CN109685704A - Pipe network cruising inspection system based on VR - Google Patents

Pipe network cruising inspection system based on VR Download PDF

Info

Publication number
CN109685704A
CN109685704A CN201910033013.1A CN201910033013A CN109685704A CN 109685704 A CN109685704 A CN 109685704A CN 201910033013 A CN201910033013 A CN 201910033013A CN 109685704 A CN109685704 A CN 109685704A
Authority
CN
China
Prior art keywords
pipe network
module
construction
inspection
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910033013.1A
Other languages
Chinese (zh)
Other versions
CN109685704B (en
Inventor
童毅
周波依
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bola Network Co Ltd
Original Assignee
Bola Network Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bola Network Co Ltd filed Critical Bola Network Co Ltd
Priority to CN201910033013.1A priority Critical patent/CN109685704B/en
Publication of CN109685704A publication Critical patent/CN109685704A/en
Application granted granted Critical
Publication of CN109685704B publication Critical patent/CN109685704B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/011Arrangements for interaction with the human body, e.g. for user immersion in virtual reality
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Development Economics (AREA)
  • Human Computer Interaction (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention relates to urban pipe network monitoring technology fields, in particular to a kind of pipe network cruising inspection system based on VR, accident of pipeline network positioning device including inspection node is arranged in, inspection terminal, VR interactive device and BIM data server, the accident of pipeline network positioning device includes for obtaining accident of pipeline network information and location information at inspection node, inspection terminal is used to obtain the location information of inspector, the accident of pipeline network information at inspection node that the BIM data server is used to receive, location information and the location information of inspector are marked respectively in urban pipe network BIM model and three-dimensional city BIM model, and generate Visualization Model data;The inspection terminal is also used to receive Visualization Model data and VR interactive device is combined to generate three-dimensional scenic, obtains three-dimensional pipe network information.The present invention can allow monitoring center to carry out real-time monitoring to the construction at inspection node, and provide technical support to construction party, avoid the pipe network at inspection node that accident frequently occurs.

Description

Pipe network cruising inspection system based on VR
Technical field
The present invention relates to urban pipe network monitoring technology field, in particular to a kind of pipe network cruising inspection system based on VR.
Background technique
City Buried Pipeline is always city " blood vessel " and " nerve ", and underground utilities are related to water supply, draining, combustion gas etc. ten A variety of underground utilities form a complicated underground utilities network (i.e. urban pipe network), traditional planar pipe network Way to manage be difficult to spatial relation that is accurate, intuitively explicitly descending power pipeline cross arrangement.
" digital city " (digital city) will refer to using Information Technology Methods in the past in city, status and future Full content is in the enterprising digitized Virtual Realization of network.Three-dimensional pipe network, i.e. combining geographic information system are incorporated in digital city (GIS) technology of system, BIM technology, database technology, AR technology and VR technology, the intuitive spatial level for showing underground utilities and position It sets, buried depth, material, shape, trend and the work well construction and surrounding enviroment of underground utilities is showed with emulation mode image.Using The inspection system of three-dimensional pipe network can allow patrol officer that can observe the position of underground utilities from inspection terminal, thus just Inspection is carried out to underground pipe network in inspector.
But currently, construction party in the case where subsurface three-dimensional pipe net leakage rate cannot be obtained, can only be according to planar pipe Net drawing understands distributed intelligence and the placement depth information of underground pipe network, but the information obtained from two-dimentional pipe network drawing has Limit.If constructing in the case where insufficient understanding underground pipe network information, in fact it could happen that road mass lesions, underground pipe network Phenomena such as being destroyed leads to the managerial confusion of Urban Buried Pipeline Network, seriously affects the normal operation in city, while also bringing very much Factor leading to social instability.Administrative department show that urban pipe network is constructed according to long-term urban pipe network accident and the analysis of maintenance statistics data thus Frequent region, and it is marked as inspection node, arrange inspector to check emphatically.But only rely on the time-consuming expense of manual inspection Power cannot check in real time, and accident frequently occurs at unavoidable inspection node.
Summary of the invention
Present invention is primarily aimed at a kind of pipe network cruising inspection system based on VR is provided, monitoring center can be allowed to inspection section Construction at point carries out real-time monitoring, and provides technical support to construction party, avoids the pipe network at inspection node that thing frequently occurs Therefore.
In order to achieve the above objectives, the present invention provides a kind of pipe network cruising inspection system based on VR, including inspection terminal, VR are handed over Mutual equipment, BIM data server and the accident of pipeline network positioning device that inspection node is set, the accident of pipeline network positioning device packet The data acquisition module for obtaining the accident of pipeline network information at inspection node is included, for obtaining the location information at inspection node The first locating module, for accident of pipeline network information and location information to be sent to the first communication module of BIM data server; The inspection terminal includes the second locating module for obtaining the location information of inspector, for location information to be sent to The second communication module of BIM data server;The BIM data server includes Visualization Model database, the visualization Model database includes urban pipe network BIM model database, three-dimensional city BIM model database, and the BIM data server is used Accident of pipeline network information, location information and the location information of inspector at the inspection node that will be received are marked respectively in city In pipe network BIM model and three-dimensional city BIM model, and generate Visualization Model data;The inspection terminal is for receiving BIM number According to the Visualization Model data that server is sent, the inspection terminal is also used to be combined to VR interactive device in inspection Accident of pipeline network information, location information at member's acquisition inspection node;
Further include that terminal and monitoring center are put in construction on record, two-dimension code label, the construction are provided at the inspection node Terminal is put on record for putting construction information on record to monitoring center before construction for construction party, the monitoring center is monitored in construction direction It puts on record and puts the pipe network information that terminal sends inspection node on record to construction after construction information in center;
It includes scan module and third communication module that terminal is put in the construction, which on record, and the scan module is used to exist when construction party When constructing at the inspection node put on record, scans the two-dimensional code label and fill in pipe network confirmation message, the third communication module is used for will Pipe network confirmation message is sent to monitoring center;The monitoring center receives after pipe network confirmation message to carry out pair with pipe network information Than the monitoring center unanimously controls BIM data server in comparing result afterwards and puts the current inspection section of terminal transmission on record to construction The Visualization Model data of point, construction party are put terminal on record with construction by VR interactive device and are used in combination, and current inspection section is obtained The three-dimensional pipe network information of point;It is existing that the monitoring center is also used to notify that the inspector near current inspection node rushes for construction , the pipe network information at Visualization Model data acquisition inspection node that inspector shows according to VR interactive device to construction party into Row is supervised and guided.
The working principle of the invention and advantage are:
1. two-dimension code label is arranged at inspection node, indicates that current inspection node is the pipe network location of Frequent Accidents, mention It is careful that construction party construction of waking up needs;
It is in order to allow construction party to put construction information on record to monitoring center before construction, together 2. the setting of terminal is put in construction on record When after construction information is put on record, monitoring center puts the pipe network information that terminal sends current inspection node on record to construction, be construction party Informational support is provided, monitoring center is also convenient for and real-time monitoring is carried out to current inspection node, construction party is avoided not know about buried pipe Net mistake constructs and damages pipe network;
3. the setting of barcode scanning module, when construction party need to formally be constructed, construction party puts terminal scanning on record by construction Two-dimension code label simultaneously fills in pipe network confirmation message, and whether compare pipe network confirmation message by monitoring center consistent with pipe network information, Information is consistent, then it represents that construction party has appreciated that the pipe network information being transmitted across before monitoring center, to the pipe at current inspection node Net has enough understandings, and the construction safety of pipe network is secure.Monitoring center puts terminal on record to construction and sends present node simultaneously Visualization Model data, construction party are put construction on record terminal and are used in combination with VR interactive device, and the vertical of underground pipe network can be obtained Body three-dimensional information provides more favorable support for construction party construction, construction party mistake is effectively avoided to construct and damage pipe network.
4. monitoring center notifies the inspector of current inspection near nodal by inspection terminal when learning construction party construction Rush for construction site, the pipe network information at Visualization Model data acquisition inspection node that inspector shows according to VR interactive device It exercises supervision guidance to construction party, provides advantageous technical support for construction party construction.
Further, monitoring device is additionally provided at inspection node, the monitoring device includes camera, fourth communication module And controller, the monitoring device are used to carry out inspection node real-time monitoring, the controller is used to pass through fourth communication mould Monitoring data are sent to monitoring center by block.
Monitoring device can monitor inspection node in real time, avoid construction party in the case where not putting construction information on record Illegally constructed.
Further, monitoring device further includes having the ranging mould group that hole depth is excavated for measuring construction, the ranging mould group Including subsidiary module and measurement process module, the subsidiary module includes that the security protection excavated around hole is arranged in The auxiliary ball for excavating and being used for subsidiary in hole, and the tape measure being arranged on safety guide rail and its measurement is arranged in column Initial end is fixed on auxiliary ball, and the measurement process module includes image analysis module and image information identification module;Camera shooting Head carries out shooting to the auxiliary ball excavated in hole and excavation hole and obtains image, and described image analysis module is for passing through in image The edge in the excavation hole in the position analysis image of auxiliary ball and the intersection point of tape measure, described image information identification module is for amplifying Identify that calibration information is sent to monitoring center by fourth communication module by the scale on the tape measure of point of intersection, controller.
The setting of ranging mould group is to enable monitoring center real the excavating depth on ground for the ease of detection construction party When understand construction party excavating depth, carry out early warning is taken timely measure before underground pipe network is destroyed.Wherein safety guide rail Setting construction site and pedestrian can be kept apart, a fixed effect can also be provided for tape measure;Auxiliary ball is in gravity Under the action of can rest on excavate hole bottom, while also will drive tape measure elongation, the construction personnel of construction site being capable of basis The scale of tape measure is easy to understand the depth for excavating hole.And the image analysis module of measurement process module can find auxiliary from image The position of ball, image analysis module can also go out the friendship at the edge and tape measure in the excavation hole in image according to the position analysis of auxiliary ball Point, and image information identification module can amplify the scale on the tape measure of identification point of intersection, and the scale letter of the tape measure of point of intersection Breath is exactly the depth for excavating hole.The depth information for excavating hole is sent to monitoring center by communication module by controller, convenient for prison Control center understands the depth information for excavating hole in real time, and carry out early warning can be taken timely measure before underground pipe network is destroyed, is kept away Exempt from the carelessness due to construction personnel, underground pipe network construction personnel before being destroyed is made to fail the case where stopping construction in time.
Further, monitoring device further includes having alarm module, and the controller for being more than in construction party excavating depth Alarm module is controlled before prescribed depth to sound an alarm.
Alarm module is avoided digging to pipe network, causes pipe network to remind construction party not exceed the excavating depth put on record Damage.
Further, alarm module is buzzer.
Buzzer is more excellent compared to alarm lamp and other effects, and alarm lamp, which needs construction personnel's moment to observe, to be infused It anticipates to warning message, and construction personnel can not notice warning information in construction at the moment, make alarm lamp that report be not achieved Alert effect;And buzzer does not need construction personnel and at every moment goes to observe, it only need to be by sound it can be learnt that warning message.
Further, inspection terminal further includes photographing module, and the photographing module is used for the inspection node to break down External environment carries out on-site data gathering.
Inspector carries out data acquisition by the construction site of the construction party of camera, understands construction party convenient for monitoring center Condition of construction.
Further, the first locating module and the second locating module are all made of Beidou positioning module.
Beidou positioning module is higher compared to GPS positioning module positioning accuracy, price is more economical, and function is more.
Further, it is logical to be all made of 4G for first communication module, second communication module, third communication module and fourth communication module Believe module.
4G communication module data transmission bauds is fast.
Detailed description of the invention
Fig. 1 is that the present invention is based on the logic diagrams of the pipe network cruising inspection system embodiment of VR;
Fig. 2 is that the present invention is based on the logic diagrams that the monitoring of the pipe network cruising inspection system embodiment of VR is set.
Specific embodiment
It is further described below by specific embodiment:
Embodiment:
A kind of pipe network cruising inspection system based on VR, as shown in Figure 1, including inspection terminal, terminal is put in construction on record, VR interaction is set Standby, BIM data server, monitoring center and the accident of pipeline network positioning device that inspection node is set.
Accident of pipeline network positioning device includes the data acquisition module for obtaining the accident of pipeline network information at inspection node, is used In the first locating module for obtaining the location information at inspection node, for accident of pipeline network information and location information to be sent to The first communication module of BIM data server.
BIM data server includes Visualization Model database, and the Visualization Model database includes urban pipe network BIM Model database, three-dimensional city BIM model database, the BIM data server is for will be at the inspection node that receive Accident of pipeline network information, location information and the location information of inspector are marked respectively in urban pipe network BIM model and three-dimensional city BIM In model, and generate Visualization Model data.
Inspection terminal includes the second locating module for obtaining the location information of inspector, for sending location information To the second communication module, display module and photographing module of BIM data server.Inspection terminal is for receiving BIM data service The Visualization Model data of device transmission simultaneously show that the inspection terminal is also used to make in conjunction with VR interactive device by display module With visualization of 3 d scene is generated, in order to the accident of pipeline network information at inspector's acquisition inspection node, location information.It is described to take the photograph As module is used to carry out on-site data gathering to the external environment of the inspection node to break down.
Two-dimension code label is provided at inspection node, the construction is put terminal on record and is used for before construction in construction direction monitoring The heart puts construction information on record, and the monitoring center is put terminal on record to construction after construction direction monitoring center puts construction information on record and sent The pipe network information of inspection node at this;
It includes scan module and third communication module that terminal is put in construction, which on record, and the scan module is used to put on record when construction party Inspection node at when constructing, scan the two-dimensional code label and fill in pipe network confirmation message, the third communication module is used for pipe network Confirmation message is sent to monitoring center;
Monitoring center compares after receiving pipe network confirmation message with pipe network information, and the monitoring center is in comparing result Control BIM data server puts the Visualization Model data that terminal sends current inspection node, construction party on record to construction after consistent Terminal is put on record with construction by VR interactive device to be used in combination, and obtains the three-dimensional pipe network information of current inspection node;
Monitoring center is also used to that the inspector near current inspection node is notified to rush for construction site by inspection terminal, Pipe network information at the inspection node for the Visualization Model data acquisition hot work in progress that inspector shows according to VR interactive device with And location information, construction site is rushed for rapidly to exercise supervision guidance to construction party.
As shown in Fig. 2, being additionally provided with monitoring device at inspection node, the monitoring device includes camera, fourth communication Module and controller, the monitoring device are used to carry out inspection node real-time monitoring, and the controller is used to pass through four-way Believe that monitoring data are sent to monitoring center by module.
Monitoring device further includes having the ranging mould group that hole depth is excavated for measuring construction, and the ranging mould group includes auxiliary Measurement module and measurement process module, the subsidiary module include that the safety guide rail excavated around hole is arranged in, setting Be used for the auxiliary ball of subsidiary in excavating hole, and the tape measure being arranged on safety guide rail and its to measure initial end solid It is scheduled on auxiliary ball, the measurement process module includes image analysis module and image information identification module;Camera is to excavation Hole and the auxiliary ball excavated in hole carry out shooting acquisition image, and described image analysis module is used for through auxiliary ball in image The edge in the excavation hole in position analysis image and the intersection point of tape measure, described image information identification module is for amplifying identification intersection point Calibration information is sent to monitoring center by fourth communication module by the scale on the tape measure at place, controller.The monitoring device It further include having alarm module, the controller is used to control alarm module hair before the prescribed depth that construction party excavating depth is more than Alarm out.The alarm module is buzzer.
First locating module and the second locating module are all made of Beidou positioning module.The first communication module, second are led to Letter module, third communication module and fourth communication module are all made of 4G communication module.
Specific implementation process is as follows:
Two-dimension code label is set at inspection node, indicates that current inspection node is the pipe network location of Frequent Accidents, reminds It is careful that construction party construction needs;
In inspection node construction, construction party needs first to put construction information on record to monitoring center before construction construction party first, After construction information is put on record, monitoring center puts the pipe network information that terminal sends current inspection node on record to construction, mentions for construction party For Informational support;
When construction party need to formally be constructed, construction party puts terminal on record by construction and scans the two-dimensional code label and fill in pipe Net confirmation message is compared whether pipe network confirmation message is consistent with pipe network information, and information is consistent by monitoring center, then it represents that construction Side has appreciated that the pipe network information being transmitted across before monitoring center, has enough understandings, construction party to the pipe network at the inspection node It rationally can correctly construct, and secure to the construction safety of pipe network.Monitoring center is put terminal on record to construction and is only sent out simultaneously Send the Visualization Model data for the inspection node currently constructed, construction party, which puts construction on record terminal in conjunction with VR interactive device, to be made With, the stereoscopic three-dimensional information of the underground pipe network of current inspection node can be obtained, for construction party construction more favorable support is provided.
Monitoring center is learning construction party in construction, and monitoring center is worked as by the second status module understanding of inspection terminal Inspector's distributing position of preceding inspection near nodal finds the patrol officer nearest apart from current inspection, and passes through inspection terminal The current inspector is notified to rush for construction site;Inspector can obtain visualization mould to BIM data server by inspection terminal Type data, and the three dimensional local information at the Visualization Model data acquisition inspection node for combining VR interactive device to show, three-dimensional Pipe network information, rushes for rapidly construction site, and is exercised supervision guidance according to the three-dimensional pipe network information of acquisition to construction party, to apply The construction of work side provides advantageous technical support.
The setting of ranging mould group is to enable monitoring center real the excavating depth on ground for the ease of detection construction party When understand construction party excavating depth, carry out early warning is taken timely measure before underground pipe network is destroyed.Wherein safety guide rail Setting construction site and pedestrian can be kept apart, a fixed effect can also be provided for tape measure;Auxiliary ball is in gravity Under the action of can rest on excavate hole bottom, while also will drive tape measure elongation, the construction personnel of construction site being capable of basis The scale of tape measure is easy to understand the depth for excavating hole.And the image analysis module of measurement process module can find auxiliary from image The position of ball, image analysis module can also go out the friendship at the edge and tape measure in the excavation hole in image according to the position analysis of auxiliary ball Point, and image information identification module can amplify the scale on the tape measure of identification point of intersection, and the scale letter of the tape measure of point of intersection Breath is exactly the depth for excavating hole.The depth information for excavating hole is sent to monitoring center by communication module by controller, convenient for prison Control center understands the depth information for excavating hole in real time, and carry out early warning can be taken timely measure before underground pipe network is destroyed, is kept away Exempt from the carelessness due to construction personnel, underground pipe network construction personnel before being destroyed is made to fail the case where stopping construction in time.
When detecting that the depth for excavating hole will reach the ground construction depth put on record, buzzer is sounded an alarm, and is reminded Construction party does not exceed the excavating depth put on record, avoids digging to pipe network, causes the damage of pipe network.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge can know the prior art all in the field, and have using routine experiment hand before the date The ability of section, one skilled in the art can improve and be implemented in conjunction with self-ability under the enlightenment that the application provides This programme, some typical known features or known method should not become one skilled in the art and implement the application Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, can also make Several modifications and improvements out, these also should be considered as protection scope of the present invention, these all will not influence the effect that the present invention is implemented Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for explaining the content of claim.

Claims (8)

1. the pipe network cruising inspection system based on VR, including inspection terminal, VR interactive device and BIM data server and setting are in inspection The accident of pipeline network positioning device of node, the accident of pipeline network positioning device include for obtaining the accident of pipeline network letter at inspection node The data acquisition module of breath, for obtaining the first locating module of the location information at inspection node, for believing accident of pipeline network Breath and location information are sent to the first communication module of BIM data server;The inspection terminal includes for obtaining inspector Location information the second locating module, for location information to be sent to the second communication module of BIM data server;It is described BIM data server includes Visualization Model database, and the Visualization Model database includes urban pipe network BIM model data Library, three-dimensional city BIM model database, the accident of pipeline network at inspection node that the BIM data server is used to receive Information, location information and the location information of inspector are marked respectively in urban pipe network BIM model and three-dimensional city BIM model, And generate Visualization Model data;The inspection terminal is used to receive the Visualization Model data of BIM data server transmission, institute State inspection terminal be also used to be combined to VR interactive device in inspector obtain inspection node at accident of pipeline network information, Location information;
It is characterized by also including constructions to put terminal and monitoring center on record, is provided with two-dimension code label at the inspection node, institute It states construction and puts terminal on record for putting construction information on record to monitoring center before construction for construction party, the monitoring center is in construction party The pipe network information that terminal sends inspection node is put on record to construction after putting construction information on record to monitoring center;
It includes scan module and third communication module that terminal is put in the construction, which on record, and the scan module is used to put on record when construction party Inspection node at when constructing, scan the two-dimensional code label and fill in pipe network confirmation message, the third communication module is used for pipe network Confirmation message is sent to monitoring center;The monitoring center compares after receiving pipe network confirmation message with pipe network information, institute State monitoring center comparing result unanimously afterwards control BIM data server put that terminal sends current inspection node on record to construction can Depending on changing model data, construction party is put terminal on record with construction by VR interactive device and is used in combination, and obtains the three of current inspection node Tie up pipe network information;The monitoring center is also used to that the inspector near current inspection node is notified to rush for construction site, inspection The pipe network information at Visualization Model data acquisition inspection node that member shows according to VR interactive device exercises supervision to construction party Guidance.
2. the pipe network cruising inspection system according to claim 1 based on VR, it is characterised in that: also set up at the inspection node There is monitoring device, the monitoring device includes camera, fourth communication module and controller, and the monitoring device is used for inspection Node carries out real-time monitoring, and the controller is used to that monitoring data to be sent to monitoring center by fourth communication module.
3. the pipe network cruising inspection system according to claim 2 based on VR, it is characterised in that: the monitoring device further includes having The ranging mould group of hole depth is excavated for measuring construction, the ranging mould group includes subsidiary module and measurement process module, The subsidiary module includes that the safety guide rail excavated around hole is arranged in, and is arranged in and excavates in hole for subsidiary Auxiliary ball, and the tape measure being arranged on safety guide rail and its measure initial end be fixed on auxiliary ball, the measured place Managing module includes image analysis module and image information identification module;Camera to excavate cheat and excavate hole in auxiliary ball into Row shooting obtains image, and described image analysis module is used for the excavation hole in the position analysis image by auxiliary ball in image The intersection point at edge and tape measure, described image information identification module are used to amplify the scale on the tape measure of identification point of intersection, controller Calibration information is sent to monitoring center by fourth communication module.
4. the pipe network cruising inspection system according to claim 3 based on VR, it is characterised in that: the monitoring device further includes having Alarm module, the controller are used to control alarm module before the prescribed depth that construction party excavating depth is more than and sound an alarm.
5. the pipe network cruising inspection system according to claim 4 based on VR, it is characterised in that: the alarm module is buzzing Device.
6. the pipe network cruising inspection system according to claim 1 based on VR, it is characterised in that: the inspection terminal further includes taking the photograph As module, the camera module is used to carry out on-site data gathering to the external environment of the inspection node to break down.
7. the pipe network cruising inspection system according to claim 1 based on VR, it is characterised in that: first locating module and Two locating modules are all made of Beidou positioning module.
8. the pipe network cruising inspection system according to claim 1 or 2 based on VR, it is characterised in that: the first communication module, Second communication module, third communication module and fourth communication module are all made of 4G communication module.
CN201910033013.1A 2019-01-14 2019-01-14 Pipe network inspection system based on VR Active CN109685704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910033013.1A CN109685704B (en) 2019-01-14 2019-01-14 Pipe network inspection system based on VR

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910033013.1A CN109685704B (en) 2019-01-14 2019-01-14 Pipe network inspection system based on VR

Publications (2)

Publication Number Publication Date
CN109685704A true CN109685704A (en) 2019-04-26
CN109685704B CN109685704B (en) 2023-07-25

Family

ID=66192281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910033013.1A Active CN109685704B (en) 2019-01-14 2019-01-14 Pipe network inspection system based on VR

Country Status (1)

Country Link
CN (1) CN109685704B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222137A (en) * 2019-06-11 2019-09-10 鲁东大学 One kind is based on oblique photograph and augmented reality Intelligent campus system
CN110764115A (en) * 2019-10-29 2020-02-07 北京无线电计量测试研究所 Wearable holographic detection system for underground pipeline
CN111209624A (en) * 2020-01-05 2020-05-29 湖南翰坤实业有限公司 Method for detecting in VR based on BIM software
CN112283592A (en) * 2020-10-23 2021-01-29 山东莱欧信息科技有限公司 Disaster prevention and control early warning monitoring system for underground pipe network
CN113051635A (en) * 2020-05-25 2021-06-29 中交隧道工程局有限公司 Railway tunnel dynamic construction management system based on BIM technology
CN116092212A (en) * 2022-12-26 2023-05-09 唐钢国际工程技术有限公司 Building inspection device based on BIM management platform
CN116798142A (en) * 2023-06-25 2023-09-22 中路高科交通检测检验认证有限公司 Visual inspection method, system, equipment and storage medium for long bridge
CN117436700A (en) * 2023-11-14 2024-01-23 山东和同信息科技股份有限公司 BIM-based new energy engineering data management system and method
CN117745263A (en) * 2023-12-19 2024-03-22 湖北三峡云计算中心有限责任公司 Data sniffing system based on city monitoring equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150083362A1 (en) * 2012-09-21 2015-03-26 Tianjin Geruisi New Technology Of Mechanical And Electrical Co. Ltd District public water supply pipe network system compatible for source side water for ground source heat pump system and reclaimed water
CN104732607A (en) * 2015-03-06 2015-06-24 深圳市燃气集团股份有限公司 Intelligent pipe network patrolling method and system
CN105938613A (en) * 2016-06-27 2016-09-14 锐创(唐山)生态建筑科技有限公司 BIM (building information modeling) and VR (virtual reality)-based smart city pipeline network integrated platform, management method thereof and construction method
CN108574734A (en) * 2018-04-10 2018-09-25 上海电力高压实业有限公司 Overhead power line construction overall process quality managing and control system based on mobile terminal and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150083362A1 (en) * 2012-09-21 2015-03-26 Tianjin Geruisi New Technology Of Mechanical And Electrical Co. Ltd District public water supply pipe network system compatible for source side water for ground source heat pump system and reclaimed water
CN104732607A (en) * 2015-03-06 2015-06-24 深圳市燃气集团股份有限公司 Intelligent pipe network patrolling method and system
CN105938613A (en) * 2016-06-27 2016-09-14 锐创(唐山)生态建筑科技有限公司 BIM (building information modeling) and VR (virtual reality)-based smart city pipeline network integrated platform, management method thereof and construction method
CN108574734A (en) * 2018-04-10 2018-09-25 上海电力高压实业有限公司 Overhead power line construction overall process quality managing and control system based on mobile terminal and method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222137A (en) * 2019-06-11 2019-09-10 鲁东大学 One kind is based on oblique photograph and augmented reality Intelligent campus system
CN110222137B (en) * 2019-06-11 2022-12-30 鲁东大学 Intelligent campus system based on oblique photography and augmented reality technology
CN110764115A (en) * 2019-10-29 2020-02-07 北京无线电计量测试研究所 Wearable holographic detection system for underground pipeline
CN111209624A (en) * 2020-01-05 2020-05-29 湖南翰坤实业有限公司 Method for detecting in VR based on BIM software
CN113051635A (en) * 2020-05-25 2021-06-29 中交隧道工程局有限公司 Railway tunnel dynamic construction management system based on BIM technology
CN112283592A (en) * 2020-10-23 2021-01-29 山东莱欧信息科技有限公司 Disaster prevention and control early warning monitoring system for underground pipe network
CN116092212A (en) * 2022-12-26 2023-05-09 唐钢国际工程技术有限公司 Building inspection device based on BIM management platform
CN116798142A (en) * 2023-06-25 2023-09-22 中路高科交通检测检验认证有限公司 Visual inspection method, system, equipment and storage medium for long bridge
CN117436700A (en) * 2023-11-14 2024-01-23 山东和同信息科技股份有限公司 BIM-based new energy engineering data management system and method
CN117436700B (en) * 2023-11-14 2024-04-12 山东和同信息科技股份有限公司 BIM-based new energy engineering data management system and method
CN117745263A (en) * 2023-12-19 2024-03-22 湖北三峡云计算中心有限责任公司 Data sniffing system based on city monitoring equipment
CN117745263B (en) * 2023-12-19 2024-05-28 湖北三峡云计算中心有限责任公司 Data sniffing system based on city monitoring equipment

Also Published As

Publication number Publication date
CN109685704B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN109685704A (en) Pipe network cruising inspection system based on VR
WO2023061039A1 (en) Tailing pond risk monitoring and early-warning system based on internet of things
CN102497568B (en) Interactive three-dimensional virtual scene and visualized information integrating system
CN109447480A (en) A kind of road and bridge engineering equipment safety monitoring system and method based on BIM+GIS modeling
CA2574595C (en) Precision gps driven utility asset management and utility damage prevention system and method
CN102044094B (en) Line polling management system and method
CN105937408B (en) Tunnel wall rock deformation method for early warning and system
CN106815439A (en) Municipal Engineering Construction monitoring method and its system based on BIM
CN206991518U (en) For monitoring the prior-warning device and system of Metro Deep Excavation geological disaster
CN107272634B (en) A kind of virtual coal mining Exercise Control system based on three-dimensional VR and data server
CN206987892U (en) A kind of prior-warning device for being used to monitor Propagation in Tunnel Disaster
CA2779525A1 (en) System and method employing three-dimensional and two-dimensional digital images
CN104599419B (en) Pipeline safety-protection system positioning test method based on fibre optical sensor
CN109144060A (en) A kind of dangerous discernment method and system of steamer line
CN107146041A (en) A kind of road network based on 3DGIS+BIM runs long-range disease screening interactive system and method
CN110821560A (en) Tunnel inspection system
CN107102604A (en) A kind of apparatus monitoring method, apparatus and system
CN110689450A (en) Wisdom water utilities operation system based on three-dimensional visual mode
CN105956045A (en) Smart surveying and mapping polling and monitoring platform of Beidou positioning and navigation city pipe network
CN108364129A (en) A kind of region ecology safety early alarming and forecasting method based on remote sensing big data
CN207852034U (en) A kind of fishing port supervisory systems
CN109000718A (en) A kind of Safety Supervision on Hydraulic Buildings system and method
CN207067726U (en) A kind of watercourse monitoring system
CN203552415U (en) Landslide monitoring alarm device based on laser ranging
CN116401879B (en) Method for simulating downstream evolution of breaking tailing sand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Tong Yi

Inventor before: Tong Yi

Inventor before: Zhou Boyi