실행 화면을 나타낸 도면이다.
도 6 내지 도 10은 본 발명의 실시예에 따른 기초자료 관리부의 실행 화면을 나타낸 도면이다.
도 11 내지 도 12는 본 발명의 실시예에 따른 공정 관리부의 실행 화면을 나타낸 도면이다.
도 13 내지 도 15는 본 발명의 실시예에 따른 수주내역 가져오기의 실행 방법을 설명하기 위해 나타낸 도면이다.
도 16은 본 발명의 실시예에 따른 수주내역 파일 등록 방법을 설명하기 위해 나타낸 도면이다.
도 17 및 도 18은 본 발명의 실시예에 따른 수주내역 엑셀데이터를 제작 방법을 설명하기 위해 나타낸 도면이다.
도 19 및 도 20은 본 발명의 실시예에 따른 사업 별 생산관리 현황 화면을 나타낸 도면이다.
도 21 내지 도 23은 본 발명의 실시예에 따른 상품 출하 등록 및 확인 화면을 나타낸 도면이다.
1 is a block diagram showing the configuration of a manufacturing and production process management system according to an embodiment of the present invention.
2 is a diagram illustrating a main screen of a manufacturing and production process management system according to an exemplary embodiment of the present invention.
3 is a view showing a menu screen of the manufacturing and production process management system according to an embodiment of the present invention.
4 and 5 are diagrams illustrating an execution screen of the system manager according to an exemplary embodiment of the present invention.
6 to 10 are views showing an execution screen of the basic data management unit according to an embodiment of the present invention.
11 to 12 are diagrams illustrating execution screens of a process management unit according to an exemplary embodiment of the present invention.
13 to 15 are diagrams for explaining a method of executing order history import according to an embodiment of the present invention.
16 is a diagram illustrating a method of registering an order history file according to an embodiment of the present invention.
17 and 18 are diagrams for explaining a method for producing order history Excel data according to an embodiment of the present invention.
19 and 20 are views showing the production management status screen for each business according to an embodiment of the present invention.
21 through 23 are diagrams illustrating a product shipment registration and confirmation screen according to an embodiment of the present invention.

본 명세서에서 사용되는 용어에 대해 간략히 설명하고, 본 발명에 대해 구체적으로 설명하기로 한다.Terms used herein will be briefly described and the present invention will be described in detail.

본 발명에서 사용되는 용어는 본 발명에서의 기능을 고려하면서 가능한 현재 널리 사용되는 일반적인 용어들을 선택하였으나, 이는 당 분야에 종사하는 기술자의 의도 또는 판례, 새로운 기술의 출현 등에 따라 달라질 수 있다. 또한, 특정한 경우는 출원인이 임의로 선정한 용어도 있으며, 이 경우 해당되는 발명의 설명 부분에서 상세히 그 의미를 기재할 것이다. 따라서 본 발명에서 사용되는 용어는 단순한 용어의 명칭이 아닌, 그 용어가 가지는 의미와 본 발명의 전반에 걸친 내용을 토대로 정의되어야 한다.The terms used in the present invention have been selected as widely used general terms as possible in consideration of the functions in the present invention, but this may vary according to the intention or precedent of the person skilled in the art, the emergence of new technologies and the like. In addition, in certain cases, there is also a term arbitrarily selected by the applicant, in which case the meaning will be described in detail in the description of the invention. Therefore, the terms used in the present invention should be defined based on the meanings of the terms and the contents throughout the present invention, rather than the names of the simple terms.

명세서 전체에서 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있음을 의미한다. 또한, 명세서에 기재된 "...부", "모듈" 등의 용어는 적어도 하나 이상의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어 또는 소프트웨어로 구현되거나 하드웨어와 소프트웨어의 결합으로 구현될 수 있다.When any part of the specification is to "include" any component, this means that it may further include other components, except to exclude other components unless otherwise stated. In addition, the terms "...", "module", etc. described in the specification mean a unit for processing at least one or more functions or operations, which may be implemented in hardware or software, or a combination of hardware and software. .

아래에서는 첨부한 도면을 참고하여 본 발명의 실시예에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다. DETAILED DESCRIPTION Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. As those skilled in the art would realize, the described embodiments may be modified in various different ways, all without departing from the spirit or scope of the present invention. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and like reference numerals designate like parts throughout the specification.

도 1은 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템의 구성을 나타낸 블록도이고, 도 2는 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템의 메인 화면을 나타낸 도면이고, 도 3은 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템의 메뉴 화면을 나타낸 도면이고, 도 4 및 도 5는 본 발명의 실시예에 따른 시스템 관리부의 실행 화면을 나타낸 도면이고, 도 6 내지 도 10은 본 발명의 실시예에 따른 기초자료 관리부의 실행 화면을 나타낸 도면이고, 도 11 내지 도 12는 본 발명의 실시예에 따른 공정 관리부의 실행 화면을 나타낸 도면이고, 도 13 내지 도 15는 본 발명의 실시예에 따른 수주내역 가져오기의 실행 방법을 설명하기 위해 나타낸 도면이고, 도 16은 본 발명의 실시예에 따른 수주내역 파일 등록 방법을 설명하기 위해 나타낸 도면이고, 도 17 및 도 18은 본 발명의 실시예에 따른 수주내역 엑셀데이터를 제작 방법을 설명하기 위해 나타낸 도면이고, 도 19 및 도 20은 본 발명의 실시예에 따른 사업 별 생산관리 현황 화면을 나타낸 도면이며, 도 21 내지 도 23은 본 발명의 실시예에 따른 상품 출하 등록 및 확인 화면을 나타낸 도면이다. 1 is a block diagram showing a configuration of a manufacturing and production process management system according to an embodiment of the present invention, Figure 2 is a view showing a main screen of the manufacturing and production process management system according to an embodiment of the present invention, Figure 3 6 is a view showing a menu screen of the manufacturing and production process management system according to an embodiment of the present invention, Figures 4 and 5 are views showing an execution screen of the system management unit according to an embodiment of the present invention, Figures 6 to 10 11 is a view showing an execution screen of the basic data management unit according to an embodiment of the present invention, Figures 11 to 12 are views showing an execution screen of the process management unit according to an embodiment of the present invention, Figures 13 to 15 are the present invention FIG. 16 is a diagram illustrating a method of executing order history import according to an embodiment of the present invention, and FIG. 16 is a diagram illustrating a method of registering order history file according to an embodiment of the present invention. 17 and 18 are diagrams for explaining a method for producing order history Excel data according to an embodiment of the present invention, Figures 19 and 20 is a production management status screen for each business according to an embodiment of the present invention 21 to 23 are diagrams illustrating a goods shipment registration and confirmation screen according to an embodiment of the present invention.

도 1을 참조하면, 본 발명의 실시예에 따른 제조 및 생산 공정 관리 시스템(1000)은 시스템 관리부(100), 기초자료 관리부(200), 공정 관리부(300) 및 생산제품 관리부(400)를 포함한다.Referring to FIG. 1, a manufacturing and production process management system 1000 according to an exemplary embodiment of the present invention includes a system manager 100, a basic data manager 200, a process manager 300, and a product manager 400. do.

본 실시예에 따른 공정 관리 시스템(1000)은 관리 권한이 있는 관리자가 아이디와 패스워드를 입력하여 로그인할 수 있는 프로그램 형태로 구현되며, 로그인 시 도 2에 도시된 공정매니저 실행화면이 표시될 수 있다. 이러한 공정매니저 실행화면의 우측 부분에는 시스템, 기초자료, 생산공정, 생산제품과 같은 상세 메뉴가 표시되며, 중앙 부분에는 생산공정현황 모니터, 공정컨트롤, 작업자 현황, 리포트 종합, 생산작업등록, 출하작업등록, 공지사항 등의 바로가기 메뉴가 표시될 수 있다. Process management system 1000 according to the present embodiment is implemented in the form of a program that can be logged in by an administrator with administrative authority input ID and password, the process manager execution screen shown in Figure 2 may be displayed when logging in. . The right part of the process manager execution screen displays detailed menus such as system, basic data, production process, and product.In the center part, monitor the production process status, process control, worker status, report synthesis, production work registration, and shipment work. A shortcut menu such as registration and announcements may be displayed.

상기 시스템 관리부(100)는, 제조 및 생산 공정의 일시 중지를 위한 스케줄의 설정관리 및 공휴일의 설정 관리할 수 있다. 이를 위해, 시스템 관리부(100)는 중지 스케줄부(110)와 공휴일 설정부(120)를 포함할 수 있다.The system manager 100 may manage setting of a schedule and setting holiday for a temporary suspension of a manufacturing and production process. To this end, the system manager 100 may include a suspension schedule unit 110 and a holiday setting unit 120.

상기 중지 스케줄부(110)는, 제조 및 생산 공정의 일시 중지 사유 별 중지코드가 할당되고, 공정 스케줄 별로 중지코드, 중지 시작 및 해지 시간, 중지 요일 정보를 입력 받아, 입력된 요일에 중지 시작 시간부터 해지 시간까지 공정이 일시 중지되도록 스케줄링 설정할 수 있다.The stop schedule unit 110 is assigned a stop code for each of the reasons for the suspension of the manufacturing and production process, and receives a stop code, stop start and end time, stop day information for each process schedule, the stop start time on the input day The schedule can be set to pause the process from to termination time.

예를 들어, 도 4에 도시된 바와 같이, 제조 또는 생산 공정의 일시 중지 사유 별로 중지코드가 각각 할당될 수 있으며, 휴식시간의 경우 E0-03, 점심식사의 경우 E0-01, 퇴근의 경우 E0-04의 중지코드가 각각 할당될 수 있어, 관리자가 등록하고자 하는 중지사유에 따라 중지코드를 입력(선택)한 후, 공정을 중지시키고자 하는 시작시간과 해지시간을 입력하면 해당 시간대에 중지스케줄이 설정될 수 있다. 그리고, 등록하고자 하는 중지스케줄이 반복적일 경우 원하는 요일의 체크박스를 선택하여 반복적 설정이 가능하다. 이와 같이, 중지 스케줄은 중지코드를 이용하여 시간 별, 요일 별 설정이 가능하다. For example, as shown in Figure 4, the stop code may be assigned to each of the reasons for the pause of the manufacturing or production process, E0-03 for break, E0-01 for lunch, E0 for work -04 stop codes can be assigned, so the administrator enters the stop code according to the stop reason to register and then enters the start time and the stop time to stop the process. Can be set. And, if the stop schedule to be registered is repetitive, it is possible to repeat the setting by selecting the check box of the desired day. In this way, the stop schedule can be set for each hour, day of the week using the stop code.

또한, 상기 중지 스케줄부(110)는 제조 및 생산 공정의 수동 일괄 중지 설정을 통해 상기 스케줄링 설정에 의한 동작을 강제 정지시킬 수 있다. In addition, the stop schedule unit 110 may forcibly stop the operation by the scheduling setting through the manual batch stop setting of the manufacturing and production process.

예를 들어, 도 4에 도시된 바와 같이, 수동 일괄 중지 항목에 특정 중지코드를 입력(선택)하고, 중지하고자 하는 날짜와 시간을 입력한 후, 중지버튼을 선택하면 해당 시간대에 공정에 대한 중지스케줄이 동작할 수 있다. 관리자가 중지 해지버튼(이전 중지버튼임)을 선택하기 이전에는 해당 공정이 중지상태를 유지하며, 중지 해지버튼을 선택하면 작업자의 진행상태 즉, 중지 스케줄이 동작하는 상태로 되돌아 갈 수 있다.For example, as shown in FIG. 4, after inputting (selecting) a specific stop code in the manual batch stop item, entering a date and time to stop, and selecting the stop button, the process stops at the corresponding time zone. The schedule may work. Before the administrator selects the stop release button (previously called the stop button), the process remains in a suspended state. If the stop release button is selected, the progress of the worker, that is, the schedule of the stop operation, may be returned.

상기 공휴일 설정부(120)는 공휴일을 설정하고, 설정된 공휴일에 상기 스케줄링 및 수동 일괄 중지 설정에 의한 동작을 오프시킬 수 있다.The holiday setting unit 120 may set a holiday and turn off the operation by the scheduling and manual batch stop setting on the set holiday.

예를 들어, 도 5에 도시된 바와 같이, 특정 월/일을 공유일로 지정할 경우, 월, 일, 휴일명을 선택하여 설정이 가능하며, 해마다 변경되는 공휴일 날짜(명절, 휴가, 대체휴일 등)는 수동으로 변경해야 한다. 기본적인 공휴일(신정, 삼일절, 어린이날, 현충일, 광복절, 개천절, 한글날, 크리스마스 등)은 별도의 설정 없이도 공휴일로 자동 등록될 수 있다.For example, as shown in Figure 5, if you specify a specific month / day as a shared day, it is possible to set by selecting the month, day, holiday name, holiday dates (year-end, holiday, alternative holidays, etc.) that change every year Must be changed manually. Basic holidays (New Year, Three Days, Children's Day, Memorial Day, Liberation Day, New Year's Day, Hangeul Day, Christmas, etc.) can be automatically registered as a public holiday without additional settings.

상기 기초자료 관리부(200)는 제조 및 생산 공정의 수주 등록 시 필요한 발주처 및 발주서식의 설정관리, 및 작업자 코드, 작업팀 코드, 작업중지 코드 별 설정 관리할 수 있다. 이를 위해, 기초자료 관리부(200)는 발주처 관리부(210)와 코드 관리부(220)를 포함할 수 있다.The basic data management unit 200 may manage the setting of the ordering order and order form required for registration of the order of the manufacturing and production process, and setting management for each worker code, work team code, and work stop code. To this end, the basic data management unit 200 may include an order management unit 210 and the code management unit 220.

상기 발주처 관리부(210)는 제조 및 생산 공정의 수주 등록 시 필요한 발주처 이름을 설정한 후 발주서식을 구분하여 발주처와 발주서식의 설정, 변경 및 추가 관리를 실시할 수 있다.The ordering unit manager 210 may set a name of the ordering party necessary for registering an order in the manufacturing and production process, and then divide the ordering form and set, change, and additionally manage the ordering order and the ordering form.

예를 들어, 도 6에 도시된 바와 같이, 수주 등록 시 필요한 발주처와 발주서식에 대한 설정, 변경, 추가가 가능하며, 특히 발주처 명을 설정한 후, 발주 서식을 구분하여 별도의 저장 없이 닫기를 누를 경우 자동으로 저장될 수 있다. For example, as shown in Figure 6, it is possible to set, change, and add to the ordering party and ordering form necessary for order registration, in particular, after setting the ordering name, to close the order without separate storage When pressed, it can be saved automatically.

상기 코드 관리부(220)는 작업자, 작업팀, 작업중지 별로 식별문자를 각각 생성 및 할당하고, 생성된 각 식별문자에 대응하는 바코드 또는 QR 코드를 포함하는 식별코드를 각각 생성하여 할당하고, 생성된 작업자 코드를 선택한 후 변경하고자 하는 팀/부서 선택 시 해당 작업자의 팀/부서 이동이 가능하고, 작업자의 삭제 및 추가가 가능하다.The code management unit 220 generates and assigns identification characters for each worker, work team, and job stop, and generates and assigns identification codes including barcodes or QR codes corresponding to the generated identification letters, respectively. When selecting a team / department to change after selecting worker code, the team / department of the worker can be moved, and the worker can be deleted and added.

예를 들어, 도 7 및 도 8에 도시된 바와 같이 작업자에 대한 코드 설정이 가능하며 해당 작업자에게 부여된 작업자 바코드 번호를 입력하여, 해당 작업자의 이름, 입사일, 퇴사일 등의 관리가 가능하다. 팀/부서를 선택한 후, 이동을 원하는 팀/부서를 선택하면 해당 팀/부서로의 이동이 가능하고, 퇴사 시 퇴사일을 기입할 수 있으며, 작업자 현황을 체크하면 본 실시예의 시스템(1000) 사용이 제한될 수 있다. 신입사원 입사의 경우 해당 팀/부서를 선택한 후 하단의 *부분에 입력하면 추가될 수 있다.For example, as shown in FIG. 7 and FIG. 8, it is possible to set a code for a worker and to input a worker barcode number assigned to the worker, so that management of the worker's name, date of joining, and retirement date is possible. After selecting a team / department, if you select a team / department you want to move, you can move to the corresponding team / department, you can enter the retirement date when you leave, and if you check the worker status, you can use the system 1000 of this embodiment. This may be limited. New recruits can be added by selecting the relevant team / department and entering the * section at the bottom.

또한, 도 9 및 도 10에 도시된 바와 같이, 작업팀 코드와 중지코드의 경우 각각에 맞는 바코드(또는 QR코드)를 생성한 후 코드 별 설정 및 추가가 가능하다. 바코드(또는 QR코드)의 생성은 코드 생성프로그램을 이용하여 생성할 수 있다. In addition, as shown in Figures 9 and 10, in the case of the work team code and the stop code, a bar code (or QR code) suitable for each can be generated and set per code. Generation of a barcode (or QR code) can be generated using a code generation program.

상기 공정 관리부(300)는 업체 별 생산일정을 등록하고, 등록된 생산일정에 대한 작업지시를 발행하며, 작업지시가 발행된 생산일정에 대한 단계 별 진행현황을 관리할 수 있다. 이를 위해, 공정 관리부(300)는 작업지시 발행부(310)와 작업지시결과 확인부(320)를 포함할 수 있다.The process management unit 300 may register a production schedule for each company, issue a work order for the registered production schedule, and manage the progress status for each step of the production schedule for which the work order is issued. To this end, the process manager 300 may include a work order issuing unit 310 and a work order result confirming unit 320.

상기 작업지시 발행부(310)는 기 저장된 업체별 수주내역을 불러와 품목 별 공정 시작일, 완료일, 출하일과 공정단계와 지시량을 포함하는 생산일정을 등록하고, 등록된 생산일정에 대한 작업지시를 발행할 수 있다. The work order issuing unit 310 retrieves the pre-stored order history for each company, registers the production schedule including the process start date, completion date, shipping date, process step and instruction amount for each item, and issues a work order for the registered production schedule. can do.

예를 들어, 도 2에 도시된 메인 화면 중 '생산공정-생산계획 및 공정컨트롤 메뉴' 또는 '공정컨트롤' 메뉴를 선택하면, 도 11에 도시된 바와 같은 실행 화면이 열릴 수 있다. 해당 실행 화면에 '수주내역 가져오기' 버튼을 선택하면 등록된 수주내역이 표시될 수 있다. For example, if a 'production process-production plan and process control menu' or 'process control' menu is selected from the main screen shown in FIG. 2, an execution screen as shown in FIG. 11 may be opened. Registered orders can be displayed by selecting the 'Get Order History' button on the relevant execution screen.

또한, 도 12에 도시된 바와 같이, 해당 실행 화면을 통해 작업지시서 등록하고자 할 경우 '작업 지시' 창에 수주번호, LOT번호, 발행인, 작업팀 등을 선택하면 해당 선택항목에 대한 작업 시작일, 완료일, 출하일을 각각 등록할 수 있으며, 해당 작업에 대한 상세 공정단계(혹은 진행단계)(P1~P21)를 해당 공정마다 적절히 기입하거나 자동으로 기입될 수 있다. In addition, as shown in Figure 12, if you want to register the work order through the execution screen, if you select the order number, LOT number, issuer, work team, etc. in the 'work order' window work start date, completion date for the selected item The shipping date may be registered, and detailed process steps (or progress steps) P1 to P21 for the corresponding work may be appropriately written for each process or automatically entered.

상기 작업지시결과 확인부(320)는 작업 지시부에 등록된 각 품목에 대한 공정단계 별 공정 시작시간과 완료시간에 대한 정보를 표시할 수 있다.The work instruction result confirming unit 320 may display information on the process start time and completion time for each process step for each item registered in the work instruction unit.

도 12에 도시된 바와 같이, 생성공정 항목에서 LOT번호를 입력하면, 공정명, 현재 공정단계, 해당 공정의 시작시간과 완료시간 및 완료수량 등의 정보가 표시될 수 있다.As illustrated in FIG. 12, when a LOT number is input in a generation process item, information such as a process name, a current process step, a start time and a completion time, and a completion quantity of a corresponding process may be displayed.

한편, 수주내역 엑셀 파일의 데이터를 불러오는 방법에 대하여 설명하면, 우선 도 13에 도시된 바와 같이 생산구분 항목에 개발시제품인지 양산품인지에 대한 생산구분을 선택하고, 생산구분이 선택된 후 발주처 항목에서 해당 발주처를 선택한다. 이후, 도 14에 도시된 바와 같이, 해당 발주처의 수주내역에 대한 엑셀 가져오기 버튼을 선택하면, 해당 컴퓨터의 네트워크에서 전체공유 폴더 파일로 이동한다. 이후, 도 15에 도시된 바와 같이, '생산관리부-공정매니저 양식-기타-발주처' 폴더로 이동하면, 해당 발주처의 수주내역 엑셀파일을 확인할 수 있다. 정리하면, 네트워크-서버-전체공유-생산관리부-공정매니저 양식-수주내역-기타-발주처 순서가 된다. 한편, 업체 선택 시 LIG NEX1과 한화디펜스의 경우에는 각각 홈페이지에 접속하여 주문현황/수주내역조회을 다운받아 업로드 해야 한다.On the other hand, the method of importing the data of the order history Excel file, as shown in Figure 13, first select the production classification for the development prototype or mass production in the production classification item, and after the production classification is selected, Select the client. Then, as shown in Figure 14, if you select the Excel import button for the order history of the client, it moves to the entire shared folder file on the network of the computer. Then, as shown in Figure 15, if you go to the folder 'production management unit-process manager form-other-ordering' folder, you can check the order file Excel file of the ordering. In summary, network-server-all share-production control-process manager form-order history-other-ordering order. In the case of selecting a company, LIG NEX1 and Hanwha Defense have to access their homepage and download their order status and order history.

이후, 도 16에 도시된 바와 같이, 작업팀 항목에서 해당 팀을 선택한 후, 도 17에 도시된 바와 같이 상기와 같이 선택된 수주내역 엑셀파일을 복사한다. 이때, 해당 파일이름에 최근 날짜를 복사해서 붙여넣기하여 파일을 생성하고, 복사본 파일은 오늘 날짜로 변경한다. Thereafter, as shown in FIG. 16, after selecting the corresponding team from the work team item, the selected order history excel file is copied as shown in FIG. 17. At this time, copy and paste the latest date to the file name to create a file, and change the copy file to today's date.

복사한 파일을 오픈하면 도 18에 도시된 바와 같은 엑셀 파일의 내용을 확인할 수 있으며, 입력할 내용은 사업별 생산관리 현황에서 확인할 수 있으며 도 19에 도시된 바와 같이, 고객사, 사업명, 주문번호, 품명, 규격, 주문수량, 납기일자 등의 내용을 확인할 수 있다. 도 19의 입력항목을 복사해서 붙여넣기를 하면 도 20과 같이 표시될 수 있다. If you open the copied file, you can check the contents of the Excel file as shown in FIG. 18. The contents to be input can be checked in the production management status for each business. As shown in FIG. 19, the customer, the business name, the order number, and the product name. You can check the contents such as, specifications, order quantity and delivery date. Copying and pasting the input item of FIG. 19 may be displayed as shown in FIG. 20.

상기 생산제품 관리부(400)는, 생산제품에 대한 출하정보와 출하작업일정을 등록하여 업체 별 공정작업을 완료시킬 수 있으며, 좀 더 구체적으로 생산제품에 대한 생산구분, 발주처, 발주번호, 품번, 품명, 지시수량, 완료수량, 납기일자, 및 출하일자를 등록하고, 출하현황을 확인할 수 있다. 이러한 생산제품 관리부(400)는 도 2에 도시된 메인 화면에서 출하작업등록 바로가기 메뉴 또는 생산제품-생산출하 등록 메뉴를 선택하여 실행할 수 있다. The production product management unit 400 may register the shipping information and the shipping work schedule for the produced product to complete the process for each company, more specifically, the production classification, ordering company, order number, part number, Item name, quantity ordered, quantity completed, delivery date and shipping date can be registered and shipment status can be confirmed. The production product management unit 400 may select and execute a shipment job registration shortcut menu or a production product-production shipment registration menu on the main screen shown in FIG. 2.

예를 들어, 해당 메뉴 버튼을 선택하면 도 21에 도시된 실행화면이 표시되고, 생산구분확인(①), 발주처 확인(②), 발주번호 확인(③), 품번 확인(④), 품명 확인(⑤), 지시수량 확인(⑥), 완료수량 확인(⑦), 납기일자 확인(⑧) 및 출하일자 등록(⑨) 항목에 대한 출하등록정보가 각각 표시될 수 있다.For example, if the corresponding menu button is selected, the execution screen shown in FIG. 21 is displayed, and the production classification check (①), order confirmation (②), order number confirmation (③), part number confirmation (④), and product name confirmation ( ⑤), shipment confirmation information (⑥), completion quantity confirmation (⑦), delivery date confirmation (⑧) and shipping date registration (⑨) items can be displayed respectively.

또한, 출하등록정보는 도 22에 도시된 바와 같이 엑셀 파일로 받을 수 있으며, 해당 파일에는 품명, 품번, 수주량, 출하일자 별 수주량이 표시될 수 있다.In addition, the shipment registration information can be received as an Excel file, as shown in Figure 22, the file name, part number, order quantity, order quantity by shipment date can be displayed.

또한, 도 21에 도시된 출하등록정보에서 출하등록을 하고자 할 때, 도 23에 도시된 바와 같이 출하일자를 선택(①)한 후 사업 별 생산현황 리스트 납품 일자에 맞춰 일자를 입력(②)하고, 출하버튼을 선택(③)하여 출하정보를 등록한다.In addition, when you want to register the shipment from the shipment registration information shown in Figure 21, as shown in Figure 23, after selecting the shipping date (①) and input the date according to the production status list delivery date by business (②) and Select the shipping button (③) to register the shipping information.

이상에서 설명한 것은 본 발명에 의한 제조 및 생산 공정 관리 시스템을 실시하기 위한 하나의 실시예에 불과한 것으로서, 본 발명은 상기 실시예에 한정되지 않고, 이하의 특허청구범위에서 청구하는 바와 같이 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변경 실시가 가능한 범위까지 본 발명의 기술적 정신이 있다고 할 것이다.What has been described above is only one embodiment for implementing the manufacturing and production process management system according to the present invention, the present invention is not limited to the above embodiment, as claimed in the following claims of the present invention Without departing from the gist of the present invention, one of ordinary skill in the art will have the technical spirit of the present invention to the extent that various modifications can be made.

1000: 제조 및 생산 공정 관리 시스템
100: 시스템 관리부
110: 중지 스케줄부
120: 공휴일 설정부
200: 기초자료 관리부
210: 발주처 관리부
220: 코드 관리부
300: 공정 관리부
310: 작업지시 발행부
320: 작업지시결과 확인부
400: 생산제품 관리부
1000: manufacturing and production process management system
100: system management department
110: stop schedule
120: holiday setting unit
200: Basic Data Management Department
210: Client Management Department
220: code management unit
300: process management department
310: work order issuance unit
320: work order result check unit
400: product management department

Claims (5)

제조 및 생산 공정의 일시 중지를 위한 스케줄의 설정관리 및 공휴일의 설정관리를 위한 시스템 관리부;
제조 및 생산 공정의 수주 등록 시 필요한 발주처 및 발주서식의 설정관리, 및 작업자 코드, 작업팀 코드, 작업중지 코드 별 설정관리를 위한 기초자료 관리부;
업체 별 생산일정을 등록하고, 등록된 생산일정에 대한 작업지시를 발행하며, 작업지시가 발행된 생산일정에 대한 단계 별 진행현황을 관리하기 위한 공정 관리부; 및
생산제품에 대한 출하정보와 출하작업일정을 등록하여 업체 별 공정작업을 완료시키기 위한 생산제품 관리부를 포함하고,
상기 시스템 관리부는,
제조 및 생산 공정의 일시 중지 사유 별 중지코드가 할당되고, 공정 스케줄 별로 중지코드, 중지 시작 및 해지 시간, 중지 요일 정보를 입력 받아, 입력된 요일에 중지 시작 시간부터 해지 시간까지 공정이 일시 중지되도록 스케줄링 설정하고, 제조 및 생산 공정의 수동 일괄 중지 설정을 통해 상기 스케줄링 설정에 의한 동작을 강제 정지시키고, 등록하고자 하는 중지스케줄이 반복적일 경우 원하는 시간 별 및 요일 별로 체크박스를 선택하여 반복적으로 설정하는 중지 스케줄부; 및
공휴일을 설정하고, 설정된 공휴일에 상기 스케줄링 및 수동 일괄 중지 설정에 의한 동작을 오프시키는 공휴일 설정부를 포함하고,
상기 공정 관리부는,
기 저장된 업체별 수주내역을 불러와 품목 별 공정 시작일, 완료일, 출하일과 공정단계와 지시량을 포함하는 생산일정을 등록하고, 등록된 생산일정에 대한 작업지시를 발행하는 작업지시 발행부; 및
상기 작업지시 발행부에 등록된 각 품목에 대한 공정단계 별 공정 시작시간과 완료시간에 대한 정보를 표시하는 작업지시결과 확인부를 포함하고,
상기 작업지시 발행부는,
생산구분 항목에 개발시제품인지 양산품인지에 대한 생산구분을 선택하고, 생산구분이 선택된 후 발주처 항목에서 해당 발주처를 선택하고, 해당 발주처의 수주내역에 대한 엑셀 가져오기 버튼을 선택하면, 해당 컴퓨터의 네트워크에서 전체공유 폴더 파일로 이동하면, 해당 발주처의 수주내역 엑셀파일의 데이터를 불러오고,
상기 생산제품 관리부는,
생산제품에 대한 생산구분, 발주처, 발주번호, 품번, 품명, 지시수량, 완료수량, 납기일자, 및 출하일자를 등록하고, 출하현황을 확인하고, 출하작업등록 바로가기 메뉴 또는 생산제품-생산출하 등록 메뉴의 선택 시 생산구분확인, 발주처 확인, 발주번호 확인, 품번 확인, 품명 확인, 지시수량 확인, 완료수량 확인, 납기일자 확인 및 출하일자 등록 항목에 대한 출하등록정보를 각각 표시하고,
상기 출하등록정보는 엑셀 파일로 다운로드 가능하고,
상기 엑셀 파일에는 품명, 품번, 수주량 및 출하일자 별 수주량이 표시되고,
상기 출하등록정보에서 출하등록을 하고자 할 때 출하일자를 선택한 후 사업 별 생산현황 리스트 납품 일자에 맞춰 일자를 입력하고, 출하버튼을 선택하여 출하정보를 등록하는 것을 특징으로 하는 제조 및 생산 공정 관리 시스템.
A system management unit for setting management of schedules for temporary suspension of manufacturing and production processes and setting management of holidays;
Basic data management unit for setting management of ordering company and order form required for registration of manufacturing and production process, and setting management for each worker code, work team code, and work stop code;
A process management unit for registering production schedules for each company, issuing work orders for the registered production schedules, and managing step-by-step progress on production schedules for which work orders have been issued; And
Includes the product management department to complete the process of each company by registering the shipping information and shipping schedule for the product,
The system manager,
A stop code is assigned to each reason for the suspension of manufacturing and production processes, and the stop code, stop start and stop time, and stop day information are input for each process schedule, and the process is paused from the start time to the stop time on the input day. By setting the scheduling, forcibly stopping the operation by the scheduling setting through the manual batch stop setting of the manufacturing and production process, and if the stop schedule to be registered is repetitive to check repeatedly by setting the check box by the desired time and day A pause schedule unit; And
A holiday setting unit for setting a holiday and turning off an operation by the scheduling and manual batch stop setting on a set holiday,
The process control unit,
A work order issuing unit for retrieving pre-stored orders for each company and registering a production schedule including a process start date, completion date, shipping date, process step and instruction amount for each item, and issuing work orders for the registered production schedule; And
And a work order result confirming unit displaying information on a process start time and a completion time for each step registered in the work order issuing unit,
The work order issuing unit,
In the production category, select the production category for the development prototype or the mass production product, select the ordering party in the ordering category after selecting the production category, and select the Excel import button for the ordering order of the relevant ordering machine. If you move to the entire shared folder file in, the data of the order order Excel file of the client is loaded.
The production product management unit,
Register the production classification, ordering party, ordering number, part number, product name, order quantity, finished quantity, delivery date, and shipment date for the manufactured product, check the shipment status, and go to the shipment work registration menu or product-production shipment When selecting the registration menu, the product identification, order confirmation, order number confirmation, product number confirmation, product name confirmation, indication quantity confirmation, completion quantity confirmation, delivery date confirmation and shipping date registration items for each item are displayed.
The shipment registration information can be downloaded as an Excel file,
The Excel file displays the item name, part number, order amount and order amount by shipment date,
Manufacturing and production process management system, characterized in that when you want to register the shipment from the shipping registration information, select the shipping date, input the date according to the production status list delivery date for each business, and select the shipping button to register the shipping information .
삭제delete 제1 항에 있어서,
상기 기초자료 관리부는,
제조 및 생산 공정의 수주 등록 시 필요한 발주처 이름을 설정한 후 발주서식을 구분하여 발주처와 발주서식의 설정, 변경 및 추가 관리를 실시하는 발주처 관리부; 및
작업자, 작업팀, 작업중지 별로 식별문자를 각각 생성 및 할당하고, 생성된 각 식별문자에 대응하는 바코드 또는 QR 코드를 포함하는 식별코드를 각각 생성하여 할당하고, 생성된 작업자 코드를 선택한 후 변경하고자 하는 팀/부서 선택 시 해당 작업자의 팀/부서 이동이 가능하고, 작업자의 삭제 및 추가가 가능한 코드 관리부를 포함하는 것을 특징으로 하는 제조 및 생산 공정 관리 시스템.
According to claim 1,
The basic data management unit,
A client management unit for setting a client's name necessary for registering an order for manufacturing and production processes, and then setting up, changing, and additionally managing the order and the order form; And
To create and assign identification letters for each worker, work team, and job stop, generate and assign identification codes including barcodes or QR codes corresponding to each generated identification letter, select the generated worker codes, and change them. Manufacturing and production process management system, characterized in that it comprises a code management unit that can move the team / department of the worker when selecting the team / department, the worker can be deleted and added.
삭제delete 삭제delete
KR1020190080932A 2019-07-04 2019-07-04 System for managing manufacturing and production process KR102064490B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190080932A KR102064490B1 (en) 2019-07-04 2019-07-04 System for managing manufacturing and production process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190080932A KR102064490B1 (en) 2019-07-04 2019-07-04 System for managing manufacturing and production process

Publications (1)

Publication Number Publication Date
KR102064490B1 true KR102064490B1 (en) 2020-01-10

Family

ID=69158520

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190080932A KR102064490B1 (en) 2019-07-04 2019-07-04 System for managing manufacturing and production process

Country Status (1)

Country Link
KR (1) KR102064490B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102176042B1 (en) * 2020-05-22 2020-11-06 장명석 Managing system
CN112801562A (en) * 2021-04-14 2021-05-14 江苏金恒信息科技股份有限公司 Batching system and method based on steel product inspection stage
CN113553019A (en) * 2020-04-24 2021-10-26 富士通株式会社 Computer-readable recording medium, method for displaying, and information processing apparatus
CN113642894A (en) * 2021-08-16 2021-11-12 无锡美林数联科技有限公司 Resource management system and method based on industrial internet
CN113673941A (en) * 2020-05-13 2021-11-19 广达国际机械有限公司 Steel structure processing management method and system
KR20220070651A (en) 2020-11-23 2022-05-31 한국기술교육대학교 산학협력단 Vision system for building process data
KR102454045B1 (en) * 2022-03-11 2022-10-14 아더웍스 주식회사 Apparatus and method for product process control

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003195932A (en) * 2001-12-28 2003-07-11 Japan Tobacco Inc Production adjusting system
JP2005216013A (en) * 2004-01-29 2005-08-11 Applicore Corp Integrated job management system
JP2012221124A (en) 2011-04-06 2012-11-12 Mitsubishi Electric Corp Production plan creation system
JP2013058119A (en) 2011-09-09 2013-03-28 Kobe Steel Ltd Production plan preparation method, production plan creation program, and production plan creation device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003195932A (en) * 2001-12-28 2003-07-11 Japan Tobacco Inc Production adjusting system
JP2005216013A (en) * 2004-01-29 2005-08-11 Applicore Corp Integrated job management system
JP2012221124A (en) 2011-04-06 2012-11-12 Mitsubishi Electric Corp Production plan creation system
JP2013058119A (en) 2011-09-09 2013-03-28 Kobe Steel Ltd Production plan preparation method, production plan creation program, and production plan creation device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113553019A (en) * 2020-04-24 2021-10-26 富士通株式会社 Computer-readable recording medium, method for displaying, and information processing apparatus
CN113673941A (en) * 2020-05-13 2021-11-19 广达国际机械有限公司 Steel structure processing management method and system
CN113673941B (en) * 2020-05-13 2024-02-02 广达国际机械有限公司 Steel structure processing management method and system thereof
KR102176042B1 (en) * 2020-05-22 2020-11-06 장명석 Managing system
KR20220070651A (en) 2020-11-23 2022-05-31 한국기술교육대학교 산학협력단 Vision system for building process data
CN112801562A (en) * 2021-04-14 2021-05-14 江苏金恒信息科技股份有限公司 Batching system and method based on steel product inspection stage
CN113642894A (en) * 2021-08-16 2021-11-12 无锡美林数联科技有限公司 Resource management system and method based on industrial internet
KR102454045B1 (en) * 2022-03-11 2022-10-14 아더웍스 주식회사 Apparatus and method for product process control

Similar Documents

Publication Publication Date Title
KR102064490B1 (en) System for managing manufacturing and production process
US20070143169A1 (en) Real-time workload information scheduling and tracking system and related methods
US20200034798A1 (en) Planning and scheduling tool assistant
US20140344181A1 (en) Construction trade building information management system, software and method
CN104471595A (en) Workflow management device and workflow management method
KR20070004162A (en) Project management information system
EP3961523A1 (en) Managing production pipelines
KR102342027B1 (en) Cloud based automatic schedule system to produce a variety of varieties in small quantities
US20130138471A1 (en) Planning and scheduling tool assistant
US20100299170A1 (en) Stages, Phases in a Project Workflow
Rossiti et al. Impacts of lean office applications in the supply sector of a construction company
KR101628318B1 (en) Construction project management method
JP2007041799A (en) Project management support system
Moser et al. Digitalization of information-intensive logistics processes to reduce production lead times at ENGEL Austria GmbH: extending value stream mapping with subject-oriented business process management
KR101664830B1 (en) System and method for managing compliance
Singer et al. A single‐source content management system for lean manufacturing
Dzhusoev et al. Selection of Software Products for the Development of a Calendar Plan for High-Rise Construction
Dart et al. Practical workflow for SAP
KR20230059331A (en) project management system
Dišek et al. Conversion of real data from production process of automotive company for process mining analysis
JP7482565B1 (en) Business management system and business management method
Popereshnyak et al. Development of the management system of orders of the companies and organization of the staff work
TWI784311B (en) Management device, management system, and management program
JP6853939B2 (en) Processing equipment, computer control methods and control programs
JP7054866B2 (en) Information processing equipment, information processing methods and information processing programs

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant