WO2023201993A1 - 一种煤矿井下单轨吊车高精度定位系统及定位方法 - Google Patents
一种煤矿井下单轨吊车高精度定位系统及定位方法 Download PDFInfo
- Publication number
- WO2023201993A1 WO2023201993A1 PCT/CN2022/123325 CN2022123325W WO2023201993A1 WO 2023201993 A1 WO2023201993 A1 WO 2023201993A1 CN 2022123325 W CN2022123325 W CN 2022123325W WO 2023201993 A1 WO2023201993 A1 WO 2023201993A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- monorail crane
- positioning
- coordinate
- unit
- beam track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
- B61L25/026—Relative localisation, e.g. using odometer
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/46—Position indicators for suspended loads or for crane elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/02—Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
- B66C11/04—Underhung trolleys
- B66C11/06—Underhung trolleys running on monorails
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
- G01C21/10—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration
- G01C21/12—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration executed aboard the object being navigated; Dead reckoning
- G01C21/16—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration executed aboard the object being navigated; Dead reckoning by integrating acceleration or speed, i.e. inertial navigation
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
- G01C21/10—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration
- G01C21/12—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration executed aboard the object being navigated; Dead reckoning
- G01C21/16—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration executed aboard the object being navigated; Dead reckoning by integrating acceleration or speed, i.e. inertial navigation
- G01C21/165—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 by using measurements of speed or acceleration executed aboard the object being navigated; Dead reckoning by integrating acceleration or speed, i.e. inertial navigation combined with non-inertial navigation instruments
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B13/00—Other railway systems
- B61B13/02—Rack railways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G17/00—Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
- B65G17/30—Details; Auxiliary devices
- B65G17/48—Controlling attitudes of load-carriers during movement
- B65G17/485—Controlling attitudes of load-carriers during movement the load carriers being suspended
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G19/00—Conveyors comprising an impeller or a series of impellers carried by an endless traction element and arranged to move articles or materials over a supporting surface or underlying material, e.g. endless scraper conveyors
- B65G19/02—Conveyors comprising an impeller or a series of impellers carried by an endless traction element and arranged to move articles or materials over a supporting surface or underlying material, e.g. endless scraper conveyors for articles, e.g. for containers
- B65G19/025—Conveyors comprising an impeller or a series of impellers carried by an endless traction element and arranged to move articles or materials over a supporting surface or underlying material, e.g. endless scraper conveyors for articles, e.g. for containers for suspended articles
Definitions
- the invention relates to the field of underground monorail crane positioning in coal mines, and in particular to a high-precision positioning system and positioning method for underground monorail cranes in coal mines.
- the monorail crane locomotive is a type of rail locomotive that is specially designed to run on special I-beams above the mine tunnels.
- UWB positioning technologies
- UWB positioning technology relies on network signals, so network equipment and base stations need to be laid out during the operation of the monorail crane, resulting in high construction and maintenance costs. And if any network equipment fails, it will cause problems with UWB positioning, making it impossible to accurately position the monorail crane. Therefore, how to achieve high-precision positioning of the monorail crane position and realize the unmanned development requirements of intelligent mines are technical issues that need to be solved urgently in this field.
- the purpose of the present invention is to provide a high-precision positioning system and positioning method for an underground monorail crane in a coal mine, which utilizes the high-precision meshing of the positioning wheel and the rack on the I-beam track, and then calculates the positioning wheel displacement. To achieve high-precision positioning of the monorail crane.
- the present invention adopts the following technical solutions:
- the invention provides a high-precision positioning system and positioning method for an underground monorail crane in a coal mine, which includes a gear-type displacement measurement device and a number of coordinate positioning units evenly distributed on the I-beam track;
- the gear-type displacement measurement device includes a gear-type displacement measurement device symmetrically arranged on the I-beam track
- the gear frame is provided with a positioning wheel and a number of running wheels.
- the running wheels run on the upper end surface of the I-beam track bottom plate.
- the positioning wheel is engaged with the rack at the lower end of the I-beam track bottom plate for transmission;
- the rack is also provided with a mounting frame and a connection seat for connecting the monorail crane, and the mounting frame is provided with an inertial measurement unit and a single-chip microcomputer that are electrically connected together;
- the positioning wheel is also provided with a rotation angle sensor for detecting its rotation angle, and the rotation angle sensor is electrically connected to the microcontroller;
- the head of the monorail crane at both ends is equipped with a coordinate update unit capable of transmitting signals to the coordinate positioning unit, and the coordinate update unit is electrically connected to the microcontroller.
- the invention also provides a positioning method for a high-precision positioning system for an underground monorail crane in a coal mine, which includes the following steps:
- Step S1 Establish the global route of all I-beam tracks in the computer
- Step S2 Use the inertial measurement unit to pick up the pose information of the monorail crane to identify the running direction of the monorail crane and draw the real-time route of the monorail crane during its travel;
- Step S3 Arrange the coordinate positioning unit and obtain the three-dimensional coordinate information containing the location of the coordinate positioning unit;
- Step S4 Between two adjacent coordinate positioning units, the microcontroller uses the angle information transmitted from the angle sensor to calculate the traveling mileage of the monorail crane, and combines the direction information measured by the inertial measurement unit to calculate the forward direction of the monorail crane. The distance traveled is combined with the coordinate position of the monorail crane in the previous coordinate positioning unit in the global route to obtain the precise three-dimensional coordinate position of the monorail crane between the two coordinate positioning units;
- Step S5 When the monorail crane passes the coordinate positioning unit, the coordinate positioning unit corrects the precise position of the monorail crane and updates the three-dimensional coordinate position of the monorail crane in the global route;
- the data transmitted by the inertial measurement unit and the angle sensor are automatically initialized. Taking the update point as the starting point, positioning is performed between the next two coordinate positioning units according to the method described in step 4;
- Step S6 Repeat steps S4 to S5 to display the three-dimensional coordinate position of the monorail crane in the global route in real time and accurately.
- step S1 the specific method of step S1 is:
- S1-1 Use laser radar to scan the I-beam track in advance, obtain the I-beam track and nearby irrelevant point cloud data, and transmit it to the computer;
- S1-2 Process the I-beam track and nearby irrelevant point cloud data, filter out the irrelevant point cloud data, retain only the point cloud data of the I-beam track, and store the point cloud data of the I-beam track in the computer. Solidify and obtain the three-dimensional solid model of the I-beam track;
- the application scenario of the inertial measurement unit in step S2 is as follows:
- the inertial measurement unit identifies the traveling direction of the monorail crane
- the inertial measurement unit identifies which switch the monorail crane has entered.
- step S3 the coordinate positioning unit is arranged as follows:
- a coordinate positioning unit is set up at the initial point where the monorail crane is connected to the I-beam track and at each turnout;
- the distance d is determined as follows:
- the coordinate positioning unit is a barcode, and the barcode contains its coordinate position in the global route;
- the coordinate update unit is a laser scanner, and the laser scanner scans the coordinate positioning unit to scan the monorail The crane's position is updated.
- the present invention can accurately calculate the traveling mileage of the monorail crane by calculating the rotation arc length of the positioning wheel. Combined with the global route of the constructed I-beam track, the present invention can accurately determine the location of the monorail crane on the I-beam track. , and the positioning accuracy of the present invention is related to the size of the positioning wheel, and the positioning accuracy can be improved by reducing the tooth pitch of the positioning wheel;
- the present invention has the odometer installed on the wheels when measuring mileage. However, when the vehicle is driving, the wheels will slip.
- the present invention reduces the mileage through gear meshing. It eliminates calculation errors caused by wheel slippage and improves positioning accuracy;
- Figure 1 is a schematic structural diagram of a high-precision positioning system for an underground monorail crane in a coal mine provided by an embodiment of the present invention
- Figure 2 is a schematic diagram of the installation position of the single-chip microcomputer provided by the embodiment of the present invention.
- Figure 3 is a schematic diagram of the positional relationship between two positioning wheels provided by the embodiment of the present invention.
- Figure 4 is a schematic diagram of the installation of a high-precision positioning system for a coal mine underground monorail crane on the monorail crane provided by an embodiment of the present invention
- Figure 5 is an enlarged view of part B in Figure 5 provided by an embodiment of the present invention.
- Figure 6 is a global road map of the installation composition of the coordinate positioning unit provided by the embodiment of the present invention.
- 1-I-beam track 2-travel wheel; 3-connecting rod; 4-positioning wheel; 5-cross bar; 6-fixed frame; 7-angle sensor; 9-connecting seat; 12-single chip microcomputer; 13-inertial measurement Unit; 18-mounting frame; 19-rack; 24-coordinate update unit; 26-power supply; 29-coordinate positioning unit.
- a high-precision positioning system for underground monorail cranes in coal mines includes
- the gear-type displacement measurement device includes two gear racks symmetrically arranged on both sides of the I-beam track 1, and the two racks are fixedly connected together;
- the gear frame is provided with a positioning wheel 4 and a plurality of running wheels 2.
- the running wheels 2 run on the upper end surface of the bottom plate of the I-beam track 1.
- the positioning wheel 4 is in contact with the rack at the lower end of the bottom plate of the I-beam track 1. 19 meshing transmission; the tooth pitch of the positioning wheel 4 is very small, so that its positioning accuracy is higher than that of the inertial measurement unit 13.
- the rack is also provided with a mounting frame 18 and a connecting seat 9 for connecting the monorail crane.
- the mounting frame 18 is provided with an inertial measurement unit 13 and a single-chip microcomputer 12 that are electrically connected together;
- the positioning wheel 4 is also provided with a rotation angle sensor 7 for detecting its rotation angle, and the rotation angle sensor 7 is electrically connected to the microcontroller 12;
- the head of the monorail crane at both ends is provided with a coordinate update unit 24 capable of transmitting signals to the coordinate positioning unit 29 .
- the coordinate update unit 24 is electrically connected to the microcontroller 12 .
- the single chip microcomputer 12 is connected to the external control center for communication and is used to control and display it through the external control center.
- the gear rack includes a connecting rod 3.
- Two running wheels 2 are symmetrically provided at both ends of the connecting rod 3.
- Two fixing brackets 6 are symmetrically fixed at both ends of the connecting rod 3, one of which is far away from the running wheel.
- One end of the wheel 2 is fixed with the mounting frame 18, and the other fixed frame 6 is fixed with the connecting seat 9 at one end away from the running wheel 2.
- the two positioning wheels 4 are rotationally connected to the same rotating shaft, and the two ends of the rotating shaft are respectively connected with supporting plates for rotation.
- Two cross bars 5 are fixed on the support plate, and the two cross bars 5 are fixedly connected to the two fixing brackets 6 on the same side.
- the invention also provides a positioning method for a high-precision positioning system for an underground monorail crane in a coal mine, which includes the following steps:
- Step S1 Establish the global route of all I-beam tracks 1 in the computer
- step S1 The specific method of step S1 is:
- S1-1 Use laser radar to scan the I-beam track 1 in advance, obtain the irrelevant point cloud data of the I-beam track 1 and its surroundings, and transmit it to the computer;
- S1-2 Process the irrelevant point cloud data of I-beam track 1 and nearby, filter out the irrelevant point cloud data, retain only the point cloud data of I-beam track 1, and save the point cloud data of I-beam track 1 in the computer.
- the point cloud data is materialized to obtain the three-dimensional solid model of the I-beam track 1;
- Step S2 Use the inertial measurement unit 13 to pick up the pose information of the monorail crane to identify the running direction of the monorail crane and draw the real-time route of the monorail crane during its travel;
- the application scenarios of the inertial measurement unit 13 are as follows:
- the inertial measurement unit 13 identifies the traveling direction of the monorail crane
- the inertial measurement unit 13 identifies which switch the monorail crane has entered.
- Step S3 Arrange the coordinate positioning unit 29 and obtain the three-dimensional coordinate information containing the location of the coordinate positioning unit 29;
- the layout of the coordinate positioning unit 29 is:
- a coordinate positioning unit 29 is provided at the initial point where the monorail crane accesses the I-beam track 1 and at each turnout;
- step S3 the distance d is determined as follows:
- Step S4 Between two adjacent coordinate positioning units 29, the single-chip computer 12 uses the angle information transmitted from the angle sensor 7 to calculate the traveling mileage of the monorail crane, and combines the direction information measured by the inertial measurement unit 13 to calculate the mileage of the monorail crane. The distance traveled in the forward direction is combined with the coordinate position of the monorail crane in the previous coordinate positioning unit 29 in the global route to obtain the precise three-dimensional coordinate position of the monorail crane between the two coordinate positioning units 29;
- Step S5 When the monorail crane passes the coordinate positioning unit 29, the coordinate positioning unit 29 corrects the precise position of the monorail crane and updates the three-dimensional coordinate position of the monorail crane in the global route;
- the data transmitted by the inertial measurement unit 13 and the rotation angle sensor 7 are automatically initialized, starting from the update point, and positioning is performed between the next two coordinate positioning units 29 according to the method described in step 4;
- Step S6 Repeat steps S4 to S5 to display the three-dimensional coordinate position of the monorail crane in the global route in real time and accurately.
- the coordinate positioning unit 29 is a barcode, and the barcode contains its coordinate position in the global route;
- the coordinate update unit 24 is a laser scanner, and the laser scanner scans the coordinate positioning unit 29 to scan the monorail.
- the crane's position is updated.
- the angle sensor 7 is preferably an MCJS type angle sensor. Just from the characteristics of the angle sensor 7 itself, the measurement angle error is about 0.05%. Then every time the monorail crane travels 100 meters, the walking error is about 5cm.
- the positioning accuracy of the positioning wheel 4 can be improved by reducing the tooth pitch. If the tooth pitch of the positioning wheel 4 is 5mm, then the single-chip computer 12 will increase the displacement in units of 5mm when calculating the displacement of the positioning wheel 4. Similarly, if the tooth pitch of the positioning wheel 4 is 1mm, the single-chip computer 12 will increase the positioning wheel 4 in units of 1mm when calculating the displacement. The smaller the increment unit, the more accurate the positioning will be.
- the coordinate positioning unit 29 can also be adjusted by adjusting the coordinate positioning unit 29 position, further improving the positioning accuracy of the positioning wheel 4, and the positioning accuracy of the present invention is controllable.
- UWB positioning technology can only achieve indoor positioning accuracy of 10cm, and the underground environment is complex and the positioning accuracy is even worse.
- the general inertial measurement unit 13 can only output angular velocity and acceleration, and cannot directly output displacement. It needs to use integration means, but the integration method will have time accumulation error. The longer the working time, the higher the error. Taking high-precision fiber optic inertial navigation as an example, the traveling error of a monorail crane is about 80cm for every 100m it travels.
- the existing odometer is directly mounted on the driving wheel for counting. If the crane is used for frequent starts and stops, the driving wheel will cause a large positioning error due to slippage, which cannot meet high-precision positioning. need.
Landscapes
- Engineering & Computer Science (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Mining & Mineral Resources (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Control And Safety Of Cranes (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
Abstract
Description
Claims (8)
- 一种煤矿井下单轨吊车高精度定位系统,其特征在于,包括齿轮式位移计量装置和若干均布在工字钢轨道(1)上的坐标定位单元(29);所述齿轮式位移计量装置包括对称设置在工字钢轨道(1)两侧的两个齿架,两个所述齿架固定连接在一起;所述齿架上设有定位轮(4)和若干行走轮(2),所述行走轮(2)在工字钢轨道(1)底板的上端面上行走,所述定位轮(4)与工字钢轨道(1)底板下端的齿条(19)啮合传动;所述齿架上还设有安装架(18)和用于连接单轨吊车的连接座(9),所述安装架(18)上设有电性连接在一起的惯性测量单元(13)与单片机(12);所述定位轮(4)上还设有用于检测其转动角度的转角传感器(7),所述转角传感器(7)电性连接单片机(12);单轨吊车两端的车头上均设有能够与坐标定位单元(29)传输信号的坐标更新单元(24),所述坐标更新单元(24)电性连接单片机(12)。
- 一种如权利要求1所述的煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,包括以下步骤:步骤S1:在计算机中建立所有工字钢轨道(1)的全局路线;步骤S2:利用惯性测量单元(13)拾取单轨吊车的位姿信息,用来辨别单轨吊车的运行方向,绘制单轨吊车行走过程中的实时路线;步骤S3:布置好坐标定位单元(29),获取坐标定位单元(29)包含所处位置的三维坐标信息;步骤S4:在相邻两个坐标定位单元(29)之间,单片机(12)利用转角传感器(7)传输到的角度信息计算获得单轨吊车的行走里程数,结合惯性测量单元(13)测得的方向信息,计算出单轨吊车在前进方向上行走的距离,结合单轨吊车在上一个坐标定位单元(29)在全局路线中的坐标位置,获得单轨吊 车在两个坐标定位单元(29)之间的精确三维坐标位置;步骤S5:当单轨吊经过坐标定位单元(29)时,坐标定位单元(29)对单轨吊车的精确位置进行矫正,更新单轨吊车在全局路线中的三维坐标位置;同时,惯性测量单元(13)与转角传感器(7)传输的数据自动初始化,以更新点为起点,在下两个坐标定位单元(29)之间按照步骤4中所述方法进行定位;步骤S6:重复步骤S4-步骤S5,实时并精准显示单轨吊车在全局路线中的三维坐标位置。
- 如权利要求2所述的一种煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,步骤S1的具体方法为:S1-1、事先采用激光雷达对工字钢轨道(1)进行扫描,获得工字钢轨道(1)及附近无关的点云数据,并将其传输至计算机中;S1-2、对工字钢轨道(1)及附近无关的点云数据进行处理,滤除无关点云数据,仅保留工字钢轨道(1)的点云数据,并在计算机中将工字钢轨道(1)的点云数据实体化,获得工字钢轨道(1)的三维实体模型;S1-3、根据工字钢轨道(1)的三维实体模型,以工字钢轨道(1)底面的中心线作为全局路线,并在计算机中赋予全局路线中每一点三维坐标,将坐标化后的全局路线传输至单片机(12)中。
- 如权利要求3所述的一种煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,步骤S2中惯性测量单元(13)的应用场景如下:S2-1单轨吊车在直线路段前后运动时,所述惯性测量单元(13)识别单轨吊车的行走方向;S2-2单轨吊车进入道岔时,所述惯性测量单元(13)识别单轨吊车究竟进入了哪条道岔。
- 如权利要求4所述的一种煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,步骤S3中,坐标定位单元(29)的布置方式为:首先,在单轨吊车的接入工字钢轨道(1)的初始点及每个道岔口处均设置一个坐标定位单元(29);然后,在上述已按照好的相邻的两个坐标定位单元(29)之间,再按照间隔距离d安装若干个坐标定位单元(29);当安装到第个k个坐标定位单元(29)与下一个道岔口处的坐标定位单元(29)之间的距离s为d<s<2d时,再安装第k+1个坐标定位单元(29);当安装到第k个坐标定位单元(29)与下一个道岔口处的坐标定位单元(29)之间的距离s为0<s<d时,停止安装第k+1个坐标定位单元(29);最后,按照上述方法,完成所有坐标定位单元(29)的安装。
- 如权利要求5所述的一种煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,步骤S3中,距离d的确定步骤如下:首先,根据所选惯性测量单元(13)对应品牌型号的技术参数,算出时间累计误差函数f(t);然后,设定惯性测量单元(13)的最大容许时间累计误差为△max,令f(t1)=△max,解算出t1,结合单轨吊车的平均运行速度v,这里取运行距离d≤v*t1,同时还要小于等于定位轮(4)产生最大允许位移误差时的行走距离。
- 如权利要求2所述的一种煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,步骤S4中,单片机(12)计算单轨吊车的行走里程数的方法为:设S为单轨吊车的位移,L为定位轮(4)分度圆所旋转过的总弧长,n为定位轮(4)的旋转角度,r为定位轮的分度圆半径,则S=L=nr。
- 如权利要求2所述的一种煤矿井下单轨吊车高精度定位系统的定位方法,其特征在于,所述坐标定位单元(29)为条形码,所述条形码中包含其在所述全局路线中的坐标位置;所述坐标更新单元(24)为激光扫描仪,所述激光扫描仪通过扫描坐标定位单元(29),对单轨吊车的位置进行更新。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2022348883A AU2022348883B2 (en) | 2022-04-18 | 2022-09-30 | High-precision positioning system for underground monorail hoist in coal mine and positioning method thereof |
| US18/247,874 US12187332B2 (en) | 2022-04-18 | 2022-09-30 | High-precision positioning system for underground monorail hoist in coal mine and positioning method thereof |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210402959.2A CN114803861B (zh) | 2022-04-18 | 2022-04-18 | 一种煤矿井下单轨吊车高精度定位系统及定位方法 |
| CN202210402959.2 | 2022-04-18 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023201993A1 true WO2023201993A1 (zh) | 2023-10-26 |
Family
ID=82536649
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2022/123325 Ceased WO2023201993A1 (zh) | 2022-04-18 | 2022-09-30 | 一种煤矿井下单轨吊车高精度定位系统及定位方法 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US12187332B2 (zh) |
| CN (1) | CN114803861B (zh) |
| AU (1) | AU2022348883B2 (zh) |
| WO (1) | WO2023201993A1 (zh) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114803861B (zh) | 2022-04-18 | 2023-01-24 | 中国矿业大学 | 一种煤矿井下单轨吊车高精度定位系统及定位方法 |
| CN118936461A (zh) * | 2024-07-17 | 2024-11-12 | 徐州科瑞矿业科技有限公司 | 一种轨道接头信标和惯导组合的单轨吊定位方法 |
| CN119976626B (zh) * | 2025-01-10 | 2026-02-03 | 陕西航泰电气股份有限公司 | 一种单轨吊车场无人值守系统及方法 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3844161A1 (de) * | 1988-12-23 | 1990-07-05 | Mannesmann Ag | Arbeitsgeraet |
| EP1043262A1 (fr) * | 1999-04-09 | 2000-10-11 | NFM Technologies | Procédé de chargement d'un conteneur sur une plate-forme d'un moyen de transport et installation de stockage et de manutention de conteneurs |
| CN104370210A (zh) * | 2014-10-24 | 2015-02-25 | 山东鑫鹏宇矿业装备有限公司 | 单轨吊车齿条轨道 |
| CN108862031A (zh) * | 2018-08-27 | 2018-11-23 | 太原理工大学 | 一种单轨吊车的驱动装置、轨道单体及单轨吊车 |
| CN212315347U (zh) * | 2020-03-11 | 2021-01-08 | 北京朗信智能科技有限公司 | 一种位置检测装置 |
| CN113479771A (zh) * | 2021-01-26 | 2021-10-08 | 山东新沙单轨运输装备有限公司 | 一种单轨吊机车定位方法及系统 |
| CN113741442A (zh) * | 2021-08-25 | 2021-12-03 | 中国矿业大学 | 一种基于数字孪生驱动的单轨吊车自动驾驶系统及方法 |
| CN114261431A (zh) * | 2021-12-29 | 2022-04-01 | 淮北金源工贸有限责任公司 | 一种用于煤矿井下运输的单轨吊道岔司控安全管理系统 |
| CN114803861A (zh) * | 2022-04-18 | 2022-07-29 | 中国矿业大学 | 一种煤矿井下单轨吊车高精度定位系统及定位方法 |
Family Cites Families (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5592883A (en) * | 1994-05-16 | 1997-01-14 | Andress, Iii; F. Jay | Monorail transportation system and vehicle for traveling thereon |
| CA2455521A1 (en) * | 2001-08-02 | 2003-02-13 | Siemens Aktiengesellschaft | Material handling systems with high frequency radio location devices |
| DE10348259A1 (de) * | 2003-10-16 | 2005-05-12 | Duerr Automotion Gmbh | Spurgeführtes Transportsystem |
| AT413950B (de) * | 2004-05-26 | 2006-07-15 | Voest Alpine Ind Anlagen | Stranggiessanlage mit mindestens einem roboter und verfahren zum betrieb einer stranggiessanlage unter einbindung von mindestens einem roboter |
| SG120230A1 (en) * | 2004-08-12 | 2006-03-28 | Inventio Ag | Lift installation with a cage and equipment for detecting a cage position as well as a method of operating such a lift installation |
| ITUD20040226A1 (it) * | 2004-12-03 | 2005-03-03 | Scaglia Indeva Spa | Apparato per il sollevamento e la movimentazione di oggetti |
| DE102007043498A1 (de) * | 2007-09-12 | 2009-03-19 | Pepperl + Fuchs Gmbh | Verfahren zur Positionierung eines Fahrzeugs sowie Positioniersysteme |
| CN102139704A (zh) * | 2011-02-01 | 2011-08-03 | 中国铁道科学研究院基础设施检测研究所 | 一种基于射频技术的高精度列车定位系统及其定位方法 |
| JP6096596B2 (ja) * | 2013-05-30 | 2017-03-15 | 三菱重工業株式会社 | 運行管理装置、運行管理方法、車両、車両交通システム及びプログラム |
| JP6337528B2 (ja) * | 2014-03-10 | 2018-06-06 | 村田機械株式会社 | 走行車輪の劣化検出方法と検出システム、及び走行台車 |
| US10279507B2 (en) * | 2016-01-08 | 2019-05-07 | Columbia Machine, Inc. | Mold transfer assembly for concrete products forming machine |
| CN105651280A (zh) * | 2016-01-17 | 2016-06-08 | 济南大学 | 一种矿井无人电机车组合定位方法 |
| EP3424845B1 (en) * | 2016-03-03 | 2021-08-11 | Murata Machinery, Ltd. | Temporary storage system |
| CN108248635B (zh) * | 2018-02-05 | 2019-03-22 | 刘春梅 | 一种用于轨道交通隧道的智能检测系统 |
| CN108750942B (zh) * | 2018-08-15 | 2024-05-14 | 尤洛卡(山东)矿业科技有限公司 | 一种单轨吊驱动装置 |
| CN111252670A (zh) * | 2018-11-30 | 2020-06-09 | 西华大学 | 一种单轨吊的同步定位方法 |
| CN109835368B (zh) * | 2019-02-25 | 2020-08-25 | 太原理工大学 | 一种单轨吊车用道岔装置 |
| CN110027593A (zh) * | 2019-04-12 | 2019-07-19 | 成都宇俊盛科技有限公司 | 一种全自动无人驾驶轨道车辆安全保障系统 |
| PT3722182T (pt) * | 2019-04-12 | 2025-06-25 | Hitachi Rail Gts Deutschland Gmbh | Método para determinar de forma segura e autónoma uma informação de posição de um comboio numa via |
| US10722805B1 (en) * | 2019-05-23 | 2020-07-28 | Disney Enterprises, Inc. | Techniques for concealed vehicle reset |
| CN210505275U (zh) * | 2019-08-27 | 2020-05-12 | 徐州鑫泰镀锌设备有限公司 | 一种有轨穿梭小车 |
| AT522764B1 (de) * | 2019-08-29 | 2021-01-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren und Messfahrzeug zur Ermittlung einer Ist-Lage eines Gleises |
| CN111637887A (zh) * | 2020-06-01 | 2020-09-08 | 太原理工大学 | 一种基于惯性模块的矿用单轨吊机车定位方法 |
| EP4247746A1 (de) * | 2021-01-27 | 2023-09-27 | Liebherr-Werk Biberach GmbH | Hebezeug sowie verfahren zum bestimmen von schlaffseil an dem hebezeug |
| CN113479221B (zh) * | 2021-05-10 | 2022-09-06 | 凯盛重工有限公司 | 一种机械式动力快速分配的单轨吊驱动单元组 |
-
2022
- 2022-04-18 CN CN202210402959.2A patent/CN114803861B/zh active Active
- 2022-09-30 US US18/247,874 patent/US12187332B2/en active Active
- 2022-09-30 WO PCT/CN2022/123325 patent/WO2023201993A1/zh not_active Ceased
- 2022-09-30 AU AU2022348883A patent/AU2022348883B2/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3844161A1 (de) * | 1988-12-23 | 1990-07-05 | Mannesmann Ag | Arbeitsgeraet |
| EP1043262A1 (fr) * | 1999-04-09 | 2000-10-11 | NFM Technologies | Procédé de chargement d'un conteneur sur une plate-forme d'un moyen de transport et installation de stockage et de manutention de conteneurs |
| CN104370210A (zh) * | 2014-10-24 | 2015-02-25 | 山东鑫鹏宇矿业装备有限公司 | 单轨吊车齿条轨道 |
| CN108862031A (zh) * | 2018-08-27 | 2018-11-23 | 太原理工大学 | 一种单轨吊车的驱动装置、轨道单体及单轨吊车 |
| CN212315347U (zh) * | 2020-03-11 | 2021-01-08 | 北京朗信智能科技有限公司 | 一种位置检测装置 |
| CN113479771A (zh) * | 2021-01-26 | 2021-10-08 | 山东新沙单轨运输装备有限公司 | 一种单轨吊机车定位方法及系统 |
| CN113741442A (zh) * | 2021-08-25 | 2021-12-03 | 中国矿业大学 | 一种基于数字孪生驱动的单轨吊车自动驾驶系统及方法 |
| CN114261431A (zh) * | 2021-12-29 | 2022-04-01 | 淮北金源工贸有限责任公司 | 一种用于煤矿井下运输的单轨吊道岔司控安全管理系统 |
| CN114803861A (zh) * | 2022-04-18 | 2022-07-29 | 中国矿业大学 | 一种煤矿井下单轨吊车高精度定位系统及定位方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| US12187332B2 (en) | 2025-01-07 |
| CN114803861A (zh) | 2022-07-29 |
| AU2022348883A1 (en) | 2023-11-02 |
| US20240043247A1 (en) | 2024-02-08 |
| AU2022348883B2 (en) | 2025-04-03 |
| CN114803861B (zh) | 2023-01-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114803861B (zh) | 一种煤矿井下单轨吊车高精度定位系统及定位方法 | |
| CN108615364B (zh) | 一种基于车路协同技术对车辆行驶状态进行监控的方法 | |
| CN102251451B (zh) | 基于多源信息融合的轨道几何状态测量方法 | |
| KR970008025B1 (ko) | 차량에 장착한 차량정보측정장치를 이용한 트래픽제어시스템 | |
| CN111927518A (zh) | 一种基于惯导与里程计组合的综采工作面液压支架自动调直方法 | |
| CN102337710A (zh) | 一种gps轨道不平顺检测系统及其检测方法 | |
| CN114132358A (zh) | 一种多平台智能化轨道综合检测系统 | |
| CN107299568A (zh) | 一种轨道动态测量系统及方法 | |
| CN111207743B (zh) | 基于编码器与惯性设备紧耦合实现厘米级精确定位的方法 | |
| CN105737825A (zh) | 一种掘进机截割头位置测量系统 | |
| CN110147103A (zh) | 自动驾驶集装箱卡车在码头岸桥区域的车道定位方法 | |
| CN107121082A (zh) | 基于光纤惯性技术的煤矿巷道连续线形检测装置及方法 | |
| CN102175168B (zh) | 中低速磁悬浮f型轨的轨道动态检测设备 | |
| CN103644888A (zh) | 一种用于检测桥梁形变的惯性基准测量方法 | |
| CN115014203B (zh) | 一种基于激光测距仪的惯导小车三维坐标测量方法及装置 | |
| WO2026016836A1 (zh) | 一种轨道接头信标和惯导组合的单轨吊定位方法 | |
| CN209382013U (zh) | 卫星定位与惯导一体化的轨检小车 | |
| CN102679974B (zh) | 高速定位免换站式盾构掘进姿态实时测量方法及系统 | |
| CN109680592A (zh) | 一种基于惯性测量和雷达测距的车载路面检测装置及方法 | |
| CN110631559A (zh) | 一种基于惯性测量的桥式吊车轨道检测装置 | |
| CN114492703B (zh) | 一种基于路径规划导航的隧道定位方法、装置及打孔方法 | |
| CN205443825U (zh) | 基于iGPS 的铁路轨道检测系统 | |
| JPH04279812A (ja) | シールド測量方法 | |
| RU2802971C1 (ru) | Высокоточная система позиционирования подземной однорельсовой подвижной лебедки внутри угольной шахты и способ такого позиционирования | |
| CN203625736U (zh) | 一种高铁轨道测量仪的机械结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 2022348883 Country of ref document: AU |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18247874 Country of ref document: US |
|
| ENP | Entry into the national phase |
Ref document number: 2022348883 Country of ref document: AU Date of ref document: 20220930 Kind code of ref document: A |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22938216 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 22938216 Country of ref document: EP Kind code of ref document: A1 |