- CN107367706A CN107367706A CN201710706352.2A CN201710706352A CN107367706A CN 107367706 A CN107367706 A CN 107367706A CN 201710706352 A CN201710706352 A CN 201710706352A CN 107367706 A CN107367706 A CN 107367706A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- investigation
- electricity
- analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The system that the present invention discloses a kind of electronization investigation and analysis electric energy meter exception, including electric energy meter, terminal, metering automation system, electric energy meter investigation and analytical equipment and electricity extremely move back benefit device, wherein:Electric energy meter is connected by terminal with metering automation system;And investigation and analytical equipment connect metering automation system to electric energy meter extremely and electricity moves back benefit device;And electricity moves back benefit device and is also connected with metering automation system.The connection network system that the present invention moves back benefit device by electric energy meter investigation and analytical equipment extremely with electric energy meter, terminal, metering automation system and electricity realizes electronization investigation and analysis electric energy meter exception, operating efficiency is improved, effectively prevent the situation of electric energy meter anomaly analysis mistakes and omissions.
Description
Technical field
The present invention relates to electric network fault to investigate field, and more particularly to a kind of electronization investigation and analysis electric energy meter exception are
System.
Background technology
If power network critical point, power plant and specially become user electric energy meter occur it is abnormal, it would be possible to power plant, with electric unit,
Power supply administration brings loss and dispute economically.Office of prefectures and cities plant stand, large user's electric energy meter substantial amounts at present, from different
The electric energy meter of producer also has different performance abnormal conditions.At present, for how to run from the substantial amounts of electric energy meter of metering automation
Data there may be operation exception electric energy meter to filter out, and accurately data analysis is carried out to there may be abnormal electric energy meter,
To judge whether the electric energy meter is that metering is abnormal, if need to carry out electricity and move back benefit and how to carry out electricity to move back that benefit etc. is a series of to ask
Topic, main still using manually investigating one by one, artificial investigation can not ensure the accuracy investigated extremely, and due to the number of electric energy meter
Measure huge, operating efficiency can not ensure.
The content of the invention
The main object of the present invention is the system for proposing a kind of electronization investigation and analysis electric energy meter exception, it is intended on overcoming
State problem.
To achieve the above object, it is proposed by the present invention abnormal including electric energy meter, terminal, metering automation system, electric energy meter
Investigation and analytical equipment, electricity, which move back, mends device and its connection network, wherein:Electric energy meter is connected by terminal and metering automation system
Connect;And investigation and analytical equipment connect metering automation system to electric energy meter extremely and electricity moves back benefit device;And electricity moves back benefit device
Also it is connected with metering automation system;Metering automation system obtains the service data of electric energy meter by terminal, sends electric energy to
Table investigation and analytical equipment extremely, the service data progress of the electric energy meter of electric energy meter investigation and analytical equipment extremely to receiving are different
Often investigation and analysis, and send final investigation analysis result to electricity and move back benefit device, electricity, which moves back, mends device according to final investigation
Analysis result calculation moves back benefit electricity and sends metering automation system to accordingly.
Preferably, the terminal includes plant stand terminal and negative control terminal, the electric energy meter include plant stand terminal electric energy meter and
Negative control terminal electric energy meter.
Preferably, the factory end end number is some numbers, and the plant stand terminal electric energy meter number is some numbers.
Preferably, the plant stand terminal connects into principal and subordinate's LAN, metering automation system with some plant stand terminal electric energy meters
System connects into principal and subordinate's LAN with some plant stand terminals, connects the connection of the plant stand terminal electric energy meter and metering automation system
Network is power private network.
Preferably, the negative control terminal number is some numbers, and the negative control terminal electric energy meter number is some numbers.
Preferably, the negative control terminal connects into principal and subordinate's LAN, metering automation system with some negative control terminal electric energy meters
System connects into principal and subordinate's LAN with some negative control terminals, connects the connection of the negative control terminal electric energy meter and metering automation system
Network is wirelessly or non-wirelessly public network.
Preferably, electric energy meter investigation and analytical equipment and electricity extremely is moved back benefit device and is integrated in one.
Preferably, some plant stand terminal electric energy meters and some negative control terminal electric energy meters respectively there is different performance to investigate extremely
Data, the electric energy meter investigation and analytical equipment extremely are provided with all plant stand terminal electric energy meters and all negative control terminal electric energy
The different performance of table is investigated extremely and the field operation application software of analysis.
Preferably, it is 4G to connect the electric energy meter investigation and analytical equipment and the connection network of metering automation system extremely
Network or WIFI.
The present invention is by establishing electric energy meter, terminal, metering automation system, electric energy meter investigation and analytical equipment and electricity extremely
Amount moves back the electronic investigation of the connection communication real-time performance between benefit device and analysis electric energy meter is abnormal, instead of in the past artificially side
Investigate one by one likes, investigated extremely further through electric energy meter and analytical equipment is completed the accurate investigation of abnormal electric energy meter electronization and divided
Analysis, further, moved back by electricity and mend device completion electricity with moving back benefit proper calculation, drastically increase operating efficiency, effectively
Anomaly analysis and electricity move back the situation misrepresented deliberately and failed to report mended and calculated caused by ground grind or sharpen has been exempted from artificially.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the structural representation of one embodiment of the invention;
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its
His embodiment, belongs to the scope of protection of the invention.
If it is to be appreciated that related in the embodiment of the present invention directionality instruction (such as up, down, left, right, before and after ...),
Then directionality instruction be only used for explaining relative position relation under a certain particular pose (as shown in drawings) between each part,
Motion conditions etc., if the particular pose changes, directionality instruction also correspondingly changes therewith.
If in addition, relating to the description of " first ", " second " etc. in the embodiment of the present invention, " first ", " second " etc. are somebody's turn to do
Description be only used for describing purpose, and it is not intended that instruction or implying its relative importance or implicit indicating indicated skill
The quantity of art feature.Thus, " first " is defined, the feature of " second " can be expressed or implicitly includes at least one spy
Sign.In addition, the technical scheme between each embodiment can be combined with each other, but must be with those of ordinary skill in the art's energy
Based on enough realizations, the knot of this technical scheme is will be understood that when the combination appearance of technical scheme is conflicting or can not realize
Conjunction is not present, also not within the protection domain of application claims.
As shown in figure 1, the present invention proposes a kind of electronization investigation and analyzes the abnormal system of electric energy meter, including electric energy meter,
Terminal, metering automation system, electric energy meter investigation and analytical equipment, electricity extremely, which move back, mends device and its connection network, wherein:Electricity
Energy table is connected by terminal with metering automation system;And electric energy meter investigation extremely and analytical equipment connection metering automation system
Benefit device is moved back with electricity;And electricity moves back benefit device and is also connected with metering automation system;Terminal obtains the service data of electric energy meter,
Send metering automation screening system to and go out to have abnormal electric energy meter, there will be the electric energy meter number of exception for metering automation system
According to electric energy meter investigation and analytical equipment extremely is sent to, electric energy meter investigation and analytical equipment extremely are to the fortune of the electric energy meter received
Row data carry out abnormal investigation and analysis, and send final investigation analysis result to electricity and move back benefit device, and electricity moves back benefit device
Benefit electricity is moved back according to final investigation Analysis result calculation accordingly and sends metering automation system to.
In the present embodiment, the present invention connects electric energy meter, terminal, metering automation system, electricity respectively by connecting network
Energy table investigation and analytical equipment and electricity extremely move back benefit device, and the electric energy meter is the instrument for measuring electrical equipment consumption electric energy
Table, if being especially mounted to province's gateway mouth, power plant and the electric energy meter generation exception for specially becoming user, it would be possible to power plant, use
Electric unit, power supply administration bring loss and dispute economically;The metering automation system is distant using metering automation system
Survey data and carry out substantial amounts of data examination, specially become user by importing each transformer station of metering automation system or certain power supply area
The electric energy meter electricity of one week, the data such as voltage x current, realize electric energy meter running situation batch quantity analysis, filter out there may be it is different
Normal electric energy meter;Electric energy meter investigation and analytical equipment extremely is realized to the service data of the single rapid lapse of time of electric energy meter one
Anomaly analysis, by the abnormal electric energy meter inventory to filtering out, electric energy meter is imported one by one nearly 1 month or the remote measurement number of longer time
According to, realize the precise abnormal analysis to electric energy meter, judge with the presence or absence of metering operation exception, if electricity need to be carried out and move back benefit;
The electricity moves back to mend device and realize and move back to being judged as carrying out that electricity moves back the electric energy meter of benefit and to mend electricity and calculate automatically, and by institute
Result of calculation is sent to metering automation system, it is referred to herein move back mend electricity and calculate automatically be by solidify electricity move back benefit calculate it is public
Formula carrys out the accurate calculating that favorite moves back benefit into electricity, and the electricity calculating that efficiently avoid artificial mode causes electricity to move back the difference that remedies defects.
The present invention is by establishing electric energy meter, terminal, metering automation system, electric energy meter investigation and analytical equipment and electricity extremely
Amount moves back the electronic investigation of the connection communication real-time performance between benefit device and analysis electric energy meter is abnormal, instead of in the past artificially side
Investigate one by one likes, investigated extremely further through electric energy meter and analytical equipment is completed the accurate investigation of abnormal electric energy meter electronization and divided
Analysis, further, moved back by electricity and mend device completion electricity with moving back benefit proper calculation, drastically increase operating efficiency, effectively
Anomaly analysis and electricity move back the situation misrepresented deliberately and failed to report mended and calculated caused by ground grind or sharpen has been exempted from artificially.
Further, the terminal includes plant stand terminal and negative control terminal, and the electric energy meter includes plant stand terminal electric energy meter
With negative control terminal electric energy meter.
In the present embodiment, it is plant stand terminal and negative control terminal that heretofore described terminal, which includes, and the plant stand terminal is
Apply the terminal in power plant and transformer station, it is possible to achieve the collection storage of electric energy meter information and the monitoring of electric energy meter operating condition,
And the information of collection is managed and transmitted, abbreviation plant stand terminal;The negative control terminal specially becomes user scene use to be installed on
In Site Service and the terminal device of management, remote meter reading, electric energy metrical, equipment working condition, the Ke Huyong to specially becoming user are realized
The function such as electric load and electric energy monitor, thus, electric energy meter also accordingly includes plant stand terminal electric energy meter and negative control terminal electric energy
Table.
Further, the factory end end number is some numbers, and the plant stand terminal electric energy meter number is some numbers.
Further, the plant stand terminal connects into principal and subordinate's LAN, metering automation with some plant stand terminal electric energy meters
System connects into principal and subordinate's LAN with some plant stand terminals, connects the company of the plant stand terminal electric energy meter and metering automation system
It is that to connect the plant stand terminal electric energy meter and the connection network of metering automation system be power private network to power private network to connect network.
Further, the negative control terminal number is some numbers, and the negative control terminal electric energy meter number is some numbers.
Further, the negative control terminal connects into principal and subordinate's LAN, metering automation with some negative control terminal electric energy meters
System connects into principal and subordinate's LAN with some negative control terminals, connects the company of the negative control terminal electric energy meter and metering automation system
Network is connect as wirelessly or non-wirelessly public network.
In the present embodiment, plant stand terminal electric energy meter substantial amounts of the present invention, are connected with metering automation system
In power private network, data are transmitted by power private network.The negative control terminal electric energy meter substantial amounts, lead to metering automation system
Cross wired or wireless local public network connection.
Further, electric energy meter investigation and analytical equipment and electricity extremely is moved back benefit device and is integrated in one.
In the present embodiment, it should be appreciated that ground is that electric energy meter investigation and analytical equipment and electricity extremely move back and mend device and can be
It is independently arranged or both is integrated in one.
Further, some plant stand terminal electric energy meters and some negative control terminal electric energy meters respectively there is different performance to arrange extremely
Data are looked into, the electric energy meter investigation and analytical equipment extremely are provided with all plant stand terminal electric energy meters and all negative control terminal electricity
Can the different performance exception investigation of table and the field operation application software of analysis.
Further, connecting electric energy meter investigation and analytical equipment and the connection network of metering automation system extremely is
4G networks or WIFI.
In the present embodiment, the investigation and analytical equipment and metering automation system extremely of the electric energy meter in the present invention further through
4G or WLAN connection, WLAN have and are not limited to WIFI.Again because of some plant stand terminal electric energy in fortune
Table and some negative control terminal electric energy meters have different performance abnormal conditions, therefore, electric energy meter is investigated extremely from different producers
And analytical equipment be provided with all plant stand terminal electric energy meters and it is all it is negative control terminal electric energy meter different performance extremely investigation and
The field operation application software of analysis, can scene progress accurately investigation and analysis work by field operation application software.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the scope of the invention, it is every at this
Under the inventive concept of invention, the equivalent structure transformation made using description of the invention and accompanying drawing content, or directly/use indirectly
It is included in other related technical areas in the scope of patent protection of the present invention.
Claims (9)
1. the system of electronization investigation and analysis electric energy meter exception, it is characterised in that including electric energy meter, terminal, metering automation
System, electric energy meter investigation and analytical equipment, electricity extremely, which move back, mends device and its connection network, wherein:
Electric energy meter is connected by terminal with metering automation system;And
Electric energy meter investigation extremely and analytical equipment connection metering automation system and electricity move back benefit device;And
Electricity moves back benefit device and is also connected with metering automation system;
Terminal obtains the service data of electric energy meter, sends metering automation screening system to and goes out to have abnormal electric energy meter, metering
Automated system there will be exception electric energy meter data to send to electric energy meter extremely investigation and analytical equipment, electric energy meter extremely investigate
And the service data of electric energy meter of the analytical equipment to receiving carries out abnormal investigation and analysis, and it will finally investigate analysis result biography
Give electricity and move back benefit device, electricity, which moves back to mend device and move back benefit electricity accordingly according to final investigation Analysis result calculation, sends metering to
Automated system.
2. the system of electronization investigation as claimed in claim 1 and analysis electric energy meter exception, it is characterised in that the terminal bag
Plant stand terminal and negative control terminal are included, the electric energy meter includes plant stand terminal electric energy meter and negative control terminal electric energy meter.
3. the system of electronization investigation as claimed in claim 2 and analysis electric energy meter exception, it is characterised in that the factory end is whole
Number is some numbers, and the plant stand terminal electric energy meter number is some numbers.
4. the system of electronization investigation as claimed in claim 3 and analysis electric energy meter exception, it is characterised in that the plant stand is whole
End connects into principal and subordinate's LAN with some plant stand terminal electric energy meters, and metering automation system connects into principal and subordinate with some plant stand terminals
LAN, it is power private network to connect the plant stand terminal electric energy meter and the connection network of metering automation system.
5. the system of electronization investigation as claimed in claim 2 and analysis electric energy meter exception, it is characterised in that the negative control is eventually
End number is some numbers, and the negative control terminal electric energy meter number is some numbers.
6. the system of electronization investigation as claimed in claim 5 and analysis electric energy meter exception, it is characterised in that the negative control is eventually
End connects into principal and subordinate's LAN with some negative control terminal electric energy meters, and metering automation system connects into principal and subordinate with some negative control terminals
LAN, the connection network for connecting the negative control terminal electric energy meter and metering automation system is wirelessly or non-wirelessly public network.
7. the system of electronization investigation as claimed in claim 1 and analysis electric energy meter exception, it is characterised in that the electric energy meter
Abnormal investigation and analytical equipment and electricity move back benefit device and are integrated in one.
8. the system of the electronization investigation and analysis electric energy meter exception as described in claim any one of 1-7, it is characterised in that if
Dry plant stand terminal electric energy meter and some negative control terminal electric energy meters have different performance investigation data, the electric energy meter extremely different respectively
Often investigation and analytical equipment are provided with the dissimilarity suitable for all plant stand terminal electric energy meters and all negative control terminal electric energy meters
Extremely the field operation application software that can be investigated and analyze.
9. the system of electronization investigation as claimed in claim 8 and analysis electric energy meter exception, it is characterised in that connect the electricity
Energy table investigation and analytical equipment and the connection network of metering automation system extremely are 4G networks or WIFI.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710706352.2A CN107367706A (en) | 2017-08-16 | 2017-08-16 | The system of electronization investigation and analysis electric energy meter exception |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710706352.2A CN107367706A (en) | 2017-08-16 | 2017-08-16 | The system of electronization investigation and analysis electric energy meter exception |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107367706A true CN107367706A (en) | 2017-11-21 |
Family
ID=60309042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710706352.2A Pending CN107367706A (en) | 2017-08-16 | 2017-08-16 | The system of electronization investigation and analysis electric energy meter exception |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107367706A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108594162A (en) * | 2018-07-16 | 2018-09-28 | 广东电网有限责任公司 | Electric energy meter abnormality detecting apparatus and detecting system |
CN111965418A (en) * | 2020-07-22 | 2020-11-20 | 国网内蒙古东部电力有限公司赤峰供电公司 | Method and system for anomaly detection and electric quantity compensation of electric energy metering device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202018734U (en) * | 2011-04-07 | 2011-10-26 | 山东比亚科技有限公司 | On-site electricity meter parameter acquisition system |
CN103513219A (en) * | 2013-09-25 | 2014-01-15 | 国家电网公司 | Novel electric energy meter on-site moving testing instrument |
CN103955509A (en) * | 2014-04-30 | 2014-07-30 | 广西电网公司电力科学研究院 | Quick search method for massive electric power metering data |
CN104793167A (en) * | 2015-04-13 | 2015-07-22 | 广东电网有限责任公司佛山供电局 | Automatic tracking and analyzing method and automatic tracking and analyzing system for metering automation terminal |
CN105911504A (en) * | 2016-04-12 | 2016-08-31 | 中国电力科学研究院 | Field fault handling system for electric energy meter |
WO2017012513A1 (en) * | 2015-07-17 | 2017-01-26 | 广东浩迪创新科技有限公司 | Electric energy meter system based on mobile terminal communication |
CN106845748A (en) * | 2016-09-22 | 2017-06-13 | 国网上海市电力公司 | A kind of INTELLIGENT IDENTIFICATION method of low-voltage collecting meter reading system data deviation reason |
CN207457487U (en) * | 2017-08-16 | 2018-06-05 | 广东电网有限责任公司揭阳供电局 | A kind of system of electronization investigation and analysis electric energy meter exception |
-
2017
- 2017-08-16 CN CN201710706352.2A patent/CN107367706A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202018734U (en) * | 2011-04-07 | 2011-10-26 | 山东比亚科技有限公司 | On-site electricity meter parameter acquisition system |
CN103513219A (en) * | 2013-09-25 | 2014-01-15 | 国家电网公司 | Novel electric energy meter on-site moving testing instrument |
CN103955509A (en) * | 2014-04-30 | 2014-07-30 | 广西电网公司电力科学研究院 | Quick search method for massive electric power metering data |
CN104793167A (en) * | 2015-04-13 | 2015-07-22 | 广东电网有限责任公司佛山供电局 | Automatic tracking and analyzing method and automatic tracking and analyzing system for metering automation terminal |
WO2017012513A1 (en) * | 2015-07-17 | 2017-01-26 | 广东浩迪创新科技有限公司 | Electric energy meter system based on mobile terminal communication |
CN105911504A (en) * | 2016-04-12 | 2016-08-31 | 中国电力科学研究院 | Field fault handling system for electric energy meter |
CN106845748A (en) * | 2016-09-22 | 2017-06-13 | 国网上海市电力公司 | A kind of INTELLIGENT IDENTIFICATION method of low-voltage collecting meter reading system data deviation reason |
CN207457487U (en) * | 2017-08-16 | 2018-06-05 | 广东电网有限责任公司揭阳供电局 | A kind of system of electronization investigation and analysis electric energy meter exception |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108594162A (en) * | 2018-07-16 | 2018-09-28 | 广东电网有限责任公司 | Electric energy meter abnormality detecting apparatus and detecting system |
CN111965418A (en) * | 2020-07-22 | 2020-11-20 | 国网内蒙古东部电力有限公司赤峰供电公司 | Method and system for anomaly detection and electric quantity compensation of electric energy metering device |
CN111965418B (en) * | 2020-07-22 | 2023-10-13 | 国网内蒙古东部电力有限公司赤峰供电公司 | Abnormality detection and electric quantity compensation method and system for electric energy metering device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102928809B (en) | Electric energy metering device remote monitoring diagnostic system and working method thereof | |
CN103852744A (en) | Distributed online monitoring system and method for electric energy metering device | |
CN105092917B (en) | A kind of electricity anti-theft system | |
CN102435871A (en) | On-line monitoring system for data collection of electric arresters based on GPS (Global Positioning System) synchronization | |
CN108233531A (en) | A kind of packaged type low-voltage electric energy mass monitoring system and method | |
CN105160864A (en) | Operating data monitoring system and method for intelligent ammeters | |
MX2010012327A (en) | Individualized self-monitoring system for transformers in power measurement installations and method of self-monitoring and diagnosis of transformers in power measurement installations. | |
CN110907884A (en) | Electric energy meter error diagnosis and analysis method based on non-invasive measurement | |
CN107290708A (en) | A kind of abnormal Check System of electric energy meter and implementation method | |
CN107404416A (en) | A kind of visualizing monitor method of power information acquisition system | |
CN204069172U (en) | Live detection integrated system | |
CN107367706A (en) | The system of electronization investigation and analysis electric energy meter exception | |
Kilter et al. | Guidelines for Power quality monitoring-Results from CIGRE/CIRED JWG C4. 112 | |
CN207457487U (en) | A kind of system of electronization investigation and analysis electric energy meter exception | |
CN204374731U (en) | Based on high voltage electric equipment information acquisition and the evaluation system of EMS-API | |
CN203164360U (en) | Transformer device insulation online monitoring system | |
CN104614699A (en) | Higher-efficiency remote monitoring and diagnosis method of electric energy metering device | |
CN108375933A (en) | A kind of 10kV substation equipment maintenance and repairs management system monitored in real time | |
CN209486285U (en) | The online remote verification Intelligent calibration system of electric energy metering device based on data sharing | |
CN103545805A (en) | Modeling-based railway power supply arm monitoring method | |
CN105116190A (en) | Novel high-voltage user electricity stealing preventing system | |
CN109557500A (en) | The online remote verification Intelligent calibration system of electric energy metering device based on data sharing | |
CN209373090U (en) | The on-line monitoring system of voltage transformer secondary voltage drop | |
Sharmila et al. | A smart distribution automation using supervisory control and data acquisition with advanced metering infrastructure and GPRS technology | |
CN207882332U (en) | system for detecting transformer iron core grounding current |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |