ZA202007123B - Method for constructing full-casing full-rotary internal-ramming pile - Google Patents

Method for constructing full-casing full-rotary internal-ramming pile

Info

Publication number
ZA202007123B
ZA202007123B ZA2020/07123A ZA202007123A ZA202007123B ZA 202007123 B ZA202007123 B ZA 202007123B ZA 2020/07123 A ZA2020/07123 A ZA 2020/07123A ZA 202007123 A ZA202007123 A ZA 202007123A ZA 202007123 B ZA202007123 B ZA 202007123B
Authority
ZA
South Africa
Prior art keywords
full
constructing
rotary internal
casing
ramming pile
Prior art date
Application number
ZA2020/07123A
Inventor
Jianxin Zhu
Jingchen Xie
Jianhua Ding
Xinlin Feng
Guang Lu
Hua Bao
Junqing Hong
Fengxiang Yao
Hongqi Zhang
Hua Jiang
Feng Zhu
Original Assignee
Jianxin Zhu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianxin Zhu filed Critical Jianxin Zhu
Publication of ZA202007123B publication Critical patent/ZA202007123B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
ZA2020/07123A 2019-04-17 2020-11-16 Method for constructing full-casing full-rotary internal-ramming pile ZA202007123B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910306498.7A CN109944238A (en) 2019-04-17 2019-04-17 Pile construction method is rammed in full-sleeve full-rotation
PCT/CN2019/106770 WO2020211286A1 (en) 2019-04-17 2019-09-19 Method for constructing full-casing full-rotary internal-ramming pile

Publications (1)

Publication Number Publication Date
ZA202007123B true ZA202007123B (en) 2021-06-30

Family

ID=67015387

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA2020/07123A ZA202007123B (en) 2019-04-17 2020-11-16 Method for constructing full-casing full-rotary internal-ramming pile

Country Status (3)

Country Link
CN (1) CN109944238A (en)
WO (1) WO2020211286A1 (en)
ZA (1) ZA202007123B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944238A (en) * 2019-04-17 2019-06-28 朱建新 Pile construction method is rammed in full-sleeve full-rotation
CN112240022A (en) * 2020-10-26 2021-01-19 姚锋祥 Construction method and construction equipment for static pressure immersed tube pile

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2724548B2 (en) * 1995-07-10 1998-03-09 関西電力株式会社 2-stage enlarged head
CN100480474C (en) * 2006-04-06 2009-04-22 朱建新 Internal-tamping immersed tube bored concrete tamping-extending pile construction method
CN102644269A (en) * 2012-05-04 2012-08-22 朱建新 Non-earth-borrowing composite pile and construction method thereof
JP6589549B2 (en) * 2015-10-20 2019-10-16 Jfeエンジニアリング株式会社 How to build cast-in-place piles
CN105239564A (en) * 2015-10-28 2016-01-13 上海十三冶建设有限公司 Construction method of cast-in-place pile with combination of full-sleeve and mud protecting wall
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles
CN105839638A (en) * 2016-06-06 2016-08-10 徐�明 Convenient and efficient construction method for piles
CN106049464B (en) * 2016-06-06 2018-07-03 朱建新 The construction method of stake
CN109944238A (en) * 2019-04-17 2019-06-28 朱建新 Pile construction method is rammed in full-sleeve full-rotation

Also Published As

Publication number Publication date
WO2020211286A1 (en) 2020-10-22
CN109944238A (en) 2019-06-28

Similar Documents

Publication Publication Date Title
SG11202107482SA (en) Method for constructing structure
GB201907244D0 (en) Method
PL3889374T3 (en) Method for constructing buildings
GB201909562D0 (en) Method
GB201911286D0 (en) Method
ZA202007123B (en) Method for constructing full-casing full-rotary internal-ramming pile
GB201910759D0 (en) Method
GB201917742D0 (en) Method
GB201913997D0 (en) Method
GB201907782D0 (en) Method
GB201900940D0 (en) Method
GB201900647D0 (en) Method
SG10202000757YA (en) Confirming method
GB201917060D0 (en) Method
GB201901532D0 (en) Method
GB2580651B (en) A method
GB202000963D0 (en) A method
EP4038198C0 (en) Method
GB201917824D0 (en) Method
GB201917806D0 (en) Method
GB201917638D0 (en) Method
GB201917599D0 (en) Method
GB201916390D0 (en) Method
GB201916388D0 (en) Method
GB201916077D0 (en) Method