WO2023218685A1 PCT/JP2022/041510 JP2022041510W WO2023218685A1 WO 2023218685 A1 WO2023218685 A1 WO 2023218685A1 JP 2022041510 W JP2022041510 W JP 2022041510W WO 2023218685 A1 WO2023218685 A1 WO 2023218685A1
Authority
WO
WIPO (PCT)
Prior art keywords
unit
control circuit
ied
control system
power protection
Prior art date
Application number
PCT/JP2022/041510
Other languages
English (en)
Japanese (ja)
Inventor
歩己 廣川
祥吾 三浦
和也 岡田
Original Assignee
株式会社東芝
東芝エネルギーシステムズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社東芝, 東芝エネルギーシステムズ株式会社 filed Critical 株式会社東芝
Publication of WO2023218685A1 publication Critical patent/WO2023218685A1/fr

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/05Details with means for increasing reliability, e.g. redundancy arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network

Definitions

  • Embodiments of the present invention relate to power protection control systems.
  • Power protection and control devices have been used in power facilities such as substations and power plants to protect and control power systems.
  • the power protection control device can perform a test on its own to confirm the operation of the power equipment, for example, before starting the operation of the power equipment.
  • control cables are laid between the relay panel room where the power protection control device is located and each power equipment, and analog control signals for controlling the operation of the power equipment are transmitted to the installed control cables. It is transmitted by For this reason, many control cables are stretched around the premises of power facilities, and, for example, when new power equipment is introduced, a lot of effort is required to construct the control cables.
  • IoT Internet of Things
  • IEC61850 process bus
  • control performed by an intelligent electronic device panel in a relay panel room is transferred to a process interface unit located in a remote power facility.
  • a process interface unit located in a remote power facility There is a concern that it will not be possible to easily check whether the information is being transmitted to the control panel and the operation according to the control is being performed correctly.
  • the problem to be solved by the present invention is to provide a power protection control system to which a process bus is applied, which can more appropriately control power equipment.
  • a power protection control system includes an intelligent electronic device board and a process interface unit board.
  • the intelligent electronic device board and the process interface unit board are connected by a process bus.
  • the intelligent electronic device board includes an operating section and an intelligent electronic device unit.
  • the operation section operates a control circuit included in the process interface unit panel.
  • the intelligent electronic device unit includes a first control unit that obtains an operating state of the operating unit and transmits information data representing the obtained operating state to the process interface unit board via the process bus.
  • the process interface unit board includes the control circuit and a process interface unit.
  • the control circuit controls power equipment installed in a power facility.
  • the process interface unit includes a second control section that restores the operational state represented by the information data transmitted via the process bus and controls the operation of the control circuit according to the restored operational state.
  • FIG. 1 is a diagram illustrating an example of the configuration of a power protection control system according to a first embodiment.
  • FIG. 2 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system of the first embodiment.
  • FIG. 7 is a diagram illustrating an example of the configuration of a power protection control system according to a second embodiment.
  • FIG. 7 is a sequence diagram illustrating an example of the flow of operations for controlling power equipment in the power protection control system of the second embodiment.
  • FIG. 7 is a sequence diagram showing another example of the flow of operations for controlling power equipment in the power protection control system of the second embodiment.
  • FIG. 7 is a diagram illustrating an example of the configuration of a power protection control system according to a third embodiment.
  • FIG. 7 is a sequence diagram showing an example of the flow of operations for checking the health of a PIU panel in the power protection control system of the third embodiment.
  • FIG. 7 is a diagram illustrating an example of the configuration of a power protection control system according to a fourth embodiment.
  • FIG. 7 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system of the fourth embodiment.
  • FIG. 7 is a diagram illustrating an example of the configuration of a power protection control system according to a fifth embodiment.
  • FIG. 7 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system of the fifth embodiment.
  • FIG. 7 is a diagram illustrating an example of the configuration of a power protection control system according to a sixth embodiment.
  • FIG. 7 is a sequence diagram showing an example of the flow of operations for testing power equipment in the power protection control system of the sixth embodiment.
  • Power protection control systems are installed, for example, in power facilities that handle high voltage, such as substations and power plants.
  • a power protection control system controls the operation of power equipment installed in a power facility.
  • the power equipment is, for example, a protection device such as a gas insulated switchgear (GIS) that switches on and off the current flowing through the bus bar.
  • GIS gas insulated switchgear
  • the power protection control system controls the protection operation of the busbar in the gas-insulated switchgear.
  • the power equipment may be, for example, a breaker such as a circuit breaker that interrupts a large current flowing through the power equipment. In this case, the power protection control system controls the disconnection operation at the circuit breaker.
  • FIG. 1 is a diagram illustrating an example of the configuration of a power protection control system according to a first embodiment.
  • FIG. 1 shows an example of a power protection control system that controls the current flowing through a circuit breaker ("CB" in FIG. 1) 30 including a trip coil (“TC” in FIG. 1) 32.
  • the power protection control system 1 includes, for example, an intelligent electronic device (hereinafter referred to as "IED") panel 10 and a process interface unit (hereinafter referred to as "PIU”) panel 20.
  • the IED panel 10 includes, for example, an IED unit 11, an operation switch operation section 12, a relay switch operation section 13, and a trip lock terminal operation section 14.
  • the PIU board 20 includes, for example, a PIU unit 21, an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24.
  • the IED panel 10 is placed in any location for managing the operation of the power equipment, such as a relay panel room or a central control room.
  • the IED panel 10 corresponds to the calculation section in a conventional power protection control device in which the calculation section and the input/output section are integrated.
  • the PIU panel 20 is placed near the power equipment installed in the power facility.
  • the PIU board 20 corresponds to the input/output section in a conventional power protection control device in which the calculation section and the input/output section are integrated.
  • Each of the operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 included in the PIU panel 20 is connected to a corresponding device such as a circuit breaker or a disconnector provided in the power equipment, for example. , are connected by analog signal lines called metal cables.
  • FIG. 1 shows an example in which the power equipment is a circuit breaker 30.
  • an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24 are connected in series in this order, and the trip lock terminal control circuit 24 is connected to a circuit breaker by a metal cable MC.
  • 30 is connected to a trip coil 32 included in the trip coil 30.
  • the IED unit 11 included in the IED panel 10 and the PIU unit 21 included in the PIU panel 20 are connected by a process bus PB.
  • the process bus PB is, for example, a signal line of a process bus network that performs digital communication using a communication protocol based on the international standard IEC61850.
  • the process bus PB is, for example, an optical cable for exchanging digital data through optical communication.
  • the IED unit 11 and the PIU unit 21 are constantly communicating via the process bus PB.
  • FIG. 1 shows an example of a configuration in which an IED panel 10 is provided with one IED unit 11, and the IED unit 11 and PIU unit 21 communicate on a one-to-one basis.
  • the IED unit 11 acquires and acquires the operation states of the operation switch operation section 12, the relay switch operation section 13, and the trip lock terminal operation section 14 operated by, for example, a manager or maintenance worker of the power equipment. Information data representing the operating state is transmitted to the PIU board 20 via the process bus PB.
  • the operation switch operation unit 12 is a switch for operating (controlling) the operation of the operation switch control circuit 22 included in the PIU panel 20.
  • the relay switch operation unit 13 is a switch for operating (controlling) the operation of the relay switch control circuit 23 included in the PIU board 20.
  • the trip lock terminal operating section 14 is a switch for operating (controlling) the operation of the trip lock terminal control circuit 24 included in the PIU board 20.
  • the IED unit 11 includes, for example, a control section 112.
  • the control unit 112 controls the operation of the IED unit 11 included in the IED panel 10 that constitutes the power protection control system 1 by, for example, executing a program (software) by a hardware processor such as a CPU (Central Processing Unit).
  • the control unit 112 is realized by hardware (including circuitry) such as LSI (Large Scale Integration), ASIC (Application Specific Integrated Circuit), FPGA (Field-Programmable Gate Array), and GPU (Graphics Processing Unit). Alternatively, it may be realized by cooperation of software and hardware.
  • the control unit 112 may be realized by a dedicated LSI.
  • the program may be stored in advance in a storage device (a storage device including a non-transitory storage medium) such as an HDD (Hard Disk Drive) or a flash memory provided in the IED unit 11 or IED board 10, or may be stored in a DVD or a storage device including a non-transitory storage medium. It is stored in a removable storage medium (non-transitory storage medium) such as a CD-ROM, and when the storage medium is attached to the drive device included in the IED unit 11 or IED board 10, the IED unit 11 or IED It may be installed in the HDD or flash memory included in the board 10.
  • the control unit 112 acquires the operation states of the operation switch operation unit 12, the relay switch operation unit 13, and the trip lock terminal operation unit 14 as digital data. More specifically, the control unit 112 provides contact information (whether each contact is open or closed) of the operation switch operation unit 12, the relay switch operation unit 13, and the trip lock terminal operation unit 14. Acquire digital data representing whether the The control unit 112 converts the acquired digital data of the contact information into optical communication data (information data) compatible with the communication protocol of the process bus PB, and transmits it to the PIU unit 21 included in the PIU board 20 via the process bus PB. .
  • the operation switch operation section 12, the relay switch operation section 13, and the trip lock terminal operation section 14 are examples of "operation sections.”
  • the control unit 112 is an example of a “first control unit”.
  • the PIU unit 21 receives the information data transmitted via the process bus PB by the IED unit 11 included in the IED panel 10, and controls the corresponding operation switch control circuit 22 and relay according to the operation state represented by the received information data.
  • the operation of the switch control circuit 23 and the trip lock terminal control circuit 24 is controlled.
  • the operation switch control circuit 22 is a control circuit for controlling the operation of power supply in the power equipment.
  • FIG. 1 shows an example in which the operation switch control circuit 22 is a control circuit that controls the operation of power supply to the trip coil 32 included in the circuit breaker 30.
  • the relay switch control circuit 23 is a control circuit for controlling a relay switch that operates when an abnormality or accident is detected in the power system connected to the power equipment.
  • the relay switch control circuit 23 is, for example, a relay switch that operates when an abnormality is detected in a protection device of power equipment, or when an accident (system accident) occurs in a path between the power equipment and other power equipment. It may also be used to control a relay switch or the like that operates.
  • FIG. 1 shows an example in which the relay switch control circuit 23 is a control circuit that controls a relay switch that operates when an abnormality is detected in a path connected to a trip coil 32 included in a circuit breaker 30.
  • the trip lock terminal control circuit 24 detects the route where the accident occurred when the fault power is disabled by the operation (opening) of the upper circuit breaker.
  • FIG. 1 shows a case where the trip lock terminal control circuit 24 is a control circuit that controls a terminal to cut off the path when an abnormality (accident) is detected in the path leading to the trip coil 32 provided in the circuit breaker 30.
  • An example is shown.
  • the PIU unit 21 includes, for example, a control section 212.
  • the control unit 212 controls the operation of the PIU unit 21 included in the PIU board 20 that constitutes the power protection control system 1 by, for example, executing a program (software) by a hardware processor such as a CPU.
  • the control unit 212 may be realized by hardware (including circuitry) such as an LSI, ASIC, FPGA, or GPU, or may be realized by cooperation between software and hardware.
  • the control unit 212 may be realized by a dedicated LSI.
  • the program may be stored in advance in a storage device such as an HDD or flash memory (a storage device equipped with a non-transitory storage medium) provided in the PIU unit 21 or PIU board 20, or may be stored in a storage device such as a DVD or CD-ROM.
  • Non-transitory storage medium non-transitory storage medium
  • the HDD provided in the PIU unit 21 or PIU board 20 is stored. or may be installed in flash memory.
  • the control unit 212 receives the information data transmitted by the IED unit 11 via the process bus PB, and controls the operation switch operation unit 12, relay switch operation unit 13, and trip lock terminal operation unit 14 represented by the received information data. Restore operational state. More specifically, the control unit 212 converts the received information data (optical communication data) according to the communication protocol of the process bus PB, and converts the received information data (optical communication data) to the operation switch operation unit 12, the relay switch operation unit 13, and the trip lock terminal. The data is restored to digital data representing information on each contact point with the operation unit 14 (whether each contact point is in an open state or a closed state).
  • control unit 212 restores the digital data of the contact information acquired by the control unit 112 as the operating states of the operation switch operation unit 12, the relay switch operation unit 13, and the trip lock terminal operation unit 14 from the received information data. .
  • the control unit 212 controls the operation switch control circuit 22 corresponding to the operation switch operation unit 12, the relay switch control circuit 23 corresponding to the relay switch operation unit 13, and the trip lock terminal operation unit according to the restored digital data of the contact information.
  • the trip lock terminal control circuits 24 corresponding to the trip lock terminal control circuits 14 are controlled.
  • the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are examples of a "control circuit.”
  • the control unit 212 is an example of a “second control unit”.
  • the power protection control system 1 controls the operation of the power equipment installed in the power facility.
  • FIG. 2 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system 1 of the first embodiment.
  • FIG. 2 shows the operation of the power protection control system 1 when, for example, an administrator present in the relay panel room of the power equipment operates the operation switch operation section 12 and the trip lock terminal operation section 14 included in the IED panel 10. This is an example.
  • FIG. 2 shows an example of the operation (processing) of each component included in the IED board 10 and the PIU board 20, and the exchange of information (data) between the respective components.
  • the IED unit 11 acquires contact information (open state) of the operated operational switch operating section 12 (step S102). ). The IED unit 11 transmits the acquired information data representing the contact point information of the operational switch operation section 12 to the PIU unit 21 (step S104).
  • the PIU unit 21 receives the information data transmitted by the IED unit 11, and restores the contact information (open state) represented by the received information data (step S106). If the operational switch control circuit 22 corresponding to the contact information is in the closed state, the PIU unit 21 controls the operation switch control circuit 22 from the closed state to the open state according to the restored contact information (step S108). Thereby, the equipment of the power equipment connected to the operational switch control circuit 22 by the metal cable MC operates according to the controlled operating state (open state) of the operational switch control circuit 22. In other words, the equipment of the power equipment operates according to the operation by the administrator from the closed state to the open state.
  • the IED unit 11 acquires the contact information (open state) of the operated trip lock terminal operation section 14. (Step S202). The IED unit 11 transmits the acquired information data representing the contact point information of the trip lock terminal operating section 14 to the PIU unit 21 (step S204).
  • the PIU unit 21 receives the information data transmitted by the IED unit 11 and restores the contact information (open state) represented by the received information data (step S206). If the trip lock terminal control circuit 24 corresponding to the contact information is in the closed state, the PIU unit 21 controls the trip lock terminal control circuit 24 from the closed state to the open state according to the restored contact information (step S208). As a result, the equipment of the power equipment connected to the trip lock terminal control circuit 24 by the metal cable MC operates according to the operating state (open state) of the controlled trip lock terminal control circuit 24 (in other words, (operation corresponding to the operation from the closed state to the open state).
  • the administrator can control the IED board 10 located in the relay board room located away from the power equipment. By operating it, the operation of the power equipment can be controlled. In other words, in a power facility where the power protection control system 1 is adopted, the administrator can control the operation of the power equipment without having to go to the power equipment installed in a location away from the relay panel room. . This is effective, for example, when inspecting or testing power equipment.
  • the sequence diagram shown in FIG. 2 shows an example of the operation of the power protection control system 1 when the administrator operates the operation switch operation section 12 and the trip lock terminal operation section 14. The same applies when operating the switch operation section 13.
  • the operations (processing) and information (data) exchange of each component included in the power protection control system 1 are the operations (processing) and information (data) of each component in the sequence diagram shown in FIG. All you have to do is make it equivalent to the exchange.
  • the IED unit 11 operates the operation switch operation unit 12, the relay switch operation unit 13, and the trip lock terminal operation unit 14.
  • Information data representing the state is transmitted to the PIU board 20 via the process bus PB.
  • the PIU unit 21 restores the information data transmitted via the process bus PB, and responds to the operation state represented by the restored information data.
  • the operation of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24 is controlled.
  • the operation switch control circuit 22, the relay switch control circuit 23, and the trip The operation of the equipment of the power equipment connected to the lock terminal control circuit 24 can be controlled.
  • a power facility employing the power protection control system 1 of the first embodiment it is possible to realize, for example, a power facility in which inspection and testing of the power facility can be easily performed.
  • the power protection control system 1 of the first embodiment the information data exchanged between the IED panel 10 and the PIU panel 20 via the process bus PB is digital data, and the information data exchanged between the IED panel 10 and the PIU panel 20 is digital data, and the information data exchanged between the IED panel 10 and the PIU panel 20 is digital data, and
  • the PIU board 20 connected by MC analog signal line
  • the power protection control system 1 of the first embodiment can perform communication with high resistance to noise, for example.
  • the process bus PB is an optical cable
  • the optical cable is a relatively thin cable, the labor required to install the process bus PB between the IED panel 10 and the PIU panel 20 can be reduced.
  • FIG. 3 is a diagram illustrating an example of the configuration of a power protection control system according to the second embodiment. Similarly to the power protection control system 1 of the first embodiment, FIG. 3 also shows an example of a power protection control system that controls the current flowing through the circuit breaker 30 including the trip coil 32.
  • the power protection control system 2 includes, for example, an IED board 10a and a PIU board 20a.
  • the IED board 10a includes, for example, an IED unit 11a, an operation switch operation section 12, a relay switch operation section 13, a trip lock terminal operation section 14, and a display section 15.
  • the PIU board 20a includes, for example, a PIU unit 21a, an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24.
  • a PIU unit 21a components having the same functions as those of the power protection control system 1 of the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted.
  • the arrangement and connections within the power equipment of each component included in the power protection control system 2 are the same as those in the power protection control system 1 of the first embodiment, so detailed explanations will be omitted.
  • the administrator of the power equipment operates the IED board 10a to control the operation of the PIU board 20a, and the result (that is, the operating state of the power equipment) can be checked on the IED board 10a. can. Therefore, in the power protection control system 2, a display unit 15 is added to the IED board 10a corresponding to the IED board 10 of the power protection control system 1, the IED unit 11 of the power protection control system 1 is replaced with the IED unit 11a, and the PIU The unit 21 has replaced the PIU unit 21a.
  • the IED unit 11a Like the IED unit 11 of the power protection control system 1, the IED unit 11a includes an operation switch operation section 12, a relay switch operation section 13, and a trip lock operated by, for example, a manager or maintenance worker of the power equipment.
  • the operating state of the terminal operating unit 14 is acquired, and information data representing the obtained operating state is transmitted to the PIU board 20a via the process bus PB.
  • the IED unit 11a receives result data (described later) transmitted via the process bus PB by the PIU unit 21a included in the PIU board 20a, and the operation switch control circuit 22 and relay switch control circuit represented by the received result data. 23 and the operating states of the trip lock terminal control circuit 24 are displayed on the display unit 15.
  • the IED unit 11a includes, for example, a control section 112a.
  • the control unit 112a acquires digital data representing the operation status (contact information) of the operation switch operation unit 12, the relay switch operation unit 13, and the trip lock terminal operation unit 14. Then, the digital data of the acquired contact point information is converted into information data and transmitted to the PIU unit 21a included in the PIU board 20a. Further, the control unit 112a receives the result data transmitted by the PIU unit 21a via the process bus PB, and controls the operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit represented by the received result data. The operating state of 24 is restored.
  • control unit 112a uses the received result data to control the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24, which are controlled according to the operating state represented by the information data transmitted to the PIU panel 20a.
  • the digital data representing the control result (whether each contact is controlled to be open or closed) is restored.
  • the control unit 112a causes the display unit 15 to display the operating states of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24, which are represented by the restored digital data of the control results.
  • the control unit 112a is an example of a "first control unit".
  • the display unit 15 presents the operating states of the operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 included in the PIU board 20a, in accordance with the control from the control unit 112a.
  • the display unit 15 is, for example, a display device such as a liquid crystal display (LCD), a CRT (cathode ray tube) display, an organic EL (electroluminescence) display, an LED (light emitting diode), or a lamp.
  • LCD liquid crystal display
  • CRT cathode ray tube
  • the operation switch control circuit 22 and the relay switch control circuit can be turned on/off or changed in color according to the signal indicating the operating state output by the control unit 112a. 23 and the operating status of the trip lock terminal control circuit 24.
  • a manager or a maintenance worker of the power equipment can operate the operation switch control circuit 22, relay switch It can be confirmed whether the operations of the control circuit 23 and the trip lock terminal control circuit 24 are being controlled correctly in the PIU board 20a.
  • the PIU unit 21a receives the information data transmitted via the process bus PB by the IED unit 11a included in the IED panel 10a, and determines the operation state represented by the received information data. Accordingly, the operations of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled. Furthermore, the PIU unit 21a acquires the operating states of the controlled operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24, and transmits result data representing the obtained operating states via the process bus PB. and transmits it to the IED panel 10a.
  • the PIU unit 21a includes, for example, a control section 212a.
  • the control unit 212a receives the information data transmitted by the IED unit 11a via the process bus PB, restores the operation state represented by the received information data, and The respective operations of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled. Further, the control unit 212a acquires, as digital data, the respective operating states of the operational switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24, which are controlled according to the restored operating state. More specifically, the control unit 212a acquires digital data representing the results (control results) of controlling the operations of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24. do.
  • control unit 212a is attached to, for example, the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24, and detects the detection results of the sensors that detect the respective operating states (respectively). (whether the contact is open or closed) may be obtained as digital data of the control result.
  • control unit 212a controls the operating states of dummy control circuits that perform the same operations by imitating the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24, based on the control results. It may also be acquired as digital data.
  • each of the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 is not actually changed in its operating state by lock control by software, but is operated by dummy control.
  • Control may be performed such that only the operating state of the circuit is changed.
  • the control unit 112 converts the acquired control result digital data into optical communication data (result data) compatible with the communication protocol of the process bus PB, and transmits it to the IED unit 11a included in the IED board 10a via the process bus PB. .
  • the operating states of the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 represented by the transmitted result data are changed to The control result of the control performed by operating the operation unit 14 is presented on the display unit 15 included in the IED board 10a.
  • the control unit 212a is an example of a "second control unit".
  • the power protection control system 2 can check the result (operating state of the power equipment) of the operation of the power equipment installed in the power facility controlled by the PIU board 20a on the IED board 10a.
  • FIG. 4 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system 2 of the second embodiment.
  • FIG. 4 shows an operation switch control circuit 22 of the PIU panel 20a whose operation is controlled by, for example, an administrator present in the relay panel room of the power equipment operating the operation switch operation unit 12 of the IED panel 10a. This is an example of the operation of the power protection control system 2 in the case where the operating state of the power protection control system 2 is presented by the IED panel 10a.
  • FIG. 4 also shows an example of the operation (processing) of each component included in the IED board 10a and the PIU board 20a, and the exchange of information (data) between the respective components.
  • the IED unit 11a performs the operation (processing) of the control section 112a included in the IED unit 11a and the exchange of information (data), and the operation (processing) of the control section 212a included in the PIU unit 21a and the exchange of information (data) are performed by the IED unit 11a.
  • the exchange of information (data) is assumed to be performed by the PIU unit 21a.
  • the same step numbers are given to the same operations (processing) and information (data) exchange as in the power protection control system 1 of the first embodiment, and detailed explanations are not given. Omitted.
  • the IED unit 11a acquires the contact information (open state) of the operated operational switch operating section 12 and uses the acquired contact information.
  • the information data represented is transmitted to the PIU unit 21a (steps S100 to S104).
  • the PIU unit 21a receives the information data transmitted by the IED unit 11a, restores the contact information (open state), and controls the operational switch control circuit 22 from the closed state to the open state according to the restored contact information ( Steps S106 to S108).
  • the equipment of the power equipment connected to the operational switch control circuit 22 by the metal cable MC operates according to the operating state (open state) of the controlled operational switch control circuit 22 (in other words, the closed state by the administrator). (operation according to the operation from to the open state).
  • the PIU unit 21a acquires the operating state of the controlled operational switch control circuit 22 (step S302).
  • the PIU unit 21a transmits the acquired result data representing the operating state of the operational switch control circuit 22 to the IED unit 11a (step S304).
  • the IED unit 11a receives the result data transmitted by the PIU unit 21a, and restores the operating state (open state) of the operational switch control circuit 22 represented by the received result data. Then, the IED unit 11a displays the operating state of the operational switch control circuit 22 represented by the restored operating state (control result) on the display unit 15, and presents it to the administrator operating the IED panel 10a (step S306). ).
  • the An administrator can control the operation of the power equipment by operating the IED panel 10a placed in the relay panel room. Furthermore, in a power facility employing the power protection control system 2, the result of controlling the operation of power equipment (the operating state of the power equipment) can be confirmed on the IED panel 10a. In other words, in an electric power facility where the power protection control system 2 is adopted, the administrator can control the operation of the electric power equipment and the You can check the results. This is also effective, for example, when inspecting or testing power equipment.
  • FIG. 5 is a sequence diagram showing another example of the flow of operations for controlling power equipment in the power protection control system 2 of the second embodiment.
  • FIG. 5 shows a relay switch control circuit 23 included in the PIU panel 20a whose operation is controlled when, for example, an administrator present in the relay panel room of the power equipment operates the relay switch operation unit 13 included in the IED panel 10a.
  • This is an example of the operation of the power protection control system 2 in the case where the operating state of the power protection control system 2 is presented by the IED panel 10a.
  • FIG. 5 also shows an example of the operation (processing) of each component included in the IED board 10a and the PIU board 20a, and the exchange of information (data) between the respective components.
  • the IED unit 11a acquires contact information (closed state) of the operated relay switch operating section 13 (step S402). ). The IED unit 11a transmits the acquired information data representing the contact point information of the relay switch operating section 13 to the PIU unit 21a (step S404).
  • the PIU unit 21a receives the information data transmitted by the IED unit 11a, and restores the contact information (closed state) represented by the received information data (step S406). In accordance with the restored contact information, the PIU unit 21a controls the relay switch control circuit 23 corresponding to the contact information from the open state to the closed state (step S408).
  • the equipment of the power equipment connected to the relay switch control circuit 23 by the metal cable MC operates according to the operating state (closed state) of the controlled relay switch control circuit 23 (in other words, the equipment of the power equipment , the operation according to the operation from the open state to the closed state by the administrator).
  • the PIU unit 21a acquires the operating state of the controlled relay switch control circuit 23 (step S410).
  • the PIU unit 21a transmits the obtained result data representing the operating state of the relay switch control circuit 23 to the IED unit 11a (step S412).
  • the IED unit 11a receives the result data transmitted by the PIU unit 21a, restores the operating state (closed state) of the relay switch control circuit 23 represented by the received result data, and restores the operating state (closed state) represented by the restored operating state (control result).
  • the operating state of the closed state is displayed on the display unit 15 and presented to the administrator operating the IED board 10a (step S414).
  • the operation switch operation section 12 the relay switch operation section 13, and the trip lock terminal operation provided in the IED panel 10a are controlled.
  • the operation of the power equipment corresponding to the operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 included in the PIU panel 20a is controlled and the control results are confirmed. can do.
  • the sequence diagram shown in FIG. 4 shows the operation of the power protection control system 2 when the administrator operates the operation switch operation section 12, and the sequence diagram shown in FIG. Although an example has been shown, the same applies when the administrator operates the trip lock terminal operation section 14.
  • the operation (processing) and information (data) exchange of each component included in the power protection control system 2 are as follows. All you have to do is make it equivalent to (data) exchange.
  • the configuration in which the control unit 212a acquires the operating state is the configuration in which the control unit 212a acquires the detection results of the sensors attached to each of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24.
  • the administrator cannot confirm the operating state of the relay switch control circuit 23 according to the operation only by operating the relay switch operation section 13 provided in the IED board 10a.
  • the configuration in which the control unit 212a acquires the operating states acquires the operating states of dummy control circuits corresponding to the operational switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24, respectively.
  • the administrator can check the operating state of the relay switch control circuit 23 according to the operation by simply operating the relay switch operation section 13 provided in the IED board 10a.
  • the dummy control circuit corresponding to the relay switch control circuit 23 is Regardless of the lock control performed by It is.
  • the control unit 212a is configured to obtain the operating state of a dummy control circuit, how each of the operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 is controlled. This is because even if the target switch or terminal is in a different operating state, the operating state of the target switch or terminal can be obtained.
  • the configuration in which the control unit 212a acquires the operating states is such that the operating states of dummy control circuits corresponding to the operational switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24 are acquired.
  • the configuration obtained is considered to be more suitable.
  • the IED unit 11a (control unit 112a) is connected to the operation switch operation unit 12
  • Information data (digital data of contact information) representing the operating states of the relay switch operating section 13 and the trip lock terminal operating section 14 is transmitted to the PIU panel 20a via the process bus PB.
  • the PIU unit 21a (control unit 212a) restores the information data transmitted via the process bus PB, and responds to the operation state represented by the restored information data. The operation of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24 is controlled.
  • the PIU board 20a can be activated by operating the IED board 10a located at a remote location. It is possible to control the operation of the equipment of the power equipment connected to the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24. Furthermore, in the power protection control system 2 of the second embodiment, the PIU unit 21a (control unit 212a) controls the control results (operating states) of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24. (digital data) is transmitted to the IED board 10a via the process bus PB.
  • the IED unit 11a restores the result data transmitted via the process bus PB, and displays the restored operating state on the display unit 15.
  • the operating states of the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 will now be presented.
  • a manager or a maintenance worker of the power equipment can operate the operation switch control circuit 22, relay switch control circuit 23, etc. by operating the operation switch operation section 12, relay switch operation section 13, and trip lock terminal operation section 14. , and whether the operation of the trip lock terminal control circuit 24 is correctly controlled in the PIU board 20a.
  • FIG. 6 is a diagram illustrating an example of the configuration of a power protection control system according to the third embodiment. Similarly to the power protection control system 1 of the first embodiment and the power protection control system 2 of the second embodiment, FIG. 6 also shows a power protection control system that controls the current flowing through the circuit breaker 30 including the trip coil 32. An example is shown.
  • the power protection control system 3 includes, for example, an IED board 10a and a PIU board 20b.
  • the IED board 10a includes, for example, an IED unit 11a, an operation switch operation section 12, a relay switch operation section 13, a trip lock terminal operation section 14, and a display section 15.
  • the PIU board 20b includes, for example, a PIU unit 21a, an operation switch control circuit 22, a relay switch control circuit 23, a trip lock terminal control circuit 24, a pressure detection relay 251, and a pressure detection relay 252.
  • components having the same functions as the power protection control system 1 of the first embodiment and the power protection control system 2 of the second embodiment are denoted by the same reference numerals, and detailed descriptions are not provided. Omitted.
  • the arrangement and connections within the power equipment of each component included in the power protection control system 3 are the same as in the power protection control system 1 of the first embodiment and the power protection control system 2 of the second embodiment, Detailed explanation will be omitted.
  • the soundness of the series circuit of the operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 connected in series on the PIU panel 20b can be confirmed. Therefore, in the power protection control system 3, a pressure detection relay 251 and a pressure detection relay 252 are added to the PIU board 20b, which corresponds to the PIU board 20a of the power protection control system 2.
  • the pressure detection relay 251 detects (measures) the voltage on the terminal side (hereinafter referred to as "the upper part of the relay switch control circuit 23") connected to the trip lock terminal control circuit 24 in the relay switch control circuit 23.
  • the pressure detection relay 251 outputs the detected (measured) voltage value (which may be information representing the detected (measured) voltage value) to the control unit 212a.
  • the pressure detection relay 252 detects (measures) the voltage on the terminal side (hereinafter referred to as "the lower part of the relay switch control circuit 23") connected to the circuit breaker 30 (that is, the metal cable MC) in the relay switch control circuit 23. )do.
  • the pressure detection relay 252 outputs the detected (measured) voltage value (which may be information representing the detected (measured) voltage value) to the control unit 212a.
  • the pressure detection relay 251 and the pressure detection relay 252 are an example of a "voltage measurement section.”
  • the operational switch control circuit 22 when the operational switch control circuit 22 is in an open state and the circuit breaker 30 is in an open state, the voltage value detected (measured) by the pressure detection relay 251 is “0V”, and the voltage value detected (measured) by the pressure detection relay 252 is “0V”. ), it can be determined that the series circuit is healthy.
  • the operational switch control circuit 22 when the operational switch control circuit 22 is in an open state and the circuit breaker 30 is in a closed state, the voltage value detected (measured) by the pressure detection relay 251 is "0V”, and the voltage value detected (measured) by the pressure detection relay 252 is “0V”. ), it can be determined that the series circuit is healthy.
  • the PIU unit 21a receives the voltage value of the upper part of the relay switch control circuit 23 detected (measured) by the pressure detection relay 251 and the voltage value detected (measured) by the pressure detection relay 252.
  • the voltage value of the lower part of the relay switch control circuit 23 is acquired, and result data representing each acquired voltage value is transmitted to the IED board 10a via the process bus PB. That is, the control unit 212a acquires each voltage value as digital data, includes the acquired digital data of each voltage value in the result data, and transmits it to the IED unit 11a.
  • each transmitted voltage value is presented on the display unit 15 as a control result.
  • the power protection control system 3 can check the health (respective voltage values) of the PIU panel 20b, which controls the operation of the power equipment installed in the power facility, on the IED panel 10a.
  • FIG. 7 is a sequence diagram showing an example of the flow of operations for checking the health of the PIU board 20b in the power protection control system 3 of the third embodiment.
  • FIG. 7 shows, for example, that an administrator present in the relay panel room of the power equipment checks the health of the operation switch control circuit 22 included in the PIU panel 20b by operating the operation switch operation unit 12 included in the IED panel 10a. This is an example of the operation of the power protection control system 3 when the power protection control system 3 is used.
  • FIG. 7 also shows an example of the operation (processing) of each component included in the IED board 10a and the PIU board 20b, and the exchange of information (data) between the respective components.
  • the IED unit 11a acquires the contact information (open state) of the operated operational switch operating section 12 and uses the acquired contact information.
  • the information data represented is transmitted to the PIU unit 21a (steps S100 to S104).
  • the PIU unit 21a When the PIU unit 21a receives the information data transmitted by the IED unit 11a, the PIU unit 21a calculates the voltage value of the upper part of the relay switch control circuit 23 detected (measured) by the pressure detection relay 251 and the voltage value detected (measured) by the pressure detection relay 252. The respective voltage values with respect to the lower voltage value of the relay switch control circuit 23 are obtained (step S500). Thereafter, the PIU unit 21a restores the contact information (open state) represented by the received information data, and controls the operational switch control circuit 22 from the closed state to the open state according to the restored contact information (steps S106 to S108). ). Thereby, the equipment of the power equipment connected to the operational switch control circuit 22 by the metal cable MC operates according to the controlled operating state (open state) of the operational switch control circuit 22.
  • the PIU unit 21a acquires the operating state of the controlled operational switch control circuit 22 (step S302). Furthermore, the PIU unit 21a detects (measures) the voltage value of the upper part of the relay switch control circuit 23 detected (measured) by the pressure detection relay 251, and the voltage value of the lower part of the relay switch control circuit 23 detected (measured) by the pressure detection relay 252. (Step S510). Then, the PIU unit 21a transmits the acquired result data representing the operating state of the operational switch control circuit 22 to the IED unit 11a, including the respective voltage values acquired in the processing of steps S500 and S510 (step S512). ).
  • the IED unit 11a receives the result data transmitted by the PIU unit 21a, and restores the operating state (open state) of the operational switch control circuit 22 and the respective voltage values represented by the received result data. Then, the IED unit 11a determines the operating state of the operational switch control circuit 22 represented by the restored operating state (control result) and the respective voltage values (that is, whether the operation of the operational switch control circuit 22 is controlled from a closed state to an open state). (respective voltage values before and after) are displayed on the display unit 15 and presented to the administrator operating the IED panel 10a (step S514).
  • the administrator can control the IED board 10a located in the relay board room located away from the power equipment. By operating it, it is possible to confirm the soundness of the operation switch control circuit 22 included in the PIU panel 20b that controls the operation of the power equipment.
  • the sequence diagram shown in FIG. 7 shows an example of the operation of the power protection control system 3 when the administrator operates the operation switch operation unit 12 to check the health of the operation switch control circuit 22.
  • the administrator can check the health of the relay switch control circuit 23 by operating the relay switch operating section 13, and can check the trip lock terminal control circuit by operating the trip lock terminal operating section 14. The health of the circuit 24 can be confirmed.
  • the operation (processing) and information (data) exchange of each component included in the power protection control system 3 are as shown in the sequence diagram shown in FIG. All you have to do is make it equivalent to the exchange.
  • the administrator can use the PI It is possible to check the health of each of the operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 included in the panel 20b. This is also effective, for example, when inspecting or testing power equipment.
  • the IED unit 11a (control section 112a) performs operations on the operation switch operation section 12, the relay switch operation section 13, and the trip lock terminal operation section 14.
  • Information data representing the state is transmitted to the PIU board 20b via the process bus PB.
  • the PIU unit 21a (control unit 212a) restores the information data transmitted via the process bus PB, and responds to the operation state represented by the restored information data.
  • the relay switch control detected (measured) by each of the pressure detection relay 251 and the pressure detection relay 252 is performed.
  • the PIU unit 21a controls the operational switch control circuit 22, the relay switch control circuit 23, and After controlling the operation of the trip lock terminal control circuit 24, the voltage values at both ends of the relay switch control circuit 23 detected (measured) by the pressure detection relay 251 and the pressure detection relay 252 are acquired.
  • the PIU unit 21a controls the control results (operating states) of the operation switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24.
  • the digital data of each obtained voltage value is transmitted to the IED board 10a via the process bus PB.
  • the IED unit 11a restores the result data transmitted via the process bus PB, and determines the restored operating state and each voltage value. is displayed on the display unit 15 and presented to the administrator.
  • the operation of controlling the operation of the equipment of the power equipment connected to the PIU panel 20b by operating the IED panel 10a located at a remote location is possible.
  • the soundness of the series circuit of the switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24 can be confirmed.
  • a manager present in a relay panel room does not have to go to a power facility installed in a remote location.
  • a more reliable power facility can be realized in a power facility that employs the power protection control system 3 of the third embodiment.
  • FIG. 8 is a diagram illustrating an example of the configuration of a power protection control system according to the fourth embodiment. Similarly to the power protection control system 1 of the first embodiment, FIG. 8 also shows an example of a power protection control system that controls the current flowing through the circuit breaker 30 including the trip coil 32.
  • the power protection control system 4 includes, for example, an IED board 10b and a PIU board 20.
  • the IED board 10b includes, for example, two IED units 11 (IED units 11-1 and 11-2) and power supplies 16 (power supplies 16-1 and 16-2) corresponding to the respective IED units 11.
  • IED units 11-1 and 11-2 power supplies 16 (power supplies 16-1 and 16-2) corresponding to the respective IED units 11.
  • the PIU board 20 includes, for example, a PIU unit 21, an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24.
  • components having the same functions as those of the power protection control system 1 of the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted.
  • the arrangement and connections within the power equipment of each component included in the power protection control system 4 are the same as those in the power protection control system 1 of the first embodiment, so detailed explanations will be omitted.
  • the power protection control system 4 is an example in which a plurality of IED units 11 including an IED unit 11-1 and an IED unit 11-2 are provided in the IED board 10b.
  • the IED unit 11-1 is an IED unit 11 for protecting power transmission lines of power equipment
  • the IED unit 11-2 is an IED unit 11 for protecting busbars of power equipment.
  • the power supply 16 supplies power to the corresponding IED unit 11.
  • a power supply 16-1 supplies power to the IED unit 11-1
  • a power supply 16-2 supplies power to the IED unit 11-2.
  • the control unit 112 (not shown in FIG. 8) included in each IED unit 11 may include information about the connected power source 16 in the information data, and transmit the information data to the PIU unit 21 via the process bus PB.
  • one PIU unit 21 included in the PIU panel 20 receives information data transmitted via the process bus PB from each of the IED unit 11-1 and the IED unit 11-2.
  • the operation of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 is controlled according to the operation state represented by each information data.
  • the control unit 212 outputs the corresponding operational switch control circuit 22, relay switch Controls the respective operations of the control circuit 23 and the trip lock terminal control circuit 24.
  • a problem may occur in one of the IED units 11.
  • Causes of problems occurring in the IED unit 11 include, for example, a malfunction in one of the functions within the IED unit 11, or a failure of the power supply 16 (whether intentionally or not by the administrator). Possible causes include power being cut off (turned off) and power not being supplied to the IED unit 11.
  • digital communication between the IED unit 11 and the PIU unit 21 via the process bus PB may be interrupted (cut off). More specifically, if the problem that has occurred is due to the power not being supplied, the IED unit 11 in which the problem has occurred is unable to transmit information data.
  • the IED unit 11 in which the problem has occurred can transmit information data.
  • the control unit 112 included in the IED unit 11 in which the problem has occurred includes failure information indicating that a malfunction has occurred in the information data, and transmits the information data to the PIU unit 21 via the process bus PB.
  • the operating state represented by the information data transmitted by the IED unit 11 where the problem occurred is not necessarily the operating state of the operational switch operating section 12, relay switch operating section 13, and trip lock terminal operating section 14 operated by the administrator. Not necessarily.
  • the control section 212 included in the PIU unit 21 does not accept information data transmitted by the IED unit 11 in which the problem has occurred. In other words, the control unit 212 locks the control of the operation of the power equipment by the IED unit 11 in which the problem has occurred.
  • the control unit 212 determines that a problem has occurred in the IED unit 11 due to the interruption of digital communication. .
  • the control unit 212 determines that there is a problem such as malfunction in the IED unit 11 that transmitted the information data containing the defective information. It is determined that this has occurred.
  • the control unit 212 then maintains a state in which the operating state (contact information) from the IED unit 11 in which the problem has occurred does not affect the operating state (contact information) from the IED unit 11 in which the problem has not occurred. , the operations of the operational switch control circuit 22, the relay switch control circuit 23, and the trip lock terminal control circuit 24.
  • the power protection control system 4 controls the operation of the power equipment installed in the power facility in accordance with only the information data transmitted by the IED units 11 in which no problems have occurred.
  • FIG. 9 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system 4 of the fourth embodiment.
  • FIG. 9 shows an example of the operation of the power protection control system 4 when, for example, a problem occurs in the IED unit 11-1 included in the IED board 10b.
  • FIG. 9 also shows an example of the operation (processing) of each component included in the IED board 10b and the PIU board 20, and the exchange of information (data) between the respective components.
  • the IED unit 11 performs the operation (processing) and exchange of information (data) of the control unit 112 (not shown) included in each IED unit 11, and that the control unit 212 (not shown) included in each IED unit 11 performs It is assumed that the PIU unit 21 performs operations (processing) and exchanges information (data).
  • the IED unit 11-1 checks whether the problem is that communication with the PIU unit 21 has been cut off (step S600). S602). If it is confirmed in step S602 that communication with the PIU unit 21 has been cut off, the transmission of information data from the IED unit 11-1 to the PIU unit 21 is stopped (step S604). On the other hand, the IED unit 11-2 transmits information data representing contact information of the operation switch operation section 12, relay switch operation section 13, and trip lock terminal operation section 14 operated by the administrator to the PIU unit 21, for example. (Step S606).
  • the PIU unit 21 detects the IED unit 11 in which the problem has occurred based on the reception status of information data from each IED unit 11 (step S608). In step S608, if the IED unit 11 in which the problem has occurred is not detected, the PIU unit 21 advances the process to step S630. On the other hand, if the IED unit 11 in which a problem has occurred is detected in step S608, the PIU unit 21 advances the process to step S620.
  • the PIU unit 21 does not receive the information data from the IED unit 11-1, but only receives the information data transmitted by the IED unit 11-2, so in the process of step S608, the PIU unit 21 detects the IED unit 11-1 as the IED unit 11 in which the problem has occurred, and advances the process to step S620.
  • step S602 if it is confirmed in step S602 that communication with the PIU unit 21 is not interrupted, the IED unit 11-1 transmits information data including defect information to the PIU unit 21 (step S602). S614).
  • the IED unit 11-2 transmits information data representing contact information of the operation switch operation section 12, relay switch operation section 13, and trip lock terminal operation section 14 operated by the administrator to the PIU unit 21, for example. (Step S616).
  • the PIU unit 21 checks whether or not the information data transmitted by each IED unit 11 includes defective information, so that the IED unit 11 in which the malfunction has occurred (the IED unit 11 in which the problem has occurred) is detected. It is determined whether there is one (step S618). If it is determined in step S618 that there is no IED unit 11 that has malfunctioned, the PIU unit 21 advances the process to step S630. On the other hand, if it is determined in step S618 that there is an IED unit 11 in which a malfunction has occurred, the PIU unit 21 advances the process to step S620.
  • the PIU unit 21 performs the step In the process of S618, the PIU unit 21 determines the IED unit 11-1 as the IED unit 11 in which a malfunction problem has occurred, and the process proceeds to step S620.
  • the PIU unit 21 locks the control from the IED unit 11 in which the problem has occurred, restores the contact information represented by the information data transmitted by the IED unit 11 in which the problem has not occurred, and converts each restored contact information into a logical In this state, the respective operations of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled (step S620).
  • the PIU unit 21 locks the control from the IED unit 11-1 where the problem has occurred, restores the contact information represented by the information data transmitted by the IED unit 11-2 where the problem has not occurred, and The respective operations of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled.
  • the PIU unit 21 restores the contact information represented by the information data transmitted by each IED unit 11, and performs a logical sum of the restored contact information. Then, the operations of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled (step S630). For example, if there is no problem in either IED unit 11-1 or IED unit 11-2, the PIU unit 21 will process the information data transmitted by each of IED unit 11-1 and IED unit 11-2. The contact information represented by is restored, and the respective operations of the corresponding operational switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled in a state in which the restored contact information is logically summed. .
  • the operation switch control circuit 22 relay from this IED unit 11 Control of the operation of the switch control circuit 23 and the trip lock terminal control circuit 24 is not accepted.
  • the power protection control system 4 of the fourth embodiment it is possible to prevent the possibility that the IED unit 11 in which the problem has occurred will be erroneously controlled. As a result, a more reliable power facility can be realized in a power facility that employs the power protection control system 4 of the fourth embodiment.
  • a power protection control system 4 having a configuration based on the configuration of the power protection control system 1 of the first embodiment has been described.
  • the configuration of the power protection control system 4 may be based on the configuration of the power protection control system 2 of the second embodiment or the power protection control system 3 of the third embodiment.
  • the IED board 10b may be replaced with the display section 15, and the PIU board 20 may be replaced with the PIU board 20a or the PIU board 20b.
  • the power protection control system 4 also has functions that the power protection control system 2 and the power protection control system 3 have (that is, the results of controlling the operation of the power equipment can be checked on the IED board 10b equipped with the display unit 15). and a function that allows the health of the PIU panel 20b to be confirmed on the IED panel 10b provided with the display unit 15) can be simultaneously realized.
  • FIG. 10 is a diagram illustrating an example of the configuration of a power protection control system according to the fifth embodiment. Similarly to the power protection control system 4 of the fourth embodiment, FIG. 10 also shows an example of a power protection control system that controls the current flowing through the circuit breaker 30 including the trip coil 32.
  • the power protection control system 5 includes, for example, an IED board 10b and a PIU board 20c.
  • the IED board 10b includes, for example, two IED units 11 (IED units 11-1 and 11-2) and power supplies 16 (power supplies 16-1 and 16-2) corresponding to the respective IED units 11.
  • IED units 11-1 and 11-2 power supplies 16 (power supplies 16-1 and 16-2) corresponding to the respective IED units 11.
  • the PIU panel 20c includes, for example, a PIU unit 21c, two operational switch control circuits 22 (operational switch control circuits 22-1 and 22-2), and two relay switch control circuits 23 (relay switch control circuits 23-1 and 22-2). 23-2) and two trip lock terminal control circuits 24 (trip lock terminal control circuits 24-1 and 24-2).
  • components having the same functions as those of the power protection control system 4 of the fourth embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted.
  • the arrangement and connections within the power equipment of each component included in the power protection control system 5 are the same as those in the power protection control system 4 of the fourth embodiment, so detailed explanations will be omitted.
  • the power protection control system 5 includes, in the PIU panel 20c, an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24 corresponding to each of the two IED units 11 included in the IED panel 10b.
  • the operational switch control circuit 22-1, the relay switch control circuit 23-1, and the trip lock terminal control circuit 24-1 each correspond to the IED unit 11-1
  • the operational switch control circuit 22-2 corresponds to the IED unit 11-1
  • relay switch control circuit 23-2, and trip lock terminal control circuit 24-2 each correspond to IED unit 11-2.
  • one PIU unit 21c included in the PIU panel 20c receives information data transmitted via the process bus PB from each of the IED unit 11-1 and the IED unit 11-2.
  • the operation of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 is controlled according to the operation state represented by each information data.
  • the PIU unit 21c includes, for example, a control section 212c.
  • the control unit 212c receives the information data transmitted by each IED unit 11 via the process bus PB, and restores the operation state represented by the received information data. Then, the respective operations of the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled. At this time, the control unit 212c controls each of the operation switch control circuit 22-1, relay switch control circuit 23-1, and trip lock terminal control circuit 24-1 according to the information data transmitted by the IED unit 11-1. and controls the operation of each of the operation switch control circuit 22-2, relay switch control circuit 23-2, and trip lock terminal control circuit 24-2 according to the information data transmitted by the IED unit 11-2. do.
  • the control unit 212c is an example of a “second control unit”.
  • a problem may occur in one of the IED units 11 in the IED board 10b.
  • digital communication via the process bus PB between the IED unit 11 and the PIU unit 21c may be interrupted (cut off). ) is also possible. Therefore, in the power protection control system 5, when a problem occurs in the IED unit 11, the control unit 212c included in the PIU unit 21c does not accept the information data transmitted by the IED unit 11 in which the problem has occurred ( locking control of the operation of the power equipment by the IED unit 11 in which the problem has occurred).
  • the PIU panel 20c includes an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24 corresponding to each IED unit 11. Therefore, the control unit 212c is configured not to accept only the operation status (contact information) from the IED unit 11 where the problem has occurred, but to accept the operation status (contact information) from the IED unit 11 where the problem has not occurred. Make it. Then, the control unit 212c controls the corresponding operation switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 according to the operation status (contact information) from the IED unit 11 in which no problem has occurred. Control behavior.
  • the power protection control system 5 controls the operation of the power equipment installed in the power facility in accordance with only the information data transmitted by the IED units 11 in which no problems have occurred.
  • FIG. 11 is a sequence diagram showing an example of the flow of operations for controlling power equipment in the power protection control system 5 of the fifth embodiment. Similar to the power protection control system 4 of the fourth embodiment, FIG. 11 is an example of the operation of the power protection control system 5 when a problem occurs in the IED unit 11-1 included in the IED board 10b, for example. FIG. 11 also shows an example of the operation (processing) of each component included in the IED board 10b and the PIU board 20c, and the exchange of information (data) between the respective components.
  • the IED unit 11 performs the operation (processing) and exchange of information (data) of the control section 112 (not shown) included in each IED unit 11, and that the control section 212c of the PIU unit 21c performs the operation (processing) and exchange of information (data). It is assumed that the PIU unit 21c performs operations (processing) and exchanges information (data).
  • the IED unit 11-1 checks whether the problem is that communication with the PIU unit 21c is cut off (step S700). S702). If it is confirmed in step S702 that communication with the PIU unit 21c has been cut off, the transmission of information data from the IED unit 11-1 to the PIU unit 21c is stopped (step S704). On the other hand, the IED unit 11-2 transmits, for example, information data representing contact information of the operation switch operation section 12, the relay switch operation section 13, and the trip lock terminal operation section 14 operated by the administrator to the PIU unit 21c. (Step S706).
  • the PIU unit 21c detects the IED unit 11 in which a problem has occurred based on the reception status of information data from each IED unit 11 (step S708). In step S708, if the IED unit 11 in which the problem has occurred is not detected, the PIU unit 21c advances the process to step S730. On the other hand, if the IED unit 11 in which a problem has occurred is detected in step S708, the PIU unit 21c advances the process to step S720.
  • the PIU unit 21c does not receive the information data from the IED unit 11-1, but only receives the information data transmitted by the IED unit 11-2, so in the process of step S708, the PIU unit 21c detects the IED unit 11-1 as the IED unit 11 in which the problem has occurred, and advances the process to step S720.
  • step S702 if it is confirmed in step S702 that communication with the PIU unit 21c is not interrupted, the IED unit 11-1 transmits information data including defect information to the PIU unit 21c (step S702). S714).
  • the IED unit 11-2 transmits, for example, information data representing contact information of the operation switch operation section 12, the relay switch operation section 13, and the trip lock terminal operation section 14 operated by the administrator to the PIU unit 21c. (Step S716).
  • the PIU unit 21c checks whether or not the information data transmitted by each IED unit 11 includes defective information, so that the IED unit 11 in which a malfunction has occurred (the IED unit 11 in which a problem has occurred) is detected. It is determined whether there is one (step S718). If it is determined in step S718 that there is no IED unit 11 that has malfunctioned, the PIU unit 21c advances the process to step S730. On the other hand, if it is determined in step S718 that there is an IED unit 11 in which a malfunction has occurred, the PIU unit 21c advances the process to step S720.
  • the PIU unit 21c performs the step In the process of S718, the PIU unit 21c determines the IED unit 11-1 as the IED unit 11 in which a malfunction problem has occurred, and advances the process to step S720.
  • the PIU unit 21c locks control from the IED unit 11 in which the problem has occurred, restores the contact information represented by the information data transmitted by the IED unit 11 in which the problem has not occurred, and performs operations corresponding to the restored contact information.
  • the operations of the switch control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled (step S720).
  • the PIU unit 21c locks the control from the IED unit 11-1 where the problem has occurred, restores the contact information represented by the information data transmitted by the IED unit 11-2 where the problem has not occurred, and
  • the respective operations of the corresponding operational switch control circuit 22-2, relay switch control circuit 23-2, and trip lock terminal control circuit 24-2 are controlled.
  • the PIU unit 21c restores the contact information represented by the information data transmitted by each IED unit 11, and switches the operational switch corresponding to each restored contact information.
  • the operations of the control circuit 22, relay switch control circuit 23, and trip lock terminal control circuit 24 are controlled (step S730). For example, if no problem has occurred in either the IED unit 11-1 or the IED unit 11-2, the PIU unit 21c restores the contact information represented by the information data transmitted by the IED unit 11-1, The respective operations of the corresponding operation switch control circuit 22-1, relay switch control circuit 23-1, and trip lock terminal control circuit 24-1 are controlled. Furthermore, the PIU unit 21c restores the contact information represented by the information data transmitted by the IED unit 11-2, and controls the corresponding operation switch control circuit 22-2, relay switch control circuit 23-2, and trip lock terminal control circuit. Controls the operation of each circuit 24-2.
  • a power protection control system 5 having a configuration based on the configuration of the power protection control system 1 of the first embodiment has been described.
  • the configuration of the power protection control system 5 is similar to the configuration of the power protection control system 4 of the fourth embodiment, and the configuration of the power protection control system 2 of the second embodiment and the power protection control system of the third embodiment.
  • the configuration may be based on the configuration of system 3.
  • the IED board 10b may be configured to include the display section 15, and the PIU board 20c may be configured to implement the functions of the PIU board 20a and PIU board 20b.
  • the power protection control system 5 similarly to the power protection control system 4 of the fourth embodiment, the power protection control system 5 also has the functions that the power protection control system 2 and the power protection control system 3 have (i.e., controls the operation of the power equipment). To simultaneously realize the function of being able to check the results of the IED board 10b equipped with the display section 15 and the function of being able to check the health of the PIU board 20b on the IED panel 10b equipped with the display section 15. I can do it.
  • FIG. 12 is a diagram illustrating an example of the configuration of a power protection control system according to the sixth embodiment. Similarly to the power protection control system 2 of the second embodiment, FIG. 12 also shows an example of a power protection control system that controls the current flowing through the circuit breaker 30 including the trip coil 32.
  • the power protection control system 6 includes, for example, an IED panel 10c and a PIU panel 20d.
  • the IED board 10c includes, for example, an IED unit 11c, a display section 15, and a test button 17.
  • an operational switch operating section 12 a relay switch operating section 13, and a trip lock terminal operating section 14 are connected to the IED unit 11c.
  • the PIU board 20d includes, for example, a PIU unit 21d, an operation switch control circuit 22, a relay switch control circuit 23, and a trip lock terminal control circuit 24.
  • a PIU unit 21d components having the same functions as those of the power protection control system 2 of the second embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted.
  • the arrangement and connections within the power equipment of each component included in the power protection control system 6 are the same as those in the power protection control system 2 of the second embodiment, so detailed explanations will be omitted.
  • the operation switch control circuit 22, relay switch control circuit 23, and relay switch control circuit 23 provided in the PIU panel 20d are activated.
  • a series of tests can be performed to confirm the operational soundness of the equipment of the power equipment controlled by the trip lock terminal control circuit 24. Therefore, in the power protection control system 6, a test button 17 is added to the IED board 10c corresponding to the IED board 10a of the power protection control system 2, the IED unit 11a of the power protection control system 2 is replaced by the IED unit 11c, and the PIU The unit 21a has replaced the PIU unit 21d.
  • the test button 17 is a button operated (pressed) by, for example, an administrator in order to instruct the start of a test in the power protection control system 6.
  • a case will be described as an example in which a test is performed to confirm the soundness of the operation of a relay switch of power equipment controlled by the relay switch control circuit 23.
  • the IED unit 11c executes a test sequence in the power protection control system 6.
  • the IED unit 11c includes, for example, a control section 112c.
  • the control unit 112c starts a test on the power protection control system 6.
  • the control unit 112c transmits information data representing this to the PIU board 20d via the process bus PB.
  • the control unit 112c performs calculations based on the received test data and operates the relay switch of the power equipment controlled by the relay switch control circuit 23.
  • Information data (hereinafter referred to as "operation information data") representing operation information for the operation is generated and transmitted to the PIU board 20d.
  • control unit 112c When the control unit 112c receives result data representing the operating state of the relay switch control circuit 23 whose operation is controlled according to the transmitted operation information data from the PIU board 20d, the control unit 112c controls the relay switch control circuit represented by the received result data. 23 verifies the operating state of the relay switch of the power equipment controlled by the control unit 23 and causes the display unit 15 to display the verification result. Then, if there is no problem with the verification result (the operating state of the relay switch is normal), the control unit 112c transmits information data indicating that the test is to be terminated to the PIU panel 20d, and the power protection control system 6 Finish the test at.
  • the control unit 112c is an example of a “first control unit”.
  • the PIU unit 21d executes a test sequence in the power protection control system 6 in response to information data representing the start of a test transmitted via the process bus PB by the IED unit 11c included in the IED panel 10c.
  • the PIU unit 21d includes, for example, a control section 212d.
  • control unit 212d When the control unit 212d receives the information data transmitted from the IED unit 11c indicating that the test is to be started, the control unit 212d starts the test in the power protection control system 6. When the test is started, the control unit 212d controls the operation of the operation switch control circuit 22 and the trip lock terminal control circuit 24, and controls the operation of the equipment corresponding to the operation switch control circuit 22 and the trip lock terminal control circuit 24 provided in the power equipment. lock. Then, the control unit 212d transmits test data for confirming the soundness of the operation of the relay switch of the power equipment controlled by the relay switch control circuit 23 to the IED unit 11c via the process bus PB.
  • the test data simulates, for example, a current value or voltage value at which a relay switch of power equipment actually operates (the relay switch is in a closed state, that is, a path is cut off).
  • the control unit 212d controls the operation of the relay switch control circuit 23 according to the received operation information data. and operate the relay switch provided in the power equipment.
  • the control unit 212d acquires the operating state of the relay switch of the power equipment controlled by the relay switch control circuit 23, and transmits result data representing the obtained operating state to the IED unit 11c.
  • the control unit 212d controls the operation of the operation switch control circuit 22 and the trip lock terminal control circuit 24, and the power equipment is The devices corresponding to the operational switch control circuit 22 and trip lock terminal control circuit 24 provided are unlocked, and the test in the power protection control system 6 is completed.
  • the control unit 212d is an example of a "second control unit".
  • the IED unit 11c of the IED panel 10c and the PIU panel 20d of the PIU panel 20d cooperate to A series of tests can be performed to confirm the operational soundness of power equipment installed in a facility.
  • FIG. 13 is a sequence diagram showing an example of the flow of operation for testing power equipment in the power protection control system 6 of the sixth embodiment.
  • FIG. 13 shows, for example, that when an administrator present in the relay panel room of the power equipment presses the test button 17 provided in the IED board 10c, the relay of the power equipment controlled by the relay switch control circuit 23 provided in the PIU board 20d is activated. It is an example of the operation of the power protection control system 6 when performing a test to confirm the soundness of the operation of the switch.
  • FIG. 13 also shows an example of the operation (processing) of each component included in the IED board 10c and the PIU board 20d, and the exchange of information (data) between the respective components.
  • the IED unit 11c performs the operation (processing) of the control section 112c included in the IED unit 11c and the exchange of information (data), and the operation (processing) and the exchange of information (data) of the control section 212c included in the PIU unit 21d. It is assumed that the exchange of information (data) is performed by the PIU unit 21d.
  • the IED unit 11c acquires the pressed state of the test button 17 (step S802). Thereby, the IED unit 11c starts a test in the power protection control system 6. Then, the IED unit 11c transmits information data indicating the start of the test to the PIU unit 21d (step S804).
  • the PIU unit 21d receives the information data transmitted by the IED unit 11c. Thereby, the PIU unit 21d starts a test in the power protection control system 6. Then, the PIU unit 21d controls the operations of the operation switch control circuit 22 and the trip lock terminal control circuit 24 to be locked in accordance with the test start information represented by the received information data (step S806). As a result, the equipment of the electric power equipment connected to each of the operational switch control circuit 22 and the trip lock terminal control circuit 24 by the metal cable MC responds to the controlled operational switch control circuit 22 and the trip lock terminal control circuit 24, respectively. operation is locked. Then, the PIU unit 21d transmits test data for confirming the soundness of the operation of the relay switch of the power equipment controlled by the relay switch control circuit 23 to the IED unit 11c (step S808).
  • the IED unit 11c receives the test data transmitted by the PIU unit 21d, performs calculations based on the received test data, and generates operation information for operating the relay switch of the power equipment controlled by the relay switch control circuit 23. Generates motion information data representing (step S810). The IED unit 11c transmits the generated operation information data to the PIU unit 21d (step S812).
  • the PIU unit 21d receives the operation information data transmitted by the IED unit 11c, and restores the operation information represented by the received operation information data (step S814).
  • the PIU unit 21d controls the operation of the relay switch control circuit 23 according to the restored operation information (step S816), and operates the relay switch provided in the power equipment. Thereby, the relay switch of the power equipment connected to the relay switch control circuit 23 by the metal cable MC operates according to the controlled relay switch control circuit 23.
  • the PIU unit 21d acquires the operating state of the relay switch of the power equipment controlled by the relay switch control circuit 23 (step S818).
  • the PIU unit 21d transmits the acquired result data representing the operating state of the relay switch of the power equipment to the IED unit 11c (step S820).
  • the IED unit 11c receives the result data transmitted by the PIU unit 21d, and verifies the operating state of the relay switch of the power equipment represented by the received result data (step S822). Then, the IED unit 11c determines whether there is a problem with the verification result, that is, whether the relay switch of the power equipment is in a normal operating state corresponding to the transmitted operating information data (step S824).
  • step S824 If it is determined in step S824 that the operating state of the relay switch of the power equipment is normal, the IED unit 11c transmits information data indicating the end of the test to the PIU unit 21d (step S826).
  • the PIU unit 21d receives the information data transmitted by the IED unit 11c, and unlocks the operation of the operation switch control circuit 22 and the trip lock terminal control circuit 24 according to the test completion information represented by the received information data. (Step S828). As a result, the equipment of the power equipment connected to each of the operation switch control circuit 22 and the trip-lock terminal control circuit 24 by the metal cable MC is controlled according to the operation switch control circuit 22 and the trip-lock terminal control circuit 24, respectively. operation is unlocked. Thereafter, the PIU unit 21d transmits unlock data indicating that the operation of the equipment of the power equipment corresponding to the operation switch control circuit 22 and the trip lock terminal control circuit 24 has been unlocked to the IED unit 11c ( Step S830). Then, the PIU unit 21d ends the test in the power protection control system 6.
  • the IED unit 11c Upon receiving the unlock data transmitted by the PIU unit 21d, the IED unit 11c displays the verification result on the display unit 15 and presents it to the administrator operating the IED board 10c (step S832). In this case, the IED unit 11c displays the verification result on the display unit 15 indicating that there was no problem with the verification result, that is, it was determined in step S824 that the operating state of the relay switch of the power equipment is a normal operating state. Display. Then, the IED unit 11c ends the test in the power protection control system 6.
  • step S824 if it is determined in step S824 that the operating state of the relay switch of the power equipment is not a normal operating state, the IED unit 11c displays the verification result on the display unit 15 and operates the IED panel 10c. The administrator is made to present it (step S832). In this case, the IED unit 11c causes the display unit 15 to display a verification result indicating that there is a problem with the verification result. In this case, since the IED unit 11c has not transmitted the information data indicating the end of the test to the PIU unit 21d, the test in the power protection control system 6 continues.
  • the administrator can install the IED board 10c located in the relay board room away from the power equipment. By operating (pressing) the test button 17 that the can be executed.
  • managers can check the operational health of power equipment equipment without having to go to the power equipment installed in a location far from the relay panel room. It can be confirmed. This is also effective, for example, when inspecting or testing power equipment.
  • the sequence diagram shown in FIG. 13 shows the power protection control system 6 when performing a test to confirm the operational soundness of the relay switch of the power equipment controlled by the relay switch control circuit 23 in response to the press of the test button 17.
  • the operation switch control circuit 22 and the trip lock terminal control circuit 24 also perform a test to confirm the operational soundness of the equipment of the power equipment to be controlled.
  • the operation (processing) and information (data) exchange of each component included in the power protection control system 6 are the operations (processing) and information (data) of each component in the sequence diagram shown in FIG. All you have to do is make it equivalent to the exchange.
  • the IED unit 11c control unit 112c
  • the PIU unit 21d control unit 212d
  • the IED unit 11c control unit 112c
  • the PIU unit 21d control unit 212d
  • an administrator present in the relay panel room can test power equipment installed at a remote location by simply operating (pressing) the test button 17. It is possible to more easily check the health of power equipment equipment without having to go to the location.
  • a power protection control system 6 configured to include a test button 17 in the IED unit 11c has been described.
  • the test button 17 may be provided in the PIU unit 21d instead of the IED unit 11c.
  • the IED unit 11c included in the IED panel 10c and the PIU panel 20d included in the PIU panel 20d cooperate to perform a series of tests to confirm the operational soundness of the corresponding equipment provided in the power equipment. (test) sequence can be executed.
  • the operation (processing) of each component and the exchange of information (data) of each component included in the power protection control system 6 are as shown in the sequence diagram shown in FIG. 13. All you have to do is make it equivalent to the exchange of data).
  • the IED board and the PIU board are connected by a process bus.
  • each panel can be placed at a separate location.
  • the IED unit transmits information data representing the operation status of the operation switch operation unit, the relay switch operation unit, and the trip lock terminal operation unit via the process bus.
  • the information data is transmitted to the PIU panel, and the PIU unit (control unit) restores the information data transmitted via the process bus to control the operations of the operational switch control circuit, relay switch control circuit, and trip lock terminal control circuit. .
  • metal cables can be connected to the operation switch control circuit, relay switch control circuit, and trip lock terminal control circuit provided in the PIU panel by operating the IED panel located at a remote location. can control the operation of connected power equipment equipment.
  • a power facility employing the power protection control system of each embodiment it is possible to realize, for example, a power facility in which inspection and testing of the power facility can be easily performed.
  • the operation switch operation section, the relay switch operation section, and the trip lock terminal operation section are not limited to being actual switches or terminals.
  • the functions of the IED board can be transferred to a computer device such as a personal computer (PC), a server device, or a digital device that is connected to or has a built-in display device and input device, such as a terminal device such as a tablet terminal or smartphone. It may also be realized by software (application) executed in .
  • a schematic operation switch operation section, relay switch operation section, and trip lock terminal operation section should be displayed on the display device, and these schematic switches and terminals should be operated using an input device such as a mouse or keyboard. This may be equivalent to operating an actual switch or terminal.
  • the input device is combined with a display device that displays a schematic operation switch operation section, relay switch operation section, or trip lock terminal operation section (so-called touch panel), the screen of the display device By performing various touch operations (tap, flick, etc.) on the displayed schematic switches and terminals, it becomes equivalent to operating the actual switches and terminals. You can also do that.
  • the intelligent electronic device board (10) and the process interface unit board (20) are connected to each other by a process bus (PB). acquires the operation parts (12, 13, 14) for operating the control circuits (22, 23, 24) provided on the process interface unit panel, the operation state of the operation parts, and information data representing the obtained operation state.
  • the process interface unit (21) having the process interface unit (212) power equipment can be controlled more suitably in a power protection control system to which a process bus is applied.
  • a power protection control system in which an intelligent electronic device board and a process interface unit board are connected by a process bus,
  • the intelligent electronic device board includes: an operation section for operating a control circuit included in the process interface unit board; an intelligent electronic device unit having a first control section that acquires an operating state of the operating section and transmits information data representing the obtained operating state to the process interface unit board via the process bus; Equipped with The process interface unit board is The control circuit that controls power equipment installed in a power facility; a process interface unit having a second control section that restores an operational state represented by the information data transmitted via the process bus and controls the operation of the control circuit according to the restored operational state; Equipped with Power protection control system.
  • the intelligent electronic device board is located anywhere in the power facility;
  • the process interface unit board is located near the power equipment,
  • the control circuit and equipment included in the power equipment may be connected by an analog signal line.
  • the control circuit may include an operational switch, a relay switch, and a trip lock terminal.
  • the second control unit obtains an operating state of the control circuit controlled according to the restored operating state, and transmits result data representing the obtained operating state to the intelligent electronic device board via the process bus. transmit,
  • the intelligent electronic device board further includes a display unit for presenting an operating state represented by the result data transmitted via the process bus, The first control unit may cause the display unit to display the operating state represented by the result data.
  • the process interface unit board further includes two voltage measurement units that measure voltages across the trip lock terminal, The second control unit acquires the voltage values measured by each of the voltage measurement units, and transmits the result data including the acquired voltage values to the intelligent electronic device board via the process bus, The first control section may cause the display section to display the voltage value represented by the result data transmitted via the process bus.
  • the intelligent electronic device board includes a plurality of the intelligent electronic device units,
  • the second control unit restores each operation state represented by each of the information data transmitted from each of the intelligent electronic device units via the process bus, and performs a logical OR of each of the restored operation states.
  • the operation of the control circuit may be controlled depending on the operating state.
  • Appendix 7 In the power protection control system described in Appendix 6, When the transmission of the information data from any of the intelligent electronic device units via the process bus is interrupted, the second control unit is configured to control the information data to be transmitted from the intelligent electronic device unit to which the transmission of the information data has been interrupted.
  • the control circuit may not accept control of the operation of the control circuit according to the operating state represented by the information data.
  • Appendix 8 In the power protection control system described in Appendix 6 or Appendix 7, When the information data transmitted from any of the intelligent electronic device units via the process bus indicates that the intelligent electronic device unit is malfunctioning, the second control unit controls the control unit from the intelligent electronic device unit that is malfunctioning.
  • the control circuit may not accept control of the operation of the control circuit according to the operating state represented by the transmitted information data.
  • the intelligent electronic device board includes a plurality of the intelligent electronic device units
  • the process interface unit board includes a plurality of the control circuits corresponding to each of the intelligent electronic device units
  • the second control unit restores the respective operational states represented by the respective information data transmitted from the respective intelligent electronic device units via the process bus, and according to the restored respective operational states. , may control the operation of the corresponding control circuit.
  • the intelligent electronic device board includes a test button for testing the control circuit, When the information data indicating that the test button has been pressed is transmitted via the process bus, the second control unit locks the operation of the control circuit, and controls the operation of the control circuit via the process bus. Transmit test data to intelligent electronic device board, The first control unit transmits operation information data based on the test data to the process interface unit board via the process bus, The second control unit controls the operation of the control circuit according to the operation information data, and transmits result data representing an operation state of the control circuit to the intelligent electronic device board via the process bus. , The first control unit may verify the operating state represented by the result data.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Emergency Protection Circuit Devices (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

Ce système de commande de protection électrique, selon un mode de réalisation, comporte une carte de dispositif électronique intelligent et une carte d'unité d'interface de traitement qui sont connectées par un bus de traitement ; la carte du dispositif électronique intelligent comprend une unité d'actionnement et une unité de dispositif électronique intelligent. L'unité d'actionnement actionne un circuit de commande de la carte de l'unité d'interface de traitement. L'unité du dispositif électronique intelligent comporte une première unité de commande qui transmet des données d'informations indiquant l'état de fonctionnement de l'unité d'actionnement. La carte de l'unité d'interface de traitement comporte le circuit de commande et une unité d'interface de traitement. Le circuit de commande commande l'équipement électrique d'une installation électrique. L'unité d'interface de traitement comporte une seconde unité de commande qui commande le fonctionnement du circuit de commande par restauration de l'état de fonctionnement indiqué par les données d'informations transmises.
PCT/JP2022/041510 2022-05-12 2022-11-08 Système de commande de protection electrique WO2023218685A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-078870 2022-05-12
JP2022078870A JP2023167582A (ja) 2022-05-12 2022-05-12 電力保護制御システム

Publications (1)

Publication Number Publication Date
WO2023218685A1 true WO2023218685A1 (fr) 2023-11-16

Family

ID=88730194

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/041510 WO2023218685A1 (fr) 2022-05-12 2022-11-08 Système de commande de protection electrique

Country Status (2)

Country Link
JP (1) JP2023167582A (fr)
WO (1) WO2023218685A1 (fr)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003224932A (ja) * 2002-01-29 2003-08-08 Hitachi Ltd 変電所システム
WO2014188507A1 (fr) * 2013-05-21 2014-11-27 三菱電機株式会社 Système de commande de protection destiné à un bus de traitement, unité de fusion et dispositif de calcul

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003224932A (ja) * 2002-01-29 2003-08-08 Hitachi Ltd 変電所システム
WO2014188507A1 (fr) * 2013-05-21 2014-11-27 三菱電機株式会社 Système de commande de protection destiné à un bus de traitement, unité de fusion et dispositif de calcul

Also Published As

Publication number Publication date
JP2023167582A (ja) 2023-11-24

Similar Documents

Publication Publication Date Title
US9753088B2 (en) Portable diagnostic apparatus for testing circuit breakers
JP6058315B2 (ja) デジタル保護リレー
CN103983884A (zh) 多芯线缆测试系统及方法
CN112067970B (zh) 一种带校验功能的板件智能测试系统
JP2008059857A (ja) 配線接続装置
JP2012038044A (ja) 監視制御システムの試験装置および試験方法
CN112083310A (zh) 一种板件智能测试系统
US20140152329A1 (en) Insulation Monitoring Device With Measuring Circuit Interruption
WO2023218685A1 (fr) Système de commande de protection electrique
US20220018903A1 (en) Disconnect Verification
JP2010284057A (ja) 保護継電装置の特性試験システム
CN106918757A (zh) 一种电压互感器二次回路完好性的判别方法
JP2009081929A (ja) ケーブル接続チェッカー
JP2009247117A (ja) 電気設備の監視装置
JP2007028709A (ja) 電気所設備統合化システム
KR101832573B1 (ko) 이중화 구조를 갖는 제어시스템을 시험하기 위한 이동형 시험장치 및 시험 시스템
JP2001157381A (ja) 変電機器制御監視装置
US10436854B2 (en) Power supply arrangement
GB2479222A (en) Diagnostic Device for Testing a Television Set
JP2016133410A (ja) 配線検査システムおよび配線検査方法
CN103138168A (zh) 飞行器断路器板的电缆布线
KR200490075Y1 (ko) 항공기 데이터처리기 점검장치
JP4236822B2 (ja) 事故自動復旧装置の試験方法
WO2006059369A1 (fr) Procede d’affichage des informations d’interface reseau et appareil de communication
KR200169762Y1 (ko) 무인 변전소의 감시 제어반

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22940950

Country of ref document: EP

Kind code of ref document: A1