WO2022138450A1 - 通信制御方法及びユーザ装置 - Google Patents

通信制御方法及びユーザ装置 Download PDF

Info

Publication number
WO2022138450A1
WO2022138450A1 PCT/JP2021/046549 JP2021046549W WO2022138450A1 WO 2022138450 A1 WO2022138450 A1 WO 2022138450A1 JP 2021046549 W JP2021046549 W JP 2021046549W WO 2022138450 A1 WO2022138450 A1 WO 2022138450A1
Authority
WO
WIPO (PCT)
Prior art keywords
transmission
mbs
ptp
ptm
status report
Prior art date
Application number
PCT/JP2021/046549
Other languages
English (en)
French (fr)
Inventor
真人 藤代
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to JP2022571378A priority Critical patent/JPWO2022138450A1/ja
Publication of WO2022138450A1 publication Critical patent/WO2022138450A1/ja
Priority to US18/339,896 priority patent/US20230337327A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/40Connection management for selective distribution or broadcast
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/06Selective distribution of broadcast services, e.g. multimedia broadcast multicast service [MBMS]; Services to user groups; One-way selective calling services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/11Allocation or use of connection identifiers

Definitions

  • the present disclosure relates to a communication control method and a user device used in a mobile communication system.
  • NR New Radio
  • RAT Radio Access Technology
  • LTE Long Term Evolution
  • the communication control method is a communication control method executed by a user device in a mobile communication system that provides a multicast / broadcast service (MBS), and is a communication control method for PTP (Point-To-Point) transmission and PTM (Point). -Depending on the receipt of MBS data transmitted from the base station by any transmission method of To-Multipoint) transmission and the switching of the transmission method between the PTP transmission and the PTM transmission. It includes triggering the transmission of a status report indicating the reception status of MBS data in a predetermined layer of the user apparatus, and transmitting the status report to the base station.
  • MBS multicast / broadcast service
  • the user device is a user device used in a mobile communication system that provides a multicast / broadcast service (MBS), and is used for PTP (Point-To-Point) transmission and PTM (Point-To-Multipoint) transmission.
  • a receiver that receives MBS data transmitted from a base station by any of the transmission methods of the above, and a predetermined user device according to the fact that the transmission method is switched between the PTP transmission and the PTM transmission. It includes a control unit that triggers transmission of a status report indicating the reception status of MBS data in the layer, and a transmission unit that transmits the status report to the base station.
  • logical channel logical channel
  • Transport channel Transport channel
  • NR 5G system
  • the purpose of this disclosure is to realize an improved multicast / broadcast service.
  • FIG. 1 is a diagram showing a configuration of a mobile communication system according to an embodiment.
  • This mobile communication system complies with the 5th generation system (5GS: 5th Generation System) of the 3GPP standard.
  • 5GS 5th Generation System
  • 5GS will be described as an example, but the LTE (Long Term Evolution) system may be applied at least partially to the mobile communication system, and the 6th generation (6G) system may be applied at least partially. May be done.
  • mobile communication systems include a user device (UE: User Equipment) 100, a 5G radio access network (NG-RAN: Next Generation Radio Access Network) 10, and a 5G core network (5GC: 5G). It has Core Network) 20.
  • UE User Equipment
  • NG-RAN Next Generation Radio Access Network
  • 5GC 5G core network
  • the UE 100 is a mobile wireless communication device.
  • the UE 100 may be any device as long as it is a device used by the user.
  • the UE 100 may be a mobile phone terminal (including a smartphone), a tablet terminal, a notebook PC, or a communication module (communication card or communication card).
  • a device including a chipset), a sensor or a device provided on the sensor, a vehicle or a device provided on the vehicle (Vehicle UE), a flying object or a device provided on the flying object (Arial UE).
  • the NG-RAN 10 includes a base station (referred to as "gNB” in a 5G system) 200.
  • the gNB 200 are connected to each other via the Xn interface, which is an interface between base stations.
  • the gNB 200 manages one or more cells.
  • the gNB 200 performs wireless communication with the UE 100 that has established a connection with its own cell.
  • the gNB 200 has a radio resource management (RRM) function, a routing function for user data (hereinafter, simply referred to as “data”), a measurement control function for mobility control / scheduling, and the like.
  • RRM radio resource management
  • Cell is used as a term to indicate the smallest unit of a wireless communication area.
  • the term “cell” is also used to indicate a function or resource for wireless communication with the UE 100.
  • One cell belongs to one carrier frequency.
  • gNB can also connect to EPC (Evolved Packet Core), which is the core network of LTE.
  • EPC Evolved Packet Core
  • LTE base stations can also be connected to 5GC.
  • the LTE base station and gNB can also be connected via an inter-base station interface.
  • 5GC20 includes AMF (Access and Mobility Management Function) and UPF (User Plane Function) 300.
  • the AMF performs various mobility controls and the like for the UE 100.
  • the AMF manages the mobility of the UE 100 by communicating with the UE 100 using NAS (Non-Access Stratum) signaling.
  • UPF controls data transfer.
  • the AMF and UPF are connected to the gNB 200 via the NG interface, which is an interface between the base station and the core network.
  • FIG. 2 is a diagram showing a configuration of a UE 100 (user device) according to an embodiment.
  • the UE 100 includes a receiving unit 110, a transmitting unit 120, and a control unit 130.
  • the receiving unit 110 performs various receptions under the control of the control unit 130.
  • the receiving unit 110 includes an antenna and a receiver.
  • the receiver converts the radio signal received by the antenna into a baseband signal (received signal) and outputs it to the control unit 130.
  • the transmission unit 120 performs various transmissions under the control of the control unit 130.
  • the transmitter 120 includes an antenna and a transmitter.
  • the transmitter converts the baseband signal (transmission signal) output by the control unit 130 into a radio signal and transmits it from the antenna.
  • the control unit 130 performs various controls on the UE 100.
  • the control unit 130 includes at least one processor and at least one memory.
  • the memory stores a program executed by the processor and information used for processing by the processor.
  • the processor may include a baseband processor and a CPU (Central Processing Unit).
  • the baseband processor modulates / demodulates and encodes / decodes the baseband signal.
  • the CPU executes a program stored in the memory to perform various processes.
  • FIG. 3 is a diagram showing the configuration of gNB200 (base station) according to one embodiment.
  • the gNB 200 includes a transmission unit 210, a reception unit 220, a control unit 230, and a backhaul communication unit 240.
  • the transmission unit 210 performs various transmissions under the control of the control unit 230.
  • the transmitter 210 includes an antenna and a transmitter.
  • the transmitter converts the baseband signal (transmission signal) output by the control unit 230 into a radio signal and transmits it from the antenna.
  • the receiving unit 220 performs various receptions under the control of the control unit 230.
  • the receiving unit 220 includes an antenna and a receiver.
  • the receiver converts the radio signal received by the antenna into a baseband signal (received signal) and outputs it to the control unit 230.
  • the control unit 230 performs various controls on the gNB 200.
  • the control unit 230 includes at least one processor and at least one memory.
  • the memory stores a program executed by the processor and information used for processing by the processor.
  • the processor may include a baseband processor and a CPU.
  • the baseband processor modulates / demodulates and encodes / decodes the baseband signal.
  • the CPU executes a program stored in the memory to perform various processes.
  • the backhaul communication unit 240 is connected to an adjacent base station via an interface between base stations.
  • the backhaul communication unit 240 is connected to the AMF / UPF 300 via the base station-core network interface.
  • the gNB is composed of a CU (Central Unit) and a DU (Distributed Unit) (that is, the functions are divided), and both units may be connected by an F1 interface.
  • FIG. 4 is a diagram showing a configuration of a protocol stack of a wireless interface of a user plane that handles data.
  • the wireless interface protocol of the user plane includes a physical (PHY) layer, a MAC (Medium Access Control) layer, an RLC (Radio Link Control) layer, and a PDCP (Packet Data Convergence Protocol) layer. It has an SDAP (Service Data Adjustment Protocol) layer.
  • PHY physical
  • MAC Medium Access Control
  • RLC Radio Link Control
  • PDCP Packet Data Convergence Protocol
  • SDAP Service Data Adjustment Protocol
  • the PHY layer performs coding / decoding, modulation / demodulation, antenna mapping / demapping, and resource mapping / demapping. Data and control information are transmitted between the PHY layer of the UE 100 and the PHY layer of the gNB 200 via a physical channel.
  • the MAC layer performs data priority control, retransmission processing by hybrid ARQ (HARQ), random access procedure, and the like. Data and control information are transmitted between the MAC layer of the UE 100 and the MAC layer of the gNB 200 via the transport channel.
  • the MAC layer of gNB200 includes a scheduler. The scheduler determines the transport format (transport block size, modulation / coding method (MCS)) of the upper and lower links and the resource block allocated to the UE 100.
  • MCS modulation / coding method
  • the RLC layer transmits data to the receiving RLC layer by using the functions of the MAC layer and the PHY layer. Data and control information are transmitted between the RLC layer of the UE 100 and the RLC layer of the gNB 200 via a logical channel.
  • the PDCP layer performs header compression / decompression and encryption / decryption.
  • the SDAP layer maps an IP flow, which is a unit in which a core network performs QoS control, with a wireless bearer, which is a unit in which an AS (Access Stratum) controls QoS.
  • IP flow which is a unit in which a core network performs QoS control
  • wireless bearer which is a unit in which an AS (Access Stratum) controls QoS.
  • AS Access Stratum
  • FIG. 5 is a diagram showing a configuration of a protocol stack of a wireless interface of a control plane that handles signaling (control signal).
  • the protocol stack of the radio interface of the control plane has an RRC (Radio Resource Control) layer and a NAS (Non-Access Stratum) layer in place of the SDAP layer shown in FIG.
  • RRC signaling for various settings is transmitted between the RRC layer of UE100 and the RRC layer of gNB200.
  • the RRC layer controls logical channels, transport channels, and physical channels in response to the establishment, re-establishment, and release of radio bearers.
  • RRC connection connection between the RRC of the UE 100 and the RRC of the gNB 200
  • the UE 100 is in the RRC connected state.
  • RRC connection no connection between the RRC of the UE 100 and the RRC of the gNB 200
  • the UE 100 is in the RRC idle state.
  • the connection between the RRC of the UE 100 and the RRC of the gNB 200 is suspended, the UE 100 is in the RRC inactive state.
  • the NAS layer located above the RRC layer performs session management, mobility management, etc.
  • NAS signaling is transmitted between the NAS layer of the UE 100 and the NAS layer of the AMF300B.
  • the UE 100 has an application layer and the like in addition to the wireless interface protocol.
  • MBS is a service that enables broadcast or multicast, that is, one-to-many (PTM: Point To Multipoint) data transmission from NG-RAN10 to UE100.
  • PTM Point To Multipoint
  • MBS may be referred to as MBMS (Multicast Broadcast and Multicast Service).
  • the MBS use cases (service types) include public safety communication, mission-critical communication, V2X (Vehicle to Everything) communication, IPv4 or IPv6 multicast distribution, IPTV, group communication, software distribution, and the like.
  • FIG. 6 is a diagram showing a correspondence relationship between a downlink logical channel (Logical channel) and a transport channel (Transport channel) according to an embodiment.
  • MBSFN Multipoint Broadcast Single Frequency Network
  • SC-PTM Single Cell Point To Multipoint
  • the logical channels used for MBSFN transmission are MTCH (Multicast Traffic Channel) and MCCH (Multicast Control Channel), and the transport channel used for MBSFN transmission is MCH (Multicast Control Channel).
  • MBSFN transmission is mainly designed for multi-cell transmission, and each cell performs synchronous transmission of the same signal (same data) in the same MBSFN subframe in an MBSFN area composed of a plurality of cells.
  • the logical channels used for SC-PTM transmission are SC-MTCH (Single Cell Multicast Traffic Channel) and SC-MCCH (Single Cell Multicast Control Channel).
  • the transport channel used for SC-PTM transmission is DL-SCH (Downlink Shared Channel).
  • SC-PTM transmission is designed primarily for single-cell transmission and performs broadcast or multicast data transmission on a cell-by-cell basis.
  • the physical channels used for SC-PTM transmission are PDCCH (Physical Downlink Control Channel) and PDSCH (Physical Downlink Control Channel), and dynamic resource allocation is possible.
  • MBS may be provided using a method similar to the SC-PTM transmission method.
  • MBS may be provided using the MBSFN transmission method.
  • MBS may be read as multicast.
  • MBS may be provided by broadcast.
  • MBS data means data provided by MBS
  • MBS control channel means MCCH or SC-MCCH
  • MBS traffic channel means MTCH or SC-MTCH.
  • MBS data may be transmitted by unicast.
  • MBS data may be referred to as MBS packets or MBS traffic.
  • the network can provide different MBS services for each MBS session.
  • the MBS session is identified by at least one of TMGI (Temporary Mobile Group Identity) and a session identifier, and at least one of these identifiers is called an MBS session identifier.
  • TMGI Temporal Mobile Group Identity
  • Such an MBS session identifier may be referred to as an MBS service identifier or a multicast group identifier.
  • FIG. 7 is a diagram showing a method of distributing MBS data according to an embodiment.
  • MBS data (MBS Traffic) is distributed from a single data source (application service provider) to a plurality of UEs.
  • the 5G CN (5GC) 20 which is a 5G core network, receives MBS data from an application service provider, creates a copy of the MBS data (Replication), and distributes it.
  • NG-RAN10 5G radio access networks
  • 5G RAN 5G radio access networks
  • MBS connection such a connection (tunnel) will be referred to as an “MBS connection”.
  • the MBS connection may be referred to as a Shared MBS Traffic delivery connection or a shared transport.
  • the MBS connection is terminated at NG-RAN10 (ie, gNB200).
  • the MBS connection may have a one-to-one correspondence with the MBS session.
  • the gNB 200 selects either PTP (Point-to-Point: Unicast) or PTM (Point-to-Multipoint: Multicast or Broadcast) transmission method at its own discretion, and MBS data is sent to the UE 100 by the selected transmission method. To send.
  • PTP Point-to-Point: Unicast
  • PTM Point-to-Multipoint: Multicast or Broadcast
  • a unicast session is established between NG-RAN10 and UE100, and MBS data is individually distributed from 5GC20 to UE100.
  • MBS data is individually distributed from 5GC20 to UE100.
  • Such a unicast may be called a PDU session.
  • Unicast (PDU session) ends at UE100.
  • split MBS bearer Next, the split MBS bearer according to the embodiment will be described.
  • the gNB 200 may set the MBS bearer (hereinafter, appropriately referred to as “split MBS bearer”) separated into the PTP communication path and the PTM communication path in the UE 100.
  • the gNB 200 can dynamically switch the transmission of MBS data to the UE 100 between PTP (PTP communication path) and PTM (PTM communication path).
  • the gNB 200 can improve reliability by double-transmitting the same MBS data by using PTP (PTP communication path) and PTM (PTM communication path) in combination.
  • the predetermined layer that terminates the split is a MAC layer (HARQ), an RLC layer, a PDCP layer, or a SDAP layer.
  • HARQ MAC layer
  • RLC Radio Link Control
  • PDCP Packet Control Protocol
  • SDAP Secure Sockets Layer
  • FIG. 8 is a diagram showing a split MBS bearer according to an embodiment.
  • the PTP communication path will be referred to as a PTP leg
  • the PTM communication path will be referred to as a PTM leg
  • the functional part corresponding to each layer is called an entity.
  • each of the PDCP entity of gNB200 and the PDCP entity of UE100 separates the MBS bearer, which is a bearer (data radio bearer) used for MBS, into a PTP leg and a PTM leg.
  • the PDCP entity is provided for each bearer.
  • Each of gNB200 and UE100 has two RLC entities provided for each leg, one MAC entity, and one PHY entity.
  • the PHY entity may be provided for each leg.
  • the UE 100 may have two MAC entities.
  • the PHY entity sends and receives PTP leg data using a cell RNTI (C-RNTI: Cell Radio Network Entity Identifier) that is assigned one-to-one with the UE 100.
  • C-RNTI Cell Radio Network Entity Identifier
  • the PHY entity sends and receives PTM leg data using the group RNTI (G-RNTI: Group Radio Network Entity Identifier) that is assigned one-to-one with the MBS session.
  • G-RNTI Group Radio Network Entity Identifier
  • a split MBS bearer is set from gNB200 to UE100, and the PTM leg is activated. Must have been. In other words, even if the split MBS bearer is set in the UE 100, the gNB 200 cannot perform PTM transmission of MBS data using this PTM leg when the PTM leg is in the deactivation state.
  • the split MBS bearer is set from the gNB 200 to the UE 100 and the PTP leg is activated. There is. In other words, even if the split MBS bearer is set in the UE 100, the gNB 200 cannot perform PTP transmission of MBS data using this PTP leg when the PTP leg is in the inactive state.
  • the UE 100 monitors the PDCCH (Physical Downlink Control Channel) to which the G-RNTI associated with the MBS session is applied while the PTM leg is activated (that is, the blind display of the PDCCH using the G-RNTI). Do the coding).
  • the UE 100 may monitor the PDCCH only at the scheduling opportunity of the MBS session.
  • the UE 100 does not monitor the PDCCH to which the G-RNTI associated with the MBS session is applied (ie, does not blind decode the PDCCH using the G-RNTI) when the PTM leg is deactivated. ..
  • the UE 100 monitors the PDCCH to which the C-RNTI is applied while the PTP leg is activated.
  • the UE 100 monitors the PDCCH in the set on period (OnDuration) when the intermittent reception (DRX: Discontinuus Reception) in the PTP leg is set.
  • OnDuration the on period
  • DRX Discontinuus Reception
  • the UE 100 may monitor the PDCCH of the cell even if the cell is deactivated.
  • the UE 100 may monitor the PDCCH to which C-RNTI is applied in preparation for normal unicast downlink transmission other than MBS data in a state where the PTP leg is deactivated. However, the UE 100 does not have to monitor the PDCCH for the MBS session when the cell (frequency) associated with the MBS session is specified.
  • the split MBS bearer as described above is set by the RRC message (for example, RRC Configuration message) transmitted by the RRC entity of gNB200 to the RRC entity of UE100.
  • RRC message for example, RRC Configuration message
  • FIG. 9 is a diagram showing an operation example 1 relating to activation and deactivation of the leg according to the embodiment.
  • the RRC entity of gNB200 sends an RRC message including the setting of the split MBS bearer (split bearer) shown in FIG. 8 to the UE 100.
  • the RRC message is, for example, an RRC Reconnection message.
  • the RRC entity of the UE 100 establishes a split MBS bearer based on the settings contained in the RRC message received from the gNB 200.
  • the UE 100 may establish a plurality of split MBS bearers according to the setting from the gNB 200.
  • the gNB 200 may instruct the UE 100 in the initial state of each leg (that is, activation or deactivation of each leg) by the same message.
  • the RRC entity of gNB200 sends an RRC message containing the bearer setting of the split MBS bearer to the UE 100, the RRC message includes the activation or deactivation instruction of each leg together with the bearer setting.
  • Such an RRC message may include at least one of an identifier of the leg (PTP leg, PTM leg) to be instructed and an identifier indicating either activation or deactivation.
  • the RRC message may include an identifier (eg, TMGI, G-RNTI, session identifier, QoS flow identifier, bearer identifier) associated with the MBS session (split MBS bearer) to be instructed.
  • step S12 the gNB 200 sends an instruction to individually activate or deactivate the PTP leg and the PTM leg to the UE 100.
  • the MAC entity of gNB200 may transmit a MAC control element (MAC CE) including the instruction to the UE 100.
  • the MAC entity of UE100 receives MAC CE from gNB200.
  • the PHY entity of the gNB 200 may transmit downlink control information (DCI) including the instruction to the UE 100.
  • the PHY entity of UE100 receives DCI from gNB200.
  • DCI downlink control information
  • Such a MAC CE or DCI may include at least one of an identifier of the leg (PTP leg, PTM leg) to be instructed and an identifier indicating either activation or deactivation.
  • the MAC CE or DCI may include an identifier (for example, TMGI, G-RNTI, session identifier, QoS flow identifier, bearer identifier) associated with the MBS session (split MBS bearer) to be instructed.
  • the UE 100 starts the data reception process using C-RNTI in response to the reception of the instruction to activate the PTP leg.
  • the UE 100 starts the MBS data reception processing using the G-RNTI in response to the reception of the instruction to activate the PTM leg.
  • the UE 100 ends the data reception process using the C-RNTI in response to the reception of the instruction to deactivate the PTP leg.
  • the UE 100 ends the MBS data reception processing using the G-RNTI in response to the reception of the instruction to deactivate the PTM leg.
  • the gNB 200 may transmit (PTM transmission) an instruction to activate or deactivate the PTP leg to the UE 100 via the PTM leg in the activated state.
  • PTM transmission an instruction to activate or deactivate the PTP leg to the UE 100 via the PTM leg in the activated state.
  • the gNB 200 may transmit (PTM transmission) an instruction to deactivate the PTM leg to the UE 100 via the PTM leg in the activated state.
  • PTM transmission an instruction to deactivate the PTM leg to the UE 100 via the PTM leg in the activated state.
  • the gNB 200 may transmit (PTP transmission) an instruction to activate or deactivate the PTM leg to the UE 100 via the PTP leg in the activated state. This allows the PTM leg to be individually activated or deactivated for each UE 100.
  • the gNB 200 may transmit (PTP transmission) an instruction to deactivate the PTP leg to the UE 100 via the PTP leg in the activated state. This allows the PTP leg to be individually deactivated for each UE 100.
  • the UE 100 may transmit a response to the received instruction to the gNB 200 in response to receiving an instruction from the gNB 200 to activate at least one leg of the PTP leg and the PTM leg in step S12.
  • This response may be transmitted from the MAC entity of the UE 100 to the gNB 200 via the PTP leg, for example.
  • the UE 100 may initiate a data receiving operation on the activated leg after transmitting the response.
  • the gNB 200 transmits data via the activated leg in response to receiving a response from the UE 100. That is, after receiving the response, the gNB 200 starts the data transmission operation in the leg.
  • the UE 100 may transmit a response to the received instruction to the gNB 200 in response to receiving an instruction from the gNB 200 to deactivate at least one leg of the PTP leg and the PTM leg in step S12.
  • FIG. 10 is a diagram showing an operation example 2 relating to activation and deactivation of a leg according to an embodiment. Since the basic operation of the operation example 2 is the same as that of the operation example 1, the differences from the operation example 1 will be mainly described here. The operation example 2 can be used in combination with the operation example 1.
  • the gNB 200 transmits an instruction for activating or deactivating both the PTP leg and the PTM leg to the UE 100.
  • the MAC entity of gNB200 includes both the control instruction of the PTP leg and the control instruction of the PTM leg in the MAC CE instructing the activation or deactivation of the leg.
  • the RRC entity of gNB200 sends an RRC message including the setting of the split MBS bearer (split bearer) shown in FIG. 8 to the UE 100.
  • the RRC message may include information that sets the initial state of each leg.
  • the information for setting the initial state of each leg may be the same information as the instruction included in the MAC CE or DCI described later.
  • step S22 the gNB 200 sends an instruction to the UE 100 to activate or deactivate both the PTP leg and the PTM leg.
  • the instructions are included in MAC CE or DCI.
  • the MAC CE or DCI indicates an indication value for activating both the PTP leg and the PTM leg (for example, “1”) or deactivating both the PTP leg and the PTM leg (for example, “0”).
  • the activation of both the PTP leg and the PTM leg may be the activation of the split MBS bearer or the activation of duplication using the two legs.
  • the deactivation of both the PTP leg and the PTM leg may be the deactivation of the split MBS bearer or the deactivation of double transmission using the two legs.
  • the MAC CE or DCI may include an identifier (for example, TMGI, G-RNTI, session identifier, QoS flow identifier, bearer identifier) associated with the MBS session (split MBS bearer) to be instructed.
  • MAC CE or DCI may include activation or deactivation instructions for each such identifier.
  • FIG. 11 is a diagram showing an example of a MAC CE (1 octet) that stores an instruction value for each bearer identifier (or logical channel identifier) according to an embodiment.
  • M1 to M8 correspond to bearers # 1 to # 8 (or logical channels # 1 to # 8.
  • Each field of M1 to M8 is 1 bit, and each field has one bit.
  • the indicated value for activation (eg, "1") or deactivation (eg, "0") is stored.
  • Step S23 is the same as operation example 1.
  • the UE 100 may send the response to the gNB 200.
  • the PDCP entity of the UE 100 may perform a duplicate packet discarding process of two identical MBS packets transmitted by duplication.
  • the RRC entity of the UE 100 may send a message (RAI: Entity Assistance Information / preference) to the gNB 200 to prompt the gNB 200 to release the RRC connection when the PTP leg is deactivated.
  • RAI Entity Assistance Information / preference
  • the UE 100 may be allowed to transmit the RAI even while the dynamic switching of the PTP leg and the PTM leg is being set.
  • Switching operation between PTP transmission and PTM transmission Next, the operation of switching between PTP transmission and PTM transmission according to the embodiment will be described.
  • the PTP transmission may be a method of transmitting MBS data from the gNB 200 to the UE 100 using a PTP leg (PTP communication path).
  • the PTM transmission may be a method of transmitting MBS data from the gNB 200 to the UE 100 using a PTM leg (PTM communication path).
  • the PTP transmission may be a method of transmitting MBS data from the gNB 200 to the UE 100 using a PTP bearer (PTP communication path) which is a first data radio bearer for PTP.
  • the PTM transmission may be a method of transmitting MBS data from the gNB 200 to the UE 100 using a PTM bearer (PTM communication path) which is a second data radio bearer for PTM.
  • the switching operation between PTP transmission and PTM transmission is an operation of terminating the MBS data transmission of one of the PTP transmissions and the PTM transmissions and at the same time starting the MBS data transmission of the other transmission method.
  • MBS data MBS packet
  • the MBS data MBS packet
  • the receiving unit 110 receives MBS data transmitted from the gNB 200 by either PTP (Point-To-Point) transmission or PTM (Point-To-Multipoint) transmission.
  • the control unit 130 of the UE 100 triggers the transmission of a status report indicating the reception status of MBS data in a predetermined layer of the UE 100 in response to the transmission method being switched between PTP transmission and PTM transmission.
  • the transmission unit 120 of the UE 100 transmits the status report to the gNB 200.
  • the gNB 200 can grasp the reception state of the MBS data of the UE 100 regarding the switching between the PTP transmission and the PTM transmission. Therefore, even if the MBS packet is missing when switching between PTP transmission and PTM transmission, the gNB 200 can easily identify the missing MBS packet. Therefore, when a packet loss of an MBS packet occurs, it can be retransmitted in the PDCP layer (or RLC layer), so that the reliability of communication can be improved.
  • the predetermined layer is the PDCP layer and the status report transmitted from the UE 100 to the gNB 200 is the PDCP status report (PDCP status report).
  • the predetermined layer may be an RLC layer.
  • the status report transmitted from the UE 100 to the gNB 200 may be an RLC status report (RLC Status PDU).
  • FIG. 12 is a diagram showing a configuration example of a PDCP status report according to an embodiment.
  • the PDCP status report has, as the main components, a 1-bit length "D / C” field, a 3-bit length "PDU Type” field, and a 32-bit length "FMC (First Missing”). It has a "COUNT)” field and a variable bit length "Bitmap” field.
  • the "D / C" field is a field indicating whether this PDCP PDU is a PDCP Data PDU or a PDCP Control PDU.
  • the PDCP status report corresponds to the PDCP Control PDU.
  • the "PDU Type” field is a field indicating whether the PDCP Control PDU is "PDCP status report”, "Interspired ROHC feedback", or "EHC feedback”.
  • the "FMC (First Missing COUNT)" field is a field indicating the count value (COUNT) of the PDCP SDU that was first missing in the reordering window.
  • the count value (COUNT) is composed of an HFN (Hyper Frame Number) and a PDCP sequence number.
  • the "Bitmap” field is a field indicating the missing PDCP SDU and the PDCP SDU correctly received by the receiving PDCP entity. Specifically, the "Bitmap” field indicates the reception status of PDCP SDU after FMC as "0" (missing) or "1" (correctly received).
  • FIG. 13 is a diagram showing a switching operation from PTM transmission to PTP transmission according to one embodiment.
  • the gNB 200 has established the MBS connection of the shared MBS data distribution (Shared MBS Traffic Delivery) shown in FIG. 7 as 5GC20.
  • step S101 the gNB 200 starts PTM transmission of MBS data. Specifically, the gNB 200 initiates multicast or broadcast transmission of MBS data belonging to a certain MBS session.
  • step S102 the gNB 200 transmits MBS data belonging to a certain MBS session by PTM.
  • the UE 100 receives the MBS data.
  • step S103 the PDCP entity of the UE 100 uses the sequence number of the MBS data (PDCP SDU) transmitted by the PTM that was successfully received and the sequence of the MBS data that failed to be received in order to generate the PDCP status report. Each number may be recorded.
  • PDCP SDU sequence number of the MBS data
  • step S104 the gNB 200 transmits an instruction for switching from PTM transmission to PTP transmission to the UE 100.
  • This instruction may be a PTM leg deactivation instruction and / or a PTP leg activation instruction.
  • This instruction may be a change instruction from a PTM bearer to a PTP bearer by an RRC message (for example, an RRC Modification message).
  • This instruction may include a transmission instruction or transmission setting for a PDCP status report.
  • the UE 100 may voluntarily trigger (step S107) and transmit the PDCP status report (step S108) even if there is no transmission instruction or transmission setting of the PDCP status report from the gNB 200.
  • step S105 the gNB 200 and the UE 100 perform a switching process from PTM transmission to PTP transmission. Specifically, the gNB 200 and the UE 100 end the PTM transmission of the MBS data belonging to a certain MBS session and start the PTP transmission of the MBS data belonging to the MBS session.
  • step S106 gNB200 transmits MBS data belonging to the MBS session by PTP.
  • the UE 100 receives the MBS data.
  • the UE 100 may fail to receive the last MBS data (PDCP SDU) transmitted by the PTM due to the switching process from the PTM transmission to the PTP transmission.
  • the PDCP entity of the UE 100 records the sequence number of the MBS data (PDCP SDU) that failed to be received among the MBS data (PDCP SDU) transmitted by the PTM.
  • the UE 100 may fail to receive the first MBS data (PDCP SDU) transmitted by PTP due to the switching process from PTM transmission to PTP transmission.
  • the PDCP entity of the UE 100 records the sequence number of the MBS data (PDCP SDU) that failed to be received among the MBS data (PDCP SDU) transmitted by PTP.
  • step S107 the PDCP entity of UE100 triggers the transmission of the PDCP status report. Specifically, the PDCP entity of UE 100 generates a PDCP status report as shown in FIG. 12 and passes the PDCP status report to a lower layer.
  • the PDCP entity of the UE 100 may trigger the transmission of the PDCP status report when receiving the instruction of step S104, or trigger the transmission of the PDCP status report when the switching process of step S105 is performed. It is also good.
  • the PDCP entity of the UE 100 may trigger the transmission of the PDCP status report after a lapse of a certain period of time after receiving the instruction of step S104, or the PDCP status report after a lapse of a certain time after performing the switching process of step S105. May be triggered to send.
  • a fixed time timer value
  • condition for the UE 100 to trigger the transmission of the PDCP status report there may be a condition that the sequence number of the MBS data last received by the PTM and the sequence number of the MBS data first received by the PTP are discontinuous.
  • the PDCP entity of the UE 100 triggers the transmission of the PDCP status report only when it detects such a discontinuity.
  • the condition for the UE 100 to trigger the transmission of the PDCP status report may be that it has detected a missing (discontinuous sequence number) in the MBS data transmitted by the PTM.
  • step S108 the lower layer of UE100 (RLC entity, MAC entity, and PHY entity) transmits the PDCP status report to gNB200.
  • the gNB 200 receives a PDCP status report.
  • step S109 the gNB 200 retransmits the missing MBS data to the UE 100 by PTP based on the missing packet information (FMC and Bitmap) included in the PDCP status report.
  • the UE 100 receives the MBS data retransmitted by PTP.
  • the missing MBS data can be identified based on the PDCP status report, and the missing MBS data can be supplemented by retransmission in the PDCP layer. ..
  • FIG. 14 is a diagram showing a switching operation from PTP transmission to PTM transmission according to one embodiment.
  • step S201 the gNB 200 starts PTP transmission of MBS data. Specifically, the gNB 200 initiates unicast transmission of MBS data belonging to a certain MBS session.
  • step S202 gNB200 transmits MBS data belonging to a certain MBS session by PTM.
  • the UE 100 receives the MBS data.
  • step S203 the PDCP entity of the UE 100 uses the sequence number of the MBS data (PDCP SDU) transmitted by PTP, the sequence number of the MBS data successfully received, and the sequence of the MBS data failed to be received, in order to generate the PDCP status report. Each number may be recorded.
  • PDCP SDU sequence number of the MBS data
  • step S204 the gNB 200 transmits an instruction for switching from PTP transmission to PTM transmission to the UE 100.
  • This instruction may be a PTP leg deactivation instruction and / or a PTM leg activation instruction.
  • This instruction may be a change instruction from a PTP bearer to a PTM bearer by an RRC message (for example, an RRC Modification message).
  • This instruction may include a transmission instruction or transmission setting for a PDCP status report.
  • the UE 100 may voluntarily trigger (step S207) and transmit the PDCP status report even if there is no transmission instruction or transmission setting of the PDCP status report from the gNB 200 (step S208).
  • step S205 the gNB 200 and the UE 100 perform a switching process from PTP transmission to PTM transmission. Specifically, the gNB 200 and the UE 100 end the PTP transmission of the MBS data belonging to a certain MBS session and start the PTM transmission of the MBS data belonging to the MBS session.
  • step S206 the gNB 200 transmits MBS data belonging to the MBS session by PTM.
  • the UE 100 receives the MBS data.
  • the UE 100 may fail to receive the last MBS data (PDCP SDU) transmitted by PTP due to the switching process from PTP transmission to PTM transmission.
  • the PDCP entity of the UE 100 records the sequence number of the MBS data (PDCP SDU) that failed to be received among the MBS data (PDCP SDU) transmitted by PTP.
  • the UE 100 may fail to receive the first MBS data (PDCP SDU) transmitted by the PTM due to the switching process from the PTP transmission to the PTM transmission.
  • the PDCP entity of the UE 100 records the sequence number of the MBS data (PDCP SDU) that failed to be received among the MBS data (PDCP SDU) transmitted by the PTM.
  • step S207 the PDCP entity of UE100 triggers the transmission of the PDCP status report. Specifically, the PDCP entity of UE 100 generates a PDCP status report as shown in FIG. 12 and passes the PDCP status report to a lower layer.
  • the PDCP entity of the UE 100 may trigger the transmission of the PDCP status report when receiving the instruction in step S204, or trigger the transmission of the PDCP status report when the switching process of step S205 is performed. May be good.
  • the PDCP entity of the UE 100 may trigger the transmission of the PDCP status report after a certain period of time has elapsed from receiving the instruction in step S204, or the PDCP status report after a certain period of time has elapsed from the switching process of step S205. May be triggered to send.
  • a fixed time timer value
  • condition for the UE 100 to trigger the transmission of the PDCP status report there may be a condition that the sequence number of the MBS data last received by the PTP and the sequence number of the MBS data first received by the PTM are discontinuous.
  • the PDCP entity of the UE 100 triggers the transmission of the PDCP status report only when it detects such a discontinuity.
  • the condition for the UE 100 to trigger the transmission of the PDCP status report may be the detection of a missing item (discontinuity of sequence numbers) in the MBS data transmitted by PTP.
  • step S208 the lower layer of UE100 (RLC entity, MAC entity, and PHY entity) transmits the PDCP status report to gNB200.
  • the gNB 200 receives a PDCP status report.
  • step S209 the gNB 200 retransmits the missing MBS data to the UE 100 by PTM based on the missing packet information (FMC and Bitmap) included in the PDCP status report.
  • the UE 100 receives the MBS data retransmitted by the PTM.
  • the missing MBS data can be identified based on the PDCP status report, and the missing MBS data can be supplemented by retransmission in the PDCP layer. ..
  • FIG. 15 is a diagram showing an example of changing the switching operation from PTP transmission to PTM transmission according to one embodiment.
  • steps S301 to S308 is the same as that of FIG. However, in steps S304 and S305, the gNB 200 and the UE 100 maintain an active state without deactivating the PTP communication path (PTP leg).
  • step S309 the gNB 200 retransmits the missing MBS data to the UE 100 by PTP based on the missing packet information (FMC and Bitmap) included in the PDCP status report.
  • the UE 100 receives the MBS data retransmitted by PTP.
  • the gNB 200 and the UE 100 perform the MBS data retransmission processing by the PTP while performing the MBS data initial transmission processing by the PTM.
  • the MBS data can be retransmitted by PTP only to the UE 100 in which the MBS data is missing, so that efficient retransmission processing can be realized.
  • the UE 100 may voluntarily stop the reception processing in the PTP when the missing MBS data is supplemented by retransmission.
  • the PTP communication path is configured by the PTP leg and the PTM communication path is configured by the PTM leg using the split MBS bearer has been described.
  • the PTP communication path may be configured by the first radio bearer for PTP and the PTM communication path may be configured by the second radio bearer for PTM.
  • the predetermined layer is the PDCP layer and the status report transmitted from the UE 100 to the gNB 200 is the PDCP status report (PDCP status report).
  • the PDCP entity in the above-described embodiment may be read as an RLC entity, and the PDCP status report may be read as an RLC status report (RLC Status PDU).
  • Each of the above-mentioned operation flows is not limited to the case where they are individually and independently implemented, but can be implemented by combining two or more operation flows. For example, some steps of one operation flow may be added to another operation flow, or some steps of one operation flow may be replaced with some steps of another operation flow.
  • the base station may be an NR base station (gNB)
  • the base station may be an LTE base station (eNB).
  • the base station may be a relay node such as an IAB (Integrated Access and Backhaul) node.
  • the base station may be a DU (Distributed Unit) of an IAB node.
  • a program may be provided that causes a computer to execute each process performed by the UE 100 or gNB 200.
  • the program may be recorded on a computer-readable medium.
  • Computer-readable media can be used to install programs on a computer.
  • the computer-readable medium on which the program is recorded may be a non-transient recording medium.
  • the non-transient recording medium is not particularly limited, but may be, for example, a recording medium such as a CD-ROM or a DVD-ROM.
  • a circuit that executes each process performed by the UE 100 or the gNB 200 may be integrated, and at least a part of the UE 100 or the gNB 200 may be configured as a semiconductor integrated circuit (chipset, SoC).
  • NG-RAN 5G RAN
  • 5GC 5G CN
  • UE 110 Receiver unit 120: Transmitter unit 130: Control unit 200: gNB 210: Transmitter 220: Receiver 230: Control 240: Backhaul communication unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

マルチキャスト・ブロードキャストサービス(MBS)を提供する移動通信システムにおいてUE100が実行する通信制御方法は、PTP(Point-To-Point)伝送及びPTM(Point-To-Multipoint)伝送のいずれかの伝送方式でgNB200から伝送されるMBSデータを受信するステップS105と、伝送方式がPTP伝送とPTM伝送との間で切り替えられたことに応じて、UE100の所定レイヤにおけるMBSデータの受信状態を示すステータス報告の送信をトリガするステップS107と、ステータス報告をgNB200に送信するステップS108とを有する。

Description

通信制御方法及びユーザ装置
 本開示は、移動通信システムで用いる通信制御方法及びユーザ装置に関する。
 近年、第5世代(5G)の移動通信システムが注目されている。5Gシステムの無線アクセス技術(RAT:Radio Access Technology)であるNR(New Radio)は、第4世代の無線アクセス技術であるLTE(Long Term Evolution)に比べて、高速・大容量かつ高信頼・低遅延といった特徴を有する。
3GPP技術仕様書「3GPP TS 38.300 V16.3.0 (2020-09)」
 第1の態様に係る通信制御方法は、マルチキャスト・ブロードキャストサービス(MBS)を提供する移動通信システムにおいてユーザ装置が実行する通信制御方法であって、PTP(Point-To-Point)伝送及びPTM(Point-To-Multipoint)伝送のいずれかの伝送方式で基地局から伝送されるMBSデータを受信することと、前記伝送方式が前記PTP伝送と前記PTM伝送との間で切り替えられたことに応じて、前記ユーザ装置の所定レイヤにおけるMBSデータの受信状態を示すステータス報告の送信をトリガすることと、前記ステータス報告を前記基地局に送信することと、を有する。
 第2の態様に係るユーザ装置は、マルチキャスト・ブロードキャストサービス(MBS)を提供する移動通信システムで用いるユーザ装置であって、PTP(Point-To-Point)伝送及びPTM(Point-To-Multipoint)伝送のいずれかの伝送方式で基地局から伝送されるMBSデータを受信する受信部と、前記伝送方式が前記PTP伝送と前記PTM伝送との間で切り替えられたことに応じて、前記ユーザ装置の所定レイヤにおけるMBSデータの受信状態を示すステータス報告の送信をトリガする制御部と、前記ステータス報告を前記基地局に送信する送信部とを備える。
一実施形態に係る移動通信システムの構成を示す図である。 一実施形態に係るUE(ユーザ装置)の構成を示す図である。 一実施形態に係るgNB(基地局)の構成を示す図である。 データを取り扱うユーザプレーンの無線インターフェイスのプロトコルスタックの構成を示す図である。 シグナリング(制御信号)を取り扱う制御プレーンの無線インターフェイスのプロトコルスタックの構成を示す図である。 一実施形態に係る下りリンクの論理チャネル(Logical channel)とトランスポートチャネル(Transport channel)との対応関係を示す図である。 一実施形態に係るMBSデータの配信方法を示す図である。 一実施形態に係るスプリットMBSベアラを示す図である。 一実施形態に係るレグのアクティブ化及び非アクティブ化に関する動作例1を示す図である。 一実施形態に係るレグのアクティブ化及び非アクティブ化に関する動作例2を示す図である。 一実施形態に係るベアラ識別子(若しくは論理チャネル識別子)ごとの指示値を格納するMAC CE(1オクテット)の一例を示す図である。 一実施形態に係るPDCPステータス報告の構成例を示す図である。 一実施形態に係るPTM伝送からPTP伝送への切り替え動作を示す図である。 一実施形態に係るPTP伝送からPTM伝送への切り替え動作を示す図である。 一実施形態に係るPTP伝送からPTM伝送への切り替え動作の変更例を示す図である。
 5Gシステム(NR)にマルチキャスト・ブロードキャストサービスを導入することが検討されている。NRのマルチキャスト・ブロードキャストサービスは、LTEのマルチキャスト・ブロードキャストサービスよりも改善されたサービスを提供することが望まれる。
 そこで、本開示は、改善されたマルチキャスト・ブロードキャストサービスを実現することを目的とする。
 図面を参照しながら、実施形態に係る移動通信システムについて説明する。図面の記載において、同一又は類似の部分には同一又は類似の符号を付している。
 (移動通信システムの構成)
 まず、実施形態に係る移動通信システムの構成について説明する。図1は、一実施形態に係る移動通信システムの構成を示す図である。この移動通信システムは、3GPP規格の第5世代システム(5GS:5th Generation System)に準拠する。以下において、5GSを例に挙げて説明するが、移動通信システムにはLTE(Long Term Evolution)システムが少なくとも部分的に適用されてもよいし、第6世代(6G)システムが少なくとも部分的に適用されてもよい。
 図1に示すように、移動通信システムは、ユーザ装置(UE:User Equipment)100と、5Gの無線アクセスネットワーク(NG-RAN:Next Generation Radio Access Network)10と、5Gのコアネットワーク(5GC:5G Core Network)20とを有する。
 UE100は、移動可能な無線通信装置である。UE100は、ユーザにより利用される装置であればどのような装置であっても構わないが、例えば、UE100は、携帯電話端末(スマートフォンを含む)やタブレット端末、ノートPC、通信モジュール(通信カード又はチップセットを含む)、センサ若しくはセンサに設けられる装置、車両若しくは車両に設けられる装置(Vehicle UE)、飛行体若しくは飛行体に設けられる装置(Aerial UE)である。
 NG-RAN10は、基地局(5Gシステムにおいて「gNB」と呼ばれる)200を含む。gNB200は、基地局間インターフェイスであるXnインターフェイスを介して相互に接続される。gNB200は、1又は複数のセルを管理する。gNB200は、自セルとの接続を確立したUE100との無線通信を行う。gNB200は、無線リソース管理(RRM)機能、ユーザデータ(以下、単に「データ」という)のルーティング機能、モビリティ制御・スケジューリングのための測定制御機能等を有する。「セル」は、無線通信エリアの最小単位を示す用語として用いられる。「セル」は、UE100との無線通信を行う機能又はリソースを示す用語としても用いられる。1つのセルは1つのキャリア周波数に属する。
 なお、gNBがLTEのコアネットワークであるEPC(Evolved Packet Core)に接続することもできる。LTEの基地局が5GCに接続することもできる。LTEの基地局とgNBとが基地局間インターフェイスを介して接続されることもできる。
 5GC20は、AMF(Access and Mobility Management Function)及びUPF(User Plane Function)300を含む。AMFは、UE100に対する各種モビリティ制御等を行う。AMFは、NAS(Non-Access Stratum)シグナリングを用いてUE100と通信することにより、UE100のモビリティを管理する。UPFは、データの転送制御を行う。AMF及びUPFは、基地局-コアネットワーク間インターフェイスであるNGインターフェイスを介してgNB200と接続される。
 図2は、一実施形態に係るUE100(ユーザ装置)の構成を示す図である。
 図2に示すように、UE100は、受信部110、送信部120、及び制御部130を備える。
 受信部110は、制御部130の制御下で各種の受信を行う。受信部110は、アンテナ及び受信機を含む。受信機は、アンテナが受信する無線信号をベースバンド信号(受信信号)に変換して制御部130に出力する。
 送信部120は、制御部130の制御下で各種の送信を行う。送信部120は、アンテナ及び送信機を含む。送信機は、制御部130が出力するベースバンド信号(送信信号)を無線信号に変換してアンテナから送信する。
 制御部130は、UE100における各種の制御を行う。制御部130は、少なくとも1つのプロセッサ及び少なくとも1つのメモリを含む。メモリは、プロセッサにより実行されるプログラム、及びプロセッサによる処理に用いられる情報を記憶する。プロセッサは、ベースバンドプロセッサと、CPU(Central Processing Unit)とを含んでもよい。ベースバンドプロセッサは、ベースバンド信号の変調・復調及び符号化・復号等を行う。CPUは、メモリに記憶されるプログラムを実行して各種の処理を行う。
 図3は、一実施形態に係るgNB200(基地局)の構成を示す図である。
 図3に示すように、gNB200は、送信部210、受信部220、制御部230、及びバックホール通信部240を備える。
 送信部210は、制御部230の制御下で各種の送信を行う。送信部210は、アンテナ及び送信機を含む。送信機は、制御部230が出力するベースバンド信号(送信信号)を無線信号に変換してアンテナから送信する。
 受信部220は、制御部230の制御下で各種の受信を行う。受信部220は、アンテナ及び受信機を含む。受信機は、アンテナが受信する無線信号をベースバンド信号(受信信号)に変換して制御部230に出力する。
 制御部230は、gNB200における各種の制御を行う。制御部230は、少なくとも1つのプロセッサ及び少なくとも1つのメモリを含む。メモリは、プロセッサにより実行されるプログラム、及びプロセッサによる処理に用いられる情報を記憶する。プロセッサは、ベースバンドプロセッサと、CPUとを含んでもよい。ベースバンドプロセッサは、ベースバンド信号の変調・復調及び符号化・復号等を行う。CPUは、メモリに記憶されるプログラムを実行して各種の処理を行う。
 バックホール通信部240は、基地局間インターフェイスを介して隣接基地局と接続される。バックホール通信部240は、基地局-コアネットワーク間インターフェイスを介してAMF/UPF300と接続される。なお、gNBは、CU(Central Unit)とDU(Distributed Unit)とで構成され(すなわち、機能分割され)、両ユニット間はF1インターフェイスで接続されてもよい。
 図4は、データを取り扱うユーザプレーンの無線インターフェイスのプロトコルスタックの構成を示す図である。
 図4に示すように、ユーザプレーンの無線インターフェイスプロトコルは、物理(PHY)レイヤと、MAC(Medium Access Control)レイヤと、RLC(Radio Link Control)レイヤと、PDCP(Packet Data Convergence Protocol)レイヤと、SDAP(Service Data Adaptation Protocol)レイヤとを有する。
 PHYレイヤは、符号化・復号、変調・復調、アンテナマッピング・デマッピング、及びリソースマッピング・デマッピングを行う。UE100のPHYレイヤとgNB200のPHYレイヤとの間では、物理チャネルを介してデータ及び制御情報が伝送される。
 MACレイヤは、データの優先制御、ハイブリッドARQ(HARQ)による再送処理、及びランダムアクセスプロシージャ等を行う。UE100のMACレイヤとgNB200のMACレイヤとの間では、トランスポートチャネルを介してデータ及び制御情報が伝送される。gNB200のMACレイヤはスケジューラを含む。スケジューラは、上下リンクのトランスポートフォーマット(トランスポートブロックサイズ、変調・符号化方式(MCS))及びUE100への割当リソースブロックを決定する。
 RLCレイヤは、MACレイヤ及びPHYレイヤの機能を利用してデータを受信側のRLCレイヤに伝送する。UE100のRLCレイヤとgNB200のRLCレイヤとの間では、論理チャネルを介してデータ及び制御情報が伝送される。
 PDCPレイヤは、ヘッダ圧縮・伸張、及び暗号化・復号化を行う。
 SDAPレイヤは、コアネットワークがQoS制御を行う単位であるIPフローとAS(Access Stratum)がQoS制御を行う単位である無線ベアラとのマッピングを行う。なお、RANがEPCに接続される場合は、SDAPが無くてもよい。
 図5は、シグナリング(制御信号)を取り扱う制御プレーンの無線インターフェイスのプロトコルスタックの構成を示す図である。
 図5に示すように、制御プレーンの無線インターフェイスのプロトコルスタックは、図4に示したSDAPレイヤに代えて、RRC(Radio Resource Control)レイヤ及びNAS(Non-Access Stratum)レイヤを有する。
 UE100のRRCレイヤとgNB200のRRCレイヤとの間では、各種設定のためのRRCシグナリングが伝送される。RRCレイヤは、無線ベアラの確立、再確立及び解放に応じて、論理チャネル、トランスポートチャネル、及び物理チャネルを制御する。UE100のRRCとgNB200のRRCとの間に接続(RRC接続)がある場合、UE100はRRCコネクティッド状態にある。UE100のRRCとgNB200のRRCとの間に接続(RRC接続)がない場合、UE100はRRCアイドル状態にある。UE100のRRCとgNB200のRRCとの間の接続がサスペンドされている場合、UE100はRRCインアクティブ状態にある。
 RRCレイヤの上位に位置するNASレイヤは、セッション管理及びモビリティ管理等を行う。UE100のNASレイヤとAMF300BのNASレイヤとの間では、NASシグナリングが伝送される。
 なお、UE100は、無線インターフェイスのプロトコル以外にアプリケーションレイヤ等を有する。
 (MBS)
 次に、一実施形態に係るMBSについて説明する。MBSは、NG-RAN10からUE100に対してブロードキャスト又はマルチキャスト、すなわち、1対多(PTM:Point To Multipoint)でのデータ送信を可能とするサービスである。MBSは、MBMS(Multimedia Broadcast and Multicast Service)と呼ばれてもよい。なお、MBSのユースケース(サービス種別)としては、公安通信、ミッションクリティカル通信、V2X(Vehicle to Everything)通信、IPv4又はIPv6マルチキャスト配信、IPTV、グループ通信、及びソフトウェア配信等がある。
 LTEにおけるMBSの送信方式には、MBSFN(Multicast Broadcast Single Frequency Network)送信及びSC-PTM(Single Cell Point To Multipoint)送信の2種類がある。図6は、一実施形態に係る下りリンクの論理チャネル(Logical channel)とトランスポートチャネル(Transport channel)との対応関係を示す図である。
 図6に示すように、MBSFN送信に用いる論理チャネルはMTCH(Multicast Traffic Channel)及びMCCH(Multicast Control Channel)であり、MBSFN送信に用いるトランスポートチャネルはMCH(Multicast Control Channel)である。MBSFN送信は、主にマルチセル送信用に設計されており、複数のセルからなるMBSFNエリアにおいて各セルが同じMBSFNサブフレームで同じ信号(同じデータ)の同期送信を行う。
 SC-PTM送信に用いる論理チャネルはSC-MTCH(Single Cell Multicast Traffic Channel)及びSC-MCCH(Single Cell Multicast Control Channel)である。SC-PTM送信に用いるトランスポートチャネルは、DL-SCH(Downlink Shared Channel)である。SC-PTM送信は、主に単一セル送信用に設計されており、セル単位でブロードキャスト又はマルチキャストでのデータ送信を行う。SC-PTM送信に用いる物理チャネルはPDCCH(Physical Downlink Control Channel)及びPDSCH(Physical Downlink Control Channel)であり、動的なリソース割当が可能になっている。
 以下において、SC-PTM伝送方式と同様な方式を用いてMBSが提供される一例について主として説明するが、MBSFN伝送方式を用いてMBSが提供されてもよい。また、MBSがマルチキャストにより提供される一例について主として説明する。このため、MBSをマルチキャストと読み替えてもよい。但し、MBSがブロードキャストにより提供されてもよい。
 また、MBSデータとは、MBSにより提供されるデータをいい、MBS制御チャネルとは、MCCH又はSC-MCCHをいい、MBSトラフィックチャネルとは、MTCH又はSC-MTCHをいうものとする。但し、MBSデータは、ユニキャストで送信される場合もある。MBSデータは、MBSパケット又はMBSトラフィックと呼ばれてもよい。
 ネットワークは、MBSセッションごとに異なるMBSサービスを提供できる。MBSセッションは、TMGI(Temporary Mobile Group Identity)及びセッション識別子のうち少なくとも1つにより識別され、これらの識別子のうち少なくとも1つをMBSセッション識別子と呼ぶ。このようなMBSセッション識別子は、MBSサービス識別子又はマルチキャストグループ識別子と呼ばれてもよい。
 図7は、一実施形態に係るMBSデータの配信方法を示す図である。
 図7に示すように、MBSデータ(MBS Traffic)は、単一のデータソース(アプリケーションサービスプロバイダ)から複数のUEに配信される。5Gコアネットワークである5G CN(5GC)20は、アプリケーションサービスプロバイダからMBSデータを受信し、MBSデータのコピーの作成(Replication)を行って配信する。
 5GC20の観点からは、共有MBSデータ配信(Shared MBS Traffic delivery)及び個別MBSデータ配信(Individual MBS Traffic delivery)の2つの配信方法が可能である。
 共有MBSデータ配信では、5G無線アクセスネットワーク(5G RAN)であるNG-RAN10と5GC20との間に接続が確立され、5GC20からNG-RAN10へMBSデータを配信する。以下において、このような接続(トンネル)を「MBS接続」と呼ぶ。
 MBS接続は、Shared MBS Traffic delivery接続又は共有トランスポート(shared transport)と呼ばれてもよい。MBS接続は、NG-RAN10(すなわち、gNB200)で終端する。MBS接続は、MBSセッションと1対1で対応していてもよい。
 gNB200は、自身の判断でPTP(Point-to-Point:ユニキャスト)及びPTM(Point-to-Multipoint:マルチキャスト又はブロードキャスト)のいずれかの伝送方式を選択し、選択した伝送方式でUE100にMBSデータを送信する。
 他方、個別MBSデータ配信では、NG-RAN10とUE100との間にユニキャストのセッションが確立され、5GC20からUE100へMBSデータを個別に配信する。このようなユニキャストは、PDUセッション(PDU Session)と呼ばれてもよい。ユニキャスト(PDUセッション)は、UE100で終端する。
 (スプリットMBSベアラ)
 次に、一実施形態に係るスプリットMBSベアラについて説明する。
 gNB200は、PTP通信パス及びPTM通信パスに分離されたMBSベアラ(以下、適宜「スプリットMBSベアラ」と呼ぶ)をUE100に設定し得る。これにより、gNB200は、UE100に対するMBSデータの送信をPTP(PTP通信パス)とPTM(PTM通信パス)との間で動的に切り替えることができる。或いは、gNB200は、PTP(PTP通信パス)及びPTM(PTM通信パス)を併用して同一のMBSデータを二重送信することにより信頼性を高めることができる。
 スプリットを終端する所定レイヤは、MACレイヤ(HARQ)、RLCレイヤ、PDCPレイヤ、又はSDAPレイヤである。以下において、スプリットを終端する所定レイヤがPDCPレイヤである一例について主として説明するが、所定レイヤは、MACレイヤ(HARQ)、RLCレイヤ、又はSDAPレイヤであってもよい。
 図8は、一実施形態に係るスプリットMBSベアラを示す図である。以下において、PTP通信パスをPTPレグと呼び、PTM通信パスをPTMレグと呼ぶ。また、各レイヤに相当する機能部をエンティティと呼ぶ。
 図8に示すように、gNB200のPDCPエンティティ及びUE100のPDCPエンティティのそれぞれは、MBSに用いるベアラ(データ無線ベアラ)であるMBSベアラをPTPレグ及びPTMレグに分離する。なお、PDCPエンティティはベアラごとに設けられる。
 gNB200及びUE100のそれぞれは、レグごとに設けられる2つのRLCエンティティと、1つのMACエンティティと、1つのPHYエンティティとを有する。PHYエンティティは、レグごとに設けられてもよい。なお、UE100が2つのgNB200との通信を行う二重接続(Dual Connectivity)の場合、UE100が2つのMACエンティティを有していてもよい。
 PHYエンティティは、UE100と1対1で割り当てられるセルRNTI(C-RNTI:Cell Radio Network Temporary Identifier)を用いて、PTPレグのデータを送受信する。PHYエンティティは、MBSセッションと1対1で割り当てられるグループRNTI(G-RNTI:Group Radio Network Temporary Identifier)を用いて、PTMレグのデータを送受信する。C-RNTIはUE100ごとに異なるが、G-RNTIは1つのMBSセッションを受信する複数のUE100で共通のRNTIである。
 gNB200からUE100に対してPTMレグを用いてMBSデータのPTM送信(マルチキャスト又はブロードキャスト)を行うためには、gNB200からUE100にスプリットMBSベアラが設定されており、且つ、PTMレグがアクティブ化(activation)されている必要がある。言い換えると、gNB200は、UE100にスプリットMBSベアラが設定されていても、PTMレグが非アクティブ(deactivation)状態にある場合は、このPTMレグを用いてMBSデータのPTM送信を行うことができない。
 また、gNB200及びUE100がPTPレグを用いてMBSデータのPTP送信(ユニキャスト)を行うためには、gNB200からUE100にスプリットMBSベアラが設定されており、且つ、PTPレグがアクティブ化されている必要がある。言い換えると、gNB200は、UE100にスプリットMBSベアラが設定されていても、PTPレグが非アクティブ状態にある場合は、このPTPレグを用いてMBSデータのPTP送信を行うことができない。
 UE100は、PTMレグがアクティブ化された状態において、MBSセッションと対応付けられたG-RNTIが適用されたPDCCH(Physical Downlink Control Channel)をモニタする(すなわち、G-RNTIを用いてPDCCHのブラインドデコーディングを行う)。UE100は、当該MBSセッションのスケジューリング機会にのみ当該PDCCHをモニタしてもよい。
 UE100は、PTMレグが非アクティブ化された状態において、MBSセッションと対応付けられたG-RNTIが適用されたPDCCHをモニタしない(すなわち、G-RNTIを用いたPDCCHのブラインドデコーディングを行わない)。
 UE100は、PTPレグがアクティブ化された状態において、C-RNTIが適用されたPDCCHをモニタする。UE100は、PTPレグにおける間欠受信(DRX:Discontinuous Reception)が設定されている場合、設定されたオン期間(OnDuration)においてPDCCHをモニタする。UE100は、MBSセッションと紐づいたセル(周波数)が指定されている場合、当該セルが非アクティブ化されていても、当該セルのPDCCHをモニタしてもよい。
 UE100は、PTPレグが非アクティブ化された状態において、MBSデータ以外の通常のユニキャスト下りリンク送信に備えて、C-RNTIが適用されたPDCCHをモニタしてもよい。但し、UE100は、MBSセッションと紐づいたセル(周波数)が指定されている場合、当該MBSセッションについて当該PDCCHをモニタしなくてもよい。
 なお、gNB200のRRCエンティティがUE100のRRCエンティティに対して送信するRRCメッセージ(例えば、RRC Reconfigurationメッセージ)により、上述のようなスプリットMBSベアラが設定されるものとする。
 (レグのアクティブ化及び非アクティブ化)
 次に、一実施形態に係るレグのアクティブ化及び非アクティブ化について説明する。
 図9は、一実施形態に係るレグのアクティブ化及び非アクティブ化に関する動作例1を示す図である。
 図9に示すように、ステップS11において、gNB200のRRCエンティティは、図8に示すスプリットMBSベアラ(スプリットベアラ)の設定を含むRRCメッセージをUE100に送信する。RRCメッセージは、例えばRRC Reconfigurationメッセージである。UE100のRRCエンティティは、gNB200から受信したRRCメッセージに含まれる設定に基づいてスプリットMBSベアラを確立する。以下において、UE100が確立するスプリットMBSベアラが1つである一例について主として説明するが、UE100は、gNB200からの設定に応じて複数のスプリットMBSベアラを確立してもよい。
 gNB200は、RRCメッセージ(RRC Reconfigurationメッセージ)でベアラ設定を行う際に、同メッセージにて各レグの初期状態(すなわち、各レグのアクティブ化又は非アクティブ化)をUE100に指示してもよい。gNB200のRRCエンティティは、スプリットMBSベアラのベアラ設定を含むRRCメッセージをUE100に送信するとき、ベアラ設定と共に、各レグのアクティブ化又は非アクティブ化の指示をRRCメッセージに含める。
 このようなRRCメッセージは、指示の対象となるレグ(PTPレグ、PTMレグ)の識別子、及び、アクティブ化及び非アクティブ化のいずれか一方を示す識別子のうち、少なくとも一方を含んでもよい。RRCメッセージは、指示の対象となるMBSセッション(スプリットMBSベアラ)と対応付けられた識別子(例えば、TMGI、G-RNTI、セッション識別子、QoSフロー識別子、ベアラ識別子)を含んでもよい。
 ステップS12において、gNB200は、PTPレグ及びPTMレグを個別にアクティブ化又は非アクティブ化するための指示をUE100に送信する。
 ここで、gNB200のMACエンティティは、当該指示を含むMAC制御要素(MAC CE)をUE100に送信してもよい。UE100のMACエンティティは、gNB200からMAC CEを受信する。或いは、gNB200のPHYエンティティは、当該指示を含む下りリンク制御情報(DCI)をUE100に送信してもよい。UE100のPHYエンティティは、gNB200からDCIを受信する。
 このようなMAC CE又はDCIは、指示の対象となるレグ(PTPレグ、PTMレグ)の識別子、及び、アクティブ化及び非アクティブ化のいずれか一方を示す識別子のうち、少なくとも一方を含んでもよい。MAC CE又はDCIは、指示の対象となるMBSセッション(スプリットMBSベアラ)と対応付けられた識別子(例えば、TMGI、G-RNTI、セッション識別子、QoSフロー識別子、ベアラ識別子)を含んでもよい。
 MAC CE又はDCIを用いて各レグのアクティブ化及び非アクティブ化を指示することにより、RRCメッセージを用いる場合に比べて動的な制御が可能である。
 UE100は、PTPレグをアクティブ化する指示の受信に応じて、C-RNTIを用いたデータの受信処理を開始する。UE100は、PTMレグをアクティブ化する指示の受信に応じて、G-RNTIを用いたMBSデータの受信処理を開始する。他方、UE100は、PTPレグを非アクティブ化する指示の受信に応じて、C-RNTIを用いたデータの受信処理を終了する。UE100は、PTMレグを非アクティブ化する指示の受信に応じて、G-RNTIを用いたMBSデータの受信処理を終了する。
 ステップS12において、gNB200は、アクティブ化された状態にあるPTMレグを介して、PTPレグをアクティブ化又は非アクティブ化する指示をUE100に送信(PTM送信)してもよい。これにより、複数のUE100のPTPレグをPTMで一括してアクティブ化又は非アクティブ化することができる。
 gNB200は、アクティブ化された状態にあるPTMレグを介して、PTMレグを非アクティブ化する指示をUE100に送信(PTM送信)してもよい。これにより、複数のUE100のPTMレグをPTMで一括して非アクティブ化することができる。
 ステップS12において、gNB200は、アクティブ化された状態にあるPTPレグを介して、PTMレグをアクティブ化又は非アクティブ化する指示をUE100に送信(PTP送信)してもよい。これにより、UE100ごとにPTMレグを個別にアクティブ化又は非アクティブ化することができる。
 gNB200は、アクティブ化された状態にあるPTPレグを介して、PTPレグを非アクティブ化する指示をUE100に送信(PTP送信)してもよい。これにより、UE100ごとにPTPレグを個別に非アクティブ化することができる。
 ステップS13において、UE100は、ステップS12でgNB200からPTPレグ及びPTMレグの少なくとも一方のレグをアクティブ化する指示を受信したことに応じて、受信した指示に対する応答をgNB200に送信してもよい。この応答は、例えば、UE100のMACエンティティからPTPレグを介してgNB200に送信されてもよい。UE100は、当該応答を送信後、アクティブ化されたレグにおけるデータ受信動作を開始してもよい。
 gNB200は、UE100からの応答の受信に応じて、アクティブ化されたレグを介してデータを送信する。すなわち、gNB200は、当該応答を受信後、当該レグにおけるデータ送信動作を開始する。
 なお、UE100は、ステップS12でgNB200からPTPレグ及びPTMレグの少なくとも一方のレグを非アクティブ化する指示を受信したことに応じて、受信した指示に対する応答をgNB200に送信してもよい。
 図10は、一実施形態に係るレグのアクティブ化及び非アクティブ化に関する動作例2を示す図である。動作例2の基本的な動作は動作例1と同様であるため、ここでは動作例1との相違点について主として説明する。なお、動作例2は動作例1と併用可能である。
 動作例2では、gNB200が、PTPレグ及びPTMレグの両方をアクティブ化又は非アクティブ化するための指示をUE100に送信する。例えば、gNB200のMACエンティティは、レグのアクティブ化又は非アクティブ化を指示するMAC CEに、PTPレグの制御指示及びPTMレグの制御指示の両方を含める。
 図10に示すように、ステップS21において、gNB200のRRCエンティティは、図8に示すスプリットMBSベアラ(スプリットベアラ)の設定を含むRRCメッセージをUE100に送信する。上述のように、当該RRCメッセージは、各レグの初期状態を設定する情報を含んでもよい。各レグの初期状態を設定する情報は、後述のMAC CE又はDCIに含まれる指示と同様な情報であってもよい。
 ステップS22において、gNB200は、PTPレグ及びPTMレグの両方をアクティブ化又は非アクティブ化するための指示をUE100に送信する。上述のように、当該指示は、MAC CE又はDCIに含まれる。
 ここで、MAC CE又はDCIは、PTPレグ及びPTMレグの両方のアクティブ化(例えば、“1”)、又はPTPレグ及びPTMレグの両方の非アクティブ化(例えば、“0”)の指示値を含む。PTPレグ及びPTMレグの両方のアクティブ化は、スプリットMBSベアラのアクティブ化であってもよいし、2つのレグを用いた二重送信(Duplication)のアクティブ化であってもよい。また、PTPレグ及びPTMレグの両方の非アクティブ化は、スプリットMBSベアラの非アクティブ化であってもよいし、2つのレグを用いた二重送信の非アクティブ化であってもよい。
 MAC CE又はDCIは、指示の対象となるMBSセッション(スプリットMBSベアラ)と対応付けられた識別子(例えば、TMGI、G-RNTI、セッション識別子、QoSフロー識別子、ベアラ識別子)を含んでもよい。MAC CE又はDCIは、このような識別子ごとにアクティブ化又は非アクティブ化の指示を含んでもよい。
 図11は、一実施形態に係るベアラ識別子(若しくは論理チャネル識別子)ごとの指示値を格納するMAC CE(1オクテット)の一例を示す図である。図11に示すように、MAC CEにおいて、M1乃至M8は、ベアラ#1乃至#8(若しくは論理チャネル#1乃至#8と対応する。M1乃至M8の各フィールドは1ビットであり、各フィールドにアクティブ化(例えば、“1”)又は非アクティブ化(例えば、“0”)の指示値が格納される。
 ステップS23は、動作例1と同様である。UE100は、応答をgNB200に送信してもよい。
 UE100のPDCPエンティティは、PTPレグ及びPTMレグの両方がアクティブ化された場合、二重送信(Duplication)で送信される2つの同一MBSパケットの重複破棄(duplicate packet discarding)処理を行ってもよい。
 UE100のRRCエンティティは、PTPレグが非アクティブ化された場合、RRC接続の解放をgNB200に促すためのメッセージ(RAI:Release Assistance Information/preference)をgNB200に送信してもよい。或いは、UE100は、PTPレグ及びPTMレグの動的切り替えが設定中であってもRAIの送信が許可されるとしてもよい。
 (PTP伝送とPTM伝送との切り替え動作)
 次に、一実施形態に係るPTP伝送とPTM伝送との切り替え動作について説明する。
 スプリットMBSベアラを前提とする場合、PTP伝送は、PTPレグ(PTP通信パス)を用いてgNB200からUE100へMBSデータを伝送する方式であってもよい。PTM伝送は、PTMレグ(PTM通信パス)を用いてgNB200からUE100へMBSデータを伝送する方式であってもよい。
 或いは、スプリットMBSベアラを前提としなくてもよい。PTP伝送は、PTP用の第1データ無線ベアラであるPTPベアラ(PTP通信パス)を用いてgNB200からUE100へMBSデータを伝送する方式であってもよい。PTM伝送は、PTM用の第2データ無線ベアラであるPTMベアラ(PTM通信パス)を用いてgNB200からUE100へMBSデータを伝送する方式であってもよい。
 PTP伝送とPTM伝送との切り替え動作は、PTP伝送及びPTM伝送のうち、一方の伝送方式のMBSデータ伝送を終了するのと同時に、他方の伝送方式のMBSデータ伝送を開始する動作である。このような切り替えの際に、gNB200からUE100へ伝送されるMBSデータ(MBSパケット)が欠落する懸念がある。このようなパケットロスが発生した場合、通信の信頼性を高めるために、PDCPレイヤ(又はRLCレイヤ)における再送が行われることが望ましい。
 一実施形態に係るUE100において、受信部110は、PTP(Point-To-Point)伝送及びPTM(Point-To-Multipoint)伝送のいずれかの伝送方式でgNB200から伝送されるMBSデータを受信する。UE100の制御部130は、伝送方式がPTP伝送とPTM伝送との間で切り替えられたことに応じて、UE100の所定レイヤにおけるMBSデータの受信状態を示すステータス報告の送信をトリガする。UE100の送信部120は、ステータス報告をgNB200に送信する。
 これにより、gNB200は、PTP伝送とPTM伝送との切り替えに関してUE100のMBSデータの受信状態を把握できる。このため、gNB200は、PTP伝送とPTM伝送との切り替えの際にMBSパケットが欠落しても、欠落したMBSパケットを特定しやすくなる。よって、MBSパケットのパケットロスが発生した場合、PDCPレイヤ(又はRLCレイヤ)における再送が可能になるため、通信の信頼性を高めることができる。
 以下において、所定レイヤがPDCPレイヤであって、UE100からgNB200へ送信されるステータス報告がPDCPステータス報告(PDCP status report)である一例について説明する。但し、所定レイヤは、RLCレイヤであってもよい。UE100からgNB200へ送信されるステータス報告は、RLCステータス報告(RLC Status PDU)であってもよい。
 図12は、一実施形態に係るPDCPステータス報告の構成例を示す図である。
 図12に示すように、PDCPステータス報告は、主要な構成要素として、1ビット長の「D/C」フィールドと、3ビット長の「PDU Type」フィールドと、32ビット長の「FMC(First Missing COUNT)」フィールドと、可変ビット長の「Bitmap」フィールドとを有する。
 「D/C」フィールドは、このPDCP PDUがPDCP Data PDUであるか又はPDCP Control PDUであるかを示すフィールドである。PDCPステータス報告は、PDCP Control PDUに相当する。
 「PDU Type」フィールドは、このPDCP Control PDUが、「PDCP status report」、及び「Interspersed ROHC feedback」、及び「EHC feedback」のいずれであるかを示すフィールドである。
 「FMC(First Missing COUNT)」フィールドは、リオーダリングウィンドウ内で最初に欠落したPDCP SDUのカウント値(COUNT)を示すフィールドである。なお、カウント値(COUNT)は、HFN(Hyper Frame Number)及びPDCPシーケンス番号により構成される。
 「Bitmap」フィールドは、欠落したPDCP SDUと、受信側PDCPエンティティで正しく受信されたPDCP SDUとを示すフィールドである。具体的には、「Bitmap」フィールドは、FMC以降のPDCP SDUの受信状態を「0」(欠落)又は「1」(正しく受信)で示す。
 (1)PTM伝送からPTP伝送への切り替え動作
 次に、一実施形態に係るPTM伝送からPTP伝送への切り替え動作について説明する。図13は、一実施形態に係るPTM伝送からPTP伝送への切り替え動作を示す図である。以下の説明において、gNB200は、図7に示す共有MBSデータ配信(Shared MBS Traffic delivery)のMBS接続を5GC20と確立しているものとする。
 図13に示すように、ステップS101において、gNB200は、MBSデータのPTM伝送を開始する。具体的には、gNB200は、あるMBSセッションに属するMBSデータのマルチキャスト伝送又はブロードキャスト伝送を開始する。
 ステップS102において、gNB200は、あるMBSセッションに属するMBSデータをPTMで送信する。UE100は、MBSデータを受信する。
 ステップS103において、UE100のPDCPエンティティは、PDCPステータス報告を生成するために、PTMで送信されるMBSデータ(PDCP SDU)のうち受信に成功したMBSデータのシーケンス番号及び受信に失敗したMBSデータのシーケンス番号をそれぞれ記録してもよい。
 ステップS104において、gNB200は、PTM伝送からPTP伝送へ切り替えるための指示をUE100に送信する。この指示は、PTMレグのディアクティベーション指示及び/又はPTPレグのアクティベーション指示であってもよい。この指示は、RRCメッセージ(例えば、RRC Reconfigurationメッセージ)による、PTMベアラからPTPベアラへの変更指示であってもよい。この指示は、PDCPステータス報告の送信指示又は送信設定を含んでもよい。但し、UE100は、gNB200からのPDCPステータス報告の送信指示又は送信設定がなくても、PDCPステータス報告を自発的にトリガ(ステップS107)及び送信してもよい(ステップS108)。
 ステップS105において、gNB200及びUE100は、PTM伝送からPTP伝送への切り替え処理を行う。具体的には、gNB200及びUE100は、あるMBSセッションに属するMBSデータのPTM伝送を終了するとともに、当該MBSセッションに属するMBSデータのPTP伝送を開始する。
 ステップS106において、gNB200は、当該MBSセッションに属するMBSデータをPTPで送信する。UE100は、MBSデータを受信する。
 UE100は、PTM伝送からPTP伝送への切り替え処理に伴い、PTMで送信される最後のMBSデータ(PDCP SDU)の受信に失敗し得る。この場合、UE100のPDCPエンティティは、PTMで送信されるMBSデータ(PDCP SDU)のうち受信に失敗したMBSデータ(PDCP SDU)のシーケンス番号を記録する。
 UE100は、PTM伝送からPTP伝送への切り替え処理に伴い、PTPで送信される最初のMBSデータ(PDCP SDU)の受信に失敗し得る。この場合、UE100のPDCPエンティティは、PTPで送信されるMBSデータ(PDCP SDU)のうち受信に失敗したMBSデータ(PDCP SDU)のシーケンス番号を記録する。
 ステップS107において、UE100のPDCPエンティティは、PDCPステータス報告の送信をトリガする。具体的には、UE100のPDCPエンティティは、図12に示すようなPDCPステータス報告を生成し、PDCPステータス報告を下位レイヤに渡す。
 ここで、UE100のPDCPエンティティは、ステップS104の指示を受信したときにPDCPステータス報告の送信をトリガしてもよいし、ステップS105の切り替え処理を行ったときにPDCPステータス報告の送信をトリガしてもよい。
 UE100のPDCPエンティティは、ステップS104の指示を受信してから一定時間の経過後にPDCPステータス報告の送信をトリガしてもよいし、ステップS105の切り替え処理を行ってから一定時間の経過後にPDCPステータス報告の送信をトリガしてもよい。このような一定時間(タイマ値)は、gNB200からUE100に設定されてもよい。
 UE100がPDCPステータス報告の送信をトリガする条件として、PTMで最後に受信したMBSデータのシーケンス番号とPTPで最初に受信したMBSデータのシーケンス番号とが不連続であるという条件があってもよい。UE100のPDCPエンティティは、このような不連続を検知した場合に限り、PDCPステータス報告の送信をトリガする。UE100がPDCPステータス報告の送信をトリガする条件は、PTMで送信されたMBSデータにおける欠落(シーケンス番号の不連続)を検知したことであってもよい。
 ステップS108において、UE100の下位レイヤ(RLCエンティティ、MACエンティティ、及びPHYエンティティ)は、PDCPステータス報告をgNB200に送信する。gNB200は、PDCPステータス報告を受信する。
 ステップS109において、gNB200は、PDCPステータス報告に含まれる欠落パケット情報(FMC及びBitmap)に基づいて、欠落したMBSデータをPTPでUE100に再送する。UE100は、PTPで再送されたMBSデータを受信する。
 このように、PTM伝送からPTP伝送への切り替えの際に、UE100においてMBSデータが欠落しても、PDCPステータス報告に基づいて欠落MBSデータを特定し、PDCPレイヤにおける再送により欠落MBSデータを補完できる。
 (2)PTP伝送からPTM伝送への切り替え動作
 次に、一実施形態に係るPTP伝送からPTM伝送への切り替え動作について説明する。図14は、一実施形態に係るPTP伝送からPTM伝送への切り替え動作を示す図である。
 図14に示すように、ステップS201において、gNB200は、MBSデータのPTP伝送を開始する。具体的には、gNB200は、あるMBSセッションに属するMBSデータのユニキャスト伝送を開始する。
 ステップS202において、gNB200は、あるMBSセッションに属するMBSデータをPTMで送信する。UE100は、MBSデータを受信する。
 ステップS203において、UE100のPDCPエンティティは、PDCPステータス報告を生成するために、PTPで送信されるMBSデータ(PDCP SDU)のうち受信に成功したMBSデータのシーケンス番号及び受信に失敗したMBSデータのシーケンス番号をそれぞれ記録してもよい。
 ステップS204において、gNB200は、PTP伝送からPTM伝送へ切り替えるための指示をUE100に送信する。この指示は、PTPレグのディアクティベーション指示及び/又はPTMレグのアクティベーション指示であってもよい。この指示は、RRCメッセージ(例えば、RRC Reconfigurationメッセージ)による、PTPベアラからPTMベアラへの変更指示であってもよい。この指示は、PDCPステータス報告の送信指示又は送信設定を含んでもよい。但し、UE100は、gNB200からのPDCPステータス報告の送信指示又は送信設定がなくても、PDCPステータス報告を自発的にトリガ(ステップS207)及び送信してもよい(ステップS208)。
 ステップS205において、gNB200及びUE100は、PTP伝送からPTM伝送への切り替え処理を行う。具体的には、gNB200及びUE100は、あるMBSセッションに属するMBSデータのPTP伝送を終了するとともに、当該MBSセッションに属するMBSデータのPTM伝送を開始する。
 ステップS206において、gNB200は、当該MBSセッションに属するMBSデータをPTMで送信する。UE100は、MBSデータを受信する。
 UE100は、PTP伝送からPTM伝送への切り替え処理に伴い、PTPで送信される最後のMBSデータ(PDCP SDU)の受信に失敗し得る。この場合、UE100のPDCPエンティティは、PTPで送信されるMBSデータ(PDCP SDU)のうち受信に失敗したMBSデータ(PDCP SDU)のシーケンス番号を記録する。
 UE100は、PTP伝送からPTM伝送への切り替え処理に伴い、PTMで送信される最初のMBSデータ(PDCP SDU)の受信に失敗し得る。この場合、UE100のPDCPエンティティは、PTMで送信されるMBSデータ(PDCP SDU)のうち受信に失敗したMBSデータ(PDCP SDU)のシーケンス番号を記録する。
 ステップS207において、UE100のPDCPエンティティは、PDCPステータス報告の送信をトリガする。具体的には、UE100のPDCPエンティティは、図12に示すようなPDCPステータス報告を生成し、PDCPステータス報告を下位レイヤに渡す。
 ここで、UE100のPDCPエンティティは、ステップS204の指示を受信したときにPDCPステータス報告の送信をトリガしてもよいし、ステップS205の切り替え処理を行ったときにPDCPステータス報告の送信をトリガしてもよい。
 UE100のPDCPエンティティは、ステップS204の指示を受信してから一定時間の経過後にPDCPステータス報告の送信をトリガしてもよいし、ステップS205の切り替え処理を行ってから一定時間の経過後にPDCPステータス報告の送信をトリガしてもよい。このような一定時間(タイマ値)は、gNB200からUE100に設定されてもよい。
 UE100がPDCPステータス報告の送信をトリガする条件として、PTPで最後に受信したMBSデータのシーケンス番号とPTMで最初に受信したMBSデータのシーケンス番号とが不連続であるという条件があってもよい。UE100のPDCPエンティティは、このような不連続を検知した場合に限り、PDCPステータス報告の送信をトリガする。UE100がPDCPステータス報告の送信をトリガする条件は、PTPで送信されたMBSデータにおける欠落(シーケンス番号の不連続)を検知したことであってもよい。
 ステップS208において、UE100の下位レイヤ(RLCエンティティ、MACエンティティ、及びPHYエンティティ)は、PDCPステータス報告をgNB200に送信する。gNB200は、PDCPステータス報告を受信する。
 ステップS209において、gNB200は、PDCPステータス報告に含まれる欠落パケット情報(FMC及びBitmap)に基づいて、欠落したMBSデータをPTMでUE100に再送する。UE100は、PTMで再送されたMBSデータを受信する。
 このように、PTP伝送からPTM伝送への切り替えの際に、UE100においてMBSデータが欠落しても、PDCPステータス報告に基づいて欠落MBSデータを特定し、PDCPレイヤにおける再送により欠落MBSデータを補完できる。
 (3)PTP伝送からPTM伝送への切り替え動作の変更例
 次に、一実施形態に係るPTP伝送からPTM伝送への切り替え動作の変更例について説明する。図15は、一実施形態に係るPTP伝送からPTM伝送への切り替え動作の変更例を示す図である。
 図15に示すように、ステップS301乃至S308の動作は、図14と同様である。但し、ステップS304及びS305において、gNB200及びUE100は、PTP通信パス(PTPレグ)をディアクティベーションせずにアクティブな状態を維持する。
 ステップS309において、gNB200は、PDCPステータス報告に含まれる欠落パケット情報(FMC及びBitmap)に基づいて、欠落したMBSデータをPTPでUE100に再送する。UE100は、PTPで再送されたMBSデータを受信する。
 このように、gNB200及びUE100は、MBSデータの初送処理をPTMで行いつつ、MBSデータの再送処理をPTPで行う。これにより、MBSデータの欠落が生じたUE100に対してのみ、当該MBSデータをPTPで再送できるため、効率的な再送処理を実現できる。なお、UE100は、欠落したMBSデータが再送により補完された場合、PTPでの受信処理を自発的に停止してもよい。
 (その他の実施形態)
 上述の実施形態において、スプリットMBSベアラを用いて、PTP通信パスをPTPレグにより構成するとともに、PTM通信パスをPTMレグにより構成する一例について説明した。しかしながら、2つの無線ベアラ(データ無線ベアラ)を用いて、PTP通信パスをPTP用の第1無線ベアラにより構成するとともに、PTM通信パスをPTM用の第2無線ベアラにより構成してもよい。
 上述の実施形態において、所定レイヤがPDCPレイヤであって、UE100からgNB200へ送信されるステータス報告がPDCPステータス報告(PDCP status report)である一例について説明した。但し、上述の実施形態におけるPDCPエンティティをRLCエンティティと読み替え、PDCPステータス報告をRLCステータス報告(RLC Status PDU)と読み替えてもよい。
 上述の各動作フローは、別個独立に実施する場合に限らず、2以上の動作フローを組み合わせて実施可能である。例えば、1つの動作フローの一部のステップを他の動作フローに追加してもよいし、1つの動作フローの一部のステップを他の動作フローの一部のステップと置換してもよい。
 上述の実施形態において、基地局がNR基地局(gNB)である一例について説明したが基地局がLTE基地局(eNB)であってもよい。また、基地局は、IAB(Integrated Access and Backhaul)ノード等の中継ノードであってもよい。基地局は、IABノードのDU(Distributed Unit)であってもよい。
 UE100又はgNB200が行う各処理をコンピュータに実行させるプログラムが提供されてもよい。プログラムは、コンピュータ読取り可能媒体に記録されていてもよい。コンピュータ読取り可能媒体を用いれば、コンピュータにプログラムをインストールすることが可能である。ここで、プログラムが記録されたコンピュータ読取り可能媒体は、非一過性の記録媒体であってもよい。非一過性の記録媒体は、特に限定されるものではないが、例えば、CD-ROMやDVD-ROM等の記録媒体であってもよい。
 また、UE100又はgNB200が行う各処理を実行する回路を集積化し、UE100又はgNB200の少なくとも一部を半導体集積回路(チップセット、SoC)として構成してもよい。
 以上、図面を参照して実施形態について詳しく説明したが、具体的な構成は上述のものに限られることはなく、要旨を逸脱しない範囲内において様々な設計変更等をすることが可能である。
 本願は、日本国特許出願第2020-214243号(2020年12月23日出願)の優先権を主張し、その内容の全てが本願明細書に組み込まれている。
10   :NG-RAN(5G RAN)
20   :5GC(5G CN)
100  :UE
110  :受信部
120  :送信部
130  :制御部
200  :gNB
210  :送信部
220  :受信部
230  :制御部
240  :バックホール通信部
 

Claims (8)

  1.  マルチキャスト・ブロードキャストサービス(MBS)を提供する移動通信システムにおいてユーザ装置が実行する通信制御方法であって、
     PTP(Point-To-Point)伝送及びPTM(Point-To-Multipoint)伝送のいずれかの伝送方式で基地局から伝送されるMBSデータを受信することと、
     前記伝送方式が前記PTP伝送と前記PTM伝送との間で切り替えられたことに応じて、前記ユーザ装置の所定レイヤにおけるMBSデータの受信状態を示すステータス報告の送信をトリガすることと、
     前記ステータス報告を前記基地局に送信することと、を有する
     通信制御方法。
  2.  前記所定レイヤは、PDCP(Packet Data Convergence Protocol)レイヤであって、
     前記ステータス報告は、PDCPステータス報告である
     請求項1に記載の通信制御方法。
  3.  前記切り替えることは、前記伝送方式を前記PTM伝送から前記PTP伝送へ切り替えることを含む
     請求項1又は2に記載の通信制御方法。
  4.  前記ステータス報告に基づいて前記基地局からPTPで再送される前記MBSデータを受信することをさらに有する
     請求項3に記載の通信制御方法。
  5.  前記切り替えることは、前記伝送方式を前記PTP伝送から前記PTM伝送へ切り替えることを含む
     請求項1又は2に記載の通信制御方法。
  6.  前記ステータス報告に基づいて前記基地局からPTMで再送される前記MBSデータを受信することをさらに有する
     請求項5に記載の通信制御方法。
  7.  前記ステータス報告に基づいて前記基地局からPTPで再送される前記MBSデータを受信することをさらに有する
     請求項5に記載の通信制御方法。
  8.  マルチキャスト・ブロードキャストサービス(MBS)を提供する移動通信システムで用いるユーザ装置であって、
     PTP(Point-To-Point)伝送及びPTM(Point-To-Multipoint)伝送のいずれかの伝送方式で基地局から伝送されるMBSデータを受信する受信部と、
     前記伝送方式が前記PTP伝送と前記PTM伝送との間で切り替えられたことに応じて、前記ユーザ装置の所定レイヤにおけるMBSデータの受信状態を示すステータス報告の送信をトリガする制御部と、
     前記ステータス報告を前記基地局に送信する送信部と、を備える
     ユーザ装置。
     
PCT/JP2021/046549 2020-12-23 2021-12-16 通信制御方法及びユーザ装置 WO2022138450A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022571378A JPWO2022138450A1 (ja) 2020-12-23 2021-12-16
US18/339,896 US20230337327A1 (en) 2020-12-23 2023-06-22 Communication control method and user equipment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020214243 2020-12-23
JP2020-214243 2020-12-23

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/339,896 Continuation US20230337327A1 (en) 2020-12-23 2023-06-22 Communication control method and user equipment

Publications (1)

Publication Number Publication Date
WO2022138450A1 true WO2022138450A1 (ja) 2022-06-30

Family

ID=82159337

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/046549 WO2022138450A1 (ja) 2020-12-23 2021-12-16 通信制御方法及びユーザ装置

Country Status (3)

Country Link
US (1) US20230337327A1 (ja)
JP (1) JPWO2022138450A1 (ja)
WO (1) WO2022138450A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024082295A1 (zh) * 2022-10-21 2024-04-25 北京小米移动软件有限公司 小区处理、小区处理指示方法和装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
VIVO: "Dynamic PTM PTP switch for RRC Connected UE", 3GPP DRAFT; R2-2010216, vol. RAN WG2, 23 October 2020 (2020-10-23), pages 1 - 8, XP051942897 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024082295A1 (zh) * 2022-10-21 2024-04-25 北京小米移动软件有限公司 小区处理、小区处理指示方法和装置

Also Published As

Publication number Publication date
JPWO2022138450A1 (ja) 2022-06-30
US20230337327A1 (en) 2023-10-19

Similar Documents

Publication Publication Date Title
US10045395B2 (en) Base station, processor, and user terminal for setting a configuration to the user terminal for discontinuously monitoring a physical downlink control channel (PDCCH) on which a control signal is transmitted by the base station
WO2021056151A1 (zh) 一种多播传输控制方法以及相关设备
WO2022085717A1 (ja) 通信制御方法
US20240080939A1 (en) Communication control method and user equipment
US20230354475A1 (en) Communication control method
US20230337327A1 (en) Communication control method and user equipment
US20240015850A1 (en) Communication control method and user equipment
JP2023100957A (ja) 通信制御方法、ユーザ装置及びプロセッサ
WO2022085646A1 (ja) 通信制御方法
JP7508576B2 (ja) 通信制御方法
WO2022234847A1 (ja) 通信制御方法及びユーザ装置
WO2022085573A1 (ja) 通信制御方法
US20230188950A1 (en) Communication control method
WO2023013670A1 (ja) 通信方法及びユーザ装置
WO2022239691A1 (ja) 通信制御方法
US20240040662A1 (en) Communication control method and user equipment
JP7425259B2 (ja) 通信制御方法及び基地局
WO2022153990A1 (ja) 通信制御方法及びユーザ装置
US20240179799A1 (en) Communication method, user equipment, and base station
WO2023002988A1 (ja) 通信方法
WO2023063371A1 (ja) 通信方法
WO2022080230A1 (ja) 通信制御方法
JP2024088761A (ja) 通信制御方法、ユーザ装置、プロセッサ及びプログラム
JP2024084816A (ja) 通信制御方法、ユーザ装置、プロセッサ、プログラム及び移動通信システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21910598

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022571378

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21910598

Country of ref document: EP

Kind code of ref document: A1