WO2024038772A1 - 電源装置 - Google Patents

電源装置 Download PDF

Info

Publication number
WO2024038772A1
WO2024038772A1 PCT/JP2023/028476 JP2023028476W WO2024038772A1 WO 2024038772 A1 WO2024038772 A1 WO 2024038772A1 JP 2023028476 W JP2023028476 W JP 2023028476W WO 2024038772 A1 WO2024038772 A1 WO 2024038772A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
converter
voltage
control signal
secondary battery
Prior art date
Application number
PCT/JP2023/028476
Other languages
English (en)
French (fr)
Inventor
徹 丹沢
秀樹 内田
Original Assignee
国立大学法人静岡大学
日本ゼオン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国立大学法人静岡大学, 日本ゼオン株式会社 filed Critical 国立大学法人静岡大学
Publication of WO2024038772A1 publication Critical patent/WO2024038772A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • H02M3/10Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M3/145Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M3/155Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only

Definitions

  • the present invention relates to a power supply device.
  • the Internet of Things is one of the technologies that will be used in future social systems.
  • IoT technology uses sensors to independently collect information on temperature, pressure, vibration, chemical substances, traffic volume, etc. both indoors and outdoors. The collected information is transferred to the cloud via the internet. The transferred data is analyzed as big data.
  • the purpose of analysis is various. For example, the purpose of analysis may be to determine whether or not an abnormality has occurred in a sensor. If it is determined that an abnormality has occurred in the sensor, countermeasures are taken such as stopping the operation of the sensor. For example, for the purpose of analysis, a sensor may be operated under predetermined conditions. The purpose of the analysis may be to feed back appropriate sensor operating conditions in response to changes in the external environment.
  • things basically collect information, transmit information, and feed back information without human intervention.
  • Integrated circuit systems for IoT are important devices that measure environmental variables and send the information obtained from the measurements to the Internet.
  • the IoT integrated circuit system is also referred to as an Edge terminal.
  • Edge terminals may not be able to receive power supply in the first place. Even if the Edge terminal is equipped with a power source such as a battery, restrictions may be imposed on replacing the power source such as the battery.
  • Energy harvesting technology can be cited as a technology for continuing to operate Edge terminals under conditions of limited power supply.
  • Energy harvesting technology obtains electricity by having a power generation element harvest environmental energy.
  • power generation elements convert sunlight, heat, vibrations, or radio waves into electric power.
  • the power generated by the power generation element is extremely small. Therefore, the power generated by the power generation element cannot directly satisfy the power required by a load device such as an Edge terminal. Therefore, power supply technology is being considered that utilizes the power generated by the power generation element to output the power required by the load device.
  • Non-Patent Documents 1 and 2 disclose power supply technologies that utilize elements that generate electricity using temperature differences, which are environmental energy.
  • Non-Patent Documents 1 and 2 propose a power supply circuit and operating conditions for the power supply circuit for efficiently extracting power from an element.
  • Conditions for efficiently extracting power from a power generating element depend on the state of environmental energy that the power generating element receives. On the other hand, humans cannot control the state of the environmental energy that the power generation element receives. Therefore, the state of environmental energy that the power generation element receives varies in various ways.
  • a power supply device including a power generating element needs to select an appropriate operation in response to changes in external factors such as changes in environmental energy or changes in power required by a load device.
  • the present invention provides a power supply device that can select an appropriate operation in response to changes in external factors.
  • the present invention is a power supply device that supplies power to a load device.
  • the power supply device includes a secondary battery, a power generating element connected in series to the secondary battery, a first terminal connected to the power generating element, a second terminal connected to the load device, and a power generating element connected to the secondary battery in series.
  • a converter having a third terminal connected thereto. The converter generates power at at least one of the second terminal and the third terminal based on the power required by the load device and/or the voltage generated by the power generation element.
  • the power supply device generates a control signal using at least one of the power requested by the load device and the measured voltage based on the second voltage.
  • the second voltage increases or decreases depending on changes in the external environment. Therefore, by controlling using at least one of the power required by the load device and the measured voltage based on the second voltage, the power supply device can be operated in response to changes in external factors.
  • the converter of the power supply device described above may perform the storage drive operation when the required power of the load device is larger than the first threshold current.
  • the converter stores the power received from the first terminal in the energy storage element of the converter, and generates the energy stored in the energy storage element as power to the second terminal, thereby driving the load device. may be given power to.
  • the operation of storing energy in the energy storage element and the operation of supplying power to the load device can be performed in parallel.
  • the converter of the power supply device described above may perform the charging operation when the required power of the load device is smaller than the second threshold current.
  • the converter during charging operation may provide power to the secondary battery by generating energy stored in an energy storage element included in the converter as power to the third terminal. According to such an operation of the converter, it is possible to perform an operation of supplying power to the secondary battery.
  • the converter of the power supply device described above may selectively perform a load driving operation and a charging operation.
  • the converter When in load driving operation, the converter may provide power to the load device by generating energy stored in an energy storage element of the converter as power to the second terminal.
  • the converter during charging operation may provide power to the secondary battery by generating the energy stored in the energy storage element as power to the third terminal. According to the operation of such a converter, it is possible to selectively perform the operation of storing energy in the energy storage element, the operation of supplying power to the load device, and the operation of supplying power to the secondary battery.
  • the converter of the power supply device described above may selectively perform the storage drive operation and the charging operation.
  • the converter stores the power received from the first terminal in the energy storage element of the converter, and generates the energy stored in the energy storage element as power to the second terminal, thereby driving the load device. may be given power to.
  • the converter during charging operation may provide power to the secondary battery by generating the energy stored in the energy storage element as power to the third terminal. According to the operation of such a converter, it is possible to selectively perform an operation of storing energy in the energy storage element and supplying power to the load device, and an operation of supplying power to the secondary battery.
  • the converter of the above power supply device may perform a direct supply operation.
  • the converter in direct supply operation may provide power from the secondary battery to the load device by connecting the second terminal to the third terminal. According to the operation of the converter, the power of the secondary battery can be provided to the load device without passing through the power generation element and the energy storage element.
  • the converter of the power supply device described above may further include a short circuit capable of connecting the output of the secondary battery and the input of the converter.
  • the short circuit may switch between a mode in which the secondary battery is connected to the converter via the power generating element and a mode in which the secondary battery is directly connected to the converter without going through the power generating element. According to the operation of such a converter, the voltage required by the load device can be applied to the power of the secondary battery without passing through the power generation element.
  • the period during which the converter supplies power to the load device via the second terminal does not have to overlap with the period during which the converter supplies power to the secondary battery via the third terminal.
  • the period during which the converter supplies power to the load device via the second terminal may not coincide with the period during which the converter supplies power to the secondary battery via the third terminal.
  • a part of the period during which the converter supplies power to the load device via the second terminal does not need to overlap with a part of the period during which the converter supplies power to the secondary battery via the three terminals.
  • the converter of the power supply device described above operates by driving the converter to satisfy the power extraction conditions determined based on the voltage generated by the power generation element and the voltage generated by the secondary battery, and by using the voltage generated by the power generation element to generate electricity.
  • the operation of obtaining the extraction conditions may be repeated. According to the operation of such a converter, even when external factors change, electric power can be suitably extracted from the power generating element.
  • Another form of the present invention is also a power supply device that supplies power to a load device.
  • Another form of power supply device includes a secondary battery, a power generating element connected in series to the secondary battery, a first terminal connected to the power generating element, and a second terminal connected to a load device. and a converter having a third terminal connected to the secondary battery.
  • the converter operates by driving the converter to satisfy the power extraction conditions determined based on the voltage generated by the power generation element and the voltage generated by the secondary battery, and by using the voltage generated by the power generation element to obtain the power extraction conditions. and repeat. According to the operation of such a converter, even when external factors change, electric power can be suitably extracted from the power generating element.
  • a power supply device that can select an appropriate operation according to changes in external factors is provided.
  • FIG. 1 is a functional block diagram of a power supply device according to a first embodiment.
  • 2(a) and 2(b) are diagrams illustrating the operating principle of the power supply device shown in FIG. 1.
  • FIG. 3 is a circuit diagram of the power supply device shown in FIG. 1.
  • FIG. 4 is a functional block diagram of a controller included in the power supply device shown in FIG. 1.
  • FIG. 5 is a flow diagram showing the operation of the controller of the first embodiment.
  • FIG. 6(a) is a diagram showing waveforms for control signals.
  • FIG. 6(b) is a diagram illustrating a circuit configuration for generating a control signal.
  • FIG. 7 is a table for explaining control signals.
  • FIG. 8(a) is a diagram showing a circuit during a run-up operation.
  • FIG. 8(b) is a diagram showing a circuit during load driving operation.
  • FIG. 8(c) is a diagram showing the circuit during standby operation.
  • FIG. 9 is a diagram for explaining the breakdown of power during normal operation.
  • FIG. 10(a) is a diagram showing a circuit in storage drive operation.
  • FIG. 10(b) is a diagram showing a circuit during charging operation.
  • FIG. 10(c) is a diagram showing the circuit during standby operation.
  • FIG. 11(a) is a diagram showing a circuit during high load operation.
  • FIG. 11(b) is a diagram showing the circuit during no-load operation.
  • FIG. 12(a) is a diagram showing a circuit during low voltage operation.
  • FIG. 12(b) is a diagram showing a modified example circuit for low voltage operation.
  • FIG. 13(a) is a first example for explaining the power extracted from the power generation element.
  • FIG. 13(b) is a second example for explaining the power extracted from the power generation element.
  • FIG. 13(c) is a third example for explaining the power extracted from the power generation element.
  • FIG. 14(a) is a time history of voltage for explaining MPPT operation.
  • FIG. 14(b) is a voltage time history showing an enlarged portion of FIG. 14(a).
  • FIG. 15 is a functional block diagram of the power supply device according to the second embodiment.
  • FIG. 16(a) is an example of a control signal output by the second voltage determination section.
  • FIG. 16(b) is an example of a control signal for the power extraction operation.
  • FIG. 16(c) is an example of a control signal for refresh operation.
  • FIG. 17 is a flow diagram showing the operation of the controller of the second embodiment.
  • FIG. 18(a) is an example of the circuit of the reference voltage generating section.
  • FIG. 18(b) is an example of a control signal that the controller provides to the reference voltage generator.
  • FIG. 18(c) is a table for explaining the operation of the reference voltage generating section.
  • FIG. 19 is an example of a circuit of the second voltage determination section.
  • FIG. 20(a) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the first embodiment.
  • FIG. 20(b) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the second embodiment.
  • FIG. 20(a) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the second embodiment.
  • FIG. 20(c) is a diagram showing the relationship between the output to the load device and the output to the secondary battery in the power supply device of the third embodiment.
  • FIG. 21 is a circuit diagram of the power supply device of the second embodiment.
  • FIG. 22 is a table for explaining control signals in the power supply device of the second embodiment.
  • FIG. 23(a) is a diagram showing a circuit during normal operation performed by the power supply device of the second embodiment.
  • FIG. 23(b) is a diagram showing a circuit when the power supply device of the second embodiment performs a high-load operation.
  • FIG. 24(a) is a diagram showing a circuit when the power supply device of the second embodiment performs a no-load operation.
  • FIG. 24(b) is a diagram showing a circuit when the power supply device of the second embodiment performs a high voltage operation.
  • FIG. 25(a) is a diagram showing a circuit when the power supply device of the second embodiment performs low voltage operation.
  • FIG. 25(b) is a diagram showing a circuit when the power supply device of the second embodiment performs a modified low voltage operation.
  • FIG. 26 is a circuit diagram of the power supply device of the third embodiment.
  • FIG. 27 is a table for explaining control signals in the power supply device of the third embodiment.
  • FIG. 28(a) is a diagram showing a circuit when the power supply device of the third embodiment performs a duplicate output operation in a normal operation.
  • FIG. 28(b) is a diagram showing a circuit when the power supply device of the third embodiment performs a load output operation in normal operation.
  • FIG. 29(a) is a diagram showing a circuit when the power supply device of the third embodiment performs a high-load operation.
  • FIG. 29(b) is a diagram showing a circuit when the power supply device of the third embodiment performs a no-load operation.
  • FIG. 30(a) is a diagram showing a circuit when the power supply device of the third embodiment performs a redundant output operation in a high voltage operation.
  • FIG. 30(b) is a diagram showing a circuit when a charging operation is performed in a high voltage operation performed by the power supply device of the third embodiment.
  • FIG. 31(a) is a diagram showing a circuit when the power supply device of the third embodiment performs low voltage operation.
  • FIG. 31(b) is a diagram showing a circuit when the power supply device of the third embodiment performs a modified example of low voltage operation.
  • FIG. 32 is a diagram showing the configuration of the power supply device of the first modification.
  • FIG. 33 is a diagram showing the configuration of a power supply device according to a second modification.
  • FIG. 34 is a diagram showing the configuration of a power supply device according to a third modification.
  • FIG. 35 is an illustration of additional circuitry that can be connected to the power supply.
  • FIG. 1 is a functional block diagram of a power supply device 1 according to the first embodiment. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG. 1, the power supply device 1 provides electric power (P OUT ) to the load device 9. As shown in FIG.
  • the load device 9 may be a device that constitutes IoT. Load device 9 includes a plurality of electrical elements. The load device 9 consumes power (P LOAD ). Power (P LOAD ) can be defined by the product of voltage (V LOAD ) and current (I LOAD ).
  • Examples of devices that make up IoT include sensors that measure the surrounding environment.
  • the sensors obtain measurements regarding desired measurement parameters such as temperature, humidity, and illuminance.
  • the load device 9 requires power (P LOAD ) on the order of several watts.
  • the voltage (V LOAD ) required by the load device 9 is about 3V.
  • the power supply device 1 supplies a predetermined power (P OUT ) to the load device 9 at a timing requested by the load device 9.
  • the load device 9 does not need to continuously request power (P OUT ) from the power supply device 1.
  • the load device 9 measures the ambient temperature at predetermined time intervals. Then, the load device 9 transmits the measured temperature through a wireless IC or the like. In such an operation, the load device 9 receives power (P OUT ) from the power supply device 1 at the timing when temperature measurement and communication are performed.
  • the power supply device 1 includes a power generation element 2, a secondary battery 3, a converter 4, and a controller 7 as main components.
  • the power supply device 1 may include additional elements in addition to the above-mentioned components as necessary.
  • the power generation element 2 receives external energy and converts the external energy into electrical energy.
  • the power generation element 2 may be any of various elements capable of receiving external energy and generating electrical energy.
  • the power generating element 2 outputs a voltage (V EH ) and a current (I EH ).
  • the voltage ( VEH ) of the power generation element 2 may be a DC voltage.
  • the voltage ( VEH ) of the power generating element 2 may be an alternating current voltage. For example, when the power generation element 2 converts vibration energy into electrical energy, the power generation element 2 outputs an alternating current voltage having a frequency corresponding to the frequency of the input vibration.
  • DC voltage power generation elements include solar cells that utilize solar energy and thermoelectric conversion elements that utilize charge imbalance due to temperature differences.
  • Examples of AC voltage generating elements include piezoelectric elements that utilize disturbance of dipole moment due to vibration, vibrating elements that utilize electromagnetic induction voltage, pyroelectric elements that utilize the pyroelectric effect, and RF elements that generate electricity by receiving radio waves. Can be mentioned.
  • thermoelectric conversion elements use heat energy, the most common energy, there are expectations that the range of applications will expand in the future.
  • materials used for thermoelectric conversion elements include inorganic semiconductor materials and organic conductive polymers.
  • Elements using carbon nanotubes (CNTs) have flexibility and are lightweight.
  • An element using carbon nanotubes (CNT) is an element using a thin film. Therefore, elements using carbon nanotubes (CNTs) can create structures that can handle larger temperature differences than other materials even in the same environment.
  • devices using carbon nanotubes (CNTs) can be installed in a variety of environments. Therefore, elements using carbon nanotubes (CNTs) can expand the range of applications.
  • CNTs carbon nanotubes
  • single-walled carbon nanotubes single-walled CNTs
  • multi-walled carbon nanotubes multi-walled CNTs
  • the CNTs single-walled CNTs or multi-walled CNTs may be used alone.
  • the CNTs may be a mixture of single-walled CNTs and multi-walled CNTs. When used as a mixture, the content of single-walled CNTs is preferably 50% by mass or more. When used in combination, the content of single-walled CNTs is more preferably 70% by mass or more.
  • the content of single-walled CNTs is more preferably 90% by mass or more.
  • the average diameter of single-walled CNTs may be between 0.7 and 15 nm.
  • the single-walled CNT preferably has a ratio of G-band peak intensity to D-band peak intensity (G/D ratio) of 1 or more and 20 or less in a Raman spectrum.
  • G/D ratio G-band peak intensity to D-band peak intensity
  • the average length of the fibrous carbon nanostructure at the time of synthesis is 100 ⁇ m or more.
  • the BET specific surface area of the single-walled CNT is preferably 600 m 2 /g or more. It is further preferable that the BET specific surface area of the single-walled CNT is 800 m 2 /g or more.
  • the BET specific surface area of the single-walled CNT is preferably 2500 m 2 /g or less. It is more preferable that the BET specific surface area of the single-walled CNT is 1200 m 2 /g
  • Single-walled CNTs may be manufactured by, for example, a wet process in which a catalyst layer is formed on the surface of a base material in the super growth method. According to this manufacturing method, single-walled CNTs can be efficiently manufactured.
  • the super growth method (see International Publication No. 2006/011655) is a chemical vapor deposition method in which a raw material compound and a carrier gas are supplied onto a substrate having a catalyst layer on its surface for producing carbon nanotubes.
  • CVD method chemical vapor deposition method in which a raw material compound and a carrier gas are supplied onto a substrate having a catalyst layer on its surface for producing carbon nanotubes.
  • oxidizing agent catalyst activating material
  • SGCNT Super Growth Carbon nanotube
  • SGCNT is characterized by its high power generation capacity (Seebeck coefficient) due to its high purity and high doping effect compared to other CNTs.
  • SGCNT is highly suitable as a thermoelectric conversion element.
  • SGCNTs are characterized by low cost, high material purity, and easy doping.
  • the secondary battery 3 performs charging and discharging operations.
  • the secondary battery 3 outputs a DC voltage (V BAT ) of, for example, 3V or 5V.
  • the voltage (V BAT ) output by the secondary battery 3 may correspond to the voltage (V LOAD ) required by the load device 9.
  • V LOAD DC voltage
  • the voltage (V BAT ) output by the secondary battery 3 may be at least 3V or more.
  • Converter 4 receives power ( PIN ).
  • Power (P IN ) received by converter 4 can be defined by voltage (V IN ) and current (I IN ).
  • the voltage (V IN ) is the sum of the voltage of the power generation element 2 (V EH ) and the voltage of the secondary battery 3 (V BAT ). Secondary battery 3, power generation element 2, and converter 4 are connected in series. Therefore, the current output by the secondary battery 3 is (I IN ).
  • the current output by the power generating element 2 is also (I IN ).
  • Converter 4 converts the received power (P IN ) into power (P LOAD ) required by load device 9 .
  • the aspect of the power (P LOAD ) required by the load device 9 may be defined, for example, by the current (I LOAD ) required by the load device 9.
  • the converter 4 may increase the current (I IN ) by lowering the voltage (V IN ) to a current (I OUT ) that is equal to or greater than the current (I LOAD ) required by the load device 9. increase.
  • Converter 4 may be a step-down power converter. The specific circuit configuration of converter 4 will be described later.
  • Converter 4 selectively supplies current to either load device 9 or secondary battery 3 .
  • Converter 4 is capable of switching between a first operation, a second operation, and a third operation.
  • first operation converter 4 provides current (I OUT ) to load device 9 but does not provide current (I BACK ) to secondary battery 3 .
  • second operation converter 4 does not provide current (I OUT ) to load device 9 but provides feedback current (I BACK ) to secondary battery 3 .
  • converter 4 supplies part of the current (I OUT ) to load device 9 and supplies the remaining part to secondary battery 3 as feedback current (I BACK ).
  • the controller 7 outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the converter 4.
  • Converter 4 includes a plurality of switch elements. Control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 are for turning on or off the switch elements.
  • FIG. 2(a) shows the power (P IN ) input to the converter 4.
  • the power ( PIN ) is the sum of the power (P BAT ) caused by the secondary battery 3 and the power (P E_NET ) caused by the power generation element 2.
  • the power ( PBAT ) due to the secondary battery 3 is the product of the current (I IN ) and the output voltage (V BAT ) of the secondary battery 3.
  • power (P BAT ) is shown as the area of a rectangular region. The horizontal side of the rectangular area indicates the current (I IN ). The vertical sides of the rectangular area indicate the voltage (V BAT ).
  • the electric power (P E_NET ) resulting from the power generation element 2 is the product of the current (I IN ) and the output voltage of the power generation element 2 .
  • the voltage (V EH ) output by the power generating element 2 is the voltage (V E ) output by the power generator 22 minus the voltage drop (R E ⁇ I IN ) caused by the output resistance 21 (V E - R E ⁇ I IN ).
  • power (P E_NET ) is shown as the area of a rectangular region. The horizontal side of the rectangular area indicates the current (I IN ). The vertical sides of the rectangular area indicate the voltage (V E ⁇ R E ⁇ I IN ).
  • FIG. 2(b) shows the power (P OUT ) output by the converter 4.
  • the power (P OUT ) can be defined by the power (P BACK ) returned to the secondary battery 3 and the power (P OUT ) provided to the load device 9.
  • the power (P R ) provided to the load device 9 is defined as the power remaining after removing the power (P BACK ) returned to the secondary battery 3 from the power (P OUT ) output by the converter 4.
  • the power (P OUT ) provided to the load device 9 is the product of the current (I OUT ) and the voltage (V OUT ).
  • the power extraction efficiency ( ⁇ ) of the converter 4 is 100%.
  • the magnitude of the power (P IN ) and the magnitude of the power (P OUT ) are the same.
  • the remaining power after removing the power (P BAT ) caused by the secondary battery 3 from the power (P OUT ) output by the converter 4 is given to the load device 9 .
  • the load device 9 can be operated.
  • the remaining power is greater than the power (P LOAD ) required by the load device 9
  • the difference between the remaining power and the power (P LOAD ) can be further returned to the secondary battery 3.
  • the power stored in the secondary battery 3 can be increased.
  • the secondary battery 3 can be charged.
  • FIG. 3 is an example of a specific circuit of the power supply device 1 shown in FIG. 1. The components included in the power supply device 1 and their connection configuration will be described. Next, the operation of the power supply device 1 will be explained.
  • the power generating element 2 includes an output resistor 21 and a power generating body 22.
  • the power generator 22 receives external energy and generates DC power.
  • the negative electrode of the power generator 22 is connected to the secondary battery 3.
  • a positive electrode of the power generator 22 is connected to the converter 4 via the output resistor 21.
  • the power generator 22 may be provided with a voltmeter 23 .
  • the voltmeter 23 supplies the voltage (V E ) generated by the generator 22 to the controller 7 as a signal ⁇ 23.
  • Converter 4 includes a first switch element 41, a second switch element 42, a first diode 44, a second diode 45, and an inductor 46 (energy storage element).
  • the converter 4 has an input terminal 4a and output terminals 4b, 4c, and 4d.
  • the first switch element 41 switches between an operation of connecting the input terminal 4a of the converter 4 to the inductor 46 and an operation of disconnecting the input terminal 4a of the converter 4 from the inductor 46.
  • the drain of the first switch element 41 is connected to the input terminal 4a of the converter 4.
  • the source of the first switch element 41 is connected to the second switch element 42.
  • the gate of the first switch element 41 receives the control signal ⁇ 41.
  • the first switch element 41 is a p-channel type MOSFET.
  • the first switch element 41 connects the input terminal 4a of the converter 4 to the inductor 46 when receiving the control signal ⁇ 41 (L).
  • the first switch element 41 disconnects the input terminal 4a of the converter 4 from the inductor 46 when receiving the control signal ⁇ 41 (H).
  • the second switch element 42 switches between an operation of connecting the inductor 46 to the reference voltage GND and an operation of disconnecting the inductor 46 from the reference voltage GND.
  • the drain of the second switch element 42 is connected to the source of the first switch element 41.
  • the source of the second switch element 42 is connected to the reference voltage GND via the output terminal 4c.
  • the gate of the second switch element 42 receives the control signal ⁇ 42.
  • the second switch element 42 is an n-channel MOSFET.
  • the second switch element 42 connects the inductor 46 to the reference voltage GND when receiving the control signal ⁇ 42 (H).
  • the second switch element 42 disconnects the inductor 46 from the reference voltage GND when receiving the control signal ⁇ 42 (L).
  • the inductor 46 is connected to the node J2.
  • the node J2 is a point provided on the wiring connecting the first switch element 41 to the second switch element 42.
  • Inductor 46 is also connected to output terminal 4b of converter 4 via switch element 47.
  • an inductor 46 is illustrated as an energy storage element.
  • the energy storage element is not limited to inductor 46.
  • the energy storage element may employ, for example, a switched capacitor circuit that includes a plurality of capacitors and a switch that changes the connection configuration of each capacitor.
  • the first diode 44 is connected in parallel to the first switch element 41. Specifically, the input of the first diode 44 is connected to the source of the first switch element 41. The output of the first diode 44 is connected to the drain of the first switch element 41.
  • the second diode 45 is connected in parallel to the second switch element 42. Specifically, the input of the second diode 45 is connected to the source of the second switch element 42. The output of the second diode 45 is connected to the reference voltage GND via the output terminal 4c. The output of the second diode 45 is connected to the input of the first diode 44. The second diode 45 is connected in series with the first diode 44.
  • Ringing may occur between the first switch element 41, the second switch element 42, and the inductor 46. According to ringing, voltage increases and voltage decreases are repeated. Repeated voltage increases and voltage decreases may damage the first switch element 41 and the second switch element 42.
  • the first diode 44 and the second diode 45 protect the first switch element 41 and the second switch element 42 from voltage increases and voltage decreases that occur repeatedly due to ringing.
  • the first diode 44 and the second diode 45 are additional components to the converter 4. Therefore, converter 4 can also omit first diode 44 and second diode 45.
  • the converter 4 further includes a switch element 47 on the output side and a switch element 48 on the feedback side.
  • the switch elements 47 and 48 are, for example, insulated gate field effect transistors (MOSFETs).
  • the switch element 47 on the output side switches between an operation of supplying the power output from the inductor 46 to the load device 9 and an operation of not supplying the power output from the inductor 46 to the load device 9.
  • the output side switch element 47 is provided between the inductor 46 and the output terminal 4b of the converter 4.
  • the drain of the switch element 47 on the output side is connected to the inductor 46.
  • the source of the switch element 47 on the output side is connected to the output terminal 4b of the converter 4.
  • the gate of the switch element 47 on the output side receives the control signal ⁇ 47.
  • the switch element 47 on the output side is an n-channel MOFET.
  • the output side switch element 47 connects the inductor 46 to the output terminal 4b of the converter 4 when receiving the control signal ⁇ 47(H).
  • the output side switch element 47 disconnects the output terminal 4b of the converter 4 from the inductor 46 when receiving the control signal ⁇ 47(L).
  • the switch element 48 on the feedback side switches between an operation in which the power output from the inductor 46 is provided to the secondary battery 3 and an operation in which the power output from the inductor 46 is not provided to the secondary battery 3.
  • the feedback side switch element 48 is provided between the inductor 46 and the positive electrode of the secondary battery 3.
  • the drain of the switch element 48 on the feedback side is connected to the inductor 46.
  • the source of the switch element 48 on the feedback side is connected to the positive electrode of the secondary battery 3.
  • the gate of switch element 48 on the feedback side receives control signal ⁇ 48.
  • the switch element 48 on the feedback side is an n-channel MOSFET.
  • the switch element 48 on the feedback side connects the inductor 46 to the positive electrode of the secondary battery 3 when receiving the control signal ⁇ 48 (H).
  • the output side switch element 47 disconnects the inductor 46 from the positive electrode of the secondary battery 3 when receiving the control signal ⁇ 48 (L).
  • the power supply device 1 may also include several additional electrical components.
  • Capacitor 51 is arranged between input terminal 4a of converter 4 and reference voltage GND. Capacitor 51 adjusts the impedance between power generating element 2 and converter 4 . Capacitor 51 improves the efficiency of power transmission from power generation element 2 to converter 4 . Capacitor 51 is an additional element. Therefore, the capacitor 51 can also be omitted.
  • the power supply device 1 further includes resistance elements 61 and 62 and a capacitor 63. Resistance elements 61 and 62 are arranged between output terminal 4b of converter 4 and reference voltage GND. The resistance elements 61 and 62 are connected to a connection point provided on a path connecting the power supply device 1 to the load device 9. Resistance elements 61 and 62 can also be considered as components of converter 4.
  • the capacitor 63 functions as a so-called bypass capacitor. Capacitor 63 supplies insufficient current when the voltage (V OUT ) of power supply device 1 decreases. As a result, a drop in the voltage applied to the load device 9 is suppressed. Capacitor 63, like resistive elements 61 and 62, is arranged between output terminal 4b of converter 4 and reference voltage GND.
  • the resistive elements 61, 62 and the capacitor 63 are additional elements. Therefore, illustration may be omitted in other drawings.
  • Power supply device 1 performs multiple operations.
  • the power supply device 1 selects an operation using the current (I LOAD ) consumed by the load device 9.
  • the power supply device 1 uses the voltage (V E ) generated by the power generation element 2 to select an operation.
  • the selection of operations is executed by the controller 7.
  • the controller 7 receives the current (I LOAD ) consumed by the load device 9 and the voltage (V E ) generated by the power generation element 2 . If the required operation is limited, the controller 7 can select the operation by receiving only the current (I LOAD ) consumed by the load device 9.
  • the controller 7 can also select an operation by receiving only the voltage (V E ) generated by the power generation element 2 .
  • the controller 7 shown in FIG. 4 includes a load current determination section 71, a voltage determination section 72, and a control signal output section 73. These are functional components.
  • the controller 7 is physically a computer, and functional components are realized by the computer executing a program.
  • Controller 7 receives signal ⁇ 93 (I LOAD ) from ammeter 93 .
  • the controller 7 receives a signal ⁇ 23 (V E ) (measured voltage) from the voltmeter 23.
  • the controller 7 uses the signals ⁇ 93 and ⁇ 23 to generate control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48.
  • Controller 7 provides generated control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 to converter 4.
  • Load current determination section 71 receives signal ⁇ 93 (I LOAD ) from ammeter 93.
  • the load current determination unit 71 defines a high load state, a medium load state, and a no-load state.
  • the high load state and the medium load state are distinguished by an upper threshold current ( ISH ) (first threshold current).
  • the intermediate load state and the no-load state are distinguished by a lower threshold current (I SL ) (second threshold current).
  • the load current determination unit 71 determines that a high load state is present when the current value indicated by the signal ⁇ 93 (I LOAD ) is larger than the upper threshold current (I SH ).
  • the load current determination unit 71 determines that the state is a medium load state when the current value indicated by the signal ⁇ 93 (I LOAD ) is smaller than the upper threshold current (I SH ) and larger than the lower threshold current (I SL ). The load current determination unit 71 determines that there is no load state when the current value indicated by the signal ⁇ 93 (I LOAD ) is smaller than the lower threshold current (I SL ).
  • the controller 7 uses the voltage (V E ) of the power generation element 2 to further classify the state into three states.
  • Voltage determining section 72 receives signal ⁇ 23 (V E ) from voltmeter 23 .
  • the voltage determination unit 72 defines a high voltage state, a medium voltage state, and a low voltage state.
  • the high voltage state and the medium voltage state are distinguished by an upper threshold voltage (V SH ) (first threshold voltage).
  • the medium voltage state and the low voltage state are distinguished by a lower threshold voltage (V SL ) (second threshold voltage).
  • the voltage determination unit 72 determines that the state is a high voltage state when the voltage value indicated by the signal ⁇ 23 (V E ) is larger than the upper threshold voltage (V SH ).
  • the voltage determination unit 72 determines that the state is a medium voltage state when the voltage value indicated by the signal ⁇ 23 (V E ) is smaller than the upper threshold voltage (V SH ) and larger than the lower threshold voltage (V SL ). The voltage determination unit 72 determines that the state is a low voltage state when the voltage value indicated by the signal ⁇ 23 (V E ) is smaller than the lower threshold voltage (V SL ).
  • the controller 7 uses the load current (I LOAD ) and the voltage (V E ) of the power generating element 2 to determine whether the state of the power supply device 1 is included in a high load state, a no-load state, or a medium-load state. It is determined which of the following five states corresponds to: a high voltage state included in the medium load state, a medium voltage state included in the medium load state, and a low voltage state included in the medium load state.
  • the controller 7 selects an operation corresponding to each of the five states. When the controller 7 determines that it is in a high load state, it selects the high load operation M2. When the controller 7 determines that it is in a no-load state, it selects the no-load operation M3. When the controller 7 determines that the high voltage state is present, the controller 7 selects the high voltage operation M4. When the controller 7 determines that the voltage is in the medium voltage state, the controller 7 selects the normal operation M1. When the controller 7 determines that it is in the low voltage state, it selects the low voltage operation M5.
  • FIG. 5 shows an operation flow executed by the controller 7.
  • the load current determination unit 71 of the controller 7 receives a signal ⁇ 93 (I LOAD ) indicating the load current (I LOAD ) (step S11).
  • the load current determination unit 71 determines whether the current (I LOAD ) is larger than the upper threshold current (I SH ) (first threshold) (step S12). If the load current (I LOAD ) is larger than the upper threshold current (I SH ) (step S12: YES), the load current determination unit 71 outputs the result to the control signal output unit 73 as a signal ⁇ 71 (H). .
  • the control signal output unit 73 that receives the signal ⁇ 71 (H) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high-load operation M2 to the converter 4 (step S13). Details of the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 will be described later.
  • the load current determination unit 71 determines that the load current (I LOAD ) is smaller than the lower threshold current (I SL ). It is determined whether it is small (step S14). If the load current (I LOAD ) is smaller than the lower threshold current (I SL ) (step S14: YES), the load current determination unit 71 outputs the result to the control signal output unit 73 as a signal ⁇ 71 (L). .
  • the control signal output unit 73 that receives the signal ⁇ 71 (L) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the no-load operation M3 to the converter 4 (step S15).
  • step S14 If the current (I LOAD ) is larger than the lower threshold current (I SL ) (second threshold) (step S14: NO), the controller 7 receives the signal ⁇ 23 (V E ) (step S16).
  • the controller 7 determines whether the measured voltage (V E ) is larger than the upper threshold voltage (V SH ) (step S17). This operation is executed by the voltage determination section 72. If the measured voltage (V E ) is larger than the upper threshold voltage (V SH ) (step S17: YES), the voltage determination unit 72 outputs the result to the control signal output unit 73 as a signal ⁇ 72 (H). .
  • the control signal output unit 73 that receives the signal ⁇ 72 (H) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high voltage operation M4 to the converter 4 (step S18).
  • step S17 NO
  • the voltage determination unit 72 determines that the measured voltage (V E ) is smaller than the lower threshold voltage (V SL ). It is determined whether or not the value is also smaller (step S18). If the measured voltage (V E ) is smaller than the lower threshold voltage (V SL ) (step S19: YES), the voltage determination unit 72 outputs the result to the control signal output unit 73 as a signal ⁇ 72 (L). .
  • Control signal output section 73 receiving signal ⁇ 72 (L) outputs control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for low voltage operation M5 to converter 4 (step S21).
  • the voltage determination unit 72 If the measured voltage (V E ) is larger than the lower threshold voltage (V SL ) (step S19: NO), the voltage determination unit 72 outputs the result to the control signal output unit 73 as a signal ⁇ 72 (M). .
  • the control signal output unit 73 that receives the signal ⁇ 72(M) outputs the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the normal operation M1 to the converter 4 (step S22).
  • the control signal output section 73 selects the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 from the five waveforms PG, PGB, NG, ON, and OFF shown in FIG. 6 according to the mode of operation.
  • the waveforms PG, PGB, NG, ON, and OFF include a high (H) component and a low (L) component.
  • the waveforms PG, PGB, NG, ON, and OFF each include a first period D1, a second period D2, and a third period D3.
  • waveform PG H
  • waveform PGB L
  • waveform NG H
  • waveform ON H
  • waveform OFF L
  • waveform PG H
  • waveform PGB L
  • waveform NG L
  • waveform ON H
  • waveform OFF L
  • Waveform PGB is an inversion of waveform PG.
  • the waveform ON is always high (H) throughout the first period D1, second period D2, and third period D3.
  • the waveform OFF is always low (L) throughout the first period D1, second period D2, and third period D3.
  • FIG. 6(b) is an example of a circuit that constitutes the control signal output section 73.
  • Control signal output section 73 includes a first control circuit 76 and a second control circuit 77.
  • the first control circuit 76 outputs a waveform PG.
  • the second control circuit 77 outputs a waveform NG.
  • the first control circuit 76 includes a comparator 761, a pulse circuit 762, a delay circuit 764, and an RS flip-flop 763.
  • Comparator 761 compares voltage Va and reference voltage Vref. Voltage Va is a voltage generated at node J1 set between resistance element 61 and resistance element 62. Comparator 761 outputs a signal (H) to pulse circuit 762 when voltage Va is lower than reference voltage Vref.
  • the pulse circuit 762 receiving the signal (H) outputs a pulse signal to the RS flip-flop 763.
  • the RS flip-flop 763 switches the waveform PG from high (H) to low (L) (see symbol t1 in FIG. 6(a)).
  • the output of RS flip-flop 763 is also given to delay circuit 764.
  • the delay circuit 764 outputs a signal to the RS flip-flop 763 after a predetermined delay time (see t2 in FIG. 6A) has elapsed.
  • the RS flip-flop 763 receives the signal from the delay circuit 764 and switches the waveform PG from low (L) to high (H) (see symbol t3 in FIG. 6(a)).
  • the switching from low (L) to high (H) may be performed on the condition that the voltage between the source and drain of the switching element 41 reaches a predetermined potential difference.
  • the second control circuit 77 includes a comparator 771, a pulse circuit 772, a delay circuit 774, and an RS flip-flop 773.
  • the delay circuit 774 receives the waveform PG switched from low (L) to high (H) from the RS flip-flop 763 of the first control circuit 76 .
  • Delay circuit 774 receiving waveform PG provides a pulse to RS flip-flop 773 after a predetermined time has elapsed. Upon receiving the pulse, the RS flip-flop 773 switches the waveform NG from low (L) to high (H) (see symbol t4 in FIG. 6(a)).
  • Comparator 771 compares voltage Vd and reference voltage GND.
  • Voltage Vd is a voltage generated at node J2 set between first switch element 41 and second switch element 42.
  • An inductor 46 is also connected to node J2.
  • a signal (H) is output to the pulse circuit 772 when the voltage Vd is lower than the reference voltage GND.
  • the pulse circuit 772 receiving the signal (H) outputs a pulse signal to the RS flip-flop 773.
  • the RS flip-flop 773 that receives the pulse signal switches the waveform NG from high (H) to low (L) (see symbol t5 in FIG. 6(a)).
  • the control signal output section 73 controls high/low switching of the waveforms PG and NG using the voltage Va on the output side of the inductor 46 and the voltage Vd on the input side of the inductor 46.
  • FIG. 7 also shows combinations of control signals and waveforms. Details of a specific circuit configuration when these control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 are applied will be described later.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the normal operation M1.
  • a combination of a control signal and a waveform is indicated by placing parentheses after the code of the control signal and writing a code indicating the waveform within the parentheses.
  • a component (“H” or “L”) indicating the signal level is attached after the code indicating the waveform.
  • Control signal ⁇ 41 Waveform PG...Control signal ⁇ 41 (PG).
  • Control signal ⁇ 42 Waveform NG...Control signal ⁇ 42 (NG).
  • Control signal ⁇ 47 Waveform NG...Control signal ⁇ 47 (NG).
  • Control signal ⁇ 48 Waveform PGB...Control signal ⁇ 48 (PGB).
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high voltage operation M4.
  • Control signal ⁇ 41 (PG).
  • Control signal ⁇ 42 (NG).
  • Control signal ⁇ 47 (PGB).
  • Control signal ⁇ 48 (NG).
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the low voltage operation M5.
  • Control signal ⁇ 41 ON:H
  • Control signal ⁇ 42 OFF: L
  • Control signal ⁇ 47 ON:H
  • Control signal ⁇ 48 ON:H).
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the low voltage operation M5A of the modified example.
  • Control signal ⁇ 41 (OFF:L).
  • Control signal ⁇ 42 (OFF: L).
  • Control signal ⁇ 47 (ON:H).
  • Control signal ⁇ 48 (OFF: L).
  • Control signal ⁇ 81 (ON:H)
  • the control signal output section 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the high-load operation M2.
  • Control signal ⁇ 41 (OFF:L).
  • Control signal ⁇ 42 (OFF: L).
  • Control signal ⁇ 47 (ON:H).
  • Control signal ⁇ 48 (OFF: L).
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 for the no-load operation M3.
  • Control signal ⁇ 41 (OFF).
  • Control signal ⁇ 42 (ON).
  • Control signal ⁇ 47 (OFF).
  • Control signal ⁇ 48 (ON).
  • ⁇ Normal operation M1> During the normal operation M1, the power supply device 1 performs a run-up operation M11 (first operation), a load drive operation M12 (second operation), and a standby operation M13 (third operation). These operations are switched by control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 output by the controller 7.
  • the run-up operation M11, the load drive operation M12, and the standby operation M13 are executed in this order.
  • the order in which the run-up operation M11, load drive operation M12, and standby operation M13 are executed is not limited to this.
  • the run-up operation M11, the load drive operation M12, and the standby operation M13 may be performed in any order.
  • FIG. 8(a) shows the state of the circuit during the run-up operation M11.
  • the wiring shown by a solid line means that a current flows during the run-up operation M11.
  • the wiring indicated by a broken line indicates that no current flows during the run-up operation M11.
  • Control signal ⁇ 41 (PG:L).
  • Control signal ⁇ 42 (NG:L).
  • Control signal ⁇ 47 (NG:L).
  • Control signal ⁇ 48 (PGB:H).
  • the first switch element 41 receiving the control signal ⁇ 41 connects the input terminal 4a of the converter 4 to the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 disconnects the inductor 46 from the reference voltage GND.
  • the output-side switch element 47 that receives the control signal ⁇ 47 (NG:L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (PGB:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
  • a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, and the feedback side switch element 48 is configured.
  • a closed circuit including the secondary battery 3, the power generation element 2, and the capacitor 51 is also configured.
  • a voltage (V IN ) obtained by adding the voltage (V EH ) of the power generating element 2 and the voltage (V BAT ) of the secondary battery 3 is applied to the input terminal 4 a of the converter 4 .
  • a current (I IN ) flows through a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, and the feedback side switch element 48.
  • the current (I L ) flowing through the inductor 46 gradually increases. As a result, inductor 46 stores energy.
  • the load device 9 is disconnected from the power supply device 1. At this time, a closed circuit including the load device 9 and the capacitor 63 is configured. If sufficient power is stored in the capacitor 63, the load device 9 can receive power from the capacitor 63.
  • a closed circuit including the power generating element 2, the secondary battery 3, and the capacitor 51 is also configured.
  • the power generation element 2 is connected to the inductor 46.
  • the energy generated by the power generating element 2 may be stored in the inductor 46 and also in the capacitor 51.
  • FIG. 8(b) shows the state of the circuit during load drive operation M12.
  • the controller 7 outputs the following control signals.
  • Control signal ⁇ 41 (PG:H).
  • Control signal ⁇ 42 (NG:H).
  • Control signal ⁇ 47 (NG:H).
  • Control signal ⁇ 48 (PGB:L).
  • the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (NG:H) connects the inductor 46 to the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 (NG:H) connects the inductor 46 to the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (PGB:L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
  • a closed circuit including the inductor 46, the output-side switch element 47, the load device 9, and the second switch element 42 is configured.
  • the inductor 46 provides the load device 9 with electric power (P OUT ) resulting from the stored energy.
  • the load device 9 supplied with power from the power supply device 1 is driven. If the power provided by inductor 46 (P OUT ) is greater than the power required by load device 9 (P LOAD ), the excess power may be stored in capacitor 63 .
  • the energy stored in the inductor 46 gradually decreases, and the current (I L ) in the inductor 46 also gradually decreases.
  • a closed circuit including the power generation element 2, the secondary battery 3, and the capacitor 51 is also configured during the load drive operation M12.
  • the power generation element 2 is disconnected from the inductor 46.
  • the energy generated by the power generating element 2 is not stored in the inductor 46.
  • the energy generated by the power generation element 2 during the load drive operation M12 may be stored in the capacitor 51.
  • ⁇ Standby operation M13> The standby operation M13 will be explained with reference to FIG. 8(c). During the standby operation M13, the load device 9 consumes all the energy stored in the capacitor 63. During standby operation M13, converter 4 does not need to be operated. If the energy stored in the capacitor 63 is not sufficient, the standby operation M13 may be omitted.
  • FIG. 8(c) shows the state of the circuit during standby operation M13.
  • the controller 7 outputs the following control signals.
  • Control signal ⁇ 41 (PG:H).
  • Control signal ⁇ 42 (NG:L).
  • Control signal ⁇ 47 (NG:L).
  • Control signal ⁇ 48 (PGB:L).
  • the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (NG:L) disconnects the inductor 46 from the reference voltage GND.
  • the output-side switch element 47 that receives the control signal ⁇ 47 (NG:L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (PGB:L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
  • a closed circuit including the inductor 46 is not configured.
  • the load device 9 is disconnected from the power supply device 1. This state is the same as the closed circuit including the load device 9 and the capacitor 63 configured during the run-up operation M11. If sufficient power is stored in the capacitor 63, the load device 9 can receive power from the capacitor 63.
  • a closed circuit including the power generation element 2, the secondary battery 3, and the capacitor 51 is also configured during the standby operation M13.
  • the power generation element 2 is disconnected from the inductor 46.
  • the energy generated by the power generating element 2 is not stored in the inductor 46.
  • the energy generated by the power generating element 2 during the standby operation M13 may be stored in the capacitor 51.
  • FIG. 9 conceptually shows the breakdown of electric power in the power supply device 1.
  • the power input to the power supply device 1 PIN
  • P BAT the sum of the power of the secondary battery 3
  • P EH the power of the power generation element 2
  • the power (P BAT ) of the secondary battery 3 is the product of the voltage (V BAT ) and the current (I IN ).
  • the electric power (P EH ) of the power generating element 2 is the product of the voltage (V E ) and the current (I IN ).
  • the power extraction efficiency ( ⁇ ) of the converter 4 is 100%. According to this assumption, the entire sum of power (P BAT ) and power (P EH ) can be stored in inductor 46 . All of the electric power (P EH ) of the power generating element 2 can be stored in the inductor 46 .
  • the power extraction efficiency ( ⁇ ) of converter 4 is less than 100%. According to this assumption, a portion of the sum of power (P BAT ) and power (P EH ) can be stored in inductor 46 . A part of the electric power (P EH ) of the power generating element 2 can be stored in the inductor 46 .
  • the electric power (P EH ) of the power generation element 2 includes the electric power (P E_NET ) stored in the inductor 46 and the electric power (P E_LOSS ) that is not stored in the inductor 46 and becomes a loss.
  • the power loss (P E_LOSS ) is the product of the voltage drop (R E ⁇ I IN ), which is represented by the product of the output resistance 21 (R E ) and the current (I IN ), and the current (I IN ). be.
  • the electric power (P E_NET ) accumulated in the inductor 46 is the remainder after subtracting the electric power (P E_LOSS ) resulting from a loss from the electric power (P EH ) of the power generation element 2 .
  • the power (P OUT ) output by the converter 4 is returned to the secondary battery 3 again.
  • the power (P BACK ) returned to the secondary battery 3 is the product of the voltage (V BAT ) and the current fed back (I BACK ).
  • the current (I BACK ) is smaller than the current (I IN ).
  • the difference between the current (I IN ) and the current (I BACK ) is the current consumed (I CKT ).
  • the consumed power (P CKT ) can be defined by the consumed current (I CKT ) and voltage (V BAT ).
  • the secondary battery 3 outputs power (P BAT ), receives power (P BACK ) back, and consumes power (P CKT ).
  • the power supply device 1 can obtain electric power ( PE_NET ) from the power generating element 2 by consuming electric power ( PCKT ).
  • the power supply device 1 can also be considered as a battery with an extended lifespan.
  • BLE Battery Life Extension
  • BLE was defined as an index indicating how much the life of the power supply device 1 is extended.
  • the degree of extension of the life of the secondary battery 3 was evaluated. It is assumed that the current (I CKT ) defining the consumed power (P CKT ) is 2 ⁇ A, and the voltage (V BAT ) of the secondary battery 3 is 1.5V. As a result, the power consumed ( PCKT ) was 3 ⁇ W.
  • the power supply device 1 can drive the load device 9, which requires 30 ⁇ W of power, by consuming 3 ⁇ W of the secondary battery 3.
  • the secondary battery 3 supplies all the 30 ⁇ W required by the load device 9, 30 ⁇ W is consumed.
  • the power supply device 1 consumes only 1/10 of that, 3 ⁇ W. Therefore, in terms of life, the power supply device 1 can have a life 10 times longer than the life when the secondary battery 3 supplies all the 30 ⁇ W required by the load device 9.
  • the high voltage operation M4 will be explained with reference to FIG.
  • the voltage (V E ) generated by the power generation element 22 increases in accordance with the temperature difference.
  • the voltage (V E ) increases, for example, storing energy in the inductor 46 and driving the load device 9 can be performed in parallel.
  • the power supply device 1 performs an accumulation drive operation M41 (first operation), a charging operation M42 (second operation), and a standby operation M51 (third operation). These operations are also switched by control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 output by the controller 7.
  • Control signal ⁇ 41 (PG:L).
  • Control signal ⁇ 42 (NG:L).
  • Control signal ⁇ 47 (PGB:H).
  • Control signal ⁇ 48 (NG:L).
  • the first switch element 41 receiving the control signal ⁇ 41 connects the input terminal 4a of the converter 4 to the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 disconnects the inductor 46 from the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 connects the inductor 46 to the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (NG:L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
  • a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, the output side switch element 47, and the load device 9 is configured.
  • a voltage (V IN ) obtained by adding the voltage (V BAT ) of the secondary battery 3 to the voltage (V EH ) generated by the power generating element 2 is provided to the input terminal 4 a of the converter 4. .
  • inductor 46 stores energy.
  • the load device 9 is connected to the power supply device 1. Therefore, the load device 9 can receive power supply from the power supply device 1. As a result, during the storage drive operation M41, the load device 9 is driven.
  • a closed circuit including the power generating element 2, the secondary battery 3, and the capacitor 51 is also configured.
  • the energy generated by the power generating element 2 may be stored in the inductor 46 and also in the capacitor 51.
  • Control signal ⁇ 41 (PG:H).
  • Control signal ⁇ 42 (NG:H).
  • Control signal ⁇ 47 (PGB:L).
  • Control signal ⁇ 48 (NG:H).
  • the first switch element 41 that receives the control signal ⁇ 41 disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 connects the inductor 46 to the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 (PGB:L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
  • the switch element 48 on the feedback side that receives the control signal ⁇ 48 (NG:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
  • a closed circuit including the second switch element 42, the inductor 46, the feedback side switch element 48, and the secondary battery 3 is configured. According to this closed circuit, the energy stored in the inductor 46 is given to the secondary battery 3. As a result, the inductor 46 charges the secondary battery 3.
  • the load device 9 is disconnected from the power supply device 1. At this time, a closed circuit including the load device 9 and the capacitor 63 is configured. If sufficient power is stored in the capacitor 63, the load device 9 can receive power from the capacitor 63.
  • a closed circuit including the power generating element 2, the secondary battery 3, and the capacitor 51 is also configured.
  • the energy generated by the power generating element 2 may be stored in the inductor 46 and also in the capacitor 51.
  • control signal ⁇ 41 (PG:H).
  • Control signal ⁇ 42 (NG:L).
  • Control signal ⁇ 47 (PGB:L).
  • Control signal ⁇ 48 (NG:L).
  • the low voltage operation M5 will be explained with reference to FIG. 11(a).
  • the voltage (V E ) generated by the power generation element 22 becomes low.
  • the secondary battery 3 can be used to drive the load device 9.
  • the voltage (V BAT ) of the secondary battery 3 that satisfies the voltage (V LOAD ) required by the load device 9 means that the voltage (V BAT ) of the secondary battery 3 satisfies the voltage (V LOAD ) required by the load device 9. ( VLOAD ), and a case where the voltage ( VBAT ) of the secondary battery 3 is higher than the voltage ( VLOAD ) required by the load device 9.
  • the load device 9 When the voltage (V BAT ) of the secondary battery 3 is equal to the voltage (V LOAD ) required by the load device 9, the load device 9 is driven by directly connecting the secondary battery 3 to the load device 9. Can be done.
  • the secondary battery 3 is directly connected to the load device 9 without going through the power generation element 2 and converter 4 .
  • the low voltage operation M5 does not include some periods like the normal operation M1 and the high voltage operation M4.
  • the power supply 1 includes only one direct supply operation.
  • the power output from the secondary battery 3 is given to the load device 9 without passing through the power generation element 2.
  • the low voltage operation M5 can be employed even when the power generation element 2 has an electrical failure (broken wire). According to the low-voltage operation M5, even if the power generation element 2 is electrically damaged, power can be supplied from the power supply device 1 to the load device 9.
  • the fact that the power output from the secondary battery 3 is given to the load device 9 without passing through the power generation element 2 means that the power output from the secondary battery 3 does not go through the output resistance 21 of the power generation element 2. This means that it is applied to the load device 9. Therefore, the voltage (V BAT ) of the secondary battery 3 can be prevented from being affected by a voltage drop caused by the output resistance 21 of the power generation element 2 .
  • the voltage (V BAT ) of the secondary battery 3 can be directly applied to the load device 9 .
  • Direct supply operation The direct supply operation will be explained.
  • direct supply operation the secondary battery 3 provides energy to the load device 9.
  • Control signal ⁇ 41 ON:H
  • Control signal ⁇ 42 OFF: L
  • Control signal ⁇ 47 ON:H
  • Control signal ⁇ 48 ON:H
  • the first switch element 41 that receives the control signal ⁇ 41 (ON:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (OFF:L) disconnects the inductor 46 from the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 (ON:H) connects the inductor 46 to the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (ON:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
  • a closed circuit including the secondary battery 3, the switch element 48 on the feedback side, and the load device 9 is configured. According to this closed circuit, power from the secondary battery 3 is given to the load device 9.
  • Low voltage operation M5 could be selected when the condition that the voltage (V BAT ) of the secondary battery 3 is equal to the voltage (V LOAD ) required by the load device 9 is satisfied.
  • a circuit configuration and operation that can be adopted when the voltage (V BAT ) of the secondary battery 3 is higher than the voltage (V LOAD ) required by the load device 9 will be described as a modified example with reference to FIG. 11(b).
  • the power supply device 1A of the modified example includes a short circuit 80 that avoids the power generating element 2.
  • Short circuit 80 connects secondary battery 3 directly to converter 4 .
  • a first end of the short circuit 80 is connected to the wiring between the secondary battery 3 and the power generation element 2.
  • a second end of short circuit 80 is connected between power generation element 2 and converter 4 .
  • Short circuit 80 has a switch element 81 .
  • the low voltage operation M5A of the modified example does not include some periods like the normal operation M1 and the high voltage operation M4.
  • the power supply device 1A includes only one step-down supply operation.
  • the step-down supply operation will be explained. During the step-down supply operation, the secondary battery 3 provides energy to the load device 9 via the converter 4 .
  • Control signal ⁇ 41 (OFF: L).
  • Control signal ⁇ 42 (OFF: L).
  • Control signal ⁇ 47 (ON:H).
  • Control signal ⁇ 48 (OFF: L).
  • Control signal ⁇ 81 (ON:H).
  • the first switch element 41 that receives the control signal ⁇ 41 (OFF: L) connects the input terminal 4a of the converter 4 to the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (OFF:L) disconnects the inductor 46 from the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 (ON:H) connects the inductor 46 to the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (OFF: L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
  • the switch element 81 of the short circuit 80 Upon receiving the control signal ⁇ 81 (ON:H), the switch element 81 of the short circuit 80 connects the positive electrode of the secondary battery 3 to the input terminal 4a of the converter 4.
  • a closed circuit including the secondary battery 3, the switch element 81 of the short circuit 80, the inductor 46, the output side switch element 47, and the load device 9 is configured. According to this closed circuit, the voltage-stepped power of the secondary battery 3 is given to the load device 9.
  • the low-voltage operation M5A of the modified example also allows the power supply device 1A to provide power to the load device 9 when the power generation element 2 has an electrical failure.
  • the power supply device 1A including the short circuit 80 can also perform normal operation M1 and high voltage operation M4.
  • the controller 7 outputs the control signal ⁇ 81 (OFF).
  • the high load operation M2 will be explained with reference to FIG. 12(a).
  • the high load operation M2 is executed when the load device 9 requests higher power (P LOAD ) than the power (P LOAD ) required during the normal operation M1.
  • the high load operation M2 includes one driving operation.
  • inductor 46 stores energy. Inductor 46 provides energy to load device 9.
  • the circuit configuration and operation during the high load operation M2 are the same as the circuit configuration and operation during the storage drive operation M41 of the high voltage operation M4.
  • the high load operation M2 will be explained.
  • the controller 7 outputs the following control signals.
  • Control signal ⁇ 41 (OFF:L).
  • Control signal ⁇ 42 (OFF: L).
  • Control signal ⁇ 47 (ON:H).
  • Control signal ⁇ 48 (OFF: L).
  • the first switch element 41 that receives the control signal ⁇ 41 (OFF: L) connects the input terminal 4a of the converter 4 to the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (OFF:L) disconnects the inductor 46 from the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 (ON:H) connects the inductor 46 to the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (OFF: L) disconnects the inductor 46 from the positive electrode of the secondary battery 3.
  • a closed circuit including the power generation element 2, the first switch element 41, the inductor 46, the output side switch element 47, and the load device 9 is configured.
  • a voltage (V IN ) obtained by adding the voltage (V BAT ) of the secondary battery 3 to the voltage (V EH ) generated by the power generating element 2 is provided to the input terminal 4 a of the converter 4. .
  • inductor 46 stores energy.
  • No-load operation M3 The no-load operation M3 will be explained with reference to FIG. 12(b). During no-load operation M3, the power supply device 1 does not provide power to the load device 9. The no-load operation M3 is executed when the load device 9 has stopped its operation.
  • the no-load operation M3 includes one charging operation. During no-load operation M3, the inductor 46 provides stored energy to the secondary battery 3. In other words, during no-load operation M3, the secondary battery 3 is charged.
  • the circuit configuration and operation during the no-load operation M3 are the same as the circuit configuration and operation during the charging operation M42 of the high voltage operation M4.
  • the no-load operation M3 will be explained.
  • the controller 7 outputs the following control signals.
  • Control signal ⁇ 41 ON:H.
  • Control signal ⁇ 42 ON:H).
  • Control signal ⁇ 47 OFF: L.
  • Control signal ⁇ 48 ON:H).
  • the first switch element 41 that receives the control signal ⁇ 41 (ON:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (ON:H) connects the inductor 46 to the reference voltage GND.
  • the output side switch element 47 that receives the control signal ⁇ 47 (OFF: L) disconnects the inductor 46 from the output terminal 4b of the converter 4.
  • the feedback side switch element 48 that receives the control signal ⁇ 48 (ON:H) connects the inductor 46 to the positive electrode of the secondary battery 3.
  • a closed circuit including the second switch element 42, the inductor 46, the feedback side switch element 48, and the secondary battery 3 is configured. According to this closed circuit, the energy stored in the inductor 46 is given to the secondary battery 3. As a result, the inductor 46 charges the secondary battery 3.
  • the power supply device 1 of the first embodiment includes a secondary battery 3, a power generation element 2 connected in series to the secondary battery 3, an input terminal 4a connected to the output of the power generation element 2, and a secondary battery 3.
  • the converter 4 includes an output terminal 4b connected to the output of the converter 3 and an output terminal 4b connected to the load device 9.
  • Converter 4 provides power to at least one of output terminal 4b and output terminal 4b based on the required power ( PLOAD ) of load device 9 and/or the generated voltage ( VE ) of power generation element 2.
  • the required power (P LOAD ) may be, for example, the power value itself.
  • the required power (P LOAD ) can also be replaced with elements that constitute the required power (P LOAD ), such as a required current and a required voltage.
  • the operation of the power supply device 1 may be switched based on the requested current instead of the requested power (P LOAD ).
  • the power supply device 1 may actively obtain the required power (P LOAD ), the required current, and the required voltage from the load device 9 .
  • the required power (P LOAD ), the required current, and the required voltage may be passively obtained by the power supply device 1 from the load device 9.
  • the load device 9 may actively provide the required power (P LOAD ), the required current, and the required voltage to the power supply device 1 .
  • the power supply device 1 generates control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 using at least one of the electric power (P LOAD ) requested by the load device 9 and the voltage (V E ) generated by the power generator 22.
  • the voltage (V E ) increases or decreases depending on changes in the external environment. Therefore, by controlling using at least one of the power (P LOAD ) and voltage (V E ) required by the load device 9, the power supply device 1 can be operated in response to changes in external factors.
  • the power supply device 1 of the first embodiment uses both the required current of the load device 9 and the voltage generated by the power generation element 2 as control variables for switching the operation of the circuit.
  • the power supply device 1 performs normal operation M1, high load operation M2, no-load operation M3, high voltage operation M4, low voltage operation M5, and another low voltage operation M5A according to the required current of load device 9 and Switching is performed according to the voltage generated by the power generation element 2.
  • the power supply device 1 may use only the required current of the load device 9 as a control variable for switching the operation of the circuit.
  • the power supply device 1 switches between a normal operation M1, a high load operation M2, and a no-load operation M3 according to the required current of the load device 9.
  • the power supply device 1 may use only the voltage generated by the power generating element 2 as a control variable for switching the operation of the circuit.
  • the power supply device 1 switches between a normal operation M1, a high voltage operation M4, a low voltage operation M5, and another low voltage operation M5A depending on the voltage generated by the power generation element 2.
  • the ratio between the electric power (P E_NET ) taken out from the electric power generating element 2 and the electric power resulting in loss (P E_LOSS ) is determined by the current (I IN ).
  • the proportion of power (P E_LOSS ) that becomes a loss increases.
  • the proportion of power lost (P E_LOSS ) decreases.
  • the amount of electric power (P E_NET ) taken out from the power generation element 2 decreases.
  • Obtaining desired power from the power generating element 2 can also be said to mean controlling the ratio of the power extracted from the power generating element 2 (P E_NET ) and the power resulting in loss (P E_LOSS ).
  • the ratio between the power extracted from the power generating element 2 (P E_NET ) and the power lost (P E_LOSS ) is referred to as "power extraction efficiency ( ⁇ )" in the following description.
  • the electric power (P E ) generated by the power generating element 2 is influenced by the external environment such as temperature. Assume that a current (I IN ) that can obtain a desired power (P E_NET ) in a certain state (for example, temperature) is set. If this setting is maintained, there is a possibility that the power extraction efficiency ( ⁇ ) will decrease when one state changes to another state.
  • Equation (2) is intended only for the power generation element 2.
  • the influence of the voltage (V BAT ) of the secondary battery 3 is not included in equation (2).
  • the inventors regarded the configuration including the power generation element 2 and the secondary battery 3 as one power generation source, and diligently studied conditions for maximizing the power extraction efficiency ( ⁇ ) of the power generation source.
  • I IN V E 2 / (4 x V O x R E )...(5)
  • I IN (MAX) V E /2 x R E ... (6)
  • V IN The voltage (V IN ) is expressed by the following formula (7).
  • the inventors have found that when the configuration including the power generation element 2 and the secondary battery 3 is considered as one power generation source, the condition for maximizing the power efficiency is Equation (7).
  • VIN VBAT + VE /2...(7)
  • a power supply device 1B that can maintain the power extraction efficiency ( ⁇ ) at a desired state even when a change in the external environment occurs will be described. Maintaining the power extraction efficiency ( ⁇ ) at a desired state means operating the power supply device 1B so as to satisfy the condition of equation (7).
  • the conditions shown in equation (7) are based on an ideal electric circuit in which the power supply device 1B does not include components such as parasitic resistance and parasitic capacitance.
  • the actual power supply device 1B includes components such as parasitic resistance and parasitic capacitance of an inductor and a transistor.
  • the actual power supply device 1B also includes power loss such as power consumption of the controller 7B. Considering these factors, the optimal conditions for extracting the maximum power may deviate from the conditions shown in equation (7).
  • the power supply device 1B may adopt the condition shown in equation (8) instead of the condition shown in equation (7).
  • VIN VBAT +b ⁇ VE ...(8)
  • Equation (8) includes a variable b.
  • the variable b is set to a value different from 0.5.
  • the condition shown in equation (8) is satisfied by setting the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3 shown in FIG. 18(a) to appropriate values. It is possible to realize an operation that satisfies the following.
  • Using an analog circuit it is possible to set the upper reference voltage (V REFP ) and lower reference voltage (V REFN ) that provide optimal conditions. Even when setting the upper reference voltage (V REFP ) and lower reference voltage (V REFN ) using a digital circuit including an A/D converter and a D/A converter, operation that satisfies the conditions shown in equation (8) is realized. can.
  • the circuit configuration of the power supply device 1B of the second embodiment is the same as that of the first embodiment.
  • the power supply device 1B of the second embodiment is characterized by the operation of the converter 4.
  • An operation for keeping the power extraction efficiency ( ⁇ ) in a desired state even when a change in the external environment occurs is referred to as an MPPT operation R1.
  • the power supply device 1B that executes the MPPT operation R1 will be described in detail.
  • ⁇ MPPT operation R1> MPPT operation R1 will be explained. It has already been mentioned that the power extraction efficiency ( ⁇ ) is affected by the current (I IN ) that the converter 4 receives. Controller 7B executes control to maintain the current (I IN ) applied to converter 4 at a desired value. Controller 7B performs an operation to keep the voltage (V IN ) received by converter 4 within a predetermined range so that the current (I IN ) applied to converter 4 is maintained at a desired value. The operation of keeping the voltage (V IN ) within a predetermined range is referred to as "power extraction operation R11."
  • Controller 7B performs an operation of updating the range within which the voltage (V IN ) received by converter 4 should be accommodated.
  • the operation of updating the range in which the voltage (V IN ) received by converter 4 should be contained is referred to as "refresh operation R12."
  • FIG. 14(a) shows the voltage (V IN ) that converter 4 receives when performing MPPT operation R1.
  • the MPPT operation R1 includes a power extraction operation R11 and a refresh operation R12.
  • the controller 7B repeatedly executes the power extraction operation R11 and the refresh operation R12.
  • the minimum unit (T CYC ) of the MPPT operation R1 is defined by one power extraction operation R11 and one refresh operation R12.
  • the minimum unit (T CYC ) is shown in which the power extraction operation R11 is executed first and the refresh operation R12 is executed later.
  • the minimum unit (T CYC ) may be defined as one in which the refresh operation R12 is executed first and the power extraction operation R11 is executed later.
  • the power extraction operation R11 provides power (P OUT ) to the load device 9.
  • the voltage (V IN ) is within a predetermined range.
  • the predetermined range is defined by an upper reference voltage (V REFP ) (first threshold voltage) and a lower reference voltage (V REFN ) (second threshold voltage).
  • Controller 7B controls converter 4 so that voltage (V IN ) increases from lower reference voltage (V REFN ) toward upper reference voltage (V REFP ).
  • a suspend operation R111 see FIG. 14(b)
  • Controller 7B controls converter 4 so that voltage (V IN ) decreases from upper reference voltage (V REFP ) toward lower reference voltage (V REFN ).
  • Such an operation is called a resume operation R112.
  • the resume operation R112 includes a run-up operation M11 and a load drive operation M12.
  • the run-up operation M11 and the load drive operation M12 have already been explained in the first embodiment, so a detailed explanation will be omitted.
  • the minimum unit (T OP ) of the power extraction operation R11 is defined by one suspend operation R111 and one resume operation R112.
  • Refresh operation R12 obtains the magnitude of the voltage (V IN ) that converter 4 is experiencing.
  • the refresh operation R12 includes a standby operation R121 and a sample operation R122.
  • standby operation R121 charge is accumulated in capacitor 51 (see FIG. 3) by stopping the operation of converter 4.
  • the capacitance of the capacitor 51 is sufficiently large, it converges to the value of the voltage (V IN ).
  • the magnitude of the voltage (V IN ) can be obtained.
  • the voltage (V IN ) obtained in the standby operation M51 is used to obtain an upper reference voltage (V REFP ) and a lower reference voltage (V REFN ).
  • the controller 7B includes a load current determination section 71, a first voltage determination section 72, and a control signal output section 73B.
  • the load current determination section 71 and the first voltage determination section 72 are the same as the load current determination section 71 and the voltage determination section 72 of the first embodiment, so a detailed description thereof will be omitted.
  • Controller 7B further includes a reference voltage generation section 75 and a second voltage determination section 74.
  • Reference voltage generating section 75 receives voltage (V BAT ) and voltage (V IN ).
  • the reference voltage generator 75 uses the voltage (V BAT ) and the voltage (V IN ) to obtain an upper reference voltage (V REFP ) and a lower reference voltage (V REFN ).
  • the reference voltage generation section 75 provides the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ) to the second voltage determination section 74 .
  • the reference voltage generating section 75 may obtain the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ) using an analog circuit. A configuration example in which the reference voltage generation section 75 is an analog circuit will be described later.
  • the reference voltage generator 75 may obtain the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ) using a digital circuit.
  • the reference voltage generator 75 converts the voltage (V IN ) into a digital value using an AD converter.
  • An upper reference voltage (V REFP ) and a lower reference voltage (V REFN ) are obtained by computer calculation.
  • the upper reference voltage (V REFP ) is obtained by adding a predetermined value to the voltage (V IN ).
  • a lower reference voltage (V REFN ) is obtained by subtracting a predetermined value from the voltage (V IN ).
  • the second voltage determination section 74 receives the upper reference voltage (V REFP ) and the lower reference voltage (V REFN ).
  • the second voltage determination section 74 receives the voltage (V IN ).
  • the second voltage determination unit 74 executes the following operation during the power extraction operation R11.
  • the second voltage determination unit 74 determines whether the voltage (V IN ) has reached the upper reference voltage (V REFP ).
  • the second voltage determination unit 74 determines whether the voltage (V IN ) has reached the lower reference voltage (V REFN ).
  • the second voltage determination unit 74 obtains a control signal ⁇ 73 (SUSPEND) and a control signal ⁇ 74 (RESUME) as a result of the determination.
  • the second voltage determination unit 74 provides a control signal ⁇ 73 (SUSPEND) and a control signal ⁇ 74 (RESUME) to the control signal output unit 73B.
  • the second voltage determination section 74 When it is determined that the voltage (V IN ) has reached the upper reference voltage (V REFP ), the second voltage determination section 74 outputs the following control signals ⁇ 73 and ⁇ 74 (see FIG. 16(b)). Control signal ⁇ 73 (SUSPEND: H). Control signal ⁇ 74 (RESUME:L).
  • the second voltage determination section 74 When it is determined that the voltage (V IN ) has reached the lower reference voltage (V REFN ), the second voltage determination section 74 outputs the following control signals ⁇ 73 and ⁇ 74 (see FIG. 16(b)). Control signal ⁇ 73 (SUSPEND:L). Control signal ⁇ 74 (RESUME: H).
  • the second voltage determination section 74 outputs the following control signals ⁇ 73 and ⁇ 74 (see FIG. 16(c)).
  • Control signal ⁇ 73 (SUSPEND: H).
  • Control signal ⁇ 74 (RESUME:L).
  • the second voltage determination section 74 may obtain the control signal ⁇ 73 (SUSPEND) and the control signal ⁇ 74 (RESUME) using an analog circuit.
  • SUSPEND control signal ⁇ 73
  • REUME control signal ⁇ 74
  • the second voltage determination section 74 may obtain the control signal ⁇ 73 (SUSPEND) and the control signal ⁇ 74 (RESUME) using a digital circuit.
  • the control signal output section 73 switches the waveforms PG, NG, and PGB according to the control signal ⁇ 73 (SUSPEND) and the control signal ⁇ 74 (RESUME).
  • the controller 7 selects one of the five operations depending on the load power (P LAOD ) and the voltage (V IN ).
  • the MPPT operation R1 described in the second embodiment is executed during the normal operation M1 among the five operations.
  • the combinations of the control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 and the waveforms PG, PGN, and NG are as follows. Control signal ⁇ 41 (PG). Control signal ⁇ 42 (NG). Control signal ⁇ 47 (NG). Control signal ⁇ 48 (PGB).
  • the control signal output unit 73 receives the following control signals ⁇ 73 and ⁇ 74 during the suspend operation R111 (see FIG. 16(b)).
  • Control signal ⁇ 73 (SUSPEND: H).
  • Control signal ⁇ 74 (RESUME::L).
  • the control signal output section 73 receives the above control signals ⁇ 73 and ⁇ 74, it outputs the following control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 (see FIG. 16(b)).
  • Control signal ⁇ 41 (PG:H).
  • Control signal ⁇ 42 (NG:L).
  • Control signal ⁇ 48 (PGB:L).
  • the control signal output unit 73 receives the following control signals ⁇ 73 and ⁇ 74 during the resume operation R112 (see FIG. 16(b)).
  • Control signal ⁇ 73 (SUSPEND:L).
  • Control signal ⁇ 74 (RESUME::H).
  • the control signal output section 73 receives the above control signals ⁇ 73 and ⁇ 74, it outputs the following control signals ⁇ 41, ⁇ 42, ⁇ 47, ⁇ 48 for the run-up operation M11 and control signals ⁇ 41, ⁇ 42, ⁇ 47, ⁇ 48 for the load drive operation M12. and are output alternately (see FIG. 16(b)).
  • Control signal ⁇ 41 (PG:L) for run-up operation M11.
  • Control signal ⁇ 42 (NG:L) for run-up operation M11.
  • the control signal output unit 73 outputs the following control signals ⁇ 41, ⁇ 42, ⁇ 47, and ⁇ 48 (see FIG. 16(c)) during the refresh operation R12.
  • Control signal ⁇ 41 (PG:H).
  • Control signal ⁇ 42 (NG:L).
  • Control signal ⁇ 47 (NG:L).
  • Control signal ⁇ 48 (PGB:L).
  • the controller 7B obtains the voltage (V IN ) (step S31).
  • the controller 7B determines whether the voltage (V IN ) has reached the upper reference voltage (V REFP ) (step S32).
  • the controller 7B obtains the voltage (V IN ) again (step S31).
  • the controller 7B repeats step S31 and step S32 until the voltage (V IN ) reaches the upper reference voltage (V REFP ).
  • step S32 When the controller 7B determines that the voltage (V IN ) has reached the upper reference voltage (V REFP ) (step S32: YES), the controller 7B switches from the suspend operation R111 to the resume operation R112. The controller 7B executes a resume operation R112 (step S33). In the resume operation R112, the controller 7B repeatedly executes the run-up operation M11 (step S33a) and the load drive operation M12 (step S33b).
  • the controller 7B obtains the voltage (V IN ) while executing the resume operation R112 (step S34).
  • the controller 7B determines whether the voltage (V IN ) has reached the lower reference voltage (V REFN ) (step S35).
  • the controller 7B obtains the voltage (V IN ) again (step S34).
  • the controller 7B repeats step S34 and step S35 until the voltage (V IN ) reaches the lower reference voltage (V REFN ).
  • step S35 When the controller 7B determines that the voltage (V IN ) has reached the lower reference voltage (V REFN ) (step S35: YES), the controller 7B determines whether the conditions for performing the refresh operation R12 are satisfied (step S36).
  • the condition for performing the refresh operation R12 may be, for example, that a predetermined time has elapsed.
  • the condition for performing the refresh operation R12 may be, for example, the occurrence of a predetermined temperature difference.
  • step S36 determines that the conditions for performing the refresh operation R12 are not satisfied (step S36: NO)
  • the controller 7B switches from the resume operation R112 to the suspend operation R111.
  • the controller 7B executes a suspend operation R111 (step S37).
  • the operation to obtain the voltage (V IN ) (step S31) is performed again.
  • the controller 7B repeatedly executes steps S31 to S37 until the conditions for executing the refresh operation R12 are met.
  • the operations from step S31 to step S37 correspond to the power extraction operation R11 (step S30).
  • step S36 determines that the conditions for performing the refresh operation R12 are satisfied (step S36: YES)
  • the controller 7B executes the refresh operation R12 (steps S41 to S44).
  • the controller 7B executes a standby operation R121 (step S41).
  • step S42 determines whether the voltage (V IN ) has converged (step S42).
  • step S42 determines that the voltage (Vs IN ) has not converged (step S42: NO)
  • step S42 determines that the voltage (V IN ) has converged (step S41: YES)
  • step S44 new upper reference voltages (V REFP ) and lower reference voltages (V REFN ) are obtained.
  • the controller 7B executes the suspend operation R111 (step S44) again.
  • the operation to obtain the voltage (V IN ) (step S31) is performed again.
  • the reference voltage generation section 75 includes a first input terminal 75T1, a second input terminal 75T2, a first output terminal 75T3, and a second output terminal 75T4.
  • the first input terminal 75T1 receives a voltage (V BAT ).
  • the second input terminal 75T2 receives a voltage (V IN ).
  • the first output terminal 75T3 outputs the upper reference voltage (V REFP ).
  • the second output terminal 75T4 outputs the lower reference voltage (V REFN ).
  • the reference voltage generation section 75 includes a first capacitor 75C1, a second capacitor 75C2, and a third capacitor 75C3.
  • the reference voltage generation section 75 includes a first switch 75S1, a second switch 75S2, a third switch 75S3, a fourth switch 75S4, and a fifth switch 75S5.
  • the first to fifth switches 75S1 to 75S5 receive control signals ⁇ 75a to ⁇ 75c from the controller 7B.
  • the first capacitor 75C1 is connected between the second input terminal 75T2 and the reference voltage GND.
  • a first switch 75S1 is arranged between the second input terminal 75T2 and the reference voltage GND.
  • a first connection point is arranged between the first capacitor 75C1 and the first switch 75S1.
  • the second capacitor 75C2 is connected between the first input terminal 75T1 and the reference voltage GND.
  • a second switch 75S2 is arranged between the first input terminal 75T1 and the reference voltage GND.
  • a second connection point is arranged between the second capacitor 75C2 and the second switch 75S2.
  • the third capacitor 75C3 is connected between the first reference voltage GND and the second reference voltage GND.
  • a third switch 75S3 is arranged between the first reference voltage GND and the second reference voltage GND.
  • a third connection point is arranged between the third capacitor 75C3 and the third switch 75S3.
  • the first connection point is connected to the second connection point.
  • a fourth switch 75S4 is arranged between the first connection point and the second connection point.
  • the second connection point is connected to the third connection point.
  • a fifth switch 75S5 is arranged between the second connection point and the third connection point.
  • the first connection point is connected to the first output terminal 75T3.
  • the second connection point is connected to the second output terminal 75T4.
  • the reference voltage generating section 75 receives the following control signals ⁇ 75a to ⁇ 75c as a first operation.
  • a voltage (V IN ) is applied to the first capacitor 75C1.
  • a voltage (V BAT ) is applied to the second capacitor 75C2.
  • a voltage (0V) is applied to the third capacitor 75C3.
  • a voltage (V IN -V BAT +V E ) is generated at the first connection point.
  • a voltage (V BAT ) is generated at the second connection point.
  • a voltage (0V) is generated at the third connection point.
  • the reference voltage generating section 75 receives the following control signals ⁇ 75a to ⁇ 75c as a second operation.
  • Control signal ⁇ 75a (L) Control signal ⁇ 75b (H)
  • Control signal ⁇ 75c (L) According to the above control signals ⁇ 75a to ⁇ 75c, the first capacitor 75C1 and the second capacitor 75C2 are connected in series. As a result, a voltage (V BAT +V E /2) is generated at the first connection point and the second connection point. A voltage (0V) is generated at the third connection point.
  • the reference voltage generating section 75 receives the following control signals ⁇ 75a to ⁇ 75c as a third operation.
  • a voltage (V REFP ) is generated at the first connection point.
  • a voltage (a ⁇ (V BAT +V E /2)) is generated at the second connection point and the third connection point.
  • a is a number less than 1 (for example, 0.9).
  • ⁇ Operation example 2> As a second operation example, an operation for obtaining an upper reference voltage (V REFP ) and a lower reference voltage (V REFN ) by circuit operation and digital value calculation will be described.
  • the reference voltage generator 75 obtains an upper reference voltage (V REFP ).
  • the reference voltage generation section 75 converts the upper reference voltage (V REFP ) into a digital value using an AD converter. At this time, the charges accumulated in the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3 may be discharged. It is unnecessary to hold the upper reference voltage (V REFP ) and the upper reference voltage (V REFP ) using the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3. As a result, the result of the refresh operation R12 is not affected by the voltage holding characteristics of the first capacitor 75C1, the second capacitor 75C2, and the third capacitor 75C3.
  • the arithmetic unit calculates the lower reference voltage (V REFN ) using the upper reference voltage (V REFP ) which is a digital value.
  • the DA converter converts the upper reference voltage (V REFP ) and lower reference voltage (V REFN ), which are digital values, into the upper reference voltage (V REFP ) and lower reference voltage (V REFN ), which are analog values. Then, it is output to the second voltage determination section 74.
  • the second voltage determination section 74 includes a first comparator 74a, a first latch circuit 74b, a second comparator 74c, and a second latch circuit 74d.
  • the first comparator 74a compares the voltage (V IN ) with a lower reference voltage (V REFN ).
  • a voltage (V IN ) is applied to the input terminal (positive) of the first comparator 74a.
  • the lower reference voltage (V REFN ) is applied from the second output terminal of the reference voltage generation section 75 to the input terminal (negative) of the first comparator 74a.
  • the first latch circuit 74b receives the output of the first comparator 74a.
  • the first latch circuit 74b outputs a signal (L) when the voltage (V IN ) is greater than the lower reference voltage (V REFN ).
  • the first latch circuit 74b outputs a signal (H) when the voltage (V IN ) is smaller than the lower reference voltage (V REFN ).
  • the first latch circuit 74b outputs the control signal ⁇ 73 (SUSPEND).
  • the second comparator 74c compares the voltage (V IN ) with the upper reference voltage (V REFP ).
  • the upper reference voltage (V REFP ) is applied from the reference voltage generation section 75 to the input terminal (positive) of the second comparator 74c.
  • a voltage (V IN ) is applied to the input terminal (negative) of the second comparator 74c.
  • the second latch circuit 74d receives the output of the second comparator 74c.
  • the second latch circuit 74d outputs a signal (L) when the voltage (V IN ) is smaller than the upper reference voltage (V REFN ).
  • the second latch circuit 74d outputs a signal (H) when the voltage (V IN ) is higher than the upper reference voltage (V REFP ).
  • the second latch circuit 74d outputs the control signal ⁇ 74 (RESUME).
  • a power supply device 1B of the second embodiment includes a secondary battery 3, a power generating element 2 connected in series to the secondary battery 3, an input terminal 4a connected to the output of the power generating element 2, and a secondary battery.
  • the converter 4 includes an output terminal 4b connected to the output of the converter 3 and an output terminal 4b connected to the load device 9.
  • the converter 4 performs a power extraction operation R11 that drives the converter 4 to satisfy power extraction conditions determined based on the voltage (V E ) of the power generation element 2 and the voltage (V BAT ) generated by the secondary battery 3;
  • the refresh operation R12 for obtaining the power extraction conditions using the generated voltage (V E ) of No. 2 is repeated. According to the operation of the converter 4, even if external factors change, electric power can be suitably extracted from the power generation element 2.
  • the controller 7B performs a power extraction operation R11 that drives the converter 4 so that the voltage (V IN ) received by the converter 4 satisfies the power extraction conditions (V REFP , V REFN ) and the power extraction conditions (V REFP , V REFN ).
  • the refresh operation R12 obtained is repeated. According to such control, even if external factors change, electric power can be suitably extracted from the power generation element 2.
  • the current (I L ) output by the inductor 46 becomes the current (I OUT ) given to the load device 9 or the current given to the secondary battery 3 (I BACK ). It was either As shown in FIG. 20(a), the load output period K1 during which current (I OUT ) is applied from the converter 4 to the load device 9 overlaps with the charging period K2 during which current (I BACK ) is applied from the converter 4 to the secondary battery 3. I haven't.
  • the load output period K1 may coincide with the charging period K2.
  • This coincidence means that the timing to start the load output period K1 and the timing to start the charging period K2 match, and the timing to end the load output period K1 and the timing to end the charging period K2 match.
  • the length of the load output period K1 is the same as the length of the charging period K2.
  • a portion of the load output period K1 may overlap a portion of the charging period K2. In this case, at least one of the timing to start outputting and the timing to stop outputting does not match.
  • the load output period K1 and the charging period K2 are started simultaneously.
  • the charging period K2 ends while the load output period K1 continues.
  • an operation in which converter 4 supplies current (I OUT ) to load device 9 and current (I BACK ) to secondary battery 3 (duplicate output operation M11D), and current (I OUT ) from converter 4 to load device 9 occurs. ) (load output operation M12D) are executed in this order.
  • load output operation M12D are executed in this order. A case where such an operation is performed will be described as a fourth embodiment.
  • FIG. 21 is an example of a specific circuit of the power supply device 1C of the third embodiment.
  • the power supply device 1C includes a power generation element 2, a secondary battery 3, a converter 4C, and a controller 7. Since the power generation element 2 and the secondary battery 3 are the same as those in the first embodiment, detailed explanations will be omitted.
  • Converter 4C includes a switch element N1 on the inductor 46 side, a switch element P1 on the feedback side, and a switch element P2 on the output side, in place of the switch elements 47 and 48.
  • the switch elements N1, P1, and P2 are, for example, insulated gate field effect transistors (MOSFETs).
  • the switch element N1 on the inductor 46 side switches between an operation of providing the electric power accumulated in the inductor 46 to the load device 9 and an operation of stopping supply of the electric power to the load device 9.
  • Switch element N1 is provided between inductor 46 and output terminal 4d of converter 4. Specifically, the drain of the switch element N1 is connected to the inductor 46.
  • the source of the switch element N1 is connected to the output terminal 4d via the switch element P2.
  • the source of the switch element N1 is also connected to the secondary battery 3 via the switch element P1.
  • the gate of switch element N1 receives control signal ⁇ N1.
  • the switch element N1 is an n-channel MOFET. Switch element N1 connects inductor 46 to output terminal 4d of converter 4 when receiving control signal ⁇ N1 (H). Switch element N1 disconnects inductor 46 from output terminal 4d of converter 4 when receiving control signal ⁇ N1 (L).
  • the switch element P1 on the feedback side adjusts the magnitude of the current (I BACK ) provided from the inductor 46 to the secondary battery 3.
  • Switch element P1 is provided between switch element N1 and the output of secondary battery 3. Specifically, the drain of the switch element N1 is connected to the switch element N1. The source of the switch element N1 is connected to the output of the secondary battery 3.
  • the gate of switch element P1 receives control signal ⁇ P1.
  • Switch element P1 is a p-channel MOFET.
  • a current flows between the drain and the source according to the voltage level of the control signal ⁇ P1.
  • the switch element P1 causes a current (I BACK ) to flow from the inductor 46 to the secondary battery 3 in accordance with the voltage level of the control signal ⁇ P1.
  • the output side switch element P2 adjusts the magnitude of the current (I OUT ) provided from the inductor 46 to the load device 9.
  • Switch element P2 is provided between switch element N1 and output terminal 4d of converter 4.
  • the drain of the switch element N1 is connected to the switch element N1.
  • the source of switch element N1 is connected to output terminal 4d of converter 4.
  • the gate of switch element P2 receives control signal ⁇ P2.
  • Switch element P2 is a p-channel MOFET. When the switch element P2 receives the control signal ⁇ P2, a current flows between the drain and the source according to the voltage level of the control signal ⁇ P2. The switch element P2 causes a current (I OUT ) to flow from the inductor 46 to the load device 9 in accordance with the voltage level of the control signal ⁇ P2.
  • the operation of the power supply device 1C of the third embodiment will be described below.
  • the power supply device 1C can also perform five operations similarly to the power supply device 1 of the first embodiment.
  • the power supply device 1C performs normal operation M1C, high load operation M2C, no-load operation M3C, high voltage operation M4C, low voltage operation M5C, and M5CA.
  • FIG. 22 shows combinations of control signals and waveforms.
  • control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the normal operation M1C.
  • Control signal ⁇ 41 (PG).
  • Control signal ⁇ 42 (NG).
  • Control signal ⁇ N1 (PGB&NG).
  • Control signal ⁇ P1 (Vgp1a).
  • Control signal ⁇ P2 (Vgp2a).
  • FIG. 23(a) shows the connection configuration of the circuit when receiving control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
  • Switch element N1 receives both waveform PGB and waveform NG as control signal ⁇ N1.
  • the inductor 46 is connected to the secondary battery 3.
  • a current (I BACK ) is applied, and a current (I OUT ) is also applied to the load device 9 .
  • the switch element N1 provides current to the secondary battery 3 and load device 9 all at once, and stops providing current to the secondary battery 3 and load device 9 all at once.
  • the secondary battery 3 is supplied with a current (I BACK ) according to the voltage of the control signal ⁇ P1 received by the switch element P1.
  • Load device 9 is supplied with a current (I OUT ) according to the voltage of control signal ⁇ P2 received by switch element P2.
  • the ratio between the voltage (Vgp1a) of the control signal ⁇ P1 and the voltage (Vgp2a) of the control signal ⁇ P2 corresponds to the ratio of the current (I BACK ) applied to the secondary battery 3 and the current (I OUT ) applied to the load device 9.
  • the voltage (Vgp1a) of the control signal ⁇ P1 may be smaller than the voltage (Vgp1b) of the control signal ⁇ P2.
  • the current applied to the secondary battery 3 (I BACK ) is smaller than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the load device 9.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the high-load operation M2C.
  • Control signal ⁇ 41 OFF.
  • Control signal ⁇ 42 OFF).
  • Control signal ⁇ N1 ON).
  • Control signal ⁇ P1 OFF).
  • Control signal ⁇ P2 ON).
  • FIG. 23(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
  • the connection configuration in FIG. 23(b) is the same as the connection configuration in the high load operation M2 of the first embodiment (FIG. 12(a)), so detailed explanation will be omitted.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the no-load operation M3C.
  • Control signal ⁇ 41 (OFF).
  • Control signal ⁇ 42 (ON).
  • Control signal ⁇ N1 (ON).
  • Control signal ⁇ P1 (ON).
  • Control signal ⁇ P2 (OFF).
  • FIG. 24(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
  • the connection configuration in FIG. 24(a) is the same as the connection configuration in the no-load operation M3 of the first embodiment (FIG. 12(b)), so a detailed explanation will be omitted.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for high voltage operation M4C.
  • Control signal ⁇ 41 (PG).
  • Control signal ⁇ 42 (NG).
  • Control signal ⁇ N1 (PGB&NG).
  • Control signal ⁇ P1 (Vgp1b).
  • Control signal ⁇ P2 (Vgp2b).
  • FIG. 24(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
  • the connection configuration in FIG. 24(b) is the same as that of the normal operation M1C shown in FIG. 23(a).
  • the magnitude relationship between the voltage of the control signal ⁇ P1 and the voltage of the control signal ⁇ P2 when the high voltage operation M4C is performed is different from the magnitude relationship between the voltage of the control signal ⁇ P1 and the voltage of the control signal ⁇ P2 when the normal operation M1C is performed.
  • the voltage of the control signal ⁇ P1 may be higher than the voltage of the control signal ⁇ P2 (Vgp2b).
  • the current applied to the secondary battery 3 (I BACK ) is larger than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the secondary battery 3.
  • control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for low voltage operation M5C.
  • Control signal ⁇ 41 ON).
  • Control signal ⁇ 42 OFF.
  • Control signal ⁇ N1 ON).
  • Control signal ⁇ P1 ON).
  • Control signal ⁇ P2 ON).
  • FIG. 25(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
  • the connection configuration in FIG. 25(a) is the same as the connection configuration in the low voltage operation M5 of the first embodiment (FIG. 11(a)), so a detailed explanation will be omitted.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2 for the low voltage operation M5CA of the modified example.
  • Control signal ⁇ 41 OFF.
  • Control signal ⁇ 42 OFF).
  • Control signal ⁇ N1 ON).
  • Control signal ⁇ P1 OFF).
  • Control signal ⁇ P2 ON).
  • Control signal ⁇ 81 ON).
  • FIG. 25(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N1, ⁇ P1, and ⁇ P2.
  • the connection configuration in FIG. 25(b) is the same as the connection configuration (FIG. 11(b)) for the low voltage operation M5C of the first embodiment, so a detailed explanation will be omitted.
  • FIG. 26 is an example of a specific circuit of the power supply device 1D according to the fourth embodiment.
  • Power supply device 1D includes a power generation element 2, a secondary battery 3, a converter 4D, and a controller 7. Since the power generation element 2 and the secondary battery 3 are the same as those in the first embodiment, detailed explanations will be omitted.
  • Converter 4D includes a first switch element N2 on the feedback side, a switch element N3 on the inductor 46 side, a second switch element P3 on the feedback side, and a switch element P4 on the output side in place of the switch elements 47 and 48.
  • Switch elements N2, N3, P3, and P4 are, for example, insulated gate field effect transistors (MOSFETs).
  • the first switch element N2 on the feedback side switches between an operation of supplying the electric power accumulated in the inductor 46 to the secondary battery 3 and an operation of stopping supply of the electric power to the secondary battery 3.
  • Switch element N2 is provided between inductor 46 and secondary battery 3.
  • the drain of switch element N2 is connected to inductor 46.
  • the source of the switch element N2 is connected to the secondary battery 3 via the switch element P3.
  • the gate of the first switch element N2 receives a control signal ⁇ N2.
  • the switch element N2 is an n-channel MOFET. Switch element N2 connects inductor 46 to secondary battery 3 when receiving control signal ⁇ N2 (H). Switch element N2 disconnects inductor 46 from secondary battery 3 when receiving control signal ⁇ N2 (L).
  • the switch element N3 on the inductor 46 side switches between an operation of supplying the electric power accumulated in the inductor 46 to the load device 9 and an operation of stopping supply of the electric power to the load device 9.
  • Switch element N3 is provided between inductor 46 and output terminal 4d of converter 4 via switch element P4.
  • the drain of switch element N3 is connected to inductor 46.
  • the source of switch element N3 is connected to output terminal 4d of converter 4 via switch element P4.
  • the gate of switch element N3 receives control signal ⁇ N3.
  • the switch element N3 is an n-channel MOFET. Switch element N3 connects inductor 46 to load device 9 when receiving control signal ⁇ N3 (H). Switch element N3 disconnects inductor 46 from secondary battery 3 when receiving control signal ⁇ N3 (L).
  • the second switch element P3 on the feedback side adjusts the magnitude of the current (I BACK ) provided from the inductor 46 to the secondary battery 3.
  • the second switch element P3 is provided between the first switch element N2 and the output of the secondary battery 3.
  • the drain of the second switch element P3 is connected to the first switch element N2.
  • the source of the second switch element P3 is connected to the output of the secondary battery 3.
  • the gate of the second switch element P3 receives the control signal ⁇ P3.
  • the second switch element P3 is a p-channel MOFET.
  • the second switch element P3 receives the control signal ⁇ P3, a current flows between the drain and the source according to the voltage level of the control signal ⁇ P3.
  • the second switch element P3 causes a current (I BACK ) to flow from the inductor 46 to the secondary battery 3 in accordance with the voltage level of the control signal ⁇ P3.
  • the output side switch element P4 adjusts the magnitude of the current (I OUT ) provided from the inductor 46 to the load device 9.
  • Switch element P4 is provided between switch element N3 and output terminal 4d of converter 4.
  • the drain of switch element P4 is connected to switch element N3.
  • the source of switch element P4 is connected to output terminal 4d of converter 4.
  • the gate of switch element P4 receives control signal ⁇ P4.
  • Switch element P4 is a p-channel MOFET. When the switch element P4 receives the control signal ⁇ P4, a current flows between the drain and the source according to the voltage level of the control signal ⁇ P4. The switch element P4 causes a current (I OUT ) to flow from the inductor 46 to the load device 9 in accordance with the voltage level of the control signal ⁇ P4.
  • the operation of the power supply device 1D according to the third embodiment will be described below.
  • the power supply device 1D can also perform five operations similarly to the power supply device 1 of the first embodiment.
  • the power supply device 1D performs a normal operation M1D, a high load operation M2D, a no-load operation M3D, a high voltage operation M4D, and a low voltage operation M5D and M5DA.
  • FIG. 27 shows combinations of control signals and waveforms.
  • Control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the normal operation M1D.
  • Control signal ⁇ 41 PG
  • Control signal ⁇ 42 NG
  • Control signal ⁇ N2 PGB
  • Control signal ⁇ N3 PGB&NG
  • Control signal ⁇ P3 Vgp3a
  • Control signal ⁇ P4 Vgp4a).
  • the normal operation M1D includes a duplicate output operation M11D and a load output operation M12D.
  • the duplicate output operation M11D and the load output operation M12D correspond to the output operation shown in FIG. 20(c).
  • FIG. 28(a) shows a circuit connection configuration for the duplicate output operation M11D.
  • the first switch element 41 receiving the control signal ⁇ 41 (PG:L) connects the input terminal 4a of the converter 4 to the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (NG:L) disconnects the inductor 46 from the reference voltage GND.
  • the switch element N2 that receives the control signal ⁇ N2 (PGB:H) connects the inductor 46 to the secondary battery 3.
  • Switch element N3 that receives control signal ⁇ N3 (PGB:H, NG:L) connects inductor 46 to load device 9.
  • the load device 9 is provided with a current (I OUT ) according to the control signal ⁇ P4 (Vgp4a) received by the switch element P4.
  • the secondary battery 3 is supplied with a current (I BACK ) according to the control signal ⁇ P3 (Vgp3a) received by the switch element P3.
  • the overlapping output operation M11D the period in which the current (I OUT ) is applied to the load device 9 and the period in which the current (I BACK ) is applied to the secondary battery 3 overlap.
  • FIG. 28(b) shows the circuit connection configuration when the load output operation M12D is performed.
  • the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (NG:H) connects the inductor 46 to the reference voltage GND.
  • the switch element N2 that receives the control signal ⁇ N2 (PGB:L) disconnects the inductor 46 from the secondary battery 3.
  • Switch element N3 that receives control signal ⁇ N3 (PGB:L, NG:H) connects inductor 46 to load device 9.
  • the load device 9 is provided with a current (I OUT ) according to the control signal ⁇ P4 (Vgp4a) received by the switch element P4. No current (I BACK ) is applied to the secondary battery 3 .
  • the period in which the current (I OUT ) is applied to the load device 9 does not overlap with the period in which the current (I BACK ) is applied to the secondary battery 3.
  • the voltage of the control signal ⁇ P3 may be lower than the voltage of the control signal ⁇ P4 (Vgp4b).
  • the current applied to the secondary battery 3 (I BACK ) is smaller than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the load device 9.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the high-load operation M2D.
  • Control signal ⁇ 41 (OFF).
  • Control signal ⁇ 42 (OFF).
  • Control signal ⁇ N2 (OFF).
  • Control signal ⁇ N3 (ON).
  • Control signal ⁇ P3 (OFF).
  • Control signal ⁇ P4 (ON).
  • FIG. 29(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
  • the connection configuration in FIG. 29(a) is the same as the connection configuration in the high load operation M2 of the first embodiment (FIG. 12(a)), so a detailed explanation will be omitted.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the no-load operation M3D.
  • Control signal ⁇ 41 (OFF).
  • Control signal ⁇ 42 (ON).
  • Control signal ⁇ N2 (ON).
  • Control signal ⁇ N3 (OFF).
  • Control signal ⁇ P3 (ON).
  • Control signal ⁇ P4 (OFF).
  • FIG. 29(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4. Since the connection configuration in FIG. 29(a) is the same as the connection configuration in the no-load operation M3 of the first embodiment (FIG. 12(b)), detailed explanation will be omitted.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for high voltage operation M4D.
  • Control signal ⁇ 41 (PG).
  • Control signal ⁇ 42 (NG).
  • Control signal ⁇ N2 (PGB&NG).
  • Control signal ⁇ N3 (PGB).
  • Control signal ⁇ P3 (Vgp3b).
  • Control signal ⁇ P4 Vgp4b).
  • FIGS. 30(a) and 30(b) show the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
  • the high voltage operation M4D includes a duplicate output operation M41D and a charging operation M42D.
  • FIG. 30(a) shows a circuit connection configuration for the duplicate output operation M41D.
  • the first switch element 41 receiving the control signal ⁇ 41 (PG:L) connects the input terminal 4a of the converter 4 to the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (NG:L) disconnects the inductor 46 from the reference voltage GND.
  • the switch element N2 that receives the control signal ⁇ N2 (PGB:H, NG:L) connects the inductor 46 to the secondary battery 3.
  • Switch element N3, which has received control signal ⁇ N3 (PGB:H) connects inductor 46 to load device 9.
  • the secondary battery 3 is given a current (I BACK ) according to the control signal ⁇ P3 (Vgp3b) received by the switch element P3.
  • Load device 9 is supplied with a current (I OUT ) according to control signal ⁇ P4 (Vgp4b) received by switch element P4.
  • the overlapping output operation M41D the period in which the current (I OUT ) is applied to the load device 9 and the period in which the current (I BACK ) is applied to the secondary battery 3 overlap.
  • FIG. 30(b) shows a circuit connection configuration during charging operation M42D.
  • the first switch element 41 receiving the control signal ⁇ 41 (PG:H) disconnects the input terminal 4a of the converter 4 from the inductor 46.
  • the second switch element 42 receiving the control signal ⁇ 42 (NG:H) connects the inductor 46 to the reference voltage GND.
  • the switch element N2 that receives the control signal ⁇ N2 (PGB:L, NG:H) connects the inductor 46 to the secondary battery 3.
  • Switch element N3, which has received control signal ⁇ N3 (PGB:L) disconnects inductor 46 from load device 9. As a result, no current (I OUT ) is applied to the load device 9.
  • the secondary battery 3 is supplied with a current (I BACK ) according to the control signal ⁇ P3 (Vgp3b) received by the switch element P3.
  • the period in which the current (I BACK ) is applied to the secondary battery 3 does not overlap with the period in which the current (I OUT ) is applied to the load device 9 .
  • control signal ⁇ P3 may be higher than the voltage of control signal ⁇ P4 (Vgp4b).
  • the current applied to the secondary battery 3 (I BACK ) is larger than the current applied to the load device 9 (I OUT ). A large amount of current is supplied to the secondary battery 3.
  • control signal output section 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the low voltage operation M5D.
  • Control signal ⁇ 41 ON).
  • Control signal ⁇ 42 OFF).
  • Control signal ⁇ N2 ON).
  • Control signal ⁇ N3 ON).
  • Control signal ⁇ P3 ON).
  • Control signal ⁇ P4 ON).
  • FIG. 31(a) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
  • the connection configuration in FIG. 29(a) is the same as the connection configuration in the low voltage operation M5 of the first embodiment (FIG. 11(a)), so detailed explanation will be omitted.
  • the control signal output unit 73 outputs the following combinations as control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4 for the low voltage operation M5DA of the modified example.
  • Control signal ⁇ 41 (OFF).
  • Control signal ⁇ 42 (OFF).
  • Control signal ⁇ N2 (OFF).
  • Control signal ⁇ N3 (ON).
  • Control signal ⁇ P3 (OFF).
  • FIG. 31(b) shows the connection configuration of the circuit when receiving the above control signals ⁇ 41, ⁇ 42, ⁇ N2, ⁇ N3, ⁇ P3, and ⁇ P4.
  • the connection configuration in FIG. 31(b) is the same as the connection configuration (FIG. 11(b)) for the low voltage operation M5A of the first embodiment, so a detailed explanation will be omitted.
  • the power supply device of the present invention is not limited to the configuration and operation of the power supply device 1 of the first embodiment and the power supply device 1B of the second embodiment.
  • FIG. 32 shows the configuration of a power supply device 1E of a first modification.
  • the power supply device 1E includes capacitors 53 and 534 instead of the capacitor 51.
  • the capacitors 53 and 54 may be considered to be the capacitor 51 of the first embodiment divided into two capacitors.
  • the power supply device 1E includes several nodes H1, H2, H3, and H4.
  • the node H1 is provided on the wiring that connects the positive electrode of the secondary battery 3 to the power generation element 2.
  • Node H2 is provided on the wiring that connects output terminal 4c of converter 4 to the negative electrode of secondary battery 3.
  • Node H3 is provided on the wiring that connects power generation element 2 to input terminal 4a of converter 4.
  • Node H4 is provided on the wiring that connects output terminal 4b of converter 4 to node H1.
  • Capacitor 53 is provided between node H3 and node H4.
  • Capacitor 54 is provided between node H2 and node H4.
  • Capacitor 53 is connected in series to capacitor 54 via node N4.
  • FIG. 33 shows the configuration of a power supply device 1F according to a second modification.
  • the power supply device 1F includes a power generation element 2F instead of the power generation element 2.
  • the power generating element 2F includes a power generating body 22F, a full wave rectifier 2S, and a capacitor 24.
  • the full-wave rectifier 2S is composed of four diodes 25A, 25B, 25C, and 25D.
  • the power generator 22F receives external energy and generates AC power.
  • the full-wave rectifier 2S performs full-wave rectification on the alternating current power generated by the power generator 22F.
  • the capacitor 24 holds the rectified DC power output from the full-wave rectifier 2S.
  • the electric power generated by the power generation element 2F is AC, but the electric power given to the converter 4 is DC.
  • FIG. 34 shows the configuration of a power supply device 1G according to a third modification.
  • the power supply device 1G includes two capacitors 53 and 54 like the power supply device 1E of the first modification.
  • the power supply device 1G includes a power generation element 2G having a power generation body 22G that generates AC power, as in the second modification.
  • the power supply device 1E of the first modification example, the power supply device 1F of the second modification example, and the power supply device 1G of the third modification example perform operations according to changes in external factors, similar to the power supply device 1 of the first embodiment. It's fine.
  • the power supply device 1E of the first modification example, the power supply device 1F of the second modification example, and the power supply device 1G of the third modification example described above respond to changes in external factors similarly to the power supply device 1 of the first embodiment. and select the appropriate action.
  • the power supply device 1E of the first modification, the power supply device 1F of the second modification, and the power supply device 1G of the third modification may perform operations that satisfy the power extraction conditions in the same manner as the power supply device 1B of the second embodiment. .
  • the power supply device 1E of the first modification example, the power supply device 1F of the second modification example, and the power supply device 1G of the third modification example, as well as the power supply device 1B of the second embodiment are able to withstand changes in external factors. Even if there is, electric power can be suitably extracted from the power generation element 2E.
  • the power supply device 1E of the first modification, the power supply device 1F of the second modification, and the power supply device 1G of the third modification have a converter 4C of the third embodiment (see FIG. 21) as a specific circuit configuration of the converter 4. may be adopted, and the same operation as the power supply device 1C of the third embodiment may be performed.
  • the power supply device 1E may employ the converter 4D of the fourth embodiment (see FIG. 26) as a specific circuit configuration of the converter 4, and may perform the same operation as the power supply device 1D of the fourth embodiment.
  • the power supply device 1E of the first modification, the power supply device 1F of the second modification, and the power supply device 1G of the third modification select the mode of output from the inductor 46 to the secondary battery 3 and the load device 9. be able to.
  • An additional circuit 100 shown in FIG. 35 may be provided between the power supply device 1 and the load device 9.
  • the additional circuit 100 includes a switch element 101 , a capacitor 102 , a secondary battery 103 , a first detection circuit section 104 , and a second detection circuit section 105 .
  • the switch element 101 is provided in the wiring that connects the power supply device 1 to the load device 9.
  • the switch element 101 is, for example, a p-type MOSFET.
  • the first detection circuit section 104 is arranged between the wiring connecting the power supply device 1 to the switch element 101 and the reference voltage GND.
  • the first detection circuit section 104 includes a resistance element 104a and a first comparator 104b.
  • the resistance element 104a is arranged between the wiring connecting the power supply device 1 to the switch element 101 and the reference voltage GND.
  • a first input terminal of the first comparator 104b is connected to a wiring that connects the resistance element 104a to the reference voltage GND.
  • a second input terminal of the first comparator 104b receives a limiting voltage (V S1 ).
  • the first comparator 104b outputs a control signal ⁇ 104 (H) when the voltage (V OUT ) output by the power supply device 1 becomes larger than the limit voltage (V S1 ).
  • Control signal ⁇ 104 (H) is given to switch element 101.
  • the switch element 101 that receives the control signal ⁇ 104 (H) disconnects the power supply device 1 from the load device 9.
  • the first detection circuit section 104 suppresses excessive voltage from being output from the power supply device 1.
  • the capacitor 102 is arranged between the wiring connecting the power supply device 1 to the switch element 101 and the reference voltage GND.
  • the secondary battery 103 is arranged between the wiring connecting the switch element 101 to the load device 9 and the reference voltage GND.
  • the second detection circuit section 105 is arranged between the wiring connecting the converter 4 to the load device 9 and the reference voltage GND.
  • the second detection circuit section 105 includes a second comparator 105a and a third comparator 105b.
  • a first input terminal of the second comparator 105a receives a voltage (V BAT_LOAD ).
  • a second input terminal of the second comparator 105a receives a limiting voltage (V S2 ).
  • the second comparator 105a outputs a control signal ⁇ 105a (H) when the voltage (V BAT_LOAD ) becomes larger than the limit voltage (V S2 ).
  • the switch element 101 that receives the control signal ⁇ 105a (H) disconnects the power supply device 1 from the load device 9. This suppresses excessive current from being applied to the secondary battery 103 from the power supply device 1.
  • a first input terminal of the third comparator 105b receives a voltage (V BAT_LOAD ).
  • the second input terminal of the third comparator 105b receives the limiting voltage (V S2 ).
  • the third comparator 105b outputs a control signal ⁇ 105b (H) when the voltage (V BAT_LOAD ) becomes smaller than the limit voltage (V S2 ).
  • the switch element 101 that receives the control signal ⁇ 105b (H) connects the power supply device 1 to the load device 9. As a result, the voltage (V BATT_LOAD ) output by the secondary battery 103 is suppressed from dropping too much.
  • the second detection circuit unit 105 keeps the voltage (V BAT_LOAD ) of the secondary battery 103 within a predetermined range.
  • the power supply device of the present invention includes [1] “a power supply device that supplies power to a load device, which includes a secondary battery, a power generation element connected in series to the secondary battery, and a power generation element connected to the power generation element. a converter having a first terminal connected to the load device, a second terminal connected to the load device, and a third terminal connected to the secondary battery; /or a power supply device that generates the electric power in at least one of the second terminal and the third terminal based on the voltage generated by the power generation element.
  • the power supply device of the present invention provides the power supply device according to the present invention, wherein [2] “The converter performs an accumulation drive operation when the required power of the load device is larger than a first threshold current, and when the converter is in the accumulation drive operation, the converter: Electric power is supplied to the load device by accumulating the electric power received from the first terminal in an energy accumulating element of the converter and generating the energy accumulated in the energy accumulating element as electric power to the second terminal. , the power supply device according to [1] above.”
  • the power supply device of the present invention includes [3] “The converter performs a charging operation when the required power of the load device is smaller than a second threshold current, and when the converter is in the charging operation, the converter The power supply device according to [1] or [2] above, which supplies power to the secondary battery by generating energy stored in an energy storage element of the battery as the power to the third terminal. Good too.
  • the power supply device of the present invention includes [4] “The converter selectively performs a load driving operation and a charging operation, and when the converter is in the load driving operation, the converter uses an energy storage element that the converter has. The converter supplies power to the load device by generating the energy stored in the energy storage element as the power to the second terminal, and when the converter is in the charging operation, the converter converts the energy stored in the energy storage element into the power.
  • the power supply device according to any one of [1] to [3] above, which supplies power to the secondary battery by generating power to the third terminal.
  • the power supply device of the present invention includes [5] "The converter selectively performs a storage drive operation and a charging operation, and when the converter is in the storage drive operation, the converter charges the energy storage element of the converter with the The electric power received from the first terminal is stored, and the energy stored in the energy storage element is generated as the electric power to the second terminal to supply electric power to the load device.
  • the converter provides power to the secondary battery by generating the energy stored in the energy storage element as the power to the third terminal, as described in any one of [1] to [4] above. power supply unit.”
  • the power supply device of the present invention provides the power supply device according to [6] “The converter performs a direct supply operation, and when the converter is in the direct supply operation, the converter connects the second terminal to the third terminal.
  • the power supply device according to any one of [1] to [5] above, which provides power from a secondary battery to the load device.
  • the power supply device of the present invention further includes [7] “a short circuit capable of connecting the output of the secondary battery and the input of the converter, the short circuit connecting the secondary battery to the The power source according to any one of [1] to [6] above, wherein the power supply switches between a mode in which the secondary battery is connected to the converter and a mode in which the secondary battery is directly connected to the converter without going through the power generation element. device.”
  • the period during which the converter supplies power to the load device via the second terminal is the period during which the converter supplies power to the secondary battery via the third terminal.
  • the period during which the converter supplies power to the load device via the second terminal is the period during which the converter supplies power to the secondary battery via the third terminal.
  • the converter supplies power to the secondary battery via the three terminals.
  • the power supply device according to any one of [1] to [7] above, which overlaps with a part of the period in which the power supply is provided.
  • the power supply device of the present invention includes [11] “The converter drives the converter so as to satisfy a power extraction condition determined based on the voltage generated by the power generating element and the voltage generated by the secondary battery; The power supply device according to any one of [1] to [10] above, which repeats the operation of obtaining the power extraction condition using the voltage generated by the power generation element.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

電源装置は、二次電池と、二次電池に対して直列に接続された発電素子と、発電素子の出力に接続された入力端子と、二次電池の出力に接続された出力端子と負荷装置に接続された出力端子とを有するコンバータと、を備える。コンバータは、負荷装置の要求電力及び/又は発電素子の発生電圧に基づいて、出力端子及び出力端子の少なくとも一方に電力を与える。

Description

電源装置
 本発明は、電源装置に関する。
 将来の社会システムに利用される技術のひとつとしてモノのインターネット(IoT:Internet of Things)がある。IoT技術では、室内及び室外を問わず温度、圧力、振動、化学物質及び交通量などの情報を自立的にセンサで収集する。収集した情報は、インターネットを介してクラウドに転送される。転送されたデータは、ビッグデータとして解析される。解析の目的はさまざまである。例えば、解析の目的として、センサに異常が発生しているか否かの判断が例示できる。センサに異常が発生していると判断された場合には、センサの動作を止めるといった対応がなされる。例えば、解析の目的として、センサを所定の条件で動作させることも例示できる。解析の目的として、外部環境の変化に応じて、適切なセンサの動作条件をフィードバックすることもある。IoT技術は、モノ同士が基本的にはヒトを介さずに情報の収集、情報の伝達及び情報のフィードバックを行う。
 IoT用集積回路システムは、環境変数を測定し、測定によって得た情報をインターネットに送る重要な装置である。IoT用集積回路システムは、Edge端末とも称される。Edge端末が用いられる環境によっては、Edge端末は、十分な電力の供給を受けることが難しい場合がある。Edge端末は、そもそも電力の供給を受けることができない場合もある。Edge端末がバッテリなどの電源を備えている場合であっても、バッテリなどの電源の交換作業には制限が課される場合もある。
 制限された電力供給の条件のもとで、Edge端末を動作させ続けるための技術として、エネルギ・ハーベスティング技術が挙げられる。エネルギ・ハーベスティング技術は、発電素子が環境エネルギを収穫することによって、電力を得る。例えば、発電素子は、太陽光、熱、振動または電波を電力に変換する。
 発電素子が発生する電力は極めて小さい。従って、発電素子が発生する電力は、そのままではEdge端末のような負荷装置が要求する電力を満たすことができない。そこで、発電素子が発生する電力を利用して、負荷装置が要求する電力を出力する電源技術が検討されている。
 非特許文献1、2は、環境エネルギである温度差を利用して発電する素子を利用した電源技術を開示する。非特許文献1、2は、素子から効率よく電力を取り出すための電源回路と電源回路の動作条件とを提案する。
Imet al., IEEE JSSC, vol.47, no.12, pp.3055, Dec.2012. Caoet al., IEEE JSSC, vol.54, no.12, pp.3362, Dec.2019.
 発電素子から効率よく電力を取り出すための条件は、発電素子が受ける環境エネルギの状態に左右される。その一方で、発電素子が受ける環境エネルギの状態は、人間が制御できない。従って、発電素子が受ける環境エネルギの状態は、さまざまに変化する。発電素子を含む電源装置は、環境エネルギの変化又は負荷装置が要求する電力の変化といった外部要因の変化に応じて、適切な動作を選択する必要があった。
 本発明は、外部要因の変化に応じて適切な動作を選択できる電源装置を与える。
 本発明の一形態は、負荷装置に電力を与える電源装置である。電源装置は、二次電池と、二次電池に対して直列に接続された発電素子と、発電素子に接続された第1端子と、負荷装置に接続された第2端子と、二次電池に接続された第3端子と、を有するコンバータと、を備える。コンバータは、負荷装置の要求電力及び/又は発電素子の発生電圧に基づいて、第2端子及び第3端子の少なくとも一方に電力を発生させる。
 電源装置は、負荷装置が要求する電力及び第2電圧に基づく計測電圧の少なくとも一方を利用して制御信号を発生する。第2電圧は、外部環境の変化に応じて増減する。従って、負荷装置が要求する電力及び第2電圧に基づく計測電圧の少なくとも一方を利用した制御によれば、外部要因の変化に応じて、電源装置を動作させることができる。
 上記の電源装置のコンバータは、負荷装置の要求電力が第1閾値電流より大きいときに、蓄積駆動動作を実行してよい。蓄積駆動動作であるときのコンバータは、コンバータが有するエネルギ蓄積素子に第1端子から受けた電力を蓄積すると共に、エネルギ蓄積素子に蓄積されたエネルギを電力として第2端子へ発生させることによって負荷装置に電力を与えてよい。このようなコンバータの動作によれば、エネルギ蓄積素子にエネルギを蓄積する動作と、負荷装置に電力を与える動作と、並行して実行することができる。
 上記の電源装置のコンバータは、負荷装置の要求電力が第2閾値電流より小さいときに、充電動作を実行してよい。充電動作であるときのコンバータは、コンバータが有するエネルギ蓄積素子に蓄積されたエネルギを電力として第3端子へ発生させることによって二次電池に電力を与えてよい。このようなコンバータの動作によれば、二次電池に電力を与える動作を実行することができる。
 上記の電源装置のコンバータは、負荷駆動動作と、充電動作と、を選択的に実行してよい。負荷駆動動作であるときのコンバータは、コンバータが有するエネルギ蓄積素子に蓄積されたエネルギを電力として第2端子へ発生させることによって負荷装置に電力を与えてよい。充電動作であるときのコンバータは、エネルギ蓄積素子に蓄積されたエネルギを電力として第3端子へ発生させることによって二次電池に電力を与えてよい。このようなコンバータの動作によれば、エネルギ蓄積素子にエネルギを蓄積する動作と、負荷装置に電力を与える動作と、二次電池に電力を与える動作と、を選択的に実行することができる。
 上記の電源装置のコンバータは、蓄積駆動動作と充電動作とを選択的に実行してよい。蓄積駆動動作であるときのコンバータは、コンバータが有するエネルギ蓄積素子に第1端子から受けた電力を蓄積すると共に、エネルギ蓄積素子に蓄積されたエネルギを電力として第2端子へ発生させることによって負荷装置に電力を与えてよい。充電動作であるときのコンバータは、エネルギ蓄積素子に蓄積されたエネルギを電力として第3端子へ発生させることによって二次電池に電力を与えてよい。このようなコンバータの動作によれば、エネルギ蓄積素子にエネルギを蓄積すると共に負荷装置に電力を与える動作と、二次電池に電力を与える動作と、を選択的に実行することができる。
 上記の電源装置のコンバータは、直接供給動作を実行してもよい。直接供給動作であるときのコンバータは、第2端子を第3端子に接続することによって、二次電池の電力を負荷装置に与えてよい。このようなコンバータの動作によれば、二次電池の電力を、発電素子及びエネルギ蓄積素子を介することなく負荷装置に与えることができる。
 上記の電源装置のコンバータは、二次電池の出力とコンバータの入力とを接続可能な短絡回路をさらに備えてよい。短絡回路は、発電素子を介して二次電池をコンバータに接続する態様と、発電素子を介することなく二次電池をコンバータに直接に接続する態様と、を相互に切り替えてよい。このようなコンバータの動作によれば、二次電池の電力を、発電素子を介することなく負荷装置が要求する電圧を負荷装置に与えることができる。
 コンバータが第2端子を介して負荷装置に電力を与える期間は、コンバータが第3端子を介して二次電池に電力を与える期間と重複しなくてもよい。
 コンバータが第2端子を介して負荷装置に電力を与える期間は、コンバータが第3端子を介して二次電池に電力を与える期間と一致しなくてもよい。
 コンバータが第2端子を介して負荷装置に電力を与える期間の一部は、コンバータが3端子を介して二次電池に電力を与える期間の一部と重複しなくてもよい。
 上記の電源装置のコンバータは、発電素子の発生電圧及び二次電池が発生する電圧に基づいて決まる電力取出条件を満たすようにコンバータを駆動させる動作と、発電素子の発生電圧を利用して、電力取出条件を得る動作と、を繰り返してもよい。このようなコンバータの動作によれば、外部要因の変化した場合であっても、発電素子から電力を好適に取り出すことができる。
 本発明の別の形態も、負荷装置に電力を与える電源装置である。別の形態の電源装置は、二次電池と、二次電池に対して直列に接続された発電素子と、発電素子に接続された第1端子と、負荷装置に接続された第2端子と、二次電池に接続された第3端子と、を有するコンバータと、を備える。コンバータは、発電素子の発生電圧及び二次電池が発生する電圧に基づいて決まる電力取出条件を満たすようにコンバータを駆動させる動作と、発電素子の発生電圧を利用して、電力取出条件を得る動作と、を繰り返す。このようなコンバータの動作によれば、外部要因の変化した場合であっても、発電素子から電力を好適に取り出すことができる。
 本発明によれば、外部要因の変化に応じて適切な動作を選択できる電源装置が提供される。
図1は、第1実施形態の電源装置の機能ブロック図である。 図2(a)及び図2(b)は、図1に示す電源装置の動作原理を説明する図である。 図3は、図1に示す電源装置の回路図である。 図4は、図1に示す電源装置が備えるコントローラの機能ブロック図である。 図5は、第1実施形態のコントローラの動作を示すフロー図である。 図6(a)は、制御信号のための波形を示す図である。図6(b)は、制御信号を生成する回路構成を例示する図である。 図7は、制御信号を説明するための表である。 図8(a)は、助走動作であるときの回路を示す図である。図8(b)は、負荷駆動動作であるときの回路を示す図である。図8(c)は、待機動作であるときの回路を示す図である。 図9は、通常動作であるときの電力の内訳を説明するための図である。 図10(a)は、蓄積駆動作であるときの回路を示す図である。図10(b)は、充電動作であるときの回路を示す図である。図10(c)は、待機動作であるときの回路を示す図である。 図11(a)は、高負荷動作であるときの回路を示す図である。図11(b)は、無負荷動作であるときの回路を示す図である。 図12(a)は、低電圧動作であるときの回路を示す図である。図12(b)は、低電圧動作であるときの変形例の回路を示す図である。 図13(a)は、発電素子から取り出す電力を説明するための第1例示である。図13(b)は、発電素子から取り出す電力を説明するための第2例示である。図13(c)は、発電素子から取り出す電力を説明するための第3例示である。 図14(a)は、MPPT動作を説明するための電圧の時間履歴である。図14(b)は、図14(a)の一部を拡大して示す電圧の時間履歴である。 図15は、第2実施形態の電源装置の機能ブロック図である。 図16(a)は、第2電圧判定部が出力する制御信号の例示である。図16(b)は、電力取出動作のための制御信号の例示である。図16(c)は、リフレッシュ動作のための制御信号の例示である。 図17は、第2実施形態のコントローラの動作を示すフロー図である。 図18(a)は、基準電圧発生部の回路の例示である。図18(b)は、コントローラが基準電圧発生部に与える制御信号の例示である。図18(c)は、基準電圧発生部の動作を説明するための表である。 図19は、第2電圧判定部の回路の例示である。 図20(a)は第1実施形態の電源装置における負荷装置への出力と二次電池への出力との関係を示す図である。図20(b)は第2実施形態の電源装置における負荷装置への出力と二次電池への出力との関係を示す図である。図20(c)は第3実施形態の電源装置における負荷装置への出力と二次電池への出力との関係を示す図である。 図21は、第2実施形態の電源装置の電源装置の回路図である。 図22は、第2実施形態の電源装置における制御信号を説明するための表である。 図23(a)は、第2実施形態の電源装置が行う通常動作であるときの回路を示す図である。図23(b)は、第2実施形態の電源装置が行う高負荷動作であるときの回路を示す図である。 図24(a)は、第2実施形態の電源装置が行う無負荷動作であるときの回路を示す図である。図24(b)は、第2実施形態の電源装置が行う高電圧動作であるときの回路を示す図である。 図25(a)は、第2実施形態の電源装置が行う低電圧動作であるときの回路を示す図である。図25(b)は、第2実施形態の電源装置が行う変形例の低電圧動作であるときの回路を示す図である。 図26は、第3実施形態の電源装置の電源装置の回路図である。 図27は、第3実施形態の電源装置における制御信号を説明するための表である。 図28(a)は、第3実施形態の電源装置が行う通常動作における重複出力動作であるときの回路を示す図である。図28(b)は、第3実施形態の電源装置が行う通常動作における負荷出力動作であるときの回路を示す図である。 図29(a)は、第3実施形態の電源装置が行う高負荷動作であるときの回路を示す図である。図29(b)は、第3実施形態の電源装置が行う無負荷動作であるときの回路を示す図である。 図30(a)は、第3実施形態の電源装置が行う高電圧動作における重複出力動作であるときの回路を示す図である。図30(b)は、第3実施形態の電源装置が行う高電圧動作における充電動作であるときの回路を示す図である。 図31(a)は、第3実施形態の電源装置が行う低電圧動作であるときの回路を示す図である。図31(b)は、第3実施形態の電源装置が行う変形例の低電圧動作のであるときの回路を示す図である。 図32は、第1変形例の電源装置の構成を示す図である。 図33は、第2変形例の電源装置の構成を示す図である。 図34は、第3変形例の電源装置の構成を示す図である。 図35は、電源装置に接続可能な追加回路の例示である。
 以下、添付図面を参照して、実施形態の電源装置を詳細に説明する。なお、図面の説明においては同一要素には同一符号を付し、重複する説明を省略する。
<第1実施形態>
 図1は、第1実施形態の電源装置1の機能ブロック図である。図1に示すように、電源装置1は、負荷装置9に対して電力(POUT)を与える。
 負荷装置9は、IoTを構成する装置であってよい。負荷装置9は、複数の電気素子を含む。負荷装置9は、電力(PLOAD)を消費する。電力(PLOAD)は、電圧(VLOAD)と、電流(ILOAD)との積によって定義できる。
 IoTを構成する装置として、例えば、周囲環境の計測を行うセンサが挙げられる。センサは、温度、湿度及び照度など所望の計測パラメータに関する計測値を得る。負荷装置9は、数ワット程度の電力(PLOAD)を要求する。例えば、負荷装置9が要求する電圧(VLOAD)は、3V程度である。電源装置1は、負荷装置9が要求するタイミングで、負荷装置9に所定の電力(POUT)を供給する。負荷装置9は、継続的に電源装置1に電力(POUT)を要求するものでなくてもよい。例えば、負荷装置9は、あらかじめ定められた時間間隔で周囲の温度を計測する。そして、負荷装置9は、無線ICなどを通じて計測した温度を送信する。このような動作では、負荷装置9は、温度計測及び通信が行われるタイミングで、電源装置1から電力(POUT)の供給を受ける。
 電源装置1は、主要な構成要素として、発電素子2と、二次電池3と、コンバータ4と、コントローラ7と、を有する。電源装置1は、必要に応じて上記の構成要素に加えて付加的な要素を含んでもよい。
 発電素子2は、外部エネルギを受けて、当該外部エネルギを電気エネルギに変換する。発電素子2は、外部エネルギを受けて電気エネルギを発生可能な種々の素子を用いてよい。
 発電素子2は、電圧(VEH)及び電流(IEH)を出力する。発電素子2の電圧(VEH)は、直流電圧であってもよい。発電素子2の電圧(VEH)は、交流電圧であってもよい。例えば、発電素子2が振動エネルギを電気エネルギに変換するものであるとき、発電素子2は、入力された振動の周波数に応じた周波数を有する交流電圧を出力する。
 直流電圧の発電素子としては、太陽光エネルギを利用した太陽電池及び温度差による電荷の偏りを利用した熱電変換素子などが挙げられる。交流電圧の発電素子としては、振動による双極子モーメントの乱れを利用した圧電素子、電磁誘導電圧を利用した振動素子、焦電効果を利用した焦電素子及び電波の受信によって発電するRF素子などが挙げられる。
 熱電変換素子は、もっともありふれたエネルギである熱エネルギを使用するという点で、今後、応用の範囲が広がっていく期待がある。熱電変換素子に用いられる材料として、無機半導体材料及び有機導電性高分子などが挙げられる。カーボンナノチューブ(CNT)を使った素子は、柔軟性(フレキシビリティ)を有し、軽量である。カーボンナノチューブ(CNT)を使った素子は、薄膜を使った素子である。従って、カーボンナノチューブ(CNT)を使った素子は、同一の環境でも他の材料よりも温度差をより大きく取れる構造を作ることができる。その結果、カーボンナノチューブ(CNT)を使った素子は、多様な環境に設置することができる。従って、カーボンナノチューブ(CNT)を使った素子は、応用範囲を広げることができる。
 カーボンナノチューブ(CNT)としては、単層カーボンナノチューブ(単層CNT)、及び、多層カーボンナノチューブ(多層CNT)を用いることができる。一例として、単層CNTを用いることが好ましい。CNTは、単層CNTまたは多層CNTをそれぞれ単独で用いてもよい。CNTは、単層CNT及び多層CNTを混合して用いてもよい。混合して用いる場合、単層CNTの含有割合は、50質量%以上であることが好ましい。混合して用いる場合、単層CNTの含有割合は、70質量%以上であることがより好ましい。混合して用いる場合、単層CNTの含有割合は、90質量%以上であることがさらに好ましい。単層CNTの平均直径は、0.7~15nmであってもよい。単層CNTは、ラマンスペクトルにおけるDバンドピーク強度に対するGバンドピーク強度の比(G/D比)が1以上20以下であることが好ましい。単層CNTは、合成ときにおける繊維状炭素ナノ構造体の平均長さが100μm以上であることが好ましい。単層CNTのBET比表面積は、600m/g以上であることが好ましい。単層CNTのBET比表面積は、800m/g以上であることがさらに好ましい。単層CNTのBET比表面積は、2500m/g以下であることが好ましい。単層CNTのBET比表面積は、1200m/g以下であることがさらに好ましい。
 単層CNTは、例えば、スーパーグロース法において、基材表面への触媒層の形成をウェットプロセスにより製造してよい。この製法によれば、効率的に単層CNTを製造することができる。なお、スーパーグロース法(国際公開第2006/011655号参照)とは、カーボンナノチューブ製造用の触媒層を表面に有する基材上に、原料化合物及びキャリアガスを供給して、化学的気相成長法(CVD法)によりCNTを合成する際に、系内に微量の酸化剤(触媒賦活物質)を存在させるものである。スーパーグロース法によれば、触媒層の触媒活性を飛躍的に向上させることが可能である。以下の説明では、スーパーグロース法により得られるカーボンナノチューブを「SGCNT」と称することがある。SGCNT(Super Growth Carbon nanotube)は、他のCNTに比べて、純度が高く、ドーピングの効果が高いため発電能力(ゼーベック係数)が大きいという特徴がある。SGCNTは、熱電変換素子としての適性が高い。SGCNTは、低コスト、材料純度が高い及びドーピングがしやすいという特徴がある。
 二次電池3は、充電動作及び放電動作を行う。二次電池3は、例えば、3Vまたは5Vといった直流の電圧(VBAT)を出力する。二次電池3が出力する電圧(VBAT)は、負荷装置9が要求する電圧(VLOAD)に対応してよい。例えば、負荷装置9が直流である3Vの電圧(VLOAD)を要求する場合には、二次電池3が出力する電圧(VBAT)は、少なくとも3V以上であってもよい。
 コンバータ4は、電力(PIN)を受ける。コンバータ4が受ける電力(PIN)は、電圧(VIN)と、電流(IIN)と、により定義できる。電圧(VIN)は、発電素子2の電圧(VEH)と二次電池3の電圧(VBAT)との和である。二次電池3、発電素子2及びコンバータ4は直列に接続される。従って、二次電池3が出力する電流は(IIN)である。発電素子2が出力する電流も(IIN)である。
 コンバータ4は、受けた電力(PIN)を負荷装置9が要求する電力(PLOAD)の態様に変換する。負荷装置9が要求する電力(PLOAD)の態様とは、例えば、負荷装置9が要求する電流(ILOAD)によって定義してもよい。例えば、コンバータ4は、例えば、電圧(VIN)を下げることによって電流(IIN)を、負荷装置9が要求する電流(ILOAD)と同じであるかそれよりも大きい電流(IOUT)まで増加させる。コンバータ4は、降圧型の電力変換器であってもよい。コンバータ4の具体的な回路構成は、後述する。
 コンバータ4は、負荷装置9または二次電池3の一方に選択的に電流を与える。コンバータ4は、第1動作、第2動作及び第3動作を相互に切り替え可能である。第1動作であるときにコンバータ4は、負荷装置9に電流(IOUT)を与えるが、二次電池3に電流(IBACK)を与えない。第2動作であるときにコンバータ4は、負荷装置9に電流(IOUT)を与えないが、二次電池3にフィードバック電流(IBACK)を与える。第3動作であるときにコンバータ4は、負荷装置9に電流(IOUT)の一部を与えるとともに、二次電池3に残りの部分をフィードバック電流(IBACK)として与える。
 コントローラ7は、コンバータ4のための制御信号φ41、φ42、φ47、φ48を出力する。コンバータ4は、複数のスイッチ素子を備えている。制御信号φ41、φ42、φ47、φ48は、スイッチ素子をオンまたはオフとするためのものである。
 次に、図2を参照しながら電源装置1の動作原理について説明する。
 図2(a)は、コンバータ4に入力される電力(PIN)を示す。電力(PIN)は、二次電池3に起因する電力(PBAT)と、発電素子2に起因する電力(PE_NET)と、の和である。
 二次電池3に起因する電力(PBAT)は、電流(IIN)と二次電池3の出力電圧(VBAT)との積である。図2(a)では、電力(PBAT)を矩形の領域の面積として示す。矩形の領域の横辺は、電流(IIN)を示す。矩形の領域の縦辺は、電圧(VBAT)を示す。
 発電素子2に起因する電力(PE_NET)は、電流(IIN)と発電素子2の出力電圧との積である。発電素子2が出力する電圧(VEH)は、発電体22が出力する電圧(V)から出力抵抗21に起因する電圧降下(R×IIN)を減じたもの(V-R×IIN)である。図2(a)では、電力(PE_NET)を矩形の領域の面積として示す。矩形の領域の横辺は、電流(IIN)を示す。矩形の領域の縦辺は、電圧(V-R×IIN)を示す。
 図2(b)は、コンバータ4が出力する電力(POUT)を示す。電力(POUT)は、二次電池3に戻す電力(PBACK)と、負荷装置9に提供される電力(POUT)と、により定義できる。負荷装置9に提供される電力(P)は、コンバータ4が出力する電力(POUT)から二次電池3に戻す電力(PBACK)を除いた残りの電力であると定義する。負荷装置9に提供される電力(POUT)は、電流(IOUT)と電圧(VOUT)との積である。
 仮に、コンバータ4の電力取出効率(η)が100%であるとする。この場合には、電力(PIN)の大きさと電力(POUT)の大きさとは互いに同じである。コンバータ4が出力する電力(POUT)から二次電池3に起因する電力(PBAT)と同じ大きさの電力(PBACK)を二次電池3に戻すことによって、実質的に二次電池3の電力消費をゼロとすることができる。
 コンバータ4が出力する電力(POUT)から二次電池3に起因する電力(PBAT)を除いた残余の電力は、負荷装置9に与えられる。残余の電力が負荷装置9が要求する電力(PLOAD)と等しいとき、負荷装置9を動作させることができる。余りの電力が負荷装置9が要求する電力(PLOAD)よりも大きいとき、余りの電力と電力(PLOAD)との差分を二次電池3にさらに戻すことができる。その結果、二次電池3が蓄える電力を増やすことができる。二次電池3を充電することができる。
<具体的な回路構成>
 図3は、図1に示す電源装置1の具体的な回路の一例である。電源装置1が備える構成要素と、それらの接続構成について説明する。次に、電源装置1の動作について説明する。
<発電素子>
 発電素子2は、出力抵抗21と、発電体22と、を含む。発電体22は、外部エネルギを受けて直流の電力を発生する。発電体22の負極は、二次電池3に接続されている。発電体22の正極は、出力抵抗21を介して、コンバータ4に接続されている。発電体22には、電圧計23が設けられていてもよい。電圧計23は、発電体22が発生する電圧(V)を信号φ23としてコントローラ7に与える。
<コンバータ>
 コンバータ4は、第1スイッチ素子41と、第2スイッチ素子42と、第1ダイオード44と、第2ダイオード45と、インダクタ46(エネルギ蓄積素子)と、を有する。
 コンバータ4は、入力端子4aと、出力端子4b、4c、4dと、を有する。
 第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する動作と、コンバータ4の入力端子4aをインダクタ46から切り離す動作と、を相互に切り替える。第1スイッチ素子41のドレインは、コンバータ4の入力端子4aに接続されている。第1スイッチ素子41のソースは、第2スイッチ素子42に接続されている。第1スイッチ素子41のゲートは、制御信号φ41を受ける。
 第1スイッチ素子41は、pチャネル型のMOSFETである。第1スイッチ素子41は、制御信号φ41(L)を受けたとき、コンバータ4の入力端子4aをインダクタ46に接続する。第1スイッチ素子41は、制御信号φ41(H)を受けたとき、コンバータ4の入力端子4aをインダクタ46から切り離す。
 第2スイッチ素子42は、インダクタ46を基準電圧GNDに接続する動作と、インダクタ46を基準電圧GNDから切り離す動作と、を相互に切り替える。第2スイッチ素子42のドレインは、第1スイッチ素子41のソースに接続されている。第2スイッチ素子42のソースは、出力端子4cを介して基準電圧GNDに接続されている。第2スイッチ素子42のゲートは、制御信号φ42を受ける。
 第2スイッチ素子42は、nチャネル型のMOSFETである。第2スイッチ素子42は、制御信号φ42(H)を受けたとき、インダクタ46を基準電圧GNDに接続する。第2スイッチ素子42は、制御信号φ42(L)を受けたとき、インダクタ46を基準電圧GNDから切り離す。
 インダクタ46は、ノードJ2に接続されている。ノードJ2は、第1スイッチ素子41を第2スイッチ素子42に接続する配線に設けられた点である。インダクタ46は、スイッチ素子47を介してコンバータ4の出力端子4bにも接続されている。
 本実施形態では、エネルギ蓄積素子としてインダクタ46を例示する。しかし、エネルギ蓄積素子はインダクタ46に限定されない。エネルギ蓄積素子は、例えば、複数のキャパシタとそれぞれのキャパシタの接続構成を切り替えるスイッチとを含むスイッチトキャパシタ回路を採用してもよい。
 第1ダイオード44は、第1スイッチ素子41に対して並列に接続されている。具体的には、第1ダイオード44の入力は、第1スイッチ素子41のソースに接続されている。第1ダイオード44の出力は、第1スイッチ素子41のドレインに接続されている。
 第2ダイオード45は、第2スイッチ素子42に対して並列に接続されている。具体的には、第2ダイオード45の入力は、第2スイッチ素子42のソースに接続されている。第2ダイオード45の出力は、出力端子4cを介して基準電圧GNDに接続されている。第2ダイオード45の出力は、第1ダイオード44の入力に接続されている。第2ダイオード45は、第1ダイオード44に対して直列に接続されている。
 第1スイッチ素子41及び第2スイッチ素子42と、インダクタ46と、の間でリンギングが発生する可能性がある。リンギングによれば、電圧の上昇と電圧の低下とが繰り返される。繰り返される電圧の上昇と電圧の低下は、第1スイッチ素子41及び第2スイッチ素子42にダメージを与える可能性がある。第1ダイオード44及び第2ダイオード45は、リンギングに起因して繰り返し発生する電圧の上昇と電圧の低下から、第1スイッチ素子41及び第2スイッチ素子42を保護する。
 第1ダイオード44及び第2ダイオード45は、コンバータ4にとって付加的な構成要素である。従って、コンバータ4は、第1ダイオード44及び第2ダイオード45を省略することもできる。
 コンバータ4は、さらに、出力側のスイッチ素子47と、フィードバック側のスイッチ素子48と、を有する。スイッチ素子47、48は、例えば、絶縁ゲート電界効果トランジスタ(MOSFET)である。
 出力側のスイッチ素子47は、インダクタ46から出力された電力を負荷装置9に与える動作と、インダクタ46から出力された電力を負荷装置9に与えない動作と、を相互に切り替える。出力側のスイッチ素子47は、インダクタ46とコンバータ4の出力端子4bとの間に設けられている。出力側のスイッチ素子47のドレインは、インダクタ46に接続されている。出力側のスイッチ素子47のソースは、コンバータ4の出力端子4bに接続されている。出力側のスイッチ素子47のゲートは、制御信号φ47を受ける。
 出力側のスイッチ素子47は、nチャネル型のMOFETである。出力側のスイッチ素子47は、制御信号φ47(H)を受けたとき、インダクタ46をコンバータ4の出力端子4bに接続する。出力側のスイッチ素子47は、制御信号φ47(L)を受けたとき、インダクタ46からコンバータ4の出力端子4bを切り離す。
 フィードバック側のスイッチ素子48は、インダクタ46から出力された電力を二次電池3に与える動作と、インダクタ46から出力された電力を二次電池3に与えない動作と、を相互に切り替える。フィードバック側のスイッチ素子48は、インダクタ46と二次電池3の正極との間に設けられている。フィードバック側のスイッチ素子48のドレインは、インダクタ46に接続されている。フィードバック側のスイッチ素子48のソースは、二次電池3の正極に接続されている。フィードバック側のスイッチ素子48のゲートは、制御信号φ48を受ける。
 フィードバック側のスイッチ素子48は、nチャネル型のMOSFETである。フィードバック側のスイッチ素子48は、制御信号φ48(H)を受けたとき、インダクタ46を二次電池3の正極に接続する。出力側のスイッチ素子47は、制御信号φ48(L)を受けたとき、インダクタ46を二次電池3の正極から切り離す。
<付加的な電気素子>
 電源装置1は、付加的ないくつかの電気素子を備えてもよい。
 キャパシタ51はコンバータ4の入力端子4aと基準電圧GNDとの間に配置されている。キャパシタ51は、発電素子2とコンバータ4との間のインピーダンスを調整する。キャパシタ51は、発電素子2からコンバータ4への電力の伝送の効率を改善する。キャパシタ51は、付加的な要素である。従って、キャパシタ51は、省略することもできる。
 電源装置1は、さらに、抵抗素子61、62と、キャパシタ63と、を備える。抵抗素子61、62は、コンバータ4の出力端子4bと、基準電圧GNDとの間に配置されている。抵抗素子61、62は、電源装置1を負荷装置9に接続する経路に設けられた接続点に接続されている。抵抗素子61、62は、コンバータ4の構成要素として捉えることも可能である。
 キャパシタ63は、いわゆるバイパスコンデンサとしての機能を奏する。キャパシタ63は、電源装置1の電圧(VOUT)が低下した場合に、不足する電流を供給する。その結果、負荷装置9が受ける電圧の低下が抑制される。キャパシタ63は、抵抗素子61、62と同様に、コンバータ4の出力端子4bと、基準電圧GNDとの間に配置されている。
 抵抗素子61、62及びキャパシタ63は、付加的な要素である。従って、別の図面においては図示を省略することがある。
<電源装置の動作>
 電源装置1は、複数の動作を実行する。電源装置1は、負荷装置9が消費する電流(ILOAD)を用いて、動作を選択する。電源装置1は、発電素子2が発生する電圧(V)を用いて、動作を選択する。動作の選択は、コントローラ7が実行する。コントローラ7は、負荷装置9が消費する電流(ILOAD)と発電素子2が発生する電圧(V)とを受ける。要求される動作が限定されている場合には、コントローラ7は、負荷装置9が消費する電流(ILOAD)だけを受けることによって、動作を選択することができる。コントローラ7は、発電素子2が発生する電圧(V)だけを受けることによっても、動作を選択することができる。
<コントローラ>
 図4に示すコントローラ7は、負荷電流判定部71と、電圧判定部72と、制御信号出力部73と、を有する。これらは、機能的構成要素である。コントローラ7は、物理的にはコンピュータであり、コンピュータがプログラムを実行することによって機能的な構成要素が実現される。コントローラ7は、電流計93から信号φ93(ILOAD)を受ける。コントローラ7は、電圧計23から信号φ23(V)(計測電圧)を受ける。コントローラ7は、信号φ93、φ23を利用して、制御信号φ41、φ42、φ47、φ48を生成する。コントローラ7は、生成した制御信号φ41、φ42、φ47、φ48をコンバータ4に与える。
 負荷電流判定部71は、電流計93から信号φ93(ILOAD)を受ける。負荷電流判定部71は、高負荷状態と、中負荷状態と、無負荷状態と、を定義する。高負荷状態と中負荷状態とは、上閾値電流(ISH)(第1閾値電流)によって区別される。中負荷状態と無負荷状態とは、下閾値電流(ISL)(第2閾値電流)によって区別される。負荷電流判定部71は、信号φ93(ILOAD)が示す電流値が、上閾値電流(ISH)よりも大きいとき、高負荷状態であると判定する。負荷電流判定部71は、信号φ93(ILOAD)が示す電流値が上閾値電流(ISH)より小さく且つ下閾値電流(ISL)よりも大きいとき、中負荷状態であると判定する。負荷電流判定部71は、信号φ93(ILOAD)が示す電流値が下閾値電流(ISL)よりも小さいとき、無負荷状態であると判定する。
 コントローラ7は、負荷電流判定部71が中負荷状態であると判定した場合、発電素子2の電圧(V)を利用して、さらに3つの状態に区分する。
 電圧判定部72は、電圧計23から信号φ23(V)を受ける。電圧判定部72は、高電圧状態と、中電圧状態と、低電圧状態と、を定義する。高電圧状態と中電圧状態とは、上閾値電圧(VSH)(第1閾値電圧)によって区別される。中電圧状態と低電圧状態とは、下閾値電圧(VSL)(第2閾値電圧)にによって区別される。電圧判定部72は、信号φ23(V)が示す電圧値が、上閾値電圧(VSH)よりも大きいとき、高電圧状態であると判定する。電圧判定部72は、信号φ23(V)が示す電圧値が上閾値電圧(VSH)より小さく且つ下閾値電圧(VSL)よりも大きいとき、中電圧状態であると判定する。電圧判定部72は、信号φ23(V)が示す電圧値が下閾値電圧(VSL)よりも小さいとき、低電圧状態であると判定する。
 要するに、コントローラ7は、負荷電流(ILOAD)と、発電素子2の電圧(V)と、を利用して、電源装置1の状態が、高負荷状態、無負荷状態、中負荷状態に含まれる高電圧状態、中負荷状態に含まれる中電圧状態、中負荷状態に含まれる低電圧状態、の5つの状態のいずれに該当するかを判定する。
 コントローラ7は、5つの状態のそれぞれに対応する動作を選択する。コントローラ7は、高負荷状態であると判定したとき、高負荷動作M2を選択する。コントローラ7は、無負荷状態であると判定したとき、無負荷動作M3を選択する。コントローラ7は、高電圧状態であると判定したとき、高電圧動作M4を選択する。コントローラ7は、中電圧状態であると判定したとき、通常動作M1を選択する。コントローラ7は、低電圧状態であると判定したとき、低電圧動作M5を選択する。
<コントローラ7の動作フロー>
 図5は、コントローラ7が実行する動作フローを示す。まず、コントローラ7の負荷電流判定部71は、負荷電流(ILOAD)を示す信号φ93(ILOAD)を受ける(ステップS11)。
 次に、負荷電流判定部71は、電流(ILOAD)が上閾値電流(ISH)(第1閾値)よりも大きいか否かを判定する(ステップS12)。負荷電流(ILOAD)が上閾値電流(ISH)よりも大きい場合(ステップS12:YES)には、負荷電流判定部71はその結果を信号φ71(H)として制御信号出力部73に出力する。信号φ71(H)を受けた制御信号出力部73は、高負荷動作M2のための制御信号φ41、φ42、φ47、φ48をコンバータ4に出力する(ステップS13)。制御信号φ41、φ42、φ47、φ48の詳細は、後述する。
 負荷電流(ILOAD)が上閾値電流(ISH)よりも小さい場合(ステップS12:NO)には、負荷電流判定部71は、負荷電流(ILOAD)が下閾値電流(ISL)よりも小さいか否かを判定する(ステップS14)。負荷電流(ILOAD)が下閾値電流(ISL)よりも小さい場合(ステップS14:YES)には、負荷電流判定部71はその結果を信号φ71(L)として制御信号出力部73に出力する。信号φ71(L)を受けた制御信号出力部73は、無負荷動作M3のための制御信号φ41、φ42、φ47、φ48をコンバータ4に出力する(ステップS15)。
 電流(ILOAD)が下閾値電流(ISL)(第2閾値)よりも大きい場合(ステップS14:NO)には、コントローラ7は、信号φ23(V)を受ける(ステップS16)。
 次に、コントローラ7は、計測した電圧(V)が上閾値電圧(VSH)よりも大きいか否かを判定する(ステップS17)。この動作は、電圧判定部72が実行する。計測した電圧(V)が上閾値電圧(VSH)よりも大きい場合(ステップS17:YES)には、電圧判定部72はその結果を信号φ72(H)として制御信号出力部73に出力する。信号φ72(H)を受けた制御信号出力部73は、高電圧動作M4のための制御信号φ41、φ42、φ47、φ48をコンバータ4に出力する(ステップS18)。
 計測した電圧(V)が上閾値電圧(VSH)よりも小さい場合(ステップS17:NO)には、電圧判定部72は、計測した電圧(V)が下閾値電圧(VSL)よりも小さいか否かを判定する(ステップS18)。計測した電圧(V)が下閾値電圧(VSL)よりも小さい場合(ステップS19:YES)には、電圧判定部72はその結果を信号φ72(L)として制御信号出力部73に出力する。信号φ72(L)を受けた制御信号出力部73は、低電圧動作M5のための制御信号φ41、φ42、φ47、φ48をコンバータ4に出力する(ステップS21)。
 計測した電圧(V)が下閾値電圧(VSL)よりも大きい場合(ステップS19:NO)には、電圧判定部72はその結果を信号φ72(M)として制御信号出力部73に出力する。信号φ72(M)を受けた制御信号出力部73は、通常動作M1のための制御信号φ41、φ42、φ47、φ48をコンバータ4に出力する(ステップS22)。
<制御信号>
 制御信号出力部73は、制御信号φ41、φ42、φ47、φ48を、図6に示す5つの波形PG、PGB、NG、ON、OFFから動作の態様に応じて選択する。波形PG、PGB、NG、ON、OFFは、ハイ(H)である成分と、ロー(L)である成分と、を含む。さらに、波形PG、PGB、NG、ON、OFFは、それぞれ第1期間D1、第2期間D2及び第3期間D3を含む。
 第1期間D1であるとき、それぞれの波形PG、PGB、NG、ON、OFFは、以下の成分を示す。
  波形PG(L)。
  波形PGB(H)。
  波形NG(L)。
  波形ON(H)。
  波形OFF(L)。
 第2期間D2であるとき、それぞれの波形PG、PGB、NG、ON、OFFは、以下の成分を示す。
  波形PG(H)。
  波形PGB(L)。
  波形NG(H)。
  波形ON(H)。
  波形OFF(L)。
 第3期間D3であるとき、それぞれの波形PG、PGB、NG、ON、OFFは、以下の成分を示す。
  波形PG(H)。
  波形PGB(L)。
  波形NG(L)。
  波形ON(H)。
  波形OFF(L)。
 波形PGBは、波形PGを反転させたものである。波形ONは、第1期間D1、第2期間D2及び第3期間D3を通じて常にハイ(H)である。波形OFFは、第1期間D1、第2期間D2及び第3期間D3を通じて常にロー(L)である。
 波形PG及び波形NGを出力する回路を例示する。図6(b)は、制御信号出力部73を構成する回路の例示である。制御信号出力部73は、第1制御回路76と第2制御回路77とを含む。第1制御回路76は、波形PGを出力する。第2制御回路77は、波形NGを出力する。
 第1制御回路76は、比較器761と、パルス回路762と、遅延回路764と、RSフリップフロップ763と、を含む。比較器761は、電圧Vaと基準電圧Vrefを比較する。電圧Vaは、抵抗素子61と抵抗素子62の間に設定されるノードJ1に発生する電圧である。比較器761は、電圧Vaが基準電圧Vrefより低いときに信号(H)をパルス回路762に出力する。信号(H)を受けたパルス回路762は、パルス信号をRSフリップフロップ763に出力する。その結果、RSフリップフロップ763は、波形PGをハイ(H)からロー(L)に切り替える(図6(a)の符号t1参照)。RSフリップフロップ763の出力は、遅延回路764にも与えらえれる。遅延回路764は、所定の遅延時間(図6(a)の符号t2参照)が経過した後に、RSフリップフロップ763に信号を出力する。RSフリップフロップ763は、遅延回路764からの信号を受けて、波形PGをロー(L)からハイ(H)に切り替える(図6(a)の符号t3参照)。ロー(L)からハイ(H)への切り替えは、スイッチ素子41のソース・ドレイン間の電圧が所定の電位差になったことを条件としてもよい。
 第2制御回路77は、比較器771と、パルス回路772と、遅延回路774と、RSフリップフロップ773と、を含む。遅延回路774は、第1制御回路76のRSフリップフロップ763からロー(L)からハイ(H)へ切り替わった波形PGを受ける。波形PGを受けた遅延回路774は、所定の時間が経過した後にRSフリップフロップ773にパルスを与える。パルスを受けたRSフリップフロップ773は、波形NGをロー(L)からハイ(H)に切り替える(図6(a)の符号t4参照)。比較器771は、電圧Vdと基準電圧GNDを比較する。電圧Vdは、第1スイッチ素子41と第2スイッチ素子42との間に設定されるノードJ2に発生する電圧である。ノードJ2には、インダクタ46も接続される。電圧Vdが基準電圧GNDより低いときに信号(H)をパルス回路772に出力する。信号(H)を受けたパルス回路772は、パルス信号をRSフリップフロップ773に出力する。パルス信号を受けたRSフリップフロップ773は、波形NGをハイ(H)からロー(L)に切り替える(図6(a)の符号t5参照)。
 制御信号出力部73は、インダクタ46の出力側の電圧Vaと、インダクタ46の入力側の電圧Vdと、を利用して、波形PG、NGのハイ/ローの切替を制御する。
 通常動作M1、高負荷動作M2、無負荷動作M3、高電圧動作M4、低電圧動作M5のための制御信号と波形の組み合わせについて説明する。図7にも制御信号と波形の組み合わせを示す。これらの制御信号φ41、φ42、φ47、φ48が与えられたときの具体的な回路構成の詳細については後述する。
 制御信号出力部73は、通常動作M1のための制御信号φ41、φ42、φ47、φ48として、以下の組み合わせを出力する。以下の説明において、制御信号の符号のあとに括弧を付し、その中に波形を示す符号を記載することによって、制御信号と波形との組み合わせを示す。波形を示す符号のあとに、信号レベルを示す成分(「H」又は「L」)を付す。
  制御信号φ41:波形PG・・・制御信号φ41(PG)。
  制御信号φ42:波形NG・・・制御信号φ42(NG)。
  制御信号φ47:波形NG・・・制御信号φ47(NG)。
  制御信号φ48:波形PGB・・制御信号φ48(PGB)。
 制御信号出力部73は、高電圧動作M4のための制御信号φ41、φ42、φ47、φ48として、以下の組み合わせを出力する。
  制御信号φ41(PG)。
  制御信号φ42(NG)。
  制御信号φ47(PGB)。
  制御信号φ48(NG)。
 制御信号出力部73は、低電圧動作M5のための制御信号φ41、φ42、φ47、φ48として、以下の組み合わせを出力する。
  制御信号φ41(ON:H)。
  制御信号φ42(OFF:L)。
  制御信号φ47(ON:H)。
  制御信号φ48(ON:H)。
 制御信号出力部73は、変形例の低電圧動作M5Aのための制御信号φ41、φ42、φ47、φ48として、以下の組み合わせを出力する。
  制御信号φ41(OFF:L)。
  制御信号φ42(OFF:L)。
  制御信号φ47(ON:H)。
  制御信号φ48(OFF:L)。
  制御信号φ81(ON:H)
 制御信号出力部73は、高負荷動作M2のための制御信号φ41、φ42、φ47、φ48として、以下の組み合わせを出力する。
  制御信号φ41(OFF:L)。
  制御信号φ42(OFF:L)。
  制御信号φ47(ON:H)。
  制御信号φ48(OFF:L)。
 制御信号出力部73は、無負荷動作M3のための制御信号φ41、φ42、φ47、φ48として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(ON)。
  制御信号φ47(OFF)。
  制御信号φ48(ON)。
 通常動作M1、高負荷動作M2、無負荷動作M3、高電圧動作M4、低電圧動作M5について、詳細に説明する。
<通常動作M1>
 電源装置1は、通常動作M1であるとき、助走動作M11(第1動作)と、負荷駆動動作M12(第2動作)と、待機動作M13(第3動作)と、を実行する。これらの動作は、コントローラ7が出力する制御信号φ41、φ42、φ47、φ48によって切り替えられる。以下の説明では、助走動作M11、負荷駆動動作M12及び待機動作M13の順で実行する動作を述べる。助走動作M11、負荷駆動動作M12及び待機動作M13を実行する順はこれに限定されない。助走動作M11、負荷駆動動作M12及び待機動作M13は任意の順で実行してよい。
<助走動作M11>
 図8(a)を参照しながら助走動作M11について説明する。助走動作M11であるとき、インダクタ46はエネルギを蓄積する。
 図8(a)は、助走動作M11であるときの回路の状態を示す。図8(a)に示す配線において、実線で示す配線は、助走動作M11であるときに電流が流れることを意味する。破線で示す配線は、助走動作M11であるときに電流が流れないことを示す。
 助走動作M11であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(PG:L)。
  制御信号φ42(NG:L)。
  制御信号φ47(NG:L)。
  制御信号φ48(PGB:H)。
 制御信号φ41(PG:L)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する。制御信号φ42(NG:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φ47(NG:L)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bから切り離す。制御信号φ48(PGB:H)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極に接続する。
 その結果、発電素子2と第1スイッチ素子41と、インダクタ46と、フィードバック側のスイッチ素子48と、を含む閉回路が構成される。二次電池3と発電素子2とキャパシタ51とを含む閉回路も構成される。これらの閉回路によれば、発電素子2の電圧(VEH)に二次電池3の電圧(VBAT)が足しあわされた電圧(VIN)がコンバータ4の入力端子4aに与えられる。発電素子2と第1スイッチ素子41と、インダクタ46と、フィードバック側のスイッチ素子48と、を含む閉回路には、電流(IIN)が流れる。インダクタ46に流れる電流(I)は、次第に増加する。その結果、インダクタ46はエネルギを蓄積する。
 助走動作M11であるとき、負荷装置9は、電源装置1から切り離されている。このとき、負荷装置9とキャパシタ63とを含む閉回路が構成される。キャパシタ63に十分な電力が蓄えられている場合には、負荷装置9は、キャパシタ63から電力の供給を受けることができる。
 助走動作M11であるとき、発電素子2と、二次電池3と、キャパシタ51と、を含む閉回路も構成される。助走動作M11であるとき、発電素子2は、インダクタ46に接続されている。発電素子2が発生したエネルギは、インダクタ46に蓄積されるとともにキャパシタ51に蓄積されてもよい。
<負荷駆動動作M12>
 図8(b)を参照しながら負荷駆動動作M12について説明する。負荷駆動動作M12であるとき、インダクタ46は、蓄積したエネルギを負荷装置9に与える。
 図8(b)は、負荷駆動動作M12であるときの回路の状態を示す。負荷駆動動作M12であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(PG:H)。
  制御信号φ42(NG:H)。
  制御信号φ47(NG:H)。
  制御信号φ48(PGB:L)。
 制御信号φ41(PG:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(NG:H)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDに接続する。制御信号φ47(NG:H)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bに接続する。制御信号φ48(PGB:L)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極から切り離す。
 その結果、インダクタ46と、出力側のスイッチ素子47と、負荷装置9と、第2スイッチ素子42と、を含む閉回路が構成される。この閉回路によれば、インダクタ46は、蓄積したエネルギに起因する電力(POUT)を負荷装置9に与える。その結果、電源装置1から電力を与えられた負荷装置9が駆動する。インダクタ46から提供される電力(POUT)が、負荷装置9が要求する電力(PLOAD)よりも大きい場合には、余剰の電力はキャパシタ63に蓄積されてもよい。その結果、インダクタ46に蓄積されていたエネルギは次第に減少するので、インダクタ46の電流(I)も次第に減少する。
 助走動作M11と同様に、負荷駆動動作M12であるときにも、発電素子2と、二次電池3と、キャパシタ51と、を含む閉回路も構成される。負荷駆動動作M12であるとき、発電素子2は、インダクタ46から切り離されている。発電素子2が発生したエネルギは、インダクタ46に蓄積されない。負荷駆動動作M12であるときに発電素子2が発生したエネルギは、キャパシタ51に蓄積されてもよい。
<待機動作M13>
 図8(c)を参照しながら待機動作M13について説明する。待機動作M13であるとき、負荷装置9は、キャパシタ63に蓄積されたエネルギを全て消費する。待機動作M13であるとき、コンバータ4は動作させなくてもよい。キャパシタ63に蓄積されたエネルギが十分でない場合には、待機動作M13を省略してもよい。
 図8(c)は、待機動作M13であるときの回路の状態を示す。図8(c)に示すように、待機動作M13であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(PG:H)。
  制御信号φ42(NG:L)。
  制御信号φ47(NG:L)。
  制御信号φ48(PGB:L)。
 制御信号φ41(PG:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(NG:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φ47(NG:L)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bから切り離す。制御信号φ48(PGB:L)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極から切り離す。
 その結果、インダクタ46を含む閉回路は構成されない。待機動作M13であるとき、負荷装置9は、電源装置1から切り離されている。この状態は、助走動作M11であるときに構成される負荷装置9とキャパシタ63とを含む閉回路と同じである。キャパシタ63に十分な電力が蓄えられている場合には、負荷装置9は、キャパシタ63から電力の供給を受けることができる。
 助走動作M11と同様に、待機動作M13であるときにも、発電素子2と、二次電池3と、キャパシタ51と、を含む閉回路も構成される。待機動作M13であるとき、発電素子2は、インダクタ46から切り離されている。発電素子2が発生したエネルギは、インダクタ46に蓄積されない。待機動作M13であるときに発電素子2が発生したエネルギは、キャパシタ51に蓄積されてもよい。
 上述した動作における電力の内訳を説明する。図9は、電源装置1における電力の内訳を概念的に示す。電源装置1に入力される電力(PIN)は、二次電池3の電力(PBAT)と、発電素子2の電力(PEH)と、の和である。
 二次電池3の電力(PBAT)は、電圧(VBAT)と、電流(IIN)と、の積である。発電素子2の電力(PEH)は、電圧(V)と、電流(IIN)と、の積である。ここで、コンバータ4の電力取出効率(η)は100%であると仮定する。この仮定によれば、電力(PBAT)と電力(PEH)との和の全てを、インダクタ46に蓄積することができる。発電素子2の電力(PEH)の全てを、インダクタ46に蓄積することができる。
 コンバータ4の電力取出効率(η)が100%より小さいと仮定する。この仮定によれば、電力(PBAT)と電力(PEH)との和の一部を、インダクタ46に蓄積することができる。発電素子2の電力(PEH)の一部を、インダクタ46に蓄積することができる。発電素子2の電力(PEH)は、インダクタ46に蓄積される電力(PE_NET)と、インダクタ46に蓄積されることなく損失となる電力(PE_LOSS)と、を含む。損失となる電力(PE_LOSS)は、出力抵抗21(R)と電流(IIN)との積によって示される降下電圧(R×IIN)と、電流(IIN)と、の積である。インダクタ46に蓄積される電力(PE_NET)は、発電素子2の電力(PEH)から損失となる電力(PE_LOSS)を引いた余りである。
 コンバータ4が出力する電力(POUT)は、二次電池3に再び戻される。二次電池3に戻される電力(PBACK)は、電圧(VBAT)とフィードバックされる電流(IBACK)との積である。電流(IBACK)は、電流(IIN)より小さい。電流(IIN)と電流(IBACK)との差分は、消費される電流(ICKT)である。消費される電流(ICKT)と電圧(VBAT)によって、消費される電力(PCKT)が定義できる。助走動作M11において、二次電池3は、電力(PBAT)を出力し、電力(PBACK)の戻りを受け、電力(PCKT)を消費する。
 電源装置1は、電力(PCKT)を消費することによって、発電素子2から電力(PE_NET)を得ることができる。電源装置1は、寿命が延びた電池と捉えることもできる。負荷装置9が要求する電力(PLOAD)を全て二次電池3から供給した場合に比べて、本実施形態の電源装置1の寿命がどの程度延びるかを検討した。電源装置1の寿命がどの程度延びるかを示す指標として、BLE(Battery Life Extension)を定義した。BLEは、下記式(1)によって定義できる。
  BLE=(VLOAD×ILOAD)/(VBAT×ICKT)…(1)
 具体的な数値を代入して、二次電池3の寿命の延びの程度を評価した。消費される電力(PCKT)を定義する電流(ICKT)が2μAであり、二次電池3の電圧(VBAT)が1.5Vであるとした。その結果、費される電力(PCKT)は、3μWであった。
 次に、発電素子2からインダクタ46に蓄積できた電力(PE_NET)を定義する電流(IIN)が33μAであり、電圧(V-R×IIN)が1Vであるとした。その結果、インダクタ46に蓄積できた電力(PE_NET)は、33μWであった。
 負荷装置9が要求する電力(PLOAD)を定義する電流(ILOAD)が20μAであり、電圧(VLOAD)が1.5Vであるとした。その結果、負荷装置9が要求する電力(PLOAD)は、30μWであった。
 上述の試算によれば、電源装置1は、30μWの電力を要求する負荷装置9を、3μWの二次電池3の消費によって駆動できることがわかった。負荷装置9が要求する30μWを全て二次電池3で賄う場合には、30μWを消費する。一方、電源装置1は、その1/10の3μWしか消費しない。従って、寿命に換算すると、負荷装置9が要求する30μWを全て二次電池3で賄う場合の寿命に比べて、電源装置1は、その10倍の寿命を得ることができる。
<高電圧動作M4>
 図10を参照しながら高電圧動作M4について説明する。例えば、発電素子2に与えられる温度差が大きくなりすぎた場合に、温度差に応じて発電体22が発生する電圧(V)が高くなる。電圧(V)が高まった場合には、例えば、インダクタ46へのエネルギの蓄積と負荷装置9の駆動とを並行して実行することができる。電源装置1は、高電圧動作M4であるとき、蓄積駆動動作M41(第1動作)と、充電動作M42(第2動作)と、待機動作M51(第3動作)と、を実行する。これらの動作も、コントローラ7が出力する制御信号φ41、φ42、φ47、φ48によって切り替えられる。
<蓄積駆動動作M41>
 蓄積駆動動作M41について説明する。蓄積駆動動作M41であるとき、インダクタ46はエネルギを蓄積する。インダクタ46はエネルギを負荷装置9に与える。
 蓄積駆動動作M41であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(PG:L)。
  制御信号φ42(NG:L)。
  制御信号φ47(PGB:H)。
  制御信号φ48(NG:L)。
 図10(a)に示すように、制御信号φ41(PG:L)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する。制御信号φ42(NG:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φ47(PGB:H)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bに接続する。制御信号φ48(NG:L)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極から切り離す。
 その結果、発電素子2と第1スイッチ素子41と、インダクタ46と、出力側のスイッチ素子47と、負荷装置9と、を含む閉回路が構成される。この閉回路によれば、発電素子2が発生した電圧(VEH)に二次電池3の電圧(VBAT)が足しあわされた電圧(VIN)がコンバータ4の入力端子4aに提供される。その結果、インダクタ46はエネルギを蓄積する。
 蓄積駆動動作M41であるとき、負荷装置9は、電源装置1に接続されている。従って、負荷装置9は、電源装置1から電力の供給を受けることができる。その結果、蓄積駆動動作M41であるとき、負荷装置9は、駆動する。
 蓄積駆動動作M41であるとき、発電素子2と、二次電池3と、キャパシタ51と、を含む閉回路も構成される。発電素子2が発生したエネルギは、インダクタ46に蓄積されるとともにキャパシタ51に蓄積されてもよい。
<充電動作M42>
 図10(b)を参照しながら充電動作M42について説明する。充電動作M42であるとき、インダクタ46はエネルギを二次電池3に与える。
 充電動作M42であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(PG:H)。
  制御信号φ42(NG:H)。
  制御信号φ47(PGB:L)。
  制御信号φ48(NG:H)。
 図10(b)に示すように、制御信号φ41(PG:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(NG:H)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDに接続する。制御信号φ47(PGB:L)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bから切り離す。制御信号φ48(NG:H)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極に接続する。
 その結果、第2スイッチ素子42と、インダクタ46と、フィードバック側のスイッチ素子48と、二次電池3と、を含む閉回路が構成される。この閉回路によれば、インダクタ46に蓄積されたエネルギが二次電池3に与えられる。その結果、インダクタ46は、二次電池3を充電する。
 充電動作M42であるとき、負荷装置9は、電源装置1から切り離されている。このとき、負荷装置9とキャパシタ63とを含む閉回路が構成される。キャパシタ63に十分な電力が蓄えられている場合には、負荷装置9は、キャパシタ63から電力の供給を受けることができる。
 蓄積駆動動作M41であるとき、発電素子2と、二次電池3と、キャパシタ51と、を含む閉回路も構成される。発電素子2が発生したエネルギは、インダクタ46に蓄積されるとともにキャパシタ51に蓄積されてもよい。
<待機動作M43>
 図10(c)を参照しながら待機動作M43について説明する。
 待機動作M43であるとき、コントローラ7は、以下の制御信号を出力する。待機動作M43であるときの回路の接続構成(図10(c)参照)と、その動作は、通常動作M1の待機動作M13であるときの回路の接続構成(図8(c)参照)と同じである。従って、待機動作M43であるときの回路の接続構成と、その動作の説明は、省略する。
  制御信号φ41(PG:H)。
  制御信号φ42(NG:L)。
  制御信号φ47(PGB:L)。
  制御信号φ48(NG:L)。
<低電圧動作M5>
 図11(a)を参照しながら、低電圧動作M5について説明する。例えば、発電素子2に与えられる温度差が小さくなりすぎた場合に、発電体22が発生する電圧(V)が低くなる。例えば、二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)を満たすとき、二次電池3を用いて、負荷装置9を駆動することができる。
 二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)を満たすとは、具体的には、二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)と等しい場合と、二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)より大きい場合と、を含む。
 二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)と等しいとき、二次電池3を負荷装置9に直接に接続することによって、負荷装置9を駆動することができる。二次電池3は、発電素子2及びコンバータ4を介することなく、負荷装置9に対して直接に接続される。低電圧動作M5は、通常動作M1及び高電圧動作M4のようにいくつかの期間を含まない。低電圧動作M5であるとき、電源装置1は、ひとつの直接供給動作だけを含む。
 低電圧動作M5であるとき、二次電池3から出力された電力は、発電素子2を経由することなく負荷装置9に与えられる。例えば、発電素子2が電気的に故障(断線)などした場合にも、低電圧動作M5は、採用できる。低電圧動作M5によれば、発電素子2が電気的に故障した場合であっても、電源装置1から負荷装置9に電力を与えることができる。
 二次電池3から出力された電力が発電素子2を経由することなく負荷装置9に与えられるということは、二次電池3から出力された電力が発電素子2の出力抵抗21を介することなく、負荷装置9に与えられるということである。従って、二次電池3の電圧(VBAT)が発電素子2の出力抵抗21に起因する電圧低下の影響を避けることができる。二次電池3の電圧(VBAT)を、負荷装置9へそのまま与えることができる。
<直接供給動作>
 直接供給動作について説明する。直接供給動作であるとき、二次電池3は、エネルギを負荷装置9に与える。
 直接供給動作であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(ON:H)。
  制御信号φ42(OFF:L)。
  制御信号φ47(ON:H)。
  制御信号φ48(ON:H)。
 制御信号φ41(ON:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(OFF:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φ47(ON:H)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bに接続する。制御信号φ48(ON:H)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極に接続する。
 その結果、二次電池3とフィードバック側のスイッチ素子48と負荷装置9とを含む閉回路が構成される。この閉回路によれば、二次電池3の電力が負荷装置9に与えられる。
<低電圧動作M5の変形例>
 低電圧動作M5では、二次電池3の電圧(VBAT)が負荷装置9の要求する電圧(VLOAD)と等しいという条件を満たすときに選択できた。二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)より大きいときに採用できる回路構成及び動作を、図11(b)を参照しながら変形例として説明する。
 二次電池3の電圧(VBAT)が、負荷装置9が要求する電圧(VLOAD)より大きいとき、二次電池3をコンバータ4を介して負荷装置9に間接的に接続することによって、負荷装置9を駆動することができる。負荷装置9が要求する電圧(VLOAD)より大きい二次電池3の電圧(VBAT)を、コンバータ4によって、負荷装置9が要求する電圧(VLOAD)まで下げる。このとき、二次電池3とコンバータ4との間には、発電素子2は接続されない。図11(b)に示すように、変形例の電源装置1Aは、発電素子2を回避する短絡回路80を含む。短絡回路80は、二次電池3をコンバータ4に直接に接続する。短絡回路80の第1端部は、二次電池3と発電素子2との間の配線に接続されている。短絡回路80の第2端部は、発電素子2とコンバータ4との間に接続されている。短絡回路80は、スイッチ素子81を有する。
 変形例の低電圧動作M5Aは、通常動作M1及び高電圧動作M4のようにいくつかの期間を含まない。変形例の低電圧動作M5であるとき、電源装置1Aは、ひとつの降圧供給動作だけを含む。
 降圧供給動作について説明する。降圧供給動作であるとき、二次電池3は、コンバータ4を介してエネルギを負荷装置9に与える。
 降圧供給動作であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(OFF:L)。
  制御信号φ42(OFF:L)。
  制御信号φ47(ON:H)。
  制御信号φ48(OFF:L)。
  制御信号φ81(ON:H)。
 制御信号φ41(OFF:L)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する。制御信号φ42(OFF:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φ47(ON:H)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bに接続する。制御信号φ48(OFF:L)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極から切り離す。
 制御信号φ81(ON:H)を受けた短絡回路80のスイッチ素子81は、二次電池3の正極をコンバータ4の入力端子4aに接続する。
 その結果、二次電池3と、短絡回路80のスイッチ素子81と、インダクタ46と、出力側のスイッチ素子47と、負荷装置9と、を含む閉回路が構成される。この閉回路によれば、降圧された二次電池3の電力が負荷装置9に与えられる。
 変形例の低電圧動作M5Aによっても、発電素子2が電気的に故障した場合に、電源装置1Aが負荷装置9に電力を与えることができる。
 短絡回路80を含む電源装置1Aは、通常動作M1や高電圧動作M4を実行することもできる。短絡回路80を含む電源装置1Aが通常動作M1や高電圧動作M4を実行するとき、コントローラ7は、制御信号φ81(OFF)を出力する。
<高負荷動作M2>
 図12(a)を参照しながら、高負荷動作M2について説明する。高負荷動作M2とは、負荷装置9が、通常動作M1であるときに要求する電力(PLOAD)よりも、高い電力(PLOAD)を要求したときに実行される。高負荷動作M2は、ひとつの駆動動作を含む。高負荷動作M2であるとき、インダクタ46はエネルギを蓄積する。インダクタ46はエネルギを負荷装置9に与える。高負荷動作M2であるときの回路構成と動作とは、高電圧動作M4の蓄積駆動動作M41の回路構成及び動作と同じである。
 高負荷動作M2について説明する。高負荷動作M2であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(OFF:L)。
  制御信号φ42(OFF:L)。
  制御信号φ47(ON:H)。
  制御信号φ48(OFF:L)。
 制御信号φ41(OFF:L)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する。制御信号φ42(OFF:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φ47(ON:H)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bに接続する。制御信号φ48(OFF:L)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極から切り離す。
 その結果、発電素子2と第1スイッチ素子41と、インダクタ46と、出力側のスイッチ素子47と、負荷装置9と、を含む閉回路が構成される。この閉回路によれば、発電素子2が発生した電圧(VEH)に二次電池3の電圧(VBAT)が足しあわされた電圧(VIN)がコンバータ4の入力端子4aに提供される。その結果、インダクタ46はエネルギを蓄積する。
<無負荷動作M3>
 図12(b)を参照しながら、無負荷動作M3について説明する。無負荷動作M3であるとき、電源装置1は、負荷装置9の電力を与えない。無負荷動作M3は、負荷装置9がその動作を停止しているときに実行される。
 無負荷動作M3は、ひとつの充電動作を含む。無負荷動作M3であるとき、インダクタ46は、蓄積したエネルギを二次電池3に与える。換言すると、無負荷動作M3であるとき、二次電池3は充電される。無負荷動作M3であるときの回路構成と動作とは、高電圧動作M4の充電動作M42の回路構成及び動作と同じである。
 無負荷動作M3について説明する。無負荷動作M3であるとき、コントローラ7は、以下の制御信号を出力する。
  制御信号φ41(ON:H)。
  制御信号φ42(ON:H)。
  制御信号φ47(OFF:L)。
  制御信号φ48(ON:H)。
 制御信号φ41(ON:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(ON:H)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDに接続する。制御信号φ47(OFF:L)を受けた出力側のスイッチ素子47は、インダクタ46をコンバータ4の出力端子4bから切り離す。制御信号φ48(ON:H)を受けたフィードバック側のスイッチ素子48は、インダクタ46を二次電池3の正極に接続する。
 その結果、第2スイッチ素子42と、インダクタ46と、フィードバック側のスイッチ素子48と、二次電池3と、を含む閉回路が構成される。この閉回路によれば、インダクタ46に蓄積されたエネルギが二次電池3に与えられる。その結果、インダクタ46は、二次電池3を充電する。
 第1実施形態の電源装置1は、二次電池3と、二次電池3に対して直列に接続された発電素子2と、発電素子2の出力に接続された入力端子4aと、二次電池3の出力に接続された出力端子4bと負荷装置9に接続された出力端子4bとを有するコンバータ4と、を備える。コンバータ4は、負荷装置9の要求電力(PLOAD)及び/又は発電素子2の発生電圧(V)に基づいて、出力端子4b及び出力端子4bの少なくとも一方に電力を与える。
 要求電力(PLOAD)は、例えば、電力の値そのものであってもよい。要求電力(PLOAD)は、要求電流や要求電圧といった要求電力(PLOAD)を構成する要素で置き換えることも可能である。要求電力(PLOAD)に代えて、要求電流によって電源装置1の動作を切り替えてもよい。
 要求電力(PLOAD)、要求電流及び要求電圧は、電源装置1が能動的に負荷装置9から得てもよい。要求電力(PLOAD)、要求電流及び要求電圧は、電源装置1が受動的に負荷装置9から得てもよい。負荷装置9が能動的に要求電力(PLOAD)、要求電流及び要求電圧を電源装置1に提供してもよい。
 電源装置1は、負荷装置9が要求する電力(PLOAD)及び発電体22が発生する電圧(V)の少なくとも一方を利用して制御信号φ41、φ42、φ47、φ48を発生する。電圧(V)は、外部環境の変化に応じて増減する。従って、負荷装置9が要求する電力(PLOAD)及び電圧(V)の少なくとも一方を利用した制御によれば、外部要因の変化に応じて、電源装置1を動作させることができる。
 第1実施形態の電源装置1は、負荷装置9の要求電流と発電素子2の発生電圧の両方を回路の動作を切り替えるための制御変数として用いた。電源装置1は、通常動作M1と、高負荷動作M2と、無負荷動作M3と、高電圧動作M4と、低電圧動作M5と、別の低電圧動作M5Aと、を負荷装置9の要求電流及び発電素子2の発生電圧に応じて切り替える。
 例えば、電源装置1は、負荷装置9の要求電流だけを回路の動作を切り替えるための制御変数として用いてもよい。電源装置1は、通常動作M1と、高負荷動作M2と、無負荷動作M3と、を負荷装置9の要求電流に応じて切り替える。
 例えば、電源装置1は、発電素子2の発生電圧だけを回路の動作を切り替えるための制御変数として用いてもよい。電源装置1は、通常動作M1と、高電圧動作M4と、低電圧動作M5と、別の低電圧動作M5Aと、を発電素子2の発生電圧に応じて切り替える。
<第2実施形態>
 通常動作M1の説明において、図13(a)に示す概念図を用いて、電力の内訳について説明した。この説明において、発電素子2から取り出される電力(PE_NET)は、発電素子2が発生した電力(P)より少ないことを述べた。なぜならば、損失となる電力(PE_LOSS)が生じるからである。
 発電素子2が発生した電力(P)において、発電素子2から取り出される電力(PE_NET)と、損失となる電力(PE_LOSS)と、の割合は、電流(IIN)によって決まる。図13(b)に示すように、電流(IIN)が多すぎると、損失となる電力(PE_LOSS)の割合が多くなる。図13(c)に示すように、電流(IIN)が少なすぎると、損失となる電力(PE_LOSS)の割合は減少する。しかし、発電素子2から取り出される電力(PE_NET)の量が少なくなってしまう。
 従って、発電素子2から所望の電力を得るためには、電流(IIN)を制御する必要がある。発電素子2から所望の電力を得るとは、発電素子2から取り出される電力(PE_NET)と、損失となる電力(PE_LOSS)と、の割合を制御することであるとも言える。発電素子2から取り出される電力(PE_NET)と、損失となる電力(PE_LOSS)と、の割合は、以下の説明において「電力取出効率(η)」と称する。
 発電素子2が発生する電力(P)は、温度などの外部環境の影響を受ける。仮に、ある状態(例えば温度)において所望の電力(PE_NET)を得ることが可能な電流(IIN)が設定されていたとする。この設定を維持し続けたとすれば、ある状態が別の状態に変化した場合に、電力取出効率(η)が低下する可能性がある。
 発電素子2の電力取出効率を最大にするための条件は、下記式(2)によって示される。
  VIN=V/2…(2)
 式(2)は、発電素子2のみを対象としたものである。二次電池3の電圧(VBAT)の影響は、式(2)に含まれていない。発明者らは、発電素子2及び二次電池3を含む構成をひとつの電力発生源とみなし、電力発生源の電力取出効率(η)を最大にするための条件を鋭意検討した。
 電力発生源の電力(P)を下記式(3)によって示す。
  P=P+R×IIN …(3)
 式(2)を電圧と電流とで書き改めると、式(4)を得る。
  V×IIN=I×V+R×IIN …(4)
 電流(IIN)を最大とする条件は下記式(5)、(6)により示される。
  I=V /(4×V×R)…(5)
  IIN(MAX)=V/2×R…(6)
 電圧(VIN)は、下記式(7)により示される。発明者らは、発電素子2及び二次電池3を含む構成をひとつの電力発生源として捉えた場合において、電力効率を最大にするための条件は、式(7)であることを突き止めた。
  VIN=VBAT+V/2…(7)
 第2実施形態では、外部環境の変化が生じた場合であっても、電力取出効率(η)を所望の状態に保つことが可能な電源装置1Bを説明する。電力取出効率(η)を所望の状態に保つとは、式(7)の条件を満たすように、電源装置1Bを動作させることである。
 式(7)に示す条件は、電源装置1Bが寄生抵抗及び寄生容量などの成分を含まない理想的な電気回路に基づく。現実の電源装置1Bは、インダクタ及びトランジスタが有する寄生抵抗や寄生容量といった成分を含む。現実の電源装置1Bは、コントローラ7Bの電力消費といった電力の損失も含む。これらの要因を考慮すると、最大電力を取り出すための最適条件は、式(7)に示す条件からずれることもあり得る。電源装置1Bは、式(7)に示す条件に代えて、式(8)に示す条件を採用してもよい。
  VIN=VBAT+b×V…(8)
 式(8)は、変数bを含む。電源装置1Bの動作条件として式(8)を採用する場合には、変数bは、0.5とは異なる数値に設定される。電源装置1Bを設計するときには、図18(a)に示す第1キャパシタ75C1と、第2キャパシタ75C2と、第3キャパシタ75C3と、を適切な値に設定することによって、式(8)に示す条件を満たす動作を実現できる。アナログ回路を用いて最適条件となる上基準電圧(VREFP)及び下基準電圧(VREFN)を設定することができる。A/Dコンバータ及びD/Aコンバータを含むデジタル回路を用いて上基準電圧(VREFP)及び下基準電圧(VREFN)を設定する場合にも、式(8)に示す条件を満たす動作を実現できる。
 第2実施形態の電源装置1Bの回路構成は、第1実施形態と同じである。第2実施形態の電源装置1Bは、コンバータ4の動作に特徴を有する。外部環境の変化が生じた場合であっても、電力取出効率(η)を所望の状態に保ち続けるための動作を、MPPT動作R1と称する。以下、MPPT動作R1を実行する電源装置1Bについて詳細に説明する。
<MPPT動作R1>
 MPPT動作R1について説明する。電力取出効率(η)は、コンバータ4が受ける電流(IIN)の影響を受けることをすでに述べた。コントローラ7Bは、コンバータ4へ与えられる電流(IIN)を所望の値に維持する制御を実行する。コントローラ7Bは、コンバータ4へ与えられる電流(IIN)を所望の値に維持されるように、コンバータ4が受ける電圧(VIN)を所定の範囲に収める動作を実行する。電圧(VIN)を所定の範囲に収める動作を、「電力取出動作R11」と称する。
 電力取出効率(η)は外部環境の変化の影響を受ける。コントローラ7Bは、コンバータ4が受ける電圧(VIN)を収めるべき範囲を更新する動作を実行する。コンバータ4が受ける電圧(VIN)を収めるべき範囲を更新する動作を、「リフレッシュ動作R12」と称する。
 図14(a)は、MPPT動作R1を実行しているときの、コンバータ4が受ける電圧(VIN)を示す。MPPT動作R1は、電力取出動作R11と、リフレッシュ動作R12と、を含む。コントローラ7Bは、電力取出動作R11と、リフレッシュ動作R12と、を繰り返し実行する。
 MPPT動作R1の最小単位(TCYC)は、1回の電力取出動作R11と1回のリフレッシュ動作R12とによって定義される。図14(a)では、電力取出動作R11を先に実行し、リフレッシュ動作R12を後に実行したものを最小単位(TCYC)として示している。リフレッシュ動作R12を先に実行し、電力取出動作R11をあとに実行したものを最小単位(TCYC)として定義してもよい。
 電力取出動作R11は、負荷装置9に電力(POUT)を与える。電力取出動作R11の期間では、電圧(VIN)が所定の範囲に収まっている。所定の範囲は、上基準電圧(VREFP)(第1閾値電圧)と、下基準電圧(VREFN)(第2閾値電圧)と、によって定義される。コントローラ7Bは、電圧(VIN)が下基準電圧(VREFN)から上基準電圧(VREFP)に向かって高まるようにコンバータ4を制御する。このような動作を、サスペンド動作R111と称する(図14(b)参照)。コントローラ7Bは、電圧(VIN)が上基準電圧(VREFP)から下基準電圧(VREFN)に向かって低下するようにコンバータ4を制御する。このような動作を、レジューム動作R112と称する。レジューム動作R112は、助走動作M11と、負荷駆動動作M12と、を含む。助走動作M11及び負荷駆動動作M12は、第1実施形態ですでに説明したので、詳細な説明は省略する。電力取出動作R11の最小単位(TOP)は、1回のサスペンド動作R111と1回のレジューム動作R112とによって定義される。
 リフレッシュ動作R12は、コンバータ4が受けている電圧(VIN)の大きさを得る。リフレッシュ動作R12は、待機動作R121と、サンプル動作R122と、を含む。待機動作R121では、コンバータ4の動作を停止させることによって、キャパシタ51(図3参照)に電荷を蓄積する。キャパシタ51の容量が十分に大きいとき、電圧(VIN)の値に収束する。その結果、電圧(VIN)の大きさを得ることができる。サンプル動作R122では、待機動作M51で得た電圧(VIN)を利用して、上基準電圧(VREFP)と、下基準電圧(VREFN)と、を得る。
<コントローラ:構成>
 図15に示すように、コントローラ7Bは、負荷電流判定部71、第1電圧判定部72と、制御信号出力部73Bと、を有する。負荷電流判定部71及び第1電圧判定部72は、第1実施形態の負荷電流判定部71、電圧判定部72と、同じであるから詳細な説明は省略する。コントローラ7Bは、さらに、基準電圧発生部75と、第2電圧判定部74と、を有する。
<基準電圧発生部>
 基準電圧発生部75は、電圧(VBAT)と電圧(VIN)とを受ける。基準電圧発生部75は、電圧(VBAT)と電圧(VIN)とを利用して、上基準電圧(VREFP)と下基準電圧(VREFN)とを得る。基準電圧発生部75は、上基準電圧(VREFP)と下基準電圧(VREFN)とを第2電圧判定部74に与える。
 基準電圧発生部75は、アナログ回路を利用して上基準電圧(VREFP)と下基準電圧(VREFN)とを得てもよい。基準電圧発生部75がアナログ回路である構成例は、後述する。
 基準電圧発生部75は、デジタル回路を利用して上基準電圧(VREFP)と下基準電圧(VREFN)とを得てもよい。基準電圧発生部75は、ADコンバータによって電圧(VIN)をデジタル値に変換する。コンピュータの演算によって上基準電圧(VREFP)と下基準電圧(VREFN)とを得る。例えば、電圧(VIN)に所定の値を加算することによって、上基準電圧(VREFP)を得る。電圧(VIN)から所定の値を減算することによって、下基準電圧(VREFN)を得る。
<第2電圧判定部>
 第2電圧判定部74は、上基準電圧(VREFP)と下基準電圧(VREFN)とを受ける。第2電圧判定部74は、電圧(VIN)を受ける。
 第2電圧判定部74は、電力取出動作R11であるとき、以下の動作を実行する。第2電圧判定部74は、電圧(VIN)が上基準電圧(VREFP)に達したか否かを判定する。第2電圧判定部74は、電圧(VIN)が下基準電圧(VREFN)に達したか否かを判定する。第2電圧判定部74は、判定の結果として、制御信号φ73(SUSPEND)と、制御信号φ74(RESUME)と、を得る。第2電圧判定部74は、制御信号φ73(SUSPEND)と、制御信号φ74(RESUME)と、を制御信号出力部73Bに与える。
 電圧(VIN)が上基準電圧(VREFP)に達したと判定されたとき、第2電圧判定部74は、以下の制御信号φ73、φ74(図16(b)参照)を出力する。
  制御信号φ73(SUSPEND:H)。
  制御信号φ74(RESUME:L)。
 電圧(VIN)が下基準電圧(VREFN)に達したと判定されたとき、第2電圧判定部74は、以下の制御信号φ73、φ74(図16(b)参照)を出力する。
  制御信号φ73(SUSPEND:L)。
  制御信号φ74(RESUME:H)。
 リフレッシュ動作R12であるとき、第2電圧判定部74は、以下の制御信号φ73、φ74を出力する(図16(c)参照)。
  制御信号φ73(SUSPEND:H)。
  制御信号φ74(RESUME:L)。
 第2電圧判定部74は、アナログ回路を利用して制御信号φ73(SUSPEND)と、制御信号φ74(RESUME)と、を得てもよい。第2電圧判定部74がアナログ回路である構成例は、後述する。
 第2電圧判定部74は、デジタル回路を利用して制御信号φ73(SUSPEND)と、制御信号φ74(RESUME)と、を得てもよい。
 制御信号出力部73は、制御信号φ73(SUSPEND)及び制御信号φ74(RESUME)に応じて、波形PG、NG、PGBを切り替える。第1実施形態において、コントローラ7は、負荷電力(PLAOD)と電圧(VIN)とに応じて、5つの動作のいずれかを選択すると述べた。第2実施形態で説明するMPPT動作R1は、5つの動作のうち通常動作M1であるときに実行される。制御信号φ41、φ42、φ47、φ48と波形PG、PGN、NGの組み合わせは、下記のとおりである。
  制御信号φ41(PG)。
  制御信号φ42(NG)。
  制御信号φ47(NG)。
  制御信号φ48(PGB)。
 制御信号出力部73は、サスペンド動作R111であるとき以下の制御信号φ73、φ74を受ける(図16(b)参照)。
  制御信号φ73(SUSPEND:H)。
  制御信号φ74(RESUME::L)。
 制御信号出力部73は、上記の制御信号φ73、φ74を受けたとき、以下の制御信号φ41、φ42、φ47、φ48(図16(b)参照)を出力する。
  制御信号φ41(PG:H)。
  制御信号φ42(NG:L)。
  制御信号φ47(NG:L)。
  制御信号φ48(PGB:L)。
 制御信号出力部73は、レジューム動作R112であるとき以下の制御信号φ73、φ74を受ける(図16(b)参照)。
  制御信号φ73(SUSPEND:L)。
  制御信号φ74(RESUME::H)。
 制御信号出力部73は、上記の制御信号φ73、φ74を受けたとき、以下の助走動作M11の制御信号φ41、φ42、φ47、φ48と、負荷駆動動作M12の制御信号φ41、φ42、φ47、φ48とを交互に出力する(図16(b)参照)。
  助走動作M11の制御信号φ41(PG:L)。
  助走動作M11の制御信号φ42(NG:L)。
  助走動作M11の制御信号φ47(NG:L)。
  助走動作M11の制御信号φ48(PGB:H)。
  負荷駆動動作M12の制御信号φ41(PG:H)。
  負荷駆動動作M12の制御信号φ42(NG:H)。
  負荷駆動動作M12の制御信号φ47(NG:H)。
  負荷駆動動作の制御信号φ48(PGB:L)。
 制御信号出力部73は、リフレッシュ動作R12であるとき、以下の制御信号φ41、φ42、φ47、φ48(図16(c)参照)を出力する。
  制御信号φ41(PG:H)。
  制御信号φ42(NG:L)。
  制御信号φ47(NG:L)。
  制御信号φ48(PGB:L)。
<コントローラ:動作>
 図17を参照しながら、コントローラ7Bの動作を説明する。サスペンド動作R111を実行している状態から、動作の説明を始める。
 コントローラ7Bは、電圧(VIN)を得る(ステップS31)。コントローラ7Bは、電圧(VIN)が上基準電圧(VREFP)に達したか否かを判定する(ステップS32)。コントローラ7Bは、電圧(VIN)が上基準電圧(VREFP)に達していないと判定したとき(ステップS32:NO)、再び電圧(VIN)を得る(ステップS31)。コントローラ7Bは、電圧(VIN)が上基準電圧(VREFP)に達するまで、ステップS31とステップS32とを繰り返す。
 コントローラ7Bは、電圧(VIN)が上基準電圧(VREFP)に達したと判定したとき(ステップS32:YES)、サスペンド動作R111からレジューム動作R112に切り替える。コントローラ7Bは、レジューム動作R112を実行する(ステップS33)。コントローラ7Bは、レジューム動作R112であるとき、助走動作M11(ステップS33a)と負荷駆動動作M12(ステップS33b)とを繰り返し実行する。
 コントローラ7Bは、レジューム動作R112を実行しているときに、電圧(VIN)を得る(ステップS34)。コントローラ7Bは、電圧(VIN)が下基準電圧(VREFN)に達したか否かを判定する(ステップS35)。コントローラ7Bは、電圧(VIN)が下基準電圧(VREFN)に達していないと判定したとき(ステップS35:NO)、再び電圧(VIN)を得る(ステップS34)。コントローラ7Bは、電圧(VIN)が下基準電圧(VREFN)に達するまで、ステップS34とステップS35とを繰り返す。
 コントローラ7Bは、電圧(VIN)が下基準電圧(VREFN)に達したと判定したとき(ステップS35:YES)、リフレッシュ動作R12を実行する条件を満たしたか否かを判定する(ステップS36)。リフレッシュ動作R12を実行する条件は、例えば、あらかじめ定めた時間が経過することであってもよい。リフレッシュ動作R12を実行する条件は、例えば、あらかじめ定めた温度差が発生したことであってもよい。
 コントローラ7Bは、リフレッシュ動作R12を実行する条件を満たさないと判定したとき(ステップS36:NO)、レジューム動作R112からサスペンド動作R111に切り替える。コントローラ7Bはサスペンド動作R111を実行する(ステップS37)。再び電圧(VIN)を得る動作(ステップS31)を実行する。
 コントローラ7Bは、リフレッシュ動作R12を実行する条件を満たすまで、ステップS31~ステップS37を繰り返し実行する。このステップS31~ステップS37の動作は、電力取出動作R11(ステップS30)に対応する。
 コントローラ7Bは、リフレッシュ動作R12を実行する条件を満たすと判定したとき(ステップS36:YES)、リフレッシュ動作R12(ステップS41~ステップS44)を実行する。コントローラ7Bは、待機動作R121を実行する(ステップS41)。次に、コントローラ7Bは、電圧(VIN)が収束したか否かを判定する(ステップS42)。コントローラ7Bは、電圧(VsIN)が収束していないと判定したとき(ステップS42:NO)、待機動作R121を継続する。コントローラ7Bは、電圧(VIN)が収束したと判定したとき(ステップS41:YES)、サンプル動作R122(ステップS44)を実行する。サンプル動作R122(ステップS44)の結果、新たな上基準電圧(VREFP)と下基準電圧(VREFN)とを得る。コントローラ7Bは、再びサスペンド動作R111(ステップS44)を実行する。再び電圧(VIN)を得る動作(ステップS31)を実行する。
 基準電圧発生部75をアナログ回路によって構成する実施例と、第2電圧判定部74をアナログ回路によって構成する実施例と、を説明する。
<基準電圧発生部:その1>
 図18(a)に示すように、基準電圧発生部75は、第1入力端子75T1と、第2入力端子75T2と、第1出力端子75T3と、第2出力端子75T4と、を含む。第1入力端子75T1は、電圧(VBAT)を受ける。第2入力端子75T2は、電圧(VIN)を受ける。第1出力端子75T3は、上基準電圧(VREFP)を出力する。第2出力端子75T4は、下基準電圧(VREFN)を出力する。
 基準電圧発生部75は、第1キャパシタ75C1と、第2キャパシタ75C2と、第3キャパシタ75C3と、を含む。基準電圧発生部75は、第1スイッチ75S1と、第2スイッチ75S2と、第3スイッチ75S3と、第4スイッチ75S4と、第5スイッチ75S5と、を含む。第1~第5スイッチ75S1~75S5は、コントローラ7Bから制御信号φ75a~φ75cを受ける。
 第1キャパシタ75C1は、第2入力端子75T2と基準電圧GNDとの間に接続される。第2入力端子75T2と基準電圧GNDとの間には、第1スイッチ75S1が配置される。第1キャパシタ75C1と第1スイッチ75S1との間には、第1接続点が配置される。
 第2キャパシタ75C2は、第1入力端子75T1と基準電圧GNDとの間に接続される。第1入力端子75T1と基準電圧GNDとの間には、第2スイッチ75S2が配置される。第2キャパシタ75C2と第2スイッチ75S2との間には、第2接続点が配置される。
 第3キャパシタ75C3とは、第1基準電圧GNDと第2基準電圧GNDと間に接続される。第1基準電圧GNDと第2基準電圧GNDとの間には、第3スイッチ75S3が配置される。第3キャパシタ75C3とと第3スイッチ75S3との間には、第3接続点が配置される。
 第1接続点は第2接続点に接続されている。第1接続点と第2接続点との間には、第4スイッチ75S4が配置される。第2接続点は第3接続点に接続されている。第2接続点と第3接続点との間には、第5スイッチ75S5が配置される。
 第1接続点は、第1出力端子75T3に接続されている。第2接続点は、第2出力端子75T4に接続されている。
<動作例1>
 図18(b)及び図18(c)を参照しながら、動作例1として、回路の動作のみによって上基準電圧(VREFP)及び下基準電圧(VREFN)を得る動作を説明する。動作例1では、3つの動作を実行する。
 基準電圧発生部75は、第1動作として、以下の制御信号φ75a~φ75cを受ける。
  制御信号φ75a(H)
  制御信号φ75b(L)
  制御信号φ75c(L)
 制御信号φ75a~φ75cによれば、第1キャパシタ75C1には電圧(VIN)が与えられる。第2キャパシタ75C2には電圧(VBAT)が与えられる。第3キャパシタ75C3には電圧(0V)が与えられる。その結果、第1接続点には電圧(VIN~VBAT+V)が生じる。第2接続点には、電圧(VBAT)が生じる。第3接続点には、電圧(0V)が生じる。
 基準電圧発生部75は、第2動作として、以下の制御信号φ75a~φ75cを受ける。
  制御信号φ75a(L)
  制御信号φ75b(H)
  制御信号φ75c(L)
 上記の制御信号φ75a~φ75cによれば、第1キャパシタ75C1及び第2キャパシタ75C2が直列に接続される。その結果、第1接続点及び第2接続点には電圧(VBAT+V/2)が生じる。第3接続点には、電圧(0V)が生じる。
 基準電圧発生部75は、第3動作として、以下の制御信号φ75a~φ75cを受ける。
  制御信号φ75a(L)
  制御信号φ75b(L)
  制御信号φ75c(H)
 上記の制御信号φ75a~φ75cによれば、第2キャパシタ75C2及び第3キャパシタ75C3が直列に接続される。その結果、第1接続点には、電圧(VREFP)が生じる。第2接続点及び第3接続点には、電圧(a×(VBAT+V/2))が生じる。aは、1未満の数(例えば0.9)である。
<動作例2>
 動作例2として、回路の動作とデジタル値の演算によって上基準電圧(VREFP)及び下基準電圧(VREFN)を得る動作を説明する。
 基準電圧発生部75は、上基準電圧(VREFP)を得る。基準電圧発生部75は、ADコンバータを用いて、上基準電圧(VREFP)をデジタル値に変換する。このとき、第1キャパシタ75C1、第2キャパシタ75C2及び第3キャパシタ75C3に蓄積した電荷を放電してもよい。第1キャパシタ75C1、第2キャパシタ75C2及び第3キャパシタ75C3を用いた上基準電圧(VREFP)及び上基準電圧(VREFP)の保持は、不要である。その結果、リフレッシュ動作R12の結果は、第1キャパシタ75C1、第2キャパシタ75C2及び第3キャパシタ75C3の電圧保持特性を受けない。演算器は、デジタル値である上基準電圧(VREFP)を用いて、下基準電圧(VREFN)を計算によって得る。DAコンバータは、デジタル値である上基準電圧(VREFP)及び下基準電圧(VREFN)をアナログ値である上基準電圧(VREFP)及び下基準電圧(VREFN)に変換する。そして、第2電圧判定部74に出力する。
<第2電圧判定部>
 図19に示すように、第2電圧判定部74は、第1コンパレータ74aと、第1ラッチ回路74bと、第2コンパレータ74cと、第2ラッチ回路74dと、を含む。
 第1コンパレータ74aは、電圧(VIN)と下基準電圧(VREFN)とを比較する。第1コンパレータ74aの入力端子(正)には、電圧(VIN)が与えられる。第1コンパレータ74aの入力端子(負)には、基準電圧発生部75の第2出力端子から下基準電圧(VREFN)が与えられる。第1ラッチ回路74bは、第1コンパレータ74aの出力を受ける。第1ラッチ回路74bは、電圧(VIN)が下基準電圧(VREFN)より大きいとき、信号(L)を出力する。第1ラッチ回路74bは、電圧(VIN)が下基準電圧(VREFN)より小さいとき、信号(H)を出力する。その結果、第1ラッチ回路74bは、制御信号φ73(SUSPEND)を出力する。
 第2コンパレータ74cは、電圧(VIN)と上基準電圧(VREFP)とを比較する。第2コンパレータ74cの入力端子(正)には、基準電圧発生部75から上基準電圧(VREFP)が与えられる。第2コンパレータ74cの入力端子(負)には、電圧(VIN)が与えられる。第2ラッチ回路74dは、第2コンパレータ74cの出力を受ける。第2ラッチ回路74dは、電圧(VIN)が上基準電圧(VREFN)より小さいとき、信号(L)を出力する。第2ラッチ回路74dは、電圧(VIN)が上基準電圧(VREFP)より大きいとき、信号(H)を出力する。その結果、第2ラッチ回路74dは、制御信号φ74(RESUME)を出力する。
 第2実施形態の電源装置1Bは、二次電池3と、二次電池3に対して直列に接続された発電素子2と、発電素子2の出力に接続された入力端子4aと、二次電池3の出力に接続された出力端子4bと負荷装置9に接続された出力端子4bとを有するコンバータ4と、を備える。コンバータ4は、発電素子2の電圧(V)及び二次電池3が発生する電圧(VBAT)に基づいて決まる電力取出条件を満たすようにコンバータ4を駆動させる電力取出動作R11と、発電素子2の発生電圧(V)を利用して、電力取出条件を得るリフレッシュ動作R12と、を繰り返す。コンバータ4の動作によれば、外部要因の変化した場合であっても、発電素子2から電力を好適に取り出すことができる。
 コントローラ7Bは、コンバータ4が受ける電圧(VIN)が電力取出条件(VREFP、VREFN)を満たすようにコンバータ4を駆動させる電力取出動作R11と、電力取出条件(VREFP、VREFN)を得るリフレッシュ動作R12と、を繰り返す。このような制御によれば、外部要因の変化した場合であっても、発電素子2から電力を好適に取り出すことができる。
 1実施形態の電源装置1は、インダクタ46が出力する電流(I)は、負荷装置9へ与えられる電流(IOUT)となるか、二次電池3へ与えられる電流(IBACK)となるか、の何れかであった。図20(a)に示すように、コンバータ4から負荷装置9へ電流(IOUT)を与える負荷出力期間K1は、コンバータ4から二次電池3へ電流(IBACK)を与える充電期間K2と重複していない。
 例えば、図20(b)に示すように、負荷出力期間K1は、充電期間K2と一致してもよい。この一致とは、負荷出力期間K1を開始するタイミングと充電期間K2を開始するタイミングとが一致すると共に、負荷出力期間K1を終了するタイミングと充電期間K2を終了するタイミングとが一致することをいう。負荷出力期間K1の長さは、充電期間K2の長さと同じであるともいえる。このような動作を行う場合を、第3実施形態として説明する。
 図20(c)に示すように、負荷出力期間K1の一部は、充電期間K2の一部分と重複してもよい。この場合には、出力を開始するタイミングと、出力を停止するタイミングの少なくとも一方が一致しない。図20(c)に示す例示では、負荷出力期間K1と充電期間K2とを同時に開始する。負荷出力期間K1が継続しているときに充電期間K2を終了する。その結果、コンバータ4から負荷装置9へ電流(IOUT)を与えると共に二次電池3へ電流(IBACK)を与える動作(重複出力動作M11D)と、コンバータ4から負荷装置9へ電流(IOUT)を与える動作(負荷出力動作M12D)と、がこの順に実行される。このような動作を行う場合を、第4実施形態として説明する。
<第3実施形態>
 図21は、第3実施形態の電源装置1Cの具体的な回路の一例である。電源装置1Cは、発電素子2と、二次電池3と、コンバータ4Cと、コントローラ7と、を有する。発電素子2、二次電池3は、第1実施形態と同じであるので詳細な説明は省略する。
 コンバータ4Cは、スイッチ素子47、48に代えて、インダクタ46側のスイッチ素子N1と、フィードバック側のスイッチ素子P1と、出力側のスイッチ素子P2と、を含む。スイッチ素子N1、P1、P2は、例えば、絶縁ゲート電界効果トランジスタ(MOSFET)である。
 インダクタ46側のスイッチ素子N1は、インダクタ46に蓄積された電力を負荷装置9に与える動作と、負荷装置9への提供を停止する動作と、を相互に切り替える。スイッチ素子N1は、インダクタ46とコンバータ4の出力端子4dとの間に設けられている。具体的には、スイッチ素子N1のドレインは、インダクタ46に接続されている。スイッチ素子N1のソースは、スイッチ素子P2を介して出力端子4dに接続されている。スイッチ素子N1のソースは、スイッチ素子P1を介して二次電池3にも接続されている。スイッチ素子N1のゲートは、制御信号φN1を受ける。
 スイッチ素子N1は、nチャネル型のMOFETである。スイッチ素子N1は、制御信号φN1(H)を受けたとき、インダクタ46をコンバータ4の出力端子4dに接続する。スイッチ素子N1は、制御信号φN1(L)を受けたとき、インダクタ46をコンバータ4の出力端子4dから切り離す。
 フィードバック側のスイッチ素子P1は、インダクタ46から二次電池3に提供される電流(IBACK)の大きさを調整する。スイッチ素子P1は、スイッチ素子N1と二次電池3の出力との間に設けられている。具体的には、スイッチ素子N1のドレインは、スイッチ素子N1に接続されている。スイッチ素子N1のソースは、二次電池3の出力に接続されている。スイッチ素子P1のゲートは、制御信号φP1を受ける。
 スイッチ素子P1は、pチャネル型のMOFETである。スイッチ素子P1は、制御信号φP1を受けたとき、ドレインとソースとの間に制御信号φP1の電圧の高さに応じた電流を流す。スイッチ素子P1は、インダクタ46から二次電池3へ制御信号φP1の電圧の高さに応じた電流(IBACK)を流す。
 出力側のスイッチ素子P2は、インダクタ46から負荷装置9に提供される電流(IOUT)の大きさを調整する。スイッチ素子P2は、スイッチ素子N1とコンバータ4の出力端子4dとの間に設けられている。スイッチ素子N1のドレインは、スイッチ素子N1に接続されている。スイッチ素子N1のソースは、コンバータ4の出力端子4dに接続されている。スイッチ素子P2のゲートは、制御信号φP2を受ける。
 スイッチ素子P2は、pチャネル型のMOFETである。スイッチ素子P2は、制御信号φP2を受けたとき、ドレインとソースとの間に制御信号φP2の電圧の高さに応じた電流を流す。スイッチ素子P2は、インダクタ46から負荷装置9へ制御信号φP2の電圧の高さに応じた電流(IOUT)を流す。
<電源装置1Cの動作>
 以下、第3実施形態の電源装置1Cの動作について説明する。電源装置1Cも第1実施形態の電源装置1と同様に、5つの動作を実行可能である。電源装置1Cは、通常動作M1C、高負荷動作M2C、無負荷動作M3C、高電圧動作M4C、低電圧動作M5C、M5CAを実行する。図22には、制御信号と、波形との組み合わせを示す。
<通常動作M1C>
 制御信号出力部73は、通常動作M1Cのための制御信号φ41、φ42、φN1、φP1、φP2として、以下の組み合わせを出力する。
  制御信号φ41(PG)。
  制御信号φ42(NG)。
  制御信号φN1(PGB&NG)。
  制御信号φP1(Vgp1a)。
  制御信号φP2(Vgp2a)。
 図23(a)は、制御信号φ41、φ42、φN1、φP1、φP2を受けたときの回路の接続構成を示す。スイッチ素子N1は、制御信号φN1として波形PGB及び波形NGの両方を受ける。この場合には、波形PGB(H)であるとき(図6の第1期間D1)又は波形NG(H)であるとき(図6の第2期間D2)に、インダクタ46から二次電池3へ電流(IBACK)が与えられると共に、負荷装置9にも電流(IOUT)が与えられる。スイッチ素子N1は、一括して二次電池3及び負荷装置9への電流の提供を行うと共に、一括して二次電池3及び負荷装置9への電流の提供を停止する。二次電池3には、スイッチ素子P1が受ける制御信号φP1の電圧に応じた電流(IBACK)が与えられる。負荷装置9には、スイッチ素子P2が受ける制御信号φP2の電圧に応じた電流(IOUT)が与えられる。制御信号φP1の電圧(Vgp1a)と制御信号φP2の電圧(Vgp2a)との比率は、二次電池3に与える電流(IBACK)と負荷装置9に与える電流(IOUT)の比率に対応する。
 例えば、制御信号φP1の電圧(Vgp1a)は、制御信号φP2の電圧(Vgp1b)より小さくてもよい。この場合には、二次電池3に与える電流(IBACK)は、負荷装置9に与える電流(IOUT)よりも小さい。負荷装置9に多くの電流が供給される。
<高負荷動作M2C>
 制御信号出力部73は、高負荷動作M2Cのための制御信号φ41、φ42、φN1、φP1、φP2として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(OFF)。
  制御信号φN1(ON)。
  制御信号φP1(OFF)。
  制御信号φP2(ON)。
 図23(b)は、上記の制御信号φ41、φ42、φN1、φP1、φP2を受けたときの回路の接続構成を示す。図23(b)の接続構成は、第1実施形態の高負荷動作M2であるときの接続構成(図12(a))と同じであるから、詳細な説明は省略する。
<無負荷動作M3C>
 制御信号出力部73は、無負荷動作M3Cのための制御信号φ41、φ42、φN1、φP1、φP2として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(ON)。
  制御信号φN1(ON)。
  制御信号φP1(ON)。
  制御信号φP2(OFF)。
 図24(a)は、上記の制御信号φ41、φ42、φN1、φP1、φP2を受けたときの回路の接続構成を示す。図24(a)の接続構成は、第1実施形態の無負荷動作M3であるときの接続構成(図12(b))と同じであるから、詳細な説明は省略する。
<高電圧動作M4C>
 制御信号出力部73は、高電圧動作M4Cのための制御信号φ41、φ42、φN1、φP1、φP2として、以下の組み合わせを出力する。
  制御信号φ41(PG)。
  制御信号φ42(NG)。
  制御信号φN1(PGB&NG)。
  制御信号φP1(Vgp1b)。
  制御信号φP2(Vgp2b)。
 図24(b)は、上記の制御信号φ41、φ42、φN1、φP1、φP2を受けたときの回路の接続構成を示す。図24(b)の接続構成は、図23(a)に示された通常動作M1Cの接続構成と同じである。高電圧動作M4Cであるときの制御信号φP1の電圧と制御信号φP2の電圧の大小関係は、通常動作M1Cであるときの制御信号φP1の電圧と制御信号φP2の電圧の大小関係と異なる。
 例えば、制御信号φP1の電圧(Vgp1b)は、制御信号φP2の電圧(Vgp2b)より大きくてもよい。この場合には、二次電池3に与える電流(IBACK)は、負荷装置9に与える電流(IOUT)よりも大きい。二次電池3に多くの電流が供給される。
<低電圧動作M5C、M5CA>
 制御信号出力部73は、低電圧動作M5Cのための制御信号φ41、φ42、φN1、φP1、φP2として、以下の組み合わせを出力する。
  制御信号φ41(ON)。
  制御信号φ42(OFF)。
  制御信号φN1(ON)。
  制御信号φP1(ON)。
  制御信号φP2(ON)。
 図25(a)は、上記の制御信号φ41、φ42、φN1、φP1、φP2を受けたときの回路の接続構成を示す。図25(a)の接続構成は、第1実施形態の低電圧動作M5であるときの接続構成(図11(a))と同じであるから、詳細な説明は省略する。
 制御信号出力部73は、変形例の低電圧動作M5CAのための制御信号φ41、φ42、φN1、φP1、φP2として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(OFF)。
  制御信号φN1(ON)。
  制御信号φP1(OFF)。
  制御信号φP2(ON)。
  制御信号φ81(ON)。
 図25(b)は、上記の制御信号φ41、φ42、φN1、φP1、φP2を受けたときの回路の接続構成を示す。図25(b)の接続構成は、第1実施形態の低電圧動作M5Cであるときの接続構成(図11(b))と同じであるから、詳細な説明は省略する。
<第4実施形態>
 図26は、第4実施形態の電源装置1Dの具体的な回路の一例である。電源装置1Dは、発電素子2と、二次電池3と、コンバータ4Dと、コントローラ7と、を有する。発電素子2、二次電池3は、第1実施形態と同じであるので詳細な説明は省略する。
 コンバータ4Dは、スイッチ素子47、48に代えて、フィードバック側の第1スイッチ素子N2とインダクタ46側のスイッチ素子N3と、フィードバック側の第2スイッチ素子P3と、出力側のスイッチ素子P4と、を含む。スイッチ素子N2、N3、P3、P4は、例えば、絶縁ゲート電界効果トランジスタ(MOSFET)である。
 フィードバック側の第1スイッチ素子N2は、インダクタ46に蓄積された電力を二次電池3に与える動作と、二次電池3への提供を停止する動作と、を相互に切り替える。スイッチ素子N2は、インダクタ46と二次電池3との間に設けられている。スイッチ素子N2のドレインは、インダクタ46に接続されている。スイッチ素子N2のソースは、スイッチ素子P3を介して二次電池3に接続されている。第1スイッチ素子N2のゲートは、制御信号φN2を受ける。
 スイッチ素子N2は、nチャネル型のMOFETである。スイッチ素子N2は、制御信号φN2(H)を受けたとき、インダクタ46を二次電池3に接続する。スイッチ素子N2は、制御信号φN2(L)を受けたとき、インダクタ46を二次電池3から切り離す。
 インダクタ46側のスイッチ素子N3は、インダクタ46に蓄積された電力を負荷装置9に与える動作と、負荷装置9への提供を停止する動作と、を相互に切り替える。スイッチ素子N3は、スイッチ素子P4を介してインダクタ46とコンバータ4の出力端子4dとの間に設けられている。スイッチ素子N3のドレインは、インダクタ46に接続されている。スイッチ素子N3のソースは、スイッチ素子P4を介してコンバータ4の出力端子4dに接続されている。スイッチ素子N3のゲートは、制御信号φN3を受ける。
 スイッチ素子N3は、nチャネル型のMOFETである。スイッチ素子N3は、制御信号φN3(H)を受けたとき、インダクタ46を負荷装置9に接続する。スイッチ素子N3は、制御信号φN3(L)を受けたとき、インダクタ46を二次電池3から切り離す。
 フィードバック側の第2スイッチ素子P3は、インダクタ46から二次電池3に提供される電流(IBACK)の大きさを調整する。第2スイッチ素子P3は、第1スイッチ素子N2と二次電池3の出力との間に設けられている。第2スイッチ素子P3のドレインは、第1スイッチ素子N2に接続されている。第2スイッチ素子P3のソースは、二次電池3の出力に接続されている。第2スイッチ素子P3のゲートは、制御信号φP3を受ける。
 第2スイッチ素子P3は、pチャネル型のMOFETである。第2スイッチ素子P3は、制御信号φP3を受けたとき、ドレインとソースとの間に制御信号φP3の電圧の高さに応じた電流を流す。第2スイッチ素子P3は、インダクタ46から二次電池3へ制御信号φP3の電圧の高さに応じた電流(IBACK)を流す。
 出力側のスイッチ素子P4は、インダクタ46から負荷装置9に提供される電流(IOUT)の大きさを調整する。スイッチ素子P4は、スイッチ素子N3とコンバータ4の出力端子4dとの間に設けられている。スイッチ素子P4のドレインは、スイッチ素子N3に接続されている。スイッチ素子P4のソースは、コンバータ4の出力端子4dに接続されている。スイッチ素子P4のゲートは、制御信号φP4を受ける。
 スイッチ素子P4は、pチャネル型のMOFETである。スイッチ素子P4は、制御信号φP4を受けたとき、ドレインとソースとの間に制御信号φP4の電圧の高さに応じた電流を流す。スイッチ素子P4は、インダクタ46から負荷装置9へ制御信号φP4の電圧の高さに応じた電流(IOUT)を流す。
<電源装置1Dの動作>
 以下、第3実施形態の電源装置1Dの動作について説明する。電源装置1Dも第1実施形態の電源装置1と同様に、5つの動作を実行可能である。電源装置1Dは、通常動作M1D、高負荷動作M2D、無負荷動作M3D、高電圧動作M4D、低電圧動作M5D、M5DAを実行する。図27には、制御信号と、波形との組み合わせを示す。
<通常動作M1D>
 制御信号出力部73は、通常動作M1Dのための制御信号φ41、φ42、φN2、φN3、φP3、φP4として、以下の組み合わせを出力する。
  制御信号φ41(PG)。
  制御信号φ42(NG)。
  制御信号φN2(PGB)。
  制御信号φN3(PGB&NG)。
  制御信号φP3(Vgp3a)。
  制御信号φP4(Vgp4a)。
 図28(a)及び図28(b)は、上記の制御信号φ41、φ42、φN2、φN3、φP3、φP4を受けたときの回路の接続構成を示す。通常動作M1Dは、重複出力動作M11Dと、負荷出力動作M12Dと、を含む。重複出力動作M11D及び負荷出力動作M12Dは、図20(c)に示す出力動作に対応する。
 図28(a)は、重複出力動作M11Dであるときの回路の接続構成である。制御信号φ41(PG:L)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する。制御信号φ42(NG:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φN2(PGB:H)を受けたスイッチ素子N2は、インダクタ46を二次電池3に接続する。制御信号φN3(PGB:H、NG:L)を受けたスイッチ素子N3は、インダクタ46を負荷装置9に接続する。その結果、負荷装置9には、スイッチ素子P4が受ける制御信号φP4(Vgp4a)に応じた電流(IOUT)が与えられる。さらに、二次電池3にはスイッチ素子P3が受ける制御信号φP3(Vgp3a)に応じた電流(IBACK)が与えられる。重複出力動作M11Dでは、負荷装置9に電流(IOUT)を与える期間と、二次電池3に電流(IBACK)を与える期間と、が重複している。
 図28(b)は、負荷出力動作M12Dであるときの回路の接続構成である。制御信号φ41(PG:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(NG:H)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDに接続する。制御信号φN2(PGB:L)を受けたスイッチ素子N2は、インダクタ46を二次電池3から切り離す。制御信号φN3(PGB:L、NG:H)を受けたスイッチ素子N3は、インダクタ46を負荷装置9に接続する。その結果、負荷装置9には、スイッチ素子P4が受ける制御信号φP4(Vgp4a)に応じた電流(IOUT)が与えられる。二次電池3には、電流(IBACK)が与えられない。重複出力動作M11Dでは、負荷装置9に電流(IOUT)を与える期間は、二次電池3に電流(IBACK)を与える期間と重複しない。
 例えば、制御信号φP3の電圧(Vgp3a)は、制御信号φP4の電圧(Vgp4b)より小さくてもよい。この場合には、二次電池3に与える電流(IBACK)は、負荷装置9に与える電流(IOUT)よりも小さい。負荷装置9に多くの電流が供給される。
<高負荷動作M2D>
 制御信号出力部73は、高負荷動作M2Dのための制御信号φ41、φ42、φN2、φN3、φP3、φP4として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(OFF)。
  制御信号φN2(OFF)。
  制御信号φN3(ON)。
  制御信号φP3(OFF)。
  制御信号φP4(ON)。
 図29(a)は、上記の制御信号φ41、φ42、φN2、φN3、φP3、φP4を受けたときの回路の接続構成を示す。図29(a)の接続構成は、第1実施形態の高負荷動作M2であるときの接続構成(図12(a))と同じであるから、詳細な説明は省略する。
<無負荷動作M3D>
 制御信号出力部73は、無負荷動作M3Dのための制御信号φ41、φ42、φN2、φN3、φP3、φP4として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(ON)。
  制御信号φN2(ON)。
  制御信号φN3(OFF)。
  制御信号φP3(ON)。
  制御信号φP4(OFF)。
 図29(b)は、上記の制御信号φ41、φ42、φN2、φN3、φP3、φP4を受けたときの回路の接続構成を示す。図29(a)の接続構成は、第1実施形態の無負荷動作M3であるときの接続構成(図12(b))と同じであるから、詳細な説明は省略する。
<高電圧動作M4D>
 制御信号出力部73は、高電圧動作M4Dのための制御信号φ41、φ42、φN2、φN3、φP3、φP4として、以下の組み合わせを出力する。
  制御信号φ41(PG)。
  制御信号φ42(NG)。
  制御信号φN2(PGB&NG)。
  制御信号φN3(PGB)。
  制御信号φP3(Vgp3b)。
  制御信号φP4(Vgp4b)。
 図30(a)及び図30(b)は、上記の制御信号φ41、φ42、φN2、φN3、φP3、φP4を受けたときの回路の接続構成を示す。高電圧動作M4Dは、重複出力動作M41Dと、充電動作M42Dと、を含む。
 図30(a)は、重複出力動作M41Dであるときの回路の接続構成である。制御信号φ41(PG:L)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46に接続する。制御信号φ42(NG:L)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDから切り離す。制御信号φN2(PGB:H、NG:L)を受けたスイッチ素子N2は、インダクタ46を二次電池3に接続する。制御信号φN3(PGB:H)を受けたスイッチ素子N3は、インダクタ46を負荷装置9に接続する。その結果、二次電池3には、スイッチ素子P3が受ける制御信号φP3(Vgp3b)に応じた電流(IBACK)が与えられる。負荷装置9には、スイッチ素子P4が受ける制御信号φP4(Vgp4b)に応じた電流(IOUT)が与えられる。重複出力動作M41Dでは、負荷装置9に電流(IOUT)を与える期間と、二次電池3に電流(IBACK)を与える期間と、が重複している。
 図30(b)は、充電動作M42Dであるときの回路の接続構成である。制御信号φ41(PG:H)を受けた第1スイッチ素子41は、コンバータ4の入力端子4aをインダクタ46から切り離す。制御信号φ42(NG:H)を受けた第2スイッチ素子42は、インダクタ46を基準電圧GNDに接続する。制御信号φN2(PGB:L、NG:H)を受けたスイッチ素子N2は、インダクタ46を二次電池3に接続する。制御信号φN3(PGB:L)を受けたスイッチ素子N3は、インダクタ46を負荷装置9から切り離す。その結果、負荷装置9には、電流(IOUT)が与えられない。二次電池3には、スイッチ素子P3が受ける制御信号φP3(Vgp3b)に応じた電流(IBACK)が与えられる。充電動作M42Dでは、二次電池3に電流(IBACK)を与える期間は、負荷装置9に電流(IOUT)を与える期間と重複しない。
 例えば、制御信号φP3の電圧(Vgp3b)は、制御信号φP4の電圧(Vgp4b)より大きくてもよい。この場合には、二次電池3に与える電流(IBACK)は、負荷装置9に与える電流(IOUT)よりも大きい。二次電池3に多くの電流が供給される。
<低電圧動作M5D、M5DA>
 制御信号出力部73は、低電圧動作M5Dのための制御信号φ41、φ42、φN2、φN3、φP3、φP4として、以下の組み合わせを出力する。
  制御信号φ41(ON)。
  制御信号φ42(OFF)。
  制御信号φN2(ON)。
  制御信号φN3(ON)。
  制御信号φP3(ON)。
  制御信号φP4(ON)。
 図31(a)は、上記の制御信号φ41、φ42、φN2、φN3、φP3、φP4を受けたときの回路の接続構成を示す。図29(a)の接続構成は、第1実施形態の低電圧動作M5であるときの接続構成(図11(a))と同じであるから、詳細な説明は省略する。
 制御信号出力部73は、変形例の低電圧動作M5DAのための制御信号φ41、φ42、φN2、φN3、φP3、φP4として、以下の組み合わせを出力する。
  制御信号φ41(OFF)。
  制御信号φ42(OFF)。
  制御信号φN2(OFF)。
  制御信号φN3(ON)。
  制御信号φP3(OFF)。
  制御信号φP4(ON)。
 図31(b)は、上記の制御信号φ41、φ42、φN2、φN3、φP3、φP4を受けたときの回路の接続構成を示す。図31(b)の接続構成は、第1実施形態の低電圧動作M5Aであるときの接続構成(図11(b))と同じであるから、詳細な説明は省略する。
<変形例>
 本発明の電源装置は、第1実施形態の電源装置1及び第2実施形態の電源装置1Bの構成や動作には、限定されない。
<第1変形例>
 図32は、第1変形例の電源装置1Eの構成を示す。電源装置1Eは、キャパシタ51に代えて、キャパシタ53、534を備える。キャパシタ53、54は、第1実施形態のキャパシタ51を2個のキャパシタに分割したものと捉えてよい。
 電源装置1Eは、いくつかのノードH1、H2、H3、H4を含む。ノードH1は、二次電池3の正極を発電素子2に接続する配線に設けられている。ノードH2は、コンバータ4の出力端子4cを二次電池3の負極に接続する配線に設けられている。ノードH3は、発電素子2をコンバータ4の入力端子4aに接続する配線に設けられている。ノードH4は、コンバータ4の出力端子4bをノードH1に接続する配線に設けられている。
 キャパシタ53は、ノードH3とノードH4との間に設けられている。キャパシタ54は、ノードH2とノードH4との間に設けられている。キャパシタ53は、ノードN4を介してキャパシタ54に直列に接続されている。
<第2変形例>
 図33は、第2変形例の電源装置1Fの構成を示す。電源装置1Fは、発電素子2に代えて、発電素子2Fを備える。発電素子2Fは、発電体22Fと、全波整流器2Sと、キャパシタ24と、を備える。全波整流器2Sは、4個のダイオード25A、25B、25C、25Dによって構成されている。発電体22Fは、外部エネルギを受けて交流の電力を発生する。全波整流器2Sは、発電体22Fが発生した交流の電力を、全波整流する。キャパシタ24は、全波整流器2Sが出力する整流後の直流の電力を保持する。発電素子2Fは、発生する電力は交流であるが、コンバータ4に与える電力は、直流である。
<第3変形例>
 図34は、第3変形例の電源装置1Gの構成を示す。電源装置1Gは、第1変形例の電源装置1Eのように、2個のキャパシタ53、54を備える。電源装置1Gは、第2変形例のように、交流の電力を発生する発電体22Gを有する発電素子2Gを備える。
 第1変形例の電源装置1E、第2変形例の電源装置1F及び第3変形例の電源装置1Gは、第1実施形態の電源装置1と同様に外部要因の変化に応じた動作を実行してよい。その結果、上述した第1変形例の電源装置1E、第2変形例の電源装置1F及び第3変形例の電源装置1Gは、第1実施形態の電源装置1と同様に外部要因の変化に応じて適切な動作を選択できる。
 第1変形例の電源装置1E、第2変形例の電源装置1F及び第3変形例の電源装置1Gは、第2実施形態の電源装置1Bと同様に電力取出条件を満たす動作を実行してよい。その結果、第1変形例の電源装置1E、第2変形例の電源装置1F及び第3変形例の電源装置1Gは、第2実施形態の電源装置1Bと同様に、外部要因の変化した場合であっても、発電素子2Eから電力を好適に取り出すことができる。
 第1変形例の電源装置1E、第2変形例の電源装置1F及び第3変形例の電源装置1Gは、コンバータ4の具体的な回路構成として、第3実施形態のコンバータ4C(図21参照)を採用すると共に第3実施形態の電源装置1Cと同様の動作を実行してよい。電源装置1Eは、コンバータ4の具体的な回路構成として、第4実施形態のコンバータ4D(図26参照)を採用すると共に第4実施形態の電源装置1Dと同様の動作を実行してよい。その結果、第1変形例の電源装置1E、第2変形例の電源装置1F及び第3変形例の電源装置1Gは、インダクタ46から二次電池3及び負荷装置9への出力の態様を選択することができる。
<第4変形例>
 電源装置1と負荷装置9との間には、図35に示す追加回路100が設けられてもよい。
 追加回路100は、スイッチ素子101と、キャパシタ102と、二次電池103と、第1検知回路部104と、第2検知回路部105と、を有する。
 スイッチ素子101は、電源装置1を負荷装置9に接続する配線に設けられている。スイッチ素子101は、例えばp型のMOSFETである。
 第1検知回路部104は、電源装置1をスイッチ素子101に接続する配線と、基準電圧GNDとの間に配置されている。
 第1検知回路部104は、抵抗要素104aと、第1コンパレータ104bと、を有する。抵抗要素104aは、電源装置1をスイッチ素子101に接続する配線と、基準電圧GNDとの間に配置されている。第1コンパレータ104bの第1入力端子は、抵抗要素104aを基準電圧GNDに接続する配線に接続されている。第1コンパレータ104bの第2入力端子は、制限電圧(VS1)を受ける。第1コンパレータ104bは、電源装置1が出力する電圧(VOUT)が制限電圧(VS1)より大きくなったとき、制御信号φ104(H)を出力する。制御信号φ104(H)は、スイッチ素子101に与えられる。制御信号φ104(H)を受けたスイッチ素子101は、電源装置1を負荷装置9から切り離す。その結果、第1検知回路部104は、電源装置1から過剰な電圧が出力されることを抑制する。
 キャパシタ102は、電源装置1をスイッチ素子101に接続する配線と、基準電圧GNDとの間に配置されている。
 二次電池103は、スイッチ素子101を負荷装置9に接続する配線と、基準電圧GNDとの間に配置されている。
 第2検知回路部105は、コンバータ4を負荷装置9に接続する配線と、基準電圧GNDとの間に配置されている。
 第2検知回路部105は、第2コンパレータ105aと、第3コンパレータ105bと、を有する。
 第2コンパレータ105aの第1入力端子は、電圧(VBAT_LOAD)を受ける。第2コンパレータ105aの第2入力端子は、制限電圧(VS2)を受ける。第2コンパレータ105aは、電圧(VBAT_LOAD)が制限電圧(VS2)より大きくなったとき、制御信号φ105a(H)を出力する。制御信号φ105a(H)を受けたスイッチ素子101は、電源装置1を負荷装置9から切り離す。電源装置1から過剰な電流が二次電池103に与えられることを抑制する。
 第3コンパレータ105bの第1入力端子は、電圧(VBAT_LOAD)を受ける。第3コンパレータ105bの第2入力端子は、制限電圧(VS2)を受ける。第3コンパレータ105bは、電圧(VBAT_LOAD)が制限電圧(VS2)より小さくなったとき、制御信号φ105b(H)を出力する。制御信号φ105b(H)を受けたスイッチ素子101は、電源装置1を負荷装置9に接続する。その結果、二次電池103が出力する電圧(VBATT_LOAD)が下がり過ぎることを抑制する。
 第2検知回路部105は、二次電池103の電圧(VBAT_LOAD)を、所定の範囲内に収める。
 本発明の電源装置は、[1]「負荷装置に電力を与える電源装置であって、二次電池と、前記二次電池に対して直列に接続された発電素子と、前記発電素子に接続された第1端子と、前記負荷装置に接続された第2端子と、前記二次電池に接続された第3端子と、を有するコンバータと、を備え、前記コンバータは、前記負荷装置の要求電力及び/又は前記発電素子の発生電圧に基づいて、前記第2端子及び前記第3端子の少なくとも一方に前記電力を発生させる、電源装置。」であってもよい。
 本発明の電源装置は、[2]「前記コンバータは、前記負荷装置の要求電力が第1閾値電流より大きいときに、蓄積駆動動作を実行し、前記蓄積駆動動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に前記第1端子から受けた電力を蓄積すると共に、前記エネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第2端子へ発生させることによって前記負荷装置に電力を与える、上記[1]に記載の電源装置。」であってもよい。
 本発明の電源装置は、[3]「前記コンバータは、前記負荷装置の要求電力が第2閾値電流より小さいときに、充電動作を実行し、前記充電動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第3端子へ発生させることによって前記二次電池に電力を与える、上記[1]又は[2]に記載の電源装置。」であってもよい。
 本発明の電源装置は、[4]「前記コンバータは、負荷駆動動作と、充電動作と、を選択的に実行し、前記負荷駆動動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第2端子へ発生させることによって前記負荷装置に電力を与え、前記充電動作であるときの前記コンバータは、前記エネルギ蓄積素子に蓄積された前記エネルギを前記電力として前記第3端子へ発生させることによって前記二次電池に電力を与える、上記[1]~[3]のいずれかひとつに記載の電源装置。」であってもよい。
 本発明の電源装置は、[5]「前記コンバータは、蓄積駆動動作と充電動作とを選択的に実行し、前記蓄積駆動動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に前記第1端子から受けた電力を蓄積すると共に、前記エネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第2端子へ発生させることによって前記負荷装置に電力を与え、前記充電動作であるときの前記コンバータは、前記エネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第3端子へ発生させることによって前記二次電池に電力を与える、上記[1]~[4]のいずれかひとつに記載に記載の電源装置。」であってもよい。
 本発明の電源装置は、[6]「前記コンバータは、直接供給動作を実行し、前記直接供給動作であるときの前記コンバータは、前記第2端子を前記第3端子に接続することによって、前記二次電池の電力を前記負荷装置に与える、上記[1]~[5]のいずれかひとつに記載の電源装置。」であってもよい。
 本発明の電源装置は、[7]「前記二次電池の出力と前記コンバータの入力とを接続可能な短絡回路をさらに備え、前記短絡回路は、前記発電素子を介して前記二次電池を前記コンバータに接続する態様と、前記発電素子を介することなく前記二次電池を前記コンバータに直接に接続する態様と、を相互に切り替える、上記[1]~[6]のいずれかひとつに記載の電源装置。」であってもよい。
 本発明の電源装置は、[8]「前記コンバータが前記第2端子を介して前記負荷装置に電力を与える期間は、前記コンバータが前記第3端子を介して前記二次電池に電力を与える期間と重複しない、上記[1]~[7]のいずれかひとつに記載の電源装置。」であってもよい。
 本発明の電源装置は、[9]「前記コンバータが前記第2端子を介して前記負荷装置に電力を与える期間は、前記コンバータが前記第3端子を介して前記二次電池に電力を与える期間と一致する、上記[1]~[7]のいずれかひとつに記載の電源装置。」であってもよい。
 本発明の電源装置は、[10]「前記コンバータが前記第2端子を介して前記負荷装置に電力を与える期間の一部は、前記コンバータが前記3端子を介して前記二次電池に電力を与える期間の一部と重複する、上記[1]~[7]のいずれかひとつに記載の電源装置。」であってもよい。
 本発明の電源装置は、[11]「前記コンバータは、前記発電素子の発生電圧及び前記二次電池が発生する電圧に基づいて決まる電力取出条件を満たすように前記コンバータを駆動させる動作と、前記発電素子の発生電圧を利用して、前記電力取出条件を得る動作と、を繰り返す、上記[1]~[10]のいずれかひとつに記載の電源装置。」であってもよい。
1,1A,1B,1C,1D,1E,1F,1G…電源装置、2,2E,2F,2G…発電素子、3…二次電池、4…コンバータ、4a…入力端子、4b…出力端子(第1出力端子)、4c…出力端子(第2出力端子)、7…コントローラ、9…負荷装置、80…短絡回路。

 

Claims (12)

  1.  負荷装置に電力を与える電源装置であって、
     二次電池と、
     前記二次電池に対して直列に接続された発電素子と、
     前記発電素子に接続された第1端子と、前記負荷装置に接続された第2端子と、前記二次電池に接続された第3端子と、を有するコンバータと、を備え、
     前記コンバータは、前記負荷装置の要求電力及び/又は前記発電素子の発生電圧に基づいて、前記第2端子及び前記第3端子の少なくとも一方に前記電力を発生させる、電源装置。
  2.  前記コンバータは、前記負荷装置の要求電力が第1閾値電流より大きいときに、蓄積駆動動作を実行し、
     前記蓄積駆動動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に前記第1端子から受けた電力を蓄積すると共に、前記エネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第2端子へ発生させることによって前記負荷装置に電力を与える、請求項1に記載の電源装置。
  3.  前記コンバータは、前記負荷装置の要求電力が第2閾値電流より小さいときに、充電動作を実行し、
     前記充電動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第3端子へ発生させることによって前記二次電池に電力を与える、請求項1に記載の電源装置。
  4.  前記コンバータは、負荷駆動動作と、充電動作と、を選択的に実行し、
     前記負荷駆動動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第2端子へ発生させることによって前記負荷装置に電力を与え、
     前記充電動作であるときの前記コンバータは、前記エネルギ蓄積素子に蓄積された前記エネルギを前記電力として前記第3端子へ発生させることによって前記二次電池に電力を与える、請求項1に記載の電源装置。
  5.  前記コンバータは、蓄積駆動動作と充電動作とを選択的に実行し、
     前記蓄積駆動動作であるときの前記コンバータは、前記コンバータが有するエネルギ蓄積素子に前記第1端子から受けた電力を蓄積すると共に、前記エネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第2端子へ発生させることによって前記負荷装置に電力を与え、
     前記充電動作であるときの前記コンバータは、前記エネルギ蓄積素子に蓄積されたエネルギを前記電力として前記第3端子へ発生させることによって前記二次電池に電力を与える、請求項1に記載の電源装置。
  6.  前記コンバータは、直接供給動作を実行し、
     前記直接供給動作であるときの前記コンバータは、前記第2端子を前記第3端子に接続することによって、前記二次電池の電力を前記負荷装置に与える、請求項1に記載の電源装置。
  7.  前記二次電池の出力と前記コンバータの入力とを接続可能な短絡回路をさらに備え、
     前記短絡回路は、前記発電素子を介して前記二次電池を前記コンバータに接続する態様と、前記発電素子を介することなく前記二次電池を前記コンバータに直接に接続する態様と、を相互に切り替える、請求項1に記載の電源装置。
  8.  前記コンバータが前記第2端子を介して前記負荷装置に電力を与える期間は、前記コンバータが前記第3端子を介して前記二次電池に電力を与える期間と重複しない、請求項1に記載の電源装置。
  9.  前記コンバータが前記第2端子を介して前記負荷装置に電力を与える期間は、前記コンバータが前記第3端子を介して前記二次電池に電力を与える期間と一致する、請求項1に記載の電源装置。
  10.  前記コンバータが前記第2端子を介して前記負荷装置に電力を与える期間の一部は、前記コンバータが前記3端子を介して前記二次電池に電力を与える期間の一部と重複する、請求項1に記載の電源装置。
  11.  前記コンバータは、
     前記発電素子の発生電圧及び前記二次電池が発生する電圧に基づいて決まる電力取出条件を満たすように前記コンバータを駆動させる動作と、
     前記発電素子の発生電圧を利用して、前記電力取出条件を得る動作と、を繰り返す、請求項1に記載の電源装置。
  12.  負荷装置に電力を与える電源装置であって、
     二次電池と、
     前記二次電池に対して直列に接続された発電素子と、
     前記発電素子に接続された第1端子と、前記負荷装置に接続された第2端子と、前記二次電池に接続された第3端子と、を有するコンバータと、を備え、
     前記コンバータは、
     前記発電素子の発生電圧及び前記二次電池が発生する電圧に基づいて決まる電力取出条件を満たすように前記コンバータを駆動させる動作と、
     前記発電素子の発生電圧を利用して、前記電力取出条件を得る動作と、を繰り返す、電源装置。

     
PCT/JP2023/028476 2022-08-15 2023-08-03 電源装置 WO2024038772A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022129270 2022-08-15
JP2022-129270 2022-08-15

Publications (1)

Publication Number Publication Date
WO2024038772A1 true WO2024038772A1 (ja) 2024-02-22

Family

ID=89941640

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/028476 WO2024038772A1 (ja) 2022-08-15 2023-08-03 電源装置

Country Status (1)

Country Link
WO (1) WO2024038772A1 (ja)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010288404A (ja) * 2009-06-15 2010-12-24 Fujitsu Telecom Networks Ltd 可変電源装置とモータ駆動制御装置とそれらの保護回路動作方法
JP2013510551A (ja) * 2009-11-04 2013-03-21 トライウン・アイピー・エルエルシー ブートストラップ式充電器
JP2013070547A (ja) * 2011-09-26 2013-04-18 Nissan Motor Co Ltd 電力変換装置
JP2013522717A (ja) * 2010-03-09 2013-06-13 日本テキサス・インスツルメンツ株式会社 エナジーハーベスタ・バッテリ充電回路及び方法
US20140333136A1 (en) * 2011-06-01 2014-11-13 Banpil Photonics, Inc. Integrated electronics for perpetual energy harvesting
US20170179715A1 (en) * 2015-12-21 2017-06-22 Intel Corporation Power architecture and management scheme for iot applications
JP2020088923A (ja) * 2018-11-16 2020-06-04 株式会社村田製作所 環境発電装置
JP2021103939A (ja) * 2019-12-25 2021-07-15 旭化成エレクトロニクス株式会社 電力供給回路および電源内蔵装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010288404A (ja) * 2009-06-15 2010-12-24 Fujitsu Telecom Networks Ltd 可変電源装置とモータ駆動制御装置とそれらの保護回路動作方法
JP2013510551A (ja) * 2009-11-04 2013-03-21 トライウン・アイピー・エルエルシー ブートストラップ式充電器
JP2013522717A (ja) * 2010-03-09 2013-06-13 日本テキサス・インスツルメンツ株式会社 エナジーハーベスタ・バッテリ充電回路及び方法
US20140333136A1 (en) * 2011-06-01 2014-11-13 Banpil Photonics, Inc. Integrated electronics for perpetual energy harvesting
JP2013070547A (ja) * 2011-09-26 2013-04-18 Nissan Motor Co Ltd 電力変換装置
US20170179715A1 (en) * 2015-12-21 2017-06-22 Intel Corporation Power architecture and management scheme for iot applications
JP2020088923A (ja) * 2018-11-16 2020-06-04 株式会社村田製作所 環境発電装置
JP2021103939A (ja) * 2019-12-25 2021-07-15 旭化成エレクトロニクス株式会社 電力供給回路および電源内蔵装置

Similar Documents

Publication Publication Date Title
Guan et al. Characteristics of energy storage devices in piezoelectric energy harvesting systems
Kong et al. Low-power design of a self-powered piezoelectric energy harvesting system with maximum power point tracking
Simjee et al. Efficient charging of supercapacitors for extended lifetime of wireless sensor nodes
US9748838B2 (en) Method of operating a controller for a power converter, and a corresponding controller
Simjee et al. Everlast: long-life, supercapacitor-operated wireless sensor node
JP5591641B2 (ja) 充電回路およびその制御ic、それを利用した電子機器
Lu et al. Efficient power conversion for ultra low voltage micro scale energy transducers
JP2020506654A (ja) 高度に統合された高圧アクチュエータドライバ
Casciati et al. Energy harvesting and power management of wireless sensors for structural control applications in civil engineering
Bondade et al. Integrated auto-reconfigurable power-supply network with multidirectional energy transfer for self-reliant energy-harvesting applications
WO2024038772A1 (ja) 電源装置
Hörmann et al. Evaluation of component-aware dynamic voltage scaling for mobile devices and wireless sensor networks
Dallago et al. Self-supplied integrable active high-efficiency AC-DC converter for piezoelectric energy scavenging systems
WO2013039839A2 (en) Hierarchical balancing system
Li et al. A multi-source energy harvesting system to power microcontrollers for cryptography
Wang et al. Ambient energy harvesting chips for IoT end devices
Toyama et al. 20 mV input, 4.2 V output SIDO boost converter with low-power controller and adaptive switch size selector for thermoelectric energy harvesting
Heo et al. Efficient maximum power tracking of energy harvesting using a μcontroller for power savings
Guan et al. Comparative analysis of piezoelectric power harvesting circuits for rechargeable batteries
Hörmann et al. Designing of efficient energy harvesting systems for autonomous WSNs using a tier model
Wöik et al. Standalone Power Management System for Flexible Piezo Electric Nano Generators (PENG) Based on the Co-Polymer P (VDF: TrFE)
Hamza et al. Comparative Study of AC-DC Rectifiers for Vibration Energy Harvesters
JP2024091565A (ja) 電源装置及び電源システム
Mohd Resali et al. Development of multiple-input power management circuit for piezoelectric harvester
KR20170135042A (ko) 진동과 열 에너지를 이용한 자동 스위칭 에너지 하베스팅 회로

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23854807

Country of ref document: EP

Kind code of ref document: A1