Prior art date
Application number
PCT/CN2021/135414
Other languages
French (fr)
Chinese (zh)
Inventor
王胡成
Original Assignee
大唐移动通信设备有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大唐移动通信设备有限公司 filed Critical 大唐移动通信设备有限公司
Publication of WO2022156384A1 publication Critical patent/WO2022156384A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Embodiments of the present disclosure provide a data processing method and apparatus, a base station, a network device, and a storage medium. The method comprises: according to a session management function (SMF) network element indication or after determining that a backhaul is provided by a satellite to a protocol data unit (PDU) session, determining whether a core network packet delay budget (CN PDB) or a backhaul delay satisfies a preset delay budget (PDB) requirement or not; and if not, sending a notification message carrying the value of the CN PDB to an SMF serving the PDU session, the notification message being used for notifying the SMF to request a policy control function (PCF) network element to update a QoS parameter according to the CN PDB. The backhaul delay detection is performed according to the change of the backhaul connection, and QoS modification is triggered in time, thereby avoiding service interruption.

Description

数据处理方法、装置、基站、网络设备及存储介质Data processing method, device, base station, network equipment and storage medium
相关申请的交叉引用CROSS-REFERENCE TO RELATED APPLICATIONS
本申请要求于2021年01月25日提交的申请号为202110096966X,发明名称为“数据处理方法、装置、基站、网络设备及存储介质”的中国专利申请的优先权,其通过引用方式全部并入本文。This application claims the priority of the Chinese patent application with the application number 202110096966X filed on January 25, 2021 and the invention title is "Data Processing Method, Apparatus, Base Station, Network Equipment and Storage Medium", which is fully incorporated by reference This article.
技术领域technical field
本公开涉及通信技术领域,尤其涉及一种数据处理方法、装置、基站、网络设备及存储介质。The present disclosure relates to the field of communication technologies, and in particular, to a data processing method, an apparatus, a base station, a network device, and a storage medium.
背景技术Background technique
目前第五代移动通信技术5G(fifith-generation)网络支持卫星回传,5G基站gNB(next generation node B)可通过卫星链路satellite link连接5G核心网5GC(fifith-generation Core Network)。At present, the fifth-generation mobile communication technology 5G (fifith-generation) network supports satellite backhaul, and the 5G base station gNB (next generation node B) can connect to the 5G core network 5GC (fifith-generation Core Network) through the satellite link satellite link.
gNB从近地轨道卫星LEO SAT(Low Earth orbit satellite)连接5GC,因为卫星间链路的变化,导致回传网络的数据回传时延发生变化。这种时延的变化可能导致当前的QoS参数无法满足。现有技术依赖于用户面功能网元UPF(User Plane Function)定期检查用户面连接的时延,然后通过事件上报给会话管理功能网元SMF(Session Management Function)。这种方法无法及时检测到gNB和UPF之间的时延变化,导致gNB仍然会按照原来的分组包时延预算AN PDB来调度空口传输,这样服务质量流QoS flow的端到端QoS无法保证,甚至导致业务中断。The gNB is connected to 5GC from the low earth orbit satellite LEO SAT (Low Earth orbit satellite). Due to the change of the inter-satellite link, the data backhaul delay of the backhaul network changes. This delay change may cause the current QoS parameters to be unsatisfied. The prior art relies on the user plane function network element UPF (User Plane Function) to periodically check the delay of the user plane connection, and then reports it to the session management function network element SMF (Session Management Function) through events. This method cannot detect the delay change between the gNB and the UPF in time, so that the gNB still schedules the air interface transmission according to the original packet delay budget AN PDB, so the end-to-end QoS of the QoS flow cannot be guaranteed. even lead to business interruption.
发明内容SUMMARY OF THE INVENTION
本公开实施例提供一种数据处理方法、装置、基站、网络设备及存储介质,用以解决现有技术无法根据回传网络的变化进行QoS参数的调整的问题。Embodiments of the present disclosure provide a data processing method, apparatus, base station, network device, and storage medium, so as to solve the problem that QoS parameters cannot be adjusted according to changes in the backhaul network in the prior art.
为解决上述问题,具体的,本公开实施例提供了以下技术方案:To solve the above problems, specifically, the embodiments of the present disclosure provide the following technical solutions:
第一方面,本公开实施例提供一种数据处理方法,应用于基站,包括:In a first aspect, an embodiment of the present disclosure provides a data processing method, applied to a base station, including:
根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements after the session management function network element SMF instructs or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. If not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF to update the QoS according to the CN PDB parameter.
可选的,所述确定使用卫星为PDU会话提供回传,包括:Optionally, the determining using satellite to provide backhaul for the PDU session, including:
根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
可选的,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Optionally, the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U to send a backhaul request message on a preset tunnel, and is determined according to the time of the received backhaul response message. of;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
可选的,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:Optionally, determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
第二方面,本公开实施例还提供了一种数据处理方法,应用于会话管理功能网元SMF,包括:In a second aspect, an embodiment of the present disclosure further provides a data processing method, which is applied to a session management function network element SMF, including:
接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;Receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the core network packet delay budget; wherein, the notification message is when the base station determines that the CN PDB does not meet the preset delay budget PDB requirement sent;
根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新 QoS参数。According to the notification message, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
可选的,所述CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Optionally, the CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U sending a backhaul request message on a preset tunnel, and is determined according to the time of the received backhaul response message;
或,向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, send the Internet Internet Control Message Protocol ICMP packet to the opposite end UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and it is determined according to the receiving time of the ICMP packet.
第三方面,本公开实施例还提供了一种数据处理方法,应用于会话管理功能网元SMF,包括:In a third aspect, an embodiment of the present disclosure further provides a data processing method, which is applied to a session management function network element SMF, including:
当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;After determining that the satellite is used as the backhaul, send an indication message to the base station or the user plane functional network element UPF, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB.
可选的,所述确定卫星作为回传,包括:Optionally, the determining of the satellite as the return transmission includes:
根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
第四方面,本公开实施例还提供了一种数据处理方法,应用于用户面功能网元UPF,包括:In a fourth aspect, an embodiment of the present disclosure further provides a data processing method, which is applied to a user plane function network element UPF, including:
接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;After receiving the instruction message sent by the session management function network element SMF, send a return request message;
将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF determines whether it satisfies the core network packet delay budget CN PDB or backhaul delay carried in the backhaul response message. The preset delay budget PDB requirements, if not satisfied, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
可选的,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,包括:Optionally, the SMF determines whether the preset delay budget PDB requirement is met according to the core network packet delay budget CN PDB or the return delay carried in the return response message, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB 是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
第五方面,本公开实施例还提供了一种数据处理装置,应用于基站,包括:In a fifth aspect, an embodiment of the present disclosure further provides a data processing apparatus, applied to a base station, including:
第一处理模块,用于根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The first processing module is configured to determine whether the core network packet delay budget CN PDB or the return delay meets the preset requirements after the session management function network element SMF indicates or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. Delay budget PDB requirements, if not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, the notification message is used to notify the SMF to request the policy control function network element PCF according to The CN PDB updates QoS parameters.
第六方面,本公开实施例还提供了一种数据处理装置,应用于会话管理功能网元SMF,包括:In a sixth aspect, an embodiment of the present disclosure further provides a data processing apparatus, which is applied to a session management function network element SMF, including:
第二接收模块,用于接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;The second receiving module is configured to receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the packet delay budget of the core network; wherein, the notification message is that the base station determines that the CN PDB is not satisfied Sent when the preset delay budget PDB is required;
第二处理模块,用于根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。The second processing module is configured to, according to the notification message, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
第七方面,本公开实施例还提供了一种数据处理装置,应用于会话管理功能网元SMF,包括:In a seventh aspect, an embodiment of the present disclosure further provides a data processing apparatus, which is applied to a session management function network element SMF, including:
第二发送模块,用于当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;The second sending module is configured to send an indication message to the base station or the user plane function network element UPF after determining that the satellite is used as the backhaul, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
第三处理模块,用于确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The third processing module is used to determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, requesting the policy control function network element PCF according to the CN PDB , to update the QoS parameters.
第八方面,本公开实施例还提供了一种数据处理装置,应用于用户面功能网元UPF,包括:In an eighth aspect, an embodiment of the present disclosure further provides a data processing apparatus, which is applied to a user plane function network element UPF, including:
第三发送模块,用于接收会话管理功能网元SMF发送的指示消息后, 发送回传请求消息;a third sending module, configured to send a return request message after receiving the instruction message sent by the session management function network element SMF;
第四接收模块,用于接收响应于所述回传请求消息的回传响应消息;a fourth receiving module, configured to receive a return response message in response to the return request message;
第四处理模块,用于将所述回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The fourth processing module is configured to send the backhaul response message to the SMF, and the SMF determines whether to The preset delay budget PDB requirements are met, and if not, the policy control function network element PCF is requested to update the QoS parameters according to the CN PDB.
第九方面,本公开实施例还提供了一种基站,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现如下步骤:In a ninth aspect, an embodiment of the present disclosure further provides a base station, including a memory, a processor, and a computer program stored in the memory and running on the processor, where the processor implements the following steps when executing the computer program:
根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements after the session management function network element SMF instructs or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. If not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF to update the QoS according to the CN PDB parameter.
第十方面,本公开实施例还提供了一种会话管理功能网元SMF,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现如下步骤:In a tenth aspect, an embodiment of the present disclosure further provides a session management function network element SMF, including a memory, a processor, and a computer program stored in the memory and executable on the processor, where the processor executes the computer program When implementing the following steps:
接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;Receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the core network packet delay budget; wherein, the notification message is when the base station determines that the CN PDB does not meet the preset delay budget PDB requirement sent;
根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。According to the notification message, the policy control function network element PCF is requested to update the QoS parameters according to the CN PDB.
第十一方面,本公开实施例还提供了一种会话管理功能网元SMF,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现如下步骤:In an eleventh aspect, an embodiment of the present disclosure further provides a session management function network element SMF, including a memory, a processor, and a computer program stored in the memory and executable on the processor, where the processor executes the computer The program implements the following steps:
当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;After determining that the satellite is used as the backhaul, send an indication message to the base station or the user plane functional network element UPF, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延 预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB.
第十二方面,本公开实施例还提供了一种用户面功能网元UPF,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现如下步骤:In a twelfth aspect, an embodiment of the present disclosure further provides a user plane functional network element UPF, including a memory, a processor, and a computer program stored in the memory and executable on the processor, where the processor executes the computer The program implements the following steps:
接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;After receiving the instruction message sent by the session management function network element SMF, send a return request message;
将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF determines whether it satisfies the core network packet delay budget CN PDB or backhaul delay carried in the backhaul response message. The preset delay budget PDB requirements, if not satisfied, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
第十三方面,本公开实施例还提供了一种处理器可读存储介质,所述处理器可读存储介质存储有计算机程序,所述计算机程序用于使所述处理器执行如上所述第一方面或第二方面或第三方面或第四方面所述的数据处理方法的步骤。In a thirteenth aspect, an embodiment of the present disclosure further provides a processor-readable storage medium, where the processor-readable storage medium stores a computer program, and the computer program is used to cause the processor to execute the above-mentioned first The steps of the data processing method described in one aspect or the second aspect or the third aspect or the fourth aspect.
本公开实施例提供的数据处理方法、装置、基站、网络设备及存储介质,根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务PDU会话的SMF发送携带有CN PDB取值的通知消息,通知消息用于通知SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。本公开实施例根据回传连接的变化进行回传时延探测,并及时触发QoS修改,从而避免业务中断。The data processing method, device, base station, network device, and storage medium provided by the embodiments of the present disclosure determine the core network packet delay after the session management function network element SMF instructs or determines to use satellite to provide backhaul for the protocol data unit PDU session. Whether the budget CN PDB or return delay meets the preset delay budget PDB requirements, if not, a notification message carrying the CN PDB value is sent to the SMF serving the PDU session, and the notification message is used to notify the SMF to request policy control The functional network element PCF updates the QoS parameters according to the CN PDB. The embodiments of the present disclosure perform backhaul delay detection according to changes in backhaul connections, and trigger QoS modification in time, thereby avoiding service interruption.
附图说明Description of drawings
为了更清楚地说明本公开实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作一简单地介绍,显而易见地,下面描述中的附图是本公开的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the embodiments of the present disclosure or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are some embodiments of the present disclosure, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.
图1是当卫星作为回传时5G网络的部署示意图;Figure 1 is a schematic diagram of the deployment of a 5G network when a satellite is used as a backhaul;
图2是UPF与SMF回传连接的流程示意图;FIG. 2 is a schematic flowchart of the backhaul connection between UPF and SMF;
图3是另一种UPF与SMF回传连接的流程示意图;3 is a schematic flowchart of another UPF and SMF backhaul connection;
图4是本公开实施例提供的应用于基站的步骤流程图;4 is a flowchart of steps applied to a base station provided by an embodiment of the present disclosure;
图5是本公开实施例提供的应用于会话管理功能网元SMF的步骤流程图;FIG. 5 is a flowchart of steps applied to a session management function network element SMF provided by an embodiment of the present disclosure;
图6是本公开实施例提供的另一种应用于会话管理功能网元SMF的步骤流程图;FIG. 6 is a flowchart of another step applied to a session management function network element SMF provided by an embodiment of the present disclosure;
图7是本公开实施例提供的应用于用户面功能网元UPF的步骤流程图;FIG. 7 is a flowchart of steps applied to a user plane function network element UPF provided by an embodiment of the present disclosure;
图8是本公开实施例提供的SMF通知gNB启用时延探测的示意图;8 is a schematic diagram of SMF notifying gNB to enable delay detection provided by an embodiment of the present disclosure;
图9是本公开实施例提供的gNB探测用户面时延的示意图;9 is a schematic diagram of a gNB detecting user plane delay provided by an embodiment of the present disclosure;
图10是本公开实施例提供的SMF探测用户面时延的示意图;FIG. 10 is a schematic diagram of SMF detecting user plane delay provided by an embodiment of the present disclosure;
图11是本公开实施例提供的应用于基站的数据处理装置的模块框图;11 is a block diagram of a module of a data processing apparatus applied to a base station provided by an embodiment of the present disclosure;
图12是本公开实施例提供的应用于会话管理功能网元SMF的数据处理装置的模块框图;12 is a block diagram of a module of a data processing apparatus applied to a session management function network element SMF provided by an embodiment of the present disclosure;
图13是本公开实施例提供的另一种应用于会话管理功能网元SMF的数据处理装置的模块框图;13 is a block diagram of a module of another data processing apparatus applied to a session management function network element SMF provided by an embodiment of the present disclosure;
图14是本公开实施例提供的应用于用户面功能网元UPF的数据处理装置的模块框图;14 is a block diagram of a module of a data processing apparatus applied to a user plane function network element UPF provided by an embodiment of the present disclosure;
图15是本公开实施例提供的基站结构示意图;15 is a schematic structural diagram of a base station provided by an embodiment of the present disclosure;
图16是本公开实施例提供的会话管理功能网元SMF的结构示意图;16 is a schematic structural diagram of a session management function network element SMF provided by an embodiment of the present disclosure;
图17是本公开实施例提供的用户面功能网元UPF的结构示意图。FIG. 17 is a schematic structural diagram of a user plane function network element UPF provided by an embodiment of the present disclosure.
具体实施方式Detailed ways
下面将结合本公开实施例中的附图,对本公开实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本公开一部分实施例,并不是全部的实施例。基于本公开中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本公开保护的范围。The technical solutions in the embodiments of the present disclosure will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present disclosure.
需要说明的是,如图1所示,当卫星作为回传时,5G网络的部署方式如下,5G基站gNB和接入与移动性管理功能单元AMF(Access and Mobility Management Function)之间通过卫星链路建立NG接口的关联。这种模式下,卫星链路对移动通信网络的协议仍然透明。由于gNB可能是移动的,例如车载、机载等,可能出现gNB在不同时刻连接不同卫星的情况,此时gNB和5GC之间需要新建传输层连接。另外,即使gNB不动,但由于近地轨道LEO(Low Earth orbit)/中轨道MEO(Medium Earth orbit)等非地面静止轨道卫星的移动,也可能导致服务gNB的卫星变化,从而导致回传连接的变更。It should be noted that, as shown in Figure 1, when the satellite is used as the backhaul, the 5G network is deployed as follows. The 5G base station gNB and the access and mobility management function unit AMF (Access and Mobility Management Function) are connected through the satellite chain. The link establishes the association of the NG interface. In this mode, the satellite link is still transparent to the protocol of the mobile communication network. Since the gNB may be mobile, such as vehicle, airborne, etc., it may happen that the gNB is connected to different satellites at different times. At this time, a new transport layer connection needs to be established between the gNB and the 5GC. In addition, even if the gNB does not move, the movement of non-GSO satellites such as low earth orbit LEO (Low Earth orbit) / medium orbit MEO (Medium Earth orbit) may also cause the satellite serving the gNB to change, resulting in backhaul connections. changes.
现有技术中,如图2所示,用户面功能单元UPF(User Plane Function)可以在N4关联建立/修改过程将该GTP-U路径的QoS limitation(即时延)通知给会话管理功能单元SMF(Session Management Function)。UPF通过N4Report过程将QoS limitation上报给SMF。SMF根据QoS limitation执行UPF的选择和QoS参数调整。In the prior art, as shown in Figure 2, the user plane function unit UPF (User Plane Function) can notify the session management function unit SMF ( Session Management Function). The UPF reports the QoS limitation to the SMF through the N4Report process. SMF performs UPF selection and QoS parameter adjustment according to QoS limitations.
涉及的流程如下:The processes involved are as follows:
在N4 Association Setup过程通知QoS limitationNotify QoS limitation during N4 Association Setup process
如图3所示,UPF也可以在与SMF建立N4关联时,向SMF报告其GTP-U路径上的QoS limitation。在N4 Association Update过程通知QoS limitation。As shown in Figure 3, the UPF can also report the QoS limitation on its GTP-U path to the SMF when it establishes an N4 association with the SMF. QoS limitation is notified during the N4 Association Update process.
现有技术依赖于UPF定期检查用户面连接的时延,然后通过事件上报给SMF。这种方法无法及时检测到gNB和UPF之间的时延变化,从而gNB仍然会按照原来的AN PDB来调度空口传输,这样QoS flow的端到端QoS无法保证,甚至导致业务中断。为解决该问题,本公开实施例提供了一种数据处理方法,根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。本公开实施例根据回传连接的变化进行回传时延探测,并及时触发QoS修 改,从而避免业务中断。The prior art relies on the UPF to periodically check the delay of the user plane connection, and then report it to the SMF through an event. This method cannot detect the delay change between the gNB and the UPF in time, so the gNB still schedules the air interface transmission according to the original AN PDB, so the end-to-end QoS of the QoS flow cannot be guaranteed, and even leads to service interruption. In order to solve this problem, an embodiment of the present disclosure provides a data processing method, which determines the core network packet delay budget CN PDB according to the session management function network element SMF instruction or after determining to use satellite to provide backhaul for the protocol data unit PDU session. Or return delay, whether it meets the preset delay budget PDB requirements, if not, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, and the notification message is used to notify all The SMF requests the policy control function network element PCF to update the QoS parameters according to the CN PDB. The embodiments of the present disclosure perform backhaul delay detection according to changes in backhaul connections, and trigger QoS modification in time, thereby avoiding service interruption.
下面将通过具体实施例对本公开提供的数据处理方法、装置、基站、网络设备及存储介质进行详细解释和说明。The data processing method, apparatus, base station, network device and storage medium provided by the present disclosure will be explained and described in detail below through specific embodiments.
需要说明的是,在下述描述内容中,由于方法和装置是基于同一申请构思的,方法和装置解决问题的原理相似,因此装置和方法的实施可以相互参见,重复之处不再赘述。It should be noted that, in the following description, since the method and the device are conceived based on the same application, and the principles of the method and the device for solving problems are similar, the implementation of the device and the method can be referred to each other, and repeated descriptions will not be repeated.
此外,需要说明的是,本公开实施例提供的技术方案可以适用于多种系统,尤其是5G系统。例如适用的系统可以是全球移动通讯(global system of mobile communication,GSM)系统、码分多址(code division multiple access,CDMA)系统、宽带码分多址(Wideband Code Division Multiple Access,WCDMA)通用分组无线业务(general packet radio service,GPRS)系统、长期演进(long term evolution,LTE)系统、LTE频分双工(frequency division duplex,FDD)系统、LTE时分双工(time division duplex,TDD)系统、高级长期演进(long term evolution advanced,LTE-A)系统、通用移动系统(universal mobile telecommunication system,UMTS)、全球互联微波接入(worldwide interoperability for microwave access,WiMAX)系统、5G新空口(New Radio,NR)系统等。这多种系统中均包括终端设备和网络设备。系统中还可以包括核心网部分,例如演进的分组系统(Evloved Packet System,EPS)、5G系统(5GS)等。In addition, it should be noted that the technical solutions provided by the embodiments of the present disclosure may be applicable to various systems, especially 5G systems. For example, the applicable system may be a global system of mobile communication (GSM) system, a code division multiple access (CDMA) system, a wideband code division multiple access (Wideband Code Division Multiple Access, WCDMA) general packet Wireless service (general packet radio service, GPRS) system, long term evolution (long term evolution, LTE) system, LTE frequency division duplex (frequency division duplex, FDD) system, LTE time division duplex (time division duplex, TDD) system, Long term evolution advanced (LTE-A) system, universal mobile telecommunication system (UMTS), worldwide interoperability for microwave access (WiMAX) system, 5G New Radio (New Radio, NR) system, etc. These various systems include terminal equipment and network equipment. The system may also include a core network part, such as an evolved packet system (Evloved Packet System, EPS), a 5G system (5GS), and the like.
本公开实施例涉及的终端设备,可以是指向用户提供语音和/或数据连通性的设备,具有无线连接功能的手持式设备、或连接到无线调制解调器的其他处理设备等。在不同的系统中,终端设备的名称可能也不相同,例如在5G系统中,终端设备可以称为用户设备(User Equipment,UE)。无线终端设备可以经无线接入网(Radio Access Network,RAN)与一个或多个核心网(Core Network,CN)进行通信,无线终端设备可以是移动终端设备,如移动电话(或称为“蜂窝”电话)和具有移动终端设备的计算机,例如,可以是便携式、袖珍式、手持式、计算机内置的或者车载的移动装置,它们与无线接入网交换语言和/或数据。例如,个人通信业务(Personal  Communication Service,PCS)电话、无绳电话、会话发起协议(Session Initiated Protocol,SIP)话机、无线本地环路(Wireless Local Loop,WLL)站、个人数字助理(Personal Digital Assistant,PDA)等设备。无线终端设备也可以称为系统、订户单元(subscriber unit)、订户站(subscriber station),移动站(mobile station)、移动台(mobile)、远程站(remote station)、接入点(access point)、远程终端设备(remote terminal)、接入终端设备(access terminal)、用户终端设备(user terminal)、用户代理(user agent)、用户装置(user device),本公开实施例中并不限定。由于终端设备与其它网络设备(例如核心网设备、接入网设备(即基站))一起构成一个可支持通信的网络,在本公开中,终端设备也视为一种网络设备。The terminal device involved in the embodiments of the present disclosure may be a device that provides voice and/or data connectivity to a user, a handheld device with a wireless connection function, or other processing device connected to a wireless modem. In different systems, the name of the terminal device may be different. For example, in the 5G system, the terminal device may be called user equipment (User Equipment, UE). Wireless terminal equipment can communicate with one or more core networks (Core Network, CN) via a radio access network (Radio Access Network, RAN). "telephone) and computers with mobile terminal equipment, eg portable, pocket-sized, hand-held, computer-built or vehicle-mounted mobile devices, which exchange language and/or data with the radio access network. For example, Personal Communication Service (PCS) phones, cordless phones, Session Initiated Protocol (SIP) phones, Wireless Local Loop (WLL) stations, Personal Digital Assistants (Personal Digital Assistants), PDA) and other devices. Wireless terminal equipment may also be referred to as system, subscriber unit, subscriber station, mobile station, mobile station, remote station, access point , a remote terminal device (remote terminal), an access terminal device (access terminal), a user terminal device (user terminal), a user agent (user agent), and a user device (user device), which are not limited in the embodiments of the present disclosure. Since the terminal device and other network devices (eg, core network device, access network device (ie, base station)) together form a network that can support communication, in the present disclosure, the terminal device is also regarded as a kind of network device.
本公开实施例涉及的网络设备,可以是基站,该基站可以包括多个为终端提供服务的小区,也可以是CU(Central Unit,集中控制单元)或者DU(Distributed Unit,分布式单元)。根据具体应用场合不同,网络设备又可以称为接入点,或者可以是接入网中在空中接口上通过一个或多个扇区与无线终端设备通信的设备,或者其它名称。网络设备可用于将收到的空中帧与网际协议(Internet Protocol,IP)分组进行相互更换,作为无线终端设备与接入网的其余部分之间的路由器,其中接入网的其余部分可包括网际协议(IP)通信网络。网络设备还可协调对空中接口的属性管理。例如,本公开实施例涉及的网络设备可以是全球移动通信系统(Global System for Mobile communications,GSM)或码分多址接入(Code Division Multiple Access,CDMA)中的网络设备(Base Transceiver Station,BTS),也可以是带宽码分多址接入(Wide-band Code Division Multiple Access,WCDMA)中的网络设备(NodeB),还可以是长期演进(long term evolution,LTE)系统中的演进型网络设备(evolutional Node B,eNB或e-NodeB)、5G网络架构(next generation system)中的5G基站(gNB),也可以是家庭演进基站(Home evolved Node B,HeNB)、中继节点(relay node)、家庭基站(femto)、微微基站(pico)等,本公开实施例中并不限定。在 一些网络结构中,网络设备可以包括集中单元(centralized unit,CU)节点和分布单元(distributed unit,DU)节点,集中单元和分布单元也可以地理上分开布置。The network device involved in the embodiments of the present disclosure may be a base station, and the base station may include a plurality of cells providing services for the terminal, or may be a CU (Central Unit, centralized control unit) or a DU (Distributed Unit, distributed unit). Depending on the specific application, the network device may also be called an access point, or may be a device in the access network that communicates with wireless terminal devices through one or more sectors on the air interface, or other names. The network device can be used to exchange received air frames with Internet Protocol (IP) packets, and act as a router between the wireless terminal device and the rest of the access network, which can include the Internet. Protocol (IP) communication network. The network devices may also coordinate attribute management for the air interface. For example, the network device involved in the embodiments of the present disclosure may be a network device (Base Transceiver Station, BTS) in the Global System for Mobile Communications (GSM) or Code Division Multiple Access (Code Division Multiple Access, CDMA). ), it can also be a network device (NodeB) in Wide-band Code Division Multiple Access (WCDMA), or it can be an evolved network device in a long term evolution (LTE) system (evolutional Node B, eNB or e-NodeB), 5G base station (gNB) in 5G network architecture (next generation system), or Home evolved Node B (HeNB), relay node (relay node) , a home base station (femto), a pico base station (pico), etc., which are not limited in the embodiments of the present disclosure. In some network structures, network devices may include centralized unit (CU) nodes and distributed unit (DU) nodes, which may also be geographically separated.
此外,应理解,本公开实施例中术语“和/或”,描述关联对象的关联关系,表示可以存在三种关系,例如,A和/或B,可以表示:单独存在A,同时存在A和B,单独存在B这三种情况。字符“/”一般表示前后关联对象是一种“或”的关系。In addition, it should be understood that the term "and/or" in the embodiments of the present disclosure describes the association relationship of associated objects, and indicates that there may be three kinds of relationships, for example, A and/or B, which may indicate that A exists alone, and A and B exist simultaneously. B, there are three cases of B alone. The character "/" generally indicates that the associated objects are an "or" relationship.
说明书通篇中提到的“一个实施例”或“一实施例”意味着与实施例有关的特定特征、结构或特性包括在本公开的至少一个实施例中。因此,在整个说明书各处出现的“在一个实施例中”或“在一实施例中”未必一定指相同的实施例。此外,这些特定的特征、结构或特性可以任意适合的方式结合在一个或多个实施例中。Reference throughout the specification to "one embodiment" or "an embodiment" means that a particular feature, structure, or characteristic associated with the embodiment is included in at least one embodiment of the present disclosure. Thus, appearances of "in one embodiment" or "in an embodiment" in various places throughout this specification are not necessarily necessarily referring to the same embodiment. Furthermore, the particular features, structures or characteristics may be combined in any suitable manner in one or more embodiments.
下面对本公开进行具体说明。The present disclosure will be specifically described below.
如图4所示,为本公开实施例提供的应用于基站的数据处理方法的步骤流程图,该方法包括如下步骤:As shown in FIG. 4 , a flowchart of steps of a data processing method applied to a base station provided by an embodiment of the present disclosure, the method includes the following steps:
步骤101:根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Step 101: Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB after being instructed by the session management function network element SMF or determined to use satellite to provide backhaul for the protocol data unit PDU session If not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF according to the CN PDB , to update the QoS parameters.
在本步骤中,需要说明的是,在PDU会话建立过程中,SMF可根据服务终端设备UE的gNB信息,例如gNB ID,回传类型指示等,确定该PDU会话的用户面经过卫星回传;或者,在PDU会话建立完成后,根据gNB为该PDU会话分配的下行N3tunnel的隧道信息(IP地址),确定该PDU会话的用户面经过卫星回传。当SMF确定PDU会话经过卫星回传后,可针对该PDU会话中的QoS flow启用通知控制Notification control机制,和/或通知基站发送回传请求消息。In this step, it should be noted that in the process of establishing the PDU session, the SMF can determine that the user plane of the PDU session is returned via satellite according to the gNB information of the serving terminal equipment UE, such as the gNB ID, return type indication, etc.; Alternatively, after the establishment of the PDU session is completed, it is determined that the user plane of the PDU session is returned via satellite according to the tunnel information (IP address) of the downlink N3 tunnel allocated by the gNB for the PDU session. After the SMF determines that the PDU session is backhauled by the satellite, it can enable the Notification control mechanism for the QoS flow in the PDU session, and/or notify the base station to send a backhaul request message.
在本步骤中,可选的,当gNB确定服务卫星发生变化后,进行与用户面功能单元UPF之间的回传时延探测,具体的,gNB向其连接的UPF或配置的网关节点发送回传请求消息,以确定该PDU会话中各QoS flow的核心网分组包时延预算CN PDB。In this step, optionally, after the gNB determines that the serving satellite has changed, it performs backhaul delay detection with the user plane functional unit UPF. Specifically, the gNB sends back to the connected UPF or the configured gateway node. Send a request message to determine the core network packet delay budget CN PDB of each QoS flow in the PDU session.
基站接收核心网响应所发送的回传请求消息的回传响应消息。目的是为了进行PDU会话的用户面时延探测,以确定该PDU会话中各QoS flow的核心网分组包时延预算CN PDB。其中,UE发起PDU会话建立,服务UE的gNB通过卫星回传连接到5GC。The base station receives a backhaul response message sent by the core network in response to the backhaul request message. The purpose is to detect the user plane delay of the PDU session to determine the core network packet delay budget CN PDB of each QoS flow in the PDU session. Among them, the UE initiates the establishment of a PDU session, and the gNB serving the UE is connected to the 5GC through satellite backhaul.
根据回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,判断是否能满足所述基站服务的各服务质量流QoS flow的分组包时延预算PDB要求,若不满足,则向服务所述PDU会话的会话管理功能网元SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新各QoS flow的QoS参数。其中,所述回传响应消息中携带的核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的或向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。According to the core network packet delay budget CN PDB or the return delay carried in the return response message, it is judged whether it can meet the packet delay budget PDB requirements of each quality of service flow QoS flow served by the base station, if not. , then send a notification message carrying the value of the CN PDB to the session management function network element SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF according to the CN PDB , and update the QoS parameters of each QoS flow. Wherein, the core network packet delay budget CN PDB carried in the backhaul response message is a backhaul request message sent on a preset tunnel based on the general wireless packet service GPRS tunneling protocol GTP-U, and according to the received backhaul The time of the response message is determined or the Internet Control Message Protocol ICMP packet is sent to the opposite end UPF of the GPRS Tunneling Protocol GTP-U path of the general wireless packet service, and it is determined according to the receiving time of the ICMP packet.
需要说明的是,gNB根据探测的回传时延确定用户面CN PDB,然后根据CN PDB判断是否能够满足当前各服务质量流QoS flow的分组包时延预算PDB要求,若不满足,则发送通知消息给SMF。通知消息中携带CN PDB,以使SMF根据该消息向PCF报告CN PDB,触发更新各QoS flow的QoS参数的流程。所述QoS参数包括以下至少之一:It should be noted that the gNB determines the user plane CN PDB according to the detected backhaul delay, and then judges whether it can meet the current packet delay budget PDB requirements of each quality of service flow QoS flow according to the CN PDB. If not, it will send a notification. message to SMF. The notification message carries the CN PDB, so that the SMF reports the CN PDB to the PCF according to the message, and triggers the process of updating the QoS parameters of each QoS flow. The QoS parameters include at least one of the following:
5QI;5QI;
PDB;PDB;
GFBR,Guaranteed Flow Bit Rate;GFBR, Guaranteed Flow Bit Rate;
MFBR,Maximum Flow Bit Rate。MFBR, Maximum Flow Bit Rate.
本公开实施例提供的数据处理方法,根据会话管理功能网元SMF指示 或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。本公开实施例根据回传连接的变化进行回传时延探测,并及时触发QoS修改,从而避免业务中断。In the data processing method provided by the embodiment of the present disclosure, according to the session management function network element SMF instruction or after determining to use satellite to provide backhaul for the protocol data unit PDU session, determine the core network packet delay budget CN PDB or backhaul delay, whether it is Meet the preset delay budget PDB requirements, if not, send a notification message carrying the CN PDB value to the SMF serving the PDU session, where the notification message is used to notify the SMF to request a policy control function network The meta PCF updates the QoS parameters according to the CN PDB. The embodiments of the present disclosure perform backhaul delay detection according to changes in backhaul connections, and trigger QoS modification in time, thereby avoiding service interruption.
基于上述实施例的内容,在本实施例中,所述确定使用卫星为PDU会话提供回传,包括:Based on the content of the foregoing embodiment, in this embodiment, the determining to use satellite to provide backhaul for the PDU session includes:
根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
在本实施例中,可选的,在UE建立PDU会话过程中,基站根据PDU会话的N3tunnel的传输层连接确定所述PDU会话使用卫星作为回传,或者在回传连接发生切换后,基站根据PDU会话用户面连接的传输层连接的传输层连接信息确定所述PDU会话使用卫星作为回传。其中,所述传输层连接信息可以为传输层连接的基站IP地址或端口,或者无线传输技术。In this embodiment, optionally, during the process of establishing a PDU session by the UE, the base station determines that the PDU session uses satellite as the backhaul according to the transport layer connection of the N3 tunnel of the PDU session, or after the backhaul connection is switched, the base station determines according to the The transport layer connection information of the transport layer connection of the user plane connection of the PDU session determines that the PDU session uses satellite as a backhaul. The transport layer connection information may be an IP address or port of a base station connected to the transport layer, or a wireless transmission technology.
基于上述实施例的内容,在本实施例中,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Based on the content of the above embodiment, in this embodiment, the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U to send a return request message on a preset tunnel, and according to the received The time of the returned response message is determined;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
在本实施例中,需要说明的是,基站与在进行回传时延探测时,基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,例如在N3隧道(N3tunnel)上发送回波请求(echo request)包,然后根据收到回波响应(echo response)的时间来计算核心网分组包时延预算CN PDB。In this embodiment, it should be noted that when the base station and the base station perform the backhaul delay detection, based on the general wireless packet service GPRS tunneling protocol GTP-U, the backhaul request message is sent on the preset tunnel, for example, in the N3 tunnel (N3 tunnel ), and then calculate the core network packet delay budget CN PDB according to the time of receiving the echo response (echo response).
在本实施例中,需要说明的是,基站与在进行回传时延探测时可以不依赖于GTP-U tunnel management消息,而采用其他手段来检测回传时延。例如,gNB使用非第三代合作伙伴计划3GPP手段来检测回传时延,例如向GTP-U path的对端UPF发送互联网Internet控制报文协议ICMP包来检测传输路径上的往返时延。具体的,根据所述ICMP包的接收时间,确定核心网分组包时延预算CN PDB。In this embodiment, it should be noted that the base station may not rely on the GTP-U tunnel management message when performing backhaul delay detection, and may use other means to detect the backhaul delay. For example, gNB uses non-3rd Generation Partnership Project 3GPP means to detect backhaul delay, such as sending Internet Control Message Protocol (ICMP) packets to the UPF at the opposite end of the GTP-U path to detect round-trip delay on the transmission path. Specifically, the core network packet delay budget CN PDB is determined according to the receiving time of the ICMP packet.
基于上述实施例的内容,在本实施例中,所述确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:Based on the content of the above embodiment, in this embodiment, the determining whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
在本实施例中,需要说明的是,QoS flow的分组包时延预算PDB=CN PDB+AN PDB(AN PDB不为0),因此,可以根据回传时延或CN PDB,判断回传时延或CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。In this embodiment, it should be noted that the packet delay budget of QoS flow is PDB=CN PDB+AN PDB (AN PDB is not 0). Therefore, it is possible to judge the return time according to the return delay or CN PDB. Whether the delay or CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, if so, it is determined that the packet delay budget PDB requirement of the QoS flow is not met.
如图5所示,为本公开实施例提供的应用于会话管理功能网元SMF的数据处理方法的步骤流程图,该方法包括如下步骤:As shown in FIG. 5, a flowchart of steps of a data processing method applied to a session management function network element SMF provided by an embodiment of the present disclosure, the method includes the following steps:
步骤201:接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;Step 201: Receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the core network packet delay budget; wherein, the notification message is that the base station determines that the CN PDB does not meet the preset delay Sent when requested by the Budget PDB;
在本步骤中,当基站在确定CN PDB不满足所述基站与所述UPF之间的各服务质量流QoS flow的分组包时延预算PDB要求时,向服务所述PDU会话的会话管理功能网元SMF发送携带有所述CN PDB取值的通知消息。其中,CN PDB为基站在确定服务卫星发生变化时,通过进行所述基站与用户面功能网元UPF之间的回传时延探测而确定的。In this step, when the base station determines that the CN PDB does not meet the packet delay budget PDB requirements of each QoS flow between the base station and the UPF, the base station sends a request to the session management function network that serves the PDU session. The meta-SMF sends a notification message carrying the value of the CN PDB. Wherein, CN PDB is determined by performing backhaul delay detection between the base station and the user plane functional network element UPF when the base station determines that the serving satellite changes.
步骤202:根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。Step 202: Request the policy control function network element PCF to update QoS parameters according to the CN PDB according to the notification message.
在本步骤中,需要说明的是,SMF在接收基站发送的通知消息后,发 起SM policy更新过程,请求PCF更新该QoS flow的QoS参数。可选的,PCF可能需要与应用层协商,请求应用功能单元AF(Application Function)根据传输路径的时延特性更新其QoS要求。具体的,PCF根据应用层的QoS要求,更新QoS参数以适应回传连接的时延特性,并触发QoS参数修改过程。In this step, it should be noted that after receiving the notification message sent by the base station, the SMF initiates the SM policy update process, and requests the PCF to update the QoS parameters of the QoS flow. Optionally, the PCF may need to negotiate with the application layer and request the application function unit AF (Application Function) to update its QoS requirements according to the delay characteristics of the transmission path. Specifically, the PCF updates the QoS parameters according to the QoS requirements of the application layer to adapt to the delay characteristics of the backhaul connection, and triggers the QoS parameter modification process.
本公开实施例提供的数据处理方法,根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。本公开实施例根据回传连接的变化进行回传时延探测,并及时触发QoS修改,从而避免业务中断。基于上述实施例的内容,在本实施例中,所述CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;In the data processing method provided by the embodiment of the present disclosure, according to the session management function network element SMF instruction or after determining to use satellite to provide backhaul for the protocol data unit PDU session, determine the core network packet delay budget CN PDB or backhaul delay, whether it is Meet the preset delay budget PDB requirements, if not, send a notification message carrying the CN PDB value to the SMF serving the PDU session, where the notification message is used to notify the SMF to request a policy control function network The meta PCF updates the QoS parameters according to the CN PDB. The embodiments of the present disclosure perform backhaul delay detection according to changes in backhaul connections, and trigger QoS modification in time, thereby avoiding service interruption. Based on the content of the above embodiment, in this embodiment, the CN PDB sends a backhaul request message on a preset tunnel based on the General Radio Packet Service GPRS Tunneling Protocol GTP-U, and sends a backhaul request message according to the received backhaul response message. time fixed;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
在本实施例中,需要说明的是,基站在进行回传时延探测时,基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,例如在N3隧道(N3tunnel)上发送回波请求(echo request)包,然后根据收到回波响应(echo response)的时间来计算核心网分组包时延预算CN PDB。In this embodiment, it should be noted that when the base station performs the backhaul delay detection, it sends the backhaul request message on the preset tunnel based on the general wireless packet service GPRS tunneling protocol GTP-U, for example, in the N3 tunnel (N3 tunnel). The echo request packet is sent on the upper end, and then the core network packet delay budget CN PDB is calculated according to the time when the echo response (echo response) is received.
在本实施例中,需要说明的是,基站在进行回传时延探测时,可以不依赖于GTP-U tunnel management消息,而采用其他手段来检测回传时延。例如,gNB使用非第三代合作伙伴计划3GPP手段来检测回传时延,例如向GTP-U path的对端UPF发送互联网Internet控制报文协议ICMP包来检测传输路径上的往返时延。具体的,根据所述ICMP包的接收时间,确定核心 网分组包时延预算CN PDB。In this embodiment, it should be noted that, when the base station performs the backhaul delay detection, it may not rely on the GTP-U tunnel management message, but adopt other means to detect the backhaul delay. For example, gNB uses non-3rd Generation Partnership Project 3GPP means to detect backhaul delay, such as sending Internet Control Message Protocol (ICMP) packets to the UPF at the opposite end of the GTP-U path to detect round-trip delay on the transmission path. Specifically, the core network packet delay budget CN PDB is determined according to the receiving time of the ICMP packet.
如图6所示,为本公开实施例提供的应用于会话管理功能网元SMF的数据处理方法的步骤流程图,该方法包括如下步骤:As shown in FIG. 6, a flowchart of steps of a data processing method applied to a session management function network element SMF provided by an embodiment of the present disclosure, the method includes the following steps:
步骤301:当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;Step 301: After determining that the satellite is used as the backhaul, send an indication message to the base station or the user plane function network element UPF, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
在本步骤中,在PDU会话建立过程中,SMF可根据服务终端设备UE的gNB信息,例如gNB ID,回传类型指示等,确定该PDU会话的用户面经过卫星回传;或者,在PDU会话建立完成后,根据gNB为该PDU会话分配的下行N3tunnel的隧道信息(IP地址),确定该PDU会话的用户面经过卫星回传。当SMF确定PDU会话经过卫星回传后,可针对该PDU会话中的QoS flow启用通知控制Notification control机制,和/或通知基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息。In this step, during the establishment of the PDU session, the SMF can determine that the user plane of the PDU session is sent back via satellite according to the gNB information of the serving terminal equipment UE, such as the gNB ID, return type indication, etc.; or, in the PDU session After the establishment is completed, according to the tunnel information (IP address) of the downlink N3 tunnel allocated by the gNB for the PDU session, it is determined that the user plane of the PDU session is sent back through the satellite. When the SMF determines that the PDU session is backhauled through the satellite, it can enable the Notification control mechanism for the QoS flow in the PDU session, and/or notify the base station or the user plane function network element UPF to send an indication message, where the indication message is used to indicate The base station or UPF sends a backhaul request message.
SMF接收核心网响应所发送的回传请求消息的回传响应消息。目的是为了进行PDU会话的用户面时延探测,以确定该PDU会话中各QoS flow的核心网分组包时延预算CN PDB。需要说明的是,SMF可以指示基站进行回传时延探测,基站在探测后,向SMF发送携带有CN PDB取值的通知消息。此外,SMF也可以通过N4接口,向服务该PDU会话的UPF指示进行用户面路径传输时延的探测并报告时延值。UPF可通过echo reque/response过程来进行时延探测。由于基站服务多条PDU会话,因此针对服务不同PDU会话的UPF,SMF都将指示其探测路径的传输时延。各UPF在探测后,向SMF报告其与gNB之间的回传时延。SMF进而接收基站或UPF发送的CN PDB取值或回传时延,并确定核心网分组包时延预算CN PDB。The SMF receives the echo response message sent by the core network in response to the echo request message. The purpose is to detect the user plane delay of the PDU session to determine the core network packet delay budget CN PDB of each QoS flow in the PDU session. It should be noted that the SMF may instruct the base station to perform backhaul delay detection, and after the detection, the base station sends a notification message carrying the CN PDB value to the SMF. In addition, the SMF can also instruct the UPF serving the PDU session to detect the transmission delay of the user plane path and report the delay value through the N4 interface. UPF can perform delay detection through the echo reque/response process. Since the base station serves multiple PDU sessions, for the UPF serving different PDU sessions, the SMF will indicate the transmission delay of its probing path. After detection, each UPF reports the backhaul delay between it and the gNB to the SMF. The SMF then receives the CN PDB value or backhaul delay sent by the base station or UPF, and determines the CN PDB packet delay budget of the core network.
步骤302:确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Step 302: Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB .
在本步骤中,SMF可以根据探测的回传时延确定用户面CN PDB,然 后根据CN PDB判断是否能够满足当前各服务质量流QoS flow的分组包时延预算PDB要求,若不满足则向PCF报告CN PDB,触发更新各QoS flow的QoS参数的流程。In this step, the SMF can determine the user plane CN PDB according to the detected backhaul delay, and then judge whether it can meet the current packet delay budget PDB requirements of each quality of service flow QoS flow according to the CN PDB. The CN PDB is reported to trigger the process of updating the QoS parameters of each QoS flow.
本公开实施例提供的数据处理方法,根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。本公开实施例根据回传连接的变化进行回传时延探测,并及时触发QoS修改,从而避免业务中断。In the data processing method provided by the embodiment of the present disclosure, according to the session management function network element SMF instruction or after determining to use satellite to provide backhaul for the protocol data unit PDU session, determine the core network packet delay budget CN PDB or backhaul delay, whether it is Meet the preset delay budget PDB requirements, if not, send a notification message carrying the CN PDB value to the SMF serving the PDU session, where the notification message is used to notify the SMF to request a policy control function network The meta PCF updates the QoS parameters according to the CN PDB. The embodiments of the present disclosure perform backhaul delay detection according to changes in backhaul connections, and trigger QoS modification in time, thereby avoiding service interruption.
基于上述实施例的内容,在本实施例中,所述确定卫星作为回传,包括:Based on the content of the foregoing embodiment, in this embodiment, the determining of the satellite as the return transmission includes:
根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
在本实施例中,可选的,在UE建立PDU会话过程中,基站根据PDU会话的N3tunnel的传输层连接确定所述PDU会话使用卫星作为回传,或者在回传连接发生切换后,基站根据PDU会话用户面连接的传输层连接确定所述PDU会话使用卫星作为回传。In this embodiment, optionally, during the process of establishing a PDU session by the UE, the base station determines that the PDU session uses satellite as the backhaul according to the transport layer connection of the N3 tunnel of the PDU session, or after the backhaul connection is switched, the base station determines according to the The transport layer connection of the PDU Session user plane connection determines that the PDU Session uses satellite as backhaul.
如图7所示,为本公开实施例提供的应用于用户面功能网元UPF的数据处理方法的步骤流程图,该方法包括如下步骤:As shown in FIG. 7 , a flowchart of steps of a data processing method applied to a user plane function network element UPF provided by an embodiment of the present disclosure, the method includes the following steps:
步骤401:接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;Step 401: After receiving the instruction message sent by the session management function network element SMF, send a return request message;
在本步骤中,需要说明的是,UPF在接收SMF通过N4接口发送的用于进行用户面路径传输时延的探测的指示消息后,发送回传请求消息。In this step, it should be noted that after receiving the instruction message sent by the SMF through the N4 interface for detecting the transmission delay of the user plane path, the UPF sends a return request message.
UPF接收核心网响应所发送的回传请求消息的回传响应消息。目的是为了进行PDU会话的用户面时延探测,以确定该PDU会话中各QoS flow的 核心网分组包时延预算CN PDB。The UPF receives the echo response message sent by the core network in response to the echo request message. The purpose is to detect the user plane delay of the PDU session to determine the core network packet delay budget CN PDB of each QoS flow in the PDU session.
步骤402:将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Step 402: Send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF budget CN PDB or backhaul delay according to the core network packet delay carried in the backhaul response message, Determine whether the preset delay budget PDB requirements are met, and if not, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
在本步骤中,UPF将所探测的回传时延发送给SMF,SMF根据探测的回传时延确定用户面CN PDB,然后根据CN PDB判断是否能够满足当前各服务质量流QoS flow的分组包时延预算PDB要求,若不满足则向PCF报告CN PDB,触发更新各QoS flow的QoS参数的流程。In this step, the UPF sends the detected backhaul delay to the SMF, and the SMF determines the user plane CN PDB according to the detected backhaul delay, and then judges whether the packets of the current QoS flow can be satisfied according to the CN PDB. Delay budget PDB requirements, if not satisfied, report CN PDB to PCF, triggering the process of updating QoS parameters of each QoS flow.
在上述步骤401-步骤402中,可以理解的是,UPF根据SMF发送的指示消息进行基站与用户面功能网元UPF之间的回传时延探测,并向SMF报告其与基站之间的回传时延。In the above steps 401 to 402, it can be understood that the UPF performs backhaul delay detection between the base station and the user plane functional network element UPF according to the instruction message sent by the SMF, and reports the backhaul delay between it and the base station to the SMF. transmission delay.
本公开实施例提供的数据处理方法,根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。本公开实施例根据回传连接的变化进行回传时延探测,并及时触发QoS修改,从而避免业务中断。In the data processing method provided by the embodiment of the present disclosure, according to the session management function network element SMF instruction or after determining to use satellite to provide backhaul for the protocol data unit PDU session, determine the core network packet delay budget CN PDB or backhaul delay, whether it is Meet the preset delay budget PDB requirements, if not, send a notification message carrying the CN PDB value to the SMF serving the PDU session, where the notification message is used to notify the SMF to request a policy control function network The meta PCF updates the QoS parameters according to the CN PDB. The embodiments of the present disclosure perform backhaul delay detection according to changes in backhaul connections, and trigger QoS modification in time, thereby avoiding service interruption.
基于上述实施例的内容,在本实施例中,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,包括:Based on the content of the foregoing embodiment, in this embodiment, the SMF determines whether the preset delay budget PDB is satisfied according to the core network packet delay budget CN PDB or the return delay carried in the return response message. requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
在本实施例中,QoS flow的分组包时延预算PDB=CN PDB+AN PDB(AN PDB不为0),因此,SMF可以根据回传时延或CN PDB,判断回传时延或CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若 是,则确定不满足所述QoS flow的分组包时延预算PDB要求。In this embodiment, the packet delay budget of QoS flow is PDB=CN PDB+AN PDB (AN PDB is not 0). Therefore, the SMF can determine the return delay or CN PDB according to the return delay or CN PDB. Whether it is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, it is determined that the packet delay budget PDB requirement of the QoS flow is not met.
下面通过具体实施例对本公开进行具体说明。The present disclosure will be specifically described below through specific embodiments.
第一实施例:First embodiment:
在本实施例中,如图8所示,SMF通知基站gNB启用notification control和时延探测。步骤如下:In this embodiment, as shown in FIG. 8 , the SMF notifies the base station gNB to enable notification control and delay detection. Proceed as follows:
1.UE发起PDU会话建立,服务UE的gNB通过卫星回传连接到5GC。1. The UE initiates the establishment of a PDU session, and the gNB serving the UE connects to the 5GC through satellite backhaul.
2.在PDU会话建立过程中,SMF可根据服务UE的gNB信息,例如gNB ID,回传类型指示等,确定该PDU会话的用户面经过卫星回传;或者,在PDU会话建立完成后,根据gNB为该PDU会话分配的下行N3tunnel的隧道信息(IP地址),确定该PDU会话的用户面经过卫星回传。2. During the establishment of the PDU session, the SMF can determine the user plane of the PDU session via satellite backhaul according to the gNB information of the serving UE, such as gNB ID, return type indication, etc.; or, after the PDU session establishment is completed, according to The tunnel information (IP address) of the downlink N3 tunnel allocated by the gNB for the PDU session determines that the user plane of the PDU session is sent back via satellite.
3.当SMF确定PDU会话经过卫星回传后,可针对该PDU会话中的QoS flow启用Notification control机制;和/或通知基站进行PDU会话的用户面时延探测并向SMF报告(在此称为notification机制)。3. When the SMF determines that the PDU session is sent back via the satellite, it can enable the Notification control mechanism for the QoS flow in the PDU session; and/or notify the base station to perform user plane delay detection of the PDU session and report it to the SMF (herein referred to as the SMF). notification mechanism).
4.gNB针对PDU会话的用户面路径,启动时延探测,例如在N3tunnel上发送echo request包,然后根据收到echo response的时间来计算用户面路径时延。4. The gNB starts the delay detection for the user plane path of the PDU session, for example, sends an echo request packet on N3tunnel, and then calculates the user plane path delay according to the time when the echo response is received.
第二实施例:Second embodiment:
在本实施例中,如图9所示,基站gNB通过GTP-U tunnel management消息探测用户面时延。步骤如下:In this embodiment, as shown in Figure 9, the base station gNB detects the user plane delay through the GTP-U tunnel management message. Proceed as follows:
1.当服务gNB的卫星发生变更时,gNB需要通过新的卫星建立到5GC的控制平面和用户平面的连接。1. When the satellite serving the gNB is changed, the gNB needs to establish a connection to the control plane and user plane of the 5GC through the new satellite.
2.gNB建立和AMF之间的传输层连接后,针对其与核心网的各用户面路径,即各GTP-U路径,重新进行时延探测,即在各GTP-U path发送echo request包和接收echo response。2. After the gNB establishes the transport layer connection with the AMF, the delay detection is performed again for each user plane path between it and the core network, that is, each GTP-U path, that is, the echo request packet and Receive echo response.
3.根据echo request/response计算各GTP-U路径的传输时延。并将该传输时延确定为新的CN PDB。gNB判断是否通知SMF回传路径传输时延。3. Calculate the transmission delay of each GTP-U path according to echo request/response. And determine the transmission delay as the new CN PDB. The gNB determines whether to notify the SMF of the transmission delay of the backhaul path.
4.针对启用Notification control的QoS flow,gNB向服务该QoS flow的SMF反馈回传路径传输时延,即所述GTP-U路径的传输时延。4. For the QoS flow that enables Notification control, the gNB feeds back the transmission delay of the backhaul path, that is, the transmission delay of the GTP-U path, to the SMF serving the QoS flow.
针对启用Notification机制的PDU会话,gNB向SMF报告回传路径的传输时延变化。For the PDU session with the Notification mechanism enabled, the gNB reports the transmission delay change of the backhaul path to the SMF.
5.SMF收到gNB反馈的传输路径传输时延后,发起SM policy更新过程,请求PCF更新该QoS flow的QoS参数。5. After receiving the transmission delay of the transmission path fed back by the gNB, the SMF initiates the SM policy update process and requests the PCF to update the QoS parameters of the QoS flow.
6.PCF可能需要与应用层协商,请求AF根据传输路径的时延特性更新其QoS要求。6. The PCF may need to negotiate with the application layer and request the AF to update its QoS requirements according to the delay characteristics of the transmission path.
7.PCF根据应用层的QoS要求,更新QoS参数以适应回传连接的时延特性,并触发QoS参数修改过程。7. The PCF updates the QoS parameters according to the QoS requirements of the application layer to adapt to the delay characteristics of the backhaul connection, and triggers the QoS parameter modification process.
第三实施例:Third embodiment:
在本实施例中,如图10所示,基站gNB通过非3GPP手段(例如ICMP消息)探测用户面时延。具体的,在第二实施例中,gNB在进行时延探测时,可以不依赖于GTP-U tunnel management消息,而采用其他手段来检测时延,即在第二实施例的步骤2中,gNB使用非3GPP手段来检测时延,例如向GTP-U path的对端UPF发送ICMP包来检测传输路径上的往返时延。其中,gNB确定CN PDB为检测到的往返时延的一半,后续步骤同第二实施例。In this embodiment, as shown in FIG. 10 , the base station gNB detects the user plane delay through non-3GPP means (eg, ICMP message). Specifically, in the second embodiment, when the gNB performs delay detection, it may not rely on the GTP-U tunnel management message, but use other means to detect the delay, that is, in step 2 of the second embodiment, the gNB Use non-3GPP means to detect the delay, such as sending an ICMP packet to the UPF of the opposite end of the GTP-U path to detect the round-trip delay on the transmission path. Wherein, the gNB determines that the CN PDB is half of the detected round-trip delay, and the subsequent steps are the same as those of the second embodiment.
第四实施例:Fourth embodiment:
在本实施例中,需要说明的是,如图11所示,SMF探测用户面时延的步骤为:In this embodiment, it should be noted that, as shown in FIG. 11 , the steps for SMF to detect the user plane delay are:
1.当服务gNB的卫星发生变更时,gNB需要通过新的卫星建立到5GC的控制平面和用户平面的连接。1. When the satellite serving the gNB is changed, the gNB needs to establish a connection to the control plane and user plane of the 5GC through the new satellite.
2.由于传输路径的变化,gNB为各UE发起路径切换过程。2. Due to the change of the transmission path, the gNB initiates a path switching process for each UE.
3.SMF根据各UE的路径切换请求消息中携带的PDU会话的下行N3tunnel的隧道信息(gNB用户面IP地址),确定是否需要对PDU会话的N3tunnel重新进行时延探测,例如若根据gNB用户面IP地址确定gNB使用了卫星回传,则启用时延重探测。3. According to the tunnel information (gNB user plane IP address) of the downlink N3 tunnel of the PDU session carried in the path switching request message of each UE, the SMF determines whether it is necessary to perform delay detection on the N3 tunnel of the PDU session again. If the IP address determines that the gNB uses satellite backhaul, the delay reprobing is enabled.
4.SMF通过N4接口,向服务该PDU会话的UPF指示进行用户面路径传输时延的探测并报告时延值。UPF可通过echo reque/response过程来进行时 延探测。4. The SMF instructs the UPF serving the PDU session to detect the transmission delay of the user plane path through the N4 interface and report the delay value. UPF can perform delay detection through the echo reque/response process.
由于gNB服务多条PDU会话,因此针对服务不同PDU会话的UPF,SMF都将指示其探测路径的传输时延。Since the gNB serves multiple PDU sessions, the SMF will indicate the transmission delay of its probing path for UPFs serving different PDU sessions.
5.各UPF向SMF报告其与gNB之间的传输时延。5. Each UPF reports the transmission delay between it and the gNB to the SMF.
6.SMF确定gNB的UPF之前的传输时延无法满足PDU会话中某些QoS flow的QoS要求时,针对这些QoS flow发起SM policy修改过程。6. When the SMF determines that the transmission delay before the UPF of the gNB cannot meet the QoS requirements of some QoS flows in the PDU session, it initiates the SM policy modification process for these QoS flows.
7.PCF可能需要与应用层协商,请求AF根据传输路径的时延特性更新其QoS要求。7. The PCF may need to negotiate with the application layer and request the AF to update its QoS requirements according to the delay characteristics of the transmission path.
8.PCF根据应用层的QoS要求,更新QoS参数以适应回传连接的时延特性。SMF在下发更新的QoS参数时,将所述传输时延确定为新的CN PDB并发送给gNB。8. The PCF updates the QoS parameters according to the QoS requirements of the application layer to adapt to the delay characteristics of the backhaul connection. When delivering the updated QoS parameters, the SMF determines the transmission delay as a new CN PDB and sends it to the gNB.
本公开实施例提供的数据处理方法,在基站gNB确定服务卫星发生变化后,执行到UPF的传输时延检测或者通知核心网执行gNB与UPF之间的传输时延检测,gNB确定将检测到的传输时延确定为与其服务的QoS flow的5QI对应的CN PDB,并使用所述CN PDB来计算所述QoS flow的5QI对应的AN PDB。其中所述5QI可以为服务卫星变换之前从核心网接收的QoS参数;或者在服务卫星发生变化之后从核心网接收的新的QoS参数。其中,在确定CN PDB之前,向核心网报告传输时延,触发QoS修改过程或者接收核心网下发的QoS参数,和/或新的CN PDB,所述新的CN PDB为SMF根据gNB与UPF之间的传输时延来确定。本公开实施例可以准确设定CN PDB,并及时触发QoS修改避免业务中断。In the data processing method provided by the embodiments of the present disclosure, after the base station gNB determines that the serving satellite has changed, it performs transmission delay detection to the UPF or notifies the core network to perform transmission delay detection between the gNB and the UPF, and the gNB determines that the detected The transmission delay is determined as the CN PDB corresponding to the 5QI of the QoS flow it serves, and the CN PDB is used to calculate the AN PDB corresponding to the 5QI of the QoS flow. The 5QI may be a QoS parameter received from the core network before the serving satellite changes; or a new QoS parameter received from the core network after the serving satellite changes. Before determining the CN PDB, report the transmission delay to the core network, trigger the QoS modification process or receive the QoS parameters issued by the core network, and/or a new CN PDB, the new CN PDB is the SMF according to the gNB and UPF The transmission delay between them is determined. The embodiment of the present disclosure can accurately set the CN PDB, and trigger QoS modification in time to avoid service interruption.
此外,如图11所示,为本公开实施例中应用于基站的数据处理装置的模块框图,该装置包括:In addition, as shown in FIG. 11 , it is a block diagram of a data processing apparatus applied to a base station in an embodiment of the present disclosure, and the apparatus includes:
第一处理模块11,用于根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新 QoS参数。The first processing module 11 is configured to determine whether the core network packet delay budget CN PDB or the return delay meets the pre-determined value after the session management function network element SMF indicates or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. Set the delay budget PDB requirement, if not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF According to the CN PDB, the QoS parameters are updated.
基于上述实施例的内容,在本实施例中,所述确定使用卫星为PDU会话提供回传,包括:Based on the content of the foregoing embodiment, in this embodiment, the determining to use satellite to provide backhaul for the PDU session includes:
根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
基于上述实施例的内容,在本实施例中,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Based on the content of the above embodiment, in this embodiment, the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U to send a return request message on a preset tunnel, and according to the received The time of the returned response message is determined;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
基于上述实施例的内容,在本实施例中,所述确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:Based on the content of the above embodiment, in this embodiment, the determining whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
在此需要说明的是,本装置能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that this device can implement all the method steps of the data processing method embodiment applied to the base station and can achieve the same technical effect, which will not be repeated here.
此外,如图12所示,为本公开实施例提供的应用于会话管理功能网元SMF的数据处理装置的模块框图,该装置包括:In addition, as shown in FIG. 12, a module block diagram of a data processing apparatus applied to a session management function network element SMF provided by an embodiment of the present disclosure, the apparatus includes:
第二接收模块21,用于接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;The second receiving module 21 is configured to receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the packet delay budget of the core network; wherein, the notification message indicates that the base station determines that the CN PDB is not Sent when the preset delay budget PDB requirements are met;
第二处理模块22,用于根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。The second processing module 22 is configured to, according to the notification message, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
基于上述实施例的内容,在本实施例中,所述CN PDB为基于通用无 线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Based on the content of the above embodiment, in this embodiment, the CN PDB sends a backhaul request message on a preset tunnel based on the General Radio Packet Service GPRS Tunneling Protocol GTP-U, and sends a backhaul request message according to the received backhaul response message. time fixed;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
在此需要说明的是,本装置能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that this device can implement all the method steps of the data processing method embodiment applied to the base station and can achieve the same technical effect, which will not be repeated here.
此外,如图13所示,为本公开实施例提供的应用于会话管理功能网元SMF的数据处理装置的模块框图,该装置包括:In addition, as shown in FIG. 13, a module block diagram of a data processing apparatus applied to a session management function network element SMF provided by an embodiment of the present disclosure, the apparatus includes:
第二发送模块31,用于当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;The second sending module 31 is configured to send an indication message to the base station or the user plane function network element UPF after determining that the satellite is used as the backhaul, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
第三处理模块33,用于确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The third processing module 33 is configured to determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, and if not, requesting the policy control function network element PCF according to the CN PDB PDB, update QoS parameters.
基于上述实施例的内容,在本实施例中,所述确定卫星作为回传,包括:Based on the content of the foregoing embodiment, in this embodiment, the determining of the satellite as the return transmission includes:
根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
在此需要说明的是,本装置能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that this device can implement all the method steps of the data processing method embodiment applied to the base station and can achieve the same technical effect, which will not be repeated here.
此外,如图14所示,为本公开实施例提供的应用于用户面功能网元UPF的数据处理装置的模块框图,该装置包括:In addition, as shown in FIG. 14, a module block diagram of a data processing apparatus applied to a user plane function network element UPF provided by an embodiment of the present disclosure, the apparatus includes:
第三发送模块41,用于接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;The third sending module 41 is configured to send a return request message after receiving the instruction message sent by the session management function network element SMF;
第四处理模块43,用于将所述回传请求消息对应的回传响应消息发送 给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The fourth processing module 43 is configured to send a backhaul response message corresponding to the backhaul request message to the SMF, where the SMF is based on the core network packet delay budget CN PDB or CN PDB carried in the backhaul response message. Return delay, determine whether the preset delay budget PDB requirements are met, and if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB.
基于上述实施例的内容,在本实施例中,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,包括:Based on the content of the foregoing embodiment, in this embodiment, the SMF determines whether the preset delay budget PDB is satisfied according to the core network packet delay budget CN PDB or the return delay carried in the return response message. requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
在此需要说明的是,本装置能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that this device can implement all the method steps of the data processing method embodiment applied to the base station and can achieve the same technical effect, which will not be repeated here.
图15是本公开实施例提供的基站的结构示意图之一,包括存储器1520,收发机1500,处理器1510。FIG. 15 is a schematic structural diagram of a base station provided by an embodiment of the present disclosure, including a memory 1520 , a transceiver 1500 , and a processor 1510 .
其中,在图15中,总线架构可以包括任意数量的互联的总线和桥,具体由处理器1510代表的一个或多个处理器和存储器1520代表的存储器的各种电路链接在一起。总线架构还可以将诸如外围设备、稳压器和功率管理电路等之类的各种其他电路链接在一起,这些都是本领域所公知的,因此,本文不再对其进行进一步描述。总线接口提供接口。收发机1500可以是多个元件,即包括发送机和接收机,提供用于在传输介质上与各种其他装置通信的单元,这些传输介质包括无线信道、有线信道、光缆等传输介质。处理器1510负责管理总线架构和通常的处理,存储器1520可以存储处理器1510在执行操作时所使用的数据。15, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 1510 and various circuits of memory represented by memory 1520 are linked together. The bus architecture may also link together various other circuits, such as peripherals, voltage regulators, and power management circuits, which are well known in the art and, therefore, will not be described further herein. The bus interface provides the interface. Transceiver 1500 may be a number of elements, including a transmitter and a receiver, that provide means for communicating with various other devices over transmission media including wireless channels, wired channels, fiber optic cables, and the like. The processor 1510 is responsible for managing the bus architecture and general processing, and the memory 1520 may store data used by the processor 1510 in performing operations.
处理器1510可以是中央处埋器(CPU)、专用集成电路(Application Specific Integrated Circuit,ASIC)、现场可编程门阵列(Field-Programmable Gate Array,FPGA)或复杂可编程逻辑器件(Complex Programmable Logic Device,CPLD),处理器也可以采用多核架构。The processor 1510 may be a central processor (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or a complex programmable logic device (Complex Programmable Logic Device). , CPLD), the processor can also use a multi-core architecture.
存储器1520,用于存储计算机程序;收发机1500,用于在所述处理器的控制下收发数据;处理器1510,用于读取所述存储器中的计算机程序并 执行以下操作:The memory 1520 is used to store computer programs; the transceiver 1500 is used to send and receive data under the control of the processor; the processor 1510 is used to read the computer program in the memory and perform the following operations:
根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements after the session management function network element SMF instructs or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. If not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF to update the QoS according to the CN PDB parameter.
基于上述实施例的内容,在本实施例中,所述确定使用卫星为PDU会话提供回传,包括:Based on the content of the foregoing embodiment, in this embodiment, the determining to use satellite to provide backhaul for the PDU session includes:
根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
基于上述实施例的内容,在本实施例中,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Based on the content of the above embodiment, in this embodiment, the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U to send a return request message on a preset tunnel, and according to the received The time of the returned response message is determined;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
基于上述实施例的内容,在本实施例中,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:Based on the content of the foregoing embodiment, in this embodiment, determining whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
在此需要说明的是,本公开实施例提供的基站能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that the base station provided by the embodiment of the present disclosure can implement all the method steps of the data processing method embodiment applied to the base station and achieve the same technical effect, which is not repeated here.
图16是本公开实施例提供的会话管理功能网元SMF的结构示意图之一,包括存储器1620,收发机1600,处理器1610。FIG. 16 is one of the schematic structural diagrams of a session management function network element SMF provided by an embodiment of the present disclosure, including a memory 1620 , a transceiver 1600 , and a processor 1610 .
其中,在图16中,总线架构可以包括任意数量的互联的总线和桥,具体由处理器1610代表的一个或多个处理器和存储器1620代表的存储器的各种电路链接在一起。总线架构还可以将诸如外围设备、稳压器和功率管理电路等之类的各种其他电路链接在一起,这些都是本领域所公知的,因此,本文不再对其进行进一步描述。总线接口提供接口。收发机1600可以是多个元件,即包括发送机和接收机,提供用于在传输介质上与各种其他装置通信的单元,这些传输介质包括无线信道、有线信道、光缆等传输介质。处理器1610负责管理总线架构和通常的处理,存储器1620可以存储处理器1610在执行操作时所使用的数据。16, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 1610 and various circuits of memory represented by memory 1620 are linked together. The bus architecture may also link together various other circuits, such as peripherals, voltage regulators, and power management circuits, which are well known in the art and, therefore, will not be described further herein. The bus interface provides the interface. Transceiver 1600 may be multiple elements, ie, including transmitters and receivers, providing means for communicating with various other devices over transmission media including wireless channels, wired channels, fiber optic cables, and the like. The processor 1610 is responsible for managing the bus architecture and general processing, and the memory 1620 may store data used by the processor 1610 in performing operations.
处理器1610可以是中央处埋器(CPU)、专用集成电路(Application Specific Integrated Circuit,ASIC)、现场可编程门阵列(Field-Programmable Gate Array,FPGA)或复杂可编程逻辑器件(Complex Programmable Logic Device,CPLD),处理器也可以采用多核架构。The processor 1610 can be a central processor (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or a complex programmable logic device (Complex Programmable Logic Device). , CPLD), the processor can also use a multi-core architecture.
存储器1620,用于存储计算机程序;收发机1600,用于在所述处理器的控制下收发数据;处理器1610,用于读取所述存储器中的计算机程序并执行以下操作:The memory 1620 is used to store computer programs; the transceiver 1600 is used to send and receive data under the control of the processor; the processor 1610 is used to read the computer programs in the memory and perform the following operations:
接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;Receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the core network packet delay budget; wherein, the notification message is when the base station determines that the CN PDB does not meet the preset delay budget PDB requirement sent;
根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。According to the notification message, the policy control function network element PCF is requested to update the QoS parameters according to the CN PDB.
基于上述实施例的内容,在本实施例中,所述CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;Based on the content of the above embodiment, in this embodiment, the CN PDB sends a backhaul request message on a preset tunnel based on the General Radio Packet Service GPRS Tunneling Protocol GTP-U, and sends a backhaul request message according to the received backhaul response message. time fixed;
或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
还执行以下操作:当确定卫星作为回传后,向基站或用户面功能网元 UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;Also perform the following operations: after determining that the satellite is used as the backhaul, send an indication message to the base station or the user plane functional network element UPF, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB.
基于上述实施例的内容,在本实施例中,所述确定卫星作为回传,包括:Based on the content of the foregoing embodiment, in this embodiment, the determining of the satellite as the return transmission includes:
根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
在此需要说明的是,本公开实施例提供的会话管理功能网元SMF能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that the session management function network element SMF provided by the embodiment of the present disclosure can implement all the method steps of the data processing method embodiment applied to the base station and achieve the same technical effect, which is not repeated here.
图17是本公开实施例提供的用户面功能网元UPF的结构示意图之一,包括存储器1720,收发机1700,处理器1710。FIG. 17 is one of the schematic structural diagrams of the user plane function network element UPF provided by an embodiment of the present disclosure, including a memory 1720 , a transceiver 1700 , and a processor 1710 .
其中,在图17中,总线架构可以包括任意数量的互联的总线和桥,具体由处理器1710代表的一个或多个处理器和存储器1720代表的存储器的各种电路链接在一起。总线架构还可以将诸如外围设备、稳压器和功率管理电路等之类的各种其他电路链接在一起,这些都是本领域所公知的,因此,本文不再对其进行进一步描述。总线接口提供接口。收发机1700可以是多个元件,即包括发送机和接收机,提供用于在传输介质上与各种其他装置通信的单元,这些传输介质包括无线信道、有线信道、光缆等传输介质。处理器1710负责管理总线架构和通常的处理,存储器1720可以存储处理器1710在执行操作时所使用的数据。17, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 1710 and various circuits of memory represented by memory 1720 are linked together. The bus architecture may also link together various other circuits, such as peripherals, voltage regulators, and power management circuits, which are well known in the art and, therefore, will not be described further herein. The bus interface provides the interface. Transceiver 1700 may be multiple elements, including a transmitter and a receiver, providing means for communicating with various other devices over transmission media including wireless channels, wired channels, fiber optic cables, and the like. The processor 1710 is responsible for managing the bus architecture and general processing, and the memory 1720 may store data used by the processor 1710 in performing operations.
处理器1710可以是中央处埋器(CPU)、专用集成电路(Application Specific Integrated Circuit,ASIC)、现场可编程门阵列(Field-Programmable Gate Array,FPGA)或复杂可编程逻辑器件(Complex Programmable Logic Device,CPLD),处理器也可以采用多核架构。The processor 1710 may be a central processor (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or a complex programmable logic device (Complex Programmable Logic Device). , CPLD), the processor can also use a multi-core architecture.
存储器1720,用于存储计算机程序;收发机1700,用于在所述处理器的控制下收发数据;处理器1710,用于读取所述存储器中的计算机程序并执行以下操作:The memory 1720 is used to store computer programs; the transceiver 1700 is used to send and receive data under the control of the processor; the processor 1710 is used to read the computer programs in the memory and perform the following operations:
接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;After receiving the instruction message sent by the session management function network element SMF, send a return request message;
将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF determines whether it satisfies the core network packet delay budget CN PDB or backhaul delay carried in the backhaul response message. The preset delay budget PDB requirements, if not satisfied, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
基于上述实施例的内容,在本实施例中,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,包括:Based on the content of the foregoing embodiment, in this embodiment, the SMF determines whether the preset delay budget PDB is satisfied according to the core network packet delay budget CN PDB or the return delay carried in the return response message. requirements, including:
根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
在此需要说明的是,本公开实施例提供的用户面功能网元UPF能够实现应用于基站的数据处理方法实施例的所有方法步骤并能够达到相同的技术效果,在此不再进行赘述。It should be noted here that the user plane function network element UPF provided by the embodiments of the present disclosure can implement all the method steps of the data processing method embodiments applied to the base station and achieve the same technical effect, which is not repeated here.
另一方面,本公开实施例还提供一种处理器可读存储介质,所述处理器可读存储介质存储有计算机程序,所述计算机程序用于使所述处理器执行上述实施例中所述的方法。On the other hand, an embodiment of the present disclosure further provides a processor-readable storage medium, where a computer program is stored in the processor-readable storage medium, and the computer program is used to cause the processor to execute the processes described in the foregoing embodiments. Methods.
所述处理器可读存储介质可以是处理器能够存取的任何可用介质或数据存储设备,包括但不限于磁性存储器(例如软盘、硬盘、磁带、磁光盘(MO)等)、光学存储器(例如CD、DVD、BD、HVD等)、以及半导体存储器(例如ROM、EPROM、EEPROM、非易失性存储器(NAND FLASH)、固态硬盘(SSD))等。The processor-readable storage medium can be any available medium or data storage device that can be accessed by a processor, including, but not limited to, magnetic storage (eg, floppy disk, hard disk, magnetic tape, magneto-optical disk (MO), etc.), optical storage (eg, CD, DVD, BD, HVD, etc.), and semiconductor memory (eg, ROM, EPROM, EEPROM, non-volatile memory (NAND FLASH), solid-state disk (SSD)), etc.
由上述实施例可见,处理器可读存储介质存储有计算机程序,所述计算机程序用于使所述处理器执行上述数据处理方法的步骤。It can be seen from the above-mentioned embodiments that the processor-readable storage medium stores a computer program, and the computer program is used to cause the processor to execute the steps of the above-mentioned data processing method.
本领域内的技术人员应明白,本公开的实施例可提供为方法、系统、或计算机程序产品。因此,本公开可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本公开可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器和光学存储器等)上实施的计算机程序产品的形式。As will be appreciated by one skilled in the art, embodiments of the present disclosure may be provided as a method, system, or computer program product. Accordingly, the present disclosure may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present disclosure may take the form of a computer program product embodied on one or more computer-usable storage media having computer-usable program code embodied therein, including but not limited to disk storage, optical storage, and the like.
本公开是参照根据本公开实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机可执行指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机可执行指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。The present disclosure is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the disclosure. It will be understood that each flow and/or block in the flowcharts and/or block diagrams, and combinations of flows and/or blocks in the flowcharts and/or block diagrams, can be implemented by computer-executable instructions. These computer-executable instructions may be provided to the processor of a general purpose computer, special purpose computer, embedded processor or other programmable data processing device to produce a machine such that the instructions executed by the processor of the computer or other programmable data processing device produce Means for implementing the functions specified in a flow or flow of a flowchart and/or a block or blocks of a block diagram.
这些处理器可执行指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的处理器可读存储器中,使得存储在该处理器可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。These processor-executable instructions may also be stored in a processor-readable memory capable of directing a computer or other programmable data processing apparatus to operate in a particular manner, such that the instructions stored in the processor-readable memory result in the manufacture of means including the instructions product, the instruction means implements the functions specified in the flow or flow of the flowchart and/or the block or blocks of the block diagram.
这些处理器可执行指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。These processor-executable instructions can also be loaded onto a computer or other programmable data processing device to cause a series of operational steps to be performed on the computer or other programmable device to produce a computer-implemented process that Execution of the instructions provides steps for implementing the functions specified in the flowchart or blocks and/or the block or blocks of the block diagrams.
显然,本领域的技术人员可以对本公开进行各种改动和变型而不脱离本公开的精神和范围。这样,倘若本公开的这些修改和变型属于本公开权利要求及其等同技术的范围之内,则本公开也意图包含这些改动和变型在内。It will be apparent to those skilled in the art that various modifications and variations can be made in the present disclosure without departing from the spirit and scope of the present disclosure. Thus, provided that these modifications and variations of the present disclosure fall within the scope of the claims of the present disclosure and their equivalents, the present disclosure is also intended to cover such modifications and variations.

Claims (31)

  1. 一种数据处理方法,其特征在于,应用于基站,包括:A data processing method, characterized in that, applied to a base station, comprising:
    根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements after the session management function network element SMF instructs or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. If not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF to update the QoS according to the CN PDB parameter.
  2. 根据权利要求1所述的数据处理方法,其特征在于,所述确定使用卫星为PDU会话提供回传,包括:The data processing method according to claim 1, wherein the determining that a satellite is used to provide backhaul for the PDU session comprises:
    根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
    或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
  3. 根据权利要求1所述的数据处理方法,其特征在于,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;The data processing method according to claim 1, wherein the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U sending a return request message on a preset tunnel, and Determined according to the time when the response message is received;
    或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
  4. 根据权利要求1所述的数据处理方法,其特征在于,所述确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:The data processing method according to claim 1, wherein the determining whether the core network packet delay budget CN PDB or the backhaul delay meets the preset delay budget PDB requirements, comprising:
    根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
  5. 一种数据处理方法,其特征在于,应用于会话管理功能网元SMF,包括:A data processing method, characterized in that, applied to a session management function network element SMF, comprising:
    接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;Receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the core network packet delay budget; wherein, the notification message is when the base station determines that the CN PDB does not meet the preset delay budget PDB requirements sent;
    根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。According to the notification message, the policy control function network element PCF is requested to update the QoS parameters according to the CN PDB.
  6. 根据权利要求5所述的数据处理方法,其特征在于,所述CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;The data processing method according to claim 5, wherein the CN PDB sends a backhaul request message on a preset tunnel based on the General Radio Packet Service GPRS Tunneling Protocol (GTP-U), and sends a backhaul request message according to the received backhaul response. The time of the message is determined;
    或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
  7. 一种数据处理方法,其特征在于,应用于会话管理功能网元SMF,包括:A data processing method, characterized in that, applied to a session management function network element SMF, comprising:
    当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;After determining that the satellite is used as the backhaul, send an indication message to the base station or the user plane functional network element UPF, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
    确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB.
  8. 根据权利要求7所述的数据处理方法,其特征在于,所述确定卫星作为回传,包括:The data processing method according to claim 7, wherein the determining of the satellite as the return transmission comprises:
    根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
    或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
  9. 一种数据处理方法,其特征在于,应用于用户面功能网元UPF,包括:A data processing method, characterized in that, applied to a user plane functional network element UPF, comprising:
    接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;After receiving the instruction message sent by the session management function network element SMF, send a return request message;
    将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF 根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF determines whether it meets the requirements according to the core network packet delay budget CN PDB or backhaul delay carried in the backhaul response message. The preset delay budget PDB requirements, if not satisfied, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
  10. 根据权利要求9所述的数据处理方法,其特征在于,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,包括:The data processing method according to claim 9, wherein the SMF determines whether the preset delay is satisfied according to the core network packet delay budget CN PDB or the return delay carried in the return response message Budget PDB requirements, including:
    根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
  11. 一种数据处理装置,应用于基站,其特征在于,包括:A data processing device, applied to a base station, is characterized in that, comprising:
    第一处理模块,用于根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The first processing module is configured to determine whether the core network packet delay budget CN PDB or the return delay meets the preset requirements after the session management function network element SMF indicates or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. Delay budget PDB requirements, if not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, the notification message is used to notify the SMF to request the policy control function network element PCF according to The CN PDB updates QoS parameters.
  12. 根据权利要求11所述的数据处理装置,其特征在于,所述确定使用卫星为PDU会话提供回传,包括:The data processing apparatus according to claim 11, wherein the determining to use a satellite to provide backhaul for the PDU session comprises:
    根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
    或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
  13. 根据权利要求11所述的数据处理装置,其特征在于,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;The data processing device according to claim 11, wherein the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U sending a return request message on a preset tunnel, and Determined according to the time when the response message is received;
    或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的 接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite end UPF of the General Radio Packet Service GPRS Tunneling Protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
  14. 根据权利要求11所述的数据处理装置,其特征在于,所述确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:The data processing apparatus according to claim 11, wherein the determining whether the core network packet delay budget CN PDB or the backhaul delay meets the preset delay budget PDB requirements, comprising:
    根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
  15. 一种数据处理装置,应用于会话管理功能网元SMF,其特征在于,包括:A data processing device, applied to a session management function network element SMF, is characterized in that, comprising:
    第二接收模块,用于接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;The second receiving module is configured to receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the packet delay budget of the core network; wherein, the notification message is that the base station determines that the CN PDB is not satisfied Sent when the preset delay budget PDB is required;
    第二处理模块,用于根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。The second processing module is configured to, according to the notification message, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
  16. 根据权利要求15所述的数据处理装置,其特征在于,所述CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;The data processing device according to claim 15, wherein the CN PDB sends a backhaul request message on a preset tunnel based on the General Radio Packet Service GPRS Tunneling Protocol (GTP-U), and sends a backhaul request message according to the received backhaul response. The time of the message is determined;
    或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
  17. 一种数据处理装置,应用于会话管理功能网元SMF,其特征在于,包括:A data processing device, applied to a session management function network element SMF, is characterized in that, comprising:
    第二发送模块,用于当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;The second sending module is configured to send an indication message to the base station or the user plane function network element UPF after determining that the satellite is used as the backhaul, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
    第三处理模块,用于确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The third processing module is used to determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, requesting the policy control function network element PCF according to the CN PDB , to update the QoS parameters.
  18. 根据权利要求17所述的数据处理装置,其特征在于,所述确定卫星作为回传,包括:The data processing apparatus according to claim 17, wherein the determining of the satellite as the return transmission comprises:
    根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
    或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
  19. 一种数据处理装置,应用于用户面功能网元UPF,其特征在于,包括:A data processing device, applied to a user plane function network element UPF, is characterized in that, comprising:
    第三发送模块,用于接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;a third sending module, configured to send a return request message after receiving the instruction message sent by the session management function network element SMF;
    第四处理模块,用于将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。The fourth processing module is configured to send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF according to the core network packet delay budget CN PDB or backhaul carried in the backhaul response message. The transmission delay is used to determine whether the preset delay budget PDB requirements are met. If not, the policy control function network element PCF is requested to update the QoS parameters according to the CN PDB.
  20. 根据权利要求19所述的数据处理装置,其特征在于,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,包括:The data processing apparatus according to claim 19, wherein the SMF determines whether the preset delay is satisfied according to the core network packet delay budget CN PDB or the return delay carried in the return response message Budget PDB requirements, including:
    根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
  21. 一种基站,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如下步骤:A base station, comprising a memory, a processor and a computer program stored on the memory and running on the processor, wherein the processor implements the following steps when executing the computer program:
    根据会话管理功能网元SMF指示或确定使用卫星为协议数据单元PDU会话提供回传后,确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则向服务所述PDU会话的SMF发送携带有所述CN PDB取值的通知消息,所述通知消息用于通知所述SMF请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements after the session management function network element SMF instructs or determines that the satellite is used to provide backhaul for the protocol data unit PDU session. If not satisfied, send a notification message carrying the value of the CN PDB to the SMF serving the PDU session, where the notification message is used to notify the SMF to request the policy control function network element PCF to update the QoS according to the CN PDB parameter.
  22. 根据权利要求21所述的基站,其特征在于,所述确定使用卫星为PDU会话提供回传,包括:The base station of claim 21, wherein the determining to use a satellite to provide backhaul for the PDU session comprises:
    根据所述PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;Determine to use satellite to provide backhaul for the PDU session according to the transport layer connection information of the N3 tunnel of the PDU session;
    或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
  23. 根据权利要求21所述的基站,其特征在于,所述核心网分组包时延预算CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;The base station according to claim 21, wherein the core network packet delay budget CN PDB is based on the general wireless packet service GPRS tunneling protocol GTP-U sending a backhaul request message on a preset tunnel, and according to the received The time of the returned response message is determined;
    或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
  24. 根据权利要求21所述的基站,其特征在于,所述确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,包括:The base station according to claim 21, wherein the determining whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, comprising:
    根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
  25. 一种会话管理功能网元SMF,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如下步骤:A session management function network element SMF, comprising a memory, a processor and a computer program stored in the memory and running on the processor, wherein the processor implements the following steps when executing the computer program:
    接收基站发送的通知消息,所述通知消息中携带有确定核心网分组包时延预算CN PDB取值;其中,所述通知消息为所述基站在确定CN PDB不满足预设时延预算PDB要求时发送的;Receive a notification message sent by the base station, where the notification message carries the CN PDB value for determining the core network packet delay budget; wherein, the notification message is when the base station determines that the CN PDB does not meet the preset delay budget PDB requirements sent;
    根据所述通知消息,请求策略控制功能网元PCF根据所述CN PDB更新QoS参数。According to the notification message, the policy control function network element PCF is requested to update the QoS parameters according to the CN PDB.
  26. 根据权利要求25所述的会话管理功能网元SMF,其特征在于,所述CN PDB为基于通用无线分组业务GPRS隧道协议GTP-U在预设隧 道上发送回传请求消息,并根据收到的回传响应消息的时间确定的;The session management function network element SMF according to claim 25, wherein the CN PDB is based on the General Radio Packet Service GPRS Tunneling Protocol GTP-U to send a backhaul request message on a preset tunnel, and according to the received The time of returning the response message is determined;
    或,为基于向通用无线分组业务GPRS隧道协议GTP-U路径的对端UPF发送互联网Internet控制报文协议ICMP包,并根据所述ICMP包的接收时间确定的。Or, it is based on sending the Internet Internet Control Message Protocol ICMP packet to the opposite UPF of the general wireless packet service GPRS tunneling protocol GTP-U path, and is determined according to the receiving time of the ICMP packet.
  27. 一种会话管理功能网元SMF,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如下步骤:A session management function network element SMF, comprising a memory, a processor and a computer program stored in the memory and running on the processor, wherein the processor implements the following steps when executing the computer program:
    当确定卫星作为回传后,向基站或用户面功能网元UPF发送指示消息,所述指示消息用于指示基站或UPF发送回传请求消息;After determining that the satellite is used as the backhaul, send an indication message to the base station or the user plane functional network element UPF, where the indication message is used to instruct the base station or the UPF to send a backhaul request message;
    确定核心网分组包时延预算CN PDB或回传时延,是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Determine whether the core network packet delay budget CN PDB or backhaul delay meets the preset delay budget PDB requirements, if not, request the policy control function network element PCF to update QoS parameters according to the CN PDB.
  28. 根据权利要求27所述的会话管理功能网元SMF,其特征在于,所述确定卫星作为回传,包括:The session management function network element SMF according to claim 27, wherein the determining of the satellite as the backhaul comprises:
    根据协议数据单元PDU会话的N3隧道的传输层连接信息确定使用卫星为PDU会话提供回传;According to the transport layer connection information of the N3 tunnel of the protocol data unit PDU session, it is determined to use the satellite to provide backhaul for the PDU session;
    或,根据所述PDU会话的用户面连接的传输层连接信息确定使用卫星为PDU会话提供回传。Or, according to the transport layer connection information of the user plane connection of the PDU session, it is determined to use the satellite to provide backhaul for the PDU session.
  29. 一种用户面功能网元UPF,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如下步骤:A user plane function network element UPF, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, wherein the processor implements the following steps when executing the computer program:
    接收会话管理功能网元SMF发送的指示消息后,发送回传请求消息;After receiving the instruction message sent by the session management function network element SMF, send a return request message;
    将所述回传请求消息对应的回传响应消息发送给所述SMF,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB或回传时延,确定是否满足预设时延预算PDB要求,若不满足,则请求策略控制功能网元PCF根据所述CN PDB,更新QoS参数。Send the backhaul response message corresponding to the backhaul request message to the SMF, and the SMF determines whether it satisfies the core network packet delay budget CN PDB or backhaul delay carried in the backhaul response message. The preset delay budget PDB requirements, if not satisfied, request the policy control function network element PCF to update the QoS parameters according to the CN PDB.
  30. 根据权利要求29所述的用户面功能网元UPF,其特征在于,所述SMF根据所述回传响应消息中携带的核心网分组包时延预算CN PDB 或回传时延,确定是否满足预设时延预算PDB要求,包括:The user plane function network element UPF according to claim 29, wherein the SMF determines whether the pre-order is satisfied according to the core network packet delay budget CN PDB or the backhaul delay carried in the backhaul response message. Set delay budget PDB requirements, including:
    根据所述回传时延或所述CN PDB,判断所述回传时延或所述CN PDB是否大于或等于所述QoS flow的分组包时延预算PDB,若是,则确定不满足所述QoS flow的分组包时延预算PDB要求。According to the backhaul delay or the CN PDB, determine whether the backhaul delay or the CN PDB is greater than or equal to the packet delay budget PDB of the QoS flow, and if so, determine that the QoS is not satisfied Packet delay budget PDB requirement for flow.
  31. 一种非暂态计算机可读存储介质,其上存储有计算机程序,其特征在于,该程序被处理器执行时实现如权利要求1至4任一项所述的数据处理方法的步骤,或执行如权利要求5或6任一项所述的数据处理方法的步骤,或执行如权利要求7或8任一项所述的数据处理方法的步骤,或执行如权利要求9或10任一项所述的数据处理方法的步骤。A non-transitory computer-readable storage medium on which a computer program is stored, characterized in that, when the program is executed by a processor, the steps of the data processing method according to any one of claims 1 to 4 are implemented, or the program is executed The steps of the data processing method according to any one of claims 5 or 6, or the steps of executing the data processing method according to any one of claims 7 or 8, or the steps of executing the data processing method according to any one of claims 9 or 10 The steps of the data processing method described.
PCT/CN2021/135414 2021-01-25 2021-12-03 Data processing method and apparatus, base station, network device and storage medium WO2022156384A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110096966.X 2021-01-25
CN202110096966.XA CN114793342A (en) 2021-01-25 2021-01-25 Data processing method, device, base station, network equipment and storage medium

Publications (1)

Publication Number Publication Date
WO2022156384A1 true WO2022156384A1 (en) 2022-07-28

Family

ID=82460431

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/135414 WO2022156384A1 (en) 2021-01-25 2021-12-03 Data processing method and apparatus, base station, network device and storage medium

Country Status (2)

Country Link
CN (1) CN114793342A (en)
WO (1) WO2022156384A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024031462A1 (en) * 2022-08-10 2024-02-15 北京小米移动软件有限公司 Communication control method, system and apparatus, communication device, and storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110167068A (en) * 2018-02-14 2019-08-23 华为技术有限公司 A kind of method, network element, system and storage medium handling service quality QoS parameter

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110167068A (en) * 2018-02-14 2019-08-23 华为技术有限公司 A kind of method, network element, system and storage medium handling service quality QoS parameter

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
QUALCOMM INCORPRORATED: "CN PDB for slow backhaul links", 3GPP TSG_SA\WG2_ARCH; S2-2008952, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), SOPHIA-ANTIPOLIS CEDEX ; FRANCE, 9 November 2020 (2020-11-09), E (e-meeting) Elbonia ;20201116 - 20201120, XP051953267 *
SAMSUNG: "A new NOTE for Standardised 5QI to support satellite backhaul connectivity.", 3GPP TSG_SA\WG2_ARCH; S2-2008783, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, 9 November 2020 (2020-11-09), Online; 20201116 - 20201120, XP051953120 *
TNO: "Introduction of Satellite Category - discussion", 3GPP TSG_SA\WG2_ARCH; S2-2007721, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), SOPHIA-ANTIPOLIS CEDEX ; FRANCE, 2 October 2020 (2020-10-02), e-meeting; 20201012 - 20201023, XP051938751 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024031462A1 (en) * 2022-08-10 2024-02-15 北京小米移动软件有限公司 Communication control method, system and apparatus, communication device, and storage medium

Also Published As

Publication number Publication date
CN114793342A (en) 2022-07-26

Similar Documents

Publication Publication Date Title
US11109263B2 (en) Data transmission method and data transmission apparatus
US20170164234A1 (en) Dual Connectivity and Carrier Aggregation at an IP Layer
US20200351714A1 (en) Communication Method for Deterministic Transmission and Related Apparatus
WO2022028041A1 (en) Method for communication between user terminal and network, and terminal, network device and apparatus
US20200205226A1 (en) Session establishment method and apparatus
US11689969B2 (en) Service node updating method, terminal device, and network-side device
WO2022078112A1 (en) Connection establishment method and apparatus, device, and storage medium
WO2023066383A1 (en) Data transmission method and apparatus, and storage medium
WO2022062824A1 (en) Timing advance compensation method, base station, terminal, and storage medium
WO2022156384A1 (en) Data processing method and apparatus, base station, network device and storage medium
WO2018195943A1 (en) Congestion processing method and device
WO2022073491A1 (en) Handover method, apparatus, terminal device, network device, and storage medium
TW202008842A (en) Method and device for ensuring data transmission reliability, and network apparatus
WO2022188437A1 (en) Information processing method and apparatus, and storage medium
WO2022082543A1 (en) Iab-node migration method and apparatus
CN114501528B (en) Delay jitter synchronization method, device and storage medium
WO2021114103A1 (en) Dual connectivity establishment method and communication apparatus
WO2020155725A1 (en) Parameter configuration method and apparatus, and network device
WO2020223972A1 (en) Method for processing radio resource control message, apparatus, and storage medium
TW202014029A (en) Wireless communication method, terminal device, and network device
WO2024022199A1 (en) Information transmission method and apparatus, and storage medium
WO2022134636A1 (en) Backhaul path switching method, and base station, apparatus and storage medium
WO2024066899A1 (en) Method and apparatus for updating timing information
WO2022116820A1 (en) Method and apparatus for recovering rrc connection of terminal
WO2022152092A1 (en) Data transmission control method and apparatus

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21920758

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21920758

Country of ref document: EP

Kind code of ref document: A1