CN109871572A - A kind of road traffic Route Design Method - Google Patents

A kind of road traffic Route Design Method Download PDF

Info

Publication number
CN109871572A
CN109871572A CN201811613490.7A CN201811613490A CN109871572A CN 109871572 A CN109871572 A CN 109871572A CN 201811613490 A CN201811613490 A CN 201811613490A CN 109871572 A CN109871572 A CN 109871572A
Authority
CN
China
Prior art keywords
road
design
traffic
urban
intersection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811613490.7A
Other languages
Chinese (zh)
Inventor
霍丽红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811613490.7A priority Critical patent/CN109871572A/en
Publication of CN109871572A publication Critical patent/CN109871572A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of road traffic Route Design Methods, include the following steps: design vehicle outer profile size and minimum turning radius, design traffic volume, road service grade classification, highway layout speed at different levels, road passage capability, intersection design capacity;Urban public transport, bicycle traffic, pedestrian traffic, city square, Urban freight transport, urban road net layout, urban road intersection design;Road Cross Section design;Road is flat, vertical alignment design;Level-crossing planning and design;Crossings on different level planning and design;The design of road auxiliary equipment;The beneficial effects of the present invention are: preferably the planning of reflection urban highway traffic and design feature, adaptation urban land are laid out;Based on overall city planning, meets land use to transport need, embody promotion and restrictive function of the urban highway traffic to land development intensity.

Description

A kind of road traffic Route Design Method
Technical field
The invention belongs to traffic route technical fields, and in particular to a kind of road traffic Route Design Method.
Background technique
Traffic route is to be built by certain technical standard with scale, and have necessary transportation facility and technical equipment, It is intended to transport the traffic route of various passenger and freight;Including railway, highway, cruiseway, sea routes, air route, pipeline and Cableway etc..Broad sense further includes the various traffic routes of urban inner.
In order to enable City traffic system planning and design meet visitor, lorry stream and the stream of people safety with it is unimpeded;Reflect city City's style and features, urban history and cultural tradition;Space is provided for above and below ground utilities pipeline and other public utilities;Meet city The requirement that city's disaster relief is taken refuge with sunshine ventilation;Meet people and vehicle traffic in lines, the traffic shunting of motor vehicle and non-motor vehicle is wanted It asks, the present invention provides a kind of road traffic Route Design Method thus.
Summary of the invention
The purpose of the present invention is to provide a kind of road traffic Route Design Methods, to solve to be in above-mentioned background technique Make City traffic system planning and design meet the safety of visitor, lorry stream and the stream of people with it is unimpeded;Reflect cityscape, city History and cultural tradition;Space is provided for above and below ground utilities pipeline and other public utilities;Meet the city disaster relief to take refuge With the requirement of sunshine ventilation;Meet people and vehicle traffic in lines, the requirement in the traffic shunting of motor vehicle and non-motor vehicle.
To achieve the above object, the invention provides the following technical scheme: a kind of road traffic Route Design Method, including such as Lower step:
Step 1: design vehicle outer profile size and minimum turning radius, design traffic volume, road service grade classification, Highway layout speed at different levels, road passage capability, intersection design capacity;
Step 2: urban public transport, bicycle traffic, pedestrian traffic, city square, Urban freight transport, city road Road network layout, urban road intersection design;
Step 3: road Cross Section design;
Step 4: road is flat, vertical alignment design;
Step 5: level-crossing planning and design;
Step 6: crossings on different level planning and design;
Step 7: road auxiliary equipment design.
As a preferred technical solution of the invention, in the step 1, design traffic volume should calculate or count tune Annual average daily traffic (ADT) is looked into as roading controlling traffic volume;The 30th peak hour flow of forecast year should be chosen Amount is used as design traffic volume (DHV);Design hour traffic is to choose through street, trunk roads by prediction in 20 years, and subsidiary road presses 15 Year prediction;The volume of traffic of (early evening peak) whole methods of operation and direction distribution (D) during design should collect design hour.
As a preferred technical solution of the invention, in the step 1, reflect the road of the degree of crowding of road The grade of service is divided into A, B, C, D, E grades.
As a preferred technical solution of the invention, in the step 1, intersection design capacity includes flat Face intersection and traffic interchange design capacity.
As a preferred technical solution of the invention, in the step 3, road Cross Section design includes that design is former Then, boundary lines of roads width, optimal crosssection, motor vehicle lane and width of roadway, non-motor vehicle carriageway width, width of roadway, Trackside bandwidth, parting strip, crown curve and crown slope, comprehensive pipeline arrangement, kerb.
As a preferred technical solution of the invention, in the step 4, road is flat, vertical alignment design includes but not It is limited to plane, vertical alignment design principle, sighting distance, minimum radius of horizontal curve, superelevation.
As a preferred technical solution of the invention, in the step 5, level-crossing planning and design include But it is not limited to design principle, the classification of level-crossing, the traffic organization principle of different shape intersection, the design of level-crossing Parameter.
As a preferred technical solution of the invention, in the step 6, crossings on different level planning and design include but It is not limited to the basic pattern and applicable elements, sighting distance, designed driving speed of interchange.It is excellent as one kind of the invention The technical solution of choosing, in the step 7, the design of road auxiliary equipment include but is not limited to design principle, road safety facility, Control of traffic and road facility.
Compared with prior art, the beneficial effects of the present invention are:
(1) preferably the planning of reflection urban highway traffic and design feature, adaptation urban land are laid out;
(2) based on overall city planning, meet land use to transport need, embody urban highway traffic to soil The promotion and restrictive function of mining inetesity.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
Fig. 2 is kart minimum turning path figure of the invention;
Fig. 3 is lorry minimum turning path figure of the invention;
Fig. 4 is the bus minimum turning path figure of invention;
Fig. 5 is medium semitrailer minimum turning path figure of the invention;
Specific embodiment
A kind of road traffic Route Design Method, includes the following steps:
Step 1: design vehicle outer profile size and minimum turning radius, design traffic volume, road service grade classification, Highway layout speed at different levels, road passage capability, intersection design capacity;Design traffic volume should calculate or survey year Average daily traffic volume (ADT) is used as roading controlling traffic volume;The 30th peak hour traffic of forecast year should be chosen to make For design traffic volume (DHV);Design hour traffic is to choose through street, trunk roads by prediction in 20 years, and subsidiary road is pre- by 15 years It surveys;The volume of traffic of (early evening peak) whole methods of operation and direction distribution (D) during design should collect design hour;Reflect road The road service grade of the degree of crowding on road is divided into A, B, C, D, E grades;Intersection design capacity include level-crossing and Traffic interchange design capacity;
Step 2: urban public transport, bicycle traffic, pedestrian traffic, city square, Urban freight transport, city road Road network layout, urban road intersection design;
Step 3: road Cross Section design;Road Cross Section design includes design principle, boundary lines of roads width, cross section Arrangement, motor vehicle lane and width of roadway, non-motor vehicle carriageway width, width of roadway, trackside bandwidth, parting strip, road camber Curve and crown slope, comprehensive pipeline arrangement, kerb;
Step 4: road is flat, vertical alignment design;Road is flat, vertical alignment design includes but is not limited to plane, vertical alignment design Principle, sighting distance, minimum radius of horizontal curve, superelevation;
Step 5: level-crossing planning and design;Level-crossing planning and design include but is not limited to design principle, The classification of level-crossing, the traffic organization principle of different shape intersection, level-crossing design parameter;
Step 6: crossings on different level planning and design;Crossings on different level planning and design include but is not limited to that intercommunication solid is handed over Basic pattern and applicable elements, sighting distance, the designed driving speed of fork;
Step 7: road auxiliary equipment design;The design of road auxiliary equipment includes but is not limited to design principle, road safety Facility, control of traffic and road facility.
It is designed specifically to:
Automotive designs vehicle overall dimension, unit are (m)
Design traffic volume should be met the following requirements: should calculate or survey annual average daily traffic (ADT) is as road The planning control volume of traffic;The 30th peak hour traffic of forecast year should be chosen as design traffic volume (DHV), design hour The volume of traffic is to choose through street, trunk roads by prediction in 20 years, and subsidiary road was predicted by 15 years;During design should collect design hour The volume of traffic of interior (early evening peak) whole method of operation and direction distribution (D).
Reflect that the road service grade of the degree of crowding of road is divided into A, B, C, D, E grades
V/C is the ratio between maximum service volume and basic capacity under ideal conditions, and basic capacity is D grades The maximum volume of traffic of the grade of service.
Intersection design capacity: level-crossing uses signalized crossing, and intersection handling capacity is reachable 2500~6000pcu/h;Using traffic circle or have traffic control intersection, intersection handling capacity between 500pcu/h~ 2700pcu/h, wherein main should select traffic control form to the apparent intersection of traffic flow;Intersected using no traffic control Mouthful, the traffic capacity is less than 500pcu/h;
The general applicable elements reference table of grade separation citation form
Urban public transport: urban public transport planning, it should be according to urban development scale, Land arrangement and road network planning It draws, on the basis of passenger flow estimation, determines public transport mode, vehicle number, line network, junction of park and shift and Terminal Area Facilities land used Deng, and the passenger capacity of public transport should be made to meet the needs of peak;Administrative region of a city key city and Regional Central City should be preferential It develops public transport;Sub-region key city and organic town should improve the public transport network in urban district to suburb;City is public One way maximum psychology travel time when traffic programme at passenger traffic peak, should make 50% resident's riding following major public transportation mode The regulation of following table should be met:
City size Maximum psychology travel time (min) Major public transportation mode
Administrative region of a city key city 60 Greatly, middle freight volume rail rapid transit;Bus, electric car
Regional Central City 40 Bus, electric car
Sub-region key city 35 Bus
Organic town 25 Bus
Urban public transport network answers unified plan, and hierarchical arrangement, route trend is consistent with main passenger flow, main passenger flow Distribution Center should set the junction of park and shift of different modes of transportation;Administrative region of a city key city, sub-region key city public transport network are close Degree, should reach 2.0~2.5km/km2;Passenger averagely changes to coefficient administrative region of a city key city and is not preferably greater than 1.5, sub-region central city City is not preferably greater than 1.3.
Public transport mode Public transport stop spacing (m)
Bus and electric car 300-800
Bus main station express bus 1500-2000
Greatly, middle freight volume rail rapid transit 800-2000
On section, transfer distance in the same direction should not exceed 50m, and incorgruous transfer distance should not exceed 100m;To installing station, when When road does not set median strip, it should head-on be staggered 30m in vehicle forward direction;In road grade crossing and traffic interchange The station of upper setting, transfer distance is not preferably greater than 150m, and is not greater than 200m;Coach bus station, railway station, passenger traffic Harbour preferably considers joint station, and public transport stop transfer distance should be within the scope of 50m;It public transport stop should be with rail traffic Station transfer;Through street and trunk roads and suburb two-lane highway, public transport bus stop should not occupy driveway, and bus stop is answered It is arranged using bay type multi-storied, the Harbor-shaped bus stop length in urban district, it should be at least there are two parking stall;Bus and trolleybus Using on the ground other than urban road should be arranged in first and last station, and every place's land area must not be less than 1000m2;Urban taxi is adopted It, should be in road near the distribution centre of business busy section of town, external transport hub and the stream of people's frequent activity when throwing uniform business with road On set taxistand road.
Bicycle traffic: when calculating bicycle traffic psychology travel time, bicycle travel speed preferably presses 10-12km/h calculating, Congested in traffic area and the poor area of road conditions, travel speed preferably take lower limit value;The farthest trip distance of bicycle, in administrative region of a city Key city, Regional Central City should be calculated by 3km, and sub-region key city and cities and towns should be calculated by 5km;Bicycle path Network planning is drawn should be by the cycle track, Urban Branch Road and residential area of the bicycle route, urban arterial road two sides that are separately provided Road collectively constitutes the network that can guarantee bicycle Continuous Traffic;It should be wanted from the dedicated road of vehicle vehicle by desin speed 20km/h Seek carry out Alignment Design;The traffic environment of bicycle path designs, and the facilities such as safety, illumination, shade are preferably arranged.
Pedestrian traffic: in city plan pedestrian traffic system should with the flow of pedestrian flow and flow direction be basic foundation, because Various effective measures, as far as possible the reservation original pedestrian system in mountain city are used to ground suiting measures to different conditions, meets the requirement of pedestrian activity, ensures pedestrian Traffic safety and traffic continuity, must not arbitrarily reduce pavement;Pavement, Applied in Business Pedestrian Street, city riverfront pavement or woods The planning of arbor, should with the pedestrian system of residential area, with station, the collecting and distributing square of harbour, the walking of Urban Recreation congregation plaza etc. System is combined closely, and a complete City Walking System is constituted;Along pavement, shade tree, public transport bus stop and time are set When the facilities such as Che Ting, phonebooth, the normal operation of pedestrian must not be interfered;It determines the pavement traffic capacity, should can lead to by it The practical span width of capable pavement calculates;Sidewalk width should be calculated by the multiple of people's row band, and minimum clear span cannot be less than 1.5m。
City square: station, harbour the collecting and distributing land for squares gross area of traffic, can by plan a city population everyone 0.07~ 0.10m2It calculates;Station, harbour the scale on the collecting and distributing square of traffic determine that the density of stream of people on collecting and distributing square is suitable by aggregation flow of the people For 1.0~1.4 people/m2;The stop got on or off the bus on traffic square before station, harbour for passenger, distance inlet and outlet are unsuitable big In 50m;Allow vehicle short stay, but must not store for a long time;The parking lot of motor vehicle and non-motor vehicle should be arranged in collecting and distributing Square periphery;The gross area of Urban Recreation congregation plaza land used, can be by everyone the 0.13~0.40m of population that plans a city2It calculates;City Congregation plaza is strolled about or have a rest in city should not be too big;The every place in city-level square is preferably 40,000~100,000 m2;The grade every place in square, area is preferably 10,000~30,000 m2
Urban freight transport: the prediction of Urban freight transport amount should be with urban economy, social development planning, overall city planning And comprehensive transport plan is foundation;Urban freight transport should include transit shipment traffic, go out enter the market freight traffic and intracity trucking Three parts of traffic;The scale of goods stock station is preferably combined with city size with layout, in administrative region of a city key city, regionality Heart city preferably uses dispersion to layout;Subzone key city preferably uses concentration to layout, station addressing should close to main source of goods point, And it is combined with freight transportation center.
Urban road network's planning index table
Intersection traffic function, type selecting and planning and designing standard scale
Road Cross Section design: road Cross Section design should carry out in the red line width range of urban planning;Cross section Pattern, arrangement, each composition portion size and ratio should be by category of roads, rank, designed driving speed, the motor vehicles of design period Road and the non-motorized lane volume of traffic and flow of the people, traffic characteristics, traffic organization, means of transportation, upper boom line, underground utilities, green The factors such as change, landform are unified to be arranged, with the safe and smooth of support vehicles and footpound force traffic;Cross-sectional design should combine in nearly long term, Near Future Project is set to become the component part of engineering at a specified future date, and reserved pipeline position, highway layout should there are the leeway of development;To existing The method for having road reconstruction that engineering measure should be taken to combine with traffic administration, to improve road passage capability and ensure traffic peace Entirely;Through street should use dual carriageway road form, two-way 6~8 lane of A-road, 32~54 meters of boundary lines of roads width, in demand for services Compared with Multi sectional, suitable two sides set auxiliary road;Trunk roads generally use dual carriageway road form, and administrative region of a city key city driveway is generally two-way 6 Lane, 32~42 meters of boundary lines of roads width;Administrative region of a city key city built-up areas, Regional Central City major trunk roads can be two-way 4 vehicle According to the actual situation, 2 lanes also can be used in road, organic town, and boundary lines of roads width cannot be less than 12m, and pavement is arranged in two sides;It is secondary Main line generally uses single carriageway road form, and driveway is generally two-way 4 lane, administrative region of a city key city boundary lines of roads width 20~36 Rice, Regional Central City, sub-region key city, organic town can be used 2 lanes, and 12~36 meters of boundary lines of roads width, two sides Pavement is set;Branch generally uses single carriageway road form, and driveway is two-way 2~3 lane, and 9~26 meters of boundary lines of roads width, two Pavement is arranged in side;Special road generally uses single carriageway road form, and driveway is no more than 2 lanes, boundary lines of roads width 7~26 Rice;The cross section pattern of road has single carriageway road, dual carriageway road, triple carriageway road and quadri;
Comprehensive pipeline arrangement: urban road new construction pipeline (line) should be laid along underground, and buried pipeline can be used Directly buried installation or integrated pipe canal laying;The underground piping (line) laid under road should merge as far as possible according to type, take up an area down tube less Line corridor;Pipe network corridor should carry out comprehensive pipeline design, and use after planning administration administrative department passes;Pipeline (line) It should be arranged under pavement, when that can not be arranged on pavement, preferably be arranged under slow lane or non-motorized lane as far as possible;4 lanes And 4 the above width in lane road answer two sides arrange storm sewer;It is preferably two-way when dividing strip is wider or 6 lane of carriageway width Sewage pipe, feed pipe, natural gas tube and the more pipeline of other stub interfaces are set;When under high-voltage power line laying, answer Cable duct is set in both sides of the road, wherein a cable duct is high pressure designated lane;To prevent pipeline increase-volume or New raxa pipeline Laying and excavated pavement again, reserve integrated pipe canal preferably at viaduct main line interface position and critical junction;Directly buried pipeline Branched pipe should be arranged to meet the needs in both sides of the road plot, branch's tube spacing base area in certain distance in (line) or integrated pipe canal Block is determined using function, is typically located at crossing, when crossing length is more than 500m, street crossing branch pipe should be arranged in every 300m distance; Garage's underpasses and people's row channel roof thickness of earth covering be considered as arranging the needs of longitudinal pipeline, no less than 1.5m;
Kerb: kerb is preferably higher by 10~20cm of pavement edge, and linear bending section or steep section etc. in tunnel can be high 25~40cm of road surface out, and should have enough buried depths, to guarantee to stablize, kerb width is preferably 10~15cm, on grand bridge Kerb height should be greater than 40cm;Kerb preferably uses vertical, and entrance preferably uses inclined or flat;Pavement and crossing width Kerb is fit to do into inclined or flat in range, current convenient for carriage for children, wheelchair and disabled person;Separating belt end or intersection At minor radius, kerb is fit to do into curved shape;Hard stone matter or cement concrete can be used in kerb material;Cement concrete pressure resistance Spend not preferably less than 30MPa;
Road is flat, vertical alignment design: road plane position should be advised in detail road network laying by overall city planning and controlling; Road plane is linear to be combined with landform, geology, the hydrology etc., and meets the technical indicator of roads at different levels;Road plane design is answered It handles being connected for straight line and horizontal curve well, easement curve is reasonably set, superelevation, is widened;Road plane design should be according to city Intersection, along the line building entrance, parking lot entrance, dividing strip is reasonably arranged in city's roading layout and category of roads Fracture, public transport stop station location etc.;Vertical alignment design should refer to Urban planningcontrol absolute altitude and consider the vehicle of street building Enter and leave;To guarantee traffic safety, comfortable, Alignment Design answers that smooth, round and smooth, vision is continuous, and longitudinal slope preferably delays suitable, and rise and fall unsuitable frequency It is numerous;The vertical alignment design of road should comprehensively consider natural conditions, urban land property, road and region earthworks calculation, automobile The factors such as economic benefit are runed, rationally determine Pavement Design absolute altitude;The driveway of motor vehicle and non-motor vehicle mixed running, is preferably pressed Non-motor vehicle climbing capacity designs top rake.
Stopping sight distance on road plane, vertical section should be greater than or be equal to following table specified value:
Desin speed (km/h) 80 60 50 40 30 20
Stopping sight distance (m) 110 75 60 40 30 20
When the vehicle of Facing Movement has meeting possibility on driveway, Ying Caiyong meeting sighting distance, value is view of stopping in upper table Away from twice;The double-lane road of Facing Movement, should as needed and Combining with terrain, and setting has and overtakes other vehicles in appropriately distance The section of sighting distance.
Level-crossing planning and design: the planning and designing of level-crossing must be taken into consideration its effect in road network, Equilibrium relation between a variety of conditions such as associated other level-crossings and section;Urban road intersection should be by urban planning road Road network setting.Road intersection is appropriate to the occasion using orthogonal, it is necessary to which the angle of the crossing should be greater than or be equal to 45 ° when oblique, and dislocation is avoided to hand over as far as possible More than fork, five tunnels and five tunnels intersect and deformity is intersected;Intersection design should be according to the function of road intersection, property, grade, design Running speed, design hour traffic, flow direction and natural conditions etc. carry out.Such as built by separate periods, preliminary engineering should be later period enlarging Reserved land use;The pavement of intersection corner, which is mated formation, preferably suitably to be widened, and appropriately organizes pedestrian's street crossing;The important friendship of through street Prong should build overpass or underpass;Overpass or underpass are preferably built in important intersection on trunk roads;It hands over Prong design must fully consider the integration with traffic signals and various traffic rules;The Vertical Design of intersection should meet driving Comfortably, rapid and beautiful requirement is drained;The purpose of intersection design is specification vehicle, pedestrian track, allows driving vehicle It drives into, leave, cross, turn and intersects etc. and be necessarily placed at a relatively small regional scope;To improve the traffic capacity, plane Intersecting should take appropriate measures within the scope of inlet and outlet road to add lane;When major trunk roads intersect with trunk roads, usual friendship is preferably used; When the Current Traffic for entering trunk roads and trunk roads intersection is more than 4000~6000pch/h, road intersection is four lanes More than, it is settable three-dimensional to hand over and when taking Improving Measurements, adjustment traffic organization to be difficult to alleviate traffic congestion level-crossing Fork, and properly settle the influence being arranged after crossings on different level to adjacent plane intersection;Level-crossing design includes: inlet and outlet road Number of track-lines, inlet and outlet road lane width and sidewalk width;The traffic such as lane function division, traffic flow leading track, podium Canalized design;Bus stop;Parking line position and pedestrian's street crossing lateral road width and position;Sight triangle;Vertical Design;Respectively Class mark arrangement and the design of signal timing dial basic scheme etc.;The wagon flow for simplifying intersection, when necessary can forbidden part minor flow To being discongested using road network, using Signalized control tissue traffic, it is ensured that the unobstructed and due service level of intersection;Road The planning and design of intersection should guarantee that as far as possible road intersection is orthogonal;It is subject to conditions must not then use oblique when, should basis The size of intersection condition and each flow reasonably organizes traffic, when necessary can forbidden part minor movement, using road network dredge Solution, with ensure the safety of major flow with it is unobstructed;When having secondary distributor road and its ratings above road in road intersection, it is necessary to keep away Exempt from staggered cross;Main roads preferably use straight line within the scope of intersection, and when using curve, horizontal curve is preferably used to be greater than and not set The minimum radius of horizontal curve of superelevation;Desin speed refers to vehicle by entrance driveway and crosses fast by the traveling of intersection after exit ramp Degree, generally takes 0.5~0.7 times of non-intersection speed, straight traffic takes high level, and left and right steering wagon flow takes low value;Intersection is vertically set Meter should comprehensively consider comfortable, the draining factors such as unobstructed, project amount size and beauty of driving a vehicle, and rationally determine intersection designed elevation, Design principle is as follows: two road intersection, the longitudinal slope of main roads preferably remain unchanged, and secondary road longitudinal slope obeys main roads; Top rake in the scope of design of intersection, preferably less than or equal to 3%.It should be less than in difficult situation or equal to 4%, branch connect trunk Road, and when the outlet of branch right road, it is not limited;Intersection Vertical Design absolute altitude should be coordinated with the terrace absolute altitude of surrounding building; The number of track-lines in intersection carry out road should be added according to the volume of traffic, flow direction;The setting on intersection traffic island should effectively guide wagon flow Smooth traveling avoids accidentally going;Import and export road dividing strip or traffic marking should require arrangement according to canalization, and should on section Separate facilities linking.
Crossings on different level planning and design: when urban road intersects with highway, it is necessary to use crossings on different level;City is quick When road is intersected with other roads, Ying Caiyong crossings on different level;(the intersection volume of traffic is super with the big other roads of the volume of traffic for trunk roads Cross 4000~6000pcu/h) intersect, it is proved through traffic, in the transformation of usual friendship mouth or traffic organization difficulty, three-dimensional friendship can also be used Fork;In transportation condition needs or the advantageous place of orographic condition, crossings on different level can also be used, such as road cross a river or across the end of railway Portion, it is lateral opening using bridge, crossings on different level is set;It is limited by landform, setting plane traffic is more difficult, conducive to the road of setting grade separation By comparing, crossings on different level can be set in mouth;Under the premise of meeting communication function, Ying Caiyong form is succinct, goes for crossings on different level The specific ring road arrangement in direction is sailed, grade separation moulding should be with surrounding buildings and environmental harmony;When grade separation time phasing, should once set It counts, stage construction, the Aided design of traffic mark, graticule and traffic safety measure must be carried out in first stage of the project;Urban Intersection can be divided into two class of interchange and separate type crossings on different level;Interchange divides three by communication function positioning Kind;
A type-hinge type crossings on different level;
Type B-collective and distributive type crossings on different level;
C-type-simple type crossings on different level;
Crossings on different level between highway and through street, between through street and through street preferably uses A type hinge type three-dimensional Intersect, Type B, c-type crossings on different level can be used in the intersection between other roads;The basic pattern of interchange is by the trouble intersected Number mesh is generally divided into following three kinds:
T shape is intersected: mainly having tubaeform, directional type T shape;
Y shape intersects: mainly having whole directional type Y shapes and semi-directional formula Y shape;
Decussation: mainly there is independent quadrant-type, diamond shape, cloverleaf (half cloverleaf) shape, tubaeform, annular and fixed To formula;
Interchange region should have judgement to export before should having good sighting condition, main line to shunt nose needed for Sighting distance;The designed driving speed in crossings on different level main line straight trip direction should be consistent with the designed driving speed in section;In city road It in the grade separation of road, is influenced by its inlet and outlet, to ensure traffic safety, the speed within the scope of grade separation can be slightly less than the design vehicle on section Speed, but the main line technical indicator within the scope of grade separation should not be reduced with speed;The designed driving speed of bypass system within the scope of grade separation 0.7 times of desirable section bypass designed driving speed, the designed driving speed of loop ramp takes the 40 of main line designed driving speed ~50%, the designed driving speed of semi-directional ring road takes the 50~60% of main line designed driving speed, directional ramp design speed 70% or so of main line designed driving speed is taken, also can use the designed driving speed close to main line;Pass through plane in crossings on different level The desin speed of the secondary road straight traffic of intersection preferably uses 0.7 times of the desin speed of its corresponding category of roads;It is collecting and distributing The designed driving speed of road should mutually be coordinated with ring road or bypass designed driving speed;Ramp Design speed refers in Ramp Alignment The retainable maximum safe speed of urgent section institute, remaining section should travel adaptable speed as design with ring road speed change Controlling value;Ramp Design speed is related with category of intersection roads, ring road type;Right turn ramp should use the upper limit or centre as far as possible Value;Directional type and semi-directional formula left turn ramp preferably use the upper limit or median;Ring road cross section is by lane, side trip, urgent Lay-by and maintaining roadway composition, the ring road that opposite direction separates should also include median strip, and the size of each component part provides as follows: Curb-to-curb width is 3.5m, and bandwidth of stopping in emergency is 2.0m, and curb bandwidth is 0.5m, and 0.5m can be selected in maintaining roadway.
Road auxiliary equipment: city expressway median can set anticollision barrier, and anticollision barrier is arranged in trackside in principle; High embankment section (height > 6m) and abrupt slope, near water, racings, the Dangerous Area such as Lin Yan reinforced concrete, glass line steel plate anticollision should be set Guardrail or other effective safety protection facilities;City bridge and barricade of leading the way, curb level are not less than 40 centimetres;Work as curb It should be added when stone height is less than 40 centimetres and set anticollision barrier;Major urban arterial highway guardrail can be set as needed;Guardrail should be set obviously Indicate and meet traffic management department's requirement, movable rail should be arranged in when temporary traffic crossover lane;The small inferior grade of the volume of traffic Road, on abrupt slope, near water, Lin Yan and high embankment section (height > 3m) should be arranged reinforced concrete, concrete, rectangular slab of stone shield stone or its His effective safety protection facility;Concrete, rectangular slab of stone shield stone or other effective safety should be set as needed in special road Protective equipment;The volume of traffic greatly and crosses the level-crossing section more than pedestrian, settable fence or hedgerow, to prevent pedestrian in people Lane is passed through other than row lateral road;The arrangement of fence or hedgerow should not interfere the line-of-sight requirement of road;Acrossing highway, through street Urban Bridge pavement on the outside of, fence, which is preferably arranged, prevents parabolic from jeopardizing vehicle safety;Road within the scope of main city zone, should by stages, Subregion gradually establishes Intelligent road traffic information management system;Traffic warning mark should be placed in eye-catching place, any entity or individual Advertisement and other labels must not be set at warning mark;Traffic indication signal system and people's row should be arranged in grade crossing Cross the street signal system;Main city zone has formed the region of road network, the Ying Jianli intellectual traffic control network system;Road alignment variation Place, it is necessary to which sight boot flag should be arranged in the section that sight guidance is carried out to driver;Main line turning radius smaller part, circle There should be apparent steering sight line inducing mark on guardrail at road;At road shunting, grade separation bridge protective railings tail end, Directional island and The easy place of colliding should set apparent guiding Warning Mark, induction sign and Collsion proof safety facility;Road lighting to expanded field of vision, It improves intervisibility, sight is guided to have very good effect, to guarantee traffic safety, lighting installation should be arranged in downtown roads;Road lighting point For continuous illumination, local lighting, tunnel illumination three classes;At road curve, to the undesirable intersection of sighting distance, can be according to specific need Reflective mirror is set;In mountainous region, bend, sharp curve way section, intersection, garage exit/entry etc. are likely to occur the section of accident, must Reflective mirror must be set;Reflective mirror size, shape and radius of curvature are determined as the case may be by designing;On through street, trunk roads across Jiang great Qiao, major long tunnel, bridge, tunnel enter and leave both ends section, antiskid deceleration strip and road surface speed(-)limit sign should be arranged;Trunk roads Road longitudinal grade is greater than 4%, should set speed(-)limit sign and road surface forced deceleration strip within the scope of away from intersection 100m;Road longitudinal grade is larger Road, such as connect riverine (river) road T-shape and intersect, it is necessary to set deceleration strip;The intersection for not setting Traffic signal control with And channel, entrance enter main and secondary road position, setting warning mark, yield signs and deceleration device;Longitudinal slope relatively greatly enhances descending Road must set reduce-speed sign and deceleration strip along the line, while bogie passes through large percentage, should be according to degree of danger and section Ambient conditions considers setting vehicle urgent danger prevention area;People's row crosses facility zebra crossing and overpass or people's row can be used Road;In the trunk roads in city and in city expressway section, it is preferably 500m that people's row, which crosses facility spacing, on the section of secondary distributor road, The spacing of crossing or underpass is preferably 250-300m;When road width is more than four car lanes, crossing is answered Pedestrian island is set on dividing strip between the median strip or motor-driven road and non-motorized lane of driveway.
The setting principle of overpass and underpass: overpass and underpass must be arranged in through street;Heavy traffic Overpass or underpass should be set at the dense through street of street pedestrian, trunk roads, the section of secondary distributor road or level-crossing; Street pedestrian is intensive, influences vehicular traffic, causes at traffic Severe blockage;Vehicle flowrate is very big, and space headway is not able to satisfy street crossing Pedestrains safety walks the section that needs or vehicle seriously jeopardize street pedestrian's safety;The stream of people concentrates, and train train number is frequent, pedestrian Easily occur at accident across railway;Pedestrian flow amount across the crossing of intersection one is greater than 5000 person-times/h, and enters simultaneously When the equivalent car transportation amount at the crossing is greater than 1200/h;By the pedestrian flow total amount of traffic circle up to 18000 people Secondary/h, and when reaching 2000/h into the equivalent car transportation amount of traffic circle simultaneously;
Overpass and underpass setting requirements: the overpass and underpass in same street should unify consideration, Primary or stage construction;Overpass, underpass entrance should be with neighbouring environmental harmony;Overpass, underpass Setting should consider by permanent cross section is planned, and pay attention to closely at a specified future date combine;It is crossed the street for guidance pedestrian through overpass, underpass Parallel works should be set, imported and exported preferably in conjunction with neighbouring intersection pedestrian crossing system;Overpass or genuine design should accord with The requirement of urban landscape is closed, and is intimately associated with neighbouring ground or underground structure;It is answered at the entrance in overpass or tunnel Plan that the collecting and distributing land used of the stream of people, area are not preferably less than 50m2
Control of traffic and road facility: driver and pedestrian should be arranged in, it is readily seen that simultaneously can accurate interpretation in road sign Full position.It is settable as needed to illuminate or use reflective, luminous sign;Various marks are generally located on vehicle traveling side On the right side of to road or on dividing strip, sign board must not invade boundary line of road construction;Trackside formula mark should reduce Surface of sign board to driving The dazzle for the person of sailing;Plate face should be vertical or angled with center line of road, shows the way or caution sign is 0 °~10 °, ban or refer to Indicating will is 0 °~15 °;It is combinable to be mounted on a marker post when same place need to set two or more marks, but at most not It should be more than four kinds, logo content is not answered contradiction, repeated;Yield signs, releasing speed(-)limit sign, releasing overtaking prohibited sign etc. should be single Solely setting;Caution sign should be separately positioned on into before level-crossing, and difficult mountain terrain, S-curve terminus, are close at abrupt slope in sharp turn Before the locations at risk such as road, narrow bridge, narrow road, level crossing, surface slipperinness, tunnel, traffic accident multi-happening section;Prohibitory sign should divide Not She Zhi restricted speed, limitation axis, maximum height limit, Max. Clearance _M., no tooting, no parking, no left turn, forbids It turns right, no turns, no overtaking, forbids certain vehicle or all vehicle pass-throughs etc.;Index traffic sign placement intersection into To indicate vehicle heading, lane classification and crossing before mouth road, permit on the sections such as examination is braked, allowance is turned around;Refer to Road sign will should be arranged in away from 30~50m of level-crossing, point the direction, place of arrival, distance;Interchange fingerpost The longer section of distance is arranged between each face in intersection and two intersections in the preceding appropriate location of crossings on different level, road famous brand in will setting Between;Ground upper boom line should be according to planning optimal crosssection, and parallel center line of road is installed, and meets the requirement of boundary line of road construction. Roofbolt is preferably arranged in curb side strip;The part roofbolt on several way roads may be arranged in dividing strip, and pay attention to streetscape beauty;Traffic Graticule type and set-up site determine by mark, graticule as road sign simultaneously, also to dredging and guide traffic and rule Facility serves extremely important;Roadmarking should be designed according to road traffic engineering and road section pattern, determination of having a lot of social connections; Roadmarking form has driveway center line, and driveway edge line, stop line, zebra crossing, gives way at lane line Line, level-crossing central ring, carriageway width transition graticule, parking stall graticule, bus stop graticule, enters and leaves water conservancy diversion graticule Mouth graticule, guiding arrow and road surface text or pictorial symbolization etc.;Protuberant guide post is affixed to the tag block of road surface upper process, answers It is made into orienting reflex type, general section reflecting glass Bead is white, and Dangerous Area is red or yellow;Object marking may be provided in across On the pier stud of line bridge, aqueduct etc. or on the wall surface of tunnel portal side wall end face, safety island etc.;Main city zone primary and secondary road phase cross-channel Mouth should set traffic lights in principle, other crossings can need to be arranged according to road traffic;Signal lamp setting design should be according to friendship Logical engine request is gradually controlled to line traffic control and face from and is controlled;Road information system provides device;Very Large Bridge, city tunnel, quickly The big major trunk roads section of road, the volume of traffic, should be arranged Traffic Information collection device;Primary and secondary road intersects above intersection, tight Condition of road surface monitoring system device should be arranged in the traffic sensitive spot of line segments;It is logical for protection road effective service life and vehicle Vehicle parameter measurement facility can be set as needed in row safety, freeway toll station, city expressway entrance;
Parking lot: to guarantee the coast is clear and providing conveniently for masses, On Road Planning And Design should be set by national relevant regulations Set Public parking area and Stop of bus field position;The parking area in parking lot and linking-up road should facilitate parking and disengaging;Main city zone Public parking area is nearby preferably arranged in peripheral tracks transport hub station;It stops in emergency band and urgent danger prevention area;City expressway is most It is good that the band that stops in emergency completely is set;In city tunnel, the band that stops in emergency should be set, its spacing is not preferably greater than 750 meters;Under continuous urgency Urgent danger prevention area should be set as needed in ramp road.Its length is not less than 40 meters, and 5-7 meters of width, the gradient is reversed slope 10- 20%;To protect pedestrian, traffic safety, side slope safety facility should all be set as needed in city primary and secondary, Zhi Daolu;Design is answered It is reinforced according to slope surface and geological condition, gunite concrete, setting rockfall protecting net, anti-fall stone walling etc. mode handle setting side Slope safety devices;In the road section that city is especially important, the volume of traffic is very big, design will consider to compare common trench construction scheme; Municipal supporting pipelines and traffic supporting pipelines should once build completion in road, and road section pipe space resource must be sufficiently sharp With;City expressway and major trunk roads should be along completely pre-buried traffic monitoring pipeline, subsidiary road all fronts preferably pre-buried traffic monitoring pipelines;With Pre-buried traffic signals street crossing pipeline is answered at the crossing of main and secondary road intersection and zebra crossing;The confession of traffic signals and monitor and control facility Electric line is preferably derived from common transformer nearby, can be powered by nearest street-lighting transformer when unconditional.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of road traffic Route Design Method, which comprises the steps of:
Step 1: design vehicle outer profile size and minimum turning radius, design traffic volume, road service grade classification, at different levels Highway layout speed, road passage capability, intersection design capacity;
Step 2: urban public transport, bicycle traffic, pedestrian traffic, city square, Urban freight transport, urban road network Layout, urban road intersection design;
Step 3: road Cross Section design;
Step 4: road is flat, vertical alignment design;
Step 5: level-crossing planning and design;
Step 6: crossings on different level planning and design;
Step 7: road auxiliary equipment design.
2. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 1, if The meter volume of traffic should calculate or survey annual average daily traffic (ADT) is as roading controlling traffic volume;Prediction should be chosen Annual 30th peak hour traffic is as design traffic volume (DHV);Design hour traffic is to choose through street, trunk roads It was predicted by 20 years, subsidiary road was predicted by 15 years;(early evening peak) whole methods of operation during design should collect design hour The volume of traffic and direction distribution (D).
3. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 1, instead The road service grade for reflecting the degree of crowding of road is divided into A, B, C, D, E grades.
4. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 1, hand over Prong design capacity includes level-crossing and traffic interchange design capacity.
5. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 3, road Road cross-sectional design includes design principle, boundary lines of roads width, optimal crosssection, motor vehicle lane and width of roadway, non-maneuver Vehicle carriageway width, width of roadway, trackside bandwidth, parting strip, crown curve and crown slope, comprehensive pipeline arrangement, kerb.
6. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 4, road Lu Ping, vertical alignment design include but is not limited to plane, vertical alignment design principle, sighting distance, minimum radius of horizontal curve, superelevation.
7. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 5, put down Face intersections planning and design include but is not limited to design principle, the classification of level-crossing, different shape intersection traffic group Knit the design parameter of principle, level-crossing.
8. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 6, stand Body Interaction programming and design include but is not limited to basic pattern and applicable elements, sighting distance, the design driving of interchange Speed.
9. a kind of road traffic Route Design Method according to claim 1, it is characterised in that: in the step 7, road Auxiliary equipment design in road includes but is not limited to design principle, road safety facility, control of traffic and road facility.
CN201811613490.7A 2018-12-27 2018-12-27 A kind of road traffic Route Design Method Pending CN109871572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811613490.7A CN109871572A (en) 2018-12-27 2018-12-27 A kind of road traffic Route Design Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811613490.7A CN109871572A (en) 2018-12-27 2018-12-27 A kind of road traffic Route Design Method

Publications (1)

Publication Number Publication Date
CN109871572A true CN109871572A (en) 2019-06-11

Family

ID=66917242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811613490.7A Pending CN109871572A (en) 2018-12-27 2018-12-27 A kind of road traffic Route Design Method

Country Status (1)

Country Link
CN (1) CN109871572A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105645A (en) * 2019-12-31 2020-05-05 武汉理工大学 Multi-dimensional hierarchical intelligent street-crossing early warning system
CN112611355A (en) * 2020-11-03 2021-04-06 深圳市易智博网络科技有限公司 Longitudinal section map analysis method based on road underground pipeline
CN113256970A (en) * 2021-05-06 2021-08-13 哈尔滨工业大学 Intersection driving safety evaluation method and system
CN116957308A (en) * 2023-09-21 2023-10-27 武汉市规划研究院 Urban road section planning method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1594738A (en) * 2004-06-30 2005-03-16 大连理工大学 Improvement method for traffic organization of three-lane road and crossing
CN104778832A (en) * 2015-04-24 2015-07-15 东南大学 Multimode city road cross section resource coordinated configuration method
CN106381788A (en) * 2016-11-11 2017-02-08 李玉杰 Whole-net connection structure of urban road

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1594738A (en) * 2004-06-30 2005-03-16 大连理工大学 Improvement method for traffic organization of three-lane road and crossing
CN104778832A (en) * 2015-04-24 2015-07-15 东南大学 Multimode city road cross section resource coordinated configuration method
CN106381788A (en) * 2016-11-11 2017-02-08 李玉杰 Whole-net connection structure of urban road

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵宪尧等: "《道路交叉口规划、设计与管理技术》", 31 August 2016 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105645A (en) * 2019-12-31 2020-05-05 武汉理工大学 Multi-dimensional hierarchical intelligent street-crossing early warning system
CN112611355A (en) * 2020-11-03 2021-04-06 深圳市易智博网络科技有限公司 Longitudinal section map analysis method based on road underground pipeline
CN113256970A (en) * 2021-05-06 2021-08-13 哈尔滨工业大学 Intersection driving safety evaluation method and system
CN113256970B (en) * 2021-05-06 2022-10-25 哈尔滨工业大学 Intersection driving safety evaluation method and system
CN116957308A (en) * 2023-09-21 2023-10-27 武汉市规划研究院 Urban road section planning method and system
CN116957308B (en) * 2023-09-21 2023-11-24 武汉市规划研究院 Urban road section planning method and system

Similar Documents

Publication Publication Date Title
Planning Design
CN109871572A (en) A kind of road traffic Route Design Method
Czarnecki Operational world model ontology for automated driving systems–part 1: Road structure
KR20060088117A (en) A full interchange urban road system and the traffic method of using it
CN103088734B (en) Three-dimensional transportation system for urban main road
Mututantri et al. Design of a Flyover and Roundabout underneath it to ease the Traffic Congestion at the Rajagiriya Junction
Mahmud et al. Deficiencies of existing road network in Dhaka metropolitan city
Proudlove et al. Street management
Luo et al. Analysis on Safety Influencing Factors on Highway Interchange Design
AU2019100872A4 (en) Disbursing Melbourne's Eastern Freeway traffic
ESCAP Development of road infrastructure safety facility standards for the Asian high way network
Jones et al. Roundabout planning, design, and operations manual
Easa Geometric design
ESCAP Intergovernmental agreement on the Asian highway network
Fu The Application of “Humanized” Concept in Urban Road Design
Irgashevna Providing Safety and Convenience of Movement on City Streets and Roads
Stančerić et al. Redesign of four-leg urban intersection with light rail in a street corridor: case study in Zagreb
Gonzalez et al. Transportation Technical Report
Fee European Experience in Pedestrian and Bicycle Facilities
Panwar et al. Redesign of Rotary Intersection at Chambaghat Solan HP Due to 4 Lining of NH22
Abella et al. Detailed Design Report: Corridor Redesign of Chancellor Boulevard
Lubberding et al. Corridor Redesign of Chancellor Boulevard: Final Design Report
Das Development of Guidelines for the Design of Roundabouts
MENON Expressways and Traffic Management
Loutzenheiser Proposed Design Standards for Interregional Highways

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190611