SG11202107482SA - Method for constructing structure - Google Patents
Method for constructing structureInfo
- Publication number
- SG11202107482SA SG11202107482SA SG11202107482SA SG11202107482SA SG11202107482SA SG 11202107482S A SG11202107482S A SG 11202107482SA SG 11202107482S A SG11202107482S A SG 11202107482SA SG 11202107482S A SG11202107482S A SG 11202107482SA SG 11202107482S A SG11202107482S A SG 11202107482SA
- Authority
- SG
- Singapore
- Prior art keywords
- foundation plate
- pile
- underground structure
- excavation
- sinking
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
- E02D29/055—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1628—Shapes rectangular
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
METHOD FOR CONSTRUCTING STRUCTURE
The present disclosure relates to a method for constructing a structure, and more particularly, to a method for constructing an underground structure above ground and sinking the same into the ground, rather than installing the same underground. [Background Art]
In constructing a basement floor on a ground with a high level of groundwater or soft ground, the outflow of groundwater may cause serious damage to not only underground structures such as adjacent tunnels, box structures, and subways, but also ground structures.
When excavation 1s performed beyond a certain depth, the safety of adjacent structures is partially checked before construction through the excavation depth or the like.
However, in actual construction, even life-threatening accidents frequently occur due to the c¢clliapse of the earthen barrier or the like. In addition, adjacent structures or roads undergo cracks, differential settlement, and sinkholes.
In recent years, even at excavation sites where the excavation depth 1s not relatively deep, which is not the target excavation depth, the «collapse of an adjacent building has occurred due to the collapse of earthen barriers or the outflow of groundwater. As such, excavation for the ceonstructien of underground structures in urban areas is a very difficult task. Therefore, there is a need for a2 method for excavation and structure construction for safer and more stable construction of underground structures.
FIG. 1 shows an underground structure that is generally used and constructed after excavation. As shown in FIG. 1, the conventional construction method is to construct an underground structure after excavating underground soil. That is, an earthen wall 500 is installed adjacent to the land boundary line, and a center pile 700 is installed in the excavation area. Then, excavation and installation of a strut 600 are repeated to complete the underground excavation. While constructing the foundation, retaining wall and basement flocor, the strut 600 and the center pile 700 are removed to complete the underground structure.
There are various excavation methods. Various methods for earthen barrier construction are also applied depending on the conditions of the ground, and various water cut-off methods are applied depending on the location of the groundwater level. After the excavation is completed, the underground structure is constructed. Alternatively, a top- down method in which the structure is constructed from the top to the bottom while constructing the temporary earthen barrier structure is used.
The conventional underground structure censtructicn method for constructing a structure after excavation raises the following issues in terms of safety and economic feasibility. In terms of safety, damage 1s caused to surrounding facilities due to excavation and loss of life is caused by the collapse of the earthen barrier structure. In terms of economic feasibility, the land is not sufficiently used and construction costs are wasted due to the construction of earthen barriers.
In other words, due to the earthen wall, the underground structure is only constructed at a certain distance from the land boundary line, and accordingly a considerable underground area cannot be used. As a result, economic losses are great.
Korean Patent Application Publication No. 10-2013- 0061368 relates to an underground structure construction method for constructing an underground structure such as a basement flcor of a bullding or a subway, or burying an underground pipe, but fails to address the above-mentioned issues.
Therefore, there is a need for development of a safe, economical, and fast structure construction method. [Disclosure] [Technical Problem]
Therefore, the present disclosure has been made in view of the above problems, and it is one object of the present disclosure to provide an efficient structure construction method capable of ensuring safety arcund a construction site, reducing construction costs, and shortening construction time. [Technical Solution]
In the present disclosure, a structure construction method for constructing an underground structure on the ground and sinking the same into the ground includes steps of: A) constructing a foundation plate 10 and a pile 20; B) installing a Jjack-down device and constructing a basement structure; CC) performing excavation under the foundation plate 10 and sinking the underground structure; and D) dismantling the Jjack-down device and fixing the pile 20, wherein the jack-down device is installed on the foundation plate 10, such that a degree of sinking of the underground structure is controlled by adjusting force of the jack-down device, wherein the excavation under the foundation plate 10 and the sinking of the underground structure are performed in parallel.
In the present disclosure, a structure construction method for constructing an underground structure on the ground and sinking the same into the ground includes steps of: a constructing an outer foundation plate 50 and a pile 20; b) installing a Jjack-down device; c) performing excavation under the outer foundation plate 50 and sinking the underground structure; and d) dismantling the jack-down device and fixing the pile 20, wherein the jack-down device is installed on the outer foundation plate 50, such that a degree of sinking of the underground structure is controlled by adjusting force of the Jjack-down device, wherein the excavation under the outer foundation plate 50 and the sinking of the underground structure are performed in parallel.
The sinking is performed by a weight of the underground structure.
Alternatively, the sinking is performed by a weight of the underground structure and additional external force.
The additional external force is generated by: increasing the load by adding a temporary load to the underground structure; using a rock anchor or earth anchor installed in the ground; or using main surface friction of the pile installed in the ground.
The excavation is performed by: using excavation equipment; using a water jet; or suctioning and discharging soil from the ground.
The method further includes constructing an additional foundation plate on the foundation plate 10 and the pile 20 after the step D).
The method further includes constructing an additional foundation plate on the outer foundation plate 50 and the pile 20 after the step d). [advantageous Effects]
The structure construction method according to the present disclosure has the following effects.
First, an excavation wall and an outer wall, which are the structures of an underground structure, may function as a structure, while being used as earthen barriers during the construction process. Accordingly, soil leakage and water may be prevented in the vicinity of new construction, and thus the safety of nearby facilities may be secured.
Second, when the conventional method is used, groundwater leaking during excavation is discharged through pumping, which lowers the surrounding groundwater level, thereby producing a sinkhole and causing a safety related problem te adjacent structures. On the other hand, according to the present disclosure, the groundwater is not discharged out, but excavation is performed using a water
Jet in some cases. Accordingly, decrease in the surrounding groundwater level, which causes problems, may be prevented.
Third, according to the present disclosure, there is no need for a water cut-off method including a temporary earthen barrier facility, and there is no risk of collapse in excavation. Therefore, instability of the temporary structure raising several issues may be prevented.
Fourth, since temporary earthen barrier facilities are not required, time and costs required for installing and dismantling the temporary earthen barrier facilities may be reduced, shortening the construction period and reducing construction costs.
Fifth, since the surrounding ground is firmly supported by the excavaticn wall and the outer wall before excavating the ground, disturbance of the surrounding ground may not occur.
Sixth, as the earth wall is not installed, the underground structure may be constructed up te the land boundary line. Accordingly, the utility wvalue of the land may be increased and the underground space may be used as much as possible.
Seventh, the pile for construction of an underground structure may function as a support and guide to control settlement of the underground structure during construction,
and function as a deep foundation after construction is completed.
Eighth, the amount of settlement of underground structures may be controlled using a hydraulic Jack.
Accordingly, precise construction may be ensured.
Ninth, since the temporary earthen barrier facility is not reguired, accidents caused by the collapse of the
Temporary earthen barrier facility may be prevented. [Description of Drawings]
FIG. 1 shows conventional technclogy.
FIGS. 2 to 7 illustrate a procedure according to a first embodiment of the present disclosure.
FIGS. 8 and 9 illustrate a second embodiment of the present disclosure.
FIGS. 10 and 11 illustrate a third embodiment of the present disclosure.
FIG. 12 is an enlarged view of a foundation plate, a pile, and a hydraulic jack.
X Brief description of reference numerals 100: Underground structure 10: Base plate 11: Block out 12: Excavation wall 13: Tip shoe 14: Egulpment entrance 20: Pile 30: Second basement structure
31: Bottom plate 32 Outer wall 33: Pillar 34: Second basement floor 40: First basement level structure 41: Bottom plate 42: Cuter wall 43: Pillar 44: First basement level 0: Outer foundation plate 60: Outer basement structure 300: Hydraulic jack 310: Anchor 311i: Anchor fixture 320: Pressure plate 330: Pressurizing stand 400: Land boundary line 500: Earth wall 600: Strut 700: Center file [Best Model
Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings such that those of ordinary skill in the art can easily implement the present disclosure.
However, the present disclosure may be implemented in various different forms and is not limited to the embodiments described herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present disclosure. Similar reference numerals are used to refer to similar parts throughout the specification. Throughout the specification, when a certain portion “includes” or “comprises” a certain component, this indicates that other components are not excluded and may be further included unless otherwise noted. Hereinafter, preferred embodiments of the present disclosure will be described in detail with reference to the accompanying drawings.
Conventionally, an underground structure is constructed in an underground space after excavating the ground. On the other hand, in the present disclosure, a structure 1s constructed in a manner in which an underground structure is constructed on the ground, and then sunken into the ground while excavating the part under the foundation plate.
The underground structure 100 of Lhe present disclosure includes a foundation plate 10, a pile 20, and a basement structure. The basement structure may have one layer or two or more layers. In first and second embodiments, the basement structure includes a 2-level basement structure 30 and a l-level basement structure 40.
FIGS. 2 te 7 show the first embodiment of the present disclosure for constructing the underground structure 100.
Hereinafter, each censtructicen step 1n the case of constructing the second basement floor will be described in detail with reference to FIGS. 2 to 7.
A) Construction of the foundation plate 10 (see FIG. 2).
A foundation plate 10 made of reinforced concrete is constructed on the ground. As shown in FIG. 2, the edge of the foundation plate 10 may be directly adjacent to the land boundary line 400, or may substantially coincide with the land boundary line 400.
In the construction method, the outer wall of the underground structure is used as an earthen barrier.
Accordingly, a separate earthen barrier is not required.
The foundation plate and the outer wall of the underground structure are constructed so as to contact the land boundary line as much as possible to maximize the underground space.
First, since the foundation plate 10 is constructed, and then the pile 20 is constructed, a hole through which the pile 20 can be installed should be formed in the foundation plate. Therefore, in constructing the foundation plate, a sieeve for forming a hole for the pile 20 is installed in advance. A steel pipe may be used as the sleeve.
After sinking of the underground structure is completed, a groove is formed in the foundation plate by a certain thickness to form a blockout 11 in order to make a space for fixing the upper part of the pile 20 to the foundation plate {see FIG. 12). After fixing the file,
grouting is performed in the blockout 11.
An excavaticn wall 12 may be arranged at the lower edge of the foundation plate 10. The excavation wall 12 may be used as an earthen barrier wall during excavation work.
In addition, a tip shoe 13 having an inclined tip is disposed at the lower end of the excavation wall 12, such that the underground structure may be easily inserted into the ground.
To form the tip shoe 13, a steel plate, which is a permanent mold, may be used or concrete may be formed to have an inclined cross section.
After the excavation wall 12 is first constructed, concrete for the foundation plate 1s poured such that the excavation wall 12 and the foundation plate 10 are integrated.
In constructing the foundation plate 10, a required number of Jjack-down anchors 310 may be pre-installed by calculating the load of the underground structure (see FIG. 123. The quantity and capacity of the anchors 310 may he applied according to the weight of the underground structure and the load generated when the underground structure is sunken.
The lower end of the ancher 310 is provided with an anchor fixing member 311 for fixing the anchor to the foundation plate. The anchor fixing member 311 may be buried in the foundation plate 10, or may be fixed to the bottom of the foundation plate 184.
It has been described that the anchor 310 for jack- down is pre-installed. In some cases, however, The anchor may not be pre-installed. Instead, the Jack-down may be performed after installing a chemical anchor after construction of the foundation plate.
The thickness of the foundation plate is determined in consideration of the load required for Jjack-down and the structural stability of the underground structure. 2) Construction of the pile 20 (see FIG. 2).
When the foundation plate 10 is installed, the pile is installed through a hole formed by the sleeve for construction of the pile 20. The pile 20 may be a steel pile, a ready-made reinforced concrete pile, a PHC pile, a composite pile, a cast-in-place concrete pile, or the like.
Installation of piles may be performed using a method such as driving, drilling after excavation, or the like. The pile 1s installed up to the basement bedrock that may exhibit the end bearing capacity.
When the pile 20 is not used as a deep foundation after construction of the underground structure is completed, that 1s, when the foundation is a spread foundation rather than a pile foundation, only minimum temporary piles required for Jack-down of the underground structure may be constructed.
In the case of an underground structure designed with a pile foundation, the jack-down device may not be installed on every pile, but may be installed only con as many piles as necessary to jack down the underground structure. The load to be applied at this time is applied in consideration of the weight of the underground structure constructed during
Jack~-down and the amount of reduction due toe buovancy.
In the case of an underground structure designed with direct foundation, the minimum number of piles necessary for
Jack~down is constructed and used for Jjack-down. The load to be applied at this time is applied in consideration of the weight of the underground structure constructed during
Jack—-down and the amount of reduction due to buovancy. (3 Installation of jack-down device and construction of basement two-story structure (30) (see FIG. 3}
A jack-down device capable of contrelling the settlement amount and settlement speed of the underground structure is installed, and the basement two-story structure (30) is constructed. At this time, in order to reduce the construction period by efficiently proceeding the work, construction of the second basement structure 30 may be performed while installing the jack-down device.
Referring to FIG. 12, which shows a jack-down device, a pressurizing stand 330 is fixed to the top of the pile 20,
and a hydraulic jack 300 is installed on the pressurizing stand 330. The lower end of the anchor 310 is fixed to the foundation plate 10 by an anchor fixing member 311, and the upper end of the anchor 310 is fastened to the pressure plate 320. A nut may be used to fasten the upper end of the anchor 310 to the pressure plate 320. By controlling the pushing force that the hydraulic jack 300 applies to the pressure plate 3220, the amount of settlement of the foundation plate may be precisely controlled.
The Jack-down device shown in FIG. 12 is merely an embodiment, and the hydraulic jack, the anchor, the pressure plate, and the pressurizing stand may be combined in a different structure.
The second basement structure 30 may include a bottom plate 31, an outer wall 32, and a pillar 33. The outer wall 32 may function as an outer wall of the underground structure and an earthen barrier at the same time. The pillar 33 includes a pillar and a wall supporting the bottom plate 31. @ Excavation under the foundation plate 10 and Jjack- down of the underground structure (see FIGS. 3 and 4)
When the part under the foundation plate is excavated after the installation of the jack-down device is completed, the second basement structure will naturally sink due to its own welght and the weight of the foundation plate.
Various methods may be used to excavate the part under the foundation plate depending on the condition of the ground under the plate. in the case of s=zoft ground, the scil under the foundation plate may be removed by suctioning the soil. The
Jack—-down device is tc be contrelled while accurately measuring the amount of settlement such that the structure does not non-unifeormly sink when the soil is removed. After a certain amount is excavated, the structure is sunken using the jack-down device. This process is repeated to place the underground structure at a desired location. Depending on the viscosity and moisture content of the clay, water
Jetting and agitation are performed to facilitate suction.
The sucked muddy water is separated into soil and water through a dewatering process. The separated soil and sand may be Taken out to the sandy soil site and the separated water may be reused at the site to prevent environmental pollution.
When the ground under the foundaticn plate is relatively good, suction or dewatering may be additionally performed together with water Jetting or excavation may be performed in parallel to sink the structure.
When the ground under the foundation plate is hard like bedrock, an eguipment entrance 14 is formed in the foundation plate, and the ground under the foundation plate is excavated using the excavation equipment, and then the structure is brought down. (® Construction of the first basement structure 40 {see FIG. 5)
When the second basement structure 30 is placed on the foundation plate and sinks by a required depth (FIG. 4), the first basement structure 40 is constructed on the ground level on the second basement structure 30 (FIG. bh).
The first basement structure 40 may include a bottom plate 41, an outer wall 42, and a pillar 43. The outer wall 42 also functions as an outer wall of the underground structure and an earthen barrier at the same time. The pillar 43 includes a pillar and a wall supporting the bottom plate 41. © Repetition of excavation under the foundation plate 10 and jack-down of the underground structure (see
FIGS. 5 and 6)
After the construction of the first basement structure 40, the underground structure is sunken by controlling the jack-down device while excavating the earth under the foundation plate. The sinking is performed up to the required depth (FIG. 6). 7 Completing sinking, dismantling the Jjack-down device, and settling the pile (see FIG. 7)
Cnce sinking to the reguired depth is complete, the jack-down device is dismantled. After cutting the anchor 318 and fixing the anchor 310 and the upper end of the pile 20, grouting is performed in the blockout 11 to fix the pile on the foundation plate.
After performing steps © to (I above, the construction c¢f the intericr of the underground structure and construction of the ground structure are carried out as necessary. Then, the construction of the structure is completed.
FIGS. 8 and © illustrate construction of an underground structure 100 according to a second embodiment of the present disclosure.
In the second embodiment, the pile 20 1s first constructed, and then the foundation plate 10 is constructed.
In other words, in the second embodiment, step @ is performed first, and then step @ is performed. Then, steps 3 to @ are performed as described above.
In the first and second embodiments, the process of forming the first basement structure and the second basement structure has been described. However, the present disclosure is net limited te the first basement structure and the second basement structure. That is, only the first basement structure may be formed, or a plurality of basement floors of two or more basement levels may be formed by repeating steps @ and & described above.
FIGS. 10 and 11 illustrate construction of an underground structure 100 according to a third embodiment of the present disclosure.
The third embodiment may be applied when an area where an underground structure is constructed is large.
That is, when the plan area ¢f the underground structure is large, forming the entire foundation plate as one body and sinking the same may be difficult and have a risk of damaging the foundation plate, and may be rather inefficient.
In this case, an outer foundation plate 50 is constructed for a certain width at the land boundary line 400. Then, the outer foundation plate 50 is sunken in the same manner as described above. An outer basement structure 60 may be constructed on the outer foundation plate 50 and then sunken. In this operation, while excavating the soil under the outer foundation plate 50, the outer foundation plate is sunken. Once sinking of the outer foundation plate is completed, a foundation plate and the basement structure are constructed.
At this time, the internal soil inside the outer foundation plate 20 may be left as it is. Then, the internal scil may be excavated after sinking of the underground structure is completed. In addition, while the outer foundation plate 50 is sunken by a certain degree, the internal scil may be excavated.
In the third embodiment, after constructing the outer foundaticen plate 54, the pile 28 may be installed.
Alternatively, after installing the pile 20, the outer foundation plate 50 may be constructed.
In the above embodiments, it has been described that the foundation plate 10 or the cuter foundation plate 50 is constructed as a single floor. In some cases, after the sinking is completed, an additicnal foundation plate may be formed on the foundation plate 10 or the outer foundation plate 50.
That is, when a concrete pile or a pile with a large diameter is used as a pile foundation, it may be difficult te implement rebar arrangement on the foundation plate 10 due to the pile. Further, it is difficult to firmly fix the upper portion of the pile to the foundation plate.
Therefore, after the sinking 1s completed, an additional foundation plate is preferably constructed on the foundation plate 10. In constructing the additional foundation plate, the jack-down foundation plate 10 is constructed as thin as possible. After the sinking of the underground structure is completed, the pile and the foundation plate 10 are settled.
Then, rebar arrangement is performed on the pile and the foundation plate 10, and then a mat (for the additional foundation plate) is poured to construct the additional foundation plate.
In constructing an additional foundation plate on the foundation plate 10, the reinforcement and thickness of the entire foundation are considered and reflected in the floor height of the underground structure. By constructing the additional foundation plate, sufficient rigidity of the mat may be obtained even with a pile having a large diameter.
In addition, in constructing an additional foundation plate, reinforcing kars must be constructed in advance at a location determined in consideration of the connection between the additional foundation plate and the foundation plate 10, and the connection between the additional foundation plate and the wall and pillar.
On the other hand, when a steel pipe pile is used, an additional foundation plate may not be required, and only the foundation plate 10 may be used because the diameter of the pile is not large enough to interfere with the arrangement of reinforcing bars on the foundation plate, .
In sinking an underground structure, it may be difficult to =ink the structure by the weight of the underground structure alone. In this case, the structure may ke sunken using the following method.
First, a load may be added. The load may be increased by adding a temporary lecad on the foundation plate or the underground structure.
Second, a rock anchor or earth anchor may be installed in the ground, and the structure may be sunken by pulling the rock anchor or earth anchor.
Third, the friction on the main surface of the installed pile may be used. When the hydraulic Jack is contracted, a force that pulls the foundation plate downward is generated because the pile is fixed in the ground by the main surface friction force.
While the present disclosure has been described with reference to the embodiments shown in the drawings, this is only exemplary, and those of ordinary skill in the art will understand that various modifications and other eguivalent embodiments are possible therefrom. Therefore, the scope of the present disclosure should be determined by the technical spirit of the appended claims.
[craTms] 1. A structure construction method for constructing an underground structure on a ground and sinking the same into the ground, the method comprising steps of:
A) constructing a foundation plate (10) and a pile (20);
By installing a Jack-down device and constructing a basement structure;
Cy performing excavation under the foundation plate (10) and sinking the underground structure; and
D} dismantling the Jjack-down device and fixing the pile (20), wherein the Jjack-down device is installed on the foundation plate (10), such that a degree of sinking of the underground structure is controlled by adjusting force of the Jjack-down device, wherein the excavation under the foundation plate (10) and the sinking of the underground structure are performed in parallel. 2. A structure construction method for constructing an underground structure on a ground and sinking the same into the ground, the method comprising steps of:
Claims (1)
- a} constructing an outer foundation plate (50) and a pile (20); b} installing a jack-down device; c¢) performing excavation under the outer foundation plate (50) and sinking the underground structure; and dy dismantling the Jack-deown device and fixing the pile (20), wherein the Jjack-down device is installed on the outer foundation plate (50), such that a degree of sinking of the underground structure is centrolled by adjusting force of the jack-down device, wherein the excavation under the outer foundation plate (50) and the sinking of the underground structure are performed in parallel.3. The method of claim 1 or 2, wherein the sinking is performed by a weight of the underground structure.4. The method of claim 1 or 2, wherein the sinking is performed by a weight of the underground structure and additional external force.5. The method for claim 4, wherein the additional external force is generated by:increasing the load by adding a temporary load to the underground structure; using a rock anchor or earth anchor installed in the ground; or using main surface friction of the pile installed in the ground.6. The method of claim 1 or 2, wherein the excavation is performed by: using excavation equipment; using a water Jet; or suctioning and discharging secil from the ground.7. The methed of claim 1, further comprising: constructing an additional foundation plate on the foundation plate (10) and the pile (20) after the step D).8. The method of claim 2, further comprising: constructing an additional foundation plate on the outer foundation plate (50) and the pile (20) after the step dj.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020190001641A KR101960413B1 (en) | 2019-01-07 | 2019-01-07 | Structure construction method |
| PCT/KR2019/013075 WO2020145483A1 (en) | 2019-01-07 | 2019-10-04 | Method for constructing structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SG11202107482SA true SG11202107482SA (en) | 2021-08-30 |
Family
ID=66036173
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SG11202107482SA SG11202107482SA (en) | 2019-01-07 | 2019-10-04 | Method for constructing structure |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20220098817A1 (en) |
| JP (1) | JP2022517333A (en) |
| KR (1) | KR101960413B1 (en) |
| CN (1) | CN113614315A (en) |
| PH (1) | PH12021551639A1 (en) |
| SG (1) | SG11202107482SA (en) |
| WO (1) | WO2020145483A1 (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101960413B1 (en) * | 2019-01-07 | 2019-03-20 | 김준성 | Structure construction method |
| KR102199641B1 (en) | 2019-09-19 | 2021-01-07 | 김성수 | Construction method of driven pile for newly built structure |
| KR102113117B1 (en) * | 2019-10-22 | 2020-05-20 | 김준성 | Structure construction method using guide wall |
| KR102215027B1 (en) | 2020-08-31 | 2021-02-10 | 김상우 | Construction method of structure using ground bearing capacity |
| CN112502464B (en) * | 2020-11-23 | 2022-07-05 | 上海建工二建集团有限公司 | Reverse construction method for extension basement under existing building |
| KR20240015844A (en) | 2022-07-28 | 2024-02-06 | 조규면 | Underground excavation method using concrete retaining wall and H-beam blocks |
| CN115467367B (en) * | 2022-08-17 | 2023-06-16 | 湖北工业大学 | Construction method for actively compensating deformation of underpass operation tunnel in upper engineering construction |
| KR102522619B1 (en) * | 2023-01-26 | 2023-04-17 | 주식회사 선공 | Upward basement structure demolition method |
| KR102595013B1 (en) * | 2023-02-09 | 2023-10-26 | 노경범 | Construction Method of Underground Road to Minimize Traffic Control |
| US11946217B1 (en) * | 2023-09-18 | 2024-04-02 | China Railway Tunnel Group Co., Ltd. | Top plate jacking device and jacking construction method configured for V-shaped columns |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05247951A (en) * | 1992-01-30 | 1993-09-24 | Yuan Hoo Lee | Building basement construction method and traction device used for it |
| JP2688560B2 (en) * | 1993-06-29 | 1997-12-10 | 戸田建設株式会社 | Construction method of underground structure |
| JP3430376B2 (en) * | 1993-12-22 | 2003-07-28 | 大成建設株式会社 | How to build an underground skeleton |
| JPH09302683A (en) * | 1996-05-11 | 1997-11-25 | Fujikou:Kk | How to build a basement |
| KR100641960B1 (en) * | 2005-02-16 | 2006-11-06 | 이성우 | Formwork for underwater foundations using fiber-reinforced composite panels and construction method of foundations using the same |
| KR101034398B1 (en) * | 2007-06-28 | 2011-05-16 | (주)바로건설기술 | Underground structure construction method that combines underground clogging method |
| CN101418573B (en) * | 2008-01-24 | 2012-09-05 | 丁慈鑫 | Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface |
| CN101851930B (en) * | 2010-01-15 | 2012-10-03 | 丁慈鑫 | Sinking device of open caisson and sinking method of open caisson with same |
| JP4942230B1 (en) * | 2010-11-29 | 2012-05-30 | 賢治 町筋 | Submersible method and equipment for submerged method |
| KR20130061368A (en) | 2011-12-01 | 2013-06-11 | 정진덕 | Structure of retaining wall and construction method for installing underground structures |
| CN107842046A (en) * | 2017-11-27 | 2018-03-27 | 杨孝 | A kind of strengthening of foundation error-correction structure and the method for strengthening of foundation correction |
| KR101960413B1 (en) * | 2019-01-07 | 2019-03-20 | 김준성 | Structure construction method |
-
2019
- 2019-01-07 KR KR1020190001641A patent/KR101960413B1/en active Active
- 2019-10-04 PH PH1/2021/551639A patent/PH12021551639A1/en unknown
- 2019-10-04 WO PCT/KR2019/013075 patent/WO2020145483A1/en not_active Ceased
- 2019-10-04 SG SG11202107482SA patent/SG11202107482SA/en unknown
- 2019-10-04 US US17/420,979 patent/US20220098817A1/en not_active Abandoned
- 2019-10-04 CN CN201980088045.XA patent/CN113614315A/en active Pending
- 2019-10-04 JP JP2021539593A patent/JP2022517333A/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US20220098817A1 (en) | 2022-03-31 |
| PH12021551639A1 (en) | 2022-05-02 |
| CN113614315A (en) | 2021-11-05 |
| KR101960413B1 (en) | 2019-03-20 |
| WO2020145483A1 (en) | 2020-07-16 |
| JP2022517333A (en) | 2022-03-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20220098817A1 (en) | Method for constructing structure | |
| CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
| KR101070426B1 (en) | Improved Underpinning Method Using the micro pile | |
| CN110878562B (en) | Method for in-situ excavation of foundation pit and new addition of underground structure under existing reserved building | |
| KR102522619B1 (en) | Upward basement structure demolition method | |
| CN104264683B (en) | Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition | |
| JP3752560B2 (en) | Basic structure for constructing a new building in an existing basement and its construction method | |
| CN206034454U (en) | Supporting construction | |
| CN115506382A (en) | Construction method for pile plate wall of island building platform | |
| JP3126896B2 (en) | Restoration method for uneven settlement structures | |
| CN113323026A (en) | Soft soil layer existing building side-excavation deep foundation pit front reinforcing structure and reinforcing method thereof | |
| KR102645823B1 (en) | Top-down and bottom-up parallel decommissioning of existing building | |
| JP2012112121A (en) | Excavation method of ground under spread foundation and base-isolating method of existing building | |
| CN100443673C (en) | Construction method | |
| KR100976621B1 (en) | Underground foundation construction method for basement extension service | |
| KR20090120997A (en) | Construction method of underwater structure | |
| CN115434335A (en) | A support structure and construction method for elevator shaft foundation pit in deep silt strata | |
| KR101052363B1 (en) | Freestanding Digging Method for Deep Excavation | |
| KR101257905B1 (en) | Method for constructing foundation work | |
| KR102579002B1 (en) | Method of demolition of underground exterior walls | |
| JPH0559728A (en) | Sheathing work above underground structure | |
| CN114809134B (en) | Construction method for jacking and rectifying deviation of multi-layer concrete building of raft foundation | |
| CN212656218U (en) | Heavy pile machine load underpinning structure | |
| JP6259271B2 (en) | Caisson installation method and underground column body group | |
| KR102113117B1 (en) | Structure construction method using guide wall |