WO2023060394A1 - Procédé de détection d'auto-décharge de batterie, et circuit et dispositif - Google Patents

Procédé de détection d'auto-décharge de batterie, et circuit et dispositif Download PDF

Info

Publication number
WO2023060394A1
WO2023060394A1 PCT/CN2021/123090 CN2021123090W WO2023060394A1 WO 2023060394 A1 WO2023060394 A1 WO 2023060394A1 CN 2021123090 W CN2021123090 W CN 2021123090W WO 2023060394 A1 WO2023060394 A1 WO 2023060394A1
Authority
WO
WIPO (PCT)
Prior art keywords
cell
current measuring
measuring meter
parallel circuit
standard
Prior art date
Application number
PCT/CN2021/123090
Other languages
English (en)
Chinese (zh)
Inventor
张继君
王少飞
魏奕民
吴兴远
欧阳楚英
Original Assignee
宁德时代新能源科技股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 宁德时代新能源科技股份有限公司 filed Critical 宁德时代新能源科技股份有限公司
Priority to CN202180092665.8A priority Critical patent/CN116783498A/zh
Priority to PCT/CN2021/123090 priority patent/WO2023060394A1/fr
Publication of WO2023060394A1 publication Critical patent/WO2023060394A1/fr

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present application relates to the field of batteries, in particular to a battery self-discharge detection method, circuit and equipment.
  • the use of batteries is not limited to the use of a single battery alone, but more and more applications tend to appear in the form of series and parallel battery packs.
  • the inventors of the present application have discovered that the capacity and life of a battery pack are not only related to a single battery, but also related to the consistency of multiple batteries. At present, there is no effective solution for determining the consistency of batteries.
  • the embodiments of the present application provide a battery self-discharge detection method, circuit and device.
  • the embodiment of the present application proposes a battery self-discharge detection method, including:
  • the standard battery cell and the first current measuring meter form a first series circuit, and the battery cell to be tested and the first resistor form a second series circuit, and the resistance value of the first current measuring meter is the same as that of the first resistor;
  • first parallel circuit If the first parallel circuit reaches potential equilibrium, then replace the first resistor with a second current measuring meter to form a second parallel circuit;
  • the reading value of the first current measuring meter calculates the leakage current value of the cell under test, wherein the first current measurement
  • the resistance value of the meter and the second current measuring meter are the same.
  • the reading value of the second current measuring meter of each battery cell to be tested can be quickly obtained, which saves the time for potential equalization of the second parallel circuit, and greatly improves the battery detection.
  • the influence of temperature changes on the test is reduced, and the accuracy of the test is improved.
  • the steps before forming the first series circuit of the standard battery cell and the first current measuring meter, and forming the second series circuit of the battery cell under test and the first resistance, the steps include: forming the second series circuit of the standard battery cell and the battery cell under test Three parallel circuits; determining that the third parallel circuit achieves potential equilibrium.
  • the third parallel circuit achieves potential equalization, including: respectively obtaining the voltage values of the standard cell and the cell to be tested; if the difference between the voltage values is less than the preset first voltage threshold, it is determined that the third parallel circuit has reached potential equilibrium. In this way, it can be quickly determined whether the third parallel circuit has reached potential equilibrium, thereby improving measurement efficiency.
  • the third parallel circuit achieves potential equalization, including: after the standard battery cell and the battery cell to be tested form a third parallel circuit, if the operating time of the third parallel circuit exceeds the first duration threshold, it is determined that the third parallel circuit has reached potential equilibrium. Realizing the potential equalization of the third parallel circuit in this way is relatively simple and convenient to implement.
  • the first parallel circuit achieves potential equalization, including: obtaining the reading value of the first current measuring meter connected in series with the standard cell, and if the variation of the reading value is less than the preset first current threshold, Then it is determined that the first parallel circuit has reached potential equilibrium. In this way, the state of the first parallel circuit can be quickly obtained, which can greatly improve the measurement efficiency.
  • the step of achieving the potential balance of the first parallel circuit includes: determining that the first parallel circuit has reached the potential balance when the operating time of the first parallel circuit exceeds a second duration threshold. Realizing the potential equalization of the first parallel circuit in this way is relatively simple and convenient to implement.
  • the calculation of the leakage current value of each battery cell under test according to the reading value of the first current measuring meter, the reading value of the second current measuring meter and the standard leakage current value includes: obtaining and The reading value of the first current measuring meter connected in series with the standard battery cell; the reading value of the first current measuring meter connected in series with the standard battery cell is summed with the standard leakage current value, and subtracted from the The value of the second current measuring table is used to obtain the leakage current value of the cell to be tested.
  • the leakage current value of each battery cell to be tested can be accurately calculated, which improves the measurement accuracy and measurement accuracy. s efficiency.
  • the method further includes: if the leakage current value of the battery cell under test is greater than a preset allowable leakage current threshold, determining that the self-discharge of the battery cell under test is unqualified.
  • the embodiment of the present application also proposes a battery self-discharge detection circuit, including: a standard cell, a cell to be tested, a first resistor, a first current measuring meter, a second current measuring meter, and a first selection switch;
  • the standard cell and the first current measuring meter form a first series circuit
  • One end of the battery cell to be tested is respectively connected to the first resistance and one end of the second current measuring meter through the first selection switch; the resistance values of the first current measuring meter and the second current measuring meter are the same;
  • the cell to be tested and the first resistor form a second series circuit, and the first series circuit and the second series circuit form a first parallel circuit ;
  • the first selection switch disconnects the connection between the cell to be tested and the first resistor, and connects the cell to be tested to the second current measuring meter , the battery cell to be tested and the second current measuring meter form a third series circuit;
  • the first series circuit and the third series circuit form a second parallel circuit.
  • the reading value of the second current measuring meter of each battery cell to be tested can be quickly obtained, which saves the time for potential equalization of the second parallel circuit, and greatly improves the battery detection.
  • the influence of temperature changes on the test is reduced, and the accuracy of the test is improved.
  • the embodiments of the present application also provide a battery self-discharge detection device, including the battery self-discharge detection circuit in the above embodiments.
  • FIG. 1 shows a flowchart of a battery self-discharge detection method proposed in an embodiment of the present application
  • Fig. 2 shows a schematic diagram of the connection of the first parallel circuit proposed by the embodiment of the present application
  • Fig. 3 shows a schematic diagram of the connection of the second parallel circuit proposed by the embodiment of the present application
  • Fig. 4 shows the experimental data diagram of leakage current test temperature proposed by the embodiment of the present application.
  • Fig. 5 shows the experimental data diagram of the balanced leakage current test proposed in the embodiment of the present application
  • FIG. 6 shows a schematic diagram of the connection of the third parallel circuit proposed by the embodiment of the present application.
  • FIG. 7 shows a structural diagram of a battery self-discharging detection circuit proposed by an embodiment of the present application.
  • connection In the description of this application, it should be noted that, unless otherwise clearly stipulated and limited, the terms “installation”, “connection”, “connection” and “attachment” should be understood in a broad sense, for example, it may be a fixed connection, It can also be detachably connected or integrally connected; it can be directly connected or indirectly connected through an intermediary, and it can be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in this application according to specific situations.
  • Multiple appearing in this application refers to more than two (including two), similarly, “multiple groups” refers to more than two groups (including two groups), and “multi-piece” refers to more than two (Includes two pieces).
  • the battery cells may include lithium-ion secondary batteries, lithium-ion primary batteries, lithium-sulfur batteries, sodium-lithium-ion batteries, sodium-ion batteries, or magnesium-ion batteries, which are not limited in the embodiments of the present application.
  • the battery cell can be in the form of a cylinder, a flat body, a cuboid or other shapes, which is not limited in this embodiment of the present application.
  • Battery cells are generally divided into three types according to packaging methods: cylindrical battery cells, square square battery cells and pouch battery cells, which are not limited in this embodiment of the present application.
  • Power batteries are not only used in energy storage power systems such as hydraulic, thermal, wind and solar power plants, but also widely used in electric vehicles such as electric bicycles, electric motorcycles, electric vehicles, as well as military equipment and aerospace and other fields . With the continuous expansion of power battery application fields, its market demand is also constantly expanding.
  • the consistency of self-discharge is an important part.
  • the self-discharge of the battery affects the battery cell, The overall performance of the battery module and even the electric cabinet. Therefore, in the production process, it is very important to screen and classify the self-discharge consistency of the battery cells, and how to quickly judge the size of the self-discharge is the key difficulty.
  • the main self-discharge screening method for lithium-ion batteries is to measure the battery K value (OCV changes with time), that is, to test the voltage drop of the battery per unit time.
  • OCV changes with time OCV changes with time
  • This method can effectively detect the self-discharge rate of the battery, it has a big disadvantage, that is, it takes a long time.
  • This method originated from the self-discharge detection of lithium-ion batteries for portable devices with low capacity. The test time is relatively acceptable.
  • the voltage drop per unit time becomes very small, which is limited by the measurement accuracy of the voltage, so it takes a longer time to measure the self-discharge rate more accurately.
  • the embodiment of the present application proposes a battery self-discharge detection method, circuit and detection equipment, which connects a standard battery cell with a known leakage current value and the battery cell under test, and first uses a resistor instead of an ammeter for potential equalization. After the potential balance is reached, switch the resistance to the current measuring meter for current measurement, and replace the change of the test voltage by the change of the test current. It does not need to stand for a long time, and can detect the leakage of each cell more accurately and intuitively. current situation. At the same time, by reducing the total line resistance, the leakage current with a larger value can be reached more quickly, and the influence of temperature on the measurement accuracy can be effectively avoided.
  • Potential balance refers to the voltage balance between the cells. If the voltage between the cells is in an unbalanced state, the current in the line will be too large. If the current in the line is too large, there will be an Larger current charging and discharging will cause the polarization of the battery to increase, causing the polarization current to increase, which will increase the basic current of the test, and the battery will need a longer time to perform depolarization operations to detect the real leakage current. In order to quickly achieve balance, the potentials between the cells should be as balanced as possible to ensure that the initial current is in a low range, which is not enough to cause or minimize the generation of polarization current.
  • the total line resistance refers to the total resistance value of the entire detection circuit, mainly including the resistance of the connecting sheet, the internal resistance of the cell, the internal resistance of the ammeter, and the resistance of the test line. If the total line resistance is too large, the current value in the line will be low. , if the same balance leakage current is to be achieved, a longer balance time is required. Since the internal resistance of the battery cell and the connecting sheet resistance are much smaller than the internal resistance of the ammeter and the resistance of the test line, the reduction of the total line resistance is mainly to reduce the internal resistance of the ammeter and the resistance of the test line.
  • Fig. 1 shows the flowchart of the battery self-discharge detection method proposed in the embodiment of the present application, the battery self-discharge detection method mainly includes:
  • Step 110 form a first series circuit with the standard battery cell and the first current measuring meter, and form a second series circuit with the battery cell to be tested and the first resistor, the first current measuring meter and the first resistor have the same resistance value.
  • the standard battery cell refers to the battery cell with known leakage current value.
  • the performance of the standard battery cell is relatively stable, and its leakage current value is known, which can be used as a standard for measurement comparison.
  • the battery cell stored for about 90 days is selected as the standard battery cell.
  • other standards can also be used for the selection of the standard cell, as long as it has a stable standard leakage current value.
  • the number of standard batteries can be one or more, and the number is not limited.
  • Figure 2 is a schematic diagram of the connection of the battery self-discharge detection circuit proposed by the embodiment of the present application.
  • the first current measuring meter A1 is connected to one end of the standard battery S, and is connected in series with the standard battery S, and the first resistor is set at the end of the standard battery S.
  • One end of the cell under test forms a second series circuit with the cell to be tested.
  • each cell to be tested forms a second series circuit with a different first resistor.
  • the resistance value of the first resistor is the same as the resistance value of the first current measuring meter. Smaller connecting wires.
  • the resistance value of each first resistor is not greater than 50 milliohms. Under this resistance value, the potential equalization time of the first parallel circuit is greatly shortened, as shown in Table 1, which shows the time required for the circuit to achieve potential equalization when the first resistors with different resistance values are selected.
  • the first resistance value Potential equalization time 1 milliohm 1.25 hours 10 milliohms 2.5 hours 100 milliohms 20 hours 1 euro 150 hours
  • the embodiment of the present application uses the first resistor with a resistance value not greater than 50 milliohms, which can greatly shorten the time for potential equalization.
  • Step 120 Connect the first series circuit and the second series circuit in parallel to form a first parallel circuit.
  • the first series circuit and the plurality of second series circuits are connected in parallel to form a first parallel circuit.
  • the negative poles of each battery cell to be tested are connected, and the positive poles are respectively connected to the first resistor.
  • Step 130 If the first parallel circuit reaches potential equilibrium, replace the first resistor with a second current measuring meter to form a second parallel circuit.
  • the first current measuring meter A1 and the first resistor form the first parallel circuit, it is necessary to perform potential equalization among the cells to reduce the influence of the polarization current.
  • the potential equalization of the first parallel circuit can be carried out by resting the first parallel circuit. For example, after the first parallel circuit is left for 3-5 hours, it is considered that it has reached the potential equalization potential equalization; it can also be judged
  • the reading value variation of the first current measuring meter connected in series with the standard battery cell is used to determine whether the first parallel circuit has reached potential equilibrium.
  • the first parallel circuit When the first parallel circuit reaches the potential balance, it is considered that the polarization current between the standard cell and each cell to be tested is the smallest, and the cell is in a stable state, and the first resistor is replaced by the second current measuring meter respectively, forming second parallel circuit.
  • the second parallel circuit is shown in Figure 3. After the first parallel circuit reaches potential equilibrium, the first current measuring meter A1 connected to the standard cell S remains unchanged, and the first resistor connected in series with each cell to be tested is quickly Replaced by second current measuring gauges A2, A3...A16 etc.
  • both the first current measuring meter and the second current measuring meter need to use high-precision ammeters, for example: you can choose an accuracy of ⁇ 1uA current measuring meter.
  • the resistance values of the selected first current measuring meters and the second current measuring meters should be consistent, or the difference between the resistance values of the first current measuring meters and the second current measuring meters should be within a certain threshold range to avoid resistance. If the value differs too much, it will affect the measurement accuracy. That is, the resistance values of the first current measuring meter, the second current measuring meter and the first resistor used in the embodiment of the present application must be the same or the resistance difference is within a certain threshold range.
  • Step 140 Obtain the reading value of the first current measuring meter, the reading value of the second current measuring meter and the standard leakage current value of the standard cell.
  • the first resistor is switched to the second current measuring meter, since the second parallel circuit is still in the potential equalization state, it is not necessary to perform potential equalization on the second parallel circuit, and the first current measuring meter and the second current
  • the measuring meter obtains the current reading value of each series circuit, which saves the time for potential equalization of the second parallel circuit, and greatly improves the efficiency of self-discharge detection of the battery cell.
  • the reading value of the current measuring meter connected to the standard cell is Is
  • the current measuring meter connected to the cell to be tested The reading values of are respectively I 2 , I 3 , I 4 ... I 15 .
  • Step 150 Calculate the leakage current value of the cell to be tested according to the reading value of the first current measuring meter, the reading value of the second current measuring meter and the standard leakage current value.
  • the total current value of each series circuit is the same, that is, each to-be-tested
  • the leakage current value of the cell is equal to the sum of the current values measured by the second current measuring meter corresponding to the cell to be tested.
  • the leakage current value of each cell to be tested is I 2 leakage , I 3 leakage ...I 15 leakage , the leakage current value of each cell to be tested can be calculated by the following formula:
  • I s Since the leakage of I s is known, I s , I 2 , I 3 , I 4 . Display the leakage current value of each cell to be tested: I 2 leakage , I 3 leakage ...I 15 leakage .
  • Figure 4 shows a schematic diagram of the influence of temperature fluctuations on the measurement results when the battery self-discharge detection method proposed in the embodiment of the present application is used to detect the leakage current. It can be seen from the figure that the method proposed in the embodiment of the present application, After a parallel circuit reaches potential equilibrium, when the temperature changes at ⁇ 1°C, ⁇ 2°C and ⁇ 3°C, the impact on the leakage current value of each battery cell to be tested is very small, which further verifies the self-discharge of the battery provided by this application. The effectiveness of the detection method.
  • Figure 5 shows the Simulink simulation results of self-discharge detection using the battery self-discharge detection method proposed in this application, simulating batteries with different leakage currents, when the line resistance is fixed, the self-discharge of the battery proposed by the embodiment of the application
  • the change of the balance leakage current and the balance time further verify the feasibility of the test method proposed in the embodiment of the present application.
  • the battery self-discharge detection method proposed in the embodiment of the present application achieves After the potential is balanced, the first resistor is switched to the second current measuring meter, and the reading value of the second current measuring meter of each cell to be tested can be quickly obtained, which saves the time for potential equalization of the second parallel circuit and greatly improves the At the same time, by greatly reducing the total line resistance, the influence of temperature changes on the test is reduced, and the accuracy of the test is improved.
  • the standard cell and the first current measuring meter are formed into a first series circuit, and the cell to be tested and the first resistor are formed into a second series circuit Before, it further includes: forming a third parallel circuit with the standard cell and the cell to be tested; determining that the third parallel circuit has reached potential equilibrium.
  • FIG. 6 shows a third parallel circuit formed by connecting the standard cell and the cell under test in parallel.
  • the third parallel circuit is used to equalize the potential between the cells to reduce the influence of the polarization current.
  • the potential equalization of the third parallel circuit can be carried out by placing the third parallel circuit at rest. For example, after the third parallel circuit is left standing for 12 hours, it is considered that it has reached the potential equilibrium; it can also be determined by judging the standard voltage. The voltage variation of the core and each cell under test, if the variation is less than a certain threshold, it is considered that it has reached the potential equilibrium.
  • the third parallel circuit reaches the potential balance, it is considered that the polarization current between the standard battery cell and each battery cell to be tested is the smallest, and the battery cell is in a stable state, and the standard battery cell, the first current measuring meter, and each battery cell to be tested are respectively connected to The battery cell and each first resistor form a first parallel circuit.
  • determining whether the third parallel circuit has reached potential equalization includes: respectively obtaining the voltage values of the standard cell and the plurality of cells to be tested; if the difference between the voltage values is less than the preset first voltage threshold, then determine The third parallel circuit achieves potential equalization.
  • the voltage values at both ends of the standard cell and each cell to be tested are measured by a voltmeter, and when the difference between the voltages is less than the preset first voltage threshold, it is determined that the third parallel circuit has reached potential equilibrium.
  • the third parallel circuit determines whether the third parallel circuit has reached the potential balance. It is also possible to make the third parallel circuit run for a time exceeding the first duration threshold after the standard cell and multiple cells to be tested form the third parallel circuit, then Make sure that the third parallel circuit achieves potential equalization.
  • the third parallel circuit is statically placed, and when the static running time of the third parallel circuit exceeds the first duration threshold, the third parallel circuit is determined.
  • Parallel circuits achieve potential equalization.
  • the first duration threshold is generally set to 10-12 hours. Realizing the potential equalization of the third parallel circuit in this way is relatively simple and convenient to implement.
  • the first parallel circuit to determine whether the first parallel circuit has reached the potential balance, it can be obtained by obtaining the reading value of the first current measuring meter connected in series with the standard cell, and if the change in the reading value is less than the preset first current threshold, then the first Parallel circuits achieve potential equalization.
  • step 130 after connecting the standard cell in series with the first current measuring meter and the cell under test in series with the first resistor, a first parallel circuit is formed, and the first parallel circuit needs to be placed in a state of potential balance.
  • the first parallel circuit needs to be placed in a state of potential balance.
  • determining whether the first parallel circuit reaches potential equilibrium may be determined by determining whether the operating time of the first parallel circuit exceeds a second duration threshold, and if so, determining that the first parallel circuit has reached potential equilibrium.
  • the first parallel circuit is placed statically, and when the static running time of the first parallel circuit exceeds the first duration threshold, the first parallel circuit is determined.
  • Parallel circuits achieve potential equalization.
  • the second duration threshold is generally set to 3-5 hours. Realizing the potential equalization of the first parallel circuit in this way is relatively simple and convenient to implement.
  • calculating the leakage current value of each battery cell to be tested includes: obtaining the first battery cell connected in series with the standard battery cell The reading value of a current measuring meter; the reading value of the first current measuring meter connected in series with the standard cell and the standard leakage current value are summed, and the value of the second current measuring meter connected in series with the cell to be tested is subtracted to obtain Leakage current value of each cell under test.
  • step 150 it is necessary to calculate the leakage current value of each battery cell to be tested according to the standard leakage current value and the reading values of each first current measuring meter and each second current measuring meter, because each first current measuring meter and each second current measuring meter The reading value of the two current measuring meters is obtained when the second parallel circuit is in the potential equilibrium state, therefore, the total current value of each series circuit is the same, that is, the leakage current value of each battery cell to be tested is the same as the current value of the battery cell to be tested. The sum of the current values measured by the current measuring meters corresponding to the measuring cells are all equal.
  • the leakage current value of each cell to be tested is I 2 leakage , I 3 leakage ...I 15 leakage , the leakage current value of each cell to be tested can be calculated by the following formula:
  • I s leakage Since the I s leakage is known, I s , I 2 , I 3 , I 4 . . . I 15 are the reading values measured by each first current measuring meter and each second current measuring meter, therefore, The leakage current value of each cell to be tested can be calculated I 2 leakage , I 3 leakage ...I 15 leakage .
  • the leakage current value of each battery cell to be tested can be accurately calculated, which improves the measurement accuracy and measurement accuracy. s efficiency.
  • the leakage current value of each battery cell to be tested after obtaining the leakage current value of each battery cell to be tested, it is judged whether the leakage current value of the battery cell to be tested is greater than the preset allowable leakage current threshold, and if it is greater, it is determined that the battery cell to be tested is unqualified for self-discharge .
  • the purpose of measuring the leakage current value of the battery cell is to screen unqualified cells to be tested, and avoid setting cells with large leakage current values together to affect the overall performance of the battery. After the leakage current value is determined, it can be judged whether each cell under test is qualified according to the preset permissible leakage current threshold.
  • the permissible leakage current threshold can be converted to the maximum allowable leakage current value I max through the monthly self-discharge rate of each battery cell to be tested. If the leakage current value I n of the battery cell to be tested is leaked ⁇ I max , the battery to be tested is considered to be The cell is normal, otherwise the cell is considered to be abnormal.
  • the embodiment of the present application also proposes a battery self-discharge detection circuit.
  • the second current measuring meter A2, A3...A16 and the first selection switch K1, K2...K16; the standard cell S and the first current measuring meter A1 form the first series circuit;
  • One end of the battery cell D is connected to the first resistance R and one end of the second current measuring meter A2 respectively through the first selection switch K;
  • the resistance values of the first current measuring meter A1 and the second current measuring meter A2 are the same;
  • the first When the selection switch K is connected to the first resistor R, the cell D to be tested and the first resistor R form a second series circuit, and the first series circuit and the second series circuit form a first parallel circuit; if the first parallel circuit reaches potential equilibrium,
  • the first selection switch K disconnects the connection between the cell D to be tested and the first resistor R, and connects the cell D to be tested to the second current measuring meter A2, and the cell D to be tested and the second current measuring meter A2
  • the standard cell S refers to the cell with known leakage current value.
  • the performance of the standard cell is relatively stable, and its leakage current value is known, which can be used as a standard for measurement comparison.
  • the cell that has been stored for about 90 days is selected as the standard cell. , taking the known leakage current value as the standard leakage current value for comparison.
  • other standards can also be used for the selection of the standard cell, as long as it has a stable standard leakage current value.
  • the first current measuring meter A1 and the second current measuring meter A2 are current measuring meters with the same resistance value, generally high-precision ammeters, for example, a current measuring meter with an accuracy of ⁇ 1uA can be selected.
  • the resistance values of the selected first current measuring meters and the second current measuring meters should be consistent, or the resistance difference between the first current measuring meters and the second current measuring meters should be within a certain threshold range, so as to avoid the The resistance value difference of the current measuring meter is too large, which affects the measurement accuracy.
  • the total resistance value of the circuit has a great influence on the potential equalization, if the total resistance value of the circuit is too large, the time for potential equalization will be too long.
  • the resistance value of the resistance value is not more than 50 milliohms. Under this resistance value, the potential equalization time of the second parallel circuit is greatly shortened. As shown in Table 1, it shows that the current measuring meter with different resistance values is selected, and the circuit reaches potential equalization. the time required.
  • the control switch K1 is a single-pole two-throw switch, which is respectively connected to the first current measuring meter and the positive and negative poles of the battery cell, and is used to control the access of the first current measuring meter.
  • the control switches K2, K3...K16 are single-pole three-throw switches, which are respectively connected to the first resistor, the second current measuring meter, and the positive and negative poles of the battery cell, and are used to respectively switch the first resistor to The second current measuring meter, alternatively, short the first resistor or the second current measuring meter.
  • control switches K1, K2...K16 can also use other types of switches, such as single-pole single-throw switches, and multiple single-pole single-throw switches can be set, respectively connected to the first resistor, the second current measuring meter, etc. , is not limited here.
  • the standard cell S is connected in parallel with multiple cells D2, D3...D16 to be tested, and current measuring meters A2, A3 Vietnamese are connected in series at one end of each cell to be tested.
  • the first resistors R2, R3...R16 are respectively connected to the two ends of the control switch K at both ends of the first current measuring meter and the second current measuring meter, K1 is set at both ends of A1, K2 is set at both ends of A2 and R2..., K16 is set at both ends of A16 and R16.
  • each control switch K1, K2, ..., K16 is first contacted with the contact point 1, when When the control switch is placed at the contact point 1, each current measuring meter and the first resistor are directly short-circuited, and the positive and negative poles of each cell are connected to form a third parallel circuit.
  • each first resistor is connected in series with each cell to be tested , forming a first parallel circuit.
  • the control switches K1, K2...K16 are placed on the contact point 3, and the current measuring meters A1, A2, A3...A16 are connected with the standard electric current
  • the cells and the cells to be tested are connected in series to form a second parallel circuit.
  • the battery self-discharge test circuit proposed in the embodiment of the present application is connected to the standard battery cell, after the first parallel circuit composed of the standard battery cell, the first current measuring meter, the battery cell to be tested and the first resistor reaches the potential balance, Switching the first resistor to the second current measuring meter can quickly obtain the reading value of the second current measuring meter of each cell to be tested, which saves the time for potential equalization of the second parallel circuit and greatly improves the efficiency of cell detection. At the same time, by greatly reducing the total line resistance, the influence of temperature changes on the test is reduced, and the accuracy of the test is improved.
  • the battery self-discharge detection circuit includes: a standard cell S, a cell D to be tested, a first resistor R, The first current measuring meter A1, the second current measuring meter A2, A3...A16 and the first selection switch K1, K2...K16; the standard cell S is composed of the first current measuring meter A1 The first series circuit; one end of the cell D to be tested is connected to the first resistance R and one end of the second current measuring meter A2 through the first selection switch K; the first current measuring meter A1 and the second current measuring meter A2 The resistance values are the same; when the first selection switch K is connected to the first resistor R, the cell D to be tested and the first resistor R form a second series circuit, and the first series circuit and the second series circuit form a first parallel circuit; if the first The parallel circuit achieves potential balance, the first selection switch K disconnects the connection between the
  • the battery self-discharge detection device proposed in the embodiment of the present application can quickly realize potential equalization, improve the efficiency of battery self-discharge test, and at the same time, by greatly reducing the total line resistance, the influence of temperature changes on the test is reduced. Improved test accuracy.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Secondary Cells (AREA)

Abstract

La présente demande concerne un procédé de détection d'auto-décharge de batterie. Le procédé comprend les étapes suivantes : former un premier circuit en parallèle au moyen d'un élément de batterie standard et d'une pluralité d'éléments de batterie à tester ; si le premier circuit en parallèle atteint un équilibre de potentiel, connecter respectivement en série l'élément de batterie standard et la pluralité des éléments de batterie à tester à des ampèremètres de façon à former un second circuit en parallèle ; si le second circuit en parallèle atteint un équilibre de potentiel, acquérir une valeur de lecture de chaque ampèremètre ; acquérir une valeur de courant de fuite standard de l'élément de batterie standard ; et selon la valeur de courant de fuite standard et la valeur de lecture de chaque ampèremètre, obtenir une valeur de courant de fuite de chaque élément de batterie à tester. L'équilibrage de potentiel peut être réalisé rapidement, ce qui permet d'améliorer l'efficacité d'un test d'auto-décharge de batterie.
PCT/CN2021/123090 2021-10-11 2021-10-11 Procédé de détection d'auto-décharge de batterie, et circuit et dispositif WO2023060394A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202180092665.8A CN116783498A (zh) 2021-10-11 2021-10-11 电池自放电检测方法、电路和设备
PCT/CN2021/123090 WO2023060394A1 (fr) 2021-10-11 2021-10-11 Procédé de détection d'auto-décharge de batterie, et circuit et dispositif

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2021/123090 WO2023060394A1 (fr) 2021-10-11 2021-10-11 Procédé de détection d'auto-décharge de batterie, et circuit et dispositif

Publications (1)

Publication Number Publication Date
WO2023060394A1 true WO2023060394A1 (fr) 2023-04-20

Family

ID=85987143

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/123090 WO2023060394A1 (fr) 2021-10-11 2021-10-11 Procédé de détection d'auto-décharge de batterie, et circuit et dispositif

Country Status (2)

Country Link
CN (1) CN116783498A (fr)
WO (1) WO2023060394A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117134012A (zh) * 2023-10-26 2023-11-28 河南锂动电源有限公司 一种故障自检测锂电池
CN117347887A (zh) * 2023-12-04 2024-01-05 宁德时代新能源科技股份有限公司 测试电池自放电的方法、系统以及装置

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117406112B (zh) * 2023-12-13 2024-03-15 瑞浦兰钧能源股份有限公司 电池自放电筛选方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901932A (zh) * 2012-09-24 2013-01-30 合肥国轩高科动力能源有限公司 一种检测锂电池自放电的工艺
CN102901931A (zh) * 2012-09-24 2013-01-30 合肥国轩高科动力能源有限公司 筛选自放电异常的锂电池的方法
JP2018522522A (ja) * 2015-07-14 2018-08-09 ボルボトラックコーポレーション バッテリパックを平衡化する方法及びシステム
CN110935655A (zh) * 2019-11-15 2020-03-31 上海理工大学 一种基于并联电池组支路电流变化的自放电快速筛选方法
CN111965545A (zh) * 2020-07-31 2020-11-20 蜂巢能源科技有限公司 锂电池自放电检测方法、装置及系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901932A (zh) * 2012-09-24 2013-01-30 合肥国轩高科动力能源有限公司 一种检测锂电池自放电的工艺
CN102901931A (zh) * 2012-09-24 2013-01-30 合肥国轩高科动力能源有限公司 筛选自放电异常的锂电池的方法
JP2018522522A (ja) * 2015-07-14 2018-08-09 ボルボトラックコーポレーション バッテリパックを平衡化する方法及びシステム
CN110935655A (zh) * 2019-11-15 2020-03-31 上海理工大学 一种基于并联电池组支路电流变化的自放电快速筛选方法
CN111965545A (zh) * 2020-07-31 2020-11-20 蜂巢能源科技有限公司 锂电池自放电检测方法、装置及系统

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117134012A (zh) * 2023-10-26 2023-11-28 河南锂动电源有限公司 一种故障自检测锂电池
CN117134012B (zh) * 2023-10-26 2024-01-16 河南锂动电源有限公司 一种故障自检测锂电池
CN117347887A (zh) * 2023-12-04 2024-01-05 宁德时代新能源科技股份有限公司 测试电池自放电的方法、系统以及装置
CN117347887B (zh) * 2023-12-04 2024-04-12 宁德时代新能源科技股份有限公司 测试电池自放电的方法、系统以及装置

Also Published As

Publication number Publication date
CN116783498A (zh) 2023-09-19

Similar Documents

Publication Publication Date Title
WO2023060394A1 (fr) Procédé de détection d'auto-décharge de batterie, et circuit et dispositif
CN107020251B (zh) 电池及电池组的筛选方法
US9577293B2 (en) Method and system for equalizing and matching lithium secondary batteries
CN101907688B (zh) 一种锂离子电池电性能一致性的检测方法
WO2020147315A1 (fr) Procédé de dépistage rapide d'auto-décharge de batterie parallèle
CN102901931B (zh) 筛选自放电异常的锂电池的方法
CN105304954A (zh) 一种电池的配组方法及其配组系统
CN103545564B (zh) 充电电池单元及其缺陷检测方法
CN104749482A (zh) 一种电池电芯的焊接可靠性测试方法
CN103008261A (zh) 一种锂离子电池自放电程度的分选方法
CN105044616A (zh) 一种锂电池的检测方法
CN104730463A (zh) 单体电池一致性的检测方法
CN105510836A (zh) 一种锂离子电池自放电测试方法及其电池配组方法
CN109507600A (zh) 一种退役磷酸铁锂电池梯次利用评估方法
US20170125857A1 (en) Method and system for equalizing and matching lithium secondary batteries
CN116184235B (zh) 电池自放电性能的检测方法和装置
CN203405512U (zh) 铅酸蓄电池短路电流与内阻水平测试装置
WO2023060393A1 (fr) Procédé de détection d'autodécharge de batterie, circuit et dispositif
CN104198943B (zh) 一种锂电池包性能检测方法及系统
CN109269967B (zh) 一种锂离子电池壳体腐蚀的测试方法
CN110542864A (zh) 一种锂离子电池自放电率热力学检测方法
CN103872727B (zh) 一种锂离子动力电池最大使用电流的确定方法
US20200350641A1 (en) Apparatus, method and battery pack for detecting fault of electrical conductor
CN102544408B (zh) 电池盒和手机充、放电测试系统
CN103744029A (zh) 一种基于内阻测量单体电池剩余容量的估算方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21960146

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 202180092665.8

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE