CN104778832A - Multimode city road cross section resource coordinated configuration method - Google Patents

Multimode city road cross section resource coordinated configuration method Download PDF

Info

Publication number
CN104778832A
CN104778832A CN201510203023.7A CN201510203023A CN104778832A CN 104778832 A CN104778832 A CN 104778832A CN 201510203023 A CN201510203023 A CN 201510203023A CN 104778832 A CN104778832 A CN 104778832A
Authority
CN
China
Prior art keywords
width
transportation
lane
mode
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510203023.7A
Other languages
Chinese (zh)
Other versions
CN104778832B (en
Inventor
陈峻
叶娇
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201510203023.7A priority Critical patent/CN104778832B/en
Publication of CN104778832A publication Critical patent/CN104778832A/en
Application granted granted Critical
Publication of CN104778832B publication Critical patent/CN104778832B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Traffic Control Systems (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a multimode city road cross section resource coordinated configuration method. The method includes the steps that firstly, whether a bus-only lane is set and what cross section form is adopted are determined according to set red line width and design requirements; then, road supply conditions of motor vehicles are determined, whether mixing of cars and buses occurs and the width of each motor way are determined, traffic conditions are determined, the passenger transport efficiency and emission rate of each transport means per standard unit width are determined again, and then an objective function with the highest cross section passenger transport efficiency and the smallest emission rate and corresponding constraint conditions are established; finally, the objective function is solved to obtain key parameters in the optimization process and a cross section resource allocation result. Under the road conditions and traffic conditions of the set red line width, a cross section layout design scheme achieving the high road cross section passenger transport capacity and the small emission quantity can be provided.

Description

A kind of multimode Urban Road Cross-section resource coordination collocation method
Technical field
The present invention relates to a kind of multimode Urban Road Cross-section resource coordination collocation method, belong to Urban Traffic Planning field.
Background technology
China city is compact arrangement form, densely-populated in built-up areas, and big and medium-sized cities land resource is in extremely non-starving condition, and along with the raising of Chinese Urbanization level and urban society's level of economic development, this situation will in aggravating trend further.Urban vehicles poputation rapidly increases in addition, and the traffic congestion brought thus and problem of environmental pollution are also increasingly serious.Therefore, how scientific and reasonable distribution urban road section resource, improves land resources utilization efficiency as far as possible and seems particularly important under the prerequisite adapting to multimode transport need.
New urban theory proposes " transit guiding exploitation " (TOD) pattern, supports that public transport uses, reduces the demand of the use to car.To the aspect of Planning and Design of Urban Road Cross-section, every country has corresponding specification, especially with the U.S. and Japan for representative, but given by these design specificationss is still the scope of each lane width, and when designing road Cross Section, the current problem of excessive concern " road ", traffic efficiency becomes more and more important criterion, and ignores the vital action even abandoning " street " carrying originally.In addition when carrying out transversal section global design, do not consider the problem of environmental pollution brought by motor vehicle.
In order to embody, people-oriented and the planning and design concept of sustainable development, and road Cross Section design should break away from the simple thought for automobile services.Research is from traveler angle, by multimode traffic adopter unit, path resource takies based on efficiency analysis, the microvisual model of Urban Road Cross-section resource coordination configuration is set up in research, is optimized design so that section passenger capacity is large as far as possible and section discharge capacity is little as far as possible for the transversal section layout of objective function to set red line width.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the invention provides a kind of multimode Urban Road Cross-section resource coordination collocation method, the method, under the road conditions and transportation condition of set red line width, can provide one to make road Cross Section passenger capacity comparatively large and the transversal section layout design scheme that discharge capacity is less.
Technical scheme: for achieving the above object, the technical solution used in the present invention is: a kind of multimode Urban Road Cross-section resource coordination collocation method, comprises the following steps:
Step 1, according to the red line width of road and design requirement determination public transportation lane and cross-sectional form; The dividing strip situation be simultaneously provided with according to cross-sectional form, determines the original width of dividing strip;
Step 2, the road supply conditions of the cross-sectional form determination motor vehicle of the public transportation lane determined according to red line width and the step 1 of road and employing, determines the width in car bus colleague's situation and each track of car lane simultaneously;
Step 3, according to design requirement determination transportation condition, described transportation condition comprises the design rate and unit vehicle average passenger occupancy that transversal section have several mode of transportation, various mode of transportation, sets the expection service level of various mode of transportation;
Step 4, the width calculation in the road supply conditions of the motor vehicle that the design rate of the various modes of transportation obtained according to step 3, unit vehicle average passenger occupancy and expection service level, step 2 are determined, car bus colleague's situation and each track of car lane is selected into standard unit's width passenger traffic efficiency and the emission index of the various modes of transportation of transversal section;
Step 5, according to the expection service level that step 3 obtains, and the standard unit's width passenger traffic efficiency being selected into the various modes of transportation of transversal section calculated in step 4 and emission index, set up section passenger traffic efficiency is maximum, emission index is minimum objective function and corresponding constraint condition;
Step 6, after obtaining the objective function that step 5 sets up, travel through the array mode of various mode of transportation number of track-lines, solve optimal case, be optimized key parameter in process and transversal section resource allocation result.
The standard unit's width passenger traffic efficiency calculated in described step 4:
E i = C i W i 0 × v i ;
C i=C i0×p i×η i
C i 0 = 3600 v i S i ;
S i = L 0 + v 0 t + v 0 2 2 a ;
In formula: E-width passenger traffic efficiency, i-value 1-4, respectively corresponding car road, public transportation lane, bicycle lane and walkway; C isingle lane design passenger capacity of-mode of transportation i, W i0-be standard unit's lane width, p ithe average passenger occupancy of-introducing mode of transportation i, η ithe lane capacity correction factor of-mode of transportation i, C i0-design capacity calculated value, v ithe travelling speed of-the i-th kind of traffic flow, S i-safe bus head spacing, L 0-length of wagon, a-average retardation rate, v 0initial velocity before-deceleration, the t-reaction time.
The unit width emission index obtained in described step 4 comprises standard unit's width emission index of car, standard unit's width emission index of bus;
Wherein, standard unit's width emission index of car is:
y 1 = 1 W 10 ( y NO x + y HC + y CO )
y NO x = 3.20529 × 10 - 4 + 6.22451 × 10 - 5 x
y HC=7.24546×10 -4+6.73095×10 -5x-2.29452×10 -6x 2+2.16185×10 -8x 3
y CO=8.68×10 -3+2.4×10 -3x-9.92745×10 -5x 2+9.62459×10 -7x 3
In formula, y 1-car standard unit width emission index, average emission rate, y hCthe average emission rate of-HC, y cOthe average emission rate of-CO, x-Vehicle Speed;
Standard unit's width emission index of bus is:
y 2 = 1 W 20 ( y NO x + y PM )
y NO x = 1.416 × 10 - 2 + 3.906 × 10 - 3 x - 1.02 × 10 - 4 x 2
y PM=8.697×10 -5+1.3533×10 -4x-9.282×10 -6x 2
In formula, y 2-public transportation lane standard unit width emission index, average emission rate, y pMthe average emission rate of-PM.
The load-carrying efficiency of the whole road Cross Section set up in described step 5 is large as far as possible, the resource optimization model objective function that energy resource consumption is the least possible:
max E = Σ q N q W q [ 3600 v q S q × p q × η q W q 0 × v q ] min y = N 1 W 1 y 1 + N 2 W 2 y 2 ;
In formula: the passenger traffic efficiency of the whole section of E-, N qthe number of track-lines of-mode of transportation q, W qthe unit lane width of-mode of transportation q, v qfor Vehicle Speed or walking speed, S qfor the safe bus head spacing of mode of transportation q, N 1, N 2be respectively the number of track-lines of car and public transportation lane; W 1, W 2be respectively the unit lane width of car and public transportation lane, y 1for car standard unit width emission index, y 2for public transportation lane standard unit width emission index, p qfor the average passenger occupancy of mode of transportation q, η qfor the lane capacity correction factor of mode of transportation q, W q0for standard unit's lane width;
This bound for objective function:
s . t . 2 Σ q N q W q + W n + W w + W m + 2 W j + 2 W r + 1.0 ≤ D N q min ≤ N q ≤ D W q ;
In formula: the red line width of D-planning, N qthe number of track-lines of-mode of transportation q, W qsingle lane width of-mode of transportation q, W n-motor vehicle fast lane width, W w-motor vehicle kerb lane width, W m-central strip bandwidth, W jthe non-street medians width of-machine, W rthe non-street medians width of-people; N qminthe minimum number of track-lines of design for mode of transportation q.
One provided by the invention multimode Urban Road Cross-section resource coordination collocation method, compared to existing technology, has following beneficial effect:
The present invention take Urban Road Cross-section as research object, simultaneously with passenger traffic efficiency optimization and exhaust emissions minimum for target, establish based on multimode Urban Road Cross-section resource coordination Optimized model, making up in the Resourse Distribute of transversal section take motor vehicle as the defect that allocation units ignore that " people " is only path resource distribution body, and in the exhaust emissions amount of design phase conservative control motor vehicle.The present invention on the basis of planning red line width and the mode of transportation determined, by setting up multiobject Optimized model, can provide based on multimode transversal section resource coordination configuration optimal case.Due to two objective functions be in conflict situation time, there is not the optimum solution making all objective functions simultaneously reach extreme value, can only noninferior solution be sought, be i.e. Pareto solution.Under set red line width conditions, transversal section placement scheme limited amount, so consider to be worked out by algorithm to carry out exhaustive solving to model.Can obtain as drawn a conclusion by analyzing the optimum results of example: 1. different objective functions the Alpine flora scheme that obtains be different; 2. the increase of car lane can improve passenger capacity really, but due to its emission index large, environmental pollution is corresponding increase also, and increasing degree is greater than the amplitude that passenger capacity improves; 3. iff concern emission index, so passenger traffic efficiency will reduce greatly, is unfavorable for the running of urban traffic network; 4. the prioritization scheme obtained under two-objective programming can while reaching quite high passenger traffic efficiency emission index also relatively little, meet sustainable development idea, compare single-goal function scheme, the overall operation benefit of transversal section is optimum.
Accompanying drawing explanation
Fig. 1 is process flow diagram of the present invention.
Fig. 2 is three kinds of prioritization scheme comparative analysis figure in example of the present invention, and wherein, Fig. 2 a is only with the prioritization scheme that motor vehicle passenger capacity is objective function, and Fig. 2 b is be only the prioritization scheme of objective function with discharge capacity, and Fig. 2 c is the prioritization scheme of two-objective programming.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further described.
A kind of multimode Urban Road Cross-section resource coordination collocation method, as shown in Figure 1, comprises the following steps:
Step 1, according to the red line width of road and design requirement determination public transportation lane and cross-sectional form, described design requirement and category of roads, actual measurement or prognosis traffic volume and bus passenger flow; The dividing strip situation be simultaneously provided with according to cross-sectional form, determines the original width of dividing strip.
Step 2, the road supply conditions of the cross-sectional form determination motor vehicle of the public transportation lane determined according to red line width and the step 1 of road and employing, determines the width in car bus colleague's situation and each track of car lane simultaneously.
Step 3, according to design requirement determination transportation condition, described transportation condition comprises the design rate and unit vehicle average passenger occupancy that transversal section have several mode of transportation, various mode of transportation, sets the expection service level of various mode of transportation.
Step 4, the width calculation in the road supply conditions of the motor vehicle that the design rate of the various modes of transportation obtained according to step 3, unit vehicle average passenger occupancy and expection service level, step 2 are determined, car bus colleague's situation and each track of car lane is selected into standard unit's width passenger traffic efficiency and the emission index of the various modes of transportation of transversal section.
Standard unit's width passenger traffic efficiency:
E i = C i W i 0 × v i ;
C i=C i0×p i×η i
C i 0 = 3600 v i S i ;
S i = L 0 + v 0 t + v 0 2 2 a ;
E-width passenger traffic efficiency in formula, unit person (m/s)/(mh); I-value 1-4, respectively corresponding car road, public transportation lane, bicycle lane and walkway; C isingle lane design passenger capacity of-mode of transportation i, unit person/h; W i0-be standard unit's lane width, unit m, mainly play the correcting action of lane width to passenger capacity, wherein car lane gets 3.25, and public transportation lane gets 3.5, and cycle track gets 1.2, and walkway gets 0.8; p ithe average passenger occupancy of-introducing mode of transportation i, people from unit/veh, calculates section passenger capacity; η ithe lane capacity correction factor of-mode of transportation i, its value is the correctness in order to verify traffic capacity computation model, its value is relevant with design rate, get when wherein car design rate is less than or equal to 60km/h 1.00 or design rate get 1.40 when being greater than 60km/h, get when bus design rate is less than or equal to 60km/h 1.00 or design rate get 1.17 when being greater than 60km/h, bicycle gets 1.39, and walking gets 1.22; C i0-design capacity calculated value, unit veh/h; v ithe travelling speed of-the i-th kind of traffic flow, unit m/s; S i-safe bus head spacing, i.e. stopping sight distance, unit m; L 0-length of wagon, unit m, wherein car gets 4.70, and bus gets 12.00, and bicycle gets 1.90; A-average retardation rate, unit m/s 2; v 0initial velocity before-deceleration, unit m/s; In the t-reaction time, unit s, gets 0.97.
Unit width emission index comprises standard unit's width emission index of car, standard unit's width emission index of bus;
Wherein, standard unit's width emission index of car is:
y 1 = 1 W 10 ( y NO x + y HC + y CO )
y NO x = 3.20529 × 10 - 4 + 6.22451 × 10 - 5 x
y HC=7.24546×10 -4+6.73095×10 -5x-2.29452×10 -6x 2+2.16185×10 -8x 3
y CO=8.68×10 -3+2.4×10 -3x-9.92745×10 -5x 2+9.62459×10 -7x 3
In formula, y 1-car standard unit width emission index, unit mg/ (ms); average emission rate, unit mg/s; y hCthe average emission rate of-HC, unit mg/s; y cOthe average emission rate of-CO, unit mg/s;
X-Vehicle Speed, unit m/s;
Standard unit's width emission index of bus is:
y 2 = 1 W 20 ( y NO x + y PM )
y NO x = 1.416 × 10 - 2 + 3.906 × 10 - 3 x - 1.02 × 10 - 4 x 2
y PM=8.697×10 -5+1.3533×10 -4x-9.282×10 -6x 2
In formula, y 2-public transportation lane standard unit width emission index, unit mg/ (ms); average emission rate, unit mg/s; y pMthe average emission rate of-PM, unit mg/s.
Step 5, according to the expection service level that step 3 obtains, and the standard unit's width passenger traffic efficiency being selected into the various modes of transportation of transversal section calculated in step 4 and emission index, set up section passenger traffic efficiency is maximum, emission index is minimum objective function and corresponding constraint condition.
The load-carrying efficiency of the whole road Cross Section set up is large as far as possible, the resource optimization model objective function that energy resource consumption is the least possible:
max E = Σ q N q W q E q
miny=N 1W 1y 1+N 2W 2y 2
The standard unit's width passenger traffic efficiency obtained by step 4 obtains;
max E = Σ q N q W q [ 3600 v q S q × p q × η q W q 0 × v q ] min y = N 1 W 1 y 1 + N 2 W 2 y 2 ; - - - ( 1 )
In formula (1): the passenger traffic efficiency of the whole section of E-, unit person (m/s)/h; N qthe number of track-lines of-mode of transportation q; Q represents the mark of mode of transportation, q=1,2,3,4, represent car, bus, bicycle and pedestrian respectively; W qthe unit lane width of-mode of transportation q, unit m; v qfor Vehicle Speed or walking speed, unit m/s; S qfor the safe bus head spacing of mode of transportation q, i.e. stopping sight distance, unit m; Y is the emission index of whole transversal section, unit mg/s; N 1, N 2be respectively the number of track-lines of car and public transportation lane; W 1, W 2be respectively the unit lane width of car and public transportation lane, unit m; y 1for car standard unit width emission index, unit mg/ (ms); y 2for public transportation lane standard unit width emission index, unit mg/ (ms); p qfor the average passenger occupancy of mode of transportation q, people from unit/veh, calculates section passenger capacity; η qfor the lane capacity correction factor of mode of transportation q, its value is the correctness in order to verify traffic capacity computation model, the design capacity value of getting in urban road design criterion compares, find that the traffic capacity that the traffic capacity of formulae discovery gained provides with specification is not exclusively equal, so use coefficient η qthe traffic capacity is revised; W q0for standard unit's lane width, unit m, mainly plays the correcting action of lane width to passenger capacity; E qstandard unit's width passenger traffic efficiency of-mode of transportation q, unit person (m/s)/(mh).
Set up corresponding scalar functions and set up constraint equation, comprise the constraint of number of track-lines two aspects of boundary lines of roads width, each mode of transportation.Boundary lines of roads wide constraint: road Cross Section width shared by various mode of transportation and street medians width sum are not more than boundary lines of roads width,
2 Σ q N q W q + W n + W w + W m + 2 W j + 2 W r + 1.0 ≤ D - - - ( 2 )
In formula (2), D is the red line width of planning, unit m; N qfor the number of track-lines of mode of transportation q; W qfor single lane width of mode of transportation q, unit m; W nfor motor vehicle fast lane width, unit m; W wfor motor vehicle kerb lane width, unit m; W mfor central strip bandwidth, unit m; W jfor the non-street medians width of machine, unit m; W rto behave non-street medians width, unit m;
Number of track-lines retrains: shared by each mode of transportation, number of track-lines is (to bicycle lane and walkway, the bicycle number that number of track-lines and section can pass through side by side and pedestrian's number) be greater than the minimum number of track-lines of designing requirement and be less than available maximum number of track-lines when hypothesis section only has one-way communication mode, as follows:
N q min ≤ N q ≤ D W q - - - ( 3 )
In formula (3), N qminthe minimum number of track-lines of design for mode of transportation q; N qfor the number of track-lines of mode of transportation q; D is the red line width of planning, unit m; W qfor single lane width of mode of transportation q, unit m;
In sum, its constraint condition is as follows:
s . t . 2 Σ q N q W q + W n + W w + W m + 2 W j + 2 W r + 1.0 ≤ D N q min ≤ N q ≤ D W q ;
In formula: the red line width of D-planning, unit m; N qthe number of track-lines of-mode of transportation q; W qsingle lane width of-mode of transportation q, unit m; W n-motor vehicle fast lane width, unit m; W w-motor vehicle kerb lane width, unit m; W m-central strip bandwidth, unit m; W jthe non-street medians width of-machine, unit m; W rthe non-street medians width of-people, unit m.
Step 6, after obtaining the objective function of step 5 foundation, travel through the array mode of various mode of transportation number of track-lines, solve optimal case, be optimized key parameter in process and transversal section resource allocation result, namely obtains the multimode transversal section resource coordination allocation plan taking into account the passenger traffic efficiency comes first of exhaust emissions.
In order to better the present invention is described, now principle of the present invention is described.
Determining, whether public transportation lane is set according to set red line width D and design requirement, adopts which kind of cross-sectional form, if there is dividing strip, also need the width W determining dividing strip m, W j, W r.
According to red line width, the road supply conditions whether arranging the cross-sectional form determination motor vehicle of public transportation lane and employing, namely determine the whether mixed row of car bus and each lane width W of car lane 1, W 2, W n, W w.
According to design requirement determination transportation condition, comprise design rate v transversal section having several mode of transportation, various mode of transportation qand unit vehicle average passenger occupancy η qdeng.
Calculate single lane design passenger capacity, formula is such as formula shown in (4):
C q=C q0×p q×η q(4)
In formula (4), C qfor single lane design passenger capacity of mode of transportation q, people from unit/h; η qfor the lane capacity correction factor of mode of transportation q.
C q0for the bicycle road basic capacity of mode of transportation q, computing formula is such as formula shown in (5):
C q 0 = 3600 v q S q - - - ( 5 )
In formula (5), v qfor Vehicle Speed or walking speed, unit m/s; S qfor safe bus head spacing, i.e. stopping sight distance, unit m, computing formula is such as formula shown in (6):
S q = L 0 + v 0 t + v 0 2 2 a - - - ( 6 )
In formula (6), L 0for length of wagon, unit m, wherein car gets 4.70, and bus gets 12.00, and bicycle gets 1.90; v 0for the initial velocity before deceleration, unit m/s; T is the reaction time, and unit s, gets 0.97; A is average retardation rate, unit m/s 2; HCM handbook specifies that the security row human world on walkway is apart from being substantially fixed as 1.5m, i.e. S 4=1.5m, comprising the walking space of 0.6m and the psychological space of 0.9m.
Calculate standard unit's width passenger traffic efficiency of each mode of transportation, computing formula is such as formula shown in (7):
E q = C q W q 0 × v q - - - ( 7 )
In formula (7), E qfor unit width passenger traffic efficiency, unit person (m/s)/(mh); C qfor design passenger capacity, unit person/h; W q0for standard unit's lane width, unit m, mainly plays the correcting action of lane width to passenger capacity, concrete value reference table 1;
Table 1 standard unit lane width (unit m)
V qfor Vehicle Speed or walking speed, unit m/s.
Calculate standard unit's width emission index of car, formula such as formula shown in (8),
y 1 = 1 W 10 ( y NO x + y HC + y CO ) - - - ( 8 )
In formula (8), W 10for car lane standard unit lane width, unit m;
Y nOx, y hC, y cObe respectively NO x, HC, CO average emission rate, unit mg/s, computing formula respectively such as formula shown in (9) (10) (11),
y NO x = 3.205 × 10 - 4 + 6.224 × 10 - 5 x - - - ( 9 )
y HC=7.245×10 -4+6.730×10 -5x-2.294×10 -6x 2+2.161×10 -8x 3(10)
y CO=8.68×10 -3+2.4×10 -3x-9.927×10 -5x 2+9.624×10 -7x 3(11)
In above three formulas, x is car actual travel speed, unit m/s;
Calculate standard unit's width emission index of bus, formula such as formula shown in (12),
y 2 = 1 W 20 ( y NO x + y PM ) - - - ( 12 )
In formula (12), W 20for public transportation lane standard unit lane width, unit m;
Y nOx, y pMbe respectively NO x, PM average emission rate, unit mg/s, computing formula respectively such as formula shown in (13) (14),
y NO x = 1.416 × 10 - 2 + 3.906 × 10 - 3 x - 1.02 × 10 - 4 x 2 - - - ( 13 )
y PM=8.697×10 -5+1.3533×10 -4x-9.282×10 -6x 2(14)
In above two formulas, x is bus actual travel speed, unit m/s;
Set the expection service level of various mode of transportation, according to the computing formula of service level, establish an equation and solve the actual motion speed of car and bus, namely ask the value of x;
Standard unit's width passenger traffic efficiency of each mode of transportation calculated and standard unit's width emission index are substituted into and obtains objective function, shown in (15),
max E = Σ q N q W q E q min y = N 1 W 1 y 1 + N 2 W 2 y 2 - - - ( 15 )
E is the passenger traffic efficiency of whole section, unit person (m/s)/h; N qfor the number of track-lines of mode of transportation q; W qfor the unit lane width of mode of transportation q, unit m; E qfor standard unit's width passenger traffic efficiency of mode of transportation q, unit person (m/s)/(mh); By the bicycle road width W of red line width D, each mode of transportation q, number of track-lines N qwith isolation strip width W m, W j, W rsubstitution formula (2), obtains equation of constraint.
Travel through the array mode of various mode of transportation number of track-lines, seek the Pareto solution under two-objective programming, namely relatively optimum transversal section Resource Allocation Formula.As shown in Figure 2, Fig. 2 a is only with the prioritization scheme that motor vehicle passenger capacity is objective function.Fig. 2 b is be only the prioritization scheme of objective function with discharge capacity.Fig. 2 c is the prioritization scheme of two-objective programming.
Finally obtain transversal section resource allocation result, i.e. the width of transversal section shared by each mode of transportation and number of track-lines, some key parameters be simultaneously optimized in process, comprise section discharge capacity, section passenger capacity and discharge capacity per capita.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (4)

1. a multimode Urban Road Cross-section resource coordination collocation method, its feature, comprises the following steps:
Step 1, according to red line width and the design requirement of road, determines public transportation lane and cross-sectional form; The dividing strip situation be simultaneously provided with according to cross-sectional form, determines the original width of dividing strip;
Step 2, the road supply conditions of the cross-sectional form determination motor vehicle of the public transportation lane determined according to red line width and the step 1 of road and employing, determines the width in car bus colleague's situation and each track of car lane simultaneously;
Step 3, according to design requirement determination transportation condition, described transportation condition comprises the design rate and unit vehicle average passenger occupancy that transversal section have several mode of transportation, various mode of transportation, sets the expection service level of various mode of transportation;
Step 4, the width calculation in the road supply conditions of the motor vehicle that the design rate of the various modes of transportation obtained according to step 3, unit vehicle average passenger occupancy and expection service level, step 2 are determined, car bus colleague's situation and each track of car lane is selected into standard unit's width passenger traffic efficiency and the automotive emission rate of the various modes of transportation of transversal section;
Step 5, according to the expection service level that step 3 obtains, and the standard unit's width passenger traffic efficiency being selected into the various modes of transportation of transversal section calculated in step 4 and emission index, set up section passenger traffic efficiency is maximum, emission index is minimum objective function and corresponding constraint condition;
Step 6, after obtaining the objective function that step 5 sets up, travel through the array mode of various mode of transportation number of track-lines, solve optimal case, be optimized key parameter in process and transversal section resource allocation result.
2. multimode Urban Road Cross-section resource coordination collocation method according to claim 1, is characterized in that: the standard unit's width passenger traffic efficiency calculated in described step 4:
E i = C i W i 0 × v i ;
C i=C i0×p i×η i
C i 0 = 3600 v i S i ;
S i = L 0 + v 0 t + v 0 2 2 a ;
In formula: E-width passenger traffic efficiency, i-value 1-4, respectively corresponding car road, public transportation lane, bicycle lane and walkway; C isingle lane design passenger capacity of-mode of transportation i, W i0-be standard unit's lane width, p ithe average passenger occupancy of-introducing mode of transportation i, η ithe lane capacity correction factor of-mode of transportation i, C i0-design capacity calculated value, v ithe travelling speed of-the i-th kind of traffic flow, S i-safe bus head spacing, L 0-length of wagon, a-average retardation rate, v 0initial velocity before-deceleration, the t-reaction time.
3. multimode Urban Road Cross-section resource coordination collocation method according to claim 1, it is characterized in that: the unit width emission index obtained in described step 4 comprises standard unit's width emission index of car, standard unit's width emission index of bus;
Wherein, standard unit's width emission index of car is:
y 1 = 1 W 10 ( y N O x + y HC + Y CO )
y NO x = 3.20529 × 10 - 4 + 6.22451 × 10 - 5 x
y HC=7.24546×10 -4+6.73095×10 -5x-2.29452×10 -6x 2+2.16185×10 -8x 3
y CO=8.68×10 -3+2.4×10 -3x-9.92745×10 -5x 2+9.62459×10 -7x 3
In formula, y 1-car standard unit width emission index, -NO xaverage emission rate, y hCthe average emission rate of-HC, y cOthe average emission rate of-CO, x-Vehicle Speed;
Standard unit's width emission index of bus is:
y 2 = 1 W 20 ( y NO x + y PM )
y N O x = 1.416 × 10 - 2 + 3.906 × 10 - 3 x - 1.02 × 10 - 4 x 2
y PM=8.697×10 -5+1.3533×10 -4x-9.282×10 -6x 2
In formula, y 2-public transportation lane standard unit width emission index, -NO xaverage emission rate, y pMthe average emission rate of-PM.
4. multimode Urban Road Cross-section resource coordination collocation method according to claim 1, it is characterized in that: the load-carrying efficiency of the whole road Cross Section set up in described step 5 is large as far as possible, the resource optimization model objective function that energy resource consumption is the least possible:
max E = Σ q N q W q [ 3600 v q S q × p q × η q W q 0 × v q ] min y = N 1 W 1 y 1 + N 2 W 2 y 2 ;
In formula: the passenger traffic efficiency of the whole section of E-, N qthe number of track-lines of-mode of transportation q, W qthe unit lane width of-mode of transportation q, v qfor Vehicle Speed or walking speed, S qfor the safe bus head spacing of mode of transportation q, N 1, N 2be respectively the number of track-lines of car and public transportation lane; W 1, W 2be respectively the unit lane width of car and public transportation lane, y 1for car standard unit width emission index, y 2for public transportation lane standard unit width emission index, p qfor the average passenger occupancy of mode of transportation q, η qfor the lane capacity correction factor of mode of transportation q, W q0for standard unit's lane width;
This bound for objective function:
s . t . 2 Σ q N q W q + W n + W w + W m + 2 W j + 2 W r + 1.0 ≤ D N q min ≤ N q ≤ D W q ;
In formula: the red line width of D-planning, N qthe number of track-lines of-mode of transportation q, W qsingle lane width of-mode of transportation q, W n-motor vehicle fast lane width, W w-motor vehicle kerb lane width, W m-central strip bandwidth, W jthe non-street medians width of-machine, W rthe non-street medians width of-people; N qminthe minimum number of track-lines of design for mode of transportation q.
CN201510203023.7A 2015-04-24 2015-04-24 A kind of multimode Urban Road Cross-section resource coordination collocation method Active CN104778832B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510203023.7A CN104778832B (en) 2015-04-24 2015-04-24 A kind of multimode Urban Road Cross-section resource coordination collocation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510203023.7A CN104778832B (en) 2015-04-24 2015-04-24 A kind of multimode Urban Road Cross-section resource coordination collocation method

Publications (2)

Publication Number Publication Date
CN104778832A true CN104778832A (en) 2015-07-15
CN104778832B CN104778832B (en) 2017-07-28

Family

ID=53620272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510203023.7A Active CN104778832B (en) 2015-04-24 2015-04-24 A kind of multimode Urban Road Cross-section resource coordination collocation method

Country Status (1)

Country Link
CN (1) CN104778832B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279966A (en) * 2015-10-09 2016-01-27 武汉理工大学 Jam recognition method for campus traffic
CN105427605A (en) * 2015-12-23 2016-03-23 山东理工大学 Method for efficiency calculation of setting of bus transit lane with consideration of transportation means transfer
CN106056909A (en) * 2016-06-29 2016-10-26 东南大学 Medium and small city bus rapid transit threshold determination method
CN109871572A (en) * 2018-12-27 2019-06-11 霍丽红 A kind of road traffic Route Design Method
CN111739296A (en) * 2020-06-19 2020-10-02 长安大学 Space-time separation method for passengers and non-motor vehicles in large bus station area
CN116957308A (en) * 2023-09-21 2023-10-27 武汉市规划研究院 Urban road section planning method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5646853A (en) * 1991-07-19 1997-07-08 Hitachi, Ltd. Traffic control system
JP2002146761A (en) * 2000-11-13 2002-05-22 Nkk Corp Method for executing and planning of construction work for road occupation
CN102031738A (en) * 2010-10-08 2011-04-27 师自宽 H-shaped urban arterial road public transportation system
CN202755280U (en) * 2012-08-01 2013-02-27 上海市城市建设设计研究总院 Elevated rapid bus lane system built with society lanes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5646853A (en) * 1991-07-19 1997-07-08 Hitachi, Ltd. Traffic control system
JP2002146761A (en) * 2000-11-13 2002-05-22 Nkk Corp Method for executing and planning of construction work for road occupation
CN102031738A (en) * 2010-10-08 2011-04-27 师自宽 H-shaped urban arterial road public transportation system
CN202755280U (en) * 2012-08-01 2013-02-27 上海市城市建设设计研究总院 Elevated rapid bus lane system built with society lanes

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
中国城市规划设计研究院: "《城市规划资料集 第九分册 风景·园林·绿地·旅游 》", 30 June 2007 *
弓秦生: "城市道路基本断面的确定", 《城市道桥与防洪》 *
李朝阳 等: "城市道路横断面规划设计研究", 《城市规划汇刊》 *
汪涛 等: "高品质城市道路横断面规划设计探讨", 《人性化城市综合交通体系规划与实践——中国城市交通规划学会2009年论文集》 *
王建光 等: "浅析城市道路横断面规划设计的主要原则", 《城市道桥与防洪》 *
耿媛婧: "城市交通控制专项规划探析与实践", 《城市道桥与防洪》 *
黄晓明 等: "《交通运输导论》", 31 July 2014 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279966A (en) * 2015-10-09 2016-01-27 武汉理工大学 Jam recognition method for campus traffic
CN105427605A (en) * 2015-12-23 2016-03-23 山东理工大学 Method for efficiency calculation of setting of bus transit lane with consideration of transportation means transfer
CN106056909A (en) * 2016-06-29 2016-10-26 东南大学 Medium and small city bus rapid transit threshold determination method
CN106056909B (en) * 2016-06-29 2018-09-07 东南大学 A kind of small and medium-sized cities bus rapid transit Threshold
CN109871572A (en) * 2018-12-27 2019-06-11 霍丽红 A kind of road traffic Route Design Method
CN111739296A (en) * 2020-06-19 2020-10-02 长安大学 Space-time separation method for passengers and non-motor vehicles in large bus station area
CN111739296B (en) * 2020-06-19 2021-09-24 长安大学 Space-time separation method for passengers and non-motor vehicles in large bus station area
CN116957308A (en) * 2023-09-21 2023-10-27 武汉市规划研究院 Urban road section planning method and system
CN116957308B (en) * 2023-09-21 2023-11-24 武汉市规划研究院 Urban road section planning method and system

Also Published As

Publication number Publication date
CN104778832B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN104778832A (en) Multimode city road cross section resource coordinated configuration method
CN103942948B (en) Based on the generation method of the urban public bus lines network of sectionally smooth join
CN106875710B (en) A kind of intersection self-organization control method towards net connection automatic driving vehicle
CN103871241B (en) One dynamically divides control method towards track, Weaving Sections of Urban Expressway
CN104794919B (en) A kind of autoroute track resource real-time optimization collocation method
CN100337256C (en) Method for estimating city road network traffic flow state
CN103824467B (en) For reservation type communication navigation method of servicing and the device of POV
CN102568197B (en) Method for setting bidirectional green wave signals for bus trunk line
CN103593988B (en) Inside a kind of road, bus stop turns to public transit vehicle sort method
CN108831143A (en) Signalized intersections fleet speed guiding method based on bus or train route coordination technique
CN109727470A (en) A kind of current decision-making technique of Distributed Intelligent Network connection automobile intersection complex scene
CN105551273B (en) A kind of distribution method of tramcar bus priority at intersection control detector position
CN104499393A (en) Bus transit lane planning method for balancing trip cost of bus passengers and private cars
CN107187442A (en) The plug-in hybrid electric automobile EMS predicted based on operating mode
CN107180538B (en) A kind of recognition methods of vehicle-mounted track traffic direction
CN107871184A (en) A kind of site selecting method of the electric automobile charging station of facing area electrically-charging equipment
CN105321347A (en) Hierarchical road network traffic jam evaluation method
CN110992699A (en) Urban road network public traffic right road network planning method
CN110085025A (en) A kind of multi-modal speed of service optimization method of bus rapid transit
CN106157618A (en) A kind of urban public transportation lane planning cloth network method
CN108985616A (en) A kind of public transportation lane evaluation of layout method
Tzvetkova Guidelines for Improving the Quality of Urban Passenger Transport in the City of Sofia within the Context of Stable Urban Mobility
Chen et al. Coordinated timing of multiple intersections based on Anylogic.
CN105306157A (en) Vehicular communication modelling method based on network connection
CN103426294B (en) A kind of division methods based on the other multi-layer Fuzzy of emergency traffic flow priority

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ye Jiao

Inventor after: Zhu Li

Inventor after: Wang Bin

Inventor after: Chen Jun

Inventor before: Chen Jun

Inventor before: Ye Jiao

Inventor before: Wang Bin

CB03 Change of inventor or designer information
GR01 Patent grant