WO2024038772A1 - 電源装置 - Google Patents
電源装置 Download PDFInfo
- Publication number
- WO2024038772A1 WO2024038772A1 PCT/JP2023/028476 JP2023028476W WO2024038772A1 WO 2024038772 A1 WO2024038772 A1 WO 2024038772A1 JP 2023028476 W JP2023028476 W JP 2023028476W WO 2024038772 A1 WO2024038772 A1 WO 2024038772A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- converter
- voltage
- control signal
- secondary battery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M3/00—Conversion of DC power input into DC power output
- H02M3/02—Conversion of DC power input into DC power output without intermediate conversion into AC
- H02M3/04—Conversion of DC power input into DC power output without intermediate conversion into AC by static converters
- H02M3/10—Conversion of DC power input into DC power output without intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
- H02M3/145—Conversion of DC power input into DC power output without intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
- H02M3/155—Conversion of DC power input into DC power output without intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
Definitions
- the present invention relates to a power supply device.
- the Internet of Things is one of the technologies that will be used in future social systems.
- IoT technology uses sensors to independently collect information on temperature, pressure, vibration, chemical substances, traffic volume, etc. both indoors and outdoors. The collected information is transferred to the cloud via the internet. The transferred data is analyzed as big data.
- the purpose of analysis is various. For example, the purpose of analysis may be to determine whether or not an abnormality has occurred in a sensor. If it is determined that an abnormality has occurred in the sensor, countermeasures are taken such as stopping the operation of the sensor. For example, for the purpose of analysis, a sensor may be operated under predetermined conditions. The purpose of the analysis may be to feed back appropriate sensor operating conditions in response to changes in the external environment.
- things basically collect information, transmit information, and feed back information without human intervention.
- Integrated circuit systems for IoT are important devices that measure environmental variables and send the information obtained from the measurements to the Internet.
- the IoT integrated circuit system is also referred to as an Edge terminal.
- Edge terminals may not be able to receive power supply in the first place. Even if the Edge terminal is equipped with a power source such as a battery, restrictions may be imposed on replacing the power source such as the battery.
- Energy harvesting technology can be cited as a technology for continuing to operate Edge terminals under conditions of limited power supply.
- Energy harvesting technology obtains electricity by having a power generation element harvest environmental energy.
- power generation elements convert sunlight, heat, vibrations, or radio waves into electric power.
- the power generated by the power generation element is extremely small. Therefore, the power generated by the power generation element cannot directly satisfy the power required by a load device such as an Edge terminal. Therefore, power supply technology is being considered that utilizes the power generated by the power generation element to output the power required by the load device.
- Non-Patent Documents 1 and 2 disclose power supply technologies that utilize elements that generate electricity using temperature differences, which are environmental energy.
- Non-Patent Documents 1 and 2 propose a power supply circuit and operating conditions for the power supply circuit for efficiently extracting power from an element.
- Conditions for efficiently extracting power from a power generating element depend on the state of environmental energy that the power generating element receives. On the other hand, humans cannot control the state of the environmental energy that the power generation element receives. Therefore, the state of environmental energy that the power generation element receives varies in various ways.
- a power supply device including a power generating element needs to select an appropriate operation in response to changes in external factors such as changes in environmental energy or changes in power required by a load device.
- the present invention provides a power supply device that can select an appropriate operation in response to changes in external factors.
- the present invention is a power supply device that supplies power to a load device.
- the power supply device includes a secondary battery, a power generating element connected in series to the secondary battery, a first terminal connected to the power generating element, a second terminal connected to the load device, and a power generating element connected to the secondary battery in series.
- a converter having a third terminal connected thereto. The converter generates power at at least one of the second terminal and the third terminal based on the power required by the load device and/or the voltage generated by the power generation element.
- the power supply device generates a control signal using at least one of the power requested by the load device and the measured voltage based on the second voltage.
- the second voltage increases or decreases depending on changes in the external environment. Therefore, by controlling using at least one of the power required by the load device and the measured voltage based on the second voltage, the power supply device can be operated in response to changes in external factors.
- the converter of the power supply device described above may perform the storage drive operation when the required power of the load device is larger than the first threshold current.
- the converter stores the power received from the first terminal in the energy storage element of the converter, and generates the energy stored in the energy storage element as power to the second terminal, thereby driving the load device. may be given power to.
- the operation of storing energy in the energy storage element and the operation of supplying power to the load device can be performed in parallel.
- the converter of the power supply device described above may perform the charging operation when the required power of the load device is smaller than the second threshold current.
- the converter during charging operation may provide power to the secondary battery by generating energy stored in an energy storage element included in the converter as power to the third terminal. According to such an operation of the converter, it is possible to perform an operation of supplying power to the secondary battery.
- the converter of the power supply device described above may selectively perform a load driving operation and a charging operation.
- the converter When in load driving operation, the converter may provide power to the load device by generating energy stored in an energy storage element of the converter as power to the second terminal.
- the converter during charging operation may provide power to the secondary battery by generating the energy stored in the energy storage element as power to the third terminal. According to the operation of such a converter, it is possible to selectively perform the operation of storing energy in the energy storage element, the operation of supplying power to the load device, and the operation of supplying power to the secondary battery.
- the converter of the power supply device described above may selectively perform the storage drive operation and the charging operation.
- the converter stores the power received from the first terminal in the energy storage element of the converter, and generates the energy stored in the energy storage element as power to the second terminal, thereby driving the load device. may be given power to.
- the converter during charging operation may provide power to the secondary battery by generating the energy stored in the energy storage element as power to the third terminal. According to the operation of such a converter, it is possible to selectively perform an operation of storing energy in the energy storage element and supplying power to the load device, and an operation of supplying power to the secondary battery.
- the converter of the above power supply device may perform a direct supply operation.
- the converter in direct supply operation may provide power from the secondary battery to the load device by connecting the second terminal to the third terminal. According to the operation of the converter, the power of the secondary battery can be provided to the load device without passing through the power generation element and the energy storage element.
- the converter of the power supply device described above may further include a short circuit capable of connecting the output of the secondary battery and the input of the converter.
- the short circuit may switch between a mode in which the secondary battery is connected to the converter via the power generating element and a mode in which the secondary battery is directly connected to the converter without going through the power generating element. According to the operation of such a converter, the voltage required by the load device can be applied to the power of the secondary battery without passing through the power generation element.
- the period during which the converter supplies power to the load device via the second terminal does not have to overlap with the period during which the converter supplies power to the secondary battery via the third terminal.
- the period during which the converter supplies power to the load device via the second terminal may not coincide with the period during which the converter supplies power to the secondary battery via the third terminal.
- a part of the period during which the converter supplies power to the load device via the second terminal does not need to overlap with a part of the period during which the converter supplies power to the secondary battery via the three terminals.
- the converter of the power supply device described above operates by driving the converter to satisfy the power extraction conditions determined based on the voltage generated by the power generation element and the voltage generated by the secondary battery, and by using the voltage generated by the power generation element to generate electricity.
- the operation of obtaining the extraction conditions may be repeated. According to the operation of such a converter, even when external factors change, electric power can be suitably extracted from the power generating element.
- Another form of the present invention is also a power supply device that supplies power to a load device.
- Another form of power supply device includes a secondary battery, a power generating element connected in series to the secondary battery, a first terminal connected to the power generating element, and a second terminal connected to a load device. and a converter having a third terminal connected to the secondary battery.
- the converter operates by driving the converter to satisfy the power extraction conditions determined based on the voltage generated by the power generation element and the voltage generated by the secondary battery, and by using the voltage generated by the power generation element to obtain the power extraction conditions. and repeat. According to the operation of such a converter, even when external factors change, electric power can be suitably extracted from the power generating element.
- a power supply device that can select an appropriate operation according to changes in external factors is provided.
- FIG. 1 is a functional block diagram of a power supply device according to a first embodiment.
- 2(a) and 2(b) are diagrams illustrating the operating principle of the power supply device shown in FIG. 1.
- FIG. 3 is a circuit diagram of the power supply device shown in FIG. 1.
- FIG. 4 is a functional block diagram of a controller included in the power supply device shown in FIG. 1.
- FIG. 5 is a flow diagram showing the operation of the controller of the first embodiment.
- FIG. 6(a) is a diagram showing waveforms for control signals.
- FIG. 6(b) is a diagram illustrating a circuit configuration for generating a control signal.
- FIG. 7 is a table for explaining control signals.
- FIG. 8(a) is a diagram showing a circuit during a run-up operation.
- FIG. 8(b) is a diagram showing a circuit during load driving operation.
- FIG. 8(c) is a diagram showing the circuit during standby operation.
- FIG. 9 is a diagram for explaining the breakdown of power during normal operation.
- FIG. 10(a) is a diagram showing a circuit in storage drive operation.
- FIG. 10(b) is a diagram showing a circuit during charging operation.
- FIG. 10(c) is a diagram showing the circuit during standby operation.
- FIG. 11(a) is a diagram showing a circuit during high load operation.
- FIG. 11(b) is a diagram showing the circuit during no-load operation.
- FIG. 12(a) is a diagram showing a circuit during low voltage operation.
- FIG. 12(b) is a diagram showing a modified example circuit for low voltage operation.
- FIG. 13(a) is a first example for explaining the power extracted from the power generation element.
- FIG. 13(b) is a second example for explaining the power extracted from the power generation element.
- FIG. 13(c) is a third example for explaining the power extracted from the power generation element.
- FIG. 14(a) is a time history of voltage for explaining MPPT operation.
- FIG. 14(b) is a voltage time history showing an enlarged portion of FIG. 14(a).
- FIG. 15 is a functional block diagram of the power supply device according to the second embodiment.
- FIG. 16(a) is an example of a control signal output by the second voltage determination section.
- FIG. 16(b) is an example of a control signal for the power extraction operation.
- FIG. 16(c) is an example of a control signal for refresh operation.
- FIG. 17 is a flow diagram showing the operation of the controller of the second embodiment.
- FIG. 18(a) is an example of the circuit of the reference voltage generating section.
- FIG. 18(b) is an example of a control signal that the controller provides to the reference voltage generator.
- FIG. 18(c) is a table for explaining the operation of the reference voltage generating section.
- FIG. 19 is an example of a circuit of the second voltage determination section.
- FIG. 20(a) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the first embodiment.
- FIG. 20(b) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the second embodiment.
- FIG. 20(a) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the second embodiment.
- FIG. 20(c) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the third embodiment.
- FIG. 21 is a circuit diagram of the power supply device of the second embodiment.
- FIG. 22 is a table for explaining control signals in the power supply device of the second embodiment.
- FIG. 23(a) is a diagram showing a circuit during normal operation performed by the power supply device of the second embodiment.
- FIG. 23(b) is a diagram showing a circuit when the power supply device of the second embodiment performs a high-load operation.
- FIG. 24(a) is a diagram showing a circuit when the power supply device of the second embodiment performs a no-load operation.
- FIG. 24(b) is a diagram showing a circuit when the power supply device of the second embodiment performs a high voltage operation.
- FIG. 25(a) is a diagram showing a circuit when the power supply device of the second embodiment performs low voltage operation.
- FIG. 25(b) is a diagram showing a circuit when the power supply device of the second embodiment performs a modified low voltage operation.
- FIG. 26 is a circuit diagram of the power supply device of the third embodiment.
- FIG. 27 is a table for explaining control signals in the power supply device of the third embodiment.
- FIG. 28(a) is a diagram showing a circuit when the power supply device of the third embodiment performs a duplicate output operation in a normal operation.
- FIG. 28(b) is a diagram showing a circuit when the power supply device of the third embodiment performs a load output operation in normal operation.
- FIG. 29(a) is a diagram showing a circuit when the power supply device of the third embodiment performs a high-load operation.
- FIG. 29(b) is a diagram showing a circuit when the power supply device of the third embodiment performs a no-load operation.
- FIG. 30(a) is a diagram showing a circuit when the power supply device of the third embodiment performs a redundant output operation in a high voltage operation.
- FIG. 30(b) is a diagram showing a circuit when a charging operation is performed in a high voltage operation performed by the power supply device of the third embodiment.
- FIG. 31(a) is a diagram showing a circuit when the power supply device of the third embodiment performs low voltage operation.
- FIG. 31(b) is a diagram showing a circuit when the power supply device of the third embodiment performs a modified example of low voltage operation.
- FIG. 32 is a diagram showing the configuration of the power supply device of the first modification.
- FIG. 33 is a diagram showing the configuration of a power supply device according to a second modification.
- FIG. 34 is a diagram showing the configuration of a power supply device according to a third modification.
- FIG. 35 is an illustration of additional circuitry that can be connected to the power supply.
- FIG. 1 is a functional block diagram of a power supply device 1 according to the first embodiment. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG.
- the load device 9 may be a device that constitutes IoT. Load device 9 includes a plurality of electrical elements. The load device 9 consumes power (P LOAD ). Power (P LOAD ) can be defined by the product of voltage (V LOAD ) and current (I LOAD ).
- Examples of devices that make up IoT include sensors that measure the surrounding environment.
- the sensors obtain measurements regarding desired measurement parameters such as temperature, humidity, and illuminance.
- the load device 9 requires power (P LOAD ) on the order of several watts.
- the voltage (V LOAD ) required by the load device 9 is about 3V.
- the power supply device 1 supplies a predetermined power (P OUT ) to the load device 9 at a timing requested by the load device 9.
- the load device 9 does not need to continuously request power (P OUT ) from the power supply device 1.
- the load device 9 measures the ambient temperature at predetermined time intervals. Then, the load device 9 transmits the measured temperature through a wireless IC or the like. In such an operation, the load device 9 receives power (P OUT ) from the power supply device 1 at the timing when temperature measurement and communication are performed.
- the power supply device 1 includes a power generation element 2, a secondary battery 3, a converter 4, and a controller 7 as main components.
- the power supply device 1 may include additional elements in addition to the above-mentioned components as necessary.
- the power generation element 2 receives external energy and converts the external energy into electrical energy.
- the power generation element 2 may be any of various elements capable of receiving external energy and generating electrical energy.
- the power generating element 2 outputs a voltage (V EH ) and a current (I EH ).
- the voltage ( VEH ) of the power generation element 2 may be a DC voltage.
- the voltage ( VEH ) of the power generating element 2 may be an alternating current voltage. For example, when the power generation element 2 converts vibration energy into electrical energy, the power generation element 2 outputs an alternating current voltage having a frequency corresponding to the frequency of the input vibration.
- DC voltage power generation elements include solar cells that utilize solar energy and thermoelectric conversion elements that utilize charge imbalance due to temperature differences.
- Examples of AC voltage generating elements include piezoelectric elements that utilize disturbance of dipole moment due to vibration, vibrating elements that utilize electromagnetic induction voltage, pyroelectric elements that utilize the pyroelectric effect, and RF elements that generate electricity by receiving radio waves. Can be mentioned.
- thermoelectric conversion elements use heat energy, the most common energy, there are expectations that the range of applications will expand in the future.
- materials used for thermoelectric conversion elements include inorganic semiconductor materials and organic conductive polymers.
- Elements using carbon nanotubes (CNTs) have flexibility and are lightweight.
- An element using carbon nanotubes (CNT) is an element using a thin film. Therefore, elements using carbon nanotubes (CNTs) can create structures that can handle larger temperature differences than other materials even in the same environment.
- devices using carbon nanotubes (CNTs) can be installed in a variety of environments. Therefore, elements using carbon nanotubes (CNTs) can expand the range of applications.
- CNTs carbon nanotubes
- single-walled carbon nanotubes single-walled CNTs
- multi-walled carbon nanotubes multi-walled CNTs
- the CNTs single-walled CNTs or multi-walled CNTs may be used alone.
- the CNTs may be a mixture of single-walled CNTs and multi-walled CNTs. When used as a mixture, the content of single-walled CNTs is preferably 50% by mass or more. When used in combination, the content of single-walled CNTs is more preferably 70% by mass or more.
- the content of single-walled CNTs is more preferably 90% by mass or more.
- the average diameter of single-walled CNTs may be between 0.7 and 15 nm.
- the single-walled CNT preferably has a ratio of G-band peak intensity to D-band peak intensity (G/D ratio) of 1 or more and 20 or less in a Raman spectrum.
- G/D ratio G-band peak intensity to D-band peak intensity
- the average length of the fibrous carbon nanostructure at the time of synthesis is 100 ⁇ m or more.
- the BET specific surface area of the single-walled CNT is preferably 600 m 2 /g or more. It is further preferable that the BET specific surface area of the single-walled CNT is 800 m 2 /g or more.
- the BET specific surface area of the single-walled CNT is preferably 2500 m 2 /g or less. It is more preferable that the BET specific surface area of the single-walled CNT is 1200 m 2 /g
- Single-walled CNTs may be manufactured by, for example, a wet process in which a catalyst layer is formed on the surface of a base material in the super growth method. According to this manufacturing method, single-walled CNTs can be efficiently manufactured.
- the super growth method (see International Publication No. 2006/011655) is a chemical vapor deposition method in which a raw material compound and a carrier gas are supplied onto a substrate having a catalyst layer on its surface for producing carbon nanotubes.
- CVD method chemical vapor deposition method in which a raw material compound and a carrier gas are supplied onto a substrate having a catalyst layer on its surface for producing carbon nanotubes.
- oxidizing agent catalyst activating material
- SGCNT Super Growth Carbon nanotube
- SGCNT is characterized by its high power generation capacity (Seebeck coefficient) due to its high purity and high doping effect compared to other CNTs.
- SGCNT is highly suitable as a thermoelectric conversion element.
- SGCNTs are characterized by low cost, high material purity, and easy doping.
- the secondary battery 3 performs charging and discharging operations.
- the secondary battery 3 outputs a DC voltage (V BAT ) of, for example, 3V or 5V.
- the voltage (V BAT ) output by the secondary battery 3 may correspond to the voltage (V LOAD ) required by the load device 9.
- V LOAD DC voltage
- the voltage (V BAT ) output by the secondary battery 3 may be at least 3V or more.
- Converter 4 receives power ( PIN ).
- Power (P IN ) received by converter 4 can be defined by voltage (V IN ) and current (I IN ).
- the voltage (V IN ) is the sum of the voltage of the power generation element 2 (V EH ) and the voltage of the secondary battery 3 (V BAT ). Secondary battery 3, power generation element 2, and converter 4 are connected in series. Therefore, the current output by the secondary battery 3 is (I IN ).
- the current output by the power generating element 2 is also (I IN ).
- Converter 4 converts the received power (P IN ) into power (P LOAD ) required by load device 9 .
- the aspect of the power (P LOAD ) required by the load device 9 may be defined, for example, by the current (I LOAD ) required by the load device 9.
- the converter 4 may increase the current (I IN ) by lowering the voltage (V IN ) to a current (I OUT ) that is equal to or greater than the current (I LOAD ) required by the load device 9. increase.
- Converter 4 may be a step-down power converter. The specific circuit configuration of converter 4 will be described later.
- Converter 4 selectively supplies current to either load device 9 or secondary battery 3 .
- Converter 4 is capable of switching between a first operation, a second operation, and a third operation.
- first operation converter 4 provides current (I OUT ) to load device 9 but does not provide current (I BACK ) to secondary battery 3 .
- second operation converter 4 does not provide current (I OUT ) to load device 9 but provides feedback current (I BACK ) to secondary battery 3 .
- converter 4 supplies part of the current (I OUT ) to load device 9 and supplies the remaining part to secondary battery 3 as feedback current (I BACK ).
- the controller 7 outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the converter 4.
- Converter 4 includes a plurality of switch elements. Control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 are for turning on or off the switch elements.
- FIG. 2(a) shows the power (P IN ) input to the converter 4.
- the power ( PIN ) is the sum of the power (P BAT ) caused by the secondary battery 3 and the power (P E_NET ) caused by the power generation element 2.
- the power ( PBAT ) due to the secondary battery 3 is the product of the current (I IN ) and the output voltage (V BAT ) of the secondary battery 3.
- power (P BAT ) is shown as the area of a rectangular region. The horizontal side of the rectangular area indicates the current (I IN ). The vertical sides of the rectangular area indicate the voltage (V BAT ).
- the electric power (P E_NET ) resulting from the power generation element 2 is the product of the current (I IN ) and the output voltage of the power generation element 2 .
- the voltage (V EH ) output by the power generating element 2 is the voltage (V E ) output by the power generator 22 minus the voltage drop (R E ⁇ I IN ) caused by the output resistance 21 (V E - R E ⁇ I IN ).
- power (P E_NET ) is shown as the area of a rectangular region. The horizontal side of the rectangular area indicates the current (I IN ). The vertical sides of the rectangular area indicate the voltage (V E ⁇ R E ⁇ I IN ).
- FIG. 2(b) shows the power (P OUT ) output by the converter 4.
- the power (P OUT ) can be defined by the power (P BACK ) returned to the secondary battery 3 and the power (P OUT ) provided to the load device 9.
- the power (P R ) provided to the load device 9 is defined as the power remaining after removing the power (P BACK ) returned to the secondary battery 3 from the power (P OUT ) output by the converter 4.
- the power (P OUT ) provided to the load device 9 is the product of the current (I OUT ) and the voltage (V OUT ).
- the power extraction efficiency ( ⁇ ) of the converter 4 is 100%.
- the magnitude of the power (P IN ) and the magnitude of the power (P OUT ) are the same.
- the remaining power after removing the power (P BAT ) caused by the secondary battery 3 from the power (P OUT ) output by the converter 4 is given to the load device 9 .
- the load device 9 can be operated.
- the remaining power is greater than the power (P LOAD ) required by the load device 9
- the difference between the remaining power and the power (P LOAD ) can be further returned to the secondary battery 3.
- the power stored in the secondary battery 3 can be increased.
- the secondary battery 3 can be charged.
- FIG. 3 is an example of a specific circuit of the power supply device 1 shown in FIG. 1. The components included in the power supply device 1 and their connection configuration will be described. Next, the operation of the power supply device 1 will be explained.
- the power generating element 2 includes an output resistor 21 and a power generating body 22.
- the power generator 22 receives external energy and generates DC power.
- the negative electrode of the power generator 22 is connected to the secondary battery 3.
- a positive electrode of the power generator 22 is connected to the converter 4 via the output resistor 21.
- the power generator 22 may be provided with a voltmeter 23 .
- the voltmeter 23 supplies the voltage (V E ) generated by the generator 22 to the controller 7 as a signal ⁇ 23.
- Converter 4 includes a first switch element 41, a second switch element 42, a first diode 44, a second diode 45, and an inductor 46 (energy storage element).
- the converter 4 has an input terminal 4a and output terminals 4b, 4c, and 4d.
- the first switch element 41 switches between an operation of connecting the input terminal 4a of the converter 4 to the inductor 46 and an operation of disconnecting the input terminal 4a of the converter 4 from the inductor 46.
- the drain of the first switch element 41 is connected to the input terminal 4a of the converter 4.
- the source of the first switch element 41 is connected to the second switch element 42.
- the gate of the first switch element 41 receives the control signal ⁇ 41.
- the first switch element 41 is a p-channel type MOSFET.
- the first switch element 41 connects the input terminal 4a of the converter 4 to the inductor 46 when receiving the control signal ⁇ 41 (L).
- the first switch element 41 disconnects the input terminal 4a of the converter 4 from the inductor 46 when receiving the control signal ⁇ 41 (H).
- the second switch element 42 switches between an operation of connecting the inductor 46 to the reference voltage GND and an operation of disconnecting the inductor 46 from the reference voltage GND.
- the drain of the second switch element 42 is connected to the source of the first switch element 41.
- the source of the second switch element 42 is connected to the reference voltage GND via the output terminal 4c.
- the gate of the second switch element 42 receives the control signal ⁇ 42.
- the second switch element 42 is an n-channel MOSFET.
- the second switch element 42 connects the inductor 46 to the reference voltage GND when receiving the control signal ⁇ 42 (H).
- the second switch element 42 disconnects the inductor 46 from the reference voltage GND when receiving the control signal ⁇ 42 (L).
- the inductor 46 is connected to the node J2.
- the node J2 is a point provided on the wiring connecting the first switch element 41 to the second switch element 42.
- Inductor 46 is also connected to output terminal 4b of converter 4 via switch element 47.
- an inductor 46 is illustrated as an energy storage element.
- the energy storage element is not limited to inductor 46.
- the energy storage element may employ, for example, a switched capacitor circuit that includes a plurality of capacitors and a switch that changes the connection configuration of each capacitor.
- the first diode 44 is connected in parallel to the first switch element 41. Specifically, the input of the first diode 44 is connected to the source of the first switch element 41. The output of the first diode 44 is connected to the drain of the first switch element 41.
- the second diode 45 is connected in parallel to the second switch element 42. Specifically, the input of the second diode 45 is connected to the source of the second switch element 42. The output of the second diode 45 is connected to the reference voltage GND via the output terminal 4c. The output of the second diode 45 is connected to the input of the first diode 44. The second diode 45 is connected in series with the first diode 44.
- Ringing may occur between the first switch element 41, the second switch element 42, and the inductor 46. According to ringing, voltage increases and voltage decreases are repeated. Repeated voltage increases and voltage decreases may damage the first switch element 41 and the second switch element 42.
- the first diode 44 and the second diode 45 protect the first switch element 41 and the second switch element 42 from voltage increases and voltage decreases that occur repeatedly due to ringing.
- the first diode 44 and the second diode 45 are additional components to the converter 4. Therefore, converter 4 can also omit first diode 44 and second diode 45.
- the converter 4 further includes a switch element 47 on the output side and a switch element 48 on the feedback side.
- the switch elements 47 and 48 are, for example, insulated gate field effect transistors (MOSFETs).
- the switch element 47 on the output side switches between an operation of supplying the power output from the inductor 46 to the load device 9 and an operation of not supplying the power output from the inductor 46 to the load device 9.
- the output side switch element 47 is provided between the inductor 46 and the output terminal 4b of the converter 4.
- the drain of the switch element 47 on the output side is connected to the inductor 46.
- the source of the switch element 47 on the output side is connected to the output terminal 4b of the converter 4.
- the gate of the switch element 47 on the output side receives the control signal ⁇ 47.
- the switch element 47 on the output side is an n-channel MOFET.
- the output side switch element 47 connects the inductor 46 to the output terminal 4b of the converter 4 when receiving the control signal ⁇ 47(H).
- the output side switch element 47 disconnects the output terminal 4b of the converter 4 from the inductor 46 when receiving the control signal ⁇ 47(L).
- the switch element 48 on the feedback side switches between an operation in which the power output from the inductor 46 is provided to the secondary battery 3 and an operation in which the power output from the inductor 46 is not provided to the secondary battery 3.
- the feedback side switch element 48 is provided between the inductor 46 and the positive electrode of the secondary battery 3.
- the drain of the switch element 48 on the feedback side is connected to the inductor 46.
- the source of the switch element 48 on the feedback side is connected to the positive electrode of the secondary battery 3.
- the gate of switch element 48 on the feedback side receives control signal ⁇ 48.
- the switch element 48 on the feedback side is an n-channel MOSFET.
- the switch element 48 on the feedback side connects the inductor 46 to the positive electrode of the secondary battery 3 when receiving the control signal ⁇ 48 (H).
- the output side switch element 47 disconnects the inductor 46 from the positive electrode of the secondary battery 3 when receiving the control signal ⁇ 48 (L).
- the power supply device 1 may also include several additional electrical components.
- Capacitor 51 is arranged between input terminal 4a of converter 4 and reference voltage GND. Capacitor 51 adjusts the impedance between power generating element 2 and converter 4 . Capacitor 51 improves the efficiency of power transmission from power generation element 2 to converter 4 . Capacitor 51 is an additional element. Therefore, the capacitor 51 can also be omitted.
- the power supply device 1 further includes resistance elements 61 and 62 and a capacitor 63. Resistance elements 61 and 62 are arranged between output terminal 4b of converter 4 and reference voltage GND. The resistance elements 61 and 62 are connected to a connection point provided on a path connecting the power supply device 1 to the load device 9. Resistance elements 61 and 62 can also be considered as components of converter 4.
- the capacitor 63 functions as a so-called bypass capacitor. Capacitor 63 supplies insufficient current when the voltage (V OUT ) of power supply device 1 decreases. As a result, a drop in the voltage applied to the load device 9 is suppressed. Capacitor 63, like resistive elements 61 and 62, is arranged between output terminal 4b of converter 4 and reference voltage GND.
- the resistive elements 61, 62 and the capacitor 63 are additional elements. Therefore, illustration may be omitted in other drawings.
- Power supply device 1 performs multiple operations.
- the power supply device 1 selects an operation using the current (I LOAD ) consumed by the load device 9.
- the power supply device 1 uses the voltage (V E ) generated by the power generation element 2 to select an operation.
- the selection of operations is executed by the controller 7.
- the controller 7 receives the current (I LOAD ) consumed by the load device 9 and the voltage (V E ) generated by the power generation element 2 . If the required operation is limited, the controller 7 can select the operation by receiving only the current (I LOAD ) consumed by the load device 9.
- the controller 7 can also select an operation by receiving only the voltage (V E ) generated by the power generation element 2 .
- the controller 7 shown in FIG. 4 includes a load current determination section 71, a voltage determination section 72, and a control signal output section 73. These are functional components.
- the controller 7 is physically a computer, and functional components are realized by the computer executing a program.
- Controller 7 receives signal ⁇ 93 (I LOAD ) from ammeter 93 .
- the controller 7 receives a signal ⁇ 23 (V E ) (measured voltage) from the voltmeter 23.
- the controller 7 uses the signals ⁇ 93 and ⁇ 23 to generate control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48.
- Controller 7 provides generated control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 to converter 4.
- Load current determination section 71 receives signal ⁇ 93 (I LOAD ) from ammeter 93.
- the load current determination unit 71 defines a high load state, a medium load state, and a no-load state.
- the high load state and the medium load state are distinguished by an upper threshold current ( ISH ) (first threshold current).
- the intermediate load state and the no-load state are distinguished by a lower threshold current (I SL ) (second threshold current).
- the load current determination unit 71 determines that a high load state is present when the current value indicated by the signal ⁇ 93 (I LOAD ) is larger than the upper threshold current (I SH ).
- the load current determination unit 71 determines that the state is a medium load state when the current value indicated by the signal ⁇ 93 (I LOAD ) is smaller than the upper threshold current (I SH ) and larger than the lower threshold current (I SL ). The load current determination unit 71 determines that there is no load state when the current value indicated by the signal ⁇ 93 (I LOAD ) is smaller than the lower threshold current (I SL ).
- the controller 7 uses the voltage (V E ) of the power generation element 2 to further classify the state into three states.
- Voltage determining section 72 receives signal ⁇ 23 (V E ) from voltmeter 23 .
- the voltage determination unit 72 defines a high voltage state, a medium voltage state, and a low voltage state.
- the high voltage state and the medium voltage state are distinguished by an upper threshold voltage (V SH ) (first threshold voltage).
- the medium voltage state and the low voltage state are distinguished by a lower threshold voltage (V SL ) (second threshold voltage).
- the voltage determination unit 72 determines that the state is a high voltage state when the voltage value indicated by the signal ⁇ 23 (V E ) is larger than the upper threshold voltage (V SH ).
- the voltage determination unit 72 determines that the state is a medium voltage state when the voltage value indicated by the signal ⁇ 23 (V E ) is smaller than the upper threshold voltage (V SH ) and larger than the lower threshold voltage (V SL ). The voltage determination unit 72 determines that the state is a low voltage state when the voltage value indicated by the signal ⁇ 23 (V E ) is smaller than the lower threshold voltage (V SL ).
- the controller 7 uses the load current (I LOAD ) and the voltage (V E ) of the power generating element 2 to determine whether the state of the power supply device 1 is included in a high load state, a no-load state, or a medium-load state. It is determined which of the following five states corresponds to: a high voltage state included in the medium load state, a medium voltage state included in the medium load state, and a low voltage state included in the medium load state.
- the controller 7 selects an operation corresponding to each of the five states. When the controller 7 determines that it is in a high load state, it selects the high load operation M2. When the controller 7 determines that it is in a no-load state, it selects the no-load operation M3. When the controller 7 determines that the high voltage state is present, the controller 7 selects the high voltage operation M4. When the controller 7 determines that the voltage is in the medium voltage state, the controller 7 selects the normal operation M1. When the controller 7 determines that it is in the low voltage state, it selects the low voltage operation M5.
- FIG. 5 shows an operation flow executed by the controller 7.
- the load current determination unit 71 of the controller 7 receives a signal ⁇ 93 (I LOAD ) indicating the load current (I LOAD ) (step S11).
- the load current determination unit 71 determines whether the current (I LOAD ) is larger than the upper threshold current (I SH ) (first threshold) (step S12). If the load current (I LOAD ) is larger than the upper threshold current (I SH ) (step S12: YES), the load current determination unit 71 outputs the result to the control signal output unit 73 as a signal ⁇ 71 (H). .
- the control signal output unit 73 that receives the signal ⁇ 71 (H) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high-load operation M2 to the converter 4 (step S13). Details of the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 will be described later.
- the load current determination unit 71 determines that the load current (I LOAD ) is smaller than the lower threshold current (I SL ). It is determined whether it is small (step S14). If the load current (I LOAD ) is smaller than the lower threshold current (I SL ) (step S14: YES), the load current determination unit 71 outputs the result to the control signal output unit 73 as a signal ⁇ 71 (L). .
- the control signal output unit 73 that receives the signal ⁇ 71 (L) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the no-load operation M3 to the converter 4 (step S15).
- step S14 If the current (I LOAD ) is larger than the lower threshold current (I SL ) (second threshold) (step S14: NO), the controller 7 receives the signal ⁇ 23 (V E ) (step S16).
- the controller 7 determines whether the measured voltage (V E ) is larger than the upper threshold voltage (V SH ) (step S17). This operation is executed by the voltage determination section 72. If the measured voltage (V E ) is larger than the upper threshold voltage (V SH ) (step S17: YES), the voltage determination unit 72 outputs the result to the control signal output unit 73 as a signal ⁇ 72 (H). .
- the control signal output unit 73 that receives the signal ⁇ 72 (H) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high voltage operation M4 to the converter 4 (step S18).
- step S17 NO
- the voltage determination unit 72 determines that the measured voltage (V E ) is smaller than the lower threshold voltage (V SL ). It is determined whether or not the value is also smaller (step S18). If the measured voltage (V E ) is smaller than the lower threshold voltage (V SL ) (step S19: YES), the voltage determination unit 72 outputs the result to the control signal output unit 73 as a signal ⁇ 72 (L). .
- Control signal output section 73 receiving signal ⁇ 72 (L) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for low voltage operation M5 to converter 4 (step S21).
- the voltage determination unit 72 If the measured voltage (V E ) is larger than the lower threshold voltage (V SL ) (step S19: NO), the voltage determination unit 72 outputs the result to the control signal output unit 73 as a signal ⁇ 72 (M). .
- the control signal output unit 73 that receives the signal ⁇ 72(M) outputs the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the normal operation M1 to the converter 4 (step S22).
- the control signal output section 73 selects the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 from the five waveforms PG, PGB, NG, ON, and OFF shown in FIG. 6 according to the mode of operation.
- the waveforms PG, PGB, NG, ON, and OFF include a high (H) component and a low (L) component.
- the waveforms PG, PGB, NG, ON, and OFF each include a first period D1, a second period D2, and a third period D3.
- waveform PG H
- waveform PGB L
- waveform NG H
- waveform ON H
- waveform OFF L
- waveform PG H
- waveform PGB L
- waveform NG L
- waveform ON H
- waveform OFF L
- Waveform PGB is an inversion of waveform PG.
- the waveform ON is always high (H) throughout the first period D1, second period D2, and third period D3.
- the waveform OFF is always low (L) throughout the first period D1, second period D2, and third period D3.
- FIG. 6(b) is an example of a circuit that constitutes the control signal output section 73.
- Control signal output section 73 includes a first control circuit 76 and a second control circuit 77.
- the first control circuit 76 outputs a waveform PG.
- the second control circuit 77 outputs a waveform NG.
- the first control circuit 76 includes a comparator 761, a pulse circuit 762, a delay circuit 764, and an RS flip-flop 763.
- Comparator 761 compares voltage Va and reference voltage Vref. Voltage Va is a voltage generated at node J1 set between resistance element 61 and resistance element 62. Comparator 761 outputs a signal (H) to pulse circuit 762 when voltage Va is lower than reference voltage Vref.
- the pulse circuit 762 receiving the signal (H) outputs a pulse signal to the RS flip-flop 763.
- the RS flip-flop 763 switches the waveform PG from high (H) to low (L) (see symbol t1 in FIG. 6(a)).
- the output of RS flip-flop 763 is also given to delay circuit 764.
- the delay circuit 764 outputs a signal to the RS flip-flop 763 after a predetermined delay time (see t2 in FIG. 6A) has elapsed.
- the RS flip-flop 763 receives the signal from the delay circuit 764 and switches the waveform PG from low (L) to high (H) (see symbol t3 in FIG. 6(a)).
- the switching from low (L) to high (H) may be performed on the condition that the voltage between the source and drain of the switching element 41 reaches a predetermined potential difference.
- the second control circuit 77 includes a comparator 771, a pulse circuit 772, a delay circuit 774, and an RS flip-flop 773.
- the delay circuit 774 receives the waveform PG switched from low (L) to high (H) from the RS flip-flop 763 of the first control circuit 76 .
- Delay circuit 774 receiving waveform PG provides a pulse to RS flip-flop 773 after a predetermined time has elapsed. Upon receiving the pulse, the RS flip-flop 773 switches the waveform NG from low (L) to high (H) (see symbol t4 in FIG. 6(a)).
- Comparator 771 compares voltage Vd and reference voltage GND.
- Voltage Vd is a voltage generated at node J2 set between first switch element 41 and second switch element 42.
- An inductor 46 is also connected to node J2.
- a signal (H) is output to the pulse circuit 772 when the voltage Vd is lower than the reference voltage GND.
- the pulse circuit 772 receiving the signal (H) outputs a pulse signal to the RS flip-flop 773.
- the RS flip-flop 773 that receives the pulse signal switches the waveform NG from high (H) to low (L) (see symbol t5 in FIG. 6(a)).
- the control signal output section 73 controls high/low switching of the waveforms PG and NG using the voltage Va on the output side of the inductor 46 and the voltage Vd on the input side of the inductor 46.
- FIG. 7 also shows combinations of control signals and waveforms. Details of a specific circuit configuration when these control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 are applied will be described later.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the normal operation M1.
- a combination of a control signal and a waveform is indicated by placing parentheses after the code of the control signal and writing a code indicating the waveform within the parentheses.
- a component (“H” or “L”) indicating the signal level is attached after the code indicating the waveform.
- Control signal ⁇ 41 Waveform PG...Control signal ⁇ 41 (PG).
- Control signal ⁇ 42 Waveform NG...Control signal ⁇ 42 (NG).
- Control signal ⁇ 47 Waveform NG...Control signal ⁇ 47 (NG).
- Control signal ⁇ 48 Waveform PGB...Control signal ⁇ 48 (PGB).
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high voltage operation M4.
- Control signal ⁇ 41 (PG).
- Control signal ⁇ 42 (NG).
- Control signal ⁇ 47 (PGB).
- Control signal ⁇ 48 (NG).
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the low voltage operation M5.
- Control signal ⁇ 41 ON:H
- Control signal ⁇ 42 OFF: L
- Control signal ⁇ 47 ON:H
- Control signal ⁇ 48 ON:H).
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the low voltage operation M5A of the modified example.
- Control signal ⁇ 41 (OFF:L).
- Control signal ⁇ 42 (OFF: L).
- Control signal ⁇ 47 (ON:H).
- Control signal ⁇ 48 (OFF: L).
- Control signal ⁇ 81 (ON:H)
- the control signal output section 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high-load operation M2.
- Control signal ⁇ 41 (OFF:L).
- Control signal ⁇ 42 (OFF: L).
- Control signal ⁇ 47 (ON:H).
- Control signal ⁇ 48 (OFF: L).
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the no-load operation M3.
- Control signal ⁇ 41 (OFF).
- Control signal ⁇ 42 (ON).
- Control signal ⁇ 47 (OFF).
- Control signal ⁇ 48 (ON).
- ⁇ Normal operation M1> During the normal operation M1, the power supply device 1 performs a run-up operation M11 (first operation), a load drive operation M12 (second operation), and a standby operation M13 (third operation). These operations are switched by control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 output by the controller 7.
- the run-up operation M11, the load drive operation M12, and the standby operation M13 are executed in this order.
- the order in which the run-up operation M11, load drive operation M12, and standby operation M13 are executed is not limited to this.
- the run-up operation M11, the load drive operation M12, and the standby operation M13 may be performed in any order.
- FIG. 8(a) shows the state of the circuit during the run-up operation M11.
- the wiring shown by a solid line means that a current flows during the run-up operation M11.
- the wiring indicated by a broken line indicates that no current flows during the run-up operation M11.
- Control signal ⁇ 41 (PG:L).
- Control signal ⁇ 42 (NG:L).
- Control signal ⁇ 47 (NG:L).
- Control signal ⁇ 48 (PGB:H).
- the first switch element 41 receiving the control signal ⁇ 41 connects the input terminal 4a of the converter 4 to the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 disconnects the inductor 46 from the reference voltage GND.
- the output-side switch element 47 that receives the control signal ⁇ 47 (NG:L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (PGB:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
- a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, and the feedback side switch element 48 is configured.
- a closed circuit including the secondary battery 3, the power generation element 2, and the capacitor 51 is also configured.
- a voltage (V IN ) obtained by adding the voltage (V EH ) of the power generating element 2 and the voltage (V BAT ) of the secondary battery 3 is applied to the input terminal 4 a of the converter 4 .
- a current (I IN ) flows through a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, and the feedback side switch element 48.
- the current (I L ) flowing through the inductor 46 gradually increases. As a result, inductor 46 stores energy.
- the load device 9 is disconnected from the power supply device 1. At this time, a closed circuit including the load device 9 and the capacitor 63 is configured. If sufficient power is stored in the capacitor 63, the load device 9 can receive power from the capacitor 63.
- a closed circuit including the power generating element 2, the secondary battery 3, and the capacitor 51 is also configured.
- the power generation element 2 is connected to the inductor 46.
- the energy generated by the power generating element 2 may be stored in the inductor 46 and also in the capacitor 51.
- FIG. 8(b) shows the state of the circuit during load drive operation M12.
- the controller 7 outputs the following control signals.
- Control signal ⁇ 41 (PG:H).
- Control signal ⁇ 42 (NG:H).
- Control signal ⁇ 47 (NG:H).
- Control signal ⁇ 48 (PGB:L).
- the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (NG:H) connects the inductor 46 to the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 (NG:H) connects the inductor 46 to the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (PGB:L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
- a closed circuit including the inductor 46, the output-side switch element 47, the load device 9, and the second switch element 42 is configured.
- the inductor 46 provides the load device 9 with electric power (P OUT ) resulting from the stored energy.
- the load device 9 supplied with power from the power supply device 1 is driven. If the power provided by inductor 46 (P OUT ) is greater than the power required by load device 9 (P LOAD ), the excess power may be stored in capacitor 63 .
- the energy stored in the inductor 46 gradually decreases, and the current (I L ) in the inductor 46 also gradually decreases.
- a closed circuit including the power generation element 2, the secondary battery 3, and the capacitor 51 is also configured during the load drive operation M12.
- the power generation element 2 is disconnected from the inductor 46.
- the energy generated by the power generating element 2 is not stored in the inductor 46.
- the energy generated by the power generation element 2 during the load drive operation M12 may be stored in the capacitor 51.
- ⁇ Standby operation M13> The standby operation M13 will be explained with reference to FIG. 8(c). During the standby operation M13, the load device 9 consumes all the energy stored in the capacitor 63. During standby operation M13, converter 4 does not need to be operated. If the energy stored in the capacitor 63 is not sufficient, the standby operation M13 may be omitted.
- FIG. 8(c) shows the state of the circuit during standby operation M13.
- the controller 7 outputs the following control signals.
- Control signal ⁇ 41 (PG:H).
- Control signal ⁇ 42 (NG:L).
- Control signal ⁇ 47 (NG:L).
- Control signal ⁇ 48 (PGB:L).
- the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (NG:L) disconnects the inductor 46 from the reference voltage GND.
- the output-side switch element 47 that receives the control signal ⁇ 47 (NG:L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (PGB:L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
- a closed circuit including the inductor 46 is not configured.
- the load device 9 is disconnected from the power supply device 1. This state is the same as the closed circuit including the load device 9 and the capacitor 63 configured during the run-up operation M11. If sufficient power is stored in the capacitor 63, the load device 9 can receive power from the capacitor 63.
- a closed circuit including the power generation element 2, the secondary battery 3, and the capacitor 51 is also configured during the standby operation M13.
- the power generation element 2 is disconnected from the inductor 46.
- the energy generated by the power generating element 2 is not stored in the inductor 46.
- the energy generated by the power generating element 2 during the standby operation M13 may be stored in the capacitor 51.
- FIG. 9 conceptually shows the breakdown of electric power in the power supply device 1.
- the power input to the power supply device 1 PIN
- P BAT the sum of the power of the secondary battery 3
- P EH the power of the power generation element 2
- the power (P BAT ) of the secondary battery 3 is the product of the voltage (V BAT ) and the current (I IN ).
- the electric power (P EH ) of the power generating element 2 is the product of the voltage (V E ) and the current (I IN ).
- the power extraction efficiency ( ⁇ ) of the converter 4 is 100%. According to this assumption, the entire sum of power (P BAT ) and power (P EH ) can be stored in inductor 46 . All of the electric power (P EH ) of the power generating element 2 can be stored in the inductor 46 .
- the power extraction efficiency ( ⁇ ) of converter 4 is less than 100%. According to this assumption, a portion of the sum of power (P BAT ) and power (P EH ) can be stored in inductor 46 . A part of the electric power (P EH ) of the power generating element 2 can be stored in the inductor 46 .
- the electric power (P EH ) of the power generation element 2 includes the electric power (P E_NET ) stored in the inductor 46 and the electric power (P E_LOSS ) that is not stored in the inductor 46 and becomes a loss.
- the power loss (P E_LOSS ) is the product of the voltage drop (R E ⁇ I IN ), which is represented by the product of the output resistance 21 (R E ) and the current (I IN ), and the current (I IN ). be.
- the electric power (P E_NET ) accumulated in the inductor 46 is the remainder after subtracting the electric power (P E_LOSS ) resulting from a loss from the electric power (P EH ) of the power generation element 2 .
- the power (P OUT ) output by the converter 4 is returned to the secondary battery 3 again.
- the power (P BACK ) returned to the secondary battery 3 is the product of the voltage (V BAT ) and the current fed back (I BACK ).
- the current (I BACK ) is smaller than the current (I IN ).
- the difference between the current (I IN ) and the current (I BACK ) is the current consumed (I CKT ).
- the consumed power (P CKT ) can be defined by the consumed current (I CKT ) and voltage (V BAT ).
- the secondary battery 3 outputs power (P BAT ), receives power (P BACK ) back, and consumes power (P CKT ).
- the power supply device 1 can obtain electric power ( PE_NET ) from the power generating element 2 by consuming electric power ( PCKT ).
- the power supply device 1 can also be considered as a battery with an extended lifespan.
- BLE Battery Life Extension
- BLE was defined as an index indicating how much the life of the power supply device 1 is extended.
- the degree of extension of the life of the secondary battery 3 was evaluated. It is assumed that the current (I CKT ) defining the consumed power (P CKT ) is 2 ⁇ A, and the voltage (V BAT ) of the secondary battery 3 is 1.5V. As a result, the power consumed ( PCKT ) was 3 ⁇ W.
- the power supply device 1 can drive the load device 9, which requires 30 ⁇ W of power, by consuming 3 ⁇ W of the secondary battery 3.
- the secondary battery 3 supplies all the 30 ⁇ W required by the load device 9, 30 ⁇ W is consumed.
- the power supply device 1 consumes only 1/10 of that, 3 ⁇ W. Therefore, in terms of life, the power supply device 1 can have a life 10 times longer than the life when the secondary battery 3 supplies all the 30 ⁇ W required by the load device 9.
- the high voltage operation M4 will be explained with reference to FIG.
- the voltage (V E ) generated by the power generation element 22 increases in accordance with the temperature difference.
- the voltage (V E ) increases, for example, storing energy in the inductor 46 and driving the load device 9 can be performed in parallel.
- the power supply device 1 performs an accumulation drive operation M41 (first operation), a charging operation M42 (second operation), and a standby operation M51 (third operation). These operations are also switched by control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 output by the controller 7.
- Control signal ⁇ 41 (PG:L).
- Control signal ⁇ 42 (NG:L).
- Control signal ⁇ 47 (PGB:H).
- Control signal ⁇ 48 (NG:L).
- the first switch element 41 receiving the control signal ⁇ 41 connects the input terminal 4a of the converter 4 to the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 disconnects the inductor 46 from the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 connects the inductor 46 to the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (NG:L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
- a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, the output side switch element 47, and the load device 9 is configured.
- a voltage (V IN ) obtained by adding the voltage (V BAT ) of the secondary battery 3 to the voltage (V EH ) generated by the power generating element 2 is provided to the input terminal 4 a of the converter 4. .
- inductor 46 stores energy.
- the load device 9 is connected to the power supply device 1. Therefore, the load device 9 can receive power supply from the power supply device 1. As a result, during the storage drive operation M41, the load device 9 is driven.
- a closed circuit including the power generating element 2, the secondary battery 3, and the capacitor 51 is also configured.
- the energy generated by the power generating element 2 may be stored in the inductor 46 and also in the capacitor 51.
- Control signal ⁇ 41 (PG:H).
- Control signal ⁇ 42 (NG:H).
- Control signal ⁇ 47 (PGB:L).
- Control signal ⁇ 48 (NG:H).
- the first switch element 41 that receives the control signal ⁇ 41 disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 connects the inductor 46 to the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 (PGB:L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
- the switch element 48 on the feedback side that receives the control signal ⁇ 48 (NG:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
- a closed circuit including the second switch element 42, the inductor 46, the feedback side switch element 48, and the secondary battery 3 is configured. According to this closed circuit, the energy stored in the inductor 46 is given to the secondary battery 3. As a result, the inductor 46 charges the secondary battery 3.
- the load device 9 is disconnected from the power supply device 1. At this time, a closed circuit including the load device 9 and the capacitor 63 is configured. If sufficient power is stored in the capacitor 63, the load device 9 can receive power from the capacitor 63.
- a closed circuit including the power generating element 2, the secondary battery 3, and the capacitor 51 is also configured.
- the energy generated by the power generating element 2 may be stored in the inductor 46 and also in the capacitor 51.
- control signal ⁇ 41 (PG:H).
- Control signal ⁇ 42 (NG:L).
- Control signal ⁇ 47 (PGB:L).
- Control signal ⁇ 48 (NG:L).
- the low voltage operation M5 will be explained with reference to FIG. 11(a).
- the voltage (V E ) generated by the power generation element 22 becomes low.
- the secondary battery 3 can be used to drive the load device 9.
- the voltage (V BAT ) of the secondary battery 3 that satisfies the voltage (V LOAD ) required by the load device 9 means that the voltage (V BAT ) of the secondary battery 3 satisfies the voltage (V LOAD ) required by the load device 9. ( VLOAD ), and a case where the voltage ( VBAT ) of the secondary battery 3 is higher than the voltage ( VLOAD ) required by the load device 9.
- the load device 9 When the voltage (V BAT ) of the secondary battery 3 is equal to the voltage (V LOAD ) required by the load device 9, the load device 9 is driven by directly connecting the secondary battery 3 to the load device 9. Can be done.
- the secondary battery 3 is directly connected to the load device 9 without going through the power generation element 2 and converter 4 .
- the low voltage operation M5 does not include some periods like the normal operation M1 and the high voltage operation M4.
- the power supply 1 includes only one direct supply operation.
- the power output from the secondary battery 3 is given to the load device 9 without passing through the power generation element 2.
- the low voltage operation M5 can be employed even when the power generation element 2 has an electrical failure (broken wire). According to the low-voltage operation M5, even if the power generation element 2 is electrically damaged, power can be supplied from the power supply device 1 to the load device 9.
- the fact that the power output from the secondary battery 3 is given to the load device 9 without passing through the power generation element 2 means that the power output from the secondary battery 3 does not go through the output resistance 21 of the power generation element 2. This means that it is applied to the load device 9. Therefore, the voltage (V BAT ) of the secondary battery 3 can be prevented from being affected by a voltage drop caused by the output resistance 21 of the power generation element 2 .
- the voltage (V BAT ) of the secondary battery 3 can be directly applied to the load device 9 .
- Direct supply operation The direct supply operation will be explained.
- direct supply operation the secondary battery 3 provides energy to the load device 9.
- Control signal ⁇ 41 ON:H
- Control signal ⁇ 42 OFF: L
- Control signal ⁇ 47 ON:H
- Control signal ⁇ 48 ON:H
- the first switch element 41 that receives the control signal ⁇ 41 (ON:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (OFF:L) disconnects the inductor 46 from the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 (ON:H) connects the inductor 46 to the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (ON:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
- a closed circuit including the secondary battery 3, the switch element 48 on the feedback side, and the load device 9 is configured. According to this closed circuit, power from the secondary battery 3 is given to the load device 9.
- Low voltage operation M5 could be selected when the condition that the voltage (V BAT ) of the secondary battery 3 is equal to the voltage (V LOAD ) required by the load device 9 is satisfied.
- a circuit configuration and operation that can be adopted when the voltage (V BAT ) of the secondary battery 3 is higher than the voltage (V LOAD ) required by the load device 9 will be described as a modified example with reference to FIG. 11(b).
- the power supply device 1A of the modified example includes a short circuit 80 that avoids the power generating element 2.
- Short circuit 80 connects secondary battery 3 directly to converter 4 .
- a first end of the short circuit 80 is connected to the wiring between the secondary battery 3 and the power generation element 2.
- a second end of short circuit 80 is connected between power generation element 2 and converter 4 .
- Short circuit 80 has a switch element 81 .
- the low voltage operation M5A of the modified example does not include some periods like the normal operation M1 and the high voltage operation M4.
- the power supply device 1A includes only one step-down supply operation.
- the step-down supply operation will be explained. During the step-down supply operation, the secondary battery 3 provides energy to the load device 9 via the converter 4 .
- Control signal ⁇ 41 (OFF: L).
- Control signal ⁇ 42 (OFF: L).
- Control signal ⁇ 47 (ON:H).
- Control signal ⁇ 48 (OFF: L).
- Control signal ⁇ 81 (ON:H).
- the first switch element 41 that receives the control signal ⁇ 41 (OFF: L) connects the input terminal 4a of the converter 4 to the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (OFF:L) disconnects the inductor 46 from the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 (ON:H) connects the inductor 46 to the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (OFF: L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
- the switch element 81 of the short circuit 80 Upon receiving the control signal ⁇ 81 (ON:H), the switch element 81 of the short circuit 80 connects the positive electrode of the secondary battery 3 to the input terminal 4a of the converter 4.
- a closed circuit including the secondary battery 3, the switch element 81 of the short circuit 80, the inductor 46, the output side switch element 47, and the load device 9 is configured. According to this closed circuit, the voltage-stepped power of the secondary battery 3 is given to the load device 9.
- the low-voltage operation M5A of the modified example also allows the power supply device 1A to provide power to the load device 9 when the power generation element 2 has an electrical failure.
- the power supply device 1A including the short circuit 80 can also perform normal operation M1 and high voltage operation M4.
- the controller 7 outputs the control signal ⁇ 81 (OFF).
- the high load operation M2 will be explained with reference to FIG. 12(a).
- the high load operation M2 is executed when the load device 9 requests higher power (P LOAD ) than the power (P LOAD ) required during the normal operation M1.
- the high load operation M2 includes one driving operation.
- inductor 46 stores energy. Inductor 46 provides energy to load device 9.
- the circuit configuration and operation during the high load operation M2 are the same as the circuit configuration and operation during the storage drive operation M41 of the high voltage operation M4.
- the high load operation M2 will be explained.
- the controller 7 outputs the following control signals.
- Control signal ⁇ 41 (OFF:L).
- Control signal ⁇ 42 (OFF: L).
- Control signal ⁇ 47 (ON:H).
- Control signal ⁇ 48 (OFF: L).
- the first switch element 41 that receives the control signal ⁇ 41 (OFF: L) connects the input terminal 4a of the converter 4 to the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (OFF:L) disconnects the inductor 46 from the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 (ON:H) connects the inductor 46 to the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (OFF: L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
- a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, the output side switch element 47, and the load device 9 is configured.
- a voltage (V IN ) obtained by adding the voltage (V BAT ) of the secondary battery 3 to the voltage (V EH ) generated by the power generating element 2 is provided to the input terminal 4 a of the converter 4. .
- inductor 46 stores energy.
- No-load operation M3 The no-load operation M3 will be explained with reference to FIG. 12(b). During no-load operation M3, the power supply device 1 does not provide power to the load device 9. The no-load operation M3 is executed when the load device 9 has stopped its operation.
- the no-load operation M3 includes one charging operation. During no-load operation M3, the inductor 46 provides stored energy to the secondary battery 3. In other words, during no-load operation M3, the secondary battery 3 is charged.
- the circuit configuration and operation during the no-load operation M3 are the same as the circuit configuration and operation during the charging operation M42 of the high voltage operation M4.
- the no-load operation M3 will be explained.
- the controller 7 outputs the following control signals.
- Control signal ⁇ 41 ON:H.
- Control signal ⁇ 42 ON:H).
- Control signal ⁇ 47 OFF: L.
- Control signal ⁇ 48 ON:H).
- the first switch element 41 that receives the control signal ⁇ 41 (ON:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (ON:H) connects the inductor 46 to the reference voltage GND.
- the output side switch element 47 that receives the control signal ⁇ 47 (OFF: L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
- the feedback side switch element 48 that receives the control signal ⁇ 48 (ON:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
- a closed circuit including the second switch element 42, the inductor 46, the feedback side switch element 48, and the secondary battery 3 is configured. According to this closed circuit, the energy stored in the inductor 46 is given to the secondary battery 3. As a result, the inductor 46 charges the secondary battery 3.
- the power supply device 1 of the first embodiment includes a secondary battery 3, a power generation element 2 connected in series to the secondary battery 3, an input terminal 4a connected to the output of the power generation element 2, and a secondary battery 3.
- the converter 4 includes an output terminal 4b connected to the output of the converter 3 and an output terminal 4b connected to the load device 9.
- Converter 4 provides power to at least one of output terminal 4b and output terminal 4b based on the required power ( PLOAD ) of load device 9 and/or the generated voltage ( VE ) of power generation element 2.
- the required power (P LOAD ) may be, for example, the power value itself.
- the required power (P LOAD ) can also be replaced with elements that constitute the required power (P LOAD ), such as a required current and a required voltage.
- the operation of the power supply device 1 may be switched based on the requested current instead of the requested power (P LOAD ).
- the power supply device 1 may actively obtain the required power (P LOAD ), the required current, and the required voltage from the load device 9 .
- the required power (P LOAD ), the required current, and the required voltage may be passively obtained by the power supply device 1 from the load device 9.
- the load device 9 may actively provide the required power (P LOAD ), the required current, and the required voltage to the power supply device 1 .
- the power supply device 1 generates control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 using at least one of the electric power (P LOAD ) requested by the load device 9 and the voltage (V E ) generated by the power generator 22.
- the voltage (V E ) increases or decreases depending on changes in the external environment. Therefore, by controlling using at least one of the power (P LOAD ) and voltage (V E ) required by the load device 9, the power supply device 1 can be operated in response to changes in external factors.
- the power supply device 1 of the first embodiment uses both the required current of the load device 9 and the voltage generated by the power generation element 2 as control variables for switching the operation of the circuit.
- the power supply device 1 performs normal operation M1, high load operation M2, no-load operation M3, high voltage operation M4, low voltage operation M5, and another low voltage operation M5A according to the required current of load device 9 and Switching is performed according to the voltage generated by the power generation element 2.
- the power supply device 1 may use only the required current of the load device 9 as a control variable for switching the operation of the circuit.
- the power supply device 1 switches between a normal operation M1, a high load operation M2, and a no-load operation M3 according to the required current of the load device 9.
- the power supply device 1 may use only the voltage generated by the power generating element 2 as a control variable for switching the operation of the circuit.
- the power supply device 1 switches between a normal operation M1, a high voltage operation M4, a low voltage operation M5, and another low voltage operation M5A depending on the voltage generated by the power generation element 2.
- the ratio between the electric power (P E_NET ) taken out from the electric power generating element 2 and the electric power resulting in loss (P E_LOSS ) is determined by the current (I IN ).
- the proportion of power (P E_LOSS ) that becomes a loss increases.
- the proportion of power lost (P E_LOSS ) decreases.
- the amount of electric power (P E_NET ) taken out from the power generation element 2 decreases.
- Obtaining desired power from the power generating element 2 can also be said to mean controlling the ratio of the power extracted from the power generating element 2 (P E_NET ) and the power resulting in loss (P E_LOSS ).
- the ratio between the power extracted from the power generating element 2 (P E_NET ) and the power lost (P E_LOSS ) is referred to as "power extraction efficiency ( ⁇ )" in the following description.
- the electric power (P E ) generated by the power generating element 2 is influenced by the external environment such as temperature. Assume that a current (I IN ) that can obtain a desired power (P E_NET ) in a certain state (for example, temperature) is set. If this setting is maintained, there is a possibility that the power extraction efficiency ( ⁇ ) will decrease when one state changes to another state.
- Equation (2) is intended only for the power generation element 2.
- the influence of the voltage (V BAT ) of the secondary battery 3 is not included in equation (2).
- the inventors regarded the configuration including the power generation element 2 and the secondary battery 3 as one power generation source, and diligently studied conditions for maximizing the power extraction efficiency ( ⁇ ) of the power generation source.
- I IN V E 2 / (4 x V O x R E )...(5)
- I IN (MAX) V E /2 x R E ... (6)
- V IN The voltage (V IN ) is expressed by the following formula (7).
- the inventors have found that when the configuration including the power generation element 2 and the secondary battery 3 is considered as one power generation source, the condition for maximizing the power efficiency is Equation (7).
- VIN VBAT + VE /2...(7)
- a power supply device 1B that can maintain the power extraction efficiency ( ⁇ ) at a desired state even when a change in the external environment occurs will be described. Maintaining the power extraction efficiency ( ⁇ ) at a desired state means operating the power supply device 1B so as to satisfy the condition of equation (7).
- the conditions shown in equation (7) are based on an ideal electric circuit in which the power supply device 1B does not include components such as parasitic resistance and parasitic capacitance.
- the actual power supply device 1B includes components such as parasitic resistance and parasitic capacitance of an inductor and a transistor.
- the actual power supply device 1B also includes power loss such as power consumption of the controller 7B. Considering these factors, the optimal conditions for extracting the maximum power may deviate from the conditions shown in equation (7).
- the power supply device 1B may adopt the condition shown in equation (8) instead of the condition shown in equation (7).
- VIN VBAT +b ⁇ VE ...(8)
- Equation (8) includes a variable b.
- the variable b is set to a value different from 0.5.
- the condition shown in equation (8) is satisfied by setting the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3 shown in FIG. 18(a) to appropriate values. It is possible to realize an operation that satisfies the following.
- Using an analog circuit it is possible to set the upper reference voltage (V REFP ) and lower reference voltage (V REFN ) that provide optimal conditions. Even when setting the upper reference voltage (V REFP ) and lower reference voltage (V REFN ) using a digital circuit including an A/D converter and a D/A converter, operation that satisfies the conditions shown in equation (8) is realized. can.
- the circuit configuration of the power supply device 1B of the second embodiment is the same as that of the first embodiment.
- the power supply device 1B of the second embodiment is characterized by the operation of the converter 4.
- An operation for keeping the power extraction efficiency ( ⁇ ) in a desired state even when a change in the external environment occurs is referred to as an MPPT operation R1.
- the power supply device 1B that executes the MPPT operation R1 will be described in detail.
- ⁇ MPPT operation R1> MPPT operation R1 will be explained. It has already been mentioned that the power extraction efficiency ( ⁇ ) is affected by the current (I IN ) that the converter 4 receives. Controller 7B executes control to maintain the current (I IN ) applied to converter 4 at a desired value. Controller 7B performs an operation to keep the voltage (V IN ) received by converter 4 within a predetermined range so that the current (I IN ) applied to converter 4 is maintained at a desired value. The operation of keeping the voltage (V IN ) within a predetermined range is referred to as "power extraction operation R11."
- Controller 7B performs an operation of updating the range within which the voltage (V IN ) received by converter 4 should be accommodated.
- the operation of updating the range in which the voltage (V IN ) received by converter 4 should be contained is referred to as "refresh operation R12."
- FIG. 14(a) shows the voltage (V IN ) that converter 4 receives when performing MPPT operation R1.
- the MPPT operation R1 includes a power extraction operation R11 and a refresh operation R12.
- the controller 7B repeatedly executes the power extraction operation R11 and the refresh operation R12.
- the minimum unit (T CYC ) of the MPPT operation R1 is defined by one power extraction operation R11 and one refresh operation R12.
- the minimum unit (T CYC ) is shown in which the power extraction operation R11 is executed first and the refresh operation R12 is executed later.
- the minimum unit (T CYC ) may be defined as one in which the refresh operation R12 is executed first and the power extraction operation R11 is executed later.
- the power extraction operation R11 provides power (P OUT ) to the load device 9.
- the voltage (V IN ) is within a predetermined range.
- the predetermined range is defined by an upper reference voltage (V REFP ) (first threshold voltage) and a lower reference voltage (V REFN ) (second threshold voltage).
- Controller 7B controls converter 4 so that voltage (V IN ) increases from lower reference voltage (V REFN ) toward upper reference voltage (V REFP ).
- a suspend operation R111 see FIG. 14(b)
- Controller 7B controls converter 4 so that voltage (V IN ) decreases from upper reference voltage (V REFP ) toward lower reference voltage (V REFN ).
- Such an operation is called a resume operation R112.
- the resume operation R112 includes a run-up operation M11 and a load drive operation M12.
- the run-up operation M11 and the load drive operation M12 have already been explained in the first embodiment, so a detailed explanation will be omitted.
- the minimum unit (T OP ) of the power extraction operation R11 is defined by one suspend operation R111 and one resume operation R112.
- Refresh operation R12 obtains the magnitude of the voltage (V IN ) that converter 4 is experiencing.
- the refresh operation R12 includes a standby operation R121 and a sample operation R122.
- standby operation R121 charge is accumulated in capacitor 51 (see FIG. 3) by stopping the operation of converter 4.
- the capacitance of the capacitor 51 is sufficiently large, it converges to the value of the voltage (V IN ).
- the magnitude of the voltage (V IN ) can be obtained.
- the voltage (V IN ) obtained in the standby operation M51 is used to obtain an upper reference voltage (V REFP ) and a lower reference voltage (V REFN ).
- the controller 7B includes a load current determination section 71, a first voltage determination section 72, and a control signal output section 73B.
- the load current determination section 71 and the first voltage determination section 72 are the same as the load current determination section 71 and the voltage determination section 72 of the first embodiment, so a detailed description thereof will be omitted.
- Controller 7B further includes a reference voltage generation section 75 and a second voltage determination section 74.
- Reference voltage generating section 75 receives voltage (V BAT ) and voltage (V IN ).
- the reference voltage generator 75 uses the voltage (V BAT ) and the voltage (V IN ) to obtain an upper reference voltage (V REFP ) and a lower reference voltage (V REFN ).
- the reference voltage generation section 75 provides the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ) to the second voltage determination section 74 .
- the reference voltage generating section 75 may obtain the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ) using an analog circuit. A configuration example in which the reference voltage generation section 75 is an analog circuit will be described later.
- the reference voltage generator 75 may obtain the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ) using a digital circuit.
- the reference voltage generator 75 converts the voltage (V IN ) into a digital value using an AD converter.
- An upper reference voltage (V REFP ) and a lower reference voltage (V REFN ) are obtained by computer calculation.
- the upper reference voltage (V REFP ) is obtained by adding a predetermined value to the voltage (V IN ).
- a lower reference voltage (V REFN ) is obtained by subtracting a predetermined value from the voltage (V IN ).
- the second voltage determination section 74 receives the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ).
- the second voltage determination section 74 receives the voltage (V IN ).
- the second voltage determination unit 74 executes the following operation during the power extraction operation R11.
- the second voltage determination unit 74 determines whether the voltage (V IN ) has reached the upper reference voltage (V REFP ).
- the second voltage determination unit 74 determines whether the voltage (V IN ) has reached the lower reference voltage (V REFN ).
- the second voltage determination unit 74 obtains a control signal ⁇ 73 (SUSPEND) and a control signal ⁇ 74 (RESUME) as a result of the determination.
- the second voltage determination unit 74 provides a control signal ⁇ 73 (SUSPEND) and a control signal ⁇ 74 (RESUME) to the control signal output unit 73B.
- the second voltage determination section 74 When it is determined that the voltage (V IN ) has reached the upper reference voltage (V REFP ), the second voltage determination section 74 outputs the following control signals ⁇ 73 and ⁇ 74 (see FIG. 16(b)). Control signal ⁇ 73 (SUSPEND: H). Control signal ⁇ 74 (RESUME:L).
- the second voltage determination section 74 When it is determined that the voltage (V IN ) has reached the lower reference voltage (V REFN ), the second voltage determination section 74 outputs the following control signals ⁇ 73 and ⁇ 74 (see FIG. 16(b)). Control signal ⁇ 73 (SUSPEND:L). Control signal ⁇ 74 (RESUME: H).
- the second voltage determination section 74 outputs the following control signals ⁇ 73 and ⁇ 74 (see FIG. 16(c)).
- Control signal ⁇ 73 (SUSPEND: H).
- Control signal ⁇ 74 (RESUME:L).
- the second voltage determination section 74 may obtain the control signal ⁇ 73 (SUSPEND) and the control signal ⁇ 74 (RESUME) using an analog circuit.
- SUSPEND control signal ⁇ 73
- REUME control signal ⁇ 74
- the second voltage determination section 74 may obtain the control signal ⁇ 73 (SUSPEND) and the control signal ⁇ 74 (RESUME) using a digital circuit.
- the control signal output section 73 switches the waveforms PG, NG, and PGB according to the control signal ⁇ 73 (SUSPEND) and the control signal ⁇ 74 (RESUME).
- the controller 7 selects one of the five operations depending on the load power (P LAOD ) and the voltage (V IN ).
- the MPPT operation R1 described in the second embodiment is executed during the normal operation M1 among the five operations.
- the combinations of the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 and the waveforms PG, PGN, and NG are as follows. Control signal ⁇ 41 (PG). Control signal ⁇ 42 (NG). Control signal ⁇ 47 (NG). Control signal ⁇ 48 (PGB).
- the control signal output unit 73 receives the following control signals ⁇ 73 and ⁇ 74 during the suspend operation R111 (see FIG. 16(b)).
- Control signal ⁇ 73 (SUSPEND: H).
- Control signal ⁇ 74 (RESUME::L).
- the control signal output section 73 receives the above control signals ⁇ 73 and ⁇ 74, it outputs the following control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 (see FIG. 16(b)).
- Control signal ⁇ 41 (PG:H).
- Control signal ⁇ 42 (NG:L).
- Control signal ⁇ 48 (PGB:L).
- the control signal output unit 73 receives the following control signals ⁇ 73 and ⁇ 74 during the resume operation R112 (see FIG. 16(b)).
- Control signal ⁇ 73 (SUSPEND:L).
- Control signal ⁇ 74 (RESUME::H).
- the control signal output section 73 receives the above control signals ⁇ 73 and ⁇ 74, it outputs the following control signals ⁇ 41, ⁇ 42, ⁇ 47, ⁇ 48 for the run-up operation M11 and control signals ⁇ 41, ⁇ 42, ⁇ 47, ⁇ 48 for the load drive operation M12. and are output alternately (see FIG. 16(b)).
- Control signal ⁇ 41 (PG:L) for run-up operation M11.
- Control signal ⁇ 42 (NG:L) for run-up operation M11.
- the control signal output unit 73 outputs the following control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 (see FIG. 16(c)) during the refresh operation R12.
- Control signal ⁇ 41 (PG:H).
- Control signal ⁇ 42 (NG:L).
- Control signal ⁇ 47 (NG:L).
- Control signal ⁇ 48 (PGB:L).
- the controller 7B obtains the voltage (V IN ) (step S31).
- the controller 7B determines whether the voltage (V IN ) has reached the upper reference voltage (V REFP ) (step S32).
- the controller 7B obtains the voltage (V IN ) again (step S31).
- the controller 7B repeats step S31 and step S32 until the voltage (V IN ) reaches the upper reference voltage (V REFP ).
- step S32 When the controller 7B determines that the voltage (V IN ) has reached the upper reference voltage (V REFP ) (step S32: YES), the controller 7B switches from the suspend operation R111 to the resume operation R112. The controller 7B executes a resume operation R112 (step S33). In the resume operation R112, the controller 7B repeatedly executes the run-up operation M11 (step S33a) and the load drive operation M12 (step S33b).
- the controller 7B obtains the voltage (V IN ) while executing the resume operation R112 (step S34).
- the controller 7B determines whether the voltage (V IN ) has reached the lower reference voltage (V REFN ) (step S35).
- the controller 7B obtains the voltage (V IN ) again (step S34).
- the controller 7B repeats step S34 and step S35 until the voltage (V IN ) reaches the lower reference voltage (V REFN ).
- step S35 When the controller 7B determines that the voltage (V IN ) has reached the lower reference voltage (V REFN ) (step S35: YES), the controller 7B determines whether the conditions for performing the refresh operation R12 are satisfied (step S36).
- the condition for performing the refresh operation R12 may be, for example, that a predetermined time has elapsed.
- the condition for performing the refresh operation R12 may be, for example, the occurrence of a predetermined temperature difference.
- step S36 determines that the conditions for performing the refresh operation R12 are not satisfied (step S36: NO)
- the controller 7B switches from the resume operation R112 to the suspend operation R111.
- the controller 7B executes a suspend operation R111 (step S37).
- the operation to obtain the voltage (V IN ) (step S31) is performed again.
- the controller 7B repeatedly executes steps S31 to S37 until the conditions for executing the refresh operation R12 are met.
- the operations from step S31 to step S37 correspond to the power extraction operation R11 (step S30).
- step S36 determines that the conditions for performing the refresh operation R12 are satisfied (step S36: YES)
- the controller 7B executes the refresh operation R12 (steps S41 to S44).
- the controller 7B executes a standby operation R121 (step S41).
- step S42 determines whether the voltage (V IN ) has converged (step S42).
- step S42 determines that the voltage (Vs IN ) has not converged (step S42: NO)
- step S42 determines that the voltage (V IN ) has converged (step S41: YES)
- step S44 new upper reference voltages (V REFP ) and lower reference voltages (V REFN ) are obtained.
- the controller 7B executes the suspend operation R111 (step S44) again.
- the operation to obtain the voltage (V IN ) (step S31) is performed again.
- the reference voltage generation section 75 includes a first input terminal 75T1, a second input terminal 75T2, a first output terminal 75T3, and a second output terminal 75T4.
- the first input terminal 75T1 receives a voltage (V BAT ).
- the second input terminal 75T2 receives a voltage (V IN ).
- the first output terminal 75T3 outputs the upper reference voltage (V REFP ).
- the second output terminal 75T4 outputs the lower reference voltage (V REFN ).
- the reference voltage generation section 75 includes a first capacitor 75C1, a second capacitor 75C2, and a third capacitor 75C3.
- the reference voltage generation section 75 includes a first switch 75S1, a second switch 75S2, a third switch 75S3, a fourth switch 75S4, and a fifth switch 75S5.
- the first to fifth switches 75S1 to 75S5 receive control signals ⁇ 75a to ⁇ 75c from the controller 7B.
- the first capacitor 75C1 is connected between the second input terminal 75T2 and the reference voltage GND.
- a first switch 75S1 is arranged between the second input terminal 75T2 and the reference voltage GND.
- a first connection point is arranged between the first capacitor 75C1 and the first switch 75S1.
- the second capacitor 75C2 is connected between the first input terminal 75T1 and the reference voltage GND.
- a second switch 75S2 is arranged between the first input terminal 75T1 and the reference voltage GND.
- a second connection point is arranged between the second capacitor 75C2 and the second switch 75S2.
- the third capacitor 75C3 is connected between the first reference voltage GND and the second reference voltage GND.
- a third switch 75S3 is arranged between the first reference voltage GND and the second reference voltage GND.
- a third connection point is arranged between the third capacitor 75C3 and the third switch 75S3.
- the first connection point is connected to the second connection point.
- a fourth switch 75S4 is arranged between the first connection point and the second connection point.
- the second connection point is connected to the third connection point.
- a fifth switch 75S5 is arranged between the second connection point and the third connection point.
- the first connection point is connected to the first output terminal 75T3.
- the second connection point is connected to the second output terminal 75T4.
- the reference voltage generating section 75 receives the following control signals ⁇ 75a to ⁇ 75c as a first operation.
- a voltage (V IN ) is applied to the first capacitor 75C1.
- a voltage (V BAT ) is applied to the second capacitor 75C2.
- a voltage (0V) is applied to the third capacitor 75C3.
- a voltage (V IN -V BAT +V E ) is generated at the first connection point.
- a voltage (V BAT ) is generated at the second connection point.
- a voltage (0V) is generated at the third connection point.
- the reference voltage generating section 75 receives the following control signals ⁇ 75a to ⁇ 75c as a second operation.
- Control signal ⁇ 75a (L) Control signal ⁇ 75b (H)
- Control signal ⁇ 75c (L) According to the above control signals ⁇ 75a to ⁇ 75c, the first capacitor 75C1 and the second capacitor 75C2 are connected in series. As a result, a voltage (V BAT +V E /2) is generated at the first connection point and the second connection point. A voltage (0V) is generated at the third connection point.
- the reference voltage generating section 75 receives the following control signals ⁇ 75a to ⁇ 75c as a third operation.
- a voltage (V REFP ) is generated at the first connection point.
- a voltage (a ⁇ (V BAT +V E /2)) is generated at the second connection point and the third connection point.
- a is a number less than 1 (for example, 0.9).
- ⁇ Operation example 2> As a second operation example, an operation for obtaining an upper reference voltage (V REFP ) and a lower reference voltage (V REFN ) by circuit operation and digital value calculation will be described.
- the reference voltage generator 75 obtains an upper reference voltage (V REFP ).
- the reference voltage generation section 75 converts the upper reference voltage (V REFP ) into a digital value using an AD converter. At this time, the charges accumulated in the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3 may be discharged. It is unnecessary to hold the upper reference voltage (V REFP ) and the upper reference voltage (V REFP ) using the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3. As a result, the result of the refresh operation R12 is not affected by the voltage holding characteristics of the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3.
- the arithmetic unit calculates the lower reference voltage (V REFN ) using the upper reference voltage (V REFP ) which is a digital value.
- the DA converter converts the upper reference voltage (V REFP ) and lower reference voltage (V REFN ), which are digital values, into the upper reference voltage (V REFP ) and lower reference voltage (V REFN ), which are analog values. Then, it is output to the second voltage determination section 74.
- the second voltage determination section 74 includes a first comparator 74a, a first latch circuit 74b, a second comparator 74c, and a second latch circuit 74d.
- the first comparator 74a compares the voltage (V IN ) with a lower reference voltage (V REFN ).
- a voltage (V IN ) is applied to the input terminal (positive) of the first comparator 74a.
- the lower reference voltage (V REFN ) is applied from the second output terminal of the reference voltage generation section 75 to the input terminal (negative) of the first comparator 74a.
- the first latch circuit 74b receives the output of the first comparator 74a.
- the first latch circuit 74b outputs a signal (L) when the voltage (V IN ) is greater than the lower reference voltage (V REFN ).
- the first latch circuit 74b outputs a signal (H) when the voltage (V IN ) is smaller than the lower reference voltage (V REFN ).
- the first latch circuit 74b outputs the control signal ⁇ 73 (SUSPEND).
- the second comparator 74c compares the voltage (V IN ) with the upper reference voltage (V REFP ).
- the upper reference voltage (V REFP ) is applied from the reference voltage generation section 75 to the input terminal (positive) of the second comparator 74c.
- a voltage (V IN ) is applied to the input terminal (negative) of the second comparator 74c.
- the second latch circuit 74d receives the output of the second comparator 74c.
- the second latch circuit 74d outputs a signal (L) when the voltage (V IN ) is smaller than the upper reference voltage (V REFN ).
- the second latch circuit 74d outputs a signal (H) when the voltage (V IN ) is higher than the upper reference voltage (V REFP ).
- the second latch circuit 74d outputs the control signal ⁇ 74 (RESUME).
- a power supply device 1B of the second embodiment includes a secondary battery 3, a power generating element 2 connected in series to the secondary battery 3, an input terminal 4a connected to the output of the power generating element 2, and a secondary battery.
- the converter 4 includes an output terminal 4b connected to the output of the converter 3 and an output terminal 4b connected to the load device 9.
- the converter 4 performs a power extraction operation R11 that drives the converter 4 to satisfy power extraction conditions determined based on the voltage (V E ) of the power generation element 2 and the voltage (V BAT ) generated by the secondary battery 3;
- the refresh operation R12 for obtaining the power extraction conditions using the generated voltage (V E ) of No. 2 is repeated. According to the operation of the converter 4, even if external factors change, electric power can be suitably extracted from the power generation element 2.
- the controller 7B performs a power extraction operation R11 that drives the converter 4 so that the voltage (V IN ) received by the converter 4 satisfies the power extraction conditions (V REFP , V REFN ) and the power extraction conditions (V REFP , V REFN ).
- the refresh operation R12 obtained is repeated. According to such control, even if external factors change, electric power can be suitably extracted from the power generation element 2.
- the current (I L ) output by the inductor 46 becomes the current (I OUT ) given to the load device 9 or the current given to the secondary battery 3 (I BACK ). It was either As shown in FIG. 20(a), the load output period K1 during which current (I OUT ) is applied from the converter 4 to the load device 9 overlaps with the charging period K2 during which current (I BACK ) is applied from the converter 4 to the secondary battery 3. I haven't.
- the load output period K1 may coincide with the charging period K2.
- This coincidence means that the timing to start the load output period K1 and the timing to start the charging period K2 match, and the timing to end the load output period K1 and the timing to end the charging period K2 match.
- the length of the load output period K1 is the same as the length of the charging period K2.
- a portion of the load output period K1 may overlap a portion of the charging period K2. In this case, at least one of the timing to start outputting and the timing to stop outputting does not match.
- the load output period K1 and the charging period K2 are started simultaneously.
- the charging period K2 ends while the load output period K1 continues.
- an operation in which converter 4 supplies current (I OUT ) to load device 9 and current (I BACK ) to secondary battery 3 (duplicate output operation M11D), and current (I OUT ) from converter 4 to load device 9 occurs. ) (load output operation M12D) are executed in this order.
- load output operation M12D are executed in this order. A case where such an operation is performed will be described as a fourth embodiment.
- FIG. 21 is an example of a specific circuit of the power supply device 1C of the third embodiment.
- the power supply device 1C includes a power generation element 2, a secondary battery 3, a converter 4C, and a controller 7. Since the power generation element 2 and the secondary battery 3 are the same as those in the first embodiment, detailed explanations will be omitted.
- Converter 4C includes a switch element N1 on the inductor 46 side, a switch element P1 on the feedback side, and a switch element P2 on the output side, in place of the switch elements 47 and 48.
- the switch elements N1, P1, and P2 are, for example, insulated gate field effect transistors (MOSFETs).
- the switch element N1 on the inductor 46 side switches between an operation of providing the electric power accumulated in the inductor 46 to the load device 9 and an operation of stopping supply of the electric power to the load device 9.
- Switch element N1 is provided between inductor 46 and output terminal 4d of converter 4. Specifically, the drain of the switch element N1 is connected to the inductor 46.
- the source of the switch element N1 is connected to the output terminal 4d via the switch element P2.
- the source of the switch element N1 is also connected to the secondary battery 3 via the switch element P1.
- the gate of switch element N1 receives control signal ⁇ N1.
- the switch element N1 is an n-channel MOFET. Switch element N1 connects inductor 46 to output terminal 4d of converter 4 when receiving control signal ⁇ N1 (H). Switch element N1 disconnects inductor 46 from output terminal 4d of converter 4 when receiving control signal ⁇ N1 (L).
- the switch element P1 on the feedback side adjusts the magnitude of the current (I BACK ) provided from the inductor 46 to the secondary battery 3.
- Switch element P1 is provided between switch element N1 and the output of secondary battery 3. Specifically, the drain of the switch element N1 is connected to the switch element N1. The source of the switch element N1 is connected to the output of the secondary battery 3.
- the gate of switch element P1 receives control signal ⁇ P1.
- Switch element P1 is a p-channel MOFET.
- a current flows between the drain and the source according to the voltage level of the control signal ⁇ P1.
- the switch element P1 causes a current (I BACK ) to flow from the inductor 46 to the secondary battery 3 in accordance with the voltage level of the control signal ⁇ P1.
- the output side switch element P2 adjusts the magnitude of the current (I OUT ) provided from the inductor 46 to the load device 9.
- Switch element P2 is provided between switch element N1 and output terminal 4d of converter 4.
- the drain of the switch element N1 is connected to the switch element N1.
- the source of switch element N1 is connected to output terminal 4d of converter 4.
- the gate of switch element P2 receives control signal ⁇ P2.
- Switch element P2 is a p-channel MOFET. When the switch element P2 receives the control signal ⁇ P2, a current flows between the drain and the source according to the voltage level of the control signal ⁇ P2. The switch element P2 causes a current (I OUT ) to flow from the inductor 46 to the load device 9 in accordance with the voltage level of the control signal ⁇ P2.
- the operation of the power supply device 1C of the third embodiment will be described below.
- the power supply device 1C can also perform five operations similarly to the power supply device 1 of the first embodiment.
- the power supply device 1C performs normal operation M1C, high load operation M2C, no-load operation M3C, high voltage operation M4C, low voltage operation M5C, and M5CA.
- FIG. 22 shows combinations of control signals and waveforms.
- control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the normal operation M1C.
- Control signal ⁇ 41 (PG).
- Control signal ⁇ 42 (NG).
- Control signal ⁇ N1 (PGB&NG).
- Control signal ⁇ P1 (Vgp1a).
- Control signal ⁇ P2 (Vgp2a).
- FIG. 23(a) shows the connection configuration of the circuit when receiving control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
- Switch element N1 receives both waveform PGB and waveform NG as control signal ⁇ N1.
- the inductor 46 is connected to the secondary battery 3.
- a current (I BACK ) is applied, and a current (I OUT ) is also applied to the load device 9 .
- the switch element N1 provides current to the secondary battery 3 and load device 9 all at once, and stops providing current to the secondary battery 3 and load device 9 all at once.
- the secondary battery 3 is supplied with a current (I BACK ) according to the voltage of the control signal ⁇ P1 received by the switch element P1.
- Load device 9 is supplied with a current (I OUT ) according to the voltage of control signal ⁇ P2 received by switch element P2.
- the ratio between the voltage (Vgp1a) of the control signal ⁇ P1 and the voltage (Vgp2a) of the control signal ⁇ P2 corresponds to the ratio of the current (I BACK ) applied to the secondary battery 3 and the current (I OUT ) applied to the load device 9.
- the voltage (Vgp1a) of the control signal ⁇ P1 may be smaller than the voltage (Vgp1b) of the control signal ⁇ P2.
- the current applied to the secondary battery 3 (I BACK ) is smaller than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the load device 9.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the high-load operation M2C.
- Control signal ⁇ 41 OFF.
- Control signal ⁇ 42 OFF).
- Control signal ⁇ N1 ON).
- Control signal ⁇ P1 OFF).
- Control signal ⁇ P2 ON).
- FIG. 23(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
- the connection configuration in FIG. 23(b) is the same as the connection configuration in the high load operation M2 of the first embodiment (FIG. 12(a)), so detailed explanation will be omitted.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the no-load operation M3C.
- Control signal ⁇ 41 (OFF).
- Control signal ⁇ 42 (ON).
- Control signal ⁇ N1 (ON).
- Control signal ⁇ P1 (ON).
- Control signal ⁇ P2 (OFF).
- FIG. 24(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
- the connection configuration in FIG. 24(a) is the same as the connection configuration in the no-load operation M3 of the first embodiment (FIG. 12(b)), so a detailed explanation will be omitted.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for high voltage operation M4C.
- Control signal ⁇ 41 (PG).
- Control signal ⁇ 42 (NG).
- Control signal ⁇ N1 (PGB&NG).
- Control signal ⁇ P1 (Vgp1b).
- Control signal ⁇ P2 (Vgp2b).
- FIG. 24(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
- the connection configuration in FIG. 24(b) is the same as that of the normal operation M1C shown in FIG. 23(a).
- the magnitude relationship between the voltage of the control signal ⁇ P1 and the voltage of the control signal ⁇ P2 when the high voltage operation M4C is performed is different from the magnitude relationship between the voltage of the control signal ⁇ P1 and the voltage of the control signal ⁇ P2 when the normal operation M1C is performed.
- the voltage of the control signal ⁇ P1 may be higher than the voltage of the control signal ⁇ P2 (Vgp2b).
- the current applied to the secondary battery 3 (I BACK ) is larger than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the secondary battery 3.
- control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for low voltage operation M5C.
- Control signal ⁇ 41 ON).
- Control signal ⁇ 42 OFF.
- Control signal ⁇ N1 ON).
- Control signal ⁇ P1 ON).
- Control signal ⁇ P2 ON).
- FIG. 25(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
- the connection configuration in FIG. 25(a) is the same as the connection configuration in the low voltage operation M5 of the first embodiment (FIG. 11(a)), so a detailed explanation will be omitted.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the low voltage operation M5CA of the modified example.
- Control signal ⁇ 41 OFF.
- Control signal ⁇ 42 OFF).
- Control signal ⁇ N1 ON).
- Control signal ⁇ P1 OFF).
- Control signal ⁇ P2 ON).
- Control signal ⁇ 81 ON).
- FIG. 25(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
- the connection configuration in FIG. 25(b) is the same as the connection configuration (FIG. 11(b)) for the low voltage operation M5C of the first embodiment, so a detailed explanation will be omitted.
- FIG. 26 is an example of a specific circuit of the power supply device 1D according to the fourth embodiment.
- Power supply device 1D includes a power generation element 2, a secondary battery 3, a converter 4D, and a controller 7. Since the power generation element 2 and the secondary battery 3 are the same as those in the first embodiment, detailed explanations will be omitted.
- Converter 4D includes a first switch element N2 on the feedback side, a switch element N3 on the inductor 46 side, a second switch element P3 on the feedback side, and a switch element P4 on the output side in place of the switch elements 47 and 48.
- Switch elements N2, N3, P3, and P4 are, for example, insulated gate field effect transistors (MOSFETs).
- the first switch element N2 on the feedback side switches between an operation of supplying the electric power accumulated in the inductor 46 to the secondary battery 3 and an operation of stopping supply of the electric power to the secondary battery 3.
- Switch element N2 is provided between inductor 46 and secondary battery 3.
- the drain of switch element N2 is connected to inductor 46.
- the source of the switch element N2 is connected to the secondary battery 3 via the switch element P3.
- the gate of the first switch element N2 receives a control signal ⁇ N2.
- the switch element N2 is an n-channel MOFET. Switch element N2 connects inductor 46 to secondary battery 3 when receiving control signal ⁇ N2 (H). Switch element N2 disconnects inductor 46 from secondary battery 3 when receiving control signal ⁇ N2 (L).
- the switch element N3 on the inductor 46 side switches between an operation of supplying the electric power accumulated in the inductor 46 to the load device 9 and an operation of stopping supply of the electric power to the load device 9.
- Switch element N3 is provided between inductor 46 and output terminal 4d of converter 4 via switch element P4.
- the drain of switch element N3 is connected to inductor 46.
- the source of switch element N3 is connected to output terminal 4d of converter 4 via switch element P4.
- the gate of switch element N3 receives control signal ⁇ N3.
- the switch element N3 is an n-channel MOFET. Switch element N3 connects inductor 46 to load device 9 when receiving control signal ⁇ N3 (H). Switch element N3 disconnects inductor 46 from secondary battery 3 when receiving control signal ⁇ N3 (L).
- the second switch element P3 on the feedback side adjusts the magnitude of the current (I BACK ) provided from the inductor 46 to the secondary battery 3.
- the second switch element P3 is provided between the first switch element N2 and the output of the secondary battery 3.
- the drain of the second switch element P3 is connected to the first switch element N2.
- the source of the second switch element P3 is connected to the output of the secondary battery 3.
- the gate of the second switch element P3 receives the control signal ⁇ P3.
- the second switch element P3 is a p-channel MOFET.
- the second switch element P3 receives the control signal ⁇ P3, a current flows between the drain and the source according to the voltage level of the control signal ⁇ P3.
- the second switch element P3 causes a current (I BACK ) to flow from the inductor 46 to the secondary battery 3 in accordance with the voltage level of the control signal ⁇ P3.
- the output side switch element P4 adjusts the magnitude of the current (I OUT ) provided from the inductor 46 to the load device 9.
- Switch element P4 is provided between switch element N3 and output terminal 4d of converter 4.
- the drain of switch element P4 is connected to switch element N3.
- the source of switch element P4 is connected to output terminal 4d of converter 4.
- the gate of switch element P4 receives control signal ⁇ P4.
- Switch element P4 is a p-channel MOFET. When the switch element P4 receives the control signal ⁇ P4, a current flows between the drain and the source according to the voltage level of the control signal ⁇ P4. The switch element P4 causes a current (I OUT ) to flow from the inductor 46 to the load device 9 in accordance with the voltage level of the control signal ⁇ P4.
- the operation of the power supply device 1D according to the third embodiment will be described below.
- the power supply device 1D can also perform five operations similarly to the power supply device 1 of the first embodiment.
- the power supply device 1D performs a normal operation M1D, a high load operation M2D, a no-load operation M3D, a high voltage operation M4D, and a low voltage operation M5D and M5DA.
- FIG. 27 shows combinations of control signals and waveforms.
- Control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the normal operation M1D.
- Control signal ⁇ 41 PG
- Control signal ⁇ 42 NG
- Control signal ⁇ N2 PGB
- Control signal ⁇ N3 PGB&NG
- Control signal ⁇ P3 Vgp3a
- Control signal ⁇ P4 Vgp4a).
- the normal operation M1D includes a duplicate output operation M11D and a load output operation M12D.
- the duplicate output operation M11D and the load output operation M12D correspond to the output operation shown in FIG. 20(c).
- FIG. 28(a) shows a circuit connection configuration for the duplicate output operation M11D.
- the first switch element 41 receiving the control signal ⁇ 41 (PG:L) connects the input terminal 4a of the converter 4 to the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (NG:L) disconnects the inductor 46 from the reference voltage GND.
- the switch element N2 that receives the control signal ⁇ N2 (PGB:H) connects the inductor 46 to the secondary battery 3.
- Switch element N3 that receives control signal ⁇ N3 (PGB:H, NG:L) connects inductor 46 to load device 9.
- the load device 9 is provided with a current (I OUT ) according to the control signal ⁇ P4 (Vgp4a) received by the switch element P4.
- the secondary battery 3 is supplied with a current (I BACK ) according to the control signal ⁇ P3 (Vgp3a) received by the switch element P3.
- the overlapping output operation M11D the period in which the current (I OUT ) is applied to the load device 9 and the period in which the current (I BACK ) is applied to the secondary battery 3 overlap.
- FIG. 28(b) shows the circuit connection configuration when the load output operation M12D is performed.
- the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (NG:H) connects the inductor 46 to the reference voltage GND.
- the switch element N2 that receives the control signal ⁇ N2 (PGB:L) disconnects the inductor 46 from the secondary battery 3.
- Switch element N3 that receives control signal ⁇ N3 (PGB:L, NG:H) connects inductor 46 to load device 9.
- the load device 9 is provided with a current (I OUT ) according to the control signal ⁇ P4 (Vgp4a) received by the switch element P4. No current (I BACK ) is applied to the secondary battery 3 .
- the period in which the current (I OUT ) is applied to the load device 9 does not overlap with the period in which the current (I BACK ) is applied to the secondary battery 3.
- the voltage of the control signal ⁇ P3 may be lower than the voltage of the control signal ⁇ P4 (Vgp4b).
- the current applied to the secondary battery 3 (I BACK ) is smaller than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the load device 9.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the high-load operation M2D.
- Control signal ⁇ 41 (OFF).
- Control signal ⁇ 42 (OFF).
- Control signal ⁇ N2 (OFF).
- Control signal ⁇ N3 (ON).
- Control signal ⁇ P3 (OFF).
- Control signal ⁇ P4 (ON).
- FIG. 29(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
- the connection configuration in FIG. 29(a) is the same as the connection configuration in the high load operation M2 of the first embodiment (FIG. 12(a)), so a detailed explanation will be omitted.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the no-load operation M3D.
- Control signal ⁇ 41 (OFF).
- Control signal ⁇ 42 (ON).
- Control signal ⁇ N2 (ON).
- Control signal ⁇ N3 (OFF).
- Control signal ⁇ P3 (ON).
- Control signal ⁇ P4 (OFF).
- FIG. 29(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4. Since the connection configuration in FIG. 29(a) is the same as the connection configuration in the no-load operation M3 of the first embodiment (FIG. 12(b)), detailed explanation will be omitted.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for high voltage operation M4D.
- Control signal ⁇ 41 (PG).
- Control signal ⁇ 42 (NG).
- Control signal ⁇ N2 (PGB&NG).
- Control signal ⁇ N3 (PGB).
- Control signal ⁇ P3 (Vgp3b).
- Control signal ⁇ P4 Vgp4b).
- FIGS. 30(a) and 30(b) show the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
- the high voltage operation M4D includes a duplicate output operation M41D and a charging operation M42D.
- FIG. 30(a) shows a circuit connection configuration for the duplicate output operation M41D.
- the first switch element 41 receiving the control signal ⁇ 41 (PG:L) connects the input terminal 4a of the converter 4 to the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (NG:L) disconnects the inductor 46 from the reference voltage GND.
- the switch element N2 that receives the control signal ⁇ N2 (PGB:H, NG:L) connects the inductor 46 to the secondary battery 3.
- Switch element N3, which has received control signal ⁇ N3 (PGB:H) connects inductor 46 to load device 9.
- the secondary battery 3 is given a current (I BACK ) according to the control signal ⁇ P3 (Vgp3b) received by the switch element P3.
- Load device 9 is supplied with a current (I OUT ) according to control signal ⁇ P4 (Vgp4b) received by switch element P4.
- the overlapping output operation M41D the period in which the current (I OUT ) is applied to the load device 9 and the period in which the current (I BACK ) is applied to the secondary battery 3 overlap.
- FIG. 30(b) shows a circuit connection configuration during charging operation M42D.
- the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
- the second switch element 42 receiving the control signal ⁇ 42 (NG:H) connects the inductor 46 to the reference voltage GND.
- the switch element N2 that receives the control signal ⁇ N2 (PGB:L, NG:H) connects the inductor 46 to the secondary battery 3.
- Switch element N3, which has received control signal ⁇ N3 (PGB:L) disconnects inductor 46 from load device 9. As a result, no current (I OUT ) is applied to the load device 9.
- the secondary battery 3 is supplied with a current (I BACK ) according to the control signal ⁇ P3 (Vgp3b) received by the switch element P3.
- the period in which the current (I BACK ) is applied to the secondary battery 3 does not overlap with the period in which the current (I OUT ) is applied to the load device 9 .
- control signal ⁇ P3 may be higher than the voltage of control signal ⁇ P4 (Vgp4b).
- the current applied to the secondary battery 3 (I BACK ) is larger than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the secondary battery 3.
- control signal output section 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the low voltage operation M5D.
- Control signal ⁇ 41 ON).
- Control signal ⁇ 42 OFF).
- Control signal ⁇ N2 ON).
- Control signal ⁇ N3 ON).
- Control signal ⁇ P3 ON).
- Control signal ⁇ P4 ON).
- FIG. 31(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
- the connection configuration in FIG. 29(a) is the same as the connection configuration in the low voltage operation M5 of the first embodiment (FIG. 11(a)), so detailed explanation will be omitted.
- the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the low voltage operation M5DA of the modified example.
- Control signal ⁇ 41 (OFF).
- Control signal ⁇ 42 (OFF).
- Control signal ⁇ N2 (OFF).
- Control signal ⁇ N3 (ON).
- Control signal ⁇ P3 (OFF).
- FIG. 31(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
- the connection configuration in FIG. 31(b) is the same as the connection configuration (FIG. 11(b)) for the low voltage operation M5A of the first embodiment, so a detailed explanation will be omitted.
- the power supply device of the present invention is not limited to the configuration and operation of the power supply device 1 of the first embodiment and the power supply device 1B of the second embodiment.
- FIG. 32 shows the configuration of a power supply device 1E of a first modification.
- the power supply device 1E includes capacitors 53 and 534 instead of the capacitor 51.
- the capacitors 53 and 54 may be considered to be the capacitor 51 of the first embodiment divided into two capacitors.
- the power supply device 1E includes several nodes H1, H2, H3, and H4.
- the node H1 is provided on the wiring that connects the positive electrode of the secondary battery 3 to the power generation element 2.
- Node H2 is provided on the wiring that connects output terminal 4c of converter 4 to the negative electrode of secondary battery 3.
- Node H3 is provided on the wiring that connects power generation element 2 to input terminal 4a of converter 4.
- Node H4 is provided on the wiring that connects output terminal 4b of converter 4 to node H1.
- Capacitor 53 is provided between node H3 and node H4.
- Capacitor 54 is provided between node H2 and node H4.
- Capacitor 53 is connected in series to capacitor 54 via node N4.
- FIG. 33 shows the configuration of a power supply device 1F according to a second modification.
- the power supply device 1F includes a power generation element 2F instead of the power generation element 2.
- the power generating element 2F includes a power generating body 22F, a full wave rectifier 2S, and a capacitor 24.
- the full-wave rectifier 2S is composed of four diodes 25A, 25B, 25C, and 25D.
- the power generator 22F receives external energy and generates AC power.
- the full-wave rectifier 2S performs full-wave rectification on the alternating current power generated by the power generator 22F.
- the capacitor 24 holds the rectified DC power output from the full-wave rectifier 2S.
- the electric power generated by the power generation element 2F is AC, but the electric power given to the converter 4 is DC.
- FIG. 34 shows the configuration of a power supply device 1G according to a third modification.
- the power supply device 1G includes two capacitors 53 and 54 like the power supply device 1E of the first modification.
- the power supply device 1G includes a power generation element 2G having a power generation body 22G that generates AC power, as in the second modification.
- the power supply device 1E of the first modification example, the power supply device 1F of the second modification example, and the power supply device 1G of the third modification example perform operations according to changes in external factors, similar to the power supply device 1 of the first embodiment. It's fine.
- the power supply device 1E of the first modification example, the power supply device 1F of the second modification example, and the power supply device 1G of the third modification example described above respond to changes in external factors similarly to the power supply device 1 of the first embodiment. and select the appropriate action.
- the power supply device 1E of the first modification, the power supply device 1F of the second modification, and the power supply device 1G of the third modification may perform operations that satisfy the power extraction conditions in the same manner as the power supply device 1B of the second embodiment. .
- the power supply device 1E of the first modification example, the power supply device 1F of the second modification example, and the power supply device 1G of the third modification example, as well as the power supply device 1B of the second embodiment are able to withstand changes in external factors. Even if there is, electric power can be suitably extracted from the power generation element 2E.
- the power supply device 1E of the first modification, the power supply device 1F of the second modification, and the power supply device 1G of the third modification have a converter 4C of the third embodiment (see FIG. 21) as a specific circuit configuration of the converter 4. may be adopted, and the same operation as the power supply device 1C of the third embodiment may be performed.
- the power supply device 1E may employ the converter 4D of the fourth embodiment (see FIG. 26) as a specific circuit configuration of the converter 4, and may perform the same operation as the power supply device 1D of the fourth embodiment.
- the power supply device 1E of the first modification, the power supply device 1F of the second modification, and the power supply device 1G of the third modification select the mode of output from the inductor 46 to the secondary battery 3 and the load device 9. be able to.
- An additional circuit 100 shown in FIG. 35 may be provided between the power supply device 1 and the load device 9.
- the additional circuit 100 includes a switch element 101 , a capacitor 102 , a secondary battery 103 , a first detection circuit section 104 , and a second detection circuit section 105 .
- the switch element 101 is provided in the wiring that connects the power supply device 1 to the load device 9.
- the switch element 101 is, for example, a p-type MOSFET.
- the first detection circuit section 104 is arranged between the wiring connecting the power supply device 1 to the switch element 101 and the reference voltage GND.
- the first detection circuit section 104 includes a resistance element 104a and a first comparator 104b.
- the resistance element 104a is arranged between the wiring connecting the power supply device 1 to the switch element 101 and the reference voltage GND.
- a first input terminal of the first comparator 104b is connected to a wiring that connects the resistance element 104a to the reference voltage GND.
- a second input terminal of the first comparator 104b receives a limiting voltage (V S1 ).
- the first comparator 104b outputs a control signal ⁇ 104 (H) when the voltage (V OUT ) output by the power supply device 1 becomes larger than the limit voltage (V S1 ).
- Control signal ⁇ 104 (H) is given to switch element 101.
- the switch element 101 that receives the control signal ⁇ 104 (H) disconnects the power supply device 1 from the load device 9.
- the first detection circuit section 104 suppresses excessive voltage from being output from the power supply device 1.
- the capacitor 102 is arranged between the wiring connecting the power supply device 1 to the switch element 101 and the reference voltage GND.
- the secondary battery 103 is arranged between the wiring connecting the switch element 101 to the load device 9 and the reference voltage GND.
- the second detection circuit section 105 is arranged between the wiring connecting the converter 4 to the load device 9 and the reference voltage GND.
- the second detection circuit section 105 includes a second comparator 105a and a third comparator 105b.
- a first input terminal of the second comparator 105a receives a voltage (V BAT_LOAD ).
- a second input terminal of the second comparator 105a receives a limiting voltage (V S2 ).
- the second comparator 105a outputs a control signal ⁇ 105a (H) when the voltage (V BAT_LOAD ) becomes larger than the limit voltage (V S2 ).
- the switch element 101 that receives the control signal ⁇ 105a (H) disconnects the power supply device 1 from the load device 9. This suppresses excessive current from being applied to the secondary battery 103 from the power supply device 1.
- a first input terminal of the third comparator 105b receives a voltage (V BAT_LOAD ).
- the second input terminal of the third comparator 105b receives the limiting voltage (V S2 ).
- the third comparator 105b outputs a control signal ⁇ 105b (H) when the voltage (V BAT_LOAD ) becomes smaller than the limit voltage (V S2 ).
- the switch element 101 that receives the control signal ⁇ 105b (H) connects the power supply device 1 to the load device 9. As a result, the voltage (V BATT_LOAD ) output by the secondary battery 103 is suppressed from dropping too much.
- the second detection circuit unit 105 keeps the voltage (V BAT_LOAD ) of the secondary battery 103 within a predetermined range.
- the power supply device of the present invention includes [1] “a power supply device that supplies power to a load device, which includes a secondary battery, a power generation element connected in series to the secondary battery, and a power generation element connected to the power generation element. a converter having a first terminal connected to the load device, a second terminal connected to the load device, and a third terminal connected to the secondary battery; /or a power supply device that generates the electric power in at least one of the second terminal and the third terminal based on the voltage generated by the power generation element.
- the power supply device of the present invention provides the power supply device according to the present invention, wherein [2] “The converter performs an accumulation drive operation when the required power of the load device is larger than a first threshold current, and when the converter is in the accumulation drive operation, the converter: Electric power is supplied to the load device by accumulating the electric power received from the first terminal in an energy accumulating element of the converter and generating the energy accumulated in the energy accumulating element as electric power to the second terminal. , the power supply device according to [1] above.”
- the power supply device of the present invention includes [3] “The converter performs a charging operation when the required power of the load device is smaller than a second threshold current, and when the converter is in the charging operation, the converter The power supply device according to [1] or [2] above, which supplies power to the secondary battery by generating energy stored in an energy storage element of the battery as the power to the third terminal. Good too.
- the power supply device of the present invention includes [4] “The converter selectively performs a load driving operation and a charging operation, and when the converter is in the load driving operation, the converter uses an energy storage element that the converter has. The converter supplies power to the load device by generating the energy stored in the energy storage element as the power to the second terminal, and when the converter is in the charging operation, the converter converts the energy stored in the energy storage element into the power.
- the power supply device according to any one of [1] to [3] above, which supplies power to the secondary battery by generating power to the third terminal.
- the power supply device of the present invention includes [5] "The converter selectively performs a storage drive operation and a charging operation, and when the converter is in the storage drive operation, the converter charges the energy storage element of the converter with the The electric power received from the first terminal is stored, and the energy stored in the energy storage element is generated as the electric power to the second terminal to supply electric power to the load device.
- the converter provides power to the secondary battery by generating the energy stored in the energy storage element as the power to the third terminal, as described in any one of [1] to [4] above. power supply unit.”
- the power supply device of the present invention provides the power supply device according to [6] “The converter performs a direct supply operation, and when the converter is in the direct supply operation, the converter connects the second terminal to the third terminal.
- the power supply device according to any one of [1] to [5] above, which provides power from a secondary battery to the load device.
- the power supply device of the present invention further includes [7] “a short circuit capable of connecting the output of the secondary battery and the input of the converter, the short circuit connecting the secondary battery to the The power source according to any one of [1] to [6] above, wherein the power supply switches between a mode in which the secondary battery is connected to the converter and a mode in which the secondary battery is directly connected to the converter without going through the power generation element. device.”
- the period during which the converter supplies power to the load device via the second terminal is the period during which the converter supplies power to the secondary battery via the third terminal.
- the period during which the converter supplies power to the load device via the second terminal is the period during which the converter supplies power to the secondary battery via the third terminal.
- the converter supplies power to the secondary battery via the three terminals.
- the power supply device according to any one of [1] to [7] above, which overlaps with a part of the period in which the power supply is provided.
- the power supply device of the present invention includes [11] “The converter drives the converter so as to satisfy a power extraction condition determined based on the voltage generated by the power generating element and the voltage generated by the secondary battery; The power supply device according to any one of [1] to [10] above, which repeats the operation of obtaining the power extraction condition using the voltage generated by the power generation element.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2024541495A JPWO2024038772A1 (cg-RX-API-DMAC7.html) | 2022-08-15 | 2023-08-03 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022-129270 | 2022-08-15 | ||
| JP2022129270 | 2022-08-15 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2024038772A1 true WO2024038772A1 (ja) | 2024-02-22 |
Family
ID=89941640
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2023/028476 Ceased WO2024038772A1 (ja) | 2022-08-15 | 2023-08-03 | 電源装置 |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JPWO2024038772A1 (cg-RX-API-DMAC7.html) |
| WO (1) | WO2024038772A1 (cg-RX-API-DMAC7.html) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010288404A (ja) * | 2009-06-15 | 2010-12-24 | Fujitsu Telecom Networks Ltd | 可変電源装置とモータ駆動制御装置とそれらの保護回路動作方法 |
| JP2013510551A (ja) * | 2009-11-04 | 2013-03-21 | トライウン・アイピー・エルエルシー | ブートストラップ式充電器 |
| JP2013070547A (ja) * | 2011-09-26 | 2013-04-18 | Nissan Motor Co Ltd | 電力変換装置 |
| JP2013522717A (ja) * | 2010-03-09 | 2013-06-13 | 日本テキサス・インスツルメンツ株式会社 | エナジーハーベスタ・バッテリ充電回路及び方法 |
| US20140333136A1 (en) * | 2011-06-01 | 2014-11-13 | Banpil Photonics, Inc. | Integrated electronics for perpetual energy harvesting |
| US20170179715A1 (en) * | 2015-12-21 | 2017-06-22 | Intel Corporation | Power architecture and management scheme for iot applications |
| JP2020088923A (ja) * | 2018-11-16 | 2020-06-04 | 株式会社村田製作所 | 環境発電装置 |
| JP2021103939A (ja) * | 2019-12-25 | 2021-07-15 | 旭化成エレクトロニクス株式会社 | 電力供給回路および電源内蔵装置 |
-
2023
- 2023-08-03 JP JP2024541495A patent/JPWO2024038772A1/ja active Pending
- 2023-08-03 WO PCT/JP2023/028476 patent/WO2024038772A1/ja not_active Ceased
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010288404A (ja) * | 2009-06-15 | 2010-12-24 | Fujitsu Telecom Networks Ltd | 可変電源装置とモータ駆動制御装置とそれらの保護回路動作方法 |
| JP2013510551A (ja) * | 2009-11-04 | 2013-03-21 | トライウン・アイピー・エルエルシー | ブートストラップ式充電器 |
| JP2013522717A (ja) * | 2010-03-09 | 2013-06-13 | 日本テキサス・インスツルメンツ株式会社 | エナジーハーベスタ・バッテリ充電回路及び方法 |
| US20140333136A1 (en) * | 2011-06-01 | 2014-11-13 | Banpil Photonics, Inc. | Integrated electronics for perpetual energy harvesting |
| JP2013070547A (ja) * | 2011-09-26 | 2013-04-18 | Nissan Motor Co Ltd | 電力変換装置 |
| US20170179715A1 (en) * | 2015-12-21 | 2017-06-22 | Intel Corporation | Power architecture and management scheme for iot applications |
| JP2020088923A (ja) * | 2018-11-16 | 2020-06-04 | 株式会社村田製作所 | 環境発電装置 |
| JP2021103939A (ja) * | 2019-12-25 | 2021-07-15 | 旭化成エレクトロニクス株式会社 | 電力供給回路および電源内蔵装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPWO2024038772A1 (cg-RX-API-DMAC7.html) | 2024-02-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Kong et al. | Low-power design of a self-powered piezoelectric energy harvesting system with maximum power point tracking | |
| Simjee et al. | Everlast: long-life, supercapacitor-operated wireless sensor node | |
| Simjee et al. | Efficient charging of supercapacitors for extended lifetime of wireless sensor nodes | |
| Romani et al. | Micropower design of a fully autonomous energy harvesting circuit for arrays of piezoelectric transducers | |
| US9748838B2 (en) | Method of operating a controller for a power converter, and a corresponding controller | |
| Kim et al. | Size and topology optimization for supercapacitor-based sub-watt energy harvesters | |
| JP5591641B2 (ja) | 充電回路およびその制御ic、それを利用した電子機器 | |
| JP5921447B2 (ja) | エナジーハーベスタ・バッテリ充電回路及び方法 | |
| JP2020506654A (ja) | 高度に統合された高圧アクチュエータドライバ | |
| Lu et al. | Efficient power conversion for ultra low voltage micro scale energy transducers | |
| Yang et al. | Charging capacitors using single crystal PMN-PT and PZN-PT energy harvesters coupled with the SSHI circuit | |
| Chew et al. | Low power adaptive power management with energy aware interface for wireless sensor nodes powered using piezoelectric energy harvesting | |
| Wang et al. | Ambient energy harvesting chips for IoT end devices | |
| Wang et al. | Power management for sub-mW energy harvester with adaptive hybrid energy storage | |
| Toyama et al. | 20 mV input, 4.2 V output SIDO boost converter with low-power controller and adaptive switch size selector for thermoelectric energy harvesting | |
| US12514120B2 (en) | Power management integrated circuit for harvesting energy and energy harvesting system including the same | |
| Wang et al. | Vibration energy harvesting IC design with incorporation of two maximum power point tracking methods | |
| CN104254181B (zh) | 一种多通道led阵列驱动电路 | |
| JP2024091565A (ja) | 電源装置及び電源システム | |
| Hörmann et al. | Evaluation of component-aware dynamic voltage scaling for mobile devices and wireless sensor networks | |
| Du | Energy-efficient interfaces for vibration energy harvesting | |
| Gogolou et al. | A reconfigurable storage unit for autonomously powered IoT nodes | |
| Srinivasan et al. | Dual input buck-boost converter for hybrid piezoelectric energy harvester–Supercapacitor sources | |
| Heo et al. | Efficient maximum power tracking of energy harvesting using a μcontroller for power savings | |
| Alhwari | Multi-source energy harvesting interface circuits for biomedical wearable electronics |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23854807 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2024541495 Country of ref document: JP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 23854807 Country of ref document: EP Kind code of ref document: A1 |