WO2022134174A1 PCT/CN2020/141697 CN2020141697W WO2022134174A1 WO 2022134174 A1 WO2022134174 A1 WO 2022134174A1 CN 2020141697 W CN2020141697 W CN 2020141697W WO 2022134174 A1 WO2022134174 A1 WO 2022134174A1
Authority
WO
WIPO (PCT)
Prior art keywords
linkage
data
resource
control
panel
Prior art date
Application number
PCT/CN2020/141697
Other languages
French (fr)
Chinese (zh)
Inventor
陈其标
Original Assignee
威创集团股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 威创集团股份有限公司 filed Critical 威创集团股份有限公司
Publication of WO2022134174A1 publication Critical patent/WO2022134174A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/222Studio circuitry; Studio devices; Studio equipment
    • H04N5/262Studio circuits, e.g. for mixing, switching-over, change of character of image, other special effects ; Cameras specially adapted for the electronic generation of special effects
    • H04N5/268Signal distribution or switching
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/14Digital output to display device ; Cooperation and interconnection of the display device with other functional units
    • G06F3/1423Digital output to display device ; Cooperation and interconnection of the display device with other functional units controlling a plurality of local displays, e.g. CRT and flat panel display
    • G06F3/1446Digital output to display device ; Cooperation and interconnection of the display device with other functional units controlling a plurality of local displays, e.g. CRT and flat panel display display composed of modules, e.g. video walls
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/222Studio circuitry; Studio devices; Studio equipment
    • H04N5/262Studio circuits, e.g. for mixing, switching-over, change of character of image, other special effects ; Cameras specially adapted for the electronic generation of special effects
    • H04N5/2624Studio circuits, e.g. for mixing, switching-over, change of character of image, other special effects ; Cameras specially adapted for the electronic generation of special effects for obtaining an image which is composed of whole input images, e.g. splitscreen
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/222Studio circuitry; Studio devices; Studio equipment
    • H04N5/262Studio circuits, e.g. for mixing, switching-over, change of character of image, other special effects ; Cameras specially adapted for the electronic generation of special effects
    • H04N5/265Mixing

Definitions

  • the present application aims to overcome at least one defect of the above-mentioned prior art, and provides a multi-type resource integration and linkage method, system and storage medium for splicing walls, which are used to provide a unified control and linkage method for a variety of different types of resources. and system.
  • the control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal sends the linkage corresponding to the linkage operation.
  • the data is sent to the scheduling server;
  • the scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
  • the control linkage panel is created through the resource configuration terminal, and users can add control linkage panels of new types of resources at will, and the scalability of resource linkage is good;
  • the control linkage panel is integrated into the dispatch server, so that the dispatch server can be used as a unified control linkage interface , receive the linkage data caused by the control linkage panel, and send the linkage data to the video wall window corresponding to the target resource, causing the target resource and video wall window to respond to the linkage operation corresponding to the linkage data, and realize the control linkage panel and the target resource and the corresponding linkage operation.
  • the splicing wall windows are connected, and a set of control linkage scheme is unified for different resources, and the maintenance is good.
  • the scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource, specifically including:
  • the scheduling server sends the linkage data to the resource management server.
  • the resource management server analyzes the linkage data to obtain the type of the target resource, and then calls the corresponding resource interface according to the type of the target resource, and sends the linkage data to the resource interface through the resource interface.
  • the splicing wall window corresponding to the target resource thereby triggering the display response of the splicing wall window.
  • the control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a button click operation on the control linkage panel, and the control linkage terminal will be corresponding to the clicked button.
  • the preset data is converted into linkage data and sent to the scheduling server.
  • the control linkage panel obtains the relevant information of the target resource and the corresponding video wall window.
  • the control linkage terminal When the click linkage operation is initiated, the control linkage terminal will convert the preset data corresponding to the clicked button event into linkage data and send it to the dispatch server, causing the linkage response of the target resource and the information update response of the video wall window, and the button event will be converted. It is a specific linkage operation and converts it into linkage data to schedule data in the scheduling server, so as to quickly and smoothly realize the control linkage of resources.
  • the splicing wall window selects the target resource to be linked, and performs a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window sends the linkage data corresponding to the linkage operation to the scheduling server;
  • the multiple resources include VWAS resources, MS multimedia resources, and element type resources.
  • a multi-resource integration and linkage system for a splicing wall including a scheduling server, a resource configuration end, a control linkage end and a splicing wall window, the resource configuration end, the control linkage
  • the terminal and the video wall window are respectively connected with the scheduling server, wherein,
  • the resource configuration terminal is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the scheduling server;
  • the control linkage terminal is configured to load the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiate a linkage operation on the control linkage panel, and the control linkage terminal loads the control linkage panel.
  • the linkage data corresponding to the linkage operation is sent to the scheduling server;
  • the scheduling server is configured to receive the linkage data, and send the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
  • a multi-resource integration and linkage system for a splicing wall which realizes the control linkage of resources through the scheduling server, resource configuration end, control linkage end and splicing wall window.
  • the resource configuration end, control linkage end and splicing wall window are all connected with the scheduling server end connection, in which the resource configuration terminal is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the dispatch server, and the dispatch server forms an integrated service framework of a unified control linkage panel; control linkage
  • the terminal is used to select the target resource to be linked, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, initiate a linkage operation on the control linkage panel, and send the linkage data corresponding to the linkage operation to the dispatch server;
  • the server After receiving the linkage data, the server sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource, so that the video wall window receives the linkage data and responds
  • the control linkage panel is created through the resource configuration terminal, and users can add control linkage panels of new types of resources at will, and the scalability of resource linkage is good;
  • the control linkage panel is integrated into the dispatch server, so that the dispatch server can be used as a unified control linkage interface , receive the linkage data caused by the control linkage panel, and send the linkage data to the splicing wall window corresponding to the target resource, causing the target resource and the splicing wall window to respond to the linkage operation corresponding to the linkage data.
  • the splicing wall windows are connected, and a set of control linkage scheme is unified for different resources, and the maintenance is good.
  • a resource management server which is respectively connected with the scheduling server and the video wall window, and is used for receiving the linkage data sent by the scheduling server, and according to the target The type of the resource calls the corresponding resource interface, and the linkage data is sent to the video wall window corresponding to the target resource through the resource interface.
  • a resource management server is connected to the scheduling server, and the resource management server is used to analyze the linkage data received from the scheduling server to obtain the type of the target resource, and then call the corresponding resource interface according to the type of the target resource. , and send the linkage data to the splicing wall window corresponding to the target resource through the resource interface, thereby triggering the display response of the splicing wall window.
  • the resource management server By introducing the resource management server at the scheduling server, when a new type of resource is added, the resource management server It can realize the modification service of network protocol and add a new resource calling interface, without directly modifying the service of the scheduling server, to meet the arbitrary expansion and service modification of the new resources, and to solve the problem of using the scheduling server as a unified control linkage interface, The problem of poor scalability.
  • control linkage terminal is specifically used to select the target resource to be linked, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, and initiate a button on the control linkage panel. For a click operation, the control linkage terminal converts the preset data corresponding to the clicked button into linkage data and sends it to the dispatch server.
  • the control linkage panel is specifically used to obtain the relevant information of the target resource and the corresponding video wall window.
  • the control linkage terminal When a button event initiates a click linkage operation, the control linkage terminal will convert the preset data corresponding to the clicked button event into linkage data and send it to the dispatch server, causing the linkage response of the target resource and the information update response of the video wall window.
  • the button event is converted into a specific linkage operation, and converted into linkage data to schedule data in the scheduling server, so as to quickly and smoothly realize the control linkage of resources.
  • the splicing wall window is also used to select the target resource that needs to be linked, and perform a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window links the linkage corresponding to the linkage operation. sending data to the scheduling server;
  • the scheduling server is further configured to receive the linkage data, and send the linkage data to the control linkage terminal corresponding to the target resource according to the type of the target resource;
  • the control linkage terminal is further configured to receive the linkage data, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, and respond to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
  • the control linkage of resources in this application supports two-way linkage.
  • the video wall window is used to select the target resource to be linked, and the linkage operation is performed in the corresponding video wall window according to the target resource type, and the linkage data corresponding to the linkage operation is sent to the dispatch service.
  • the scheduling server is used to receive the linkage data and send it to the control linkage terminal corresponding to the target resource.
  • the control linkage terminal is used to receive the linkage data and analyze the type of the target resource, and load the corresponding control linkage panel from the dispatch server.
  • the control linkage panel responds to the linkage operation, thereby causing the linkage data to be updated on the control linkage panel.
  • the linkage operation is performed in the video wall window, and the linkage data will be returned to the control linkage terminal through the dispatch server, so as to cause the update of the control linkage panel data and realize the bidirectional operation of the linkage operation process.
  • Another technical solution adopted by the present application is a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the above-mentioned multiple resource integration and linkage method of a video wall is realized.
  • a multi-resource integration linkage method, system and storage medium for a splicing wall of the present application provide a unified interface for resource linkage and a unified data interaction logic, and the user can
  • the resource configuration terminal can customize and create control linkage panels for various required resources.
  • the resource control linkage type has good scalability, and users can add new types of resource control linkage panels at will; integrate control linkage panels of various resources into the scheduling service It integrates the service framework in a unified manner, optimizes and streamlines the number of services and related technologies, optimizes deployment, and the scheduling server acts as a unified control linkage protocol interface to connect the resource management server at the scheduling server.
  • the resources The management server can realize the modification service of the network protocol, add a new resource calling interface, and do not need to directly modify the service of the scheduling server, which can meet the arbitrary expansion and service modification of the new resources, and has good scalability;
  • a set of control linkage scheme is unified for different resources, and the maintainability is good; this application also supports the two-way linkage of resource control linkage.
  • FIG. 2 is another schematic flowchart of a multi-type resource integration and linkage method for a splicing wall of the application
  • FIG. 3 is a schematic structural diagram of a multi-type resource integration linkage system of a splicing wall of the present application.
  • the accompanying drawings of the present application are only used for exemplary illustration, and should not be construed as a limitation on the present application.
  • This application is mainly used in the fusion platform, specifically in the ICVP system.
  • the ICVP system integrates various resources of the current splicing wall, and the various resources of the splicing wall in the ICVP system cooperate with the service equipment to splicing on the large screen. The way the wall window shows up.
  • the various resources of the video wall include traditional video wall resource type (VWAS), Media-Sources type (MS), multimedia type, component type and third-party applications and other resource types.
  • VWAS video wall resource type
  • MS Media-Sources type
  • multimedia type multimedia type
  • component type and third-party applications and other resource types.
  • the interface and data interaction logic of each resource are different. Therefore, each has its own set of linkage solutions.
  • This application proposes a set of methods to unify a set of control linkage solutions for different resources, which solves the problems of complex deployment, defects in the solutions, UI problems in the linkage control of multiple resources in the prior art.
  • the interaction is not uniform, the scalability is not good, and the user interaction experience is poor.
  • FIG. 1 is a schematic flowchart of a multi-type resource integration and linkage method for a video wall according to an embodiment of the present application, and the method includes the following steps:
  • the resource configuration terminal creates a control linkage panel for multiple resources, and integrates the control linkage panel for multiple resources into the scheduling server;
  • the control linkage terminal loads a corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal corresponds to the linkage operation
  • the linkage data is sent to the scheduling server;
  • the scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
  • step S103 it specifically includes:
  • the scheduling server receives the linkage data, and sends the linkage data to the resource management server;
  • the resource management server invokes the corresponding resource interface according to the type of the target resource, and sends the linkage data to the video wall window corresponding to the target resource through the resource interface.
  • the video wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, so that the video wall window displays the linkage data.
  • the process of implementing the integration control and linkage of multiple resources by using the method of this embodiment is as follows: first, the user creates control linkage panel data of multiple resources by customizing or importing template data through the resource configuration terminal, and combines the control and linkage panel data of multiple resources.
  • the control linkage panel data is integrated and bound to the scheduling server, and finally the corresponding control linkage panel is generated.
  • the scheduling server forms the corresponding protocol relationship of different resource control linkage panels according to the resource type;
  • the linkage terminal selects the target resource to be linked, and can load the corresponding control linkage panel from the scheduling server according to the protocol relationship of the type of the target resource.
  • the control linkage panel obtains the data information of the video wall window corresponding to the current target resource.
  • the control linkage panel initiates the linkage operation, and the control linkage terminal sends the linkage data corresponding to the linkage operation to the dispatch server through the communication network;
  • the dispatch server acts as a unified protocol interface for resources, and the linkage data received by the dispatch server is the protocol data.
  • the server can send the linkage data to the video wall window, but it is not conducive to service modification and resource expansion. Therefore, a resource management server is added, and the scheduling server forwards the linkage data to the resource management service.
  • the resource management server simply analyzes the linkage data, and sends the linkage data to the splicing wall window corresponding to the target resource according to the analyzed resource type; the splicing wall window can self-convert to the required linkage data according to the received linkage data. data, trigger the response of the video wall window, and the video wall window displays the corresponding linkage data.
  • the control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal Sending the linkage data corresponding to the linkage operation to the scheduling server, specifically including:
  • the control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a button click operation on the control linkage panel, and the control linkage terminal will be corresponding to the clicked button.
  • the preset data is converted into linkage data and sent to the scheduling server.
  • the linkage operation in this embodiment can be embodied as webpage clicks and button events.
  • it is a button event
  • each button event has corresponding preset data.
  • There is a corresponding relationship between the operation and the preset data is predefined.
  • the control linkage terminal obtains the preset data corresponding to the button event, and sets the preset data.
  • the data is converted into linkage data and sent to the scheduling server to realize the transmission of linkage data of linkage operation and realize linkage control of resources.
  • the multi-type resource integration and linkage method for a splicing wall in the embodiment of the present application also supports two-way linkage, and the above steps and processes can also be performed in the reverse direction, which specifically includes:
  • the resource configuration terminal creates a control linkage panel of multiple resources, and integrates the control linkage panel of multiple resources into the scheduling server;
  • the video wall window selects the target resource to be linked, and performs a linked operation on the video wall window corresponding to the target resource, and the video wall window sends the linked data corresponding to the linked operation to the dispatch server;
  • the control linkage terminal receives the linkage data, loads the corresponding control linkage panel from the scheduling server according to the type of the target resource, and responds to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
  • the process of implementing the reverse control linkage of multiple resources by using the method of this embodiment is as follows.
  • the user creates control linkage panel data of multiple resources by customizing or importing template data through the resource configuration terminal, and assigns the multiple resources to the control linkage panel data.
  • the data of the control linkage panel is integrated and bound to the dispatching server, and finally the corresponding control linkage panel is generated.
  • the dispatching server forms the corresponding protocol relationship of different resource control linkage panels according to the resource type;
  • the linkage operation is initiated on the splicing wall window, and the linkage data corresponding to the linkage operation is sent to the dispatching server; the dispatching server acts as a unified protocol interface for resources, and the linkage data received by the dispatching server is the protocol data.
  • the protocol relationship corresponding to different resources can send and process linkage data, but it is not conducive to service modification and resource expansion. Therefore, a resource management server is added, and the scheduling server forwards linkage data to the resource management server.
  • the linkage data is simply analyzed, and the linkage data is sent to the control linkage terminal corresponding to the target resource according to the analyzed resource type; the control linkage terminal receives the corresponding linkage data, and the protocol relationship according to the type of target resource can be obtained from the dispatch server. Load the corresponding control linkage panel, and update the corresponding linkage data on the control linkage panel.
  • the control linkage terminal loads the control linkage panel of the camera resource from the scheduling server according to the type of the camera resource, and obtains the current data of the camera resource, such as the current rotation speed of the camera, the angle value of the up, down, left, and right directions, and the size of the camera zoom.
  • the control linkage panel of the camera resource initiates the click button event operation. There are multiple button events on the control linkage panel, which can control the camera to move up, down, left and right, or zoom in and out. When the button event is clicked to initiate a linkage operation, the corresponding button event
  • the preset data is converted into linkage data and sent to the scheduling server through the network protocol;
  • the scheduling server receives the linkage data and forwards the linkage data to the resource management server;
  • the resource management server simply analyzes the linkage data, analyzes the corresponding camera resource type, and calls the camera resource interface to send the linkage data to the video wall window corresponding to the camera resource;
  • the splicing wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, converts the linkage data into the data required by the splicing wall window, and displays the data situation of the camera linkage.
  • the linkage operation steps of other resource types are the same as the camera resource linkage operation steps.
  • the specific process can be seen in the schematic flowchart of the method for linkage control of multiple resources shown in FIG. 2 , wherein the video wall in FIG. 2 has integrated multiple types of resources.
  • Figure 3 is a schematic structural diagram of an integrated linkage system for multiple types of resources of a splicing wall according to the present embodiment of the present application, and the system includes:
  • the scheduling server 303, the resource configuration terminal 301, the control linkage terminal 302 and the video wall window 304, the resource configuration terminal 301, the control linkage terminal 302 and the video wall window 304 are respectively connected to the scheduling server terminal 303, in,
  • the resource configuration terminal 301 is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the scheduling server 203;
  • the control linkage terminal 302 is configured to load a corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiate a linkage operation on the control linkage panel, and the control linkage terminal loads all the control linkage panels.
  • the linkage data corresponding to the linkage operation is sent to the scheduling server 303; specifically, the control linkage terminal 302 is specifically used to select the target resource to be linked, and from the scheduling server according to the type of the target resource
  • the corresponding control linkage panel is loaded in the control linkage panel, and a button click operation is initiated on the control linkage panel, and the control linkage terminal converts the preset data corresponding to the clicked button into linkage data and sends it to the scheduling server 303;
  • the scheduling server 303 is configured to receive the linkage data, and send the linkage data to the video wall window 304 corresponding to the target resource according to the type of the target resource;
  • the resource management server 305 is also included, and the resource management server 305 is respectively connected to the scheduling server 303 and the video wall window 304, and is used for receiving the linkage data sent by the scheduling server 303, and The corresponding resource interface is called according to the type of the target resource, and the linkage data is sent to the video wall window 304 corresponding to the target resource through the resource interface.
  • the video wall window 304 is used for receiving the linkage data and responding to the linkage operation corresponding to the linkage data, so that the video wall window 304 displays the linkage data.
  • a system for integrating and linking multiple types of resources of a splicing wall realizes the control and linkage of target resources through the resource configuration terminal 301 , the control linkage terminal 302 , the scheduling server 303 , the resource management server 305 , and the splicing wall window 304 .
  • the process is the same as that of the method in Example 1, and will not be described in detail.
  • a multi-type resource integration and linkage system for a video wall in the embodiment of the present application supports two-way linkage for the process of resource control linkage, and the reverse process includes:
  • the splicing wall window 304 is also used to select the target resource to be linked, and perform a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window sends the linkage data corresponding to the linkage operation. to the scheduling server 303;
  • the scheduling server 303 is further configured to receive the linkage data, and send the linkage data to the control linkage terminal 302 corresponding to the target resource according to the type of the target resource;
  • the control linkage terminal 302 is further configured to receive the linkage data, load the corresponding control linkage panel from the scheduling server 303 according to the type of the target resource, and respond to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
  • the embodiments of the present application also provide another implementation, a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, realizes the above-mentioned multiple resource integration and linkage method for a video wall .
  • a multi-resource integration and linkage method, system and storage medium for a video wall of the present application provide a unified interface for resource linkage and a unified data interaction logic, and users can freely configure resources through the resource configuration terminal.
  • the resource control linkage type has good scalability, and users can add new types of resource control linkage panels at will;
  • the resource management server can be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Theoretical Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

A multi-resource integration and linkage method for a splicing wall, a system and a storage medium, which provide a unified control and linkage method and system for multiple different types of resources. The multi-resource integration and linkage method for a splicing wall comprises: a resource configuration end creates a control linkage panel of multiple resources, and integrates the control linkage panel of the multiple resources into a scheduling server; a control linkage end loads the corresponding control linkage panel from the scheduling server according to the type of a target resource to be linked, and initiates a linkage operation for the control linkage panel, and the control linkage end sends linkage data corresponding to the linkage operation to the scheduling server; the scheduling server receives the linkage data, and sends, according to the type of the target resource, the linkage data to a splicing wall window corresponding to the target resource; and the splicing wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, so that the splicing wall window displays the linkage data.

Description

一种拼接墙的多种资源整合联动方法、系统及其存储介质A multi-resource integration and linkage method, system and storage medium of a splicing wall
本申请要求于2020年12月25日提交中国专利局、申请号为202011561334.8、发明名称为“一种拼接墙的多种资源整合联动方法、系统及其存储介质”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims the priority of the Chinese patent application filed on December 25, 2020, with the application number of 202011561334.8 and the invention titled "A multi-resource integration and linkage method, system and storage medium for a video wall", The entire contents of which are incorporated herein by reference.
技术领域technical field
本申请涉及拼接墙技术领域,更具体地,涉及一种拼接墙的多种资源整合联动方法、系统及其存储介质。The present application relates to the technical field of video walls, and more particularly, to a multi-resource integration and linkage method, system and storage medium for video walls.
背景技术Background technique
融合平台,是指利用前沿显示技术、云计算、物联网、大数据、移动互联网等新一代信息技术,构建起“对事的指挥”和“对物的管理”的“一站式”门户访问入口,融合平台能够快捷实现跨部门、跨层级的各类信息共享,形成多屏、多端的联动应用和协同,极大提升指挥中心系统和设备的集中控制效率。Fusion platform refers to the use of cutting-edge display technology, cloud computing, Internet of Things, big data, mobile Internet and other new-generation information technologies to build a "one-stop" portal access for "command of things" and "management of things" The integration platform can quickly realize various information sharing across departments and levels, form multi-screen and multi-terminal linkage applications and collaboration, and greatly improve the centralized control efficiency of the command center system and equipment.
目前,融合平台实现整合了拼接墙的各种资源,包括传统拼接大屏资源类型、Media-Sources类型(MS)、多媒体类型、元件类型和第三方应用等资源类型,但是由于目前的资源联动没有统一的接口和统一的数据交互逻辑,每一种类型的资源都有各自的一套方案,因此存在部署复杂、方案存在缺陷、UI交互不统一、扩展性不好、用户交互体验差等问题。At present, the fusion platform integrates various resources of the splicing wall, including traditional splicing large screen resource types, Media-Sources type (MS), multimedia type, component type and third-party applications. However, due to the current resource linkage, there is no Unified interface and unified data interaction logic, each type of resource has its own set of solutions, so there are problems such as complex deployment, flawed solutions, inconsistent UI interaction, poor scalability, and poor user interaction experience.
发明内容SUMMARY OF THE INVENTION
本申请旨在克服上述现有技术的至少一种缺陷,提供一种拼接墙的多种类型资源整合联动方法、系统及其存储介质,用于为多种不同类型的资源提供统一控制联动的方法和系统。The present application aims to overcome at least one defect of the above-mentioned prior art, and provides a multi-type resource integration and linkage method, system and storage medium for splicing walls, which are used to provide a unified control and linkage method for a variety of different types of resources. and system.
本申请采取的技术方案是,一种拼接墙的多种资源整合联动方法,包括:The technical solution adopted in this application is a multi-resource integration and linkage method for splicing walls, including:
资源配置端创建多种资源的控制联动面板,并将多种资源的所述控制 联动面板整合到调度服务端中;The resource configuration terminal creates a control linkage panel of multiple resources, and integrates the control linkage panel of multiple resources into the scheduling server;
控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至调度服务端;The control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal sends the linkage corresponding to the linkage operation. The data is sent to the scheduling server;
所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的拼接墙窗口;The scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
所述拼接墙窗口接收所述联动数据并响应所述联动数据对应的联动操作,以使所述拼接墙窗口显示所述联动数据。The video wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, so that the video wall window displays the linkage data.
用户通过资源配置端创建多种不同资源的控制联动面板,并将多种资源的控制联动面板整合到调度服务端中,调度服务端形成统一的控制联动面板的整合服务框架;控制联动端选择所需联动的目标资源,根据目标资源的类型从调度服务端加载对应的控制联动面板,并对控制联动面板发起联动操作,将联动操作对应的联动数据发送至调度服务端;调度服务端接收联动数据后根据目标资源的类型将联动数据发送至与目标资源对应的拼接墙窗口,从而使得拼接墙窗口接收联动数据并响应对应的联动操作,显示目标资源联动操作对应的联动数据。其中,通过资源配置端创建控制联动面板,用户可随意增加新类型资源的控制联动面板,资源联动的扩展性好;将控制联动面板整合到调度服务端,使得调度服务端作为统一的控制联动接口,接收控制联动面板引起的联动数据,并将联动数据发送至目标资源对应的拼接墙窗口,引起目标资源和拼接墙窗口响应联动数据对应的联动操作,实现了在控制联动面板和目标资源以及对应的拼接墙窗口做对接,为不同资源统一了一套控制联动方案,维护性好。Users create a variety of control linkage panels of different resources through the resource configuration terminal, and integrate the control linkage panels of various resources into the dispatch server, and the dispatch server forms an integrated service framework for a unified control linkage panel; the control linkage terminal selects the For the target resource to be linked, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, initiate a linkage operation on the control linkage panel, and send the linkage data corresponding to the linkage operation to the dispatch server; the dispatch server receives the linkage data Then, according to the type of the target resource, the linkage data is sent to the video wall window corresponding to the target resource, so that the video wall window receives the linkage data and responds to the corresponding linkage operation, and displays the linkage data corresponding to the target resource linkage operation. Among them, the control linkage panel is created through the resource configuration terminal, and users can add control linkage panels of new types of resources at will, and the scalability of resource linkage is good; the control linkage panel is integrated into the dispatch server, so that the dispatch server can be used as a unified control linkage interface , receive the linkage data caused by the control linkage panel, and send the linkage data to the video wall window corresponding to the target resource, causing the target resource and video wall window to respond to the linkage operation corresponding to the linkage data, and realize the control linkage panel and the target resource and the corresponding linkage operation. The splicing wall windows are connected, and a set of control linkage scheme is unified for different resources, and the maintenance is good.
进一步地,所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的拼接墙窗口,具体包括:Further, the scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource, specifically including:
所述调度服务端接收所述联动数据,并将所述联动数据发送至所述资源管理服务端;The scheduling server receives the linkage data, and sends the linkage data to the resource management server;
所述资源管理服务端根据所述目标资源的类型调用对应的资源接口,通过所述资源接口将所述联动数据发送至所述目标资源对应的拼接墙窗 口。The resource management server invokes the corresponding resource interface according to the type of the target resource, and sends the linkage data to the video wall window corresponding to the target resource through the resource interface.
调度服务端将联动数据发送至资源管理服务端,资源管理服务端对联动数据进行分析得出目标资源的类型,再根据目标资源的类型调用对应的资源接口,并将联动数据通过资源接口发送到目标资源对应的拼接墙窗口,从而引发拼接墙窗口的显示响应,通过在调度服务端处引入资源管理服务端,当增加新类型资源时,资源管理服务端处可实现网络协议的修改服务,增设新的资源调用接口,无需直接对调度服务端进行服务修改,满足新增资源的任意扩展和服务修改,解决了将调度服务端作为统一的控制联动接口,扩展性差的问题。The scheduling server sends the linkage data to the resource management server. The resource management server analyzes the linkage data to obtain the type of the target resource, and then calls the corresponding resource interface according to the type of the target resource, and sends the linkage data to the resource interface through the resource interface. The splicing wall window corresponding to the target resource, thereby triggering the display response of the splicing wall window. By introducing the resource management server in the scheduling server, when adding new types of resources, the resource management server can realize the modification service of the network protocol, adding The new resource calling interface does not need to directly modify the service of the scheduling server, which satisfies the arbitrary expansion and service modification of new resources, and solves the problem of poor scalability when the scheduling server is used as a unified control linkage interface.
进一步地,所述控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至调度服务端,具体包括:Further, the control linkage terminal loads a corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal loads the control linkage panel. The linkage data corresponding to the linkage operation is sent to the dispatch server, including:
所述控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起按钮点击操作,所述控制联动端将被点击按钮对应的预设数据转换为联动数据发送至所述调度服务端。The control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a button click operation on the control linkage panel, and the control linkage terminal will be corresponding to the clicked button. The preset data is converted into linkage data and sent to the scheduling server.
控制联动面板获取目标资源和对应的拼接墙窗口的相关信息,在控制联动面板上对应设有按钮事件,并且每个按钮事件具有对应的预设数据,当对控制联动面板上的某个按钮事件发起点击联动操作时,控制联动端会将被点击的按钮事件对应的预设数据转换为联动数据发送至调度服务端,引起目标资源的联动响应和拼接墙窗口的信息更新响应,将按钮事件转换为特定的联动操作,并转换为联动数据在调度服务端中进行数据的调度,快速顺利地实现资源的控制联动。The control linkage panel obtains the relevant information of the target resource and the corresponding video wall window. There are corresponding button events on the control linkage panel, and each button event has corresponding preset data. When the click linkage operation is initiated, the control linkage terminal will convert the preset data corresponding to the clicked button event into linkage data and send it to the dispatch server, causing the linkage response of the target resource and the information update response of the video wall window, and the button event will be converted. It is a specific linkage operation and converts it into linkage data to schedule data in the scheduling server, so as to quickly and smoothly realize the control linkage of resources.
进一步地,所述方法包括:Further, the method includes:
拼接墙窗口选择所需联动的目标资源,在所述目标资源对应的所述拼接墙窗口上进行联动操作,所述拼接墙窗口将所述联动操作对应的联动数据发送至调度服务端;The splicing wall window selects the target resource to be linked, and performs a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window sends the linkage data corresponding to the linkage operation to the scheduling server;
所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所 述联动数据发送至与所述目标资源对应的控制联动端;The scheduling server receives the linkage data, and sends the linkage data to the control linkage terminal corresponding to the target resource according to the type of the target resource;
所述控制联动端接收所述联动数据,根据所述目标资源的类型从所述调度服务端中加载对应的控制联动面板,并根据所述联动数据响应所述联动操作,以使所述控制联动面板更新所述联动数据。The control linkage terminal receives the linkage data, loads the corresponding control linkage panel from the scheduling server according to the type of the target resource, and responds to the linkage operation according to the linkage data, so as to make the control linkage The panel updates the linkage data.
本申请对资源的控制联动支持双向联动,在拼接墙窗口处选择所需联动的目标资源,根据目标资源类型在对应的拼接墙窗口进行联动操作,并将联动操作对应的联动数据发送到调度服务端;调度服务端接收联动数据后发送至与目标资源对应的控制联动端,控制联动端接收联动数据并分析出目标资源的类型,从调度服务端中加载对应的控制联动面板,控制联动面板响应联动操作,从而引起控制联动面板上更新联动数据。在拼接墙窗口进行联动操作,联动数据会通过调度服务端原路返回到控制联动端,以引起控制联动面板数据的更新,实现联动操作流程的双向进行。The control linkage of resources in this application supports two-way linkage. The target resource to be linked is selected at the video wall window, the linkage operation is performed in the corresponding video wall window according to the target resource type, and the linkage data corresponding to the linkage operation is sent to the dispatch service. The dispatch server receives the linkage data and sends it to the control linkage terminal corresponding to the target resource. The control linkage terminal receives the linkage data and analyzes the type of the target resource, loads the corresponding control linkage panel from the dispatch server, and the control linkage panel responds. The linkage operation causes the linkage data to be updated on the control linkage panel. The linkage operation is performed in the video wall window, and the linkage data will be returned to the control linkage terminal through the dispatch server, so as to cause the update of the control linkage panel data and realize the bidirectional operation of the linkage operation process.
进一步地,所述多种资源包括VWAS资源、MS多媒体资源、元件类型资源。Further, the multiple resources include VWAS resources, MS multimedia resources, and element type resources.
本申请采用的另一种技术方案是,一种拼接墙的多种资源整合联动系统,包括调度服务端、资源配置端、控制联动端和拼接墙窗口,所述资源配置端、所述控制联动端和所述拼接墙窗口分别与所述调度服务端连接,其中,Another technical solution adopted in this application is a multi-resource integration and linkage system for a splicing wall, including a scheduling server, a resource configuration end, a control linkage end and a splicing wall window, the resource configuration end, the control linkage The terminal and the video wall window are respectively connected with the scheduling server, wherein,
所述资源配置端,用于创建多种资源的控制联动面板,并将多种资源的所述控制联动面板整合到所述调度服务端中;The resource configuration terminal is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the scheduling server;
所述控制联动端,用于根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至所述调度服务端;The control linkage terminal is configured to load the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiate a linkage operation on the control linkage panel, and the control linkage terminal loads the control linkage panel. The linkage data corresponding to the linkage operation is sent to the scheduling server;
所述调度服务端,用于接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的所述拼接墙窗口;The scheduling server is configured to receive the linkage data, and send the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
所述拼接墙窗口,用于接收所述联动数据并响应所述联动数据对应的联动操作,以使所述拼接墙窗口显示所述联动数据。The splicing wall window is used for receiving the linkage data and responding to the linkage operation corresponding to the linkage data, so that the splicing wall window displays the linkage data.
一种拼接墙的多种资源整合联动系统,通过调度服务端、资源配置端、控制联动端和拼接墙窗口实现资源的控制联动,资源配置端、控制联动端 和拼接墙窗口均与调度服务端连接,其中,资源配置端用于创建多种资源的控制联动面板,并将多种资源的控制联动面板整合到调度服务端中,调度服务端形成统一的控制联动面板的整合服务框架;控制联动端用于选择所需联动的目标资源,根据目标资源的类型从调度服务端加载对应的控制联动面板,并对控制联动面板发起联动操作,将联动操作对应的联动数据发送至调度服务端;调度服务端用于接收联动数据后根据目标资源的类型将联动数据发送至与目标资源对应的拼接墙窗口,从而使得拼接墙窗口接收联动数据并响应对应的联动操作,显示目标资源联动操作对应的联动数据。其中,通过资源配置端创建控制联动面板,用户可随意增加新类型资源的控制联动面板,资源联动的扩展性好;将控制联动面板整合到调度服务端,使得调度服务端作为统一的控制联动接口,接收控制联动面板引起的联动数据,并将联动数据发送至目标资源对应的拼接墙窗口,引起目标资源和拼接墙窗口响应联动数据对应的联动操作,实现了在控制联动面板和目标资源以及对应的拼接墙窗口做对接,为不同资源统一了一套控制联动方案,维护性好。A multi-resource integration and linkage system for a splicing wall, which realizes the control linkage of resources through the scheduling server, resource configuration end, control linkage end and splicing wall window. The resource configuration end, control linkage end and splicing wall window are all connected with the scheduling server end connection, in which the resource configuration terminal is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the dispatch server, and the dispatch server forms an integrated service framework of a unified control linkage panel; control linkage The terminal is used to select the target resource to be linked, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, initiate a linkage operation on the control linkage panel, and send the linkage data corresponding to the linkage operation to the dispatch server; After receiving the linkage data, the server sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource, so that the video wall window receives the linkage data and responds to the corresponding linkage operation, and displays the linkage corresponding to the target resource linkage operation. data. Among them, the control linkage panel is created through the resource configuration terminal, and users can add control linkage panels of new types of resources at will, and the scalability of resource linkage is good; the control linkage panel is integrated into the dispatch server, so that the dispatch server can be used as a unified control linkage interface , receive the linkage data caused by the control linkage panel, and send the linkage data to the splicing wall window corresponding to the target resource, causing the target resource and the splicing wall window to respond to the linkage operation corresponding to the linkage data. The splicing wall windows are connected, and a set of control linkage scheme is unified for different resources, and the maintenance is good.
进一步地,还包括资源管理服务端,所述资源管理服务端分别与所述调度服务端、所述拼接墙窗口连接,用于接收所述调度服务器发送的所述联动数据,并根据所述目标资源的类型调用对应的资源接口,通过所述资源接口将所述联动数据发送至所述目标资源对应的所述拼接墙窗口。Further, it also includes a resource management server, which is respectively connected with the scheduling server and the video wall window, and is used for receiving the linkage data sent by the scheduling server, and according to the target The type of the resource calls the corresponding resource interface, and the linkage data is sent to the video wall window corresponding to the target resource through the resource interface.
本申请在调度服务端处连接有资源管理服务端,资源管理服务端用于对从调度服务端处接收的联动数据进行分析得出目标资源的类型,再根据目标资源的类型调用对应的资源接口,并将联动数据通过资源接口发送到目标资源对应的拼接墙窗口,从而引发拼接墙窗口的显示响应,通过在调度服务端处引入资源管理服务端,当增加新类型资源时,资源管理服务端处可实现网络协议的修改服务,增设新的资源调用接口,无需直接对调度服务端进行服务修改,满足新增资源的任意扩展和服务修改,解决了将调度服务端作为统一的控制联动接口,扩展性差的问题。In this application, a resource management server is connected to the scheduling server, and the resource management server is used to analyze the linkage data received from the scheduling server to obtain the type of the target resource, and then call the corresponding resource interface according to the type of the target resource. , and send the linkage data to the splicing wall window corresponding to the target resource through the resource interface, thereby triggering the display response of the splicing wall window. By introducing the resource management server at the scheduling server, when a new type of resource is added, the resource management server It can realize the modification service of network protocol and add a new resource calling interface, without directly modifying the service of the scheduling server, to meet the arbitrary expansion and service modification of the new resources, and to solve the problem of using the scheduling server as a unified control linkage interface, The problem of poor scalability.
进一步地,所述控制联动端,具体用于选择所需联动的目标资源,根据所述目标资源的类型从所述调度服务端中加载对应的控制联动面板,并 对所述控制联动面板发起按钮点击操作,所述控制联动端将被点击按钮对应的预设数据转换为联动数据发送至所述调度服务端。Further, the control linkage terminal is specifically used to select the target resource to be linked, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, and initiate a button on the control linkage panel. For a click operation, the control linkage terminal converts the preset data corresponding to the clicked button into linkage data and sends it to the dispatch server.
控制联动面板具体用于获取目标资源和对应的拼接墙窗口的相关信息,在控制联动面板上对应设有按钮事件,并且每个按钮事件具有对应的预设数据,当对控制联动面板上的某个按钮事件发起点击联动操作时,控制联动端会将被点击的按钮事件对应的预设数据转换为联动数据发送至调度服务端,引起目标资源的联动响应和拼接墙窗口的信息更新响应,将按钮事件转换为特定的联动操作,并转换为联动数据在调度服务端中进行数据的调度,快速顺利地实现资源的控制联动。The control linkage panel is specifically used to obtain the relevant information of the target resource and the corresponding video wall window. There are corresponding button events on the control linkage panel, and each button event has corresponding preset data. When a button event initiates a click linkage operation, the control linkage terminal will convert the preset data corresponding to the clicked button event into linkage data and send it to the dispatch server, causing the linkage response of the target resource and the information update response of the video wall window. The button event is converted into a specific linkage operation, and converted into linkage data to schedule data in the scheduling server, so as to quickly and smoothly realize the control linkage of resources.
进一步地,所述拼接墙窗口,还用于选择所需联动的目标资源,在所述目标资源对应的所述拼接墙窗口上进行联动操作,所述拼接墙窗口将所述联动操作对应的联动数据发送至所述调度服务端;Further, the splicing wall window is also used to select the target resource that needs to be linked, and perform a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window links the linkage corresponding to the linkage operation. sending data to the scheduling server;
所述调度服务端,还用于接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的所述控制联动端;The scheduling server is further configured to receive the linkage data, and send the linkage data to the control linkage terminal corresponding to the target resource according to the type of the target resource;
所述控制联动端,还用于接收所述联动数据,根据目标资源的类型从所述调度服务端中加载对应的控制联动面板,并根据所述联动数据响应所述联动操作,以使所述控制联动面板更新所述联动数据。The control linkage terminal is further configured to receive the linkage data, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, and respond to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
本申请对资源的控制联动支持双向联动,拼接墙窗口用于选择所需联动的目标资源,根据目标资源类型在对应的拼接墙窗口进行联动操作,并将联动操作对应的联动数据发送到调度服务端;调度服务端用于接收联动数据后发送至与目标资源对应的控制联动端,控制联动端用于接收联动数据并分析出目标资源的类型,从调度服务端中加载对应的控制联动面板,控制联动面板响应联动操作,从而引起控制联动面板上更新联动数据。在拼接墙窗口进行联动操作,联动数据会通过调度服务端原路返回到控制联动端,以引起控制联动面板数据的更新,实现联动操作流程的双向进行。The control linkage of resources in this application supports two-way linkage. The video wall window is used to select the target resource to be linked, and the linkage operation is performed in the corresponding video wall window according to the target resource type, and the linkage data corresponding to the linkage operation is sent to the dispatch service. The scheduling server is used to receive the linkage data and send it to the control linkage terminal corresponding to the target resource. The control linkage terminal is used to receive the linkage data and analyze the type of the target resource, and load the corresponding control linkage panel from the dispatch server. The control linkage panel responds to the linkage operation, thereby causing the linkage data to be updated on the control linkage panel. The linkage operation is performed in the video wall window, and the linkage data will be returned to the control linkage terminal through the dispatch server, so as to cause the update of the control linkage panel data and realize the bidirectional operation of the linkage operation process.
本申请采用另一种技术方案是,一种计算机可读存储介质,其上存储有计算机程序,所述计算机程序被处理器执行时实现以上所述的拼接墙的多种资源整合联动方法。Another technical solution adopted by the present application is a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the above-mentioned multiple resource integration and linkage method of a video wall is realized.
与现有技术相比,本申请的有益效果为:本申请一种拼接墙的多种资 源整合联动方法、系统及其存储介质,提供了资源联动的统一接口和统一的数据交互逻辑,用户通过资源配置端可自定义创建多种所需资源的控制联动面板,资源控制联动类型扩展性好,用户可随意增加新类型的资源控制联动面板;将多种不同资源的控制联动面板整合到调度服务端,统一整合服务框架,优化精简服务个数和相关技术,优化部署,并且调度服务端作为统一的控制联动协议接口,在调度服务端处连接资源管理服务端,当增加新类型资源时,资源管理服务端处可实现网络协议的修改服务,增设新的资源调用接口,无需直接对调度服务端进行服务修改,满足新增资源的任意扩展和服务修改,扩展性好;并且调度服务端实现了在控制联动面板和目标资源以及对应的拼接墙窗口做对接,为不同资源统一了一套控制联动方案,维护性好;本申请还支持资源控制联动的双向联动。Compared with the prior art, the beneficial effects of the present application are as follows: a multi-resource integration linkage method, system and storage medium for a splicing wall of the present application provide a unified interface for resource linkage and a unified data interaction logic, and the user can The resource configuration terminal can customize and create control linkage panels for various required resources. The resource control linkage type has good scalability, and users can add new types of resource control linkage panels at will; integrate control linkage panels of various resources into the scheduling service It integrates the service framework in a unified manner, optimizes and streamlines the number of services and related technologies, optimizes deployment, and the scheduling server acts as a unified control linkage protocol interface to connect the resource management server at the scheduling server. When new types of resources are added, the resources The management server can realize the modification service of the network protocol, add a new resource calling interface, and do not need to directly modify the service of the scheduling server, which can meet the arbitrary expansion and service modification of the new resources, and has good scalability; By docking the control linkage panel with the target resource and the corresponding video wall window, a set of control linkage scheme is unified for different resources, and the maintainability is good; this application also supports the two-way linkage of resource control linkage.
附图说明Description of drawings
图1为本申请一种拼接墙的多种类型资源整合联动方法的流程示意图;1 is a schematic flowchart of a multi-type resource integration and linkage method for a splicing wall of the application;
图2为本申请一种拼接墙的多种类型资源整合联动方法的另一种流程示意图;2 is another schematic flowchart of a multi-type resource integration and linkage method for a splicing wall of the application;
图3为本申请一种拼接墙的多种类型资源整合联动系统的结构示意图。FIG. 3 is a schematic structural diagram of a multi-type resource integration linkage system of a splicing wall of the present application.
具体实施方式Detailed ways
本申请附图仅用于示例性说明,不能理解为对本申请的限制。本申请主要应用在融合平台中,具体可应用在ICVP系统,ICVP系统整合了目前拼接墙的各种资源,ICVP系统中拼接墙的各种资源,配合着服务设备,在拼接大屏上以拼接墙窗口的方式展现出来。拼接墙的各种资源包括传统拼接大屏资源类型(VWAS)、Media-Sources类型(MS)、多媒体类型、元件类型和第三方应用等资源类型,每种资源的接口和数据交互逻辑都不同,因此都有其各自的一套联动方案,本申请提出了一套方法,为不同资源统一了一套控制联动方案,解决了现有技术中多种资源联动控制存在部署复杂、方案存在缺陷、UI交互不统一、扩展性不好、用户交互体验差等问题。The accompanying drawings of the present application are only used for exemplary illustration, and should not be construed as a limitation on the present application. This application is mainly used in the fusion platform, specifically in the ICVP system. The ICVP system integrates various resources of the current splicing wall, and the various resources of the splicing wall in the ICVP system cooperate with the service equipment to splicing on the large screen. The way the wall window shows up. The various resources of the video wall include traditional video wall resource type (VWAS), Media-Sources type (MS), multimedia type, component type and third-party applications and other resource types. The interface and data interaction logic of each resource are different. Therefore, each has its own set of linkage solutions. This application proposes a set of methods to unify a set of control linkage solutions for different resources, which solves the problems of complex deployment, defects in the solutions, UI problems in the linkage control of multiple resources in the prior art. The interaction is not uniform, the scalability is not good, and the user interaction experience is poor.
实施例1Example 1
如图1所示为本申请实施例一种拼接墙的多种类型资源整合联动方法的流程示意图,所述方法包括以下步骤:1 is a schematic flowchart of a multi-type resource integration and linkage method for a video wall according to an embodiment of the present application, and the method includes the following steps:
S101、资源配置端创建多种资源的控制联动面板,并将多种资源的所述控制联动面板整合到调度服务端中;S101. The resource configuration terminal creates a control linkage panel for multiple resources, and integrates the control linkage panel for multiple resources into the scheduling server;
S102、控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至调度服务端;S102. The control linkage terminal loads a corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal corresponds to the linkage operation The linkage data is sent to the scheduling server;
S103、所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的拼接墙窗口;S103, the scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
其中,在步骤S103中,具体包括:Wherein, in step S103, it specifically includes:
S1031、所述调度服务端接收所述联动数据,并将所述联动数据发送至所述资源管理服务端;S1031. The scheduling server receives the linkage data, and sends the linkage data to the resource management server;
S1032、所述资源管理服务端根据所述目标资源的类型调用对应的资源接口,通过所述资源接口将所述联动数据发送至所述目标资源对应的拼接墙窗口。S1032: The resource management server invokes the corresponding resource interface according to the type of the target resource, and sends the linkage data to the video wall window corresponding to the target resource through the resource interface.
S104、所述拼接墙窗口接收所述联动数据并响应所述联动数据对应的联动操作,以使所述拼接墙窗口显示所述联动数据。S104. The video wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, so that the video wall window displays the linkage data.
具体地,采用本实施例方法实现多种资源的整合控制联动的过程为,首先,用户通过资源配置端自定义或者导入模板数据来创建多种资源的控制联动面板数据,并将多种资源的控制联动面板数据整合和绑定到调度服务端中,最后生成对应的控制联动面板,调度服务端根据资源类型形成不同资源控制联动面板的对应协议关系;其次,在资源控制联动的过程中,控制联动端选择所需联动的目标资源,根据目标资源的类型的协议关系可从调度服务端中加载对应的控制联动面板,此时控制联动面板获取当前目标资源对应的拼接墙窗口的数据信息,对控制联动面板发起联动操作,控制联动端将联动操作对应的联动数据通过通信网络发送至调度服务端;调度服务端但作为资源的统一协议接口,调度服务端接收到的联动数据为协议数据,调度服务端根据不同资源对应的协议关系,可对联动数据进行下 发至拼接墙窗口,但不利于服务修改和资源的扩展,因此增设资源管理服务端,调度服务端将联动数据转发至资源管理服务端,资源管理服务端对联动数据进行简单的分析,根据分析出来的资源类型将联动数据发送到与目标资源对应的拼接墙窗口;拼接墙窗口根据接收到的联动数据,可自我转换为所需的数据,触发拼接墙窗口的响应,拼接墙窗口显示对应的联动数据。Specifically, the process of implementing the integration control and linkage of multiple resources by using the method of this embodiment is as follows: first, the user creates control linkage panel data of multiple resources by customizing or importing template data through the resource configuration terminal, and combines the control and linkage panel data of multiple resources. The control linkage panel data is integrated and bound to the scheduling server, and finally the corresponding control linkage panel is generated. The scheduling server forms the corresponding protocol relationship of different resource control linkage panels according to the resource type; The linkage terminal selects the target resource to be linked, and can load the corresponding control linkage panel from the scheduling server according to the protocol relationship of the type of the target resource. At this time, the control linkage panel obtains the data information of the video wall window corresponding to the current target resource. The control linkage panel initiates the linkage operation, and the control linkage terminal sends the linkage data corresponding to the linkage operation to the dispatch server through the communication network; the dispatch server acts as a unified protocol interface for resources, and the linkage data received by the dispatch server is the protocol data. According to the protocol relationship corresponding to different resources, the server can send the linkage data to the video wall window, but it is not conducive to service modification and resource expansion. Therefore, a resource management server is added, and the scheduling server forwards the linkage data to the resource management service. The resource management server simply analyzes the linkage data, and sends the linkage data to the splicing wall window corresponding to the target resource according to the analyzed resource type; the splicing wall window can self-convert to the required linkage data according to the received linkage data. data, trigger the response of the video wall window, and the video wall window displays the corresponding linkage data.
其中,所述步骤S102中,控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至调度服务端,具体包括:Wherein, in the step S102, the control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal Sending the linkage data corresponding to the linkage operation to the scheduling server, specifically including:
所述控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起按钮点击操作,所述控制联动端将被点击按钮对应的预设数据转换为联动数据发送至所述调度服务端。The control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a button click operation on the control linkage panel, and the control linkage terminal will be corresponding to the clicked button. The preset data is converted into linkage data and sent to the scheduling server.
具体地,本实施例中的联动操作可体现为网页点击和按钮事件等,当为按钮事件时,控制联动面板上设有多个按钮事件,并且每个按钮事件具有对应的预设数据,点击操作与预设数据存在对应关系,该对应关系是预先定义好的,当对控制联动面板上的某个按钮事件进行点击触发时,控制联动端得到按钮事件对应的预设数据,并将预设数据转换为联动数据发送至调度服务端,实现联动操作的联动数据的传输,实现资源的联动控制。Specifically, the linkage operation in this embodiment can be embodied as webpage clicks and button events. When it is a button event, there are multiple button events on the control linkage panel, and each button event has corresponding preset data. There is a corresponding relationship between the operation and the preset data, and the corresponding relationship is predefined. When a button event on the control linkage panel is clicked and triggered, the control linkage terminal obtains the preset data corresponding to the button event, and sets the preset data. The data is converted into linkage data and sent to the scheduling server to realize the transmission of linkage data of linkage operation and realize linkage control of resources.
本申请实施例一种拼接墙的多种类型资源整合联动方法还支持双向联动,以上步骤流程也可以反向进行,具体包括:The multi-type resource integration and linkage method for a splicing wall in the embodiment of the present application also supports two-way linkage, and the above steps and processes can also be performed in the reverse direction, which specifically includes:
S201、资源配置端创建多种资源的控制联动面板,并将多种资源的所述控制联动面板整合到调度服务端中;S201, the resource configuration terminal creates a control linkage panel of multiple resources, and integrates the control linkage panel of multiple resources into the scheduling server;
S202、拼接墙窗口选择所需联动的目标资源,在所述目标资源对应的所述拼接墙窗口上进行联动操作,所述拼接墙窗口将所述联动操作对应的联动数据发送至调度服务端;S202, the video wall window selects the target resource to be linked, and performs a linked operation on the video wall window corresponding to the target resource, and the video wall window sends the linked data corresponding to the linked operation to the dispatch server;
S203、所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的控制联动端;S203, the scheduling server receives the linkage data, and sends the linkage data to the control linkage terminal corresponding to the target resource according to the type of the target resource;
S204、所述控制联动端接收所述联动数据,根据所述目标资源的类型从所述调度服务端中加载对应的控制联动面板,并根据所述联动数据响应所述联动操作,以使所述控制联动面板更新所述联动数据。S204. The control linkage terminal receives the linkage data, loads the corresponding control linkage panel from the scheduling server according to the type of the target resource, and responds to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
具体地,采用本实施例方法实现多种资源的反向控制联动的过程为,首先,用户通过资源配置端自定义或者导入模板数据来创建多种资源的控制联动面板数据,并将多种资源的控制联动面板数据整合和绑定到调度服务端中,最后生成对应的控制联动面板,调度服务端根据资源类型形成不同资源控制联动面板的对应协议关系;其次,在所需联动的目标资源对应的拼接墙窗口上发起联动操作,并将联动操作对应的联动数据发送至调度服务端;调度服务端但作为资源的统一协议接口,调度服务端接收到的联动数据为协议数据,调度服务端根据不同资源对应的协议关系,可对联动数据进行发送处理,但不利于服务修改和资源的扩展,因此增设资源管理服务端,调度服务端将联动数据转发至资源管理服务端,资源管理服务端对联动数据进行简单的分析,根据分析出来的资源类型将联动数据发送到与目标资源对应的控制联动端;控制联动端接收对应的联动数据,据目标资源的类型的协议关系可从调度服务端中加载对应的控制联动面板,并在控制联动面板上更新对应的联动数据。Specifically, the process of implementing the reverse control linkage of multiple resources by using the method of this embodiment is as follows. First, the user creates control linkage panel data of multiple resources by customizing or importing template data through the resource configuration terminal, and assigns the multiple resources to the control linkage panel data. The data of the control linkage panel is integrated and bound to the dispatching server, and finally the corresponding control linkage panel is generated. The dispatching server forms the corresponding protocol relationship of different resource control linkage panels according to the resource type; The linkage operation is initiated on the splicing wall window, and the linkage data corresponding to the linkage operation is sent to the dispatching server; the dispatching server acts as a unified protocol interface for resources, and the linkage data received by the dispatching server is the protocol data. The protocol relationship corresponding to different resources can send and process linkage data, but it is not conducive to service modification and resource expansion. Therefore, a resource management server is added, and the scheduling server forwards linkage data to the resource management server. The linkage data is simply analyzed, and the linkage data is sent to the control linkage terminal corresponding to the target resource according to the analyzed resource type; the control linkage terminal receives the corresponding linkage data, and the protocol relationship according to the type of target resource can be obtained from the dispatch server. Load the corresponding control linkage panel, and update the corresponding linkage data on the control linkage panel.
本实施例结合摄像头资源联动控制的方法流程作进一步详细的说明,This embodiment is further described in detail in conjunction with the method flow of the camera resource linkage control.
S101’、资源配置端自定义或导入摄像头资源的控制联动面板数据,将控制联动面板数据整合到调度服务端中并绑定相关数据,最后生成摄像头资源对应的控制联动面板;S101', the resource configuration terminal customizes or imports the control linkage panel data of the camera resource, integrates the control linkage panel data into the scheduling server and binds the relevant data, and finally generates the control linkage panel corresponding to the camera resource;
S102’、控制联动端根据摄像头资源类型从调度服务端中加载摄像头资源的控制联动面板,并获取摄像头资源当前数据,比如当前摄像头转动的速度、上下左右方位的角度值以及摄像头缩放的大小,对摄像头资源的控制联动面板发起点击按钮事件操作,控制联动面板上设有多个按钮事件,可操控摄像头上下左右移动或者拉近拉远等,当点击按钮事件发起联动操作时,将按钮事件对应的预设数据转换为联动数据,并通过网络协议发送到调度服务端;S102', the control linkage terminal loads the control linkage panel of the camera resource from the scheduling server according to the type of the camera resource, and obtains the current data of the camera resource, such as the current rotation speed of the camera, the angle value of the up, down, left, and right directions, and the size of the camera zoom. The control linkage panel of the camera resource initiates the click button event operation. There are multiple button events on the control linkage panel, which can control the camera to move up, down, left and right, or zoom in and out. When the button event is clicked to initiate a linkage operation, the corresponding button event The preset data is converted into linkage data and sent to the scheduling server through the network protocol;
S1031’、调度服务端接收联动数据并将联动数据转发到资源管理服务 端;S1031', the scheduling server receives the linkage data and forwards the linkage data to the resource management server;
S1032’、资源管理服务端对联动数据进行简单的分析,分析出对应的摄像头资源类型,并调用摄像头资源接口将联动数据发送至摄像头资源对应的拼接墙窗口;S1032', the resource management server simply analyzes the linkage data, analyzes the corresponding camera resource type, and calls the camera resource interface to send the linkage data to the video wall window corresponding to the camera resource;
S104’、拼接墙窗口接收联动数据并响应联动数据对应的联动操作,将联动数据转换为拼接墙窗口所需的数据,显示摄像头联动的数据情况。S104', the splicing wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, converts the linkage data into the data required by the splicing wall window, and displays the data situation of the camera linkage.
以上的数据流程也可以反向进行,在拼接墙窗口上进行联动操作,对应的联动数据会经调度服务端、资源管理服务端原路返回到控制联动端,引起控制联动面板的数据更新。The above data flow can also be reversed, and the linkage operation is performed on the video wall window, and the corresponding linkage data will be returned to the control linkage terminal through the dispatch server and resource management server in the same way, causing the data update of the control linkage panel.
其它资源类型的联动操作步骤与摄像头资源联动操作步骤相同,具体过程可见图2所示的多种资源联动控制的方法流程示意图,其中,图2中的拼接墙已整合了多种类型资源。The linkage operation steps of other resource types are the same as the camera resource linkage operation steps. The specific process can be seen in the schematic flowchart of the method for linkage control of multiple resources shown in FIG. 2 , wherein the video wall in FIG. 2 has integrated multiple types of resources.
实施例2Example 2
如图3所示为本申请本实施例一种拼接墙的多种类型资源的整合联动系统的结构示意图,其系统包括:Figure 3 is a schematic structural diagram of an integrated linkage system for multiple types of resources of a splicing wall according to the present embodiment of the present application, and the system includes:
调度服务端303、资源配置端301、控制联动端302和拼接墙窗口304,所述资源配置端301、所述控制联动端302和所述拼接墙窗口304分别与所述调度服务端303连接,其中,The scheduling server 303, the resource configuration terminal 301, the control linkage terminal 302 and the video wall window 304, the resource configuration terminal 301, the control linkage terminal 302 and the video wall window 304 are respectively connected to the scheduling server terminal 303, in,
所述资源配置端301,用于创建多种资源的控制联动面板,并将多种资源的所述控制联动面板整合到所述调度服务端203中;The resource configuration terminal 301 is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the scheduling server 203;
所述控制联动端302,用于根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至所述调度服务端303;具体地,所述控制联动端302,具体用于选择所需联动的目标资源,根据所述目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起按钮点击操作,所述控制联动端将被点击按钮对应的预设数据转换为联动数据发送至所述调度服务端303;The control linkage terminal 302 is configured to load a corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiate a linkage operation on the control linkage panel, and the control linkage terminal loads all the control linkage panels. The linkage data corresponding to the linkage operation is sent to the scheduling server 303; specifically, the control linkage terminal 302 is specifically used to select the target resource to be linked, and from the scheduling server according to the type of the target resource The corresponding control linkage panel is loaded in the control linkage panel, and a button click operation is initiated on the control linkage panel, and the control linkage terminal converts the preset data corresponding to the clicked button into linkage data and sends it to the scheduling server 303;
所述调度服务端303,用于接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的所述拼接墙窗口304;The scheduling server 303 is configured to receive the linkage data, and send the linkage data to the video wall window 304 corresponding to the target resource according to the type of the target resource;
其中,还包括资源管理服务端305,所述资源管理服务端305分别与所述调度服务端303、所述拼接墙窗口304连接,用于接收所述调度服务器303发送的所述联动数据,并根据所述目标资源的类型调用对应的资源接口,通过所述资源接口将所述联动数据发送至所述目标资源对应的所述拼接墙窗口304。The resource management server 305 is also included, and the resource management server 305 is respectively connected to the scheduling server 303 and the video wall window 304, and is used for receiving the linkage data sent by the scheduling server 303, and The corresponding resource interface is called according to the type of the target resource, and the linkage data is sent to the video wall window 304 corresponding to the target resource through the resource interface.
所述拼接墙窗口304,用于接收所述联动数据并响应所述联动数据对应的联动操作,以使所述拼接墙窗口304显示所述联动数据。The video wall window 304 is used for receiving the linkage data and responding to the linkage operation corresponding to the linkage data, so that the video wall window 304 displays the linkage data.
本实施例一种拼接墙的多种类型资源的整合联动系统通过资源配置端301、控制联动端302、调度服务端303、资源管理服务端305、拼接墙窗口304实现对目标资源的控制联动的过程与实施例1中的方法过程相同,对此不再作详细的说明。In this embodiment, a system for integrating and linking multiple types of resources of a splicing wall realizes the control and linkage of target resources through the resource configuration terminal 301 , the control linkage terminal 302 , the scheduling server 303 , the resource management server 305 , and the splicing wall window 304 . The process is the same as that of the method in Example 1, and will not be described in detail.
本申请实施例一种拼接墙的多种类型资源整合联动系统对资源控制联动的过程支持双向联动,其反向过程包括:A multi-type resource integration and linkage system for a video wall in the embodiment of the present application supports two-way linkage for the process of resource control linkage, and the reverse process includes:
所述拼接墙窗口304,还用于选择所需联动的目标资源,在所述目标资源对应的所述拼接墙窗口上进行联动操作,所述拼接墙窗口将所述联动操作对应的联动数据发送至所述调度服务端303;The splicing wall window 304 is also used to select the target resource to be linked, and perform a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window sends the linkage data corresponding to the linkage operation. to the scheduling server 303;
所述调度服务端303,还用于接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的所述控制联动端302;The scheduling server 303 is further configured to receive the linkage data, and send the linkage data to the control linkage terminal 302 corresponding to the target resource according to the type of the target resource;
所述控制联动端302,还用于接收所述联动数据,根据目标资源的类型从所述调度服务端303中加载对应的控制联动面板,并根据所述联动数据响应所述联动操作,以使所述控制联动面板更新所述联动数据。The control linkage terminal 302 is further configured to receive the linkage data, load the corresponding control linkage panel from the scheduling server 303 according to the type of the target resource, and respond to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
本申请实施例还提供另一种实施方式,一种计算机可读存储介质,其上存储有计算机程序,所述计算机程序被处理器执行时实现以上所述的拼接墙的多种资源整合联动方法。The embodiments of the present application also provide another implementation, a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, realizes the above-mentioned multiple resource integration and linkage method for a video wall .
本申请实施例的有益效果为:本申请一种拼接墙的多种资源整合联动方法、系统及其存储介质,提供了资源联动的统一接口和统一的数据交互逻辑,用户通过资源配置端可自定义创建多种所需资源的控制联动面板,资源控制联动类型扩展性好,用户可随意增加新类型的资源控制联动面板; 将多种不同资源的控制联动面板整合到调度服务端,统一整合服务框架,优化精简服务个数和相关技术,优化部署,并且调度服务端作为统一的控制联动协议接口,在调度服务端处连接资源管理服务端,当增加新类型资源时,资源管理服务端处可实现网络协议的修改服务,增设新的资源调用接口,无需直接对调度服务端进行服务修改,满足新增资源的任意扩展和服务修改,扩展性好;并且调度服务端实现了在控制联动面板和目标资源以及对应的拼接墙窗口做对接,为不同资源统一了一套控制联动方案,维护性好;本申请还支持资源控制联动的双向联动。The beneficial effects of the embodiments of the present application are as follows: a multi-resource integration and linkage method, system and storage medium for a video wall of the present application provide a unified interface for resource linkage and a unified data interaction logic, and users can freely configure resources through the resource configuration terminal. Define and create control linkage panels for a variety of required resources. The resource control linkage type has good scalability, and users can add new types of resource control linkage panels at will; Integrate control linkage panels of multiple different resources into the scheduling server to integrate services uniformly Framework, optimize and simplify the number of services and related technologies, optimize deployment, and the scheduling server acts as a unified control linkage protocol interface, connecting the resource management server at the scheduling server. When adding new types of resources, the resource management server can be used. Realize the modification service of the network protocol, add a new resource calling interface, and do not need to directly modify the service on the scheduling server, which satisfies the arbitrary expansion and service modification of the new resources, and has good scalability; and the scheduling server realizes the control linkage panel and The target resource and the corresponding splicing wall window are connected, and a set of control linkage scheme is unified for different resources, and the maintainability is good; this application also supports the two-way linkage of resource control linkage.
显然,本申请的上述实施例仅仅是为清楚地说明本申请技术方案所作的举例,而并非是对本申请的具体实施方式的限定。凡在本申请权利要求书的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本申请权利要求的保护范围之内。Apparently, the above-mentioned embodiments of the present application are only examples for clearly illustrating the technical solutions of the present application, and are not intended to limit the specific implementations of the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the claims of the present application shall be included within the protection scope of the claims of the present application.

Claims (10)

  1. 一种拼接墙的多种资源整合联动方法,其特征在于,包括:A multi-resource integration and linkage method for a splicing wall, characterized in that it includes:
    资源配置端创建多种资源的控制联动面板,并将多种资源的所述控制联动面板整合到调度服务端中;The resource configuration terminal creates a control linkage panel for multiple resources, and integrates the control linkage panel for multiple resources into the scheduling server;
    控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至调度服务端;The control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a linkage operation on the control linkage panel, and the control linkage terminal sends the linkage corresponding to the linkage operation. The data is sent to the scheduling server;
    所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的拼接墙窗口;The scheduling server receives the linkage data, and sends the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
    所述拼接墙窗口接收所述联动数据并响应所述联动数据对应的联动操作,以使所述拼接墙窗口显示所述联动数据。The video wall window receives the linkage data and responds to the linkage operation corresponding to the linkage data, so that the video wall window displays the linkage data.
  2. 根据权利要求1所述的一种拼接墙的多种资源整合联动方法,其特征在于,所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的拼接墙窗口,具体包括:The method for integrating multiple resources of a splicing wall according to claim 1, wherein the scheduling server receives the linkage data, and sends the linkage data to a coordinator according to the type of the target resource. The video wall window corresponding to the target resource specifically includes:
    所述调度服务端接收所述联动数据,并将所述联动数据发送至资源管理服务端;The scheduling server receives the linkage data, and sends the linkage data to the resource management server;
    所述资源管理服务端根据所述目标资源的类型调用对应的资源接口,通过所述资源接口将所述联动数据发送至所述目标资源对应的拼接墙窗口。The resource management server invokes the corresponding resource interface according to the type of the target resource, and sends the linkage data to the video wall window corresponding to the target resource through the resource interface.
  3. 根据权利要求1所述的一种拼接墙的多种资源整合联动方法,其特征在于,所述控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至所述调度服务端,具体包括:The multi-resource integration and linkage method for a video wall according to claim 1, wherein the control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked , and initiates a linkage operation on the control linkage panel, and the control linkage terminal sends the linkage data corresponding to the linkage operation to the dispatch server, specifically including:
    所述控制联动端根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起按钮点击操作,所述控制联动端将被点击按钮对应的预设数据转换为联动数据发送至所述调度服务端。The control linkage terminal loads the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiates a button click operation on the control linkage panel, and the control linkage terminal will be corresponding to the clicked button. The preset data is converted into linkage data and sent to the scheduling server.
  4. 根据权利要求1所述的一种拼接墙的多种资源整合联动方法,其特征在于,所述方法包括:The method for integrating multiple resources of a splicing wall according to claim 1, wherein the method comprises:
    拼接墙窗口选择所需联动的目标资源,在所述目标资源对应的所述拼接墙窗口上进行联动操作,所述拼接墙窗口将所述联动操作对应的联动数据发送至调度服务端;The splicing wall window selects the target resource to be linked, and performs a linkage operation on the splicing wall window corresponding to the target resource, and the splicing wall window sends the linkage data corresponding to the linkage operation to the scheduling server;
    所述调度服务端接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的控制联动端;The scheduling server receives the linkage data, and sends the linkage data to the control linkage terminal corresponding to the target resource according to the type of the target resource;
    所述控制联动端接收所述联动数据,根据所述目标资源的类型从所述调度服务端中加载对应的控制联动面板,并根据所述联动数据响应所述联动操作,以使所述控制联动面板更新所述联动数据。The control linkage terminal receives the linkage data, loads the corresponding control linkage panel from the scheduling server according to the type of the target resource, and responds to the linkage operation according to the linkage data, so as to make the control linkage The panel updates the linkage data.
  5. 根据权利要求1所述的一种拼接墙的多种资源整合联动方法,其特征在于,所述多种资源包括VWAS资源、MS多媒体资源、元件类型资源。The method for integrating and linking multiple resources of a video wall according to claim 1, wherein the multiple resources include VWAS resources, MS multimedia resources, and component type resources.
  6. 一种拼接墙的多种资源整合联动系统,其特征在于,包括调度服务端、资源配置端、控制联动端和拼接墙窗口,所述资源配置端、所述控制联动端和所述拼接墙窗口分别与所述调度服务端连接,其中,A multi-resource integration and linkage system for splicing walls, characterized in that it includes a scheduling server, a resource configuration end, a control linkage end and a splicing wall window, the resource configuration end, the control linkage end and the splicing wall window. are respectively connected with the scheduling server, wherein,
    所述资源配置端,用于创建多种资源的控制联动面板,并将多种资源的所述控制联动面板整合到所述调度服务端中;The resource configuration terminal is used to create a control linkage panel of multiple resources, and integrate the control linkage panel of multiple resources into the scheduling server;
    所述控制联动端,用于根据所需联动的目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起联动操作,所述控制联动端将所述联动操作对应的联动数据发送至所述调度服务端;The control linkage terminal is configured to load the corresponding control linkage panel from the scheduling server according to the type of the target resource to be linked, and initiate a linkage operation on the control linkage panel, and the control linkage terminal loads the control linkage panel. The linkage data corresponding to the linkage operation is sent to the scheduling server;
    所述调度服务端,用于接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的所述拼接墙窗口;The scheduling server is configured to receive the linkage data, and send the linkage data to the video wall window corresponding to the target resource according to the type of the target resource;
    所述拼接墙窗口,用于接收所述联动数据并响应所述联动数据对应的联动操作,以使所述拼接墙窗口显示所述联动数据。The splicing wall window is used for receiving the linkage data and responding to the linkage operation corresponding to the linkage data, so that the splicing wall window displays the linkage data.
  7. 根据权利要求6所述的一种拼接墙的多种资源整合联动系统,其特征在于,还包括资源管理服务端,所述资源管理服务端分别与所述调度服务端、所述拼接墙窗口连接,用于接收所述调度服务器发送的所述联动数据,并根据所述目标资源的类型调用对应的资源接口,通过所述资源接口将所述联动数据发送至所述目标资源对应的所述拼接墙窗口。The multi-resource integration and linkage system for a video wall according to claim 6, further comprising a resource management server, and the resource management server is respectively connected to the scheduling server and the video wall window. , used to receive the linkage data sent by the scheduling server, and call the corresponding resource interface according to the type of the target resource, and send the linkage data to the splicing corresponding to the target resource through the resource interface. wall window.
  8. 根据权利要求6所述的一种拼接墙的多种资源整合联动系统,其特征在于,所述控制联动端,具体用于选择所需联动的目标资源,根据所述目标资源的类型从所述调度服务端中加载对应的控制联动面板,并对所述控制联动面板发起按钮点击操作,所述控制联动端将被点击按钮对应的预设数据转换为联动数据发送至所述调度服务端。The multi-resource integration and linkage system of a splicing wall according to claim 6, wherein the control linkage terminal is specifically used to select the target resource to be linked, according to the type of the target resource from the The dispatching server loads the corresponding control linkage panel, initiates a button click operation on the control linkage panel, and the control linkage terminal converts the preset data corresponding to the clicked button into linkage data and sends it to the dispatching server.
  9. 根据权利要求6所述的一种拼接墙的多种资源整合联动系统,其特征在于,所述拼接墙窗口,还用于选择所需联动的目标资源,在所述目标资源对应的所述拼接墙窗口上进行联动操作,所述拼接墙窗口将所述联动操作对应的联动数据发送至所述调度服务端;The multi-resource integration and linkage system for a splicing wall according to claim 6, wherein the splicing wall window is also used to select a target resource to be linked, and in the splicing wall corresponding to the target resource A linkage operation is performed on the wall window, and the splicing wall window sends linkage data corresponding to the linkage operation to the dispatch server;
    所述调度服务端,还用于接收所述联动数据,并根据所述目标资源的类型将所述联动数据发送至与所述目标资源对应的所述控制联动端;The scheduling server is further configured to receive the linkage data, and send the linkage data to the control linkage terminal corresponding to the target resource according to the type of the target resource;
    所述控制联动端,还用于接收所述联动数据,根据目标资源的类型从所述调度服务端中加载对应的控制联动面板,并根据所述联动数据响应所述联动操作,以使所述控制联动面板更新所述联动数据。The control linkage terminal is further configured to receive the linkage data, load the corresponding control linkage panel from the scheduling server according to the type of the target resource, and respond to the linkage operation according to the linkage data, so that the The control linkage panel updates the linkage data.
  10. 一种计算机可读存储介质,其上存储有计算机程序,其特征在于,所述计算机程序被处理器执行时实现权利要求1至5任一项所述的拼接墙的多种资源整合联动方法。A computer-readable storage medium on which a computer program is stored, characterized in that, when the computer program is executed by a processor, the multi-resource integration and linkage method of a video wall according to any one of claims 1 to 5 is implemented.
PCT/CN2020/141697 2020-12-25 2020-12-30 Multi-resource integration and linkage method for splicing wall, system and storage medium WO2022134174A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202011561334.8A CN112866588A (en) 2020-12-25 2020-12-25 Multi-resource integration linkage method and system for spliced wall and storage medium thereof
CN202011561334.8 2020-12-25

Publications (1)

Publication Number Publication Date
WO2022134174A1 true WO2022134174A1 (en) 2022-06-30

Family

ID=75996966

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/141697 WO2022134174A1 (en) 2020-12-25 2020-12-30 Multi-resource integration and linkage method for splicing wall, system and storage medium

Country Status (2)

Country Link
CN (1) CN112866588A (en)
WO (1) WO2022134174A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101145235A (en) * 2007-06-29 2008-03-19 中国石化集团胜利石油管理局 Oil field development decision-making system
CN103677719A (en) * 2013-12-24 2014-03-26 广东威创视讯科技股份有限公司 Spliced wall display method
CN103995720A (en) * 2014-05-22 2014-08-20 广东威创视讯科技股份有限公司 Method and device for achieving centralized visual display control on mosaic wall system
US20170011344A1 (en) * 2014-03-26 2017-01-12 Delta Pds Co., Ltd Method of managing strategy-map executable by computer, server performing the same and storage media storing the same

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9076111B2 (en) * 2009-06-02 2015-07-07 Schneider Electric USA, Inc. Methods of integrating multiple management domains
CN102025773B (en) * 2010-09-29 2013-12-25 广东威创视讯科技股份有限公司 Method and device for interconnected control of splicing wall
CN102809960B (en) * 2012-08-10 2015-02-25 武汉九升科技有限公司 Large-screen-application-based three-party linkage visible monitoring system and method for regulation centre
US9247283B1 (en) * 2014-10-27 2016-01-26 Cisco Technology, Inc. Mosaic presentation screen production
US9841939B2 (en) * 2014-12-18 2017-12-12 Google Inc. Methods, systems, and media for presenting requested content on public display devices
CN105025256B (en) * 2015-01-07 2018-09-07 泰华智慧产业集团股份有限公司 A kind of monitoring resource based on GIS and scheduling system and method
CN107743612A (en) * 2015-04-13 2018-02-27 巴科股份有限公司 The display system based on browser for display image data
CN105867870B (en) * 2016-05-04 2018-11-02 广东威创视讯科技股份有限公司 The echo method and apparatus of combination window
CN207663435U (en) * 2017-12-04 2018-07-27 金鹏电子信息机器有限公司 Tiled display associated apparatus and splice displaying system
CN109379556B (en) * 2018-09-30 2021-11-12 中国船舶重工集团公司第七0九研究所 Audio and video system based on business processing basic unit and working method thereof
CN110928513A (en) * 2019-11-25 2020-03-27 新智道枢(上海)科技有限公司 Super-resolution synthesis command application system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101145235A (en) * 2007-06-29 2008-03-19 中国石化集团胜利石油管理局 Oil field development decision-making system
CN103677719A (en) * 2013-12-24 2014-03-26 广东威创视讯科技股份有限公司 Spliced wall display method
US20170011344A1 (en) * 2014-03-26 2017-01-12 Delta Pds Co., Ltd Method of managing strategy-map executable by computer, server performing the same and storage media storing the same
CN103995720A (en) * 2014-05-22 2014-08-20 广东威创视讯科技股份有限公司 Method and device for achieving centralized visual display control on mosaic wall system

Also Published As

Publication number Publication date
CN112866588A (en) 2021-05-28

Similar Documents

Publication Publication Date Title
WO2020140822A1 (en) Network conference management method and apparatus and storage medium, and network conference platform and system
CN102421028B (en) Control method for intelligent television (TV), intelligent TV, remote control device and intelligent TV control system
US10708320B2 (en) Selective internal forwarding in conferences with distributed media servers
US20160259611A1 (en) Method and apparatus for implementing a multi-screen system
WO2022170446A1 (en) Method and apparatus for determining satellite link information
WO2024022214A1 (en) Information display method and apparatus, and storage medium and electronic device
WO2018010504A1 (en) Videoconferencing control method, apparatus, and system
WO2022099709A1 (en) Method and apparatus for determining satellite backhaul information
CN114296670A (en) Display equipment and control method for multi-equipment screen projection on same screen display
US11303681B2 (en) System and method for network-based transferring communication sessions between endpoints
US10567999B2 (en) Clustering in unified communication and collaboration services
US10681300B1 (en) Split screen for video sharing
WO2022134174A1 (en) Multi-resource integration and linkage method for splicing wall, system and storage medium
CN1700685A (en) A service middleware and service method using the service middleware
CN109062710A (en) A kind of remote procedure calling (PRC) method, terminal device and the network equipment
CN112929592A (en) Video call method, display device and server
US11337038B2 (en) Method, device and system for transmitting multicast group information
CN102111606B (en) Method and device for accessing to video images in video conference system
CN102244657B (en) The register method of multipoint control unit cascade conference and system
US20200192685A1 (en) Chat interface for resource management
US10540136B2 (en) Faster frame buffer rendering over a network
CN201904870U (en) Load balancing controller for MCU and video conference system thereof
CN112104649A (en) Multimedia interaction method and device, electronic equipment, server and storage medium
CN109309692B (en) Multitask off-line interactive processing system based on remote control and controlled terminal
US20200228499A1 (en) Compliance management across multiple cloud environments

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20966736

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20966736

Country of ref document: EP

Kind code of ref document: A1