CN107423886A - Engineering data management by synchronization system and management method based on Track Table - Google Patents

Engineering data management by synchronization system and management method based on Track Table Download PDF

Info

Publication number
CN107423886A
CN107423886A CN201710515970.9A CN201710515970A CN107423886A CN 107423886 A CN107423886 A CN 107423886A CN 201710515970 A CN201710515970 A CN 201710515970A CN 107423886 A CN107423886 A CN 107423886A
Authority
CN
China
Prior art keywords
data
engineering
app clients
management
track table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710515970.9A
Other languages
Chinese (zh)
Inventor
徐巍
裴哲
杨桂珍
林立锋
王玲
郭利民
吕宁
赵伟
王练杰
裴军
谷云宽
崔春杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Industry Zhiyuan Software Development Co Ltd
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Original Assignee
Beijing Construction Industry Zhiyuan Software Development Co Ltd
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Industry Zhiyuan Software Development Co Ltd, China Construction First Group Corp Ltd, China Construction First Bureau Group North China Construction Co Ltd filed Critical Beijing Construction Industry Zhiyuan Software Development Co Ltd
Priority to CN201710515970.9A priority Critical patent/CN107423886A/en
Publication of CN107423886A publication Critical patent/CN107423886A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Engineering data management by synchronization system and management method disclosed by the invention based on Track Table, the management system includes APP clients, it includes intelligent mobile APP clients and PC desktop APP clients, intelligent mobile APP clients carry out collection in worksite data metadata, then upload, PC computer desktop APP clients provide process, flowing water section partition functionality, and build table automatically using gathered data completion, and realize the automation filling of engineering data trace list data;High in the clouds data, services, it is connected by interface with each APP clients, prompts the storage and business transfer service of data metadata;Data On line inspection management system for tracking, it is connected with each APP clients, high in the clouds data, services, engineering data is checked, instructed and is tracked by data on-line checking management system for tracking to apply for checking and examination program Track Table, it will feed back to APP clients in time simultaneously and rectified and improved the problem of discovery during follow-up investigations etc., the dynamic management of engineering data is realized, improves the efficiency of management and managerial skills.

Description

Engineering data management by synchronization system and management method based on Track Table
Technical field
The present invention relates to Engineering documents Management technical field, more particularly to the engineering data management by synchronization system based on Track Table System and management method.
Background technology
Engineering data is engineering construction during the proposition of project, preparation, exploration, design, construction to completion operation etc. The documents of formation, drawing, icon, calculate the various forms of information summations such as material, audio and/or video material.Engineering data reflects work The actual conditions of journey process of construction and engineering entity quality, therefore authenticity is most basic to engineering data, most important requirement, work The quality of journey data management is put on record completion of works, settled accounts, providing quality goods or brilliant, later stage O&M, reconstruction, enlarging it is most important.
At present there is problems with and deficiency in Engineering documents Management:
(1)Engineering documents Management system is unsound, it is difficult to ensures effective development of materials compilation work;
(2)Engineering documents Management system is unsound, it is difficult to ensures data management duty fulfillment;
(3)Engineering documents Management peopleware is not universal high, it is difficult to ensures the quality of engineering data;
(4)Engineering data establishment is not in place, poor synchronization, authenticity are difficult to ensure that, it is big to inquire about difficulty;
(5)Traditional data account can not intuitively reflect the complete association of engineering data comprehensively, cause completion information filing-up work It is heavy, transfer not in time the problem of;
(6)For enterprise, the management of engineering data can not follow up in real time, can only inspect periodically, it is impossible to find in time, solve to ask Topic, management difficulty is big, risk is high.
The content of the invention
The purpose of the present invention is to be directed to above-mentioned technical problem, there is provided the engineering data management by synchronization system based on Track Table And management method, its step is reasonable, has returned the essence of Engineering documents Management, has really met the codes and standards of country, has solved Certainly there is very big breakthrough in terms of engineering data data validity, efficiently solve the problems, such as the mistake of manual maintenance, realize engineering The dynamic management of data, the efficiency of Engineering documents Management is improved, improve the managerial skills of engineering data.
Technical scheme
In order to solve the above technical problems, the engineering data management by synchronization system provided by the invention based on Track Table, it includes:
APP clients:It includes intelligent mobile APP clients and PC desktop APP clients, and intelligent mobile APP clients are carried out Collection in worksite data metadata, is then uploaded;PC desktop APP clients provide process, flowing water section partition functionality, and utilize collection Data are completed to build table automatically, realize the automation filling of engineering data trace list data;
High in the clouds data, services:It is connected by interface with each APP clients, prompts storage and the business transfer clothes of data metadata Business;
Data On line inspection management system for tracking:It is connected with each APP clients, high in the clouds data, services, is examined online by data Management system for tracking is surveyed to be checked, instructed and tracked engineering data to apply for checking and examination program Track Table, while by during follow-up investigations It was found that the problem of feed back to APP clients in time and rectified and improved, realize effective management.
Further, the intelligent mobile APP clients user is section chief, quality person, surveyor, materialman and experiment The live post personnel of member;PC desktop APP clients user is that section chief, quality person, surveyor, materialman, documenter, project are total Work;Data On line inspection management system for tracking user is the pipe such as company chief engineer, data director, project manager, project chief engineer Reason personnel.
Disclosed herein as well is the engineering data synchronization management method based on Track Table, it comprises the following steps:
S1, the establishment of engineering project information is first carried out by data On line inspection management system for tracking, is recorded according to builder's licence Enter engineering, the information of construction unit, and carry out the distribution of project personnel;
S2, before commencement of works, the screening of project process is carried out by PC desktop APP clients, establishes the work for being adapted to project Sequence storehouse;After drawing determination, flowing water section division is carried out;Data are submitted to be taken to cloud data after the completion of project process and the division of flowing water section Business, cloud data, services send message to intelligent mobile APP clients and other PC desktop clients ends using message mechanism, can carried out Timely synchronized update;
After S3, intelligent mobile APP client log in, the first of data can be carried out for the first time according to the engineering where active user by logging in Beginningization, the standard criterion storehouse data involved by engineering, project process data, flowing water section can be divided data, engineering essential information Etc. data, new data is only updated when logging on;, can be according to work in intelligent mobile APP clients after the completion of data initialization The construction speed of journey, select process to carry out the collection typing of corresponding engineering data metadata, carrying for data is carried out after the completion of collection Hand over, cloud data, services can send prompting message PC desktop APP clients in real time after submission data are received and carry out building table, and complete Into automatic filling;
S4, PC desktop APP clients carry out the establishment of engineering data form, and utilize intelligence automatically according to the message received The gathered data that mobile APP clients provide completes filling in for form, can carry out secondary editor for the form of establishment, edit After the completion of, upload the engineering data list data of completion;Documenter is entered by PC desktop APP clients to engineering data Track Table Row safeguards that trace list data is automatically performed filling by client;
S5, company chief engineer, data supervisor, each project manager, chief engineer are by data On line inspection management system for tracking to pipe Engineering data tracking data in the range of linchpin check in real time, tracked, while data in engineering data Track Table can be entered Row exceeds early warning alarm, and directly engineering data form can be checked in real time according to the date, pinpoints the problems and issues problem Rectification.
Further, in step s 4, the apply for checking and examination manufacturing process of program Track Table of engineering data is:
S4-1, it is tracked according to the different phase of construction unit, the process content to be tracked is selected from engineering process, can be right Track content carry out deeper into maintenance;
S4-2, the flowing water section content to be tracked is selected according to construction unit, the scope of construction part is determined by flowing water section;
S4-3, process data are the column data of Track Table, and construction part data are row data, establish engineering data Track Table Afterwards, client can carry out the filling of data automatically.Trace list data can carry out human intervention processing according to practice of construction situation, right The link that need not be tracked or not produce engineering data carries out special marking processing, to more meet the actual feelings of job site Condition.
Further, in step s 5, the early warning mechanism includes time early warning, and it is according to the analysis to process and process The correlation of content, the planned time of interval time and this process in engineering data form between arrangement step, realize dynamic State is reminded.
Beneficial effect of the present invention:
Engineering data management by synchronization system and management method provided by the invention based on Track Table, its step is reasonable, effectively solution The mistake problem for manual maintenance of having determined, the dynamic management of engineering data is realized, improve the efficiency of Engineering documents Management, lifted The managerial skills of engineering data.Have the advantages that:
(1)The application furthers investigate the incidence relation of working procedure and engineering data, and establishes a set of be directed on this basis The system mechanism of Engineering documents Management;
(2)On the basis of based on Track Table management system, using process and inspection lot division plan, according to the complete of engineering data Into situation, the technology for managing Track Table is automatically generated;
(3)Whether created according to engineering data form corresponding to process and position retrieval, according to trace list data fill rule, from Move and corresponding data is filled on Track Table(Form date created, missing, without content etc.), complete the dynamic life of Track Table Into.
(4)In Track Table dynamic formation, early warning and integrity check are carried out to the engineering data form in Track Table, it is right The engineering data form pinpointed the problems, is directly marked respectively in Track Table, and specific assay content can be entered Row is checked and issues corresponding warning information.
(5)Using the decomposition of process, professional guidance content is distributed in corresponding link, forms dynamic and specific aim Stronger prompting, prompting and professional guidance system.
(6)By the corresponding function of mobile App assistant, the regular reporting mechanism to project progress, builder's diary are realized Registration, the collection of acoustic scene picture arrange.By mobile App assistant by data syn-chronization corporate management can be realized to item simultaneously The inspection and tracking of mesh scene progress, builder's diary, acoustic scene picture.
(7)Traditional papery version storage archives are distinguished, both can fast and easily inquire about, the true of data can be ensured again Property, it has been truly realized the trackability of data.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, above-mentioned advantage of the invention will be apparent and be easier reason Solution, these accompanying drawings are simply schematical, are not intended to limit the present invention, wherein:
Fig. 1 is the schematic diagram of the engineering data management by synchronization system of the present invention based on Track Table;
Fig. 2 is the flow chart of the engineering data synchronization management method based on Track Table of the present invention;
Fig. 3 is the process of the present invention, flow section division schematic diagram;
The engineering data that Fig. 4 is the present invention applies for checking and examination the Making programme figure of program Track Table.
Embodiment
With reference to specific embodiments and the drawings, to engineering data management by synchronization system and pipe of the present invention based on Track Table Reason method is described in detail.
The embodiment recorded herein is the specific embodiment of the present invention, for illustrating the design of the present invention, is It is explanatory and exemplary, it should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except the reality recorded herein Exception is applied, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious and easy The other technical schemes seen, these technical schemes include any obviously replacing using to making for the embodiment recorded herein The technical scheme changed and changed.
Fig. 1 is the schematic diagram of the engineering data management by synchronization system of the present invention based on Track Table, and it includes:
APP clients:It includes intelligent mobile APP clients and PC desktop APP clients, and intelligent mobile APP clients are carried out Collection in worksite data metadata, is then uploaded;PC desktop APP clients provide process, flowing water section partition functionality, and utilize collection Data are completed to build table automatically, realize the automation filling of engineering data trace list data;
The intelligent mobile APP clients user is section chief, quality person, surveyor, materialman and laboratory technician scene people from post Member;PC desktop APP clients user is section chief, quality person, surveyor, materialman, documenter, project chief engineer;Data is online It is the administrative staff such as company chief engineer, data director, project manager, project chief engineer to check management system for tracking user.
High in the clouds data, services:It is connected by interface with each APP clients, prompts the storage and business transfer of data metadata Service;
Data On line inspection management system for tracking:It is connected with each APP clients, high in the clouds data, services, is examined online by data Management system for tracking is surveyed to be checked, instructed and tracked engineering data to apply for checking and examination program Track Table, while by during follow-up investigations It was found that the problem of feed back to APP clients in time and rectified and improved, realize effective management.
Present invention also offers the engineering data synchronization management method based on Track Table, its flow chart is as shown in Fig. 2 be based on The engineering data synchronization management method of Track Table specifically includes following steps:
S1, the establishment of engineering project information is first carried out by data On line inspection management system for tracking, is recorded according to builder's licence Enter engineering, the information of construction unit, and carry out the distribution of project personnel;
S2, before commencement of works, the screening of project process is carried out by PC desktop APP clients, establishes the work for being adapted to project Sequence storehouse;After drawing determination, flowing water section division is carried out;Data are submitted to be taken to cloud data after the completion of project process and the division of flowing water section Business, cloud data, services send message to intelligent mobile APP clients and other PC desktop clients ends using message mechanism, can carried out Timely synchronized update;
In this step, after drawing determination, flowing water section division is carried out, by ordinary circumstance, " layer-section-position-axle can be used The structure of line " is divided, as shown in Figure 3.
After S3, intelligent mobile APP client log in, data can be carried out for the first time according to the engineering where active user by logging in Initialization, can by the standard criterion storehouse data involved by engineering, project process data, that flowing water section divides data, engineering is basic The data such as information, only update new data when logging on;, can root in intelligent mobile APP clients after the completion of data initialization According to the construction speed of engineering, select process to carry out the collection typing of corresponding engineering data metadata, data are carried out after the completion of collection Submission, cloud data, services can receive submit data after in real time send prompting message PC desktop APP clients carry out building table, And complete automatic filling.
S4, PC desktop APP clients carry out the establishment of engineering data form, and utilize automatically according to the message received The gathered data that intelligent mobile APP clients provide completes filling in for form, and secondary editor can be carried out for the form of establishment, After the completion of editor, the engineering data list data of completion is uploaded;Documenter is tracked by PC desktop APP clients to engineering data Table is safeguarded that trace list data is automatically performed filling by client;
In this step, engineering data applies for checking and examination the manufacturing process figure of program Track Table, as shown in Figure 4.
S4-1, it is tracked according to the different phase of construction unit, the process content to be tracked is selected from engineering process, Can to tracking content carry out deeper into maintenance;
S4-2, the flowing water section content to be tracked is selected according to construction unit, the scope of construction part is determined by flowing water section;
S4-3, process data are the column data of Track Table, and construction part data are row data, establish engineering data Track Table Afterwards, client can carry out the filling of data automatically.Trace list data can carry out human intervention processing according to practice of construction situation, right The link that need not be tracked or not produce engineering data carries out special marking processing, to more meet the actual feelings of job site Condition.
S5, company chief engineer, data supervisor, each project manager, chief engineer pass through data On line inspection management system for tracking Engineering data tracking data in compass of competency is carried out to check in real time, tracked, while can be to number in engineering data Track Table According to carrying out exceeding early warning alarm, and directly engineering data form can in real time be checked according to the date, pinpoint the problems and issue Problem is rectified and improved.
In this step, the early warning mechanism includes time early warning, and it is according to the analysis to process and the phase of process content Mutual relation, the planned time of interval time and this process in engineering data form between arrangement step, realizes dynamic alerts.
The application realizes job site using the APP of client to relevant data acquisition, record, builder's diary, scene The inspection tracking of acoustic image, project progress;Engineering data is synchronous with progress;Missing, the early warning of delay type engineering blasting data;Realize simultaneously General headquarters' visualizations, it can be seen that list data collection, the process formed, to be truly realized to trace.Efficiently solve artificial dimension The mistake problem of shield, the dynamic management of engineering data is realized, the efficiency of Engineering documents Management is improved, improves engineering data Managerial skills.
The present invention is not limited to the above-described embodiments, and anyone can draw other various forms under the enlightenment of the present invention Product, it is every that there is technical side identical or similar to the present application however, make any change in its shape or structure Case, it is within the scope of the present invention.

Claims (5)

1. the engineering data management by synchronization system based on Track Table, it is characterised in that including:
APP clients:It includes intelligent mobile APP clients and PC desktop APP clients, and intelligent mobile APP clients are carried out Collection in worksite data metadata, is then uploaded;PC desktop APP clients provide process, flowing water section partition functionality, and utilize collection Data are completed to build table automatically, realize the automation filling of engineering data trace list data;High in the clouds data, services:By interface and respectively APP clients connect, and prompt the storage and business transfer service of data metadata;Data On line inspection management system for tracking:Its Be connected with each APP clients, high in the clouds data, services, checked, instructed by data on-line checking management system for tracking and with Track engineering data applies for checking and examination program Track Table, while enters APP clients are fed back in time the problem of discovery during follow-up investigations Row rectification, realize effective management.
2. the engineering data management by synchronization system based on Track Table according to claim 1, it is characterised in that the intelligent sliding Dynamic APP clients user is section chief, quality person, surveyor, materialman and laboratory technician scene post personnel;PC desktops APP visitors Family end user is section chief, quality person, surveyor, materialman, documenter, project chief engineer;Data On line inspection tracing management system System user is the administrative staff such as company chief engineer, data director, project manager, project chief engineer.
3. the engineering data synchronization management method based on Track Table, it is characterised in that comprise the following steps:
S1, the establishment of engineering project information is first carried out by data On line inspection management system for tracking, is recorded according to builder's licence Enter engineering, the information of construction unit, and carry out the distribution of project personnel;
S2, before commencement of works, the screening of project process is carried out by PC desktop APP clients, establishes the work for being adapted to project Sequence storehouse;After drawing determination, flowing water section division is carried out;Data are submitted to be taken to cloud data after the completion of project process and the division of flowing water section Business, cloud data, services send message to intelligent mobile APP clients and other PC desktop clients ends using message mechanism, can carried out Timely synchronized update;
After S3, intelligent mobile APP client log in, the first of data can be carried out for the first time according to the engineering where active user by logging in Beginningization, the standard criterion storehouse data involved by engineering, project process data, flowing water section can be divided data, engineering essential information Etc. data, new data is only updated when logging on;, can be according to work in intelligent mobile APP clients after the completion of data initialization The construction speed of journey, select process to carry out the collection typing of corresponding engineering data metadata, carrying for data is carried out after the completion of collection Hand over, cloud data, services can send prompting message PC desktop APP clients in real time after submission data are received and carry out building table, and complete Into automatic filling;
S4, PC desktop APP clients carry out the establishment of engineering data form, and utilize intelligence automatically according to the message received The gathered data that mobile APP clients provide completes filling in for form, can carry out secondary editor for the form of establishment, edit After the completion of, upload the engineering data list data of completion;Documenter is entered by PC desktop APP clients to engineering data Track Table Row safeguards that trace list data is automatically performed filling by client;
S5, company chief engineer, data supervisor, each project manager, chief engineer are by data On line inspection management system for tracking to pipe Engineering data tracking data in the range of linchpin check in real time, tracked, while data in engineering data Track Table can be entered Row exceeds early warning alarm, and directly engineering data form can be checked in real time according to the date, pinpoints the problems and issues problem Rectification.
4. the engineering data management by synchronization system based on Track Table according to claim 3, it is characterised in that in step S4 In, the apply for checking and examination manufacturing process of program Track Table of engineering data is:
S4-1, it is tracked according to the different phase of construction unit, the process content to be tracked is selected from engineering process, can be right Track content carry out deeper into maintenance;
S4-2, the flowing water section content to be tracked is selected according to construction unit, the scope of construction part is determined by flowing water section;
S4-3, process data are the column data of Track Table, and construction part data are row data, establish engineering data Track Table Afterwards, client can carry out the filling of data automatically, and trace list data can carry out human intervention processing according to practice of construction situation, right The link that need not be tracked or not produce engineering data carries out special marking processing, to more meet the actual feelings of job site Condition.
5. the engineering data management by synchronization system based on Track Table according to claim 3, it is characterised in that in step S5 In, the early warning mechanism includes time early warning, and it is according to the analysis to process and the correlation of process content, in engineering data The planned time of interval time and this process in form between arrangement step, realize dynamic alerts.
CN201710515970.9A 2017-06-29 2017-06-29 Engineering data management by synchronization system and management method based on Track Table Pending CN107423886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710515970.9A CN107423886A (en) 2017-06-29 2017-06-29 Engineering data management by synchronization system and management method based on Track Table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710515970.9A CN107423886A (en) 2017-06-29 2017-06-29 Engineering data management by synchronization system and management method based on Track Table

Publications (1)

Publication Number Publication Date
CN107423886A true CN107423886A (en) 2017-12-01

Family

ID=60427462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710515970.9A Pending CN107423886A (en) 2017-06-29 2017-06-29 Engineering data management by synchronization system and management method based on Track Table

Country Status (1)

Country Link
CN (1) CN107423886A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229807A (en) * 2017-12-28 2018-06-29 广州建软科技股份有限公司 A kind of marketing programs construction rotation managing and control system
CN108830539A (en) * 2018-03-28 2018-11-16 北京地厚云图科技有限公司 Task interaction and data statistics management method and storage medium
CN109670796A (en) * 2018-12-28 2019-04-23 北京城建勘测设计研究院有限责任公司 Engineering documents Management method and system
CN109784840A (en) * 2018-12-28 2019-05-21 福建华闽通达信息技术有限公司 A kind of construction survey automatic data collection processing method being associated with engineering structure task
CN109829241A (en) * 2019-02-20 2019-05-31 中建一局集团第二建筑有限公司 A method of it is constructed using the administrative skill based on architectural engineering process data
CN110110985A (en) * 2019-04-28 2019-08-09 浙江明度智控科技有限公司 A kind of record of production method and recording device
CN110505452A (en) * 2019-08-26 2019-11-26 广东电网有限责任公司 A kind of capital construction power transmission engineering Schedule monitoring method and monitoring system
CN110942272A (en) * 2019-12-13 2020-03-31 河南城建学院 Engineering project management cloud platform system based on material tracking
CN111915273A (en) * 2020-07-30 2020-11-10 北京航天发射技术研究所 Assembly management method, system, terminal and storage medium based on process tracking card
CN116501921A (en) * 2023-06-25 2023-07-28 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278694A1 (en) * 2013-03-15 2014-09-18 ConnectWise Inc. Systems and methods for business management using product data with product classes
CN104766155A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 Engineering project element management method and system based on BIM
CN204791127U (en) * 2015-03-25 2015-11-18 裴正广 Job site quality control information system
CN106408254A (en) * 2016-09-06 2017-02-15 江苏智通交通科技有限公司 Highway engineering project supervision system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278694A1 (en) * 2013-03-15 2014-09-18 ConnectWise Inc. Systems and methods for business management using product data with product classes
CN104766155A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 Engineering project element management method and system based on BIM
CN204791127U (en) * 2015-03-25 2015-11-18 裴正广 Job site quality control information system
CN106408254A (en) * 2016-09-06 2017-02-15 江苏智通交通科技有限公司 Highway engineering project supervision system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229807A (en) * 2017-12-28 2018-06-29 广州建软科技股份有限公司 A kind of marketing programs construction rotation managing and control system
CN108830539A (en) * 2018-03-28 2018-11-16 北京地厚云图科技有限公司 Task interaction and data statistics management method and storage medium
CN109670796A (en) * 2018-12-28 2019-04-23 北京城建勘测设计研究院有限责任公司 Engineering documents Management method and system
CN109784840A (en) * 2018-12-28 2019-05-21 福建华闽通达信息技术有限公司 A kind of construction survey automatic data collection processing method being associated with engineering structure task
CN109670796B (en) * 2018-12-28 2023-03-14 北京城建勘测设计研究院有限责任公司 Engineering data management method and system
CN109829241B (en) * 2019-02-20 2022-01-28 中建一局集团第二建筑有限公司 Construction method by using management technology based on constructional engineering process data
CN109829241A (en) * 2019-02-20 2019-05-31 中建一局集团第二建筑有限公司 A method of it is constructed using the administrative skill based on architectural engineering process data
CN110110985A (en) * 2019-04-28 2019-08-09 浙江明度智控科技有限公司 A kind of record of production method and recording device
CN110505452A (en) * 2019-08-26 2019-11-26 广东电网有限责任公司 A kind of capital construction power transmission engineering Schedule monitoring method and monitoring system
CN110505452B (en) * 2019-08-26 2021-04-23 广东电网有限责任公司 Capital construction power transmission project progress monitoring method and monitoring system
CN110942272A (en) * 2019-12-13 2020-03-31 河南城建学院 Engineering project management cloud platform system based on material tracking
CN111915273A (en) * 2020-07-30 2020-11-10 北京航天发射技术研究所 Assembly management method, system, terminal and storage medium based on process tracking card
CN116501921A (en) * 2023-06-25 2023-07-28 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN116501921B (en) * 2023-06-25 2023-09-15 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material

Similar Documents

Publication Publication Date Title
CN107423886A (en) Engineering data management by synchronization system and management method based on Track Table
CN107515953A (en) One kind welding overall process quality tracing and analysis system
CN115375146B (en) Digital construction integrated platform
CN112232761B (en) Infrastructure application system and method
Yu et al. RIOMS: An intelligent system for operation and maintenance of urban roads using spatio-temporal data in smart cities
US20130006688A1 (en) Creating a 3rd party team project story board
CN114386807A (en) Public health event emergency system and method
CN109947068A (en) A kind of field data acquisition system and method
CN112988865B (en) Industrial Internet service management system
US20130007694A1 (en) Project story board to board communication tools
CN109711645A (en) A kind of pipeline construction data management system and method based on two dimensional code
Ding et al. BIM research vs BIM practice: A bibliometric-qualitative analysis from China
CN113377886A (en) Production and construction project water and soil conservation supervision field investigation method
Guo et al. Implementation of CIM-related technologies within transportation projects
CN111708827A (en) Real estate unit coding system
US20130006687A1 (en) Creating a sub-story for a project story board
Jing et al. Development of BIM-Sensor integrated platform for MEP piping maintenance
Klosova et al. Methods for identifying non-value-adding activities in construction processes
CN108769612A (en) A kind of VR Visualization Platforms
Wang et al. BIM-based government engineering quality supervision system
Hafez Managing heritage through facilities data management heritage information system
Zhong et al. Visible project management system for highway construction based on 3d virtual reality and information technology
Chen et al. Construction and empirical analysis of information management system of engineering investigation quality
Plume et al. Precinct Information Modelling–project progress report
CN117436634A (en) Management platform based on NFC and GIS garden data association

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination