WO2024049733A1 - Multiple primary nodes for wireless battery management system robustness - Google Patents

Multiple primary nodes for wireless battery management system robustness Download PDF

Info

Publication number
WO2024049733A1
WO2024049733A1 PCT/US2023/031235 US2023031235W WO2024049733A1 WO 2024049733 A1 WO2024049733 A1 WO 2024049733A1 US 2023031235 W US2023031235 W US 2023031235W WO 2024049733 A1 WO2024049733 A1 WO 2024049733A1
Authority
WO
WIPO (PCT)
Prior art keywords
primary device
battery
secondary devices
primary node
wireless network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2023/031235
Other languages
English (en)
French (fr)
Inventor
Jyothsna Kunduru
Ariton Xhafa
Minghua Fu
Jonathan Nafziger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Texas Instruments Inc
Original Assignee
Texas Instruments Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Texas Instruments Inc filed Critical Texas Instruments Inc
Priority to KR1020257006270A priority Critical patent/KR20250059400A/ko
Priority to EP23787217.1A priority patent/EP4581840A1/en
Priority to CN202380059061.2A priority patent/CN119698849A/zh
Priority to JP2025512875A priority patent/JP2025529180A/ja
Publication of WO2024049733A1 publication Critical patent/WO2024049733A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04Q—SELECTING
    • H04Q9/00—Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/371—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC] with remote indication, e.g. on external chargers
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06—Management of faults, events, alarms or notifications
    • H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663—Performing the actions predefined by failover planning, e.g. switching to standby network elements
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/396—Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M10/4257—Smart batteries, e.g. electronic circuits inside the housing of the cells or batteries
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/482—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00—Network arrangements or protocols for supporting network services or applications
    • H04L67/01—Protocols
    • H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04W—WIRELESS COMMUNICATION NETWORKS
    • H04W24/00—Supervisory, monitoring or testing arrangements
    • H04W24/04—Arrangements for maintaining operational condition
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04W—WIRELESS COMMUNICATION NETWORKS
    • H04W72/00—Local resource management
    • H04W72/20—Control channels or signalling for resource management
    • H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04W—WIRELESS COMMUNICATION NETWORKS
    • H04W76/00—Connection management
    • H04W76/10—Connection setup
    • G—PHYSICS
    • G08—SIGNALLING
    • G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C25/00—Arrangements for preventing or correcting errors; Monitoring arrangements
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271—Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4278—Systems for data transfer from batteries, e.g. transfer of battery parameters to a controller, data transferred between battery controller and main controller
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04Q—SELECTING
    • H04Q2209/00—Arrangements in telecontrol or telemetry systems
    • H04Q2209/10—Arrangements in telecontrol or telemetry systems using a centralized architecture
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04Q—SELECTING
    • H04Q2209/00—Arrangements in telecontrol or telemetry systems
    • H04Q2209/40—Arrangements in telecontrol or telemetry systems using a wireless architecture
    • H—ELECTRICITY
    • H04—ELECTRIC COMMUNICATION TECHNIQUE
    • H04Q—SELECTING
    • H04Q2209/00—Arrangements in telecontrol or telemetry systems
    • H04Q2209/80—Arrangements in the sub-station, i.e. sensing device
    • H04Q2209/86—Performing a diagnostic of the sensing device

Definitions

  • a system includes a first plurality of secondary devices, each secondary device of the first plurality of secondary devices including a first wireless transmitter and a battery monitor integrated circuit (IC).
  • IC battery monitor integrated circuit
  • the battery monitor IC is configured to obtain battery data from at least one battery cell, and the first wireless transmitter is configured to wirelessly transmit the battery data.
  • a first primary device has a second wireless transmitter wirelessly coupled to the first wireless transmitters of the first plurality of secondary devices via a first wireless network.
  • a second primary device has a second wireless transmitter. The second primary device is configured to detect a fault with the first primary device and, in response detection of the fault, to establish a second wireless network with the first plurality of secondary devices.
  • FIG. 1 is a block diagram illustrating a battery management system (WBMS) having primary and secondary nodes, in accordance with an example.
  • FIG.2 is another block diagram illustrating a WBMS, in accordance with an example.
  • FIG. 3 is a block diagram of a radio usable in the primary and secondary nodes of the WBMS, in accordance with an example.
  • FIG.4 is a diagram of a superframe for a WBMS, in accordance with an example.
  • FIG.5 is a block diagram of a WBMS system having a primary node, a backup primary node, and memory that is shared between the primary and backup primary nodes, in accordance with an example.
  • FIG.6 is a block diagram of a WBMS system having a primary node and a backup primary node without use of a shared memory, in accordance with an example.
  • FIG.7 is a block diagram of a WBMS system having a primary node and a backup primary node, in accordance with yet another example.
  • FIG.8 is a block diagram of a WBMS system having a primary node and a backup primary node, in accordance with another example.
  • the same reference numbers or other reference designators are used in the drawings to designate the same or similar (either by function and/or structure) features.
  • Some systems are battery-operated and include large numbers of battery cells. Subsets of the battery cells may be packaged together in battery modules. Groups of interconnected battery modules represent a battery pack. Accordingly, a battery pack may have multiple battery cells, and in some cases may have hundreds or more of battery cells.
  • Electric vehicles for example, include rechargeable battery packs to operate the EV’s electric motor and power various electronic components within the vehicle. In the context of an EV, the battery pack may provide a voltage of 400V, 800V or another voltage. Monitoring the individual battery cells for information such as such as voltage, current, temperature, register settings, etc., helps ensure the health and functionality of the overall battery pack.
  • battery cells may vary in terms of capacity and the rate of discharge (and/or charge).
  • the cell-to-cell variation may result in imbalances in the state of charge between battery cells.
  • Balancing techniques e.g., passive cell balancing, active cell balancing
  • Passive cell balancing may dissipate excess charge in a given cell through a bleed resistor.
  • Active cell balancing redistributes charge between individual cells during the charge and discharge cycles.
  • a battery management system may be included to monitor and adjust the battery pack (e.g., cell balancing) of the system.
  • FIG.1 is a block diagram illustrating a wireless battery management system (WBMS) 100, in accordance with aspects of the present disclosure.
  • WBMS 100 is operative for providing power to a system such as an EV.
  • the system includes a motor 118 (e.g., the electric motor to cause the EV to move) and an electric control unit (ECU) 124.
  • the WBMS 100 includes battery modules 104A, 104B, ..., 104N (collectively, battery modules 104) and a battery pack controller 114.
  • the battery pack controller 114 is in wireless communication with each of the battery monitors 104.
  • Each battery monitor 104 monitors and controls a respective set of battery cells 102.
  • Each instance of battery cells 102 includes one or more cells (6 cells, 9 cells, 18 cells, etc.), and the connected groups of battery cells 102 represent the battery pack for the system (e.g., EV).
  • Each set of battery cells 102 is coupled to a battery module 104.
  • the battery cells 102 are included within, and are part of, the battery module 104.
  • the number N of battery modules 104 depends on the number of individual battery cells 102 that each module is capable of monitoring.
  • the sets of battery cells may be coupled in series to produce a substantially high voltage (e.g., 400V, 800V, etc.).
  • the battery pack controller 114 includes an interface (e.g., a controller area network (CAN) bus) to the ECU 124.
  • CAN controller area network
  • Each battery module 104 includes a battery monitor 106.
  • Each battery monitor 106 may include an analog front-end coupled to the corresponding battery cells 102 to measure and collect information (e.g., voltage, current, charge status, temperature, etc.) about the battery cells 102.
  • each battery monitor 106 is wirelessly coupled to the battery pack controller 114.
  • a microcontroller 112 within the battery pack controller 114 may process and may provide the battery cell information of some or all of the cells 102 to the ECU 124.
  • Each battery monitor 106 collects and digitizes the information about its respective battery cells 102 and wirelessly transmits the digital information to the battery pack controller 114 for reception by the microcontroller 112.
  • the microcontroller 114 may also be coupled to control inputs of switches 116 that couple the battery cells 102 to one or more motors 118 or other load devices.
  • the microcontroller 112 may also be coupled to one or more other sensors, such as a current sensor 120, which may monitor the current being supplied by the battery pack to the motor 118.
  • the battery pack controller 114 is powered by a battery 122 that is separate from the battery cells 102.
  • Battery 122 may be, for example, a relatively low voltage battery, such as a 12V battery, while the voltage produced by the serially-connected sets of battery cells 102 may be a higher voltage (e.g., 400V, 800V, etc.).
  • the battery monitors 104 wirelessly transmit their battery data to the battery pack controller 114.
  • the battery pack controller 114 and/or the ECU 124 may monitor the state of the individual cells and perform various actions as desired. For example, the ECU 124 may detect that the voltage of certain cells 102 are different from each other, and respond by performing a cell balancing procedure such as a passive or active cell balancing process. If the battery pack controller 114 were to malfunction or otherwise be unable to receive battery data from the battery monitors 104, the ability to monitor the battery cells of the battery pack and respond to the state of the cells as appropriate may be unavailable.
  • the embodiments described herein are directed to the inclusion and use of a backup battery pack controller.
  • FIG.2 is a block diagram illustrating an embodiment of WBMS 100, in accordance with aspects of the present disclosure.
  • the WBMS 100 includes a primary node 202 that functions in a way similar to the battery pack controller 114.
  • the primary node 202 includes a microcontroller 204 which is coupled to ECU 124, via, for example, a CAN bus 203.
  • the microcontroller 204 may operate in a substantially similar way as microcontroller 112.
  • the microcontroller 204 is coupled to a radio 206 via a digital communication interface 207 such as a universal asynchronous receiver- transmitter (UART) interface, serial peripheral interface (SPI), shared memory, etc.
  • the radio 206 is wirelessly coupled to the secondary nodes 210.
  • the secondary nodes 210 represent the battery modules 104 of FIG.1.
  • Each secondary node 210 include a radio 208 for communicating with the primary node’s radio 206.
  • Each secondary node 210 also includes one or more battery monitoring systems (BMS) 212, which are coupled to the respective radio 208 via a UART or other type of electrical interface.
  • BMS battery monitoring systems
  • each BMS’s 212 are shown in each battery module 210 in FIG.2, any suitable number of BMS’s may be included in any given battery module (e.g., one or more).
  • the radios 206 and 208 are capable of radio frequency (RF) wireless transmissions.
  • Each secondary node 210 may be fabricated as a printed circuit board (PCB) on which the BMS’s 212 and the radio 208 are mounted.
  • PCB printed circuit board
  • each BMS 212 is fabricated as an integrated circuit (IC), and each radio 208 also is fabricated as an IC.
  • the BMS’s 212 may be similar to battery monitors 106 and may include analog front-ends coupled to the battery cells 204 to measure and collect information (e.g., voltage, current, etc.) about the battery cells. This information may be sent, via the digital communication interface, to the respective radio 208 of the secondary node 210. The radio 208 of each secondary node 210 then wirelessly transmits the information to the primary node 202. In some cases, this wireless transmission may be performed according to a wireless battery management protocol, such as a WBMS protocol.
  • the wireless battery management protocol may define a set of wireless channels along with a set of rules for how information may be wirelessly transmitted for monitoring and managing the battery cells 102.
  • the wireless battery management protocol may utilize unlicensed frequency bands such as the 2.4GHz, 5.8 GHz, etc. bands.
  • a frequency band such as the 2.4GHz unlicensed frequency band
  • the number of channels and the size of the channels may be determined based on the protocol.
  • the WBMS protocol may divide the 2.4 GHz unlicensed frequency band into a set of 40 channels where each channel is 2 MHz wide.
  • IEEE 802.11 wireless networks may divide the same 2.4 GHz unlicensed frequency band into a set of 11 channels where each channel is 20 MHz wide.
  • FIG.3 is a block diagram of a radio 300, which may be used to implement either or both of radios 206 of the secondary nodes 210 and radio 208 of the primary node 202.
  • radio 300 includes an RF transceiver 302, a microcontroller 304, and memory 306.
  • Microcontroller 304 is coupled to the RF transceiver 302 and to memory 306.
  • Memory 306 may store software 308 that is executable by microcontroller 304.
  • the creation of the mesh network in the examples described herein may be implemented by the microcontroller 302 of radios 206 and 208 upon executing software 308.
  • FIG.4 is a superframe diagram 400 of a WBMS superframe 450 for the case in which the system in which the WBMS is operated is ON, and thus the battery pack controller 114 (primary node 202) are ON and capable of receiving wireless battery data from the battery monitors 106 (secondary nodes 210).
  • the left-hand side of the superframe diagram 400 lists a primary node 402 and multiple secondary nodes 404A, 404B, ..., 404N (collectively, secondary nodes 404).
  • the primary node 402 may include, or be, the battery pack controller 114 of FIG.1 or the primary node 202 of FIG.2.
  • the secondary nodes 404 may include, or be, the battery monitors 106 of FIG.1 or the secondary nodes 210 of FIG.2.
  • the WBMS protocol further defines how communications between nodes may be performed.
  • a WBMS network is directed by the primary node 402 which coordinates communications between the set of N secondary nodes 404.
  • the primary node 402 coordinates communications for the WBMS network by defining communication intervals and allocating the intervals using the superframe 450 structure illustrated in the example of FIG.4.
  • the superframe 450 includes a downlink allocation 406 for the primary node 402 and uplink allocations 408A, 408B, ..., 408N (collectively, uplink allocations 408) for secondary nodes 404A, 404B, ..., 404N of the set of secondary nodes 404.
  • the superframe 450 also includes a guard interval 416 prior to the downlink transmission 410, along with switching intervals 418 to provide time for the nodes to switch from a receive mode to a transmit mode, or vice versa.
  • a superframe interval 414 is the amount of time to complete all transmissions for the superframe 450, including the guard interval 416.
  • the time duration of the superframe interval 414 may vary from WBMS network to WBMS network based on the number of secondary nodes 404 in the WBMS network.
  • the primary node 402 transmits (410), during the downlink allocation 406 to the secondary nodes 404, allocation information about the uplink allocations 408 for the secondary nodes 404.
  • the allocation information may include the set of channels (e.g., as indicated by a bit map) that may be used for the WBMS network along with a per-secondary node uplink allocation indicating when the respective secondary node 404A, 404B, ... 404N may transmit 412A, 412B, ... 412N to the primary node 402.
  • the allocation information may include additional information such as an acknowledgement for uplink transmissions from a previous superframe, an indication when the next superframe may begin, an adaptive frequency hopping countdown, etc.
  • each secondary node 404 wirelessly coupled to the primary node 402 is provided an individualized uplink allocation 408 to transmit information about the battery cells associated with the respective secondary node 404.
  • Each secondary node 404 gathers information about its respective battery cells and wirelessly transmits 412 such information to the primary node 402 during the uplink interval 408 assigned to the secondary node.
  • secondary node 2404B receives 420 the downlink transmission 410 from the primary node 402 during the downlink allocation 406.
  • the secondary nodes 404 may determine the downlink allocation 406 time based on an indication from a previous superframe.
  • the uplink transmissions 412 (and retransmissions, if any) by the secondary nodes 404 are completed within their respective uplink allocations 408, but the uplink transmissions may not occupy the entire uplink allocations 408.
  • each secondary node 404 may parse the allocation information received from the primary node 402 to determine timing information for the secondary node’s uplink allocation 408 allocated to the secondary node. In some cases, information for how to locate the timing information associated with a specific secondary node may be exchanged during a WBMS network formation process.
  • FIG.5 is a block diagram of a WBMS 500 that includes two primary nodes 502 and 506, a shared memory 510, and multiple secondary node 550.
  • primary node 502 is designated as the “main” primary node and thus functions to exchange information with the secondary nodes 550 in accordance with the superframe structure described above.
  • Primary node 506 may be an instance of the same primary node device of primary node 502, but functions in a backup role to primary node 502 (and thus is referred to as the “backup” primary node).
  • Each secondary node 550 may include a battery monitor (e.g., battery monitor 506) and, or be coupled to, one or more battery cells.
  • the shared memory 510 may include volatile storage (e.g., random access memory) or non-volatile storage (e.g., programmable read-only memory).
  • the main primary node 502 While the main primary node 502 is actively functioning to exchange packets with the secondary node 550, the main primary node 502 stores network data in the shared memory 510. Such network data may include timing information such as scheduling downlink allocation (e.g., number of downlink slots), uplink allocation (e.g., number of uplink slots), frequency hopping tables, superframe construction, security keys, encryption keys, device identifiers of the devices to form the network, etc.
  • the main primary node 502 includes fault detection capabilities. For example, main primary node’s microcontroller may output a “heartbeat” signal to a fault detection circuit. The fault detection circuit may be configured to expect the heart signal every n milliseconds (e.g., every 1 millisecond).
  • the main primary node e.g., its fault detection circuit
  • the backup primary node 506 Upon receipt of the asserted fault line interrupt signal, the backup primary node 506 reads the network data from the shared memory 510 and uses the network data to assume the role of the main primary node. To take on the role of the main primary node, the backup primary node reforms and synchronizes the network.
  • FIG.6 is a block diagram of a WBMS 500 that includes two primary nodes 602 and 606 and multiple secondary node 550.
  • primary node 602 is designated as the “main” primary node and thus functions to exchange information with the secondary nodes 550 in accordance with the superframe structure described above.
  • Primary node 606 may be an instance of the same primary node device of primary node 602, but functions in a backup role to primary node 602.
  • the backup primary node 606 can assume the role of the main primary node.
  • the main and backup primary nodes 602 and 606 function in a way similar to the battery pack controller 114 described above. This embodiment lacks the shared memory 510 described above.
  • the main primary node 602 includes fault detection capabilities (e.g., a fault detection circuit that is configured to expect a heartbeat signal every n milliseconds (e.g., every 1 millisecond) from the main primary node’s microprocessor.
  • the main primary node 602 (e.g., its fault detection circuit) outputs a fault line interrupt signal to the backup primary node 606 to indicate the occurrence of a fault condition with the main primary node 602.
  • the secondary nodes 550 will cease receiving downlink packets from the main primary node.
  • Each secondary node 550 has timing data previously provided to it by the main primary node 602 by which each such secondary node can determine when to expect a downlink packet from the main primary node.
  • Each secondary node 550 responds to the absence of an expected downlink packet by transitioning to a scan mode in which the secondary node waits for network creation packets from a primary node. Rather than using network data from a shared memory, the backup primary node 606 re-establishes a network with the secondary nodes 550. In one example, the network re-establishment process occurs through any of multiple different methods which may include performing the rejoining operation with encryption key exchange packets to re-authenticate and establish the network. [0036] The backup primary node 606 is now operating as the main primary node. The backup primary node 606 may have the same fault detection capability as the former main primary node 602.
  • FIG.7 is a block diagram of a WBMS 700 that includes two primary nodes 702 and 706 and multiple secondary node 550.
  • primary node 702 is designated as the “main” primary node and thus functions to exchange information with the secondary nodes 550 in accordance with the superframe structure described above.
  • Primary node 706 may be an instance of the same primary node device of primary node 702, but functions in a backup role to primary node 702.
  • the backup primary node 706 can assume the role of the main primary node.
  • the main and backup primary nodes 702 and 706 function in a way similar to the battery pack controller 114 described above.
  • This embodiment lacks both the shared memory 510 and the fault line interrupt capability described above.
  • the backup primary node independently decides to re-establish a network with the secondary node 550 based on absence of packet transmissions for more than a threshold period of time.
  • the backup primary node 706 can synchronize to the main primary node 702 in the configuration channel phase and continue to follow the main primary node 702 in the connected mode.
  • the backup primary node is able to observe the network configuration in the configuration channel to determine the timing and sizing of the network. Then, the backup primary node tracks the active network behavior in the connected mode to maintain synchronization to the main primary node over time.
  • the backup primary node 706 may monitor the main primary node 702 at periodic intervals (e.g., once every minute, every 5 minutes, etc.). The length of the periodic interval may be programmable in the backup primary node 706.
  • FIG.8 shows yet another embodiment of a WBMS 800 including two main primary nodes 802 and 806, both of which actively communicate with secondary nodes.
  • main primary node 802 has established a network with secondary nodes 850
  • main primary node 806 has established a network with secondary nodes 860.
  • the two networks operate simultaneously.
  • the main primary nodes and the secondary nodes may be implemented as described above.
  • Each main primary node 802, 806 is programmed with a unique identifier (e.g., an address) of the secondary nodes each such main primary node is to establish its network. Accordingly, main primary node 802 is programmed with the addresses of secondary nodes 850, and main primary node 806 is programmed with the addresses of secondary nodes 860.
  • each main primary node is programmed with the addresses of the secondary nodes to which the other main primary node has established a network for use in the event of a failure of the other main primary node. That is, each main primary node is programmed with the addresses of its own secondary nodes as well as the secondary nodes within the network of the other main primary node.
  • each main primary node 802 and 806 Periodically (e.g., once every 5 minutes) each main primary node 802 and 806 scans for packets from the other main primary node. In the event that a main primary node does not detect any packets from the other main primary node, the main primary node determines that the other primary node may have failed and performs a process to establish a network with all of the secondary nodes 850 and 860.
  • the main primary node 802 or 806 attempting to establish a network with all of the secondary nodes 850 and 860 may expand the length of the superframe to include time slots for the uplink allocations of the now larger number of secondary nodes 850, 860.
  • the latency of each node secondary node 850 and 860 transmitting its battery data to the surviving main primary node may increase due to the larger number of secondary nodes accommodated by each superframe, but the WBMS 800 has redundancy to handle a failure of a main primary node.
  • the term “couple” may cover connections, communications, or signal paths that enable a functional relationship consistent with this description.
  • a device that is “configured to” perform a task or function may be configured (e.g., programmed and/or hardwired) at a time of manufacturing by a manufacturer to perform the function and/or may be configurable (or reconfigurable) by a user after manufacturing to perform the function and/or other additional or alternative functions.
  • the configuring may be through firmware and/or software programming of the device, through a construction and/or layout of hardware components and interconnections of the device, or a combination thereof.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
PCT/US2023/031235 2022-08-30 2023-08-28 Multiple primary nodes for wireless battery management system robustness Ceased WO2024049733A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020257006270A KR20250059400A (ko) 2022-08-30 2023-08-28 무선 배터리 관리 시스템 강건성을 위한 다수의 기본 노드들
EP23787217.1A EP4581840A1 (en) 2022-08-30 2023-08-28 Multiple primary nodes for wireless battery management system robustness
CN202380059061.2A CN119698849A (zh) 2022-08-30 2023-08-28 为实现无线电池管理系统稳健性的多个主节点
JP2025512875A JP2025529180A (ja) 2022-08-30 2023-08-28 ワイヤレスバッテリ管理システムのロバスト性のための複数の一次ノード

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US17/823,138 US12669544B2 (en) 2022-08-30 2022-08-30 Multiple primary nodes for wireless battery management system robustness
US17/823,138 2022-08-30

Publications (1)

Publication Number Publication Date
WO2024049733A1 true WO2024049733A1 (en) 2024-03-07

Family

ID=88372417

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2023/031235 Ceased WO2024049733A1 (en) 2022-08-30 2023-08-28 Multiple primary nodes for wireless battery management system robustness

Country Status (6)

Country Link
US (1) US12669544B2 (enExample)
EP (1) EP4581840A1 (enExample)
JP (1) JP2025529180A (enExample)
KR (1) KR20250059400A (enExample)
CN (1) CN119698849A (enExample)
WO (1) WO2024049733A1 (enExample)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12548806B2 (en) * 2022-11-30 2026-02-10 Infineon Technologies Americas Corp. Battery management system, method of battery management and wireless communication device for battery management systems
WO2026128248A1 (en) 2024-12-10 2026-06-18 Texas Instruments Incorporated Time synchronization in wireless battery management systems

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090206841A1 (en) * 2008-02-15 2009-08-20 Sam Weng Intelligent fault-tolerant battery management system
CN109324501A (zh) * 2018-09-20 2019-02-12 四川长虹电器股份有限公司 双mcu的电池管理系统及其多冗余故障重构方法
CN114156547A (zh) * 2021-10-27 2022-03-08 烟台东方电子玉麟电气有限公司 一种锂电池管理系统及方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR112013010923B1 (pt) * 2010-11-02 2020-04-28 Navitas Solutions, Inc. rede sem fio de área de bateria para um sistema inteligente de gerenciamento de baterias
US10090999B2 (en) 2015-01-27 2018-10-02 Qualcomm Incorporated Group key announcement and distribution for a data link group
KR102155331B1 (ko) 2017-07-06 2020-09-11 주식회사 엘지화학 무선 배터리 관리 시스템 및 이를 포함하는 배터리팩
KR102164547B1 (ko) 2017-07-31 2020-10-12 주식회사 엘지화학 배터리 관리 장치 및 이를 포함하는 배터리 팩
US11872905B2 (en) 2021-04-16 2024-01-16 Texas Instruments Incorporated Wireless protocol for battery management
DE102020115333A1 (de) 2019-06-17 2020-12-17 Silicon Works Co., Ltd. Drahtloses Batterie-Verwaltungssystem, Knoten für drahtlose Kommunikation und Verfahren zur Datenübertragung
WO2020260623A1 (en) 2019-06-28 2020-12-30 Analog Devices International Unlimited Company Battery fleet monitoring systems
CN112333844B (zh) 2019-08-05 2025-07-04 硅工厂股份有限公司 无线电池管理系统、用于无线通信的节点和数据发送方法
CN112333843A (zh) 2019-08-05 2021-02-05 硅工厂股份有限公司 无线电池管理系统、无线通信的节点和分配时隙的方法
KR102743585B1 (ko) 2019-09-09 2024-12-17 주식회사 엘지에너지솔루션 중간 노드를 이용하여 통신하는 배터리 관리 시스템 및 방법
US11172498B2 (en) 2019-09-18 2021-11-09 Kabushiki Kaisha Toshiba Method of generating a communication schedule for nodes in a multi-hop network
US11686699B2 (en) 2020-09-18 2023-06-27 Analog Devices, Inc. System and method for anomaly detection and total capacity estimation of a battery

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090206841A1 (en) * 2008-02-15 2009-08-20 Sam Weng Intelligent fault-tolerant battery management system
CN109324501A (zh) * 2018-09-20 2019-02-12 四川长虹电器股份有限公司 双mcu的电池管理系统及其多冗余故障重构方法
CN114156547A (zh) * 2021-10-27 2022-03-08 烟台东方电子玉麟电气有限公司 一种锂电池管理系统及方法

Also Published As

Publication number Publication date
US12669544B2 (en) 2026-06-30
CN119698849A (zh) 2025-03-25
JP2025529180A (ja) 2025-09-04
US20240069110A1 (en) 2024-02-29
EP4581840A1 (en) 2025-07-09
KR20250059400A (ko) 2025-05-02

Similar Documents

Publication Publication Date Title
EP4581840A1 (en) Multiple primary nodes for wireless battery management system robustness
CN103270666B (zh) 用于智能电池管理的无线电池区域网络
JP6421625B2 (ja) 無線電池システムおよび無線システム
JP7735722B2 (ja) 監視システム
JP7228704B2 (ja) 蓄電池装置
EP4095977B1 (en) Slave bms for diagnosing an error of a battery module and battery pack comprising same slave bms
KR20210030168A (ko) 중간 노드를 이용하여 통신하는 배터리 관리 시스템 및 방법
US12476668B2 (en) Adaptive frequency hopping in a communication network
US20230130666A1 (en) Mesh network during keep alive in wireless battery management system
US20230388980A1 (en) Efficient unicast super frame communications
JP2023033814A (ja) 監視システム
US20260299033A1 (en) Multiple primary nodes in a wireless battery management system
US20250234193A1 (en) Authenticating wireless sensor nodes in a network using physical phenomenon
US20250071699A1 (en) Node resynchronization mechanism for wireless battery management system
EP4799256A1 (en) Collision detection through intelligent silence
US12744257B2 (en) Methods of master battery unit and module battery unit management, and battery system
US20240069111A1 (en) Network restart from power save mode in wbms
US12548806B2 (en) Battery management system, method of battery management and wireless communication device for battery management systems
CN122025877B (zh) 一种双链路异构通信方法及分布式电池管理系统
JP7928679B2 (ja) 電池管理装置およびその動作方法
JP7508694B2 (ja) 蓄電池システム
JP7543981B2 (ja) 無線通信システム
US20250274000A1 (en) Scheduling for multiple primary nodes
CN119864897A (zh) 一种锂电池管理系统及其控制方法
CN119383167A (zh) 储能电池系统、地址分配方法、装置及设备

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23787217

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 202380059061.2

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2025512875

Country of ref document: JP

WWP Wipo information: published in national office

Ref document number: 202380059061.2

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2023787217

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2023787217

Country of ref document: EP

Effective date: 20250331

WWP Wipo information: published in national office

Ref document number: 2023787217

Country of ref document: EP