WO2022158229A1 - 気体圧縮機システムのプログラム更新方法 - Google Patents

気体圧縮機システムのプログラム更新方法 Download PDF

Info

Publication number
WO2022158229A1
WO2022158229A1 PCT/JP2021/047441 JP2021047441W WO2022158229A1 WO 2022158229 A1 WO2022158229 A1 WO 2022158229A1 JP 2021047441 W JP2021047441 W JP 2021047441W WO 2022158229 A1 WO2022158229 A1 WO 2022158229A1
Authority
WO
WIPO (PCT)
Prior art keywords
program
gas compressor
gas
compressor
updated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2021/047441
Other languages
English (en)
French (fr)
Inventor
諒介 内樹
勇次 池村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Industrial Equipment Systems Co Ltd
Original Assignee
Hitachi Industrial Equipment Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Industrial Equipment Systems Co Ltd filed Critical Hitachi Industrial Equipment Systems Co Ltd
Priority to CN202180075893.4A priority Critical patent/CN116529485A/zh
Priority to US18/261,976 priority patent/US12352259B2/en
Publication of WO2022158229A1 publication Critical patent/WO2022158229A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/06Control using electricity
    • F04B49/065Control using electricity and making use of computers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B41/00Pumping installations or systems specially adapted for elastic fluids
    • F04B41/06Combinations of two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/06Control using electricity
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C28/00Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C28/00Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids
    • F04C28/02Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids specially adapted for several pumps connected in series or in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D25/00Pumping installations or systems
    • F04D25/16Combinations of two or more pumps ; Producing two or more separate gas flows

Definitions

  • the present invention relates to a program update method for a gas compressor system that updates the program of the compressor while maintaining the supply of compressed gas at a predetermined pressure and flow rate.
  • Gas compressors that compress air and other gases are known to have wired/wireless network communication functions. For example, through remote monitoring using a server system via communication functions, the operating status can be grasped in real time 24 hours a day, 365 days a year. It is automatically sent to shorten the downtime of equipment.
  • Patent Document 1 discloses a program update method for a cooling system having a compressor that compresses a cooling medium, in which one of a plurality of device controllers is updated from one control program according to instructions from an integrated controller. Discloses that an update to another control program (“UD control program”) is performed.
  • UD control program another control program
  • Programs that operate gas compressors and programs that are used to monitor the above-mentioned operating status are updated on-site by service workers directly to the fluid machinery in accordance with the timing of non-working days and fluid machinery stoppages at the user's factory. It is implemented by loading the update program, and there is a problem that it takes time and cost. In this regard, it is possible to send an update program from a remote server to the fluid machine using the above-described monitoring function, etc. to automatically update the program, but the program update process requires stopping and restarting the fluid machine. There is also a problem that the supply of compressed gas is stopped during this time.
  • a plurality of gas compressors having a gas compressor main body and a control device for controlling the gas compressor main body by cooperation of a program and an arithmetic device, a discharge piping system connected to each of the plurality of compressed gases, and the plurality of and a management device for controlling the control device of the gas compressor, wherein at least one of the pressure and flow rate of the gas discharged from the discharge piping system is supplied based on a predetermined value.
  • the program updating method for a gas compressor system includes the step of driving the gas compressor other than the operating compressor to be updated of the program according to the predetermined value.
  • FIG. 5 is a flow chart showing an example of control according to the first embodiment
  • FIG. 11 is a flow chart showing a control example according to the second embodiment
  • FIG. 11 is a flow diagram showing a control example according to the third embodiment
  • FIGS. 1 and 2 The first embodiment will be described in detail with reference to FIGS. 1 and 2.
  • the same reference numerals are given to common parts, and redundant description may be omitted as appropriate.
  • the configuration of the gas compressor system 50 is shown in FIG.
  • the gas compressor system 50 includes a plurality of gas compressors, a first gas compressor 5, a second gas compressor 6, and a third gas compressor 7, a number control device 2 for controlling these, and a management system.
  • a server 1 and a management terminal 3 are provided.
  • the management server 1, the number-of-units control device 2, and the management terminal 3 are connected via a wired or wireless communication network 4, and are configured to be capable of communicating various control commands and feedback of control results.
  • the first gas compressor 5, the second gas compressor 6, and the third gas compressor 7 each include a compressor main body to which various types such as displacement type and centrifugal type can be applied.
  • Each gas compressor is, for example, an air compressor that sucks atmospheric air and produces compressed air.
  • a discharge piping system is connected to the first gas compressor 5 , the second gas compressor 6 , and the third gas compressor 7 . Compressed air from each gas compressor merges in the discharge piping system to provide the user with compressed air having a predetermined pressure and air volume. It should be noted that this embodiment can be applied to any configuration of a constant speed machine, a variable speed machine, or a mixture of these as each gas compressor.
  • the first gas compressor 5, the second gas compressor 6, and the third gas compressor 7 have a control function part by a calculation part and a program cooperating with this, and start each gas compressor , stop and various operation control can be performed. Further, the control function unit has a rewritable volatile and/or nonvolatile memory, and can store an update program in a program update process to be described later.
  • the number control device 2 has an arithmetic unit and a control function unit cooperating with this, and controls the first gas compressor 5, the second gas compressor 6, and the third gas compressor 6 via a wired or wireless communication line. It is a device that manages the operation schedule of the gas compressor 7 .
  • the operation schedule includes the number of gas compressors to be operated and the order of operation. For example, according to the pressure and amount of compressed air discharged from the discharge piping system, a command is sent to each gas compressor, and the number of compressors to be started and operated is set to 1 or 3, or a predetermined number of gas compressors is stopped or is set to no-load operation.
  • the number control device 2 also has a processing function of updating the control program of each gas compressor according to a program update processing command from the management server 1, which will be described later.
  • the management server 1 is a server device having an arithmetic unit and a control function unit that cooperates therewith.
  • the management terminal 3 is a terminal device that has an arithmetic unit and a control function unit that cooperates therewith and provides an input device and an output device for various types of information to the administrator of the gas compressor system.
  • the management server 1 and the management terminal 3 have a processing function of updating the control program of each gas compressor, which will be described later.
  • the management server 1 and the management terminal 3 are described as being separate units, but the functions of both may be integrated.
  • the communication network 4 is a network consisting of various wired/wireless communication formats such as LAN, BAN, Internet, and the like.
  • the management server 1 requests the number control device 2 to acquire the current version information of the program stored in each gas compressor, and acquires the current version information of the program. Even if the program version information of each gas compressor is stored in the number control device 2, the number control device 2 appropriately acquires the current version information stored in the memory of each gas compressor. Any of the aspects may be used.
  • the management server 1 compares the versions of the acquired current compressor program and determines whether or not there is an update. If there is update content, the management server 1 causes the management terminal 3 to output an update guide and information on whether or not the update is executable, and the process proceeds to S103. If there is no updated content, the status quo is maintained (S111).
  • S103 if the answer from the management terminal 3 is "YES (update execution)", the management server 1 proceeds to the processing of S104. If the answer from the management terminal 3 is "NO (updating is not possible)", the management server 1 advances to S112, waits for the update, and performs the management again at an arbitrary time (fixed time interval or random time interval). The terminal 3 outputs update guidance and information on whether or not it can be executed, and waits for a reply.
  • "in operation" of the gas compressor includes stop and no-load operation.
  • the management server 1 displays guidance A or B below on the management terminal 3 and waits for an answer.
  • A "Currently, the machine to be updated is in operation. Is it okay if we switch the operation of the stopped gas compressor for the update?"
  • B "Is it okay if we automatically switch the driving machine and the stopping machine for updating?” That is, the management server 1 stops the gas compressor other than the gas compressor to be updated among the first gas compressor 5, the second gas compressor 6, and the third gas compressor 7. If it is in operation, the management terminal 3 displays the guidance of A, and if all the gas compressors are in operation, the guidance of B is displayed. That is, while the gas compressor system is in operation, there is no need to stop the supply of compressed air due to updating the program.
  • the management server 1 proceeds to S105 (if all the gas compressors are in operation, stop the gas compressor to be updated). After it becomes possible to do so, the process proceeds to S105.). If the answer to A or B is "NO" (S113: NO), the management server 1 proceeds to the process of S115, specifies an update time or transmits update guidance to the management terminal 3 at arbitrary intervals, The process proceeds to S105 at the specified time or when the update instruction is answered.
  • the management server 1 performs program update processing for the update target compressor. If there is an update time specified in S113, the update process is performed at that time, or if there is an update execution command from the management terminal 3, the update process is performed.
  • Example 2 will be described.
  • the gas compressor to be updated is "in operation", that is, in full speed operation and no-load operation, the operation is switched to another stopped gas compressor or the operation is switched to another gas compressor.
  • the program is updated when switching becomes possible.
  • the program update of the compressor to be updated and which is stopped or in no-load operation is performed first.
  • FIG. 3 shows the processing flow of the second embodiment.
  • S213 differs from S113 in the first embodiment
  • the second embodiment will be described in particular with respect to this step. .
  • the management server 1 which determines in S104 that the gas compressor to be updated is not stopped (S104: NO), displays guidance C or D below on the management terminal 3 and waits for an answer.
  • C "The machine to be updated is currently in operation. Is it okay if we start the update from other gas compressors that are stopped or in no-load operation?"
  • D "Is it okay if we change the update order of the operating machine and the stopped machine for the update?" If the answer to C or D above is "YES" (S213: YES), the management server 1 proceeds to S105 (if the other gas compressor is in no-load operation, stop the gas compressor). After it becomes possible to perform the operation, the process proceeds to S105.). Also, the management server 1 does not have an answer to the above C or D. In the case of "NO” (S213: NO), the process proceeds to S115, the designation of the update time or the update guidance is transmitted to the management terminal 3 at arbitrary intervals, and the process proceeds to S105 at the specified time or when the update instruction is answered.
  • the management server 1 performs program update processing for the update target compressor. If the update time is specified in S113, the update process is performed at that time. Alternatively, when there is an update execution command from the management terminal 3, the update processing is executed.
  • No-load operation is generally performed when the required pressure and air volume at the demand destination of the compressed air through the discharge piping system are met. Therefore, even if the gas compressor during no-load operation is stopped, it can be said that the supply of compressed air to the demand side can be continued. In this manner, the present embodiment can efficiently perform program update processing without stopping the supply of compressed air.
  • Example 3 will be described.
  • the gas compressor to be updated is "in operation", that is, in full speed operation and no-load operation, the operation is switched to another stopped gas compressor or the operation is switched to another gas compressor.
  • the program is updated when switching becomes possible.
  • the program update of the gas compressor to be updated and which is stopped or in no-load operation is performed first.
  • the compressor to be updated when the gas compressor to be updated is in full-load operation and all the compressors to be updated are in full-load operation, the compressor to be updated that was previously stopped or operated without load.
  • FIG. 4 shows the processing flow of the third embodiment.
  • S313, S314, and S315 are mainly different in the third embodiment from those in the first or second embodiment, the steps will be described in particular, and common parts are denoted by the same reference numerals. and the description may be omitted as appropriate.
  • the management server 1 having determined in S104 that the gas compressors to be updated are not stopped (S104: NO), determines whether all the gas compressors are in full load operation. If all machines are in full-load operation (S313: YES), the process proceeds to S314. If there is a gas compressor that is stopped or in no-load operation (S313: NO), the management server 1 proceeds to S105 and executes program update processing for the gas compressor that is stopped or in no-load operation.
  • the management server 1 displays guidance for E or F below on the management terminal 3 and waits for an answer.
  • E "Currently, all machines to be updated are running at full load. Is it okay if we start with the gas compressor that has stopped or is in no-load operation first?”
  • F "Is it okay if we start with the gas compressor that has been stopped or is in no-load operation for renewal?”
  • S314: YES the management server 1 proceeds to S105 and updates the program of the gas compressor that is to be updated and that has stopped earlier. If the answer to E or F is "NO" (S314: NO), the management server 1 proceeds to S315 and displays on the management terminal 3 a request for specifying a time to update the program or guidance on updating at arbitrary time intervals. do. If there is a response of the specified time, the program is updated at the specified time, and if there is a request for program update, the update is performed immediately.
  • the program when there is no other gas compressor that is stopped or in no-load operation, the program can be updated from the first gas compressor that has stopped or been in no-load operation. It is possible to efficiently update the program of the gas compressor while maintaining the supply of air from the gas compressor.
  • the configuration of the gas compressor system has been described as a form in which the management server 1, the number control device 2, and the management terminal 3 control communication via the communication network 4, but these are functionally integrated. It may be configured as follows.
  • an air compressor is illustrated as a gas compressor, but the present invention can also be applied to compressor systems that compress other media.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Control Of Positive-Displacement Pumps (AREA)
  • Applications Or Details Of Rotary Compressors (AREA)
  • Stored Programmes (AREA)

Abstract

気体圧縮機本体及び該気体圧縮機本体をプログラムと演算装置の協働によって制御する制御装置を有する複数の気体圧縮機と、前記複数の圧縮気体の夫々と接続した吐出配管系統と、前記複数の気体圧縮機の制御装置を制御する管理装置とを備え、前記吐出配管系統から吐き出される気体の圧力及び流量のうち少なくとも一方を所定値に基づいて供給する気体圧縮機システムのプログラム更新方法であって、前記管理装置が、更新用プログラムを取得するステップと、前記複数の気体圧縮機の内、プログラムの更新対象となる稼働中の圧縮機についてプログラムを更新するステップと、前記複数の気体圧縮機の内、前記プログラムの更新対象となる稼働中の圧縮機とは異なる他の前記気体圧縮機を前記所定値に応じて駆動するステップとを含む。

Description

気体圧縮機システムのプログラム更新方法
 本発明は、所定圧力や流量の圧縮気体の供給を維持したままで、圧縮機のプログラム更新を行う気体圧縮機システムのプログラム更新方法に関する。
 空気を始め気体を圧縮する気体圧縮機は、有線/無線によるネットワーク通信機能を有するものが知られている。例えば通信機能を介したサーバシステムを利用した遠隔監視で24時間365日リアルタイムに稼働状況を把握するとともに、状況監視により圧縮機設備の設置環境の問題を抽出し、電子メールやメッセージ機能による警報を自動送信し、設備のダウンタイム短縮を図っている。
 このような監視機能には、気体圧縮機の制御プログラムの更新処理もある。例えば、特許文献1は、冷却媒体の圧縮を行う圧縮機を備える冷却システムのプログラム更新方法であって、複数の機器コントローラのうち一の機器コントローラは、統合コントローラの指示に従って、一の制御プログラムから他の制御プログラム(「UD用制御プログラム」)へのアップデートを実行する旨を開示する。
特開2010-277367号公報
 気体圧縮機を動作させるプログラムや上記稼働状況の監視等に使用するプログラムの更新は、例えばユーザである工場の運休日及び流体機械停止のタイミングに合わせて、サービス作業員が現地で流体機械に直接更新プログラムを読み込ませることで実施しており、時間とコストが掛かるという課題がある。この点、上述の監視機能等を利用して遠隔サーバから流体機械に更新用のプログラムを送信して自動的に更新することもできるが、プログラムの更新処理には流体機械の停止及び再起動が必要であり、この間、圧縮気体の供給が停止するという課題もある。
 上記課題を解決するために、例えば、以下の構成を適用する。即ち気体圧縮機本体及び該気体圧縮機本体をプログラムと演算装置の協働によって制御する制御装置を有する複数の気体圧縮機と、前記複数の圧縮気体の夫々と接続した吐出配管系統と、前記複数の気体圧縮機の制御装置を制御する管理装置とを備え、前記吐出配管系統から吐き出される気体の圧力及び流量のうち少なくとも一方を所定値に基づいて供給する気体圧縮機システムのプログラム更新方法であって、前記管理装置が、更新用プログラムを取得するステップと、前記複数の気体圧縮機の内、プログラムの更新対象となる稼働中の圧縮機についてプログラムを更新するステップと、前記複数の気体圧縮機の内、前記プログラムの更新対象となる稼働中の圧縮機とは異なる他の前記気体圧縮機を前記所定値に応じて駆動するステップとを含む気体圧縮機システムのプログラム更新方法である。
 本発明によれば、プログラムの更新処理時に、所定値(設定圧力や流量)に応じた圧縮気体の供給を維持しつつ自動的にソフト更新を行う。本発明の他の課題・構成・効果は、以下の記載から明らかになる。
本発明を適用した実施形態に係る概略構成を示す模式図である。 実施例1による制御例を示すフロー図である。 実施例2による制御例を示すフロー図である。 実施例3による制御例を示すフロー図である。
 以下、発明を実施するための形態について、図面を用いて説明する。
 実施例1を図1及び図2を参照しながら詳細に説明する。なお、以下に示す各図において、共通する部分には同一の参照符号を付し、重複した説明を適宜省略する場合がある。
 図1に、気体圧縮機システム50の構成を示す。気体圧縮機システム50は、第1の気体圧縮機5、第2の気体圧縮機6、及び第3の気体圧縮機7という複数の気体圧縮機と、これらを制御する台数制御装置2と、管理サーバ1と、管理端末3とを備える。管理サーバ1と、台数制御装置2と、管理端末3とは有線又は無線からなる通信網4を介して接続され、種々の制御指令や制御結果のフィードバックが通信可能に構成される。
 第1の気体圧縮機5、第2の気体圧縮機6、及び第3の気体圧縮機7は、容積型や遠心式といった種々の型式を適用可能な圧縮機本体を夫々備える。各気体圧縮機は、例えば大気を吸い込んで圧縮空気を生成する空気圧縮機である。第1の気体圧縮機5、第2の気体圧縮機6、及び第3の気体圧縮機7には、吐出配管系統が接続される。吐出配管系統において各気体圧縮機からの圧縮空気が合流し、所定の圧力及び空気量の圧縮空気をユーザに提供する。
  なお、本実施例は、各気体圧縮機として一定速機、可変速機或いはこれらの混載のいずれの構成であっても適用することができる。
 第1の気体圧縮機5、第2の気体圧縮機6、及び第3の気体圧縮機7は、演算部及びこれと協働とするプログラムによって制御機能部を有し、各気体圧縮機の起動、停止及び各種運転制御制御を行うことができるようになっている。また、制御機能部は、再書き込み可能な揮発及び/又は不揮発メモリを有し、後述するプログラム更新処理において、更新プログラムを記憶することができるようになっている。
 台数制御装置2は、演算部及びこれと協働する制御機能部を有し、有線又は無線の通信線を介して第1の気体圧縮機5、第2の気体圧縮機6、及び第3の気体圧縮機7の稼働スケジュールを管理する装置である。稼働スケジュールには、稼働する気体圧縮機の台数や稼働順等を含む。例えば、吐出配管系統から吐き出される圧縮空気の圧力や量に応じて、各気体圧縮機に指令を送信し、圧縮機の起動及び稼働台数を1台或いは3台としたり、所定台数の気体圧縮機を停止或いは無負荷運転としたりするようになっている。また、台数制御装置2は、後述する管理サーバ1からのプログラム更新処理指令に応じて、各気体圧縮機の制御プロブラムを更新する処理機能を有する。
 管理サーバ1は、演算部及びこれと協働する制御機能部を有するサーバ装置である。また、管理端末3は、演算部及びこれと協働する制御機能部を有するとともに気体圧縮機システムの管理者に対して各種情報の入力装置と出力装置を提供する端末装置である。管理サーバ1及び管理端末3は、後述する各気体圧縮機の制御プロブラムを更新する処理機能を有する。
  なお、本実施例では、管理サーバ1と管理端末3は別体の構成として説明するが、両者の機能を一体とした構成であってもよい。
 通信網4は、例えば、LAN、BAN、インターネット等といった種々の有線/無線の通信型式からなるネットワークである。
 次いで、図2を用いて、本実施例によるプログラム更新処理を説明する。
 S100で、管理サーバ1は、台数制御装置2に、各気体圧縮機に記憶されているプログラムの現状のバージョン情報の取得要求を行い、プログラムの現状のバージョン情報を取得する。なお、各気体圧縮機のプログラムのバージョン情報は、台数制御装置2に記憶する態様であっても、各気体圧縮機のメモリに記憶された現状のバージョン情報を、台数制御装置2が適宜取得する態様のいずれであってもよい。
 S102で、管理サーバ1は、取得した現状の圧縮機プログラムのバージョン比較を行い、更新内容が有るか無いかを判定する。管理サーバ1は、更新内容有りの場合、管理端末3に、更新案内及び実行可否の情報を出力させ、S103に移行する。更新内容無しの場合は現状維持とする(S111)。
 S103で、管理サーバ1は、管理端末3からの回答が「YES(更新実施)」である場合、S104の処理に進む。また、管理サーバ1は、管理端末3からの回答が「NO(更新不可)である場合はS112に進み、更新を待機として任意時間(一定の時間間隔或いはランダムの時間間隔)で、再度、管理端末3に更新案内及び実行可否の情報を出力し、回答を待機する。
 S104で、管理サーバ1は、各気体圧縮機の稼働状況を確認し、更新対象機が更新可能な状態(停止中=更新可能)である場合には(S104:YES)、S105に進む。管理サーバ1は、更新可能な状態でない場合(稼働中=更新不可)には(S104:NO)、S113に進む。なお、本実施例において、気体圧縮機の「稼働中」とは、停止及び無負荷運転を含むものとする。
 S113で、管理サーバ1は、管理端末3に以下A又はBの案内を表示し、回答を待機する。
 A:「現在更新対象機が運転中です。更新のために停止中の気体圧縮機と運転を切り替えますがよろしいでしょうか?」
 B:「更新のために運転機及び停止機を自動切り替えする場合がございますがよろしいでしょうか?」
 つまり、管理サーバ1は、第1の気体圧縮機5、第2の気体圧縮機6、及び第3の気体圧縮機7のうち、更新対象とする気体圧縮機と異なる他の気体圧縮機が停止中である場合にはAの案内を管理端末3に表示させ、全ての気体圧縮機が稼働中の場合には、Bの案内を表示する。即ち気体圧縮機システムが稼働中に、プログラム更新に起因する圧縮空気の供給を停止させることが無い。
 管理サーバ1は、上記A又はBに対する回答が、「YES」の場合(S113:YES)、S105に進む(全ての気体圧縮機が稼働中の場合には、更新対象の気体圧縮機を停止させることができるようになってからS105に進む。)。また、管理サーバ1は、上記A又はBに対する回答が「NO」の場合(S113:NO)、S115の処理に進み、管理端末3に更新時間の指定、又は更新案内を任意間隔で送信し、指定された時間或いは更新指示回答時にS105に進む。
 S105で、管理サーバ1は、更新対象の圧縮機のプログラム更新処理を行う。S113において更新時間の指定がある場合は、当該時間に更新処理を実施する、または、管理端末3から更新実施指令がある場合には、更新処理を実施する。
 このように、本実施例によれば、気体圧縮機システムシステムから圧縮空気の供給を停止することなくプログラムの更新処理を効率的に行うことができる。更には、気体圧縮気システムの管理者の意に反してプログラム更新処理が行われることを防止することができる。
 次いで、実施例2を説明する。 実施例1では、更新対象の気体圧縮機が「稼働中」即ち全速運転及び無負荷運転中の場合には、他の停止中の気体圧縮機に運転の切替又は他の気体圧縮機に運転の切替ができるようになったタイミングで、プログラムの更新を行うことを特徴の一つとした。実施例2は、更新対象の気体圧縮機が全速運転中である場合、更新対象且つ停止中又は無負荷運転中の圧縮機のプログラム更新を先に実行することを特徴の一つとする。
 図3に、実施例2の処理の流れを示す。なお、以下の説明において、実施例2は、S213が実施例1のS113と異なる為、当該ステップについて特に説明し、共通する部分には同一の参照符号を付し説明を適宜省略する場合がある。
 S213で、S104で更新対象の気体圧縮機が停止中でない(S104:NO)と判断した管理サーバ1は、管理端末3に以下C又はDの案内を表示し、回答を待機する。
 C:「現在更新対象機が運転中です。他の停止中又は無負荷運転中の気体圧縮機から更新を行いますがよろしいでしょうか?」
 D:「更新のために運転機及び停止機の更新順番を切り替える場合がございますがよろしいでしょうか?」
 管理サーバ1は、上記C又はDに対する回答が、「YES」の場合(S213:YES)、S105に進む(他の気体圧縮機が無負荷運転中である場合には、当該気体圧縮機を停止させることができるようになってからS105に進む。)。また、管理サーバ1は、上記C又はDに対する回答が。「NO」の場合(S213:NO)、S115の処理に進み、管理端末3に更新時間の指定又は更新案内を任意間隔で送信し、指定された時間或いは更新指示回答時にS105に進む。
 S105で、管理サーバ1は、更新対象の圧縮機のプログラム更新処理を行う。S113において更新時間の指定がある場合は、当該時間に更新処理を実施する。または、管理端末3から更新実施指令がある場合には、更新処理を実施する。
 無負荷運転は、一般に、吐出配管系統を介した圧縮空気の需要先での要求圧力・空気量を満たしているときに行う運転である。したがって、無負荷運転中の気体圧縮機を停止させても需要先への圧縮空気の供給を継続することができる状態といえる。このように、本実施例は、圧縮空気の供給を止めることなくプログラムの更新処理を効率的に実施することができる。
 次いで、実施例3を説明する。実施例1では、更新対象の気体圧縮機が「稼働中」即ち全速運転及び無負荷運転中の場合には、他の停止中の気体圧縮機に運転の切替又は他の気体圧縮機に運転の切替ができるようになったタイミングで、プログラムの更新を行うことを特徴の一つとした。実施例2では、更新対象の気体圧縮機が全速運転中である場合、更新対象且つ停止中又は無負荷運転中の気体圧縮機のプログラム更新を先に実行することを特徴の一つとした。
 実施例3は、更新対象の気体圧縮機が全負荷運転中であり且つ更新対象の全ての圧縮機が全負荷運転中である場合に、先に停止或いは無負荷運転となった更新対象の圧縮機からプログラムの更新を行うことを特徴の一つとする。
 図4に、実施例3の処理の流れを示す。なお、以下の説明において、実施例3は、S313、S314、S315が実施例1又は実施例2と比べて、主に異なる為、当該ステップについて特に説明し、共通する部分には同一の参照符号を付し説明を適宜省略する場合がある。
 S313で、S104において更新対象の気体圧縮機が停止中でない(S104:NO)と判断した管理サーバ1は、全ての気体圧縮機が全負荷運転中であるか否かを判断する。全機が全負荷運転中である場合(S313:YES)、S314に進む。管理サーバ1は、停止或いは無負荷運転中の気体圧縮機がある場合(S313:NO)、S105に進み、当該停止或いは無負荷運転中の気体圧縮機についてプログラムの更新処理を実行する。
 S314で、管理サーバ1は、管理端末3に以下E又はFの案内を表示し、回答を待機する。
 E:「現在更新対象機が全て全負荷運転中です。先に停止或いは無負荷運転となった気体圧縮機から更新を行いますがよろしいでしょうか?」
 F:「更新のために停止或いは無負荷運転になった気体圧縮機から更新を行う場合がございますがよろしいでしょうか?」
 S314で、E又はFへの回答が「YES」(S314:YES)の場合、管理サーバ1は、S105に進み、更新対象であり、且つ先に停止した気体圧縮機のプログラム更新を行う。また、E又はFの回答が「NO」(S314:NO)の場合、管理サーバ1は、S315に進み、プログラム更新を行う時間指定の要求又は任意時間間隔で更新の案内を管理端末3に表示する。指定時間の回答がある場合には、当該指定時間にプログラム更新を行い、プログラム更新の実施要求がある場合には、即時更新を行う。
 このように本実施例によれば、他に停止或いは無負荷運転中の気体圧縮機が無い場合、先に停止或いは無負荷運転となった気体圧縮機からプログラムの更新処理を行うことができ、気体圧縮機からの空気の供給を維持しつつ効率的に気体圧縮機のプログラム更新を行うことができる。
 以上、本発明の実施形態について説明したが、本発明は上記種々の例に限定されるものではなく、その趣旨を逸脱しない範囲で種々の変更が可能である。例えば、他の実施例の内容の一部を他の実施例の一部と置換することも可能である。
 特に、本実形例では、気体圧縮機システムの構成を管理サーバ1、台数制御装置2、管理端末3が通信網4を介して通信制御する態様として説明したが、これらが機能的に一体となる構成であってもよい。
 また、本実施例では、気体圧縮機として空気圧縮機を例示したが、本発明は他の媒体を圧縮する圧縮機システムにも適用することができる。
1…管理サーバ、2…台数制御装置、3…管理端末、4…通信網、5…第1の気体圧縮機、6…第2の気体圧縮機、7…第3の気体圧縮機

Claims (5)

  1.  気体圧縮機本体及び該気体圧縮機本体をプログラムと演算装置の協働によって制御する制御装置を有する複数の気体圧縮機と、前記複数の圧縮気体の夫々と接続した吐出配管系統と、前記複数の気体圧縮機の制御装置を制御する管理装置とを備え、前記吐出配管系統から吐き出される気体の圧力及び流量のうち少なくとも一方を所定値に基づいて供給する気体圧縮機システムのプログラム更新方法であって、
     前記管理装置が、更新用プログラムを取得するステップと、
     前記複数の気体圧縮機の内、プログラムの更新対象となる稼働中の圧縮機についてプログラムを更新するステップと、
     前記複数の気体圧縮機の内、前記プログラムの更新対象となる稼働中の圧縮機とは異なる他の前記気体圧縮機を前記所定値に応じて駆動するステップと
     を含む気体圧縮機システムのプログラム更新方法。
  2. 請求項1に記載の気体圧縮機システムのプログラム更新方法であって、
    前記他の圧縮機が、停止中の圧縮機である気体圧縮機システムのプログラム更新方法。
  3. 請求項1に記載の気体圧縮機システムのプログラム更新方法であって、
    前記他の圧縮機が、無負荷運転中の圧縮機である気体圧縮機システムのプログラム更新方法。
  4. 請求項1に記載の気体圧縮機システムのプログラム更新方法であって、
    前記プログラムの更新対象となる稼働中の圧縮機以外の前記他の圧縮機が全負荷運転中であるときに、先に停止或いは無負荷運転となった更新処理対象の圧縮機についてプログラムを更新するステップを含む気体圧縮機システムのプログラム更新方法。
  5. 請求項1に記載の気体圧縮機システムのプログラム更新方法であって、
     前記プログラムの更新対象となる稼働中の圧縮機についてプログラムを更新するステップを実行する前に、前記他の気体圧縮機を前記所定値に応じて駆動することの可否を案内及び当該可否への回答を受け付ける情報を外部出力するステップを含む気体圧縮機システムのプログラム更新方法。
PCT/JP2021/047441 2021-01-19 2021-12-21 気体圧縮機システムのプログラム更新方法 Ceased WO2022158229A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202180075893.4A CN116529485A (zh) 2021-01-19 2021-12-21 气体压缩机系统的程序更新方法
US18/261,976 US12352259B2 (en) 2021-01-19 2021-12-21 Program update method for the gas compressor system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-006199 2021-01-19
JP2021006199A JP7482052B2 (ja) 2021-01-19 2021-01-19 気体圧縮機システムのプログラム更新方法

Publications (1)

Publication Number Publication Date
WO2022158229A1 true WO2022158229A1 (ja) 2022-07-28

Family

ID=82548239

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/047441 Ceased WO2022158229A1 (ja) 2021-01-19 2021-12-21 気体圧縮機システムのプログラム更新方法

Country Status (4)

Country Link
US (1) US12352259B2 (ja)
JP (1) JP7482052B2 (ja)
CN (1) CN116529485A (ja)
WO (1) WO2022158229A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2025238917A1 (ja) * 2024-05-13 2025-11-20 株式会社日立産機システム 圧縮機システムおよびプログラムの更新方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12493273B2 (en) * 2021-03-01 2025-12-09 Applied Materials, Inc. Input/output (IO) handling during update process for manufacturing system controller

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010277367A (ja) * 2009-05-28 2010-12-09 Sanyo Electric Co Ltd 統合管理システム、統合管理方法、統合管理装置及び統合管理プログラム
WO2019044553A1 (ja) * 2017-08-28 2019-03-07 株式会社日立産機システム 流体機械、流体機械の管理方法及び流体機械管理システム
WO2020084939A1 (ja) * 2018-10-26 2020-04-30 株式会社日立産機システム 気体圧縮機
JP2020143858A (ja) * 2019-03-07 2020-09-10 株式会社ノーリツ マルチ給湯システム

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7179673B2 (ja) * 2019-04-24 2022-11-29 株式会社日立産機システム 圧縮空気製造設備、圧縮空気の目標圧調整方法、および圧縮空気の目標圧調整プログラム
US20210216306A1 (en) * 2020-01-09 2021-07-15 Myomega Systems Gmbh Secure deployment of software on industrial control systems
TW202230116A (zh) * 2020-12-11 2022-08-01 美商視野公司 多組件網路中之組件更新

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010277367A (ja) * 2009-05-28 2010-12-09 Sanyo Electric Co Ltd 統合管理システム、統合管理方法、統合管理装置及び統合管理プログラム
WO2019044553A1 (ja) * 2017-08-28 2019-03-07 株式会社日立産機システム 流体機械、流体機械の管理方法及び流体機械管理システム
WO2020084939A1 (ja) * 2018-10-26 2020-04-30 株式会社日立産機システム 気体圧縮機
JP2020143858A (ja) * 2019-03-07 2020-09-10 株式会社ノーリツ マルチ給湯システム

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2025238917A1 (ja) * 2024-05-13 2025-11-20 株式会社日立産機システム 圧縮機システムおよびプログラムの更新方法

Also Published As

Publication number Publication date
JP7482052B2 (ja) 2024-05-13
US12352259B2 (en) 2025-07-08
US20240068466A1 (en) 2024-02-29
CN116529485A (zh) 2023-08-01
JP2022110660A (ja) 2022-07-29

Similar Documents

Publication Publication Date Title
WO2022158229A1 (ja) 気体圧縮機システムのプログラム更新方法
JP6116682B2 (ja) 空調システム
UA41988C2 (uk) Спосіб управління системою стиснення газу (варіанти) та пристрій для його здійснення (варіанти)
CN113983658B (zh) 一种室内负压环境下主备用排风机切换系统及方法
US11536264B2 (en) Gas compressor
CN116610351A (zh) 服务端热升级方法、终端设备及计算机可读存储介质
JP2023078562A (ja) 空調システム管理装置および空調システム管理方法
US10295978B2 (en) Engineering device, engineering system, and download processing method
CN210715022U (zh) 一种用于组合气泵的plc自动化控制系统
JP7302633B2 (ja) 設定システム、設定装置、設定方法及び設定プログラム
NO832944L (no) Anlegg til fremstilling av kjemiske stoffer og fremgangsmaate ved styring av kjemiske produksjonsanlegg
CN114423944A (zh) 管理压缩机的方法
JPH11224107A (ja) 2つ以上の製造ユニットの制御方法
KR101372535B1 (ko) 공기조화기 및 그 동작방법
US20220035349A1 (en) Controllers of a vacuum pumping and/or abatement system
CN114035634A (zh) 生产车间冷却循环水自动控温控压方法
CN116379351B (zh) 一种输油管道的自动优化调量方法及系统
JPWO2022168270A5 (ja)
CN116146473B (zh) 空压机的控制方法、设备控制方法、装置及设备
CN119642323B (zh) 空调控制方法、装置、集控设备和计算机可读存储介质
JP7341329B2 (ja) 冷凍サイクルシステムおよび冷凍サイクル装置
JP2016009208A (ja) コントローラ
JPS5874883A (ja) 圧縮機の台数制御装置
JP7006652B2 (ja) 圧縮空気供給システムの制御方法および制御装置
CN121401741A (zh) 一种切割液集中过滤的轮转控制方法及系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21921330

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 202180075893.4

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 18261976

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21921330

Country of ref document: EP

Kind code of ref document: A1

WWG Wipo information: grant in national office

Ref document number: 18261976

Country of ref document: US