CN103545805A CN201310420977.4A CN201310420977A CN103545805A CN 103545805 A CN103545805 A CN 103545805A CN 201310420977 A CN201310420977 A CN 201310420977A CN 103545805 A CN103545805 A CN 103545805A
Authority
CN
China
Prior art keywords
supply arm
fault
power supply
model
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310420977.4A
Other languages
Chinese (zh)
Other versions
CN103545805B (en
Inventor
朱建
赵耀
李华
武雪利
徐海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
Beijing Sifang Engineering Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN201310420977.4A priority Critical patent/CN103545805B/en
Publication of CN103545805A publication Critical patent/CN103545805A/en
Application granted granted Critical
Publication of CN103545805B publication Critical patent/CN103545805B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power supply arm modeling monitoring method applied in the field of railway power supply dispatching systems. According to the method, a power supply arm expanding model according to a common information model (CIM) standard based on an international standard IEC 61970 is established, separated railway supply network distribution substations and belonged devices are combined to a whole according to power supply arm connecting relationship, and information sharing and uniform processing of each substation relevant to the power supply arm can be realized; according to linear organizational model and typical wiring manner among substations of a railway power supply system, automatic imaging and model establishing are realized; the power supply arm serves as a unit for monitoring and controlling, power supply condition of the power supply arm can be reflected more directly, and operating mode switching of the power supply arm can be realized; on the basis of the power supply model, a failure processing system is established, the range of failure positioning and analyzing is narrowed inside one power supply arm, complexity of failure process is reduced, failures can be positioned more rapidly and accurately, and failure isolation and restoration can be realized.

Description

A kind of based on modeled railway power supply arm method for supervising
Technical field
The invention belongs to power system automation technology field, relate to supply arm modelling method for supervising in railway power supply automated system.
Background technology
Along with railway power system automation development, the electric power dispatching system at railway dispatching center is collected running status and the measured value of equipment in railway power supply net by being arranged on the remote transmission terminal unit (RTU) of plant stand, make management and running personnel can follow the tracks of in time, adjust operation states of electric power system.
Supply arm has defined the supply district in railway power system, and the running status of holding on the whole supply arm is the basis of realizing Fault Isolation and fault recovery.Along with greatly developing of high-speed railway, supply arm, as administrative unit in a railway power system, has obtained more attention.
In the power supply of rail traction at present SCADA system, conventionally by drawing supply arm diagram form, supply arm is carried out to monitoring and controlling, but supply arm is not carried out to special modeling, in dispatcher's course of work, cannot intuitively obtain the running status summary information of supply arm, the direct control to switching to supply arm supplier of electricity, can only not realize supplier of electricity to handoff functionality by operating successively related switch; The troubleshooting technology of rail traction power supply mainly contains two kinds of thinkings, a kind of is troubleshooting technology based on terminating layer, by exploitation new terminal watch-dog or the function of expanding existing terminal monitoring equipment, complete troubleshooting, the method requires can carry out information sharing between terminal equipment, will increase complexity and the communication channel construction cost of terminal monitoring equipment; Another kind of for relying on railway power supply dispatching patcher to complete troubleshooting technology, dispatching patcher has gathered the information of whole power supply network, only need to develop corresponding software module just can realize troubleshooting function, cost is less, but because dispatching patcher compass of competency is very large, power supply network is complicated, and troubleshooting difficulty is very large.
Summary of the invention
For solving the above-mentioned problems in the prior art, the present invention proposes a kind of supply arm modelling method for supervising, by setting up the supply arm model of common information model (CIM) standard based on IEC61970 international standard, provide a kind of integration and shared mechanism to the power supply unit operation information in set supply district.
The present invention realizes information sharing and the unified management of be mutually related in railway power supply net distribution substation and box-type substation.From supply arm aspect, go to monitor on the one hand the running status of rail traction power supply network, to scheduling, provide effectively operation information more directly perceived; Scope based on its comprehensive data message and supply arm delimited on the other hand, can reduce the complexity of fault location, build more Fault Isolation and the fault recovery scheme of science, realize intelligent dispatch.
The present invention specifically by the following technical solutions.
A modeled railway power supply arm method for supervising, is characterized in that, said method comprising the steps of:
(1) the supply arm model of the common information model standard of definition based on IEC 61970 international standards
Follow IEC 61970 international standards, the supply district of supply arm, annexation and operational mode etc. are defined; The outlet switch at railway power supply arm two ends, the block switch of railway power supply arm that supply arm model comprises are described, the annexation between the connection wire between standing; Set up the power distribution station at described supply arm and two ends and the box type transformation in supply district thereof incidence relation, and describe described power distribution station and described box type transformation layout order; Type to supply arm defines, and comprises the self-closing power supply arm of railway power system and connects supply arm; Define the operational mode of described supply arm, comprise " prepared auto restart-coincidence ", " single prepared auto restart ", " substance closes " and " coincidence-prepared auto restart pattern "; The correlation that defines this supply arm and other supply arm, comprises active/standby relation, neighbouring relations;
(2) draw supply arm figure, and set up supply arm model
First, draw railway power system primary connection figure, and set up described railway power system block mold;
Secondly, generate the box type transformation institute's main electrical scheme in supply arm two ends power distribution station and described supply district and set up described power distribution station and described box type transformation model;
Finally, completing on the basis of described power distribution station and the winding diagram drafting of box type transformation institute, automatically draw supply arm figure, and set up supply arm model;
(3), based on supply arm model, realize the fault self-recovery of railway power system.
In step (3), the fault self-recovery based on supply arm model realization railway power system comprises following flow process:
The first step: the fault analysis and handling subsystem of railway power supply dispatching patcher loads supply arm information when described dispatching patcher starts, and in running Real-Time Monitoring supply arm fault a situation arises;
Second step: location fault is to concrete supply arm, and collect supply arm running status change sequence, when fault analysis and handling subsystem monitors fault generation information, according to the described electric model that supplies, fault incidence is navigated to a supply arm, described iron wire power supply dispatching system is recorded the change procedure of each collection capacity of this supply arm, forms fault data, for fault detect;
The 3rd step: by analysis of failure data, be confirmed whether to break down, if there is fault to occur, enter the 4th step, continue monitoring supply arm fault generation information otherwise return to the first step;
The 4th step: confirm fault type and whether be transient fault;
The 5th step: according to different fault types and whether be that transient fault generates corresponding fault isolation schemes;
The 6th step: carry out Fault Isolation and the operation that restores electricity according to described fault isolation schemes.
The present invention has following technique effect:
(a) can monitor more intuitively the running status of supply arm.When the supply arm model not having based on IEC61970 national standard, the incidence relation between measured point and equipment, supply arm does not have clear and definite definition, know the running status of supply arm, can only obtain by manually gathering the state of measurement of correlation point; After having had supply arm model object, the railway power system monitoring software of having realized supply arm model can gather its measurement of correlation dotted state by automatic analysis, forms the running status of supply arm and exports to user.
(b) reduce the complexity of electric power system troubleshooting, strengthen the accuracy of troubleshooting.There iing supply arm model, when certain point of railway power system breaks down, can easily the scope of accident analysis narrowed down on a supply arm object, and reduce the scope of information, the complexity of troubleshooting; Supply arm model object to the operational mode of supply arm, supplier of electricity to etc. attribute carried out instantiation (be clear and definite protection enable logic and the fault propagation direction of relevant protection equipment when breaking down); system can more promptly be collected the required effective information of fault locating analysis, strengthens the accuracy of troubleshooting.
Accompanying drawing explanation
Fig. 1 is railway power system figure;
Fig. 2 is railway power supply arm (FeedingSection) extended model;
Fig. 3 is the class figure of railway power supply arm.Base attribute to railway power supply arm is described;
Fig. 4 is the fault message process chart based on railway power supply arm extended model;
Fig. 5 is that the application is based on modeled rail traction supply arm method for supervising flow chart.
Embodiment
Below in conjunction with Figure of description, technical scheme of the present invention is described in further details.
The simple railway power system Tu Rutu1, A of distribution substation, the E that comprise a self-closing power supply arm and a perforation supply arm introduce respectively 1 or No. 2 external power sources, give box-type substation power supply along the line.Between the corresponding outlet switch of the A of distribution substation, E, form two supply arms of self-closing perforation.
The application discloses that a kind of the flow process of the method is as said in Fig. 5 based on modeled rail traction supply arm method for supervising, comprises that modeling, instantiation model (Automatic Drawing and modeling) and supply arm monitor and the step such as troubleshooting.Specifically comprise the following steps:
1, set up the supply arm model of common information model (CIM) standard based on IEC61970 international standard:
With regard to railway power system, supply arm Wei Yige distribution substation in normal power supply situation, the self-closing supply district with connecting power segment; Between supply arm and supply arm, have linear array relation, the link that supply arm object comprises adjacent supply arm, can realize its information sharing and collaboration.
In supply arm model, (CFeedingSection) associated class relation, as Fig. 1, has been described the relation of equipment, plant stand and supply arm in railway power system.In figure, electric power resource class, equipment class, end points class, equipment container class and plant stand class are the content of IEC61970 international standard common information model (CIM), supply arm class is extension class, belong to a kind of electric power container class, inherit in electric power resource class (PowerSystemResource), railway equipment class (Equipment_rems) is inherited in equipment class.
The supply arm model of the common information model of definition based on IEC61970 international standard comprises following content: follow IEC61970 international standard, the supply district of supply arm, annexation and operational mode etc. are defined; The outlet switch at railway power supply arm two ends, the block switch of railway power supply arm that supply arm model comprises are described, the annexation between the connection wire between standing; Set up the power distribution station at described supply arm and two ends and the box type transformation in supply district thereof incidence relation, and describe described power distribution station and described box type transformation layout order; Type to supply arm defines, and comprises up arm and the descending arm of trailer system, the self-closing power supply arm of electric power system and the perforation supply arm of electric power system; Define the operational mode of described supply arm, comprise " prepared auto restart-coincidence ", " single prepared auto restart ", " substance closes " and " coincidence-prepared auto restart pattern "; The correlation that defines this supply arm and other supply arm, comprises active/standby relation, neighbouring relations;
The class formation of supply arm is as Fig. 2, and its feature is as follows:
(a) this supply arm model is followed IEC61970 international standard, inherits in electric power resource class model (PowerSystemResource), and supply arm model defines the supply district of supply arm, annexation and operational mode etc.
(b) this supply arm model is a kind of electric power container model, it has comprised the outlet switch at railway power supply arm two ends, the block switch of railway power supply arm, the connection wire between standing, and described these switches, connect the annexation of wire;
(c) this supply arm model set up the power distribution station at railway power supply arm and two ends and the box type transformation in supply district thereof incidence relation, and described these stations layout order;
(d) this supply arm model defines the type of railway power supply arm, comprise railway power system self-closing/connect supply arm;
(e) this supply arm model definition operational mode and prepared auto restart switching time of railway power supply arm, mainly comprise " prepared auto restart-coincidence ", " single prepared auto restart ", " substance closes " and " coincidence-prepared auto restart pattern ";
(f) this supply arm model definition the correlation of this supply arm and other supply arms, comprise active/standby relation, neighbouring relations.
Railway equipment class (Equipment_rems) increases kilometer post attribute definition (Kilometer) on the basis of IEC61970 international standard equipment class (Equipment), with description equipment accurate location along the railway.
C++ is achieved as follows:
Figure BDA0000382423280000052
2, draw supply arm figure, and set up supply arm model:
It is a link of railway power supply dispatching patcher automatic mapping and modeling that supply arm graphic plotting and model are set up, and railway power supply dispatching patcher automatic mapping and modeling are the processes of instantiation of railway power system being carried out according to reality.The model of railway distribution substation and box-type substation and the mode of connection are very typical, and the institute's downline direct of travel of standing sequentially distributes, and is beneficial to automatic mapping and modeling.This patent adopts the workflow graph that is modeled as of first whole rear part, automatically builds power model:
First, draw railway power supply dispatching patcher one-level figure, and set up railway power system block mold.One-level figure is the distribution substation of railway power system institute compass of competency and the schematic diagram of box-type substation, each distribution substation on figure and box-type substation pel are corresponding one by one with distribution substation and box-type substation in railway power system, and described distribution substation and box-type substation are linear precedence according to set oriented railway and arrange.This step is set up railway power system block mold, and according to described distribution substation and the box-type substation drawing system one-level figure that puts in order.
Secondly, generate each railway substation and box-type substation main electrical scheme and set up the model of described power distribution station and box-type substation.In railway power supply dispatching patcher design process, according to the typicalness of railway power system distribution substation and box-type substation model (between distribution substation, main difference between box-type substation is the quantity of electric power incoming line and outlet and the difference of a partiting template), exploitation Automatic Drawing modeling function, and the typical wiring mode extracting from a large amount of railway power system distribution substations and box-type substation, form and carry corresponding interval ATL.Use described Automatic Drawing modeling function, electric power incoming line and number of outgoing are set, partiting template between selection correspondence, the main wiring diagram that can complete described power distribution station and box-type substation is drawn and modeling work.
Finally, on the basis of drawing at the winding diagram that completes described power distribution station and box-type substation, automatically draw supply arm figure, and set up supply arm model.Supply arm figure shows the capital equipment state of the supply district of supply arm, the order of connection of related plant stand (distribution substation and box-type substation) and the visual plants such as high-voltage switch gear of electric power system.Between plant stand, pass through connection, by the plant stand object-order recording in the above-mentioned first step, and circuit two ends end points connection attribute, find supply arm corresponding device object, carrying out supply arm figure draws automatically, while carries out these device objects and supply arm container object associated, and by guiding input frame, improves the attribute configuration of supply arm object.
3, the system failure based on supply arm model is processed:
The fault occurring on railway power supply arm, its coverage is this supply arm, after fault occurs, can according to the fault message of collecting fault location to supply arm, thereby the scope of having dwindled troubleshooting reduces the required Data Collection amount of accident analysis.Its flow process is as Fig. 4: the first step: initialization.Fault analysis and handling software program based on supply arm model loads supply arm model when initialization, and the running status of Real-Time Monitoring railway power system.
Second step: location fault arrives supply arm, and collects supply arm running status change sequence.When the fault analysis and handling software program based on supply arm model monitors occur in railway power system abnormal, according to power model, the abnormal position occurring is navigated to a supply arm.At wall, generally can on supply arm, install reclosing or standby automatic function device; after abnormal generation, reclosing or prepared auto restart protection can start, and system is recorded the change procedure of each collection capacity of supply arm; form complete fault data, for fault detect.
The 3rd step: fault validity judgement.By analysis of failure data, be confirmed whether to break down, if there is fault to occur, enter fault detect flow process, otherwise wait for fault message.
The 4th step: fault detect.Railway power supply fault mainly comprises phase fault and single-phase earthing.Whether analysis of failure data, confirm fault type and be transient fault.
The 5th step: form fault isolation schemes.If previous step failure judgement is permanent fault, form Fault Isolation recovery scheme, and trigger method implementation.
The 6th step: scheme is carried out.According to scheme, carry out Fault Isolation and the operation that restores electricity.This step can have dispatcher manually carry out or automatically perform.
The present patent application people has done detailed explanation and description in conjunction with Figure of description to embodiments of the invention; but those skilled in the art should understand that; above embodiment is only the preferred embodiments of the invention; detailed explanation is just in order to help reader to understand better spirit of the present invention; and be not limiting the scope of the invention; on the contrary, within any any improvement of doing based on invention spirit of the present invention or modification all should drop on protection scope of the present invention.

Claims (2)

1. based on a modeled railway power supply arm method for supervising, it is characterized in that, said method comprising the steps of:
(1) the supply arm model of the common information model standard of definition based on IEC 61970 international standards
Follow IEC61970 international standard, the supply district of supply arm, annexation and operational mode etc. are defined; The outlet switch at railway power supply arm two ends, the block switch of railway power supply arm that supply arm model comprises are described, the annexation between the connection wire between standing; Set up the power distribution station at described supply arm and two ends and the box type transformation in supply district thereof incidence relation, and describe described power distribution station and described box type transformation layout order; Type to supply arm defines, and comprises the self-closing power supply arm of railway power system and connects supply arm; Define the operational mode of described supply arm, comprise " prepared auto restart-coincidence ", " single prepared auto restart ", " substance closes " and " coincidence-prepared auto restart pattern "; The correlation that defines this supply arm and other supply arm, comprises active/standby relation, neighbouring relations;
(2) draw supply arm figure, and set up supply arm model
First, draw railway power system primary connection figure, and set up described railway power system block mold;
Secondly, generate the box type transformation institute's main electrical scheme in supply arm two ends power distribution station and described supply district and set up described power distribution station and described box type transformation model;
Finally, completing on the basis of described power distribution station and the winding diagram drafting of box type transformation institute, automatically draw supply arm figure, and set up supply arm model;
(3), based on supply arm model, realize the fault self-recovery of railway power system.
2. according to claim 1 based on modeled railway power supply arm method for supervising, it is characterized in that:
In step (3), the fault self-recovery based on supply arm model realization railway power system comprises following flow process:
The first step: the fault analysis and handling subsystem of railway power supply dispatching patcher loads supply arm information when described dispatching patcher starts, and in running Real-Time Monitoring supply arm fault a situation arises;
Second step: location fault is to concrete supply arm, and collect supply arm running status change sequence, when fault analysis and handling subsystem monitors fault generation information, according to the described electric model that supplies, fault incidence is navigated to a supply arm, described iron wire power supply dispatching system is recorded the change procedure of each collection capacity of this supply arm, forms fault data, for fault detect;
The 3rd step: by analysis of failure data, be confirmed whether to break down, if there is fault to occur, enter the 4th step, continue monitoring supply arm fault generation information otherwise return to the first step;
The 4th step: confirm fault type and whether be transient fault;
The 5th step: according to different fault types and whether be that transient fault generates corresponding fault isolation schemes;
The 6th step: carry out Fault Isolation and the operation that restores electricity according to described fault isolation schemes.
CN201310420977.4A 2013-09-16 2013-09-16 Modeling-based railway power supply arm monitoring method Active CN103545805B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310420977.4A CN103545805B (en) 2013-09-16 2013-09-16 Modeling-based railway power supply arm monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310420977.4A CN103545805B (en) 2013-09-16 2013-09-16 Modeling-based railway power supply arm monitoring method

Publications (2)

Publication Number Publication Date
CN103545805A true CN103545805A (en) 2014-01-29
CN103545805B CN103545805B (en) 2015-04-22

Family

ID=49968997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310420977.4A Active CN103545805B (en) 2013-09-16 2013-09-16 Modeling-based railway power supply arm monitoring method

Country Status (1)

Country Link
CN (1) CN103545805B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107290996A (en) * 2016-04-05 2017-10-24 天津市英实科技发展有限公司 Removable railway power supervising device
CN109492333A (en) * 2018-12-11 2019-03-19 积成电子股份有限公司 A kind of artwork matching process of power grid discrete model and the mode of connection
CN111562774A (en) * 2020-07-14 2020-08-21 宝信软件(成都)有限公司 Distributed parallel control method and system for subway network electric power SCADA
CN111697569A (en) * 2020-05-22 2020-09-22 国网山东省电力公司德州供电公司 Comprehensive analysis system and method for fault self-healing capability of distribution line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101004752A (en) * 2006-12-26 2007-07-25 国电南瑞科技股份有限公司 Method of jointing multiple regional net models of electric power system
US20070185591A1 (en) * 2004-08-16 2007-08-09 Abb Research Ltd Method and system for bi-directional data conversion between IEC 61970 and IEC 61850
CN102880792A (en) * 2012-08-31 2013-01-16 浙江省电力公司 Dynamic modeling method of conventional substation based on IEC standard
CN102929911A (en) * 2012-09-10 2013-02-13 福建省电力有限公司 All-in-one modeling method for transformer substation and dispatching master station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070185591A1 (en) * 2004-08-16 2007-08-09 Abb Research Ltd Method and system for bi-directional data conversion between IEC 61970 and IEC 61850
CN101004752A (en) * 2006-12-26 2007-07-25 国电南瑞科技股份有限公司 Method of jointing multiple regional net models of electric power system
CN102880792A (en) * 2012-08-31 2013-01-16 浙江省电力公司 Dynamic modeling method of conventional substation based on IEC standard
CN102929911A (en) * 2012-09-10 2013-02-13 福建省电力有限公司 All-in-one modeling method for transformer substation and dispatching master station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚勤隆等: "数字式自闭贯通线路保护测控装置的设计", 《铁道机车车辆》 *
熊列彬: "全并联AT供电方式下供电臂保护控制方案", 《电力系统自动化》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107290996A (en) * 2016-04-05 2017-10-24 天津市英实科技发展有限公司 Removable railway power supervising device
CN109492333A (en) * 2018-12-11 2019-03-19 积成电子股份有限公司 A kind of artwork matching process of power grid discrete model and the mode of connection
CN109492333B (en) * 2018-12-11 2023-03-07 积成电子股份有限公司 Graph-model matching method for power grid discrete model and wiring mode
CN111697569A (en) * 2020-05-22 2020-09-22 国网山东省电力公司德州供电公司 Comprehensive analysis system and method for fault self-healing capability of distribution line
CN111697569B (en) * 2020-05-22 2022-05-03 国网山东省电力公司德州供电公司 Comprehensive analysis system and method for fault self-healing capability of distribution line
CN111562774A (en) * 2020-07-14 2020-08-21 宝信软件(成都)有限公司 Distributed parallel control method and system for subway network electric power SCADA

Also Published As

Publication number Publication date
CN103545805B (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN102496072B (en) System for estimating distributive state of intelligent transformer station
CN104239059B (en) Intelligence based on full model matches somebody with somebody the construction method of electricity consumption unified information support platform
CN103441572B (en) Substation equipment method for supervising
CN112765258B (en) Power distribution network graph model checking management system and method thereof
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN105680568A (en) Automatic mapping monitoring system and method of intelligent substation secondary virtual loop
CN103023149A (en) Intelligent power distribution terminal and intelligent power distribution system based on IEC61850
CN103414251A (en) Substation network communication simulation system based on IEC 61850
CN103675600A (en) A power distribution network fault diagnosis system based on topology knowledge and a method
CN103715767A (en) Smart power grid information integration and display platform
CN105573283B (en) The foundation in substation equipment function association storehouse and the filter method of event correlation information group
CN104184207A (en) Integrated control method of digitalized traction substation of electrified railway
CN107958019A (en) Graphical application process based on Regulation system
CN104104151A (en) Access method of power distribution terminal equipment information
CN103545805B (en) Modeling-based railway power supply arm monitoring method
Xin et al. A smarter grid operation: New energy management systems in China
CN102983627B (en) Transition method of intellectualized monitoring system modification process of conventional transformer substation
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN108494095B (en) Bus power supply range based automatic identification and display method
CN104537571B (en) A kind of information in power dispatching center graphical representation method based on GIS
CN207117310U (en) A kind of intelligent traction substation framework
CN101651361A (en) Integrated automation system of substation
CN103326472A (en) Information sharing and interoperating method for intelligent electrical devices of intelligent substation operation cockpit
CN103647279B (en) A kind of forecast failure set creation method based on plant stand wiring information
CN102832708A (en) Intelligent transformer substation based on integrated multi-stage server framework

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190320

Address after: 100085 9, four street, Shang Di information industry base, Haidian District, Beijing.

Co-patentee after: Beijing Sifang Jibao Engineering Technology Co., Ltd.

Patentee after: Beijing Sifang Jibao Automation Co., Ltd.

Address before: 100085 9, four street, Shang Di information industry base, Haidian District, Beijing.

Patentee before: Beijing Sifang Jibao Automation Co., Ltd.

TR01 Transfer of patent right