WO2023120063A1 - 情報処理方法、プログラム、及び情報処理装置 - Google Patents

情報処理方法、プログラム、及び情報処理装置 Download PDF

Info

Publication number
WO2023120063A1
WO2023120063A1 PCT/JP2022/044018 JP2022044018W WO2023120063A1 WO 2023120063 A1 WO2023120063 A1 WO 2023120063A1 JP 2022044018 W JP2022044018 W JP 2022044018W WO 2023120063 A1 WO2023120063 A1 WO 2023120063A1
Authority
WO
WIPO (PCT)
Prior art keywords
contract
infrastructure
information processing
information
processing device
Prior art date
Application number
PCT/JP2022/044018
Other languages
English (en)
French (fr)
Inventor
昭夫 春日
Original Assignee
三井住友建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三井住友建設株式会社 filed Critical 三井住友建設株式会社
Publication of WO2023120063A1 publication Critical patent/WO2023120063A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/08Insurance

Definitions

  • the present invention relates to an information processing method, a program, and an information processing apparatus.
  • the present invention focuses on this result-linked contract and returns the economic results of infrastructure development to business operators (such as insurance companies) or fund raisers, thereby creating a new mechanism for financing infrastructure development projects. intended to provide
  • An information processing method executed by an information processing apparatus is a contract relating to an infrastructure development project for improving infrastructure, wherein payment is made based on the disaster mitigation results of the infrastructure, linked to a first result.
  • type contract or disaster insurance contract for the infrastructure obtains fund data related to funds set based on the infrastructure development project from a funding source, and obtains the fund data, the infrastructure
  • An execution destination of the maintenance project is specified, and order information regarding the infrastructure development project is transmitted to the execution destination.
  • FIG. 4 is a sequence diagram showing an example of processing related to funding and project ordering according to one embodiment of the present invention; It is a sequence diagram showing an example of payment processing according to one embodiment of the present invention.
  • FIG. 1 is a diagram showing an example of the configuration of an information processing system 1 according to one embodiment of the present invention.
  • an information processing system 1 includes information processing apparatuses 10, 20, 30, 40, 50, and 60 (hereinafter also referred to as "information processing apparatuses 10 to 60"), and each information processing Devices 10 to 60 can transmit and receive data to and from each other via network N.
  • FIG. The information processing apparatuses 60A and 60B are also referred to as the information processing apparatus 60 when they are not distinguished from each other.
  • infrastructure includes existing buildings such as, for example, existing logistics facilities, factories, offices, and the like.
  • the information processing device 10 that is mainly used by a business operator who is the owner of the infrastructure can be changed from the information processing device 20 that is mainly used by an insurance company such as a non-life insurance company to the business of a company or organization in an emergency such as a disaster.
  • BCP business continuity planning
  • disaster insurance e.g. earthquake insurance
  • the information processing device 10 receives contract information (first contract information) and store it. Further, the information processing device 10 may acquire and store contract information (insurance contract information) relating to non-life insurance in which the insurance premium includes the disaster mitigation result in the result-linked contract.
  • contract information insurance contract information
  • a performance-linked contract is a performance-linked private consignment contract (PFS: Pay For Success), where the owner entrusts the business to the business operator, sets performance indicators corresponding to the problems to be solved, and pays Includes contracts linked to the achievement or improvement of performance indicators.
  • PFS Performance-linked private consignment contract
  • the business operator entrusted with the business can procure funds from the fund provider (investors, etc.) in return for future distribution of payments (dividends are not necessarily paid to investors, etc.).
  • the owner entrusting the business will be paid only when the effect is realized, which is advantageous for both the business entrusting side and the entrusted side.
  • funds for infrastructure development for example, building resilience
  • an insurance company for example.
  • the information processing device 20 which is mainly used by insurance companies such as non-life insurance companies, provides performance-linked contracts and disaster insurance for infrastructure development projects for BCP.
  • the information processing device 20 transmits the first contract information related to the first result-linked contract for the infrastructure development project and the insurance contract information related to disaster insurance to the information processing device 10 used by the operator who is the owner of the infrastructure. do.
  • the first contract information includes, for example, contract information related to a performance-linked contract based on the economic results of the infrastructure development, in which the development cost of the infrastructure development project is estimated. Also, the recovery of the cost of infrastructure development may be included in the premium of disaster insurance.
  • the information processing device 20 requests the provider (hereinafter also referred to as "fund provider") that provides funds for the infrastructure development project to procure or provide funds.
  • the request method may be a bid or the like.
  • the information processing device 20 acquires fund data relating to funds for the infrastructure development project from the information processing device 40 mainly used by the funding source.
  • the information processing device 20 transmits order information regarding the ordering of the infrastructure development project to the information processing device 30 mainly used by the construction company or design company that executes the infrastructure development project.
  • the information processing device 20 acquires the fund data and determines that the fund data provides a cost equivalent to the maintenance cost of the infrastructure development project, the information processing device 20 transfers the fund data related to the infrastructure development project fund to the design company or the construction company. It is transmitted to the information processing device 30 used by the company. The design company or construction company receives the payment of the maintenance cost and starts the infrastructure development project.
  • the information processing device 20 collects insurance premiums from the infrastructure owner based on insurance contract information regarding disaster insurance, and manages remuneration data related to the collected insurance premiums.
  • the information processing device 20 collects a performance fee for disaster mitigation when a disaster occurs from the owner of the infrastructure based on the details of the infrastructure development project and the first contract information of the first result-linked contract, and collects the collected performance fee.
  • manage compensation data for The information processing device 20 transmits the collected insurance premiums and remuneration data related to performance remuneration to the information processing device 40 used by the funding source.
  • the remuneration data includes data indicating a remuneration as a return for a funding source to procure or provide funds for an infrastructure development project.
  • the information processing device 30 used by the construction company, design company, etc. acquires order information from the information processing device 20 .
  • the execution destination starts the infrastructure development project when the payment for the infrastructure development project is received.
  • Payments for infrastructure development projects include lump-sum payments and installment payments.
  • the information processing device 30 may receive data from the information processing device 20 indicating that the fee has been paid.
  • the fund data transmitted from the information processing device 20 may be data indicating that the fee has been paid.
  • the information processing device 40 which is mainly used by the funding source for the infrastructure development project, raises the funds notified by the information processing device 20 in order to secure the financial resources for the infrastructure development project. Funding may be done by collecting funds from others, or by applying funds owned by oneself. When the information processing device 40 raises the necessary funds, the information processing device 40 transmits fund data related to the funds to the information processing device 20 . Fund data may be, for example, data relating to the transfer of funds. Financial resources based on infrastructure development project funding data are used to implement infrastructure development projects as appropriate.
  • the information processing device 50 which is mainly used by organizations that evaluate infrastructure, executes the evaluation process of the developed infrastructure and calculates the economic results of the infrastructure development.
  • the information processing device 50 transmits a report (evaluation data) regarding the evaluation result to the information processing device 10 in order to notify the owner of the infrastructure of the evaluation result.
  • the insurance company may evaluate the disaster mitigation effect of infrastructure in the event of a disaster.
  • the information processing device 50 may be the same as the information processing device 20 .
  • the information processing device 10 determines the amount to be paid to the business operator and the prescribed rights based on the infrastructure evaluation results and the performance-linked contract, and executes remuneration processing in order to pay the determined amount. By executing the remuneration process, the information processing device 20 receives remuneration data regarding the amount (payment) of the return for the execution of the infrastructure development project for BCP.
  • the information processing device 10 is one or a plurality of information processing devices used by the owner of the infrastructure, as in the example described above.
  • An infrastructure owner may be, for example, a country, a national agency, a government, a local government, a private company, an individual, or the like.
  • Infrastructure includes, for example, buildings such as existing logistics facilities, factories, and offices, and includes structures that should be strengthened for BCP.
  • an infrastructure owner receives a proposal of a first result-linked contract related to an infrastructure development project from an insurance company, and the information processing device 10 acquires first contract information related to the first result-linked contract from the information processing device 20. and stores the acquired first contract information.
  • the first result-linked contract for infrastructure development projects is, for example, a contract between an infrastructure owner (operator) and an insurance company entrusted with an infrastructure development project, and the economic benefit from infrastructure development is at least In part, it includes a contract to pay an insurance company from the owner of the infrastructure, subject to certain conditions. At least part of the economic benefit from infrastructure development may be included in part of the premium for disaster insurance.
  • the information processing device 20 is, for example, one or more information processing devices mainly used by insurance companies such as non-life insurance companies. For example, when an insurance company concludes an insurance contract regarding a disaster in an infrastructure development project with a private business operator who is the owner of the infrastructure, the insurance company collects insurance premiums from the private business operator based on this contract information. In addition, when an insurance company concludes a first result-linked contract for an infrastructure development project with a private business operator who is the owner of the infrastructure development project, the insurance company will receive disaster mitigation from the private business operator based on this first contract information. to collect performance rewards. Incidentally, disaster insurance and performance-linked contracts may be proposed as a set by an insurance company as a solution for BCP.
  • the reward for disaster mitigation may be set in advance by contract according to the content of the infrastructure development project.
  • the reward for disaster mitigation may be added to the normal insurance fee.
  • the insurance company may collect performance rewards from the private business operator that are different from the disaster mitigation performance rewards described above.
  • the information processing device 20 used by the insurance company acquires the fund data related to infrastructure development from the information processing device 40, and sends the order information related to the infrastructure development business to the information processing device 30 used by the company that executes the infrastructure development business. Send to Further, the information processing device 20 used by the insurance company transmits to the information processing device 40 remuneration data relating to insurance premiums collected from private business operators or performance remuneration.
  • the information processing device 30 is, for example, one or a plurality of information processing devices used by an organization that implements an infrastructure development project.
  • This organization is, for example, a company that implements building resilience in infrastructure development projects such as seismic reinforcement, seismic isolation reinforcement, and vibration control reinforcement, and includes companies, organizations, and business operators that coordinate infrastructure development projects.
  • the execution destination uses this information processing device 40 to manage the infrastructure development project and execute the infrastructure development project according to a predetermined schedule.
  • the information processing device 40 is, for example, one or a plurality of information processing devices used by an organization that provides funds for infrastructure development projects.
  • This organization is, for example, a financial institution such as a bank or an investment fund, or a company such as a construction company that implements an infrastructure development project.
  • the financing referred to here includes collecting funds from users other than the business operator who uses this information system 1 and appropriating the business operator's own funds.
  • the information processing device 50 is one or a plurality of information processing devices used by a predetermined organization or the like that evaluates the economic results of infrastructure development.
  • the prescribed institution is, for example, a third-party institution (evaluation institution) capable of fairly and appropriately evaluating economic performance, and includes institutions accredited by the country or government.
  • the predetermined institution may be an insurance company that orders infrastructure development projects.
  • the information processing device 20 is shared as the information processing device 50 as well.
  • the information processing device 50 evaluates the economic results of infrastructure development to estimate economic benefits, executes infrastructure evaluations according to evaluation items, saves evaluation results, and reports including evaluation results (evaluation data). ) to the information processing apparatus 10 .
  • the information processing device 60 is, for example, an information processing device used by others who invest in infrastructure development projects. Others are, for example, investors and the like, and include individuals, companies, and the like who support and invest in infrastructure development projects. Others refer to the investment information of the infrastructure development project transmitted by the information processing device 40 and determine the investment amount.
  • the information processing device 60 transmits to the information processing device 40 an investment request including the investment amount determined by the other party. In the information processing system 1, the information processing device 60 is not necessarily required when the business prepares all necessary funds by itself.
  • Each of the information processing devices 10 to 60 described above is, for example, a personal computer, a PDA (Personal Digital Assistant), a mobile terminal such as a smartphone, a tablet terminal, a server device, etc., and each of the nth information processing devices (1 ⁇ n ⁇ 6 ) to distinguish between them.
  • a personal computer a PDA (Personal Digital Assistant)
  • PDA Personal Digital Assistant
  • mobile terminal such as a smartphone, a tablet terminal, a server device, etc.
  • nth information processing devices (1 ⁇ n ⁇ 6 )
  • FIG. 2 is a diagram showing an example of the configuration of the information processing device 10 according to one embodiment of the present invention.
  • FIG. 3 is a diagram showing an example of the configuration of the information processing device 20 according to one embodiment of the present invention.
  • FIG. 4 is a diagram showing an example of the configuration of the information processing device 30 according to one embodiment of the present invention.
  • FIG. 5 is a diagram showing an example of the configuration of the information processing device 40 according to one embodiment of the present invention. The processing of each device will be described below using two specific examples.
  • Specific example 1 As an infrastructure development project (infrastructure development project), a project (construction work, etc.) for strengthening buildings such as seismic reinforcement, seismic isolation reinforcement, and damping reinforcement will be taken as an example.
  • infrastructure development project infrastructure development project
  • a project construction work, etc.
  • For BCP businesses that own existing logistics facilities, factories, and offices should consider preparing infrastructure for disasters that may occur in the future. At this time, you may agree to the construction work to reinforce the building proposed by the insurance company, and entrust or request this construction work to the insurance company.
  • the insurance company receives the cost of this construction work from the fund and orders the construction company or design company to carry out the toughening construction work. Also, the insurance company takes ownership of the reinforcement equipment (eg, seismic equipment, etc.).
  • the contract term of the first result-linked contract may be, for example, the same as the service life of the depreciable assets of the reinforcement facility, or may be determined by agreement between the parties.
  • the business operator requests the insurance company to receive insurance money based on a trial calculation of damage based on the disaster insurance, or based on the first contract information, the economic value of the disaster mitigation effect. Pay at least part of it to your insurance company.
  • Disasters include, for example, earthquakes, tsunamis, storm surges, typhoons, and the like.
  • the insurance company pays the funding source a portion of at least a portion of the economic value of the received disaster mitigation effect in return for the funding.
  • the funding source may receive part of the insurance premiums from the insurance company.
  • an insurance company may provide disaster insurance with riders.
  • the special contract includes, for example, seismic reinforcement work, installation of seismic reinforcement equipment (ownership is transferred from the insurance company to the business operator after a predetermined period of time), and compensation for disaster mitigation results when a disaster occurs.
  • the disaster mitigation reward for example, the estimated amount may be paid by the business operator in the monthly insurance premium payment, and the amount may be accumulated. Also, the estimated amount may be either variable or fixed. In the event of a disaster, the accumulated amount will be offset by the disaster mitigation results. If the funded amount is insufficient, the business operator remains obliged, and the obligation can be compensated by a separate contract with a credit guarantee company.
  • the information processing device 10 that executes at least part of the above-described processing includes one or more processing units (CPU: Central Processing Unit) 110, one or more network communication interfaces 120, a memory 130, It includes a user interface 150 and one or more communication buses 170 for interconnecting these components.
  • CPU Central Processing Unit
  • network communication interfaces 120 one or more network communication interfaces 120
  • memory 130 It includes a user interface 150 and one or more communication buses 170 for interconnecting these components.
  • Memory 130 may be high speed random access memory such as, for example, DRAM, SRAM, other random access solid state storage, and may also be one or more magnetic disk storage devices, optical disk storage devices, flash memory devices, or other non-volatile storage devices. It may be a non-volatile memory such as a non-volatile solid-state memory device, or a non-temporary recording medium.
  • the memory 130 stores data used by the information processing system 1 .
  • memory 130 stores data relating to building resilience projects.
  • Data related to building resilience projects include, for example, evaluation data including the costs of building resilience projects for buildings owned by business operators, expected economic results (disaster mitigation results), etc. It includes the first contract information of the type contract and so on.
  • the first contract information includes at least part of public data, such as contract term and payment terms.
  • memory 130 may be one or more storage devices installed remotely from the CPU 110 .
  • memory 130 stores programs, modules and data structures that are executed by CPU 110, or a subset thereof.
  • the CPU 110 configures the control unit 112 , acquisition unit 113 , infrastructure management unit 114 , and transmission unit 115 by executing programs stored in the memory 130 .
  • the control unit 112 controls general processing related to building resilience projects.
  • Acquisition unit 113 acquires data transmitted from each information processing apparatus. For example, the acquisition unit 113 acquires the first contract information based on the first result-linked contract transmitted from the information processing device 20, or acquires the evaluation data including the evaluation result of infrastructure development transmitted from the information processing device 50. to obtain. The acquisition unit 113 may also acquire insurance contract information regarding disaster insurance transmitted from the information processing device 20 .
  • the infrastructure management unit 114 manages data related to building resilience projects. For example, the infrastructure management unit 114 stores each acquired data in the memory 130, and reads the data in the memory 130 as necessary.
  • the infrastructure management unit 114 calculates the payment amount to be paid to the insurance company when the predetermined conditions of the performance-linked contract are satisfied.
  • Predetermined conditions for performance-based contracts include the occurrence of a disaster.
  • the transmission unit 115 transmits each data to a predetermined information processing device via the network communication interface 120 .
  • the transmission unit 115 transmits to the information processing device 20 information indicating that the user will subscribe to disaster insurance, information indicating that the user agrees to the first result-linked contract, and the like.
  • the transmission unit 115 also transmits payment data (remuneration data) of the determined payment to the information processing device 20 .
  • information processing device 20 mainly used by insurance companies such as non-life insurance companies will be described.
  • information processing device 20 includes one or more processing units (CPUs) 210, one or more network communication interfaces 220, memory 230, user interface 250, and components for interconnecting these components. includes one or more communication buses 270 of Each unit shown in FIG. 3 has the same function as each unit with the same name shown in FIG. 3 and performs the same processing.
  • CPUs processing units
  • network communication interfaces 220 includes one or more network communication interfaces 220, memory 230, user interface 250, and components for interconnecting these components.
  • components for interconnecting these components includes one or more communication buses 270 of
  • Each unit shown in FIG. 3 has the same function as each unit with the same name shown in FIG. 3 and performs the same processing.
  • points different from the units shown in FIG. 2 will be described.
  • the memory 230 stores data used by the information processing system 1 .
  • memory 230 stores insurance policy information for insurance policies relating to infrastructure disasters, and stores data relating to insurance premiums collected based on insurance policies.
  • the memory 230 stores the first contract information of the first result-linked contract related to the building resilience project, and stores data on the remuneration (M1) acquired as the result remuneration for disaster mitigation based on the first result-linked contract.
  • the memory 230 stores the second contract information of the second result-linked contract for the performance reward for disaster mitigation based on the first result-linked contract, or stores a part of the performance reward based on the second contract information, such as M1 If ⁇ % is the performance reward of the funding source, data related to this reward is stored.
  • Memory 230 may also store data relating to a funder's fee of ⁇ % of the insurance premium. Let ⁇ be the first coefficient and ⁇ be the second coefficient.
  • the CPU 210 configures a control unit 212, an acquisition unit 213, a fund management unit 214, a specification unit 215, and a transmission unit 216 by executing programs stored in the memory 230.
  • the control unit 212 controls the processing of each unit, which will be described later, and executes processing related to building resilience solutions for BCP.
  • the building resilience solution for example, an insurance company receives funding from a fund, and the insurance company places an order for a building resilience project with a construction company or the like.
  • the acquisition unit 213 acquires insurance contract information related to building disaster insurance.
  • the insurance contract information includes, for example, contract term and payment terms.
  • the acquisition unit 213 also acquires the first contract information of the first result-linked contract, which is a contract related to a building resilience project for building maintenance and in which payment is made based on the disaster mitigation results of building resilience improvement. Further, the acquiring unit 213 acquires from the information processing device 40 fund data related to funds set based on the first contract information. In addition to or instead of the first contract information, the acquisition unit 213 may acquire insurance contract information of a disaster insurance contract in which insurance premiums are set in consideration of the disaster mitigation effect of building resilience.
  • the fund management unit 214 stores the fund data acquired from the information processing device 40 in the memory 230 in association with the identification information of the building resilience project.
  • the building toughening project identification information indicates the building toughening project and includes information that makes it distinguishable from other projects. Also, this identification information may be generated by the information processing device 20 .
  • the memory 230 stores, in association with this identification information, collected insurance premiums, remuneration data related to disaster mitigation performance remuneration, contact information (IP address, e-mail address of the person in charge, etc.) of the execution destination of the building resilience project, and the like. be done.
  • the identifying unit 215 Upon acquiring the fund data from the information processing device 40, the identifying unit 215 identifies the execution destination of the building resilience project based on the building resilience project. For example, the identification unit 215 identifies the contact information of the execution destination associated with the same identification information as the identification information based on the identification information associated with the fund data allocated to the financial resources by referring to the memory 230.
  • the transmission unit 216 transmits order information for the building resilience project to the specified execution destination.
  • the order information may include a construction method including building toughness technology.
  • the transmitting unit 216 may transmit fund data indicating that the funds related to the building resilience project have been allocated as financial resources to the information processing device 30 that is the execution destination.
  • the fund data in this case is data indicating that the collected funds have been used as financial resources, such as a notification of completion of transfer to a predetermined account.
  • the information processing device 20 is a device used by an insurance company, and the acquisition unit 213 may acquire the first contract information and the insurance contract information related to building disaster insurance. As a result, there is no need to make separate contracts for the disaster insurance contract and the first result-linked contract, and the contract information does not have to be transmitted separately, so the information processing device 20 improves the processing efficiency. be able to.
  • the transmission unit 216 transmits the second contract information of the second result-linked contract, which is a contract related to the building resilience project and in which payment is made based on the disaster mitigation result of the first result-linked contract, to the information processing device 40. You may send.
  • the acquisition unit 213 acquires the condition information including the payment condition (result reward ⁇ ) regarding the payment determined based on the second contract information from the transmission destination (funding source) of the second contract information.
  • is, for example, 0.5.
  • the setting unit 217 assigns a part of the insurance premium (insurance fee x ⁇ ) received from the disaster insurance for the building to the second outcome-linked contract.
  • a part of the insurance premium (insurance fee x ⁇ ) received from the disaster insurance for the building.
  • is, for example, 0.5. This will allow returns to be returned to the fund on a regular basis, even if disaster does not occur.
  • the first contract information may include condition information regarding the conditions under which payment will be made in the event that a disaster occurs during the contract period and the business using the building for which the building resilience project has been implemented can be continued after the disaster. good.
  • the condition information is a payment condition calculated in advance based on the economic loss when the building collapses, and is preferably included in the first contract information.
  • the first contract information includes, for example, the contract term and payment terms.
  • Mitigation outcomes include, for example, at least one of the following examples.
  • a specific example is the economic value of office buildings, facilities, factories, etc. (private capital).
  • the amount of secondary damage when there is no infrastructure development Specific examples include office building rents and economic losses due to the collapse of logistics facilities in the example above.
  • ⁇ Value related to environmental protection (or environmental conservation) through infrastructure development for example, reduction of CO2 emissions
  • the first contract information may include the cost of the infrastructure development project, and the funds to be procured may be set based on this cost.
  • Funds include self-funds, bonds, and the like.
  • the fund data includes, for example, fund data related to own funds and fund data related to funds procured from others.
  • the acquisition unit 213 may acquire payment data (remuneration data) transmitted by the information processing device 10 when a predetermined condition included in the first performance-linked contract is satisfied.
  • the setting unit 217 sets the contract period based on at least the amount corresponding to the disaster mitigation result, If the infrastructure is damaged in the future, a third coefficient (hereinafter also referred to as " ⁇ ") applied to the amount of money equivalent to the disaster mitigation results may be set. For example, the setting unit 217 may set the third coefficient lower as the amount corresponding to the disaster mitigation result is higher or as the contract period is longer.
  • the acquisition unit 213 may acquire probability data regarding the probability of occurrence of damage from a predetermined database. For example, the acquisition unit 213 acquires probability data indicating the probability of occurrence of a disaster announced by an organization that studies the occurrence of disasters from databases. If a reference destination of a predetermined database or the like is registered in advance, the acquisition unit 213 may specify the database from the reference destination and acquire the probability data as necessary.
  • the setting unit 217 may set the first to third coefficients further based on the obtained probability data. For example, the setting unit 217 sets the first to third coefficients using a predetermined calculation formula by synthesizing the probability data, the contract period, the amount corresponding to the disaster mitigation result, and the maintenance cost. You may
  • the setting unit 217 sets a calculation formula using the first to third coefficients as parameters so that the payment amount calculated by the set first to third coefficients is greater than or equal to the funds procured. You may Alternatively, the setting unit 217 may perform a simulation based on past cases and set appropriate first to third coefficients from a calculation formula using the first to third coefficients as parameters. In addition, the setting unit 217 uses a machine-learned learning model that obtains the appropriate first to third coefficients from the probability data of multiple cases, the contract period, the amount corresponding to the disaster mitigation result, and the maintenance cost. appropriate first to third coefficients may be set.
  • information processor 30 includes one or more processing units (CPUs) 310, one or more network communication interfaces 320, memory 330, user interface 350, and a processor for interconnecting these components. includes one or more communication buses 370 of Each unit shown in FIG. 4 has the same function as each unit with the same name shown in FIG. 2 and performs the same processing.
  • CPUs processing units
  • network communication interfaces 320 memory 330
  • user interface 350 user interface 350
  • processor for interconnecting these components includes one or more communication buses 370 of
  • communication buses 370 of Each unit shown in FIG. 4 has the same function as each unit with the same name shown in FIG. 2 and performs the same processing.
  • FIG. 4 the points different from the units shown in FIG. 2 will be described.
  • the memory 330 stores data used by the information processing system 1 .
  • memory 330 may store progress related to building resilience projects, and may store data related to funding for building resilience projects.
  • the CPU 310 configures a control unit 312 , an acquisition unit 313 , a funds management unit 314 and a progress management unit 315 by executing programs stored in the memory 330 .
  • the control unit 312 controls the processing of each unit, which will be described later, and executes processing related to the execution of the building resilience project.
  • the acquisition unit 313 acquires order information related to building resilience projects from the information processing device 20 .
  • the order information includes information such as the construction method, delivery date, and cost for strengthening the building. Further, the acquisition unit 313 may acquire financial data related to the building resilience project from the information processing device 20 .
  • the fund management department 314 manages financial resources based on financial data related to building resilience projects.
  • the fund management unit 314 may also manage the costs of equipment and materials used in construction related to building resilience projects.
  • the progress management section 315 manages the progress of the building resilience project. For example, the progress management unit 315 manages the progress of construction work so that the current status of construction work can be grasped.
  • information processing device 40 used by companies investing in building resilience projects.
  • information processing device 40 includes one or more processing units (CPUs) 410, one or more network communication interfaces 420, memory 430, user interface 450, and components for interconnecting these components. includes one or more communication buses 470 of Each unit shown in FIG. 5 has the same function as each unit with the same name shown in FIG. 2 and performs the same processing.
  • CPUs processing units
  • network communication interfaces 420 memory 430
  • user interface 450 user interface 450
  • components for interconnecting these components includes one or more communication buses 470 of
  • Each unit shown in FIG. 5 has the same function as each unit with the same name shown in FIG. 2 and performs the same processing.
  • points different from the units shown in FIG. 2 will be described.
  • the memory 430 stores data used by the information processing system 1 .
  • memory 430 stores funding data relating to the cost of infrastructure development projects.
  • the CPU 410 configures a control unit 412 , an acquisition unit 413 , a funds management unit 414 and a transmission unit 415 by executing programs stored in the memory 430 .
  • the control unit 412 controls the processing of each unit, which will be described later, and executes processing related to investment in infrastructure development projects.
  • the acquisition unit 413 acquires, for example, investment information on building resilience projects published on web pages.
  • the investment information includes, for example, details of building resilience projects, company's desired conditions for investment in building resilience projects (eg, investment amount, period for collecting funds, etc.).
  • the fund management unit 414 acquires fund data related to investment according to the investment amount set according to the investment information acquired by the acquisition unit 413, based on the operation of the investor or the like. It should be noted that the investment amount (funds) may be appropriated from funds owned by a fund that provides the funds.
  • the transmission unit 415 transmits the fund data acquired by the fund management unit 414 to the insurance company.
  • the funding source will receive funds related to a portion of the insurance premiums collected by the insurance company from the business operator who signed the building disaster insurance contract in return for securing funds for the building resilience project. data is returned. Also, when a disaster occurs, a part of the reward for the achievement of the disaster mitigation effect may be returned to the funding source.
  • Example 1 it is possible to apply the embodiment of the present invention to the building resilience project in Specific Example 1.
  • Concrete Example 1 it is possible to provide a BCP solution that is advantageous for each business operator that owns or will own a building or the like, an insurance company, and a funding source.
  • the advantage for business operators is that they can receive construction work such as seismic reinforcement free of charge by paying insurance premiums.
  • the business operator can avoid economic loss due to BCP by receiving a building resilience project.
  • the business operator can take over the facilities of the building resilience project from the insurance company free of charge.
  • Insurance companies can provide disaster insurance along with building resilience projects for BCP. In addition, insurance companies can significantly reduce their own cost burden by receiving investment from other companies regarding the cost of building resilience projects. In addition, the insurance company can receive insurance premiums on a regular basis, and can also receive performance-based rewards for mitigating damage in the event of a disaster. In addition, the insurance company may separately receive a performance fee for business continuity from the business operator after the occurrence of the disaster. This performance fee should be calculated from the economic loss due to the inability to continue the business, and it is better to make a contract in advance to receive a separate performance fee.
  • Fund providers such as funds can receive part of insurance premiums returned from insurance companies on a regular basis. can.
  • Specific Example 2 As an infrastructure development project, it is the same as Specific Example 1 in that it is a building resilience project. can receive money.
  • the fund management unit 414 of the information processing device 40 applies to the national or local governments for a subsidy for greenhouse gas reduction if there is a subsidy system for greenhouse gas reduction.
  • the fund management unit 414 may acquire fund data related to subsidies based on the greenhouse gas reduction effect certified by the evaluation organization after the occurrence of the disaster.
  • the acquisition unit 213 of the information processing device 20 may receive contract information regarding receipt of at least a part of the subsidy based on the reduction of greenhouse gases applied for by the funding source of the infrastructure development project.
  • the insurance company can also acquire a part of the subsidy acquired by the fund.
  • FIG. 6 is a sequence diagram showing an example of processing related to funding and project ordering according to one embodiment of the present invention. The processing shown in FIG. 6 can be similarly applied to specific examples 1 and 2.
  • FIG. 6 is a sequence diagram showing an example of processing related to funding and project ordering according to one embodiment of the present invention. The processing shown in FIG. 6 can be similarly applied to specific examples 1 and 2.
  • FIG. 6 is a sequence diagram showing an example of processing related to funding and project ordering according to one embodiment of the present invention. The processing shown in FIG. 6 can be similarly applied to specific examples 1 and 2.
  • step S102 the control unit 212 of the information processing device 20 and the control unit 112 of the information processing device 10 share the insurance contract information of the infrastructure disaster insurance, and the insurance company and the operator who owns or will have the infrastructure. An insurance contract is concluded in
  • step S ⁇ b>104 the transmission unit 115 of the information processing device 10 transmits to the information processing device 20 insurance premium payment data related to the disaster insurance contract for the infrastructure development project. Regarding step S104, insurance premiums are paid periodically.
  • step S106 the control unit 212 of the information processing device 20 and the control unit 112 of the information processing device 10 share the first contract information of the first result-linked contract related to the infrastructure development business, and share the first contract information with the insurance company that undertakes the infrastructure development business.
  • a first result-linked contract for infrastructure development projects is concluded with a business operator that has infrastructure.
  • the first performance-linked contract may be included in the insurance contract information, and insurance premiums may be set in consideration of performance rewards. In this case, step S106 is unnecessary. It should be noted that the order of the processing of steps S102 to S106 does not matter.
  • step S108 the fund management unit 214 of the information processing device 20 determines the amount to be invested in consideration of the development costs necessary for the infrastructure development project, and the transmission unit 216 determines investment conditions including the investment amount and returns.
  • the investment information including the information is transmitted to the information processing device 40 used by others.
  • step S ⁇ b>110 the fund management unit 414 of the information processing device 40 raises necessary funds for the infrastructure development project based on the investment information, and transmits fund data related to the funds to the information processing device 20 .
  • the fund management unit 214 of the information processing device 10 associates the acquired fund data with the identification information of the infrastructure development project.
  • step S112 the identification unit 215 of the information processing device 20 identifies the execution destination of the infrastructure development project.
  • the destination of the infrastructure development project is stored in association with the identification information of the infrastructure development project stored in the memory 230 .
  • step S114 the transmission unit 216 of the information processing device 20 transmits fund data (for example, paid data) related to the procured funds to the information processing device 30 at the execution destination.
  • fund data for example, paid data
  • step S116 the transmission unit 216 of the information processing device 20 transmits the order information for the infrastructure development project to the information processing device 30 that is the execution destination.
  • the order of steps S114 and S116 does not matter.
  • FIG. 7 is a sequence diagram showing an example of payment processing according to one embodiment of the present invention. The process shown in FIG. 7 can be similarly applied in specific examples 1 and 2.
  • FIG. 7 is a sequence diagram showing an example of payment processing according to one embodiment of the present invention. The process shown in FIG. 7 can be similarly applied in specific examples 1 and 2.
  • FIG. 7 is a sequence diagram showing an example of payment processing according to one embodiment of the present invention. The process shown in FIG. 7 can be similarly applied in specific examples 1 and 2.
  • FIG. 7 is a sequence diagram showing an example of payment processing according to one embodiment of the present invention. The process shown in FIG. 7 can be similarly applied in specific examples 1 and 2.
  • FIG. 7 is a sequence diagram showing an example of payment processing according to one embodiment of the present invention. The process shown in FIG. 7 can be similarly applied in specific examples 1 and 2.
  • FIG. 7 is a sequence diagram showing an example of payment processing according to one embodiment of the present invention. The process shown in FIG. 7 can be similarly applied in specific examples 1 and 2.
  • step S202 the information processing device 50 used by the evaluating institution evaluates the economic results of the infrastructure.
  • the economic result may be an estimated monetary amount.
  • An insurance company may serve as the evaluation agency.
  • step S204 the information processing device 50 transmits evaluation data including evaluation results to the information processing device 10 used by the owner of the infrastructure.
  • step S206 the infrastructure management unit 114 of the information processing device 10 calculates the payment by referring to the first contract information of the first result-linked contract based on the economic results included in the evaluation results. For example, the payment amount is calculated using the first coefficient for the amount corresponding to the economic result.
  • step S208 the infrastructure management unit 114 of the information processing device 10 executes processing for paying the calculated payment amount to the insurance company.
  • the infrastructure management unit 114 executes processing for transferring payment to a predetermined bank.
  • the transmission unit 115 of the information processing device 10 transmits payment data (remuneration data) regarding the payment to the information processing device 20 .
  • the payment data is, for example, data indicating that the payment of the payment has been completed.
  • step S210 the acquisition unit 213 of the information processing device 20 acquires payment data, and the fund management unit 214 manages this payment based on the payment data.
  • the fund management unit 214 executes payment processing to the fund providing source after step S212 at a predetermined timing as necessary.
  • step S212 the fund management unit 214 of the information processing device 20 refers to the second contract information based on the payment (first payment) calculated by referring to the first contract information, and Calculate the payment (second payment) to For example, the fund management unit 214 calculates the second payment by multiplying the first payment by a predetermined coefficient.
  • step S214 the fund management unit 214 of the information processing device 20 executes a process of paying the calculated second payment amount to the funding source (fund, etc.). For example, the fund management unit 214 executes processing for transferring payment to a predetermined bank.
  • the transmission unit 216 of the information processing device 20 transmits payment data (remuneration data) regarding the second payment to the information processing device 40 .
  • the payment data is, for example, data indicating that the payment of the payment has been completed.
  • a third-party evaluation agency evaluates the economic results of infrastructure at a predetermined timing, and the owner of the infrastructure, based on the evaluation results, pays a return to finance the infrastructure development project. , and the insurer is enabled to receive the payment.
  • payment processing can be performed smoothly after evaluation processing is completed, making it possible to improve system efficiency.
  • the information processing device 20 has payment amount setting conditions, it is possible to easily perform confirmation processing whether the payment amount is correct by acquiring the evaluation result, and there is no need to redo the confirmation processing. , it is possible to increase the processing efficiency of the confirmation process.
  • each of the embodiments described above is for facilitating understanding of the present invention, and is not for limiting interpretation of the present invention.
  • the present invention may be modified/improved without departing from its spirit, and the present invention also includes equivalents thereof.
  • any embodiment appropriately modified in design by a person skilled in the art is also included in the scope of the present invention as long as it has the features of the present invention.
  • each element provided in each embodiment and its arrangement, material, condition, shape, size, etc. are not limited to those illustrated and can be changed as appropriate.
  • each embodiment is an example, and it goes without saying that partial substitutions or combinations of configurations shown in different embodiments are possible, and these are also included in the scope of the present invention as long as they include the features of the present invention.
  • the fund may place an order for the infrastructure development project.

Abstract

情報処理装置が実行する情報処理方法であって、インフラストラクチャの整備を図るインフラ整備プロジェクトに関する契約であって、インフラストラクチャによる減災成果に基づいて支払いが行われる第1成果連動型契約、又は、インフラストラクチャの災害保険契約に関する契約情報を取得し、インフラ整備プロジェクトに基づいて設定される資金に関する資金データを資金提供元から取得し、資金データを取得すると、インフラ整備プロジェクトの実行先を特定し、実行先に、インフラ整備プロジェクトに関する発注情報を送信する。

Description

情報処理方法、プログラム、及び情報処理装置
 本発明は、情報処理方法、プログラム、及び情報処理装置に関する。
 近年、発生が予想される災害等への対策として、インフラストラクチャ(以下、「インフラ」とも称する。)を整備し、被害を抑えることの重要性が提唱されている(例えば非特許文献1参照)。
藤井聡、"南海トラフ巨大地震の巨大な「被害推定」と「対策効果」"、土木学会誌、2020年1月、Vol.105、No.1、P.6-9
 しかしながら、インフラの整備には多大な費用がかかり、その資金を集めることは容易ではない。他方、インフラが整備されると、インフラ整備による経済成果、例えば、災害発生時の減災成果、又は周辺地域の活性化による経済成果等があることが、各種評価機関の試算結果により示されている。また、より良いサービスの提供に対し、より高い支払いが行われる成果連動型契約が知られており、民間の創意工夫の発揮や、成果の見込める新たなサービスの試行、既存サービスの改善、優良な事業者の成長促進などの効果が期待されている。
 そこで、本発明は、この成果連動型契約に着目し、インフラ整備による経済成果を事業者(例えば保険会社等)又は資金調達者に還元することで、インフラ整備事業における資金調達の新たな仕組みを提供することを目的とする。
 本発明の一態様に係る情報処理装置が実行する情報処理方法は、インフラストラクチャの整備を図るインフラ整備プロジェクトに関する契約であって、前記インフラストラクチャによる減災成果に基づいて支払いが行われる第1成果連動型契約、又は、前記インフラストラクチャの災害保険契約に関する契約情報を取得し、前記インフラ整備プロジェクトに基づいて設定される資金に関する資金データを資金提供元から取得し、前記資金データを取得すると、前記インフラ整備プロジェクトの実行先を特定し、前記実行先に、前記インフラ整備プロジェクトに関する発注情報を送信する。
 本発明によれば、インフラ整備による経済成果を事業者又は資金調達者に還元する成果連動型契約を用いて、インフラ整備事業における資金調達の新たな仕組みを提供することができる。
本発明の一実施形態に係る情報処理システム1の構成の一例を示す図である。 本発明の一実施形態に係る情報処理装置10の構成の一例を示す図である。 本発明の一実施形態に係る情報処理装置20の構成の一例を示す図である。 本発明の一実施形態に係る情報処理装置30の構成の一例を示す図である。 本発明の一実施形態に係る情報処理装置40の構成の一例を示す図である。 本発明の一実施形態に係る資金調達及びプロジェクト発注に関する処理の一例を示すシーケンス図である。 本発明の一実施形態に係る支払処理の一例を示すシーケンス図である。
 添付図面を参照して、本発明の好適な実施形態について説明する。なお、各図において、同一の符号を付したものは、同一又は同様の構成を有する。
 [実施形態]
<システム>
 図1は、本発明の一実施形態に係る情報処理システム1の構成の一例を示す図である。図1に示すとおり、情報処理システム1は、各情報処理装置10、20、30、40、50、60(以下、「各情報処理装置10~60」とも表記する。)を含み、各情報処理装置10~60は、ネットワークNを介して相互にデータの送受信が可能である。なお、情報処理装置60A、60Bは、それぞれを区別しない場合は情報処理装置60とも表記する。
 ここで、図1に示す情報処理システム1により実現される、資金調達の新たな仕組みの概要について説明する。実施形態においては、インフラは、例えば、既存物流施設、工場、事務所などの既存の建物を含む。例えば、インフラのオーナーである事業者が主に利用する情報処理装置10は、損害保険会社などの保険会社により主に利用される情報処理装置20から、災害などの緊急事態における企業や団体の事業継続計画(BCP:Business Continuity Planning)のためのソリューション及び災害保険(例えば地震保険)の提供を受ける。
 例えば、情報処理装置10は、情報処理装置20から送信された、BCPのための建物強靭化(例えば耐震補強など)の成果連動型契約(第1成果連動型契約)に関する契約情報(第1契約情報)を取得し、記憶する。また、情報処理装置10は、成果連動型契約における減災成果を保険料金に含む損害保険に関する契約情報(保険契約情報)を取得し、記憶してもよい。
 成果連動型契約は、例えば成果連動型民間委託契約(PFS:Pay For Success)があり、オーナーが事業者に事業を委託し、解決すべき課題に対応した成果指標を設定し、支払金をこの成果指標の達成ないし改善状況に連動させる契約を含む。この成果連動型契約の場合、事業を委託された事業者は将来の支払金の分配を見返りとして資金提供者(投資家等)から資金を調達することができ(投資家等に必ずしも配当を支払う必要がなく)、他方、事業を委託するオーナーは、効果が発現した場合に初めて支払いが発生するため、事業を委託する側及び委託される側の両者にとって利点がある。図1に示す情報処理システム1では、この成果連動型契約を適用して、インフラ整備(例えば建物強靭化)に係る費用に対して、例えば保険会社と契約したファンド等に資金調達をしてもらい、インフラ整備に係る財源を確保する。
 損害保険会社などの保険会社により主に利用される情報処理装置20は、BCPのためのインフラ整備事業に対する成果連動型契約及び災害保険を提供する。例えば、情報処理装置20は、インフラ整備事業に対する第1成果連動型契約に関する第1契約情報と、災害保険に関する保険契約情報とを、インフラのオーナーである事業者が利用する情報処理装置10に送信する。第1契約情報は、例えば、インフラ整備事業の整備コスト等が試算され、インフラ整備による経済成果に基づく成果連動型契約に関する契約情報を含む。また、インフラ整備にかかるコストの回収については、災害保険の保険料金に含めるようにしてもよい。
 また、情報処理装置20は、インフラ整備事業の資金を提供する提供元(以下、「資金提供元」ともいう。)へ、資金の調達又は提供を依頼する。依頼方法は、入札などでもよい。情報処理装置20は、資金提供元が主に利用する情報処理装置40から、インフラ整備事業の資金に関する資金データを取得する。情報処理装置20は、資金データを取得すると、インフラ整備事業を実行する施工会社又は設計会社が主に利用する情報処理装置30に、インフラ整備事業の発注に関する発注情報を送信する。また、情報処理装置20は、資金データの取得により、資金データがインフラ整備事業の整備費用に相当する費用が提供されていると判定すれば、インフラ整備事業の資金に関する資金データを設計会社又は施工会社が利用する情報処理装置30に送信する。設計会社又は施工会社は整備費用の支払いを受けて、インフラ整備事業を開始する。
 また、情報処理装置20は、災害保険に関する保険契約情報に基づいて、インフラのオーナーから保険料金を徴収し、徴収した保険料金に関する報酬データを管理する。また、情報処理装置20は、インフラ整備事業の内容や第1成果連動型契約の第1契約情報に基づいて、インフラのオーナーから災害発生時の減災にかかる成果報酬を徴収し、徴収した成果報酬に関する報酬データを管理する。情報処理装置20は、徴収された保険料金及び成果報酬に関する報酬データを、資金提供元が利用する情報処理装置40に送信する。報酬データは、資金提供元が、インフラ整備事業の資金を調達又は提供するリターンとしての報酬を示すデータを含む。
 インフラ整備事業を実際に実行する施工会社又は設計会社等(「実行先」ともいう。)が利用する情報処理装置30は、情報処理装置20から発注情報を取得する。実行先は、インフラ整備事業の費用の支払いを受けると、インフラ整備事業を開始する。インフラ整備事業の費用の支払いは、一括支払いや分割支払いなどを含む。情報処理装置30は、費用の支払い済みを示すデータを情報処理装置20から受信してもよい。情報処理装置20から送信される資金データが、費用の支払い済みを示すデータであってもよい。
 インフラ整備事業の資金提供元により主に利用される情報処理装置40は、インフラ整備事業の財源を確保するため、情報処理装置20により通知された資金を調達する。資金調達は、他人から資金を集めてもよいし、自ら所持する資金を充当してもよい。情報処理装置40は、必要な資金を調達すると、この資金に関する資金データを情報処理装置20に送信する。資金データは、例えば資金の振り込みに関するデータでもよい。インフラ整備事業の資金データに基づく財源は、適宜インフラ整備事業の実行のために用いられる。
 インフラを評価する機関が主に利用する情報処理装置50は、整備されたインフラの評価処理を実行し、インフラ整備による経済成果を算出する。情報処理装置50は、評価結果をインフラのオーナーに知らせるため、評価結果に関するレポート(評価データ)を情報処理装置10に送信する。なお、災害時のインフラによる減災効果は、保険会社が評価してもよい。この場合、情報処理装置50は、情報処理装置20と同じであってもよい。
 情報処理装置10は、インフラの評価結果、及び成果連動型契約に基づいて、事業者に支払う金額や所定の権利を決定し、決定された金額を支払うため、報酬処理を実行する。報酬処理の実行により、情報処理装置20は、BCPのためのインフラ整備事業の実行に対する見返り(リターン)の金額(支払金)に関する報酬データを受信する。
 これにより、インフラ整備による経済成果に含まれる利益を成果連動型契約に基づいて保険会社に適宜支払うことができる仕組みを提供することができる。さらに、インフラ整備の資金を調達した事業者(ファンド等)には、保険料金又は経済成果の一部を保険会社から還元してもらうことで、資金提供に対する見返りを受けることができる。
 次に、各情報処理装置10~60やその利用者について説明する。情報処理装置10は、上述した例のとおり、インフラのオーナーにより利用される1又は複数の情報処理装置である。インフラのオーナーは、例えば、インフラを有する国、国の機関、政府、地方公共団体、民間企業、個人等のいずれでもよい。インフラは、例えば、既存物流施設、工場、事務所などの建物を含み、BCPのために強靭化を行うとよい構造物を含む。
 インフラのオーナーは、例えば保険会社からインフラ整備事業に関する第1成果連動型契約の提案を受けて、情報処理装置10は、第1成果連動型契約に関する第1契約情報を、情報処理装置20から取得し、取得した第1契約情報を記憶する。インフラ整備事業に関する第1成果連動型契約は、例えば、インフラのオーナー(事業者)と、インフラ整備事業の委託を受ける保険会社との間で交わされる契約であり、インフラ整備による経済的利益の少なくとも一部を、所定の条件に基づいて、インフラのオーナーから保険会社へ支払うための契約を含む。なお、インフラ整備による経済的利益の少なくとも一部は、災害保険の保険料金の一部に含まれてもよい。
 情報処理装置20は、例えば、損害保険会社などの保険会社により主に利用される1又は複数の情報処理装置である。保険会社は、例えば、インフラ整備事業の災害に関する保険契約をインフラのオーナーである民間事業者との間で締結した場合、この契約情報に基づいて、民間事業者から保険料金を徴収する。また、保険会社は、インフラ整備事業に関する第1成果連動型契約を、インフラ整備事業のオーナーである民間事業者との間で締結した場合、この第1契約情報に基づいて、民間事業者から減災の成果報酬を徴収する。なお、災害保険と成果連動型契約とは、BCPのためのソリューションとして1セットで保険会社より提案されてもよい。
 例えば、減災の成果報酬は、インフラ整備事業の内容に応じて事前に契約によって設定してもよい。また、減災の成果報酬は、通常の保険料金に上乗せしてもよい。また、保険会社は、災害発生後に民間事業者が事業を継続できた場合には、上述した減災の成果報酬とは別の成果報酬を民間事業者から徴収してもよい。また、保険会社が利用する情報処理装置20は、インフラ整備に関する資金データを情報処理装置40から取得して、インフラ整備事業に関する発注情報を、インフラ整備事業を実行する会社が利用する情報処理装置30に送信する。また、保険会社が利用する情報処理装置20は、民間事業者から徴収した保険料金または成果報酬に関する報酬データを情報処理装置40に送信する。
 情報処理装置30は、例えば、インフラ整備事業を実行する組織により利用される1又は複数の情報処理装置である。この組織は、例えば、耐震補強、免振補強、制振補強などのインフラ整備事業の建物強靭化を実行する企業等であり、インフラ整備事業の取りまとめを行う企業や団体、又は事業者などを含む。実行先は、この情報処理装置40を利用し、インフラ整備事業を管理し、所定のスケジュールに沿ってインフラ整備事業を実行する。
 情報処理装置40は、例えば、インフラ整備事業の費用を提供する組織により利用される1又は複数の情報処理装置である。この組織は、例えば、銀行、投資ファンドなどの金融機関、インフラ整備事業を実行する建設会社等の企業等であり、複数の企業等が共同で資金を調達するようにしてもよい。なお、ここでいう資金調達は、この情報システム1を利用する事業者以外の他のユーザから資金を集めることや、事業者の自己資金を充当することを含む。
 情報処理装置50は、インフラ整備による経済成果を評価する所定の機関等により利用される1又は複数の情報処理装置である。所定の機関は、例えば、経済成果を公正かつ適切に評価することが可能な第三者機関(評価機関)であり、国や政府等から認定を受けた機関を含む。所定の機関は、インフラ整備事業の発注元である保険会社であってもよい。この場合、情報処理装置20が情報処理装置50としても共通化される。情報処理装置50は、インフラ整備による経済成果を評価して経済的利益を試算したり、評価項目にしたがってインフラの評価を実行したり、評価結果を保存したり、評価結果を含むレポート(評価データ)を情報処理装置10に送信したりする。
 情報処理装置60は、例えば、インフラ整備事業に投資する他者が利用する情報処理装置である。他者は、例えば、投資家などであり、インフラ整備事業に賛同して投資する個人や企業等を含む。他者は、情報処理装置40により送信されたインフラ整備事業の投資情報を参照し、投資額を決定する。情報処理装置60は、他者により決定された投資額を含む投資要求を情報処理装置40に送信する。なお、情報処理システム1において、事業者が必要な資金を全て自ら用意する場合は、情報処理装置60は必ずしも必要ではない。
 上述した各情報処理装置10~60は、例えばパーソナルコンピュータ、PDA(Personal Digital Assistant)、スマートフォン等の携帯端末、タブレット端末、サーバ装置などであり、それぞれ第nの情報処理装置(1≦n≦6)と表記し、それぞれを区別してもよい。
 <構成>
 図2は、本発明の一実施形態に係る情報処理装置10の構成の一例を示す図である。図3は、本発明の一実施形態に係る情報処理装置20の構成の一例を示す図である。図4は、本発明の一実施形態に係る情報処理装置30の構成の一例を示す図である。図5は、本発明の一実施形態に係る情報処理装置40の構成の一例を示す図である。以下では、2つの具体例を用いて各装置の処理について説明する。
 (具体例1)
 具体例1では、インフラ整備事業(インフラ整備プロジェクト)として、耐震補強、免振補強、制振補強などの建物の強靭化を行うプロジェクト(工事等)を例に挙げる。既存の物流施設、工場、事務所を保有する事業者は、BCPのため、将来に起こり得る災害に備えてインフラを整備しておくことを考える。このとき、保険会社により提案される建物の強靭化を行う工事に同意し、この工事を保険会社に委託又は依頼してもよい。保険会社は、ファンドからこの工事の費用の提供を受け、施工会社又は設計会社に強靭化工事の発注を行う。また、保険会社は、補強設備(例えば耐震設備等)の所有権を得る。第1成果連動型契約の契約期間は、例えば、補強設備の減価償却資産の耐用年数と一致させてもよいが、当事者間の合意により定めてもよい。
 次に、災害が発生した場合に、事業者は、保険会社に災害保険に基づき、損害の試算による保険金の受取を請求したり、第1契約情報に基づいて、減災効果による経済的価値の少なくとも一部を保険会社に支払ったりする。災害は、例えば、地震、津波、高潮、台風等を含む。保険会社は、資金提供元に、資金提供の見返りとして、受け取った減災効果による経済的価値の少なくとも一部のうちの一部を支払う。また、資金提供元は、保険会社が、災害保険の保険料金を事業者から受け取る場合は、その保険料金の一部を保険会社から受け取ってもよい。
 例えば、保険会社は、特約付きの災害保険を提供してもよい。この場合の特約は、例えば耐震補強工事、耐震補強設備設置(所定期間経過で保険会社から事業者へ所有権が移転)、災害発生時に減災成果報酬支払などを含む。減災成果報酬は、例えば、月々の保険料金の支払いの中で見込み額を事業者に支払ってもらい、その金額を積み立ててもよい。また、見込み額は変動又は固定のいずれでもよい。災害が発生した場合には、積立額が減災成果に相殺される。積立額が不足した場合は、事業者に債務が残り、別途信用保証会社との契約で債務の埋め合わせをしてもよい。
 具体例1において、上述した処理の少なくとも一部を実行する情報処理装置10は、1つ又は複数の処理装置(CPU:Central Processing Unit)110、1つ又は複数のネットワーク通信インタフェース120、メモリ130、ユーザインタフェース150及びこれらの構成要素を相互接続するための1つ又は複数の通信バス170を含む。
 メモリ130は、例えば、DRAM、SRAM、他のランダムアクセス固体記憶装置などの高速ランダムアクセスメモリであり、また、1つ又は複数の磁気ディスク記憶装置、光ディスク記憶装置、フラッシュメモリデバイス、又は他の不揮発性固体記憶装置などの不揮発性メモリでもよく、非一時的な記録媒体でもよい。
 メモリ130は、情報処理システム1により用いられるデータを記憶する。例えば、メモリ130は、建物強靭化プロジェクトに関するデータを記憶する。建物強靭化プロジェクトに関するデータは、例えば、事業者が保有する建物に対する建物強靭化プロジェクトの費用や、期待される経済成果(減災成果)等を含む評価データや、建物強靭化プロジェクトの第1成果連動型契約の第1契約情報などを含む。第1契約情報は、公開データの少なくとも一部、例えば契約期間、及び支払条件などを含む。
 また、メモリ130の他の例として、CPU110から遠隔に設置される1つ又は複数の記憶装置でもよい。ある実施形態において、メモリ130はCPU110により実行されるプログラム、モジュール及びデータ構造、又はそれらのサブセットを格納する。
 CPU110は、メモリ130に記憶されるプログラムを実行することで、制御部112、取得部113、インフラ管理部114、送信部115を構成する。
 制御部112は、建物強靭化プロジェクトに関する全般的な処理を制御する。取得部113は、各情報処理装置から送信されるデータを取得する。取得部113は、例えば、情報処理装置20から送信される第1成果連動型契約に基づく第1契約情報を取得したり、情報処理装置50から送信されるインフラ整備による評価結果を含む評価データを取得したりする。また、取得部113は、情報処理装置20から送信される災害保険に関する保険契約情報を取得してもよい。
 インフラ管理部114は、建物強靭化プロジェクトに関するデータを管理する。例えば、インフラ管理部114は、取得された各データをメモリ130に格納したり、必要に応じてメモリ130内のデータを読み出したりする。
 また、インフラ管理部114は、成果連動型契約の所定の条件が満たされる場合に、保険会社に支払われる支払金を算出する。成果連動型契約の所定の条件は、災害が発生すること等を含む。
 送信部115は、ネットワーク通信インタフェース120を介して、各データを所定の情報処理装置に送信する。例えば、送信部115は、災害保険に加入することを示す情報や第1成果連動型契約に同意することを示す情報などを情報処理装置20に送信する。また、送信部115は、決定された支払金の支払金データ(報酬データ)を情報処理装置20に送信したりする。
 次に、損害保険会社などの保険会社が主に利用する情報処理装置20について説明する。図3に示すとおり、情報処理装置20は、1つ又は複数の処理装置(CPU)210、1つ又は複数のネットワーク通信インタフェース220、メモリ230、ユーザインタフェース250及びこれらの構成要素を相互接続するための1つ又は複数の通信バス270を含む。図3に示す各部は、図3に示す同じ名称の各部と同様の機能を有し、同様の処理を実行する。以下、図3に示す各部のうち、図2に示す各部と異なる点について説明する。
 メモリ230は、情報処理システム1により用いられるデータを記憶する。例えば、メモリ230は、インフラの災害に関する保険契約の保険契約情報を記憶したり、保険契約に基づいて徴収した保険料金に関するデータを記憶したりする。また、メモリ230は、建物強靭化プロジェクトに関する第1成果連動型契約の第1契約情報を記憶したり、第1成果連動型契約に基づいて減災の成果報酬として取得した報酬(M1)に関するデータを記憶したりする。また、メモリ230は、第1成果連動型契約に基づく減災の成果報酬に対する第2成果連動型契約の第2契約情報を記憶したり、第2契約情報に基づく成果報酬の一部、例えば、M1×β%を資金提供元の成果報酬とする場合、この報酬に関するデータを記憶したりする。また、メモリ230は、保険料金のα%を資金提供元の報酬とする場合、この報酬に関するデータを記憶してもよい。αを第1係数、βを第2係数とする。
 CPU210は、メモリ230に記憶されるプログラムを実行することで、制御部212、取得部213、資金管理部214、特定部215、送信部216を構成する。
 制御部212は、後述する各部の処理を制御し、BCPのための建物強靭化ソリューションに関連する処理を実行する。建物強靭化ソリューションは、例えば保険会社がファンドから資金の提供を受けて、保険会社が施工会社等に建物強靭化プロジェクトの発注を行う。
 取得部213は、建物の災害保険に関する保険契約情報を取得する。保険契約情報は、例えば、契約期間や支払条件などを含む。また、取得部213は、建物の整備を図る建物強靭化プロジェクトに関する契約であって、建物強靭化による減災成果に基づいて支払いが行われる第1成果連動型契約の第1契約情報を取得する。また、取得部213は、第1契約情報に基づいて設定される資金に関する資金データを、情報処理装置40から取得する。また、取得部213は、第1契約情報に代わり、又は追加して、建物強靭化による減災効果を考慮した保険料金が設定された災害保険契約の保険契約情報を取得してもよい。
 資金管理部214は、情報処理装置40から取得された資金データを、建物強靭化プロジェクトの識別情報に関連付けてメモリ230に記憶する。建物強靭化プロジェクトの識別情報は、建物強靭化プロジェクトを示し、他のプロジェクトと識別可能にする情報を含む。また、この識別情報は、情報処理装置20により生成されてもよい。メモリ230には、この識別情報に関連付けて、徴収された保険料金および減災の成果報酬に関する報酬データや建物強靭化プロジェクトの実行先の連絡情報(IPアドレスや担当者等のメールアドレス)などが記憶される。
 特定部215は、情報処理装置40から資金データを取得すると、建物強靭化プロジェクトに基づいて、建物強靭化プロジェクトの実行先を特定する。例えば、特定部215は、財源に充当される資金データに関連付けられる識別情報に基づいて、この識別情報と同じ識別情報に関連付けられる実行先の連絡情報を、メモリ230を参照することで特定する。
 送信部216は、特定された実行先に対して、建物強靭化プロジェクトの発注情報を送信する。発注情報には、建物強靭化の技術を含む工法などが含まれてもよい。また、送信部216は、建物強靭化プロジェクトにかかる資金を財源に充当したことを示す資金データを、実行先の情報処理装置30に送信してもよい。この場合の資金データは、徴収された資金を財源に充当したことを示すデータであり、所定口座への振込完了通知等である。これにより、建物強靭化プロジェクトのために調達された資金を、建物強靭化プロジェクトの財源に充当することができ、財源の充当が完了したことを実行先へ通知することができる。
 また、情報処理装置20は、保険会社が利用する装置であり、取得部213は、第1契約情報と、建物の災害保険に関する保険契約情報とを取得してもよい。これにより、災害保険に関する契約と第1成果連動型契約とを別で契約する必要がなく、また、それぞれ別で契約情報が送信されなくてもよいため、情報処理装置20は処理効率を向上させることができる。
 また、送信部216は、建物強靭化プロジェクトに関する契約であって、第1成果連動型契約の減災成果に基づいて支払いが行われる第2成果連動型契約の第2契約情報を情報処理装置40に送信してもよい。この場合、取得部213は、第2契約情報の送信先(資金提供元)から、第2契約情報に基づいて決定される支払いに関する支払条件(成果報酬×β)を含む条件情報を取得する。βは例えば0.5である。これにより、保険会社は建物強靭化プロジェクトに対する資金を他社に集めさせることができ、また、その見返りとして事業者から受け取る成果報酬の一部を支払う仕組みを構築することができる。
 設定部217は、第2成果連動型契約が保険会社とファンドとの間で締結される場合、建物の災害保険により受ける保険料金の一部(保険料金×α)を第2成果連動型契約の締結先(資金提供元)に支払うよう設定する。αは、例えば0.5である。これにより、災害が発生しなくても、定期的に見返りをファンドに還元することが可能になる。
 また、第1契約情報は、契約期間中に災害が発生し、建物強靭化プロジェクトを実行した建物を利用する事業が災害後に継続可能である場合に、支払いが行われる条件に関する条件情報を含んでもよい。例えば、条件情報は、建物が倒壊した場合の経済的損失に基づき事前に算出される支払条件であり、第1契約情報に含まれるとよい。
 また、第1契約情報は、例えば、契約期間や支払条件などを含む。減災成果は、例えば以下の例の少なくとも1つを含む。
・インフラの整備により維持され得る(毀損が回避されうる)社会資本・民間資本の経済的価値。例えば、インフラの整備がない場合の直接的な被害額。具体例としては、オフィスビルや施設、工場等(民間資本)の経済的価値。
・上記の民間資本が創出しうる経済的価値。例えば、インフラの整備がない場合の副次的な被害額。具体例としては、上記の例におけるオフィスビルの賃料、物流施設の倒壊による経済的損失等。
・インフラの整備による環境保護(又は環境保全)に関する価値(例えば、CO2排出量の削減)
・その他、インフラの整備による税金の優遇・軽減措置分等。
 また、第1契約情報は、インフラ整備事業にかかる費用を含み、この費用に基づいて調達する資金が設定されてもよい。資金は、自己資金や債券等を含む。資金データは、例えば、自己資金に関する資金データや、他者から調達した資金に関する資金データを含む。
 また、取得部213は、第1成果連動型契約に含まれる所定の条件が満たされる場合に、情報処理装置10により送信される支払金データ(報酬データ)を取得してもよい。
 また、第1成果連動型契約の第1契約情報に契約期間及び減災成果に相当する金額が含まれる場合、設定部217は、契約期間及び減災成果に相当する金額に少なくとも基づいて、契約期間中にインフラに被害が発生すれば、減災成果に相当する金額に適用される第3係数(以下、「γ」とも表記する。)を設定してもよい。例えば、設定部217は、減災成果に相当する金額が高いほど、又は契約期間が長いほど、第3係数を低く設定してもよい。
 これにより、第1成果連動型契約の契約内容に基づいて、災害が発生した場合の支払金を適切に設定することが可能になる。なお、定められた契約期間内(例えば20年程度)に複数回災害が発生した場合は、複数回の支払いが発生してもよい。
 取得部213は、所定のデータベースから被害の発生確率に関する確率データを取得してもよい。例えば、取得部213は、災害の発生を研究している機関等のデータベースから、これらの機関が発表している災害の発生確率を示す確率データを取得する。所定のデータベースの参照先等が予め登録されていれば、取得部213は、必要に応じて参照先からデータベースを特定し、確率データを取得してもよい。
 この場合、設定部217は、取得された確率データにさらに基づいて第1係数乃至第3係数を設定してもよい。例えば、設定部217は、確率データと、契約期間と、減災成果に相当する金額と、整備コストとを総合して、予め決められた算出式を用いて、第1係数乃至第3係数を設定してもよい。
 また、設定部217は、設定された第1係数乃至第3係数により算出される支払金が、調達された資金以上となるように、第1係数乃至第3係数をパラメータとする算出式を設定してもよい。また、設定部217は、過去の事例に基づくシミュレーションを行い、第1係数乃至第3係数をパラメータとする算出式から、適切な第1係数乃至第3係数を設定してもよい。また、設定部217は、複数の事例の確率データと、契約期間と、減災成果に相当する金額と、整備コストとから適切な第1係数乃至第3係数を求める機械学習済みの学習モデルを用いて、適切な第1係数乃至第3係数を設定してもよい。
 これにより、成果連動型契約の契約内容と災害の発生確率に基づいて、災害が発生した場合の支払金(報酬)をより適切に設定することが可能になる。例えば、発生確率が用いられることで、支払金の設定に対する妥当性を向上させることができる。
 次に、建物強靭化プロジェクトを請け負う事業者が主に利用する情報処理装置30について説明する。図4に示すとおり、情報処理装置30は、1つ又は複数の処理装置(CPU)310、1つ又は複数のネットワーク通信インタフェース320、メモリ330、ユーザインタフェース350及びこれらの構成要素を相互接続するための1つ又は複数の通信バス370を含む。図4に示す各部は、図2に示す同じ名称の各部と同様の機能を有し、同様の処理を実行する。以下、図4に示す各部のうち、図2に示す各部と異なる点について説明する。
 メモリ330は、情報処理システム1により用いられるデータを記憶する。例えば、メモリ330は、建物強靭化プロジェクトに関する進捗などを記憶したり、建物強靭化プロジェクトの資金に関するデータを記憶したりする。
 CPU310は、メモリ330に記憶されるプログラムを実行することで、制御部312、取得部313、資金管理部314、進捗管理部315を構成する。
 制御部312は、後述する各部の処理を制御し、建物強靭化プロジェクトの実行に関する処理を実行する。
 取得部313は、情報処理装置20から、建物強靭化プロジェクトに関する発注情報を取得する。発注情報には、建物を強靭化するための工法、納期、費用などの情報を含む。また、取得部313は、情報処理装置20から、建物強靭化プロジェクトに関する資金データを取得してもよい。
 資金管理部314は、建物強靭化プロジェクトに関する資金データに基づく財源を管理する。資金管理部314は、建物強靭化プロジェクトに関する工事に用いる機材や資材の費用等も管理してもよい。
 進捗管理部315は、建物強靭化プロジェクトに関する進捗状況を管理する。例えば、進捗管理部315は、工事の進捗状況を管理し、工事の現状を把握できるようにしておく。
 次に、建物強靭化プロジェクトに投資する企業が利用する情報処理装置40について説明する。図5に示すとおり、情報処理装置40は、1つ又は複数の処理装置(CPU)410、1つ又は複数のネットワーク通信インタフェース420、メモリ430、ユーザインタフェース450及びこれらの構成要素を相互接続するための1つ又は複数の通信バス470を含む。図5に示す各部は、図2に示す同じ名称の各部と同様の機能を有し、同様の処理を実行する。以下、図5に示す各部のうち、図2に示す各部と異なる点について説明する。
 メモリ430は、情報処理システム1により用いられるデータを記憶する。例えば、メモリ430は、インフラ整備事業の費用に関する資金データを記憶する。
 CPU410は、メモリ430に記憶されるプログラムを実行することで、制御部412、取得部413、資金管理部414、送信部415を構成する。
 制御部412は、後述する各部の処理を制御し、インフラ整備事業の投資に関連する処理を実行する。
 取得部413は、例えば、ウェブページなどで公開されている建物強靭化プロジェクトの投資情報を取得する。投資情報は、例えば、建物強靭化プロジェクトの内容、建物強靭化プロジェクトへの投資に関する企業の希望条件(例えば投資額、資金を集める期間など)を含む。
 資金管理部414は、投資家等の操作に基づき、取得部413により取得された投資情報に応じて設定された投資額に応じた投資に関する資金データを取得する。なお、投資額(資金)は、資金提供元のファンドなどが所持する資金が充当されてもよい。
 送信部415は、保険会社に対し、資金管理部414により取得された資金データを送信する。この場合、資金提供元には、保険会社に対して建物強靭化プロジェクトの資金を確保した見返りとして、保険会社が建物の災害保険を契約した事業者から徴収している保険料金の一部に関する資金データが還元される。また、災害発生時には、減災効果による成果報酬の一部が資金提供元に還元されてもよい。
 以上のとおり、本発明の実施形態を、具体例1における建物強靭化プロジェクトに適用することが可能である。具体例1によれば、建物等を保有する、又はこれから保有する事業者、保険会社、資金提供元それぞれにとってメリットがあるBCPのためのソリューションを提供することができる。
 事業者のメリットは、保険料金を支払うことで、無償で耐震補強等の工事を受けることが可能になる。また、事業者のメリットは、建物強靭化プロジェクトを受けることで、BCPによる経済的損失を回避することができる。また、建物強靭化プロジェクトの契約期間が過ぎた場合は、事業者は建物強靭化プロジェクトの設備を保険会社から無償で引き取ることができる。
 保険会社は、BCPのための建物強靭化プロジェクトとともに災害保険を提供することができる。また、保険会社は、建物強靭化プロジェクトにかかる費用について、他社から投資を受けることで、自社のコスト負担を大幅に減らすことができる。また、保険会社は、定期的に保険料金を受け、また、災害時の減災による成果報酬を受け取ることが可能になる。また、保険会社は、災害発生後に事業継続に対する成果報酬を事業者から別途受け取ってもよい。この成果報酬は、事業が継続できないことによる経済的損失から計算し、別途の成果報酬の受取は事前に契約しておくとよい。
 ファンドなどの資金提供元は、定期的に保険料金の一部を保険会社から還元してもらうことができ、また、災害時には、減災による成果報酬の一部を保険会社から還元してもらうこともできる。
 (具体例2)
 具体例2では、インフラ整備事業として、建物強靭化プロジェクトであることは具体例1と同じであるが、ファンドなどの資金提供元が、国等に対して所定の補助金申請をすることで補助金を受けることができる。
 例えば、情報処理装置40の資金管理部414は、温室効果ガスの削減に関する補助制度がある場合には、温室効果ガスの削減に関する補助金を国または地方公共団体に申請する。この場合、資金管理部414は、災害発生後に評価機関により認定された温室効果ガスの削減効果に基づき補助金に関する資金データを取得してもよい。
 また、情報処理装置20の取得部213は、インフラ整備事業の資金提供元により申請された温室効果ガスの削減に基づく補助金の少なくとも一部の受け取りに関する契約情報を受信してもよい。この場合、ファンドが取得した補助金の一部を保険会社も取得することができる。
 上述したとおり、具体例2においては、減災により温室効果ガスの削減が可能になるが、温室効果ガスの削減を伴う事業の資金を支援した企業等に支払われる補助金がある場合、資金提供元はその補助金に申請しておくことができる。具体例2における各情報処理装置のデータの流れや処理は、具体例1におけるデータの流れや処理と同様である。
 以上、具体例1及び2について説明したが、いずれも成果連動型契約を用いるため、保険会社は、調達した資金を有効に使い、インフラの評価に基づく成果報酬等を大きくするため、よりよいインフラを構築することが見込まれる。よりよいインフラが構築されれば、インフラのオーナーにとってもインフラによる経済的利益の恩恵を受けることができる。すなわち、成果連動型契約を適用することで、保険会社には、インフラの評価を高めて支払金(報酬)等を大きくするというインセンティブを与え、インフラのオーナーの事業者には、インフラ整備事業が着実に実行される可能性を高め、インフラ整備事業の企画を後押しすることができる。
 <動作説明>
 次に、情報処理システム1の資金調達処理及び発注処理に関する各動作について説明する。図6は、本発明の一実施形態に係る資金調達及びプロジェクト発注に関する処理の一例を示すシーケンス図である。図6に示す処理は、具体例1及び2において同様に適用することができる。
 ステップS102において、情報処理装置20の制御部212及び情報処理装置10の制御部112は、インフラの災害保険の保険契約情報を共有し、インフラを保有またはこれから保有する事業者と保険会社との間で保険契約が締結される。
 ステップS104において、情報処理装置10の送信部115は、インフラ整備事業の災害保険契約に関する保険料金の支払データを情報処理装置20に送信する。ステップS104について、定期的に保険料金の支払いが行われる。
 ステップS106において、情報処理装置20の制御部212及び情報処理装置10の制御部112は、インフラ整備事業に関する第1成果連動型契約の第1契約情報を共有し、インフラ整備事業を請け負う保険会社と、インフラを有する事業者との間でインフラ整備事業に関する第1成果連動型契約が締結される。なお、第1成果連動型契約は、保険契約情報に含められ、成果報酬が考慮された保険料金が設定されてもよい。この場合、ステップS106は不要である。なお、ステップS102~S106の各処理の順序は問わない。
 ステップS108において、情報処理装置20の資金管理部214は、インフラ整備事業に必要な整備コストを考慮して投資を受ける額を決定し、送信部216は、投資額を含む投資の条件やリターンの情報を含む投資情報を、他者が利用する情報処理装置40に送信する。
 ステップS110において、情報処理装置40の資金管理部414は、投資情報に基づいてインフラ整備事業について必要な資金を調達し、資金に関する資金データを情報処理装置20に送信する。情報処理装置10の資金管理部214は、取得された資金データをインフラ整備事業の識別情報に関連づける。
 ステップS112において、情報処理装置20の特定部215は、インフラ整備事業の実行先を特定する。インフラ整備事業の実行先は、メモリ230に記憶されたインフラ整備事業の識別情報等に関連付けて記憶されている。
 ステップS114において、情報処理装置20の送信部216は、調達された資金に関する資金データ(例えば支払い済みデータ)を、実行先の情報処理装置30に対して送信する。
 ステップS116において、情報処理装置20の送信部216は、インフラ整備事業の発注情報を、実行先の情報処理装置30に送信する。ステップS114とステップS116の順序は問わない。
 以上の処理により、成果連動型契約を適用することで、保険会社には、インフラの評価を高めて支払金等を大きくするというインセンティブを与え、インフラのオーナーの事業者には、インフラ整備事業が着実に実行される可能性を高め、インフラ整備事業の企画を後押しすることができる。
 図7は、本発明の一実施形態に係る支払処理の一例を示すシーケンス図である。図7に示す処理は、具体例1及び2において同様に適用されうる。
 ステップS202において、評価を行う機関が利用する情報処理装置50は、インフラによる経済成果を評価する。経済成果は、見積もりの金額でもよい。なお、評価機関は、保険会社が担ってもよい。
 ステップS204において、情報処理装置50は、評価結果を含む評価データを、インフラのオーナーが利用する情報処理装置10に送信する。
 ステップS206において、情報処理装置10のインフラ管理部114は、評価結果に含まれる経済成果に基づいて、第1成果連動型契約の第1契約情報を参照して支払金を算出する。例えば、経済成果に相当する金額に第1係数を用いて支払金を算出する。
 ステップS208において、情報処理装置10のインフラ管理部114は、算出した支払金を、保険会社に支払う処理を実行する。例えばインフラ管理部114は、所定の銀行に支払金を振り込む処理を実行したりする。情報処理装置10の送信部115は、支払金に関する支払金データ(報酬データ)を、情報処理装置20に送信する。支払金データは、例えば、支払金の支払いを完了したことを示すデータである。
 ステップS210において、情報処理装置20の取得部213は支払金データを取得し、資金管理部214は、支払金データに基づいて、この支払金を管理する。資金管理部214は、必要に応じて、所定のタイミングで、ステップS212以降で資金提供元への支払処理を実行する。
 ステップS212において、情報処理装置20の資金管理部214は、第1契約情報を参照して算出された支払金(第1支払金)に基づいて、第2契約情報を参照して、資金提供元への支払金(第2支払金)を算出する。例えば、資金管理部214は、第1支払金に所定の係数を掛けて第2支払金を算出する。
 ステップS214において、情報処理装置20の資金管理部214は、算出した第2支払金を、資金提供元(ファンド等)に支払う処理を実行する。例えば資金管理部214は、所定の銀行に支払金を振り込む処理を実行したりする。情報処理装置20の送信部216は、第2支払金に関する支払金データ(報酬データ)を、情報処理装置40に送信する。支払金データは、例えば、支払金の支払いを完了したことを示すデータである。
 以上の処理により、所定のタイミングで、第三者である評価機関がインフラによる経済成果を評価し、インフラのオーナーは、その評価結果に基づいて、インフラ整備事業における資金調達のリターンとなる支払金を決定し、保険会社は、支払金を受け取ることが可能になる。
 また、支払金の設定条件などを成果連動型契約の契約情報に含めることで、評価処理の完了後、支払処理を円滑に行うことができ、システム効率を上げることが可能になる。また、情報処理装置20は、支払金の設定条件を有するため、評価結果を取得すれば支払金が間違っていないかの確認処理を容易に行うことができ、確認処理をやり直したりする必要がなく、確認処理に対する処理効率を上げることが可能になる。
 なお、以上説明した各実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更/改良され得るとともに、本発明にはその等価物も含まれる。即ち、各実施形態に当業者が適宜設計変更を加えたものも、本発明の特徴を備えている限り、本発明の範囲に包含される。例えば、各実施形態が備える各要素及びその配置、材料、条件、形状、サイズなどは、例示したものに限定されるわけではなく適宜変更することができる。また、各実施形態は例示であり、異なる実施形態で示した構成の部分的な置換又は組み合わせが可能であることは言うまでもなく、これらも本発明の特徴を含む限り本発明の範囲に包含される。例えば、インフラ整備事業の実行先への発注処理は、ファンドが行うようにしてもよい。
 1…情報処理システム、10~60…情報処理装置、110…CPU、112…制御部、113…取得部、114…インフラ管理部、115…送信部、130…メモリ、210…CPU、212…制御部、213…取得部、214…資金管理部、215…特定部、216…送信部、217…設定部、230…メモリ、310…CPU、312…制御部、313…取得部、314…資金管理部、315…進捗管理部、330…メモリ、410…CPU、412…制御部、413…取得部、414…資金管理部、415…送信部。

Claims (8)

  1.  情報処理装置が実行する情報処理方法であって、
     インフラストラクチャの整備を図るインフラ整備プロジェクトに関する契約であって、前記インフラストラクチャによる減災成果に基づいて支払いが行われる第1成果連動型契約、又は、前記インフラストラクチャの災害保険契約に関する契約情報を取得し、
     前記インフラ整備プロジェクトに基づいて設定される資金に関する資金データを資金提供元から取得し、
     前記資金データを取得すると、前記インフラ整備プロジェクトの実行先を特定し、
     前記実行先に、前記インフラ整備プロジェクトに関する発注情報を送信する、
     情報処理方法。
  2.  前記情報処理装置は、保険会社が利用する装置であり、
     前記契約情報を取得することは、前記第1成果連動型契約に関する第1契約情報と、前記災害保険契約に関する保険契約情報とを取得することを含む、請求項1に記載の情報処理方法。
  3.  前記情報処理装置がさらに、
     前記第1成果連動型契約の前記減災成果に基づいて支払いが行われる第2成果連動型契約の第2契約情報を前記資金提供元に送信し、
     前記資金提供元から、前記第2契約情報に基づいて決定される前記支払いに関する支払条件を含む条件情報を受信する、
     請求項1又は2に記載の情報処理方法。
  4.  前記情報処理装置がさらに、
     前記第2成果連動型契約が締結される場合、前記インフラストラクチャの災害保険により受け取る保険料金の一部を前記資金提供元に支払うよう設定する、
     請求項3に記載の情報処理方法。
  5.  前記契約情報は、契約期間中に災害が発生し、前記インフラストラクチャを用いた事業が災害後に継続可能である場合に支払いが行われる条件に関する条件情報を含む、
     請求項1から4のいずれか一項に記載の情報処理方法。
  6.  前記情報処理装置がさらに、
     前記資金提供元により申請された温室効果ガスの削減に基づく補助金の少なくとも一部の受け取りを可能にする補助金契約情報を、前記資金提供元から受信する、
     請求項1から5のいずれか一項に記載の情報処理方法。
  7. 情報処理装置に、
     インフラストラクチャの整備を図るインフラ整備プロジェクトに関する契約であって、前記インフラストラクチャによる減災成果に基づいて支払いが行われる第1成果連動型契約、又は、前記インフラストラクチャの災害保険契約に関する契約情報を取得し、
     前記インフラ整備プロジェクトに基づいて設定される資金に関する資金データを資金提供元から取得し、
     前記資金データを取得すると、前記インフラ整備プロジェクトの実行先を特定し、
     前記実行先に、前記インフラ整備プロジェクトに関する発注情報を送信する、
     ことを実行させる、プログラム。
  8.  インフラストラクチャの整備を図るインフラ整備プロジェクトに関する契約であって、前記インフラストラクチャによる減災成果に基づいて支払いが行われる第1成果連動型契約、又は、前記インフラストラクチャの災害保険契約に関する契約情報を取得し、
     前記インフラ整備プロジェクトに基づいて設定される資金に関する資金データを資金提供元から取得する取得部と、
     前記資金データを取得すると、前記インフラ整備プロジェクトの実行先を特定する特定部と、
     前記実行先に、前記インフラ整備プロジェクトに関する発注情報を送信する送信部と、
     を備える情報処理装置。
PCT/JP2022/044018 2021-12-23 2022-11-29 情報処理方法、プログラム、及び情報処理装置 WO2023120063A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-209540 2021-12-23
JP2021209540 2021-12-23

Publications (1)

Publication Number Publication Date
WO2023120063A1 true WO2023120063A1 (ja) 2023-06-29

Family

ID=86902335

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/044018 WO2023120063A1 (ja) 2021-12-23 2022-11-29 情報処理方法、プログラム、及び情報処理装置

Country Status (1)

Country Link
WO (1) WO2023120063A1 (ja)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018169952A (ja) * 2017-03-30 2018-11-01 株式会社日本総合研究所 コンピュータプログラム、ビジネスモデル登録装置及びビジネスモデル登録方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018169952A (ja) * 2017-03-30 2018-11-01 株式会社日本総合研究所 コンピュータプログラム、ビジネスモデル登録装置及びビジネスモデル登録方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SEKIDO, RYOJI: "IT Management Era System Investments (4)", NIKKEI JOHO STRATEGY - NIKKEI INFORMATION STRATEGY, NIKKEI BP-SHA, TOKYO, JP, vol. 10, no. 9, 24 September 2001 (2001-09-24), JP , pages 212 - 215, XP009547261, ISSN: 0917-5342 *

Similar Documents

Publication Publication Date Title
Gurenko Earthquake Insurance in turkey: History of the turkish catastrophe Insurance Pool
US8175952B2 (en) System and method for managing a group insurance policy
US20040225514A1 (en) Monetizing a contract to supply a commodity
JP2008059613A (ja) 再保険をプレースするためのシステムおよび方法
WO1997003409A1 (en) Method and system for providing credit support to parties associated with derivative and other financial transactions
WO2009140592A1 (en) Method and system of insuring operational risk
US20120271658A1 (en) Method for a cloud-based integrated risk placement platform
Stuart et al. US energy service company (ESCO) industry: Recent market trends
WO2009143273A1 (en) Construction project submittal management
WO2022009715A1 (ja) 情報処理方法、プログラム、及び情報処理装置
US20220398664A1 (en) Method and system for administering and financing investment contracts and instruments
WO2023120063A1 (ja) 情報処理方法、プログラム、及び情報処理装置
Yamaguchi et al. RISK allocation in PFI projects
Becker et al. Optimization‐based profitability management tool for cloud broker
Lasa et al. Key credit factors for public private partnership (PPP) projects financing in Malaysia
Zhanda Beyond recovery? Downturns, implications and prospects of Covid-19 pandemic to real estate development in Zimbabwe
Yu et al. Re-think insurance: A new perspective of InsurTech
Camones García et al. Reviewing the efficacy of flexible contracts: a reassessment of the least present value of revenue model for public–private partnerships
KR102232545B1 (ko) 건설공사 대금의 선지급 방법 및 그 시스템
Delmon Structuring Private-Sector Participation (PSP) contracts for small scale water projects
US11574368B1 (en) Risk mitigation for affinity groupings
Camane A framework for financing public infrastructure in South Africa
Parikh et al. BOT Road Infrastructure Projects: Process, Problems, and Suggestions
Passo et al. INFRASTRUCTURE, PRIVATE INVESTMENTS AND ALLOCATION OF RISKS
LOUIS et al. Examination of Causes of Tenancy Disruption and Its Effects on Property Investment in Anambra State, Nigeria

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22910781

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2023569218

Country of ref document: JP

Kind code of ref document: A