WO2023164117A1 - Bouchon de pont gonflable - Google Patents

Bouchon de pont gonflable Download PDF

Info

Publication number
WO2023164117A1
WO2023164117A1 PCT/US2023/013797 US2023013797W WO2023164117A1 WO 2023164117 A1 WO2023164117 A1 WO 2023164117A1 US 2023013797 W US2023013797 W US 2023013797W WO 2023164117 A1 WO2023164117 A1 WO 2023164117A1
Authority
WO
WIPO (PCT)
Prior art keywords
resin
plug
well
downhole
bladder
Prior art date
Application number
PCT/US2023/013797
Other languages
English (en)
Inventor
Ahmed HASHIM
Abdul Halim AB HAMID
Original Assignee
Saudi Arabian Oil Company
Aramco Services Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saudi Arabian Oil Company, Aramco Services Company filed Critical Saudi Arabian Oil Company
Publication of WO2023164117A1 publication Critical patent/WO2023164117A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/127Packers; Plugs with inflatable sleeve
    • E21B33/1277Packers; Plugs with inflatable sleeve characterised by the construction or fixation of the sleeve
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/127Packers; Plugs with inflatable sleeve

Definitions

  • a well typically includes a wellbore (or a “borehole”) that is drilled into the earth to provide access to a geologic formation that resides below the earth’s surface (or a “subsurface formation”).
  • a well often facilitates the extraction of natural resources, such as hydrocarbons and water, from a subsurface formation, facilitates the injection of substances into the subsurface formation, or facilitates the evaluation and monitoring of the subsurface formation.
  • hydrocarbon wells are often drilled to extract (or “produce”) hydrocarbons, such as oil and gas, from subsurface formations.
  • Developing a hydrocarbon well for production typically involves a drilling stage, a completion stage and a production stage.
  • the drilling stage involves drilling a wellbore into a portion of the formation that is expected to contain hydrocarbons (often referred to as a “hydrocarbon reservoir” or a “reservoir”).
  • the drilling process is often facilitated by a drilling rig that provides for a variety of drilling operations, such as operating a drill bit to cut (or “drill”) the wellbore.
  • the completion stage involves operations for making the well ready to produce hydrocarbons, such as installing casing, installing production tubing, installing valves for regulating production flow, or pumping substances into the well to fracture, clean or otherwise prepare the well and reservoir to produce hydrocarbons.
  • the production stage involves producing hydrocarbons from the reservoir by way of the well.
  • the drilling rig is typically replaced with a production tree that includes valves that are operated to, for example, regulate production flow rate and pressure.
  • the production tree normally includes an outlet that is connected to a distribution network of midstream facilities, such as tanks, pipelines or transport vehicles, that transport production from the well to downstream facilities, such as refineries or export terminals.
  • Bridge plug In a well to isolate regions (or “zones”) located above and below the plug.
  • a bridge plug may be installed at a given depth downhole in a well to isolate an upper zone of the well (located above the plug) from a lower zone of the well (located below the plug).
  • a plug is used to isolate a zone from conditions or operations taking place in the other zone.
  • a plug may be used to seal-off a lower zone of the well while completion operations are conducted in an upper zone of the well.
  • Bridge plugs can be an important tool in developing a well.
  • a bridge plug may be installed (or “set”) in production tubing in a wellbore of the well to isolate an upper region (or “zone”) of the tubing (located above the plug) from a lower region of the tubing (located below the plug).
  • This may, for example, block production fluids from moving up the production tubing, which can, in turn, allow workover operations in the upper zone without a threat of production fluids migrating into the upper zone or workover fluids migrating into the lower zone.
  • a “kill fluid” e.g., mud
  • a “kill fluid” is deposited on top of the bridge plug to help offset and contain pressure in the lower zone.
  • a column of mud may be deposited into the upper zone, on top of the bridge plug, so that the weight of the mud acts against a top side of the bridge plug to offset production pressure, or other fluid pressures, acting on the bottom side of the bridge plug.
  • bridge plugs can be an effective tool for operating a well, they can be difficult to install and remove. For example, if it is desirable to install a bridge plug at a given depth inside production tubing and there is a restriction, such as a relatively small diameter section located at or above the given depth, the width of the bridge plug and associated components may have difficulty fitting through the restriction.
  • an inflatable bridge plug system that can provide for efficient and effective bridge plug installation and removal.
  • the bridge plug includes an inflatable bridge plug that can be installed in a well to isolate upper and lower regions located above and below the installed plug, respectively.
  • the inflatable bridge plug may be installed downhole, inside production tubing of a well, at a depth (or “plug depth”) of about 2000 feet (ft) to isolate an upper region of the inside of the production tubing (located above the plug depth of 2000 ft) from a lower region of the inside of the production tubing (located below the plug depth of 2000 ft).
  • the inflatable bridge plug system employs an inflatable bladder that can be run in a deflated state to a plug depth, where it can then be filled with a resin to inflate the bladder into sealing contact with a surrounding surface.
  • the inflatable bridge plug system may include a deflated bladder packaged in a relatively small profile tool that can be run downhole, inside the production tubing of a well to the plug depth of 2000 ft.
  • the bladder can be filled with a resin that inflates the bladder into sealing contact with a surrounding internal surface of the production tubing.
  • the resin may be a “hardening” resin that hardens inside the bladder over time (e.g., over the course of an hour), such that the inflated bladder forms a “hardened” bridge plug that isolates the upper and lower regions of the production tubing from one another.
  • Such an inflatable bridge plug may provide a relatively small profile that allows the tool and bladder to be run through downhole areas having a relatively small cross-section, and the bladder have a relatively large, inflated profile that enables the bridge plug to be installed in locations with a relatively large cross-section.
  • an inflatable plug system (e.g., including the tool housing the uninflated bladder) may have an approximately 2 inch un-inflated/running OD that enables the plug system to be run through relatively small passages (e.g., through tubing and restrictions having diameters in a range of about 2-3.5 inches) and the bladder may have an inflated/set OD of about 4 inches that enables the bridge plug to be installed in a region with relatively large cross-sections (e.g., in tubing having an internal diameter (ID) of about 3.5-4 inches).
  • ID internal diameter
  • a well plug system that includes the following: a downhole plug system adapted to be disposed downhole in a well, the downhole plug system including: a plug bladder system including: an inflatable bladder adapted to be inflated with a resin; and a check valve adapted to facilitate flow of the resin into the inflatable bladder and to inhibit back flow of the resin out of the inflatable bladder; and a plug deployment system including: a resin chamber adapted to house the resin; and a resin deployment system adapted to urge the resin to flow from the resin chamber, through the check valve and into the inflatable bladder while the downhole plug system is disposed downhole in the well to inflate the plug bladder system into sealing contact with a surrounding downhole portion of the well, the resin including a hardening resin adapted to harden inside of the inflatable bladder to form a hardened plug downhole in the well.
  • the plug deployment system is adapted to detach from the plug bladder system such that the plug deployment system can be detached from the plug bladder system and retrieved from the well with the plug bladder system remaining inflated and disposed downhole in the well.
  • the plug deployment system includes a resin pressure sensor adapted to measure a pressure of the resin, and where a control system is adapted to: determine, based on a measurement of the pressure of the resin obtained by way of the resin pressure sensor, that the pressure of the resin satisfies a resin pressure threshold, and in response to determining that the pressure of the resin satisfies the resin pressure threshold, inhibit flow of the resin into the inflatable bladder.
  • the resin deployment system includes a piston adapted to be advanced to urge the resin to flow from the resin chamber, through the check valve and into the inflatable bladder.
  • the resin deployment system includes a motive device adapted to regulate advancement of the piston.
  • the plug deployment system includes an onboard controller adapted to control operation of the motive device to regulate advancement of the piston.
  • the resin includes a two-part hardening composition including a curing agent component and a resin component, where the downhole plug system is adapted to isolate the curing agent component from the resin component while the resin is housed in resin chamber, and the downhole plug system is adapted to combine the curing agent component and the resin component such that the resin hardens inside the inflatable bladder.
  • the well plug system includes a well control system coupled to the plug deployment system by way of a tether and adapted to control operation of the plug deployment system.
  • the well includes a hydrocarbon well including downhole tubing disposed in a wellbore of the hydrocarbon well and where the downhole plug system is adapted to be disposed in the downhole tubing and the plug bladder system is adapted to be inflated into sealing contact with an interior surface of the downhole tubing.
  • a method of plugging a well that includes the following: disposing a downhole plug system downhole in a well, the downhole plug system including: a plug bladder system including: an inflatable bladder adapted to be inflated with a resin; and a check valve adapted to facilitate flow of the resin into the inflatable bladder and to inhibit back flow of the resin out of the inflatable bladder; a plug deployment system including: a resin chamber adapted to house the resin; and a resin deployment system; and controlling the plug deployment system to urge the resin to flow from the resin chamber, through the check valve and into the inflatable bladder while the downhole plug system is disposed downhole in the well to inflate the plug bladder system into sealing contact with a surrounding downhole portion of the well, the resin including a hardening resin adapted to harden inside of the inflatable bladder to form a hardened plug downhole in the well, where the resin hardens inside of the inflatable bladder to form a hardened plug downhole in the well.
  • the method further includes detaching the plug deployment system from the plug bladder system, and retrieving the plug deployment system from the well, leaving the plug bladder system inflated and disposed downhole in the well.
  • the plug deployment system includes a resin pressure sensor adapted to measure a pressure of the resin
  • the method further includes: determining, based on a measurement of the pressure of the resin obtained by way of the resin pressure sensor, that the pressure of the resin satisfies a resin pressure threshold, and in response to determining that the pressure of the resin satisfies the resin pressure threshold, inhibiting flow of the resin into the inflatable bladder.
  • the resin deployment system includes a piston, and controlling the plug deployment system to urge the resin to flow from the resin chamber includes advancing the piston to urge the resin to flow from the resin chamber, through the check valve and into the inflatable bladder.
  • the resin deployment system includes a motive device, and where advancing the piston includes controlling the motive device to regulate the advancement of the piston.
  • the resin includes a two-part hardening composition including a curing agent component and a resin component, where the downhole plug system isolates the curing agent component from the resin component while the resin is housed in resin chamber, and the downhole plug system combines the curing agent component and the resin component such that the resin hardens inside the inflatable bladder.
  • the well includes a hydrocarbon well including downhole tubing disposed in a wellbore of the hydrocarbon well, where disposing the downhole plug system downhole in the well includes disposing the downhole plug system in the downhole tubing, where the plug bladder system inflated into sealing contact with an interior surface of the downhole tubing, and where the hardening of the resin forms a hardened plug in the downhole tubing.
  • the method further includes conducting a well operation in the well with the hardened plug downhole in the well.
  • the method further includes conducting a plug removal operation including drilling through the hardened plug.
  • a non-transitory computer readable storage medium including program instructions stored thereon that are executable by a processor to perform the methods describe above.
  • the non-transitory computer readable storage medium may include program instructions stored thereon that are executable by a processor to perform the following operations for plugging a well: controlling disposing of a downhole plug system downhole in a well, the downhole plug system including: a plug bladder system including: an inflatable bladder adapted to be inflated with a resin; and a check valve adapted to facilitate flow of the resin into the inflatable bladder and to inhibit back flow of the resin out of the inflatable bladder; and a plug deployment system including: a resin chamber adapted to house the resin; and a resin deployment system; and controlling the plug deployment system to urge the resin to flow from the resin chamber, through the check valve and into the inflatable bladder while the downhole plug system is disposed downhole in the well to inflate the plug bladder system into sealing contact with a surrounding downhole portion of the well, the resin including a hardening resin
  • the operations further include controlling detachment of the plug deployment system from the plug bladder system and controlling retrieving of the plug deployment system from the well to leave the plug bladder system inflated and disposed downhole in the well.
  • FIG.1 is diagram that illustrates a well environment in accordance with one or more embodiments.
  • FIG.2 is a diagram that illustrate an example bridge plug system in accordance with one or more embodiments.
  • FIGS.3A-3F are diagrams that illustrate employing the bridge plug system of FIG. 2 to install a bridge plug in a well in accordance with one or more embodiments.
  • FIG.4 is a flowchart that illustrates a method of employing an inflatable bridge plug in a well in accordance with one or more embodiments.
  • FIG.5 is a diagram that illustrates an example computer system in accordance with one or more embodiments.
  • DETAILED DESCRIPTION [0019] Described are embodiments of novel systems and method for employing an inflatable bridge plug.
  • the bridge plug includes an inflatable bridge plug that can be installed in a well to isolate upper and lower regions located above and below the installed plug, respectively.
  • the inflatable bridge plug may be installed downhole, inside production tubing of a well, at a depth (or “plug depth”) of about 2000 feet (ft) to isolate an upper region of the inside of the production tubing (located above the plug depth of 2000 ft) from a lower region of the inside of the production tubing (located below the plug depth of 2000 ft).
  • the inflatable bridge plug system employs an inflatable bladder that can be run in a deflated state to a plug depth, where it can then be filled with a resin to inflate the bladder into sealing contact with a surrounding surface.
  • the inflatable bridge plug system may include a deflated bladder packaged in a relatively small profile tool that can be run downhole, inside the production tubing of a well to the plug depth of 2000 ft.
  • the bladder can be filled with a resin that inflates the bladder into sealing contact with a surrounding internal surface of the production tubing.
  • the resin may be a “hardening” resin that hardens inside the bladder over time (e.g., over the course of an hour), such that the inflated bladder forms a “hardened” bridge plug that isolates the upper and lower regions of the production tubing from one another.
  • Such an inflatable bridge plug may provide a relatively small profile that allows the tool and bladder to be run through downhole areas having a relatively small cross-section, and the bladder have a relatively large, inflated profile that enables the bridge plug to be installed in locations with a relatively large cross-section.
  • an inflatable plug system (e.g., including the tool housing the uninflated bladder) may have an approximately 2 inch un-inflated/running OD that enables the plug system to be run through relatively small passages (e.g., through tubing and restrictions having diameters in a range of about 2-3.5 inches) and the bladder may have an inflated/set OD of about 4 inches that enables the bridge plug to be installed in a region with relatively large cross-sections (e.g., in tubing having an internal diameter (ID) of about 3.5-4 inches).
  • ID internal diameter
  • the well environment 100 includes a reservoir (“reservoir”) 102 located in a subsurface formation (“formation”) 104, and a well system (“well”) 106.
  • the formation 104 may include a porous or fractured rock formation that resides beneath the earth’s surface (or “surface”) 108.
  • the reservoir 102 may be a hydrocarbon reservoir defined by a portion of the formation 104 that contains (or that is at least determined or expected to contain) a subsurface pool of hydrocarbons, such as oil and gas.
  • the formation 104 and the reservoir 102 may each include layers of rock having varying characteristics, such as varying degrees of permeability, porosity, and fluid saturation.
  • the well 106 may be a hydrocarbon production well that is operable to facilitate the extraction of hydrocarbons (or “production”), such as oil or gas, from the reservoir 102.
  • hydrocarbons or “production”
  • production such as oil or gas
  • the well 106 may be operable to facilitate the injection of substances, such as water or gas, into the reservoir 102.
  • the well 106 may include a wellbore 120, an inflatable bridge plug system (or “well plug system”) 122 and a well control system (“control system”) 124.
  • the wellbore 120 may be a bored hole that extends from the surface 108 into a target zone of the formation 104, such as the reservoir 102.
  • the wellbore 120 may be created, for example, by a drill bit of a drilling system of the well 106 boring through the formation 104.
  • An upper end of the wellbore 120 (e.g., located at or near the surface 108) may be referred to as the “up-hole” end of the wellbore 120.
  • a lower end of the wellbore 120 (e.g., terminating in the formation 104) may be referred to as the “downhole” end of the wellbore 120.
  • the well plug system 122 includes devices that facilitate installation of a bridge plug 130 downhole, in the wellbore 120.
  • the well plug system 122 includes a downhole plug system (or “well plug tool”) 132 that is employed to install (or “set”) the bridge plug 130 at a given depth (or “plug depth”) in the wellbore 120 of the well 106.
  • the installed bridge plug 130 may form a barrier that isolates an upper region (or “upper zone”) 134 of the wellbore 120 (located above the installed bridge plug 130) from a lower region (or “lower zone”) 136 of the wellbore 120 (located below the installed bridge plug 130).
  • the bridge plug 130 may be installed in an open-holed portion of the wellbore 120 at a plug depth of about 2000 feet, such that the installed bridge plug 130 seals against the walls of the wellbore 120 at the plug depth to form barrier that isolates an upper region 134 of the wellbore 120 (located above 2000 ft) from a lower region 136 of the wellbore 120 (located below 2000 ft).
  • the wellbore 120 includes a tubular 138 installed therein, such as casing, production tubing or another downhole tubular, and the bridge plug 130 is installed inside the tubular 138 to form a barrier that isolates an upper region (or “upper zone”) 134 of the tubular 138 from a lower region (or “lower zone”) 136 of the tubular 138.
  • a tubular 138 installed therein, such as casing, production tubing or another downhole tubular
  • the bridge plug 130 is installed inside the tubular 138 to form a barrier that isolates an upper region (or “upper zone”) 134 of the tubular 138 from a lower region (or “lower zone”) 136 of the tubular 138.
  • the wellbore 120 may include a production tubing type tubular 138 installed therein, and the bridge plug 130 is installed downhole, inside the tubular 138 at a plug depth of about 2000 ft, such that the installed bridge plug 130 forms a barrier that isolates an upper region 134 of the inside of the tubular 138 (located above 2000 ft) from a lower region 136 of the inside of the tubular 138 (located below 2000 ft).
  • a weighted substance is deposited on top of the installed bridge plug 130 to offset or contain pressure in a lower region 136.
  • a column of a “kill fluid” (e.g., mud) may be deposited into the upper region 134, on top of the installed bridge plug 130 such that the weight of the kill fluid acts against a top side of the installed bridge plug 130 to offset pressure (e.g., production or other fluid pressure) acting on the bottom side of the installed bridge plug 130.
  • the installed bridge plug 130 is uninstalled (or “removed”) to facilitate fluid communication between the upper region 134 and the lower region 136 isolated by the installed bridge plug 130.
  • a plug removal operation may be conducted that includes lowering a drilling tool into the wellbore 120 (e.g., into the tubular 138) and advancing the drilling tool to drill through (or “drill-out”) the installed bridge plug 130.
  • the resulting debris of the drilling operation including parts of the bridge plug 130, may be carried up and out of the wellbore 120 by way of drilling fluid (e.g., drilling fluid circulated through the drilling tool).
  • the bridge plug 130 is formed of materials that facilitate drilling of the bridge plug 130.
  • the bridge plug 130 may not contain abrasive components, such as metal, that could cause excessive wear or breakage of the drilling tool.
  • the well plug tool 132 includes a plug bladder system 140 and a plug deployment system 142.
  • the plug bladder system 140 includes an inflatable bladder that can be inflated with a resin to form the bridge plug 130, and the plug deployment system 142 includes devices operable to inflate the bladder with the resin.
  • the well plug tool 132 (including the inflatable bladder) is run downhole to a plug depth and the plug deployment system 142 is operated to inflate the bladder into sealing contact with a surrounding surface at the plug depth.
  • the well plug tool 132 (including the inflatable bladder packaged in a deflated state) may be run downhole, inside the tubular 138 to a plug depth of about 2000 ft, and the plug deployment system 142 may be operated fill the bladder with a resin to inflate the bladder into sealing contact with a surrounding internal surface of the tubular 138 at the plug depth.
  • the bladder is inflated with a resin that hardens over time.
  • the resin introduced into the bladder may harden within the bladder to form an inflated-hardened bladder that forms a “hardened” bridge plug 130.
  • the resin may include a two-part hardening composition (e.g., an epoxy) that includes a curing agent component (e.g., a hardener) and a resin component (e.g., an epoxy resin).
  • the plug deployment system 142 may include a resin chamber that houses the curing agent component and the resin component in isolation from one another prior to the resin being introduced into the bladder, such that the resin does not activate into a hardened state while housed in the resin chamber.
  • the plug deployment system 142 may provide for combining the curing agent component and the resin component (e.g., mixing of the hardener and epoxy resin) to activate hardening (or “curing”) of the resin at or near that time that they are introduced into the bladder.
  • the resulting “activated” resin may, then, harden (or “cure”) inside the bladder over time (e.g., over the course of one hour) to form a “hardened” bridge plug 130.
  • the hardened (or “cured”) bridge plug 130 may form an effective barrier that isolates the upper region 134 of the inside of the tubular 138 (located above 2000 ft) from the lower region 136 of the inside of the tubular 138 (located below 2000 ft).
  • an epoxy type hardening resin embodiments can include other suitable materials that can provide for flow into, and hardening within, the bladder.
  • embodiments may include use of a cementitious material (e.g., cement) that is mixed with water, to facilitate the flow of the mixed material into the bladder, where it can harden to form the hardened (or “cured”) bridge plug 130.
  • the well plug system 122 includes a tether 150.
  • the tether 150 may provide a physical connection between the well plug tool 132 and other components of the well 106, such as the well control system 124.
  • the tether 150 may include a wireline, or other cabling or conduit, that includes a cabled connection between the well plug tool 132 and surface components, including the well control system 124.
  • the tether 150 may provide for lowering, lifting, controlling or powering of the well plug system 122.
  • the tether 150 may include a wireline that includes a cabled connection that provides physical support for lowing or raising the well plug system 122 in the wellbore 120 of the well 106 or includes communication lines for communicating data signals or electrical power between the well control system 124 and the well plug system 122.
  • the well control system 124 is operable to control various operations of the well 106, including well plugging operations for installing or removing the bridge plug 130.
  • the well control system 124 may include a well system memory and a well system processor that are operable to perform some or all the various processing and control operations of the well control system 124 described here.
  • the well control system 124 includes a computer system that is the same as or similar to that of computer system 1000 described with regard to at least FIG.5.
  • FIG. 2 is a diagram that illustrates components of a well plug system 122 in accordance with one or more embodiments.
  • the well plug system 122 includes well plug tool 132 having a tool body (or “housing”) 200 housing a plug deployment system 142 and a plug bladder system 140 in a running configuration (e.g., with the bladder 230 deflated inside of the housing 200).
  • the plug deployment system 142 includes a local control system (or “onboard controller”) 210, a motive device 212, a piston 214, a resin chamber 216 (for housing a resin 218), and a resin pressure sensor 220.
  • the plug bladder system 140 includes an inflatable bladder 230 and a bladder valve 232.
  • the onboard controller 210 is operable to control various operations of the well plug tool 132, including operations of the plug deployment system 142 to deploy (e.g., inflate and disconnect from) the plug bladder system 140.
  • the onboard controller 210 may include memory and a processor that are operable to perform some or all the various processing and control operations of the plug deployment system 142 described here.
  • the onboard controller 210 receives operational commands and executes them.
  • the onboard controller 210 may receive a command (e.g., from the well control system 124 by way of the tether 150) to deploy the plug bladder system 140 and, in response to receiving the command, execute the command by operating the motive device 212 to advance the piston 214 to urge resin 218 from the resin chamber 216, through the bladder valve 232 and into the inflatable bladder 230 to inflate the bladder 230, monitor a resin pressure measured by the resin pressure sensor 220, determine when the resin pressure meets or exceeds a resin pressure threshold (e.g., 200 pounds per square inch (psi)), and, in response to determining that the pressure meets or exceeds the resin pressure threshold, control the motive device 212 to stop advancement of the piston 214 to stop further inflation of the bladder 230 with resin 218.
  • a resin pressure threshold e.g. 200 pounds per square inch (psi)
  • the other portions of the well plug tool 132 may be moved upward in the well 106 (e.g., by retraction of the tether 150) to disconnect those portions of the well plug tool 132 from the plug bladder system 140, thereby leaving the inflated bladder 230 installed in the well 106 at the plug depth.
  • the onboard controller 210 includes a computer system that is the same as or similar to that of computer system 1000 described with regard to at least FIG.5.
  • the motive device 212 is a device operable to provide for advancement of the piston 214.
  • the motive device may be operable to advance or retract a stem 240 coupled to the piston 214, such that operation of the motive device 212 can advance the stem 240 and the piston 214 downward to force (or “push”) the resin 218 from the resin chamber 216, through the bladder valve 232 and into the inflatable bladder 230 to inflate the bladder 230, or can retract the stem 240 and the piston 214 upward.
  • the motive device 212 includes a motor having drive gearing (e.g., a pinion) that engages complementary driven gearing (e.g., a rack) of a stem 240 coupled to the piston 214, such that operation of the motive device 212 provides linear motion that advances or retracts the stem 240 and the piston 214.
  • the motive device includes a hydraulic pump that generates hydraulic pressure to advance or retract the stem 240 and the piston 214.
  • the resin chamber 216 is a container operable to house the resin 218.
  • the piston 214 may be advanced to urge (e.g., “push” or “force”) the resin 218 to be expelled from the resin chamber 216 through an outlet 250 of the resin chamber 216.
  • the outlet 250 may be coupled to the plug bladder system 140 such that the expelled resin 218 is routed through the bladder valve 232 and into the inflatable bladder 230 to inflate the bladder 230.
  • the resin chamber 216 provides for maintaining separation (or “isolation”) of components of a multi-component hardening resin 218, to inhibit the resin 218 from activating and hardening in the resin chamber 216, before it is injected into the inflatable bladder 230.
  • the resin chamber 216 may include a first chamber 242 for housing a curing agent component and a second chamber 244 for a resin component.
  • the piston 214 may include first and second piston elements 246 and 248 that are operable to force (or “push”) the resin 218 from the first and second resin chambers 242 and 244.
  • the curing agent component and the resin component may remain isolated from one another until at or near the point where they exit their respective chambers 242 and 244 and the outlet 250, where they are then mixed (e.g., at or near the point of entering the plug bladder system 140) to activate hardening (or “curing”) of the resin 218 inside the bladder 230.
  • the resin pressure sensor 220 is operable to measure a pressure of the resin 218.
  • the resin pressure sensor 220 may be located at or near the outlet 250 to sense pressure of the resin 218 as it is being expelled into the plug bladder system 140.
  • This “resin pressure” may correspond to the pressure of the resin 218 inside the bladder 230, which can provide an indication of the state of the inflation of the bladder 230. For example, it can be expected that the resin pressure will increase as the bladder 230 is inflated with resin, and it can be determined that the bladder 230 is sufficiently inflated (e.g., in sealing contact with the surrounding surfaces) when the resin pressure measured by resin pressure sensor 220 exceeds a predefined resin pressure threshold (e.g., 200 psi).
  • a predefined resin pressure threshold e.g. 200 psi
  • a control system may receive and process the resin pressure measurements from the resin pressure sensor 220 to determine whether the resin pressure meets or exceeds the resin pressure threshold, and may, in response to determining that the resin pressure meets or exceeds the resin pressure threshold, control the plug deployment system 142 to stop inflating the bladder 230 with resin 218.
  • the bladder valve 232 is operable to facilitate flow of the resin 218 into the inflatable bladder 230 and to inhibit back flow of the resin 218 out of the inflatable bladder 230.
  • the bladder valve 232 may be a check valve that is operable to allow the resin 218 to flow into the bladder 230 through the check valve and block or otherwise inhibit the flow (or “back-flow”) of the resin 218 out of the bladder 230 through the check valve.
  • resin 218 may flow from the resin chamber 216, through the check valve and into the inflatable bladder 230, where the resin 218 is retained in the bladder 230 by the check valve.
  • the bladder valve 232 includes a relief valve that can be employed to release pressure in the bladder 230.
  • the relief valve may be opened, for example, if a problem is encountered during inflation, to deflate the bladder 230 so that the bladder 230 can be retrieved, repositioned or reinflated before the resin 218 fully hardens (or “cures”) in the bladder 230.
  • the bladder valve 232 provides for coupling of the plug bladder system 140 to the plug deployment system 142.
  • the bladder valve 232 may include a connector (e.g., a snap connector) that can be selectively coupled and decoupled from a complementary connector of the outlet 250 of the plug deployment system 142.
  • the connector may be connected during running of the well plug tool 132 and inflation of the bladder 230 and may be disconnected after the bladder 230 is inflated with resin 218, to enable the well plug tool 132 to be retrieved from the well 106 with the inflated bladder 230 remaining installed in the well 106, where it can fully harden (or “cure”).
  • the inflatable bladder 230 is an expandable container.
  • the inflatable bladder 230 may include an expandable container made of a flexible material, such as rubber.
  • the inflatable bladder 230 can be provided in a first, uninflated state that enables the inflatable bladder 230 be housed within the housing 200 of the well plug tool 132, and can be inflated to achieve a second, inflated state having a size and shape that is capable of sealing engaging with surrounding portions of the well 106.
  • the inflatable bladder 230 may be a hollow spherical or donut shaped container made of a flexible material (e.g., rubber) that in a first, uninflated state can be folded (or “packed”) into a relatively small volume that enables the inflatable bladder 230 be housed (or “stuffed”) within the downhole end 206 of the housing 200 of the well plug tool 132 (e.g., having an external dimeter of about 2 in), and that can be inflated (e.g., using the resin 218) to achieve a second, inflated state where the inflatable bladder 230 takes on a hollow spherical or donut shape having an outer diameter (e.g.
  • a flexible material e.g., rubber
  • the inflatable bladder 230 is formed of an elastomeric material that facilitates deformation of the inflatable bladder 230 into sealing contact with surrounding surfaces and that is suitable for use in downhole environments.
  • the inflatable bladder 230 may be formed of a rubber material, such as Nitril (NBR) or Viton® (Fluorocarbon rubber). Such rubber material may provide for deformation of the bladder (when inflated) into sealing contact with surrounding surfaces and may be capable of withstanding the internal threshold resin pressure in combination with exposure to downhole temperatures, pressures and fluids.
  • FIGS. 3A-3F are diagrams that illustrate employing the inflatable bridge plug system of FIG.2 in a well 106 in accordance with one or more embodiments.
  • FIG.3A illustrates disposing the inflatable bridge plug 130 in the well 106 in accordance with one or more embodiments.
  • FIGS.3B and 3C illustrate deploying the inflatable bridge plug 130 in the well 106 in accordance with one or more embodiments.
  • FIG. 3D illustrates retrieving a plug deployment system 142 from the well 106 and allowing the deployed, inflated bladder 230 to harden (or “cure”) in the well 106 to form a hardened (or “cured”) bridge plug 130 in accordance with one or more embodiments.
  • FIG. 3A illustrates disposing the inflatable bridge plug 130 in the well 106 in accordance with one or more embodiments.
  • FIGS.3B and 3C illustrate deploying the inflatable bridge plug 130 in the well 106 in accordance with one or more embodiments.
  • FIG. 3D illustrates retrieving a plug deployment system 142 from
  • FIG. 3E illustrates conducting a well operation (e.g., a workover including use of kill-fluid) in the well 106 with the hardened (or “cured”) bridge plug 130 in the well 106 in accordance with one or more embodiments.
  • FIG. 3E illustrates conducting a plug removal operation to remove the hardened (or “cured”) bridge plug 130 from the well 106 in accordance with one or more embodiments.
  • FIG.4 is a flowchart that illustrates a method of employing an inflatable bridge plug in a well (e.g., including plugging a well with a bridge plug) in accordance with one or more embodiments.
  • method 400 includes disposing an inflatable bridge plug system in a well (block 402). This may include running a downhole plug system (or “well plug tool”) having an inflatable bridge plug, to a plug depth in a wellbore of a well.
  • disposing an inflatable bridge plug system in a well may include the well control system 124 (or another operator of the well 106) controlling operation of the well 106 to lower (or “run”) the downhole plug system (or “well plug tool”) 132 down a production tubing tubular 138 of the well 106 (as indicated by the arrow 300), such that the downhole end 206 of the well plug tool 132 (and the bladder 230) is located at the plug depth 302 in the production tubing tubular 138.
  • method 400 includes deploying an inflatable bridge plug in a well (block 404). This may include inflating the inflatable bridge plug with a hardening resin, detaching the bridge plug from the well plug tool, retrieving the well plug tool from the well and allowing the resin in the inflated bridge plug to harden (or “cure”) to form a “hardened” (or “cured”) bridge plug at the plug depth in the wellbore of the well.
  • deploying an inflatable bridge plug in a well may include, the onboard controller 210, the well control system 124 (or another operator of the well 106) controlling of the well plug tool 132 to operate the motive device 212 to advance the piston 214 to urge resin 218 from the resin chamber 216, through the bladder valve 232 and into the inflatable bladder 230 to inflate the bladder 230 (see, e.g., arrow 310 of FIG.
  • a corresponding “inflated” signal indicating that the resin pressure meets or exceeds the resin pressure threshold may be communicated to the well control system 124 (e.g., from the onboard controller 210 to the well control system 124 by way of the tether 150 or other communication).
  • the well control system 124 may process the signal to determine that the pressure meets or exceeds the resin pressure threshold, and in response to the determination, operate the well 106 to raise the other portions of the well plug tool 132 (e.g., including the plug deployment system 142) upward in the well 106 (see, e.g., arrow 314 of FIG. 3D) to disconnect those portions of the well plug tool 132 from the plug bladder system 140 (see, e.g., arrow 312 of FIG. 3D), which leaves the inflated bladder 230 installed in the well 106.
  • the other portions of the well plug tool 132 e.g., including the plug deployment system 142
  • the plug bladder system 140 see, e.g., arrow 312 of FIG. 3D
  • the installed (or “deployed”) bladder 230 may, then, be allowed to sit relatively undisturbed for at least a hardening (or “curing”) period that is sufficient to allow the resin in the inflated bridge plug to harden (or “cure”) (e.g., for 1 hour or more) to form a “hardened” (or “cured”) bridge plug 130 at the plug depth 302 in the production tubing tubular 138 of the well 106.
  • a hardening or “curing” period that is sufficient to allow the resin in the inflated bridge plug to harden (or “cure”) (e.g., for 1 hour or more) to form a “hardened” (or “cured”) bridge plug 130 at the plug depth 302 in the production tubing tubular 138 of the well 106.
  • method 400 includes conducting a well operation with the bridge plug deployed in the well (block 406). This may include performing an operation in the well, such a workover operation or other operation that relies on the isolation provided by the deployed bridge plug.
  • conducting a well operation with the bridge plug deployed in the well may include the well control system 124 (or another operator of the well 106) controlling conducting of a workover operation in the upper region 134 of the production tubing tubular 138 (located above the bridge plug 130).
  • the workover operation may include controlling a fluid system of the well 106 to deposit (e.g., pump) a column of kill fluid (e.g., mud) 320 into the upper region 134, on top of the bridge plug 130, such that the weight of the kill fluid (illustrated by arrow 322) acts against a top side 324 of the installed bridge plug 130 to offset the pressure acting on the bottom side 316 of the installed bridge plug 130.
  • a fluid system of the well 106 to deposit (e.g., pump) a column of kill fluid (e.g., mud) 320 into the upper region 134, on top of the bridge plug 130, such that the weight of the kill fluid (illustrated by arrow 322) acts against a top side 324 of the installed bridge plug 130 to offset the pressure acting on the bottom side 316 of the installed bridge plug 130.
  • kill fluid e.g., mud
  • method 400 includes conducting a bridge plug removal operation in the well (block 408). This may include performing an operation that includes partially or completely removing a bridge plug installed in the well to establish communication between the regions (or “zones”) on either side of the bridge plug.
  • conducting a bridge plug removal operation in the well may include conducting of a plug removal operation that includes removing the bridge plug 130 so that communication is reestablished between the upper and lower regions 134 and 136 of the production tubing tubular 138.
  • This may include, for example, the well control system 124 (or another operator of the well 106) controlling a drilling system of the well 106 to drill-out the bridge plug 130.
  • the operation may include lowering a drilling tool 330 into the wellbore 120 (e.g., down the tubular 138) to drill though (or “drill-out”) the installed bridge plug 130 (as indicated by arrow 332).
  • the resulting debris of the drilling operation, including remaining parts of the bridge plug 334, may be carried up and out of the wellbore 120 by way of drilling fluid (e.g., in drilling fluid circulated through the drilling tool) (as indicated by arrows 336).
  • FIG.5 is a diagram that illustrates an example computer system (or “system”) 1000 in accordance with one or more embodiments.
  • the system 1000 is a programmable logic controller (PLC).
  • PLC programmable logic controller
  • the system 1000 may include a memory 1004, a processor 1006 and an input/output (I/O) interface 1008.
  • the memory 1004 may include non- volatile memory (e.g., flash memory, read-only memory (ROM), programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM)), volatile memory (e.g., random access memory (RAM), static random-access memory (SRAM), synchronous dynamic RAM (SDRAM)), or bulk storage memory (e.g., CD-ROM or DVD-ROM, hard drives).
  • the memory 1004 may include a non-transitory computer-readable storage medium having program instructions 1010 stored thereon.
  • the program instructions 1010 may include program modules 1012 that are executable by a computer processor (e.g., by the processor 1006) to cause the functional operations described, such as those described with regard to the onboard controller 210, the well control system 124 (or another operator of the well 106), or the method 400.
  • the processor 1006 may be any suitable processor capable of executing program instructions.
  • the processor 1006 may include a central processing unit (CPU) that carries out program instructions (e.g., the program instructions of the program modules 1012) to perform the arithmetical, logical, or input/output operations described.
  • the processor 1006 may include one or more processors.
  • the I/O interface 1008 may provide an interface for communication with one or more I/O devices 1014, such as a joystick, a computer mouse, a keyboard, or a display screen (for example, an electronic display for displaying a graphical user interface (GUI)).
  • the I/O devices 1014 may include one or more of the user input devices.
  • the I/O devices 1014 may be connected to the I/O interface 1008 by way of a wired connection (e.g., an Industrial Ethernet connection) or a wireless connection (e.g., a Wi-Fi connection).
  • the I/O interface 1008 may provide an interface for communication with one or more external devices 1016.
  • the I/O interface 1008 includes one or both of an antenna and a transceiver.
  • the external devices 1016 may include, for example, devices of the well system 106 or the well plug tool 132.
  • a description of an element including A or B may refer to the element including one or both of A and B.
  • the phrase “based on” does not limit the associated operation to being solely based on a particular item.
  • processing “based on” data A may include processing based at least in part on data A and based at least in part on data B, unless the content clearly indicates otherwise.
  • the term “from” does not limit the associated operation to being directly from.
  • receiving an item “from” an entity may include receiving an item directly from the entity or indirectly from the entity (for example, by way of an intermediary entity).

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Pipe Accessories (AREA)

Abstract

L'invention concerne une technique d'obturation de puits qui comprend un système de bouchon de fond de trou destiné à être disposé en fond de trou dans un puits et comprenant un système de vessie de bouchon comprenant une vessie gonflable d'étain (à gonfler avec une résine) et un clapet de non-retour (pour faciliter l'écoulement de la résine vers l'intérieur, et empêcher l'écoulement de retour de la résine hors de la vessie), et un système de déploiement de bouchon comprenant une chambre de résine pour loger la résine et un système de déploiement de résine pour pousser la résine à s'écouler de la chambre de résine, à travers le clapet de non-retour et dans la vessie gonflable tandis que le système de bouchon de fond de trou est disposé en fond de trou dans le puits, pour gonfler le système de vessie de bouchon pour former un bouchon durci en fond de trou dans le puits.
PCT/US2023/013797 2022-02-28 2023-02-24 Bouchon de pont gonflable WO2023164117A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US17/682,083 US11828132B2 (en) 2022-02-28 2022-02-28 Inflatable bridge plug
US17/682,083 2022-02-28

Publications (1)

Publication Number Publication Date
WO2023164117A1 true WO2023164117A1 (fr) 2023-08-31

Family

ID=85979444

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2023/013797 WO2023164117A1 (fr) 2022-02-28 2023-02-24 Bouchon de pont gonflable

Country Status (2)

Country Link
US (1) US11828132B2 (fr)
WO (1) WO2023164117A1 (fr)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3526557A1 (de) * 1985-07-25 1987-02-05 Bergwerksverband Gmbh Rohrfoermiger verlorener bohrlochverschluss
AU628540B2 (en) * 1989-05-18 1992-09-17 Bergwerksverband Gmbh Injection tube with anchoring effect
US6302214B1 (en) * 1997-12-22 2001-10-16 Specialised Petroleum Services Limited Apparatus and method for inflating packers in a drilling well
GB2403744A (en) * 2003-01-24 2005-01-12 Phil Head A means of isolating / sealing a part of a well
EP1840324A1 (fr) * 2006-03-31 2007-10-03 Services Pétroliers Schlumberger Méthode et appareil de traitement sélectif d'un tubage perforé
US7325621B2 (en) * 2003-01-29 2008-02-05 Baker Hughes Incorporated Method and apparatus for ECP element inflation utilizing solid laden fluid mixture
US8091641B2 (en) * 2006-03-31 2012-01-10 Schlumberger Technology Corporation Method and apparatus to cement a perforated casing
US20160251938A1 (en) * 2013-11-14 2016-09-01 Smjm Limited Improved support device for use in a wellbore and a method for deploying a barrier in a wellbore

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5220959A (en) 1991-09-24 1993-06-22 The Gates Rubber Company Gripping inflatable packer
US5711372A (en) 1996-05-21 1998-01-27 Tam International Inflatable packer with port collar valving and method of setting
US5925879A (en) 1997-05-09 1999-07-20 Cidra Corporation Oil and gas well packer having fiber optic Bragg Grating sensors for downhole insitu inflation monitoring
US6073692A (en) 1998-03-27 2000-06-13 Baker Hughes Incorporated Expanding mandrel inflatable packer
NO981998D0 (no) 1998-05-04 1998-05-04 Henning Hansen FremgangsmÕte ved flerfaset tettende plugging av borehull benyttet for produksjon av hydrokarboner eller injeksjon av vµsker til nedihulls formasjoner eller unders÷kelsesborehull
AU2001256872A1 (en) * 2000-04-26 2001-11-07 Triangle Equipment As Packer, setting tool for a packer and method for setting a packer
US6431274B1 (en) 2000-06-23 2002-08-13 Baker Hughes Incorporated Well packer
NO334636B1 (no) 2002-04-17 2014-05-05 Schlumberger Holdings Kompletterings-system til bruk i en brønn, og fremgangsmåte til sone-isolasjon i en brønn
US6854522B2 (en) * 2002-09-23 2005-02-15 Halliburton Energy Services, Inc. Annular isolators for expandable tubulars in wellbores
WO2004070163A1 (fr) 2003-02-03 2004-08-19 Baker Hughes Incorporated Garniture d'etancheite (packer) de fond de trou ou bouchon provisoire composite gonflable
DK178489B1 (da) 2008-03-13 2016-04-18 Maersk Olie & Gas Værktøj og fremgangsmåde til at aflukke åbninger eller lækager i en brøndboring
NO333064B1 (no) 2010-07-28 2013-02-25 Well Innovation Engineering As Bronnplugg med ekspanderende elastomerpakning samt en ekspansjonsring.
BR112013013148B1 (pt) 2010-12-17 2020-07-21 Exxonmobil Upstream Research Company aparelho de furo do poço e métodos para isolamento zonal e controle de fluxo
WO2014172715A1 (fr) 2013-04-20 2014-10-23 Bottom Line Industries, Inc. Système de gonflage d'un élément de garniture par activateur à époxy, procédés de gonflement d'un élément de garniture par un système d'activateur à époxy, élément de garniture gonflable par un activateur à époxy dans la vessie
US9677371B2 (en) 2013-06-06 2017-06-13 Halliburton Energy Services, Inc. Fluid loss well treatment
EP3111035B1 (fr) 2014-02-24 2019-04-10 Tam International Inc. Élément de garniture gonflable à enroulement de câbles
CA3010985C (fr) 2016-02-15 2022-06-28 Tam International, Inc. Vanne de niveau de fluide bas
CN106085390B (zh) 2016-06-08 2018-11-27 中国石油集团渤海钻探工程有限公司 油气井可降解化学封堵胶塞的胶塞液及其制备方法和用法
WO2018064171A1 (fr) 2016-09-30 2018-04-05 Conocophillips Company Bouchage et abandon par la colonne de production avec des bouchons à deux matériaux
CN107939335B (zh) 2017-11-16 2020-09-25 中国石油集团川庆钻探工程有限公司 固井用耐磨抗回流双胶塞系统及使用方法
US11066898B2 (en) 2018-03-26 2021-07-20 Nautonnier Holding Corp. Resin plug for wellbore abandonment
WO2020131118A1 (fr) 2018-12-21 2020-06-25 Halliburton Energy Services, Inc. Bouchon provisoire posé sous la colonne de production ayant une conception d'élastomère à dilatation élevée
US11408244B2 (en) * 2019-09-16 2022-08-09 Schlumberger Technology Corporation Automation of packer inflation
CN111075393B (zh) 2019-12-18 2021-11-30 中国石油天然气股份有限公司 一种油气田套损井长井段挤堵树脂修复工艺

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3526557A1 (de) * 1985-07-25 1987-02-05 Bergwerksverband Gmbh Rohrfoermiger verlorener bohrlochverschluss
AU628540B2 (en) * 1989-05-18 1992-09-17 Bergwerksverband Gmbh Injection tube with anchoring effect
US6302214B1 (en) * 1997-12-22 2001-10-16 Specialised Petroleum Services Limited Apparatus and method for inflating packers in a drilling well
GB2403744A (en) * 2003-01-24 2005-01-12 Phil Head A means of isolating / sealing a part of a well
US7325621B2 (en) * 2003-01-29 2008-02-05 Baker Hughes Incorporated Method and apparatus for ECP element inflation utilizing solid laden fluid mixture
EP1840324A1 (fr) * 2006-03-31 2007-10-03 Services Pétroliers Schlumberger Méthode et appareil de traitement sélectif d'un tubage perforé
US8091641B2 (en) * 2006-03-31 2012-01-10 Schlumberger Technology Corporation Method and apparatus to cement a perforated casing
US20160251938A1 (en) * 2013-11-14 2016-09-01 Smjm Limited Improved support device for use in a wellbore and a method for deploying a barrier in a wellbore

Also Published As

Publication number Publication date
US11828132B2 (en) 2023-11-28
US20230272688A1 (en) 2023-08-31

Similar Documents

Publication Publication Date Title
US10364643B2 (en) Methods for formulating a cement slurry for use in a subterranean salt formation using geometric modeling
EP3688271B1 (fr) Essai de contrainte avec ensemble garniture gonflable
US6189621B1 (en) Smart shuttles to complete oil and gas wells
US6722438B2 (en) Method and apparatus for formation damage removal
RU2726710C2 (ru) Система заканчивания скважины, обеспечивающая герметичность относительно покрывающего слоя
US8479818B2 (en) Method and apparatus to cement a perforated casing
CN112004986A (zh) 修复井眼中的循环漏失区
US8807227B2 (en) Method and apparatus for pressure testing a tubular body
CA2951832C (fr) Dispositif destine a actionner une soupape de detente de pression
US2942669A (en) Inflating pump for oil well packers
US11828132B2 (en) Inflatable bridge plug
WO2014074325A1 (fr) Système, procédé, et appareil pour complétion à stades multiples
US11939829B2 (en) Hydraulic setting tool including a fluid metering feature
US11933142B2 (en) Traceability of cementing plug using smart dart
Carrillo et al. Enabling Workover Applications with Coiled-Tubing-Deployed Inflatable Packers
Bue Optimal Drilling and Completion of Deep ERD Wells
Bellarby Specialist Completions

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23715988

Country of ref document: EP

Kind code of ref document: A1