CN107301507A - A kind of accurate three-dimensional training exercise method of power system - Google Patents
A kind of accurate three-dimensional training exercise method of power system Download PDFInfo
- Publication number
- CN107301507A CN107301507A CN201710462671.3A CN201710462671A CN107301507A CN 107301507 A CN107301507 A CN 107301507A CN 201710462671 A CN201710462671 A CN 201710462671A CN 107301507 A CN107301507 A CN 107301507A
- Authority
- CN
- China
- Prior art keywords
- power system
- accurate
- dimensional
- size
- exercise method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/20—Education
- G06Q50/205—Education administration or guidance
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Educational Technology (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Electrically Operated Instructional Devices (AREA)
Abstract
The present invention relates to a kind of accurate three-dimensional training exercise method of power system, the equipment of electric field and size, direction and the positional information of component are gathered first;The information collected is recompilated, data interaction and fusion is formed, threedimensional model is produced;Then threedimensional model is subjected to modularization fractionation, obtains size, direction and the position of different parts;According to training needs, each component logic decision instruction is assigned, and then simulate influence of size, direction and the position change of different parts to the electric field;Obtained result is finally generated into encryption information, dedicated platform server is uploaded to.The present invention highly reduces power plant scene using three-dimensional data, realizes the interaction with trainee, and rehearsal is combated a natural disaster in progress.
Description
Technical field
Field, the accurate three-dimensional training exercise side of particularly a kind of power system are examined the present invention relates to Power system tranining
Method.
Background technology
Electric power is an excessive risk industry.As long as there is accident, then be exactly major break down.The employee that newly recruits, it is necessary to by
The training of some time on duty can be operated, and the process of training was both cumbersome, and uninteresting.One new person generally requires to spend an expense
In master worker's many man-hours, it can complete to train and examine, waste time and energy.Secondly, many power stations are all relatively more long in the time of foundation
Far, the concept standardized then is not born also, even if there is CAD diagram paper, unit in charge of construction may not necessarily also construct according to drawing.Have
When the old and new equipment substitute after, real data(Length, weight, maintenance dates, parameter etc.)It will change.If
Using the method for artificial three-dimensional modeling, it is difficult to ensure that the accuracy of data.Using inexact data training, risk can be higher.Again
Secondary, the field apparatus asset management inside existing electric power is all form, or type of database, if uninteresting database can be turned
Three-dimensional three-dimensional data is melted into, just greatly improves the efficiency of training.Finally, power station more than half all by it is annual it is indefinite because
The invasion of the natural calamity of element, if all carry out it is actual combat a natural disaster rehearsal, human cost and time cost do not allow.
If a kind of program can be write, quickly by the actual conditions at power station scene, 3-dimensional digital is changed into high precision
Form, and can accomplish to stay indoors on this platform, just carry out effective employee's post training, power station
Assets protection is managed, and is combated a natural disaster escape rehearsal etc., it is possible to substantially reduce the risk of power industry training, is improved operating efficiency.
The content of the invention
In view of this, the purpose of the present invention is to propose to a kind of accurate three-dimensional training exercise method of power system, three-dimensional is utilized
Data highly reduce power plant scene, realize the interaction with trainee.
The present invention is realized using following scheme:A kind of accurate three-dimensional training exercise method of power system, comprises the following steps:
Step S1:Gather the equipment of electric field and size, direction and the positional information of component;
Step S2:The step S1 information collected is recompilated, data interaction and fusion is formed, threedimensional model is produced;
Step S3:The threedimensional model that step S2 is obtained carries out modularization fractionation, obtains size, direction and the position of different parts
Put;
Step S4:According to training needs, each component logic decision instruction is assigned, and then simulate the size of different parts, court
To the influence changed with position to the electric field;
Step S5:The result that step S4 is obtained generates encryption information, is uploaded to dedicated platform server.
Further, the collecting device used in step S1 is 3 D laser scanning equipment.
Further, the step S4 also includes:With reference to surrounding geographical environment and state, the three-dimensional mould of the part is utilized
Type, the influence of simulation outside natural calamity and built-in function process to the part and the electric field, exports emergency preplan.
Further, in addition to step S6:Trainee wears particular sensor, using VR technologies, in virtual environment
The switch of three-dimensional data type form is touched, power system operation, the separation of such as disconnecting link and closed procedure is carried out.
Further, step S2 also includes:Personnel directly enter the information of equipment in the three-dimensional model, and described information includes
Producer, size, the time of weight and maintenance and repair.
Compared with prior art, the present invention has following beneficial effect:Three-dimensional data of the present invention highly reduces power plant scene, and
And picking rate is fast, the measurement task of one month is needed in the past, and Laser Scanning Equipment of the invention is only needed to 1-2 days.The present invention
The interaction with trainee can be realized, such as start-up only needs to put on some sensors, just truly touches three dimensions
According to the switch of type, power system operation, the separation of such as disconnecting link and closed procedure are carried out, it is very subjective lively.Simultaneously at this
In invention, personnel can be roamed in three-dimensional data, directly enter all information of equipment, and such as producer, size, weight is safeguarded
Time of repairing etc., compared to uninteresting form, very intuitively.The emergent premonition of the present invention can be simulated, severe snow, heavy rain, mountain torrents,
Situations such as earthquake, equipment dismounting etc., the success rate of increase confrontation natural risk.
Brief description of the drawings
Fig. 1 is the inventive method schematic flow sheet.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the present invention will be further described.
As shown in figure 1, present embodiments providing a kind of power system precisely three-dimensional training exercise method, including following step
Suddenly:
Step S1:Gather the equipment of electric field and size, direction and the positional information of component;
Step S2:The step S1 information collected is recompilated, data interaction and fusion is formed, threedimensional model is produced;
Step S3:The threedimensional model that step S2 is obtained carries out modularization fractionation, obtains size, direction and the position of different parts
Put;
Step S4:According to training needs, each component logic decision instruction is assigned, and then simulate the size of different parts, court
To the influence changed with position to the electric field;
Step S5:The result that step S4 is obtained generates encryption information, is uploaded to dedicated platform server.
In the present embodiment, the collecting device used in step S1 is 3 D laser scanning equipment.
In the present embodiment, the step S4 also includes:With reference to surrounding geographical environment and state, the three of the part are utilized
Dimension module, the influence of simulation outside natural calamity and built-in function process to the part and the electric field, output is emergent
Prediction scheme.
In the present embodiment, in addition to step S6:Trainee wears particular sensor, using VR technologies, in virtual ring
The switch of three-dimensional data type form is touched in border, power system operation, the separation of such as disconnecting link and closed procedure is carried out.
In the present embodiment, step S2 also includes:Personnel directly enter the information of equipment, described information in the three-dimensional model
Include the time of producer, size, weight and maintenance and repair.
The present embodiment three-dimensional data highly reduces power plant scene, and picking rate is fast, and the measurement of one month is needed in the past
Task, Laser Scanning Equipment of the invention is only needed to 1-2 days.The present embodiment can realize the interaction with trainee, such as train
Instruction personnel only need to put on some sensors, just truly touch the switch of three-dimensional data type, carry out power system operation, such as
The separation of disconnecting link and closed procedure etc., it is very subjective lively.In the present embodiment, personnel can roam in three-dimensional data simultaneously
In, directly enter all information of equipment, such as producer, size, weight, the time of maintenance and repair etc., compared to uninteresting form,
It is very directly perceived.The emergent premonition of the present embodiment can be simulated, severe snow, heavy rain, mountain torrents, earthquake, equipment dismounting etc. situations such as, increase pair
The success rate of anti-natural risk.
The foregoing is only presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with
Modification, should all belong to the covering scope of the present invention.
Claims (5)
1. a kind of accurate three-dimensional training exercise method of power system, it is characterised in that:Comprise the following steps:
Step S1:Gather the equipment of electric field and size, direction and the positional information of component;
Step S2:The step S1 information collected is recompilated, data interaction and fusion is formed, threedimensional model is produced;
Step S3:The threedimensional model that step S2 is obtained carries out modularization fractionation, obtains size, direction and the position of different parts
Put;
Step S4:According to training needs, each component logic decision instruction is assigned, and then simulate the size of different parts, court
To the influence changed with position to the electric field;
Step S5:The result that step S4 is obtained generates encryption information, is uploaded to dedicated platform server.
2. a kind of accurate three-dimensional training exercise method of power system according to claim 1, it is characterised in that:In step S1
The collecting device used is 3 D laser scanning equipment.
3. a kind of accurate three-dimensional training exercise method of power system according to claim 1, it is characterised in that:The step
S4 also includes:With reference to surrounding geographical environment and state, using the threedimensional model of the part, the outside natural calamity of simulation and inside
Influence of the operating process to the part and the electric field, exports emergency preplan.
4. a kind of accurate three-dimensional training exercise method of power system according to claim 1, it is characterised in that:Also include step
Rapid S6:Trainee wears particular sensor, and using VR technologies, opening for three-dimensional data type form is touched in virtual environment
Close, carry out power system operation;The power system operation includes separation and the closed procedure of disconnecting link.
5. a kind of accurate three-dimensional training exercise method of power system according to claim 1, it is characterised in that:Step S2 is also
Including:Personnel directly enter the information of equipment in the three-dimensional model, and described information includes producer, size, weight and maintenance and repaiied
The time of reason.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710462671.3A CN107301507A (en) | 2017-06-19 | 2017-06-19 | A kind of accurate three-dimensional training exercise method of power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710462671.3A CN107301507A (en) | 2017-06-19 | 2017-06-19 | A kind of accurate three-dimensional training exercise method of power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107301507A true CN107301507A (en) | 2017-10-27 |
Family
ID=60136425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710462671.3A Pending CN107301507A (en) | 2017-06-19 | 2017-06-19 | A kind of accurate three-dimensional training exercise method of power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107301507A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108801141A (en) * | 2018-07-19 | 2018-11-13 | 国网上海市电力公司 | Ultra-high-voltage isolation switch intelligent regulator calibration system based on laser measuring technique |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101799999A (en) * | 2010-04-06 | 2010-08-11 | 中国石油化工股份有限公司 | Accident emergency drilling system and method |
CN102722106A (en) * | 2011-03-29 | 2012-10-10 | 上海晟昊信息科技有限公司 | Immersive virtual reality emulation interaction display method and display system |
CN102819861A (en) * | 2012-07-25 | 2012-12-12 | 广州供电局有限公司 | Power system three-dimensional device scene modeling method |
CN104091476A (en) * | 2014-07-25 | 2014-10-08 | 中国石油化工股份有限公司 | Real-time immersion training method |
CN104318483A (en) * | 2014-09-22 | 2015-01-28 | 国家电网公司 | Virtual electric power urgent repair plan training system |
CN105956232A (en) * | 2016-04-20 | 2016-09-21 | 国网电力科学研究院武汉南瑞有限责任公司 | Transformer station three-dimensional real scene simulation system and implementation method |
CN106327942A (en) * | 2016-10-21 | 2017-01-11 | 上海申电教育培训有限公司 | Distributed electric power training system based on virtual reality |
CN106775746A (en) * | 2016-12-28 | 2017-05-31 | 国家电网公司 | A kind of intelligent substation three-dimensional artificial training soft ware system and its platform building method |
CN106780116A (en) * | 2016-12-01 | 2017-05-31 | 全球能源互联网研究院 | The construction method of power emergency drilling method, device and its scenario models, device |
-
2017
- 2017-06-19 CN CN201710462671.3A patent/CN107301507A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101799999A (en) * | 2010-04-06 | 2010-08-11 | 中国石油化工股份有限公司 | Accident emergency drilling system and method |
CN102722106A (en) * | 2011-03-29 | 2012-10-10 | 上海晟昊信息科技有限公司 | Immersive virtual reality emulation interaction display method and display system |
CN102819861A (en) * | 2012-07-25 | 2012-12-12 | 广州供电局有限公司 | Power system three-dimensional device scene modeling method |
CN104091476A (en) * | 2014-07-25 | 2014-10-08 | 中国石油化工股份有限公司 | Real-time immersion training method |
CN104318483A (en) * | 2014-09-22 | 2015-01-28 | 国家电网公司 | Virtual electric power urgent repair plan training system |
CN105956232A (en) * | 2016-04-20 | 2016-09-21 | 国网电力科学研究院武汉南瑞有限责任公司 | Transformer station three-dimensional real scene simulation system and implementation method |
CN106327942A (en) * | 2016-10-21 | 2017-01-11 | 上海申电教育培训有限公司 | Distributed electric power training system based on virtual reality |
CN106780116A (en) * | 2016-12-01 | 2017-05-31 | 全球能源互联网研究院 | The construction method of power emergency drilling method, device and its scenario models, device |
CN106775746A (en) * | 2016-12-28 | 2017-05-31 | 国家电网公司 | A kind of intelligent substation three-dimensional artificial training soft ware system and its platform building method |
Non-Patent Citations (2)
Title |
---|
GANG CHEN: "Networking Based 3D Training Simulation System for Communication Equipment", 《INTERNATIONAL CONFERENCE ON ADVANCED MANAGEMENT SCIENCE》 * |
杨西银 等: "三维仿真技术在电力安全应急演练的运用", 《电力安全技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108801141A (en) * | 2018-07-19 | 2018-11-13 | 国网上海市电力公司 | Ultra-high-voltage isolation switch intelligent regulator calibration system based on laser measuring technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103400018B (en) | The system and method for a kind of flight program check and checking | |
CN103984333B (en) | A kind of power plant monitoring and control management system | |
CN207424869U (en) | A kind of bridge construction management system | |
CN103941745B (en) | For without the mobile substation of man-machine polling transmission line and method of work | |
CN108022039B (en) | Transformer substation simulation training system based on augmented reality | |
CN107818198A (en) | A kind of science of bridge building management platform based on BIM technology | |
CN106371456A (en) | Unmanned plane patrol method and system | |
CN105139292B (en) | Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method | |
CN107678306A (en) | Dynamic scene information is recorded and emulation back method, device, equipment and medium | |
CN110827404B (en) | Pump station panoramic monitoring and early warning system and method thereof | |
CN103034755A (en) | Visual inspection method based on virtual reality technology for transformer substation | |
CN109145445A (en) | A kind of hydroelectric project intelligent construction management system | |
CN105976089A (en) | Construction data classification system based on building information model and method thereof | |
CN107292989A (en) | High voltage power transmission cruising inspection system based on 3DGIS technologies | |
CN110097635A (en) | Road 3D based on BIM and VR roams driving simulation system method for building up | |
CN106919987B (en) | Method for manufacturing and managing operation and maintenance information model of high-speed railway passenger dedicated line equipment in virtual reality environment | |
CN111651036A (en) | Unmanned aerial vehicle simulation training system and method for power inspection | |
CN113408761A (en) | Communication infrastructure maintenance skill training system based on VR virtual reality technology | |
CN108491649A (en) | A kind of design method and processing equipment of wind power plant digital Platform | |
CN105894576A (en) | 3D substation panoramic real-time control system based on virtual simulation technology | |
CN117351521B (en) | Digital twinning-based power transmission line bird detection method, system, medium and equipment | |
CN108647607A (en) | Objects recognition method for project of transmitting and converting electricity | |
CN206479993U (en) | A kind of fusion BIM RFID builder's intelligent management system | |
CN107301507A (en) | A kind of accurate three-dimensional training exercise method of power system | |
CN115982954A (en) | Power transmission line three-dimensional simulation model construction system and model construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171027 |