電源システム Download PDF

Info

Publication number
WO2022091737A1
WO2022091737A1 PCT/JP2021/037131 JP2021037131W WO2022091737A1 WO 2022091737 A1 WO2022091737 A1 WO 2022091737A1 JP 2021037131 W JP2021037131 W JP 2021037131W WO 2022091737 A1 WO2022091737 A1 WO 2022091737A1
Authority
WO
WIPO (PCT)
Prior art keywords
switch
voltage
power supply
inter
opened
Prior art date
Application number
PCT/JP2021/037131
Other languages
English (en)
French (fr)
Inventor
哲生 森田
Original Assignee
株式会社デンソー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社デンソー filed Critical 株式会社デンソー
Priority to CN202180073192.7A priority Critical patent/CN116507521A/zh
Publication of WO2022091737A1 publication Critical patent/WO2022091737A1/ja
Priority to US18/131,501 priority patent/US20230283066A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/20Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for electronic equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • B60R16/023Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements for transmission of signals between vehicle parts or subsystems
    • B60R16/0238Electrical distribution centers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L1/00Supplying electric power to auxiliary equipment of vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • B60R16/023Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements for transmission of signals between vehicle parts or subsystems
    • B60R16/0231Circuits relating to the driving or the functioning of the vehicle
    • B60R16/0232Circuits relating to the driving or the functioning of the vehicle for measuring vehicle parameters and indicating critical, abnormal or dangerous conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • B60R16/03Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements for supply of electrical power to vehicle subsystems or for
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering

Definitions

  • This disclosure relates to a power supply system.
  • a power supply system that is applied to a vehicle and supplies electric power to various devices of this vehicle is known.
  • this power supply system when the vehicle is driven, an abnormality occurs in the system that supplies electric power to the electric load that performs the functions necessary for driving the vehicle, such as the electric brake device and the electric steering device, and the function is lost due to this. If it is damaged, it will not be possible to continue driving the vehicle.
  • a device having a first power source and a second power source as a power source for supplying electric power to an electric load is known so as not to lose its function even when an abnormality occurs while the vehicle is in operation.
  • a first load and a second load are provided as electrical loads, and power is supplied from the first power supply to the first load via a first energization path.
  • One system is known to have one system and a second system for supplying electric power from a second power source to a second load via a second energization path.
  • an inter-system switch is provided in the connection path connecting each energization path, and the inter-system switch is opened when the controller determines that an abnormality has occurred in one of the systems.
  • the present disclosure has been made to solve the above problems, and an object thereof is to provide a power supply system capable of appropriately supplying electric power to an electric load in a power supply system having a plurality of power supply systems.
  • the first means for solving the above-mentioned problems is a first system for supplying power from a first power source to an electric load via a first energization path, and an electric load from a second power source to the second energization path via a second energization path.
  • a power supply system including a second system for supplying electric power to a system and an inter-system switch provided in a connection path connecting the first energization path and the second energization path, in the second energization path. It is determined that an abnormality has occurred in the second system with the in-system switch provided between the connection point with the connection path and the second power supply, the inter-system switch, and the in-system switch closed.
  • An abnormality determination unit a state control unit that opens the inter-system switch when an abnormality is determined by the abnormality determination unit, and the system when the inter-system switch is opened by the state control unit.
  • the first system that supplies electric power from the first power source to the electric load via the first energization path and the second system that supplies electric power from the second power source to the electric load via the second energization path. Is provided. Therefore, redundant power supply by the first power supply and the second power supply becomes possible for the electric load.
  • an inter-system switch is provided in the connection path connecting the first and second energization paths to each other. Therefore, if it is determined that an abnormality has occurred in one of the systems, the switch between the systems is opened to operate the electric load by supplying power from the power supply of the other system in which the abnormality has not occurred. It is possible to continue.
  • an in-system switch is provided between the connection point with the connection path in the second energization path and the second power supply, and when the inter-system switch is opened due to the occurrence of an abnormality in the second system, The in-system switch is opened to suppress over-discharging of the second power supply, but a negative surge voltage is generated, for example, due to a sudden decrease in the current flowing from the second power supply to the second system.
  • the generated negative surge voltage becomes lower than the negative withstand voltage of the inter-system switch, the inter-system switch cannot insulate the first system and the second system, and the power to the electric load in the first system There is concern that the supply cannot be carried out properly.
  • the inter-system switch when the inter-system switch is opened, the current flowing from the second power supply to the second system is limited by controlling the opening and closing of the switch in the system, and the second is accompanied by the current limitation.
  • By limiting the current flowing from the second power supply to the second system due to the occurrence of an abnormality in the second system over-discharging of the second power supply can be suppressed.
  • a surge voltage is generated in the second system due to this current limitation, but since an excessive decrease in the applied voltage of the inter-system switch due to the surge voltage is suppressed, a surge voltage is generated in the second system due to the current limitation.
  • the inter-system switch can be operated properly. As a result, it is possible to properly supply electric power to the electric load when an abnormality occurs in the second system.
  • the suppression unit controls the opening and closing of the switch in the system when the state control unit opens the switch between the systems, so that the current flowing from the second power source to the second system can be generated. Reduce the rate of decline.
  • the magnitude of the surge voltage generated in the second system is proportional to the rate of decrease in the current flowing in the second system.
  • the reduction rate of the current flowing from the second power supply to the second system is alleviated by controlling the opening and closing of the switch in the system. ..
  • the surge voltage generated in the second system is suppressed, and an excessive decrease in the applied voltage of the inter-system switch due to the surge voltage can be suppressed.
  • the in-system switch has a first in-system switch and a second in-system switch connected in series, and is connected in parallel to the first in-system switch to form the second power supply.
  • a diode having a forward direction from the connection point to the connection point is provided, and when the state control unit opens the intersystem switch, the suppression unit opens the first system switch and opens the first system switch. 2 Close the switch in the system.
  • the suppression unit gradually reduces the duty ratio of the in-system switch when the inter-system switch is opened by the state control unit.
  • the duty ratio of the in-system switch is gradually reduced when the inter-system switch is opened.
  • the rate of decrease in the current flowing through the second system is relaxed, and an excessive decrease in the applied voltage of the inter-system switch can be suppressed.
  • the control unit includes a Zener diode having a breakdown voltage higher than the negative withstand voltage of the inter-system switch and the in-system switch, and the state control unit opens the inter-system switch.
  • the switch in the system is opened to limit the current flowing from the second power supply to the second system, and the surge generated in the second system is limited.
  • the Zener diode releases the current limitation between the second power supply and the second system.
  • the surge voltage generated in the second system is generated by limiting the current flowing from the second power supply to the second system, and the decrease is suppressed by releasing the current limitation between the second power supply and the second system. Will be done.
  • a Zener diode having a breakdown voltage higher than the negative withstand voltage of the inter-system switch and the in-system switch is provided, and when the inter-system switch is opened, the surge voltage generated in the second system is higher than the breakdown voltage. If it is too high, the switch in the system is opened to limit the current flowing from the second power supply to the second system.
  • the Zener diode is used to release the current limitation between the second power supply and the second system.
  • a bidirectional diode is composed of two diodes connected in series so that the forward directions are opposite to each other, and the bidirectional diode is connected in parallel to the switch in the system.
  • the diode whose forward direction is from the connection point toward the second power supply is the Zener diode.
  • a bidirectional diode connected in parallel to the switch in the system is provided, and of the two diodes constituting this bidirectional diode, the diode whose forward direction is from the connection point to the second power supply is used.
  • the surge voltage generated in the second system becomes lower than the breakdown voltage
  • the current flows from the second power supply to the second system via the bidirectional diode due to the loss of the rectifying function of the Zener diode among the bidirectional diodes. It flows.
  • the surge voltage suppresses the voltage applied to the inter-system switch from decreasing beyond the negative withstand voltage of the in-system switch. can do.
  • the bidirectional Zener diode is composed of two Zener diodes connected in series so that the forward directions are opposite to each other, and one end of the bidirectional Zener diode is a switch in the system. It is connected to one of the main terminals of the pair of main terminals, and the other end of the bidirectional Zener diode is connected to the open / close control terminal of the switch in the system.
  • a bidirectional Zener diode is provided by two Zener diodes, and one end of the bidirectional Zener diode is connected to one of the main terminals of the pair of main terminals of the switch in the system, and the bidirectional Zener diode is provided. The other end of the diode is connected to the open / close control terminal of the switch in the system. Therefore, when the inter-system switch is opened and the surge voltage generated in the second system is higher than the breakdown voltage, the in-system switch is maintained in the open state by the rectifying function of the bidirectional Zener diode.
  • the eighth means includes a cutoff switch provided on the second system side of the inter-system switch in the connection path and having a higher withstand voltage than the inter-system switch, and the suppression unit is provided by the state control unit.
  • the in-system switch is opened after the cutoff switch is opened.
  • the inter-system switch When an abnormality occurs in the second system, high speed is required for the inter-system switch in order to quickly insulate the first system in which the abnormality has not occurred and the second system in which the abnormality has occurred. If the inter-system switch has high withstand voltage in addition to high speed, it is considered that it can withstand the surge voltage generated in the second system. However, when a switch having high speed and high withstand voltage is used as an inter-system switch, there is a concern that the cost burden of the power supply system will increase.
  • a cutoff switch having a higher withstand voltage than the line-to-system switch is provided on the second system side of the connection path to the line-to-system switch, and the cut-off switch is opened when the line-to-system switch is opened. Later, I tried to open the switch in the system. In this case, the inter-system switch only needs to have high speed and does not need to have high withstand voltage, so that the cost burden of the power supply system can be reduced.
  • the cutoff switch is opened before the in-system switch is opened, so even if a surge voltage is generated in the second system due to the opening of the in-system switch,
  • the cutoff switch with high withstand voltage suppresses an excessive drop in the applied voltage of the inter-system switch. Therefore, it is possible to suppress an excessive decrease in the applied voltage of the inter-system switch while limiting the current flowing from the second power source to the second system.
  • the cutoff switch is a first cutoff switch, which is provided between the connection point in the second energization path and the switch in the system, and has a higher withstand voltage than the switch in the system.
  • the suppression unit includes two cutoff switches, and the suppression unit is the first after opening the first cutoff switch and before opening the in-system switch when the inter-system switch is opened by the state control unit. 2 Open the cutoff switch.
  • a first cutoff switch having a higher withstand voltage than the inter-system switch is provided on the second system side of the inter-system switch in the connection path, and between the connection point in the second energization path and the in-system switch.
  • a second cutoff switch, which has a higher withstand voltage than the in-system switch, is provided. Then, when the inter-system switch is opened, the second cutoff switch is closed after the first cutoff switch is opened and before the in-system switch is opened. In this case, even if a surge voltage is generated in the second system due to the opening of the second cutoff switch, the first cutoff switch having high withstand voltage suppresses an excessive decrease in the applied voltage of the inter-system switch.
  • the second cutoff switch having high withstand voltage suppresses an excessive decrease in the applied voltage of the switch in the system. Therefore, it is possible to suppress an excessive decrease in the applied voltage of the inter-system switch and the in-system switch while limiting the current flowing from the second power source to the second system.
  • connection point is a first connection point
  • the suppression unit is a predetermined connection point between the first connection point and the switch in the system in the second energization path. It is connected to the reference voltage member that outputs the reference voltage, the direction from the reference voltage member to the second connection point is the forward direction, and the yield is lower than the positive withstand voltage of the intersystem switch and the in-system switch.
  • a Zener diode having a voltage is provided, the reference voltage is set to a voltage higher than the negative withstand voltage of the inter-system switch and the in-system switch, and the suppression unit controls the inter-system switch by the state control unit. When opening, the switch in the system is opened.
  • a Zener diode having a forward direction from the reference voltage member to the second connection point is provided between the second connection point and the reference voltage member, and the breakdown voltage of this Zener diode is used as an intersystem switch and a system. It is made lower than the positive withstand voltage of the inner switch. As a result, when a positive surge voltage is generated in the second system, the rectifying function of the Zener diode is lost, so that the applied voltage of the inter-system switch and the in-system switch is maintained at the breakdown voltage of the Zener diode, and the applied voltage is maintained. Can be suppressed from rising beyond the positive withstand voltage of these switches.
  • the reference voltage of the reference voltage member is set to a voltage higher than the negative withstand voltage of the inter-system switch and the in-system switch.
  • FIG. 1 is an overall configuration diagram of the power supply system of the first embodiment.
  • FIG. 2 is a flowchart showing the procedure of the control process of the first embodiment.
  • FIG. 3 is a time chart showing an example of the control process of the first embodiment.
  • FIG. 4 is a flowchart showing the procedure of the control process in the modified example of the first embodiment.
  • FIG. 5 is an overall configuration diagram of the power supply system of the second embodiment.
  • FIG. 6 is a flowchart showing the procedure of the control process of the second embodiment.
  • FIG. 7 is a time chart showing an example of the control process of the second embodiment.
  • FIG. 8 is an overall configuration diagram of the power supply system in the modified example of the first embodiment.
  • FIG. 9 is an overall configuration diagram of the power supply system according to the third embodiment.
  • FIG. 10 is a flowchart showing the procedure of the control process of the third embodiment.
  • FIG. 11 is a time chart showing an example of the control process of the third embodiment.
  • FIG. 12 is an overall configuration diagram of the power supply system in the modified example of the third embodiment.
  • FIG. 13 is a flowchart showing the procedure of the control process in the modified example of the third embodiment.
  • FIG. 14 is a time chart showing an example of the control process in the modified example of the third embodiment.
  • FIG. 15 is an overall configuration diagram of the power supply system according to the fourth embodiment.
  • FIG. 16 is a time chart showing an example of the control process of the fourth embodiment.
  • the power supply system 100 is a system that supplies electric power to a general load 30 and a specific load 32.
  • the power supply system 100 includes a high-voltage storage battery 10, a DCDC converter (hereinafter referred to as a converter) 12, a first storage battery 14, a second storage battery 16, a switch unit 20, a relay switch SMR (system main relay switch), and a control device. It is equipped with 40.
  • the high-voltage storage battery 10 has a rated voltage (for example, several hundred volts) higher than that of the first and second storage batteries 14 and 16, and is, for example, a lithium ion storage battery.
  • the converter 12 is a voltage generation unit that converts the electric power supplied from the high-voltage storage battery 10 into the electric power of the power supply voltage VA and supplies it to the general load 30 and the specific load 32.
  • the power supply voltage VA is a voltage that enables driving of the general load 30 and the specific load 32.
  • the general load 30 is an electric load (hereinafter, simply a load) that is not used for operation control in a vehicle as a mobile body, and is, for example, an air conditioner, an audio device, a power window, or the like.
  • the specific load 32 is a load that performs at least one function used for vehicle operation control, for example, an electric power steering device 50 that controls steering of the vehicle, an electric braking device 51 that applies braking force to wheels, and the like. It is a traveling control device 52 or the like that monitors the situation around the vehicle.
  • the specific load 32 corresponds to the "electrical load”.
  • the specific load 32 has a first load 34 and a second load 36 redundantly provided for each function so that all the functions are not lost even if an abnormality occurs.
  • the electric power steering device 50 has a first steering motor 50A and a second steering motor 50B.
  • the electric brake device 51 has a first brake device 51A and a second brake device 51B.
  • the travel control device 52 has a camera 52A and a laser radar 52B.
  • the first steering motor 50A, the first brake device 51A, and the camera 52A correspond to the first load 34
  • the second steering motor 50B, the second brake device 51B, and the laser radar 52B correspond to the second load 36. ..
  • the first load 34 and the second load 36 together realize one function, but each of them can realize a part of the function by itself.
  • the first steering motor 50A and the second steering motor 50B allow the vehicle to be freely steered, and each steering motor 50A is subject to certain restrictions such as steering speed and steering range. , 50B enables steering of the vehicle.
  • Each specific load 32 realizes a function of supporting control by the driver in manual operation. Further, each specific load 32 realizes a function required for automatic driving in automatic driving that automatically controls behavior such as running and stopping of the vehicle. Therefore, the specific load 32 can also be said to be a load that performs at least one function necessary for driving the vehicle.
  • the first load 34 is connected to the converter 12 via the path LA1 in the first system, and power is supplied from the converter 12 to the first load 34 via the path LA1 in the first system.
  • the first storage battery 14 and the general load 30 are connected to the path LA1 in the first system.
  • the first storage battery 14 is, for example, a lead storage battery.
  • the first system ES1 is configured by the converter 12, the first storage battery 14, the general load 30, and the first load 34 connected by the path LA1 in the first system.
  • the inductance component ZA1 of the first system ES1 is shown in the path LA1 in the first system.
  • the LA1 in the first system corresponds to the "first energization path”
  • the high-voltage storage battery 10 and the converter 12 correspond to the "first power source”.
  • the second load 36 is connected to the second storage battery 16 via the path LA2 in the second system, and power is supplied from the second storage battery 16 to the second load 36 via the path LA2 in the second system.
  • the second storage battery 16 is, for example, a lithium ion storage battery.
  • the second system ES2 is configured by the second storage battery 16 and the second load 36 connected by the path LA2 in the second system.
  • the inductance component ZA2 of the second system ES2 is shown in the path LA2 in the second system.
  • the path LA2 in the second system corresponds to the "second energization path”
  • the second storage battery 16 corresponds to the "second power source”.
  • the switch unit 20 is provided in the connection path LB connecting the path LA1 in the first system and the path LA2 in the second system.
  • One end of the connection path LB is connected to the first intra-system path LA1 at the connection point PA, and the other end of the connection path LB is connected to the second intra-system path LA2 at the connection point PB.
  • the switch unit 20 includes a first switch SW1 and a second switch SW2 connected in series.
  • the first switch SW1 is provided on the first system ES1 side of the second switch SW2.
  • the first switch SW1 and the second switch SW2 correspond to "intersystem switches".
  • N-channel MOSFETs (hereinafter, simply MOSFETs) are used as the first and second switches SW1 and SW2. Therefore, the first parasitic diode DA1 is connected in parallel to the first switch SW1, and the second parasitic diode DA2 is connected in parallel to the second switch SW2.
  • the first and second switches SW1 and SW2 are connected in series so that the directions of the first and second parasitic diodes DA1 and DA2 are opposite to each other.
  • the first parasitic diode DA1 is arranged so that the anode is on the second system ES2 side and the cathode is on the first system ES1 side.
  • the second parasitic diode DA2 is arranged so that the anode is on the first system ES1 side and the cathode is on the second system ES2 side.
  • the first current detection unit 27 is provided in the path LA1 in the first system, and the second current detection unit 28 is provided in the connection path LB.
  • the first current detection unit 27 is provided in a portion of the path LA1 in the first system between the connection point PA and the first load 34, and the magnitude and direction of the current IA in the first system flowing through the portion. Is detected.
  • the second current detection unit 28 is provided in the portion of the connection path LB on the first system ES1 side of the switch unit 20, and detects the magnitude and direction of the inter-system current IB flowing through the portion.
  • the relay switch SMR is provided in a portion between the connection point PB and the second storage battery 16 in the path LA2 in the second system, and opens or closes the portion in the path LA2 in the second system. By opening and closing the relay switch SMR, the current flowing from the second storage battery 16 to the second system ES2 is controlled.
  • the control device 40 generates the first and second switching signals SC1 and SC2 in order to switch the first and second switches SW1 and SW2 based on the detected values of the first and second current detecting units 27 and 28. Then, the commands from the first and second switching signals SC1 and SC2 are output to the first and second switches SW1 and SW2. Further, the control device 40 switches and operates the relay switch SMR based on the detection values of the first and second current detection units 27 and 28. Further, the control device 40 generates a control signal SD in order to control the operation of the converter 12, and outputs a command by the control signal SD to the converter 12. The operation state and the operation stop state of the converter 12 are switched by the control signal SD.
  • control device 40 is connected to the notification unit 44, the IG switch 45, and the input unit 46, and controls these.
  • the notification unit 44 is a device that visually or audibly notifies the driver, and is, for example, a display or a speaker installed in a vehicle interior.
  • the IG switch 45 is a vehicle start switch.
  • the control device 40 monitors the opening or closing of the IG switch 45.
  • the input unit 46 is a device that accepts the operation of the driver, for example, a handle, a lever, a button, a pedal, and a voice input device.
  • the control device 40 manually drives and automatically drives the vehicle using the above-mentioned specific load 32.
  • the control device 40 includes a well-known microcomputer including a CPU, ROM, RAM, flash memory, and the like.
  • the CPU realizes various functions for manual operation and automatic operation by referring to the arithmetic program and control data in the ROM.
  • manual operation represents a state in which the vehicle is controlled by the operation of the driver using the input unit 46.
  • automatic driving represents a state in which the vehicle is driven and controlled by the control content by the control device 40 regardless of the operation of the driver.
  • automatic driving refers to automatic driving of level 3 or higher among the automatic driving levels from level 0 to level 5 defined by the National Highway Traffic Safety Administration (NHTSA).
  • Level 3 is a level at which the control device 40 controls both steering wheel operation and acceleration / deceleration while observing the traveling environment.
  • the relay switch SMR is opened in the second system ES2 in order to suppress the over-discharge of the second storage battery 16.
  • the current IC in the second system which is the current flowing from the second storage battery 16 to the second system ES2
  • the inductance component ZA2 of the second system ES2 (hereinafter, simply the first).
  • a negative surge voltage VS is generated in the two systems ES2).
  • the surge voltage VS becomes lower than the negative withstand voltage Vth, which is the withstand voltage on the negative voltage side of the first and second switches SW1 and SW2, the first and second switches SW1 and SW2 do not cause any abnormality. It is not possible to insulate the system ES1 from the second system ES2 in which the abnormality has occurred, and there is a concern that the first load 34 may not operate properly in the first system ES1.
  • the opening and closing of the relay switch SMR is controlled to limit the current IC in the second system, and this current limitation is applied.
  • the surge voltage VS generated in the second system ES2 suppresses an excessive decrease in the applied voltage of the first and second switches SW1 and SW2.
  • the surge voltage is controlled by controlling the opening and closing of the relay switch SMR to reduce the current IC in the second system and alleviate the decrease rate.
  • the voltage applied to the first and second switches SW1 and SW2 by VS is not lower than the negative withstand voltage Vth of the first and second switches SW1 and SW2.
  • the relay switch SMR includes a third switch SW3 and a fourth switch SW4 connected in series.
  • the third switch SW3 is provided on the second storage battery 16 side of the fourth switch SW4.
  • the relay switch SMR corresponds to the "in-system switch”
  • the third switch SW3 corresponds to the "second in-system switch”
  • the fourth switch SW4 corresponds to the "first in-system switch”. do.
  • MOSFETs are used as the third and fourth switches SW3 and SW4. Therefore, the third parasitic diode DA3 is connected in parallel to the third switch SW3, and the fourth parasitic diode DA4 is connected in parallel to the fourth switch SW4.
  • the third and fourth switches SW3 and SW4 are connected in series so that the directions of the third and fourth parasitic diodes DA3 and DA4 are opposite to each other.
  • the third parasitic diode DA3 is arranged so that the anode is on the connection point PB side and the cathode is on the second storage battery 16 side.
  • the fourth parasitic diode DA4 is arranged so that the anode is on the second storage battery 16 side and the cathode is on the connection point PB side. That is, the fourth parasitic diode DA4 is arranged so that the direction from the second storage battery 16 toward the connection point PB is the forward direction.
  • the control device 40 generates the third and fourth switching signals SC3 and SC4 in order to switch the third and fourth switches SW3 and SW4, and issues commands from the third and fourth switching signals SC3 and SC4 to the third and third. Output to the 4th switches SW3 and SW4. Then, in the control process, when the first and second switches SW1 and SW2 are opened, the third switch SW3 is closed and the fourth switch SW4 is opened as an open / close control of the relay switch SMR.
  • the current IC in the second system flows through the third switch SW3 and the fourth parasitic diode DA4, and the current IC in the second system is limited by the forward voltage VE of the fourth parasitic diode DA4.
  • a surge voltage VS is generated in the second system ES2 due to this current limitation, but since the limiting effect of the current IC in the second system by the fourth parasitic diode DA4 is small, the current IC in the second system is reduced due to the above limitation. The speed is relaxed. Therefore, even when a surge voltage VS is generated in the second system ES2 due to the current limitation, the third and fourth switches SW3 and SW4 can be properly operated. As a result, it is possible to properly supply power to the first load 34 when an abnormality occurs in the second system ES2.
  • FIG. 2 shows a flowchart of the control process of the present embodiment.
  • the control device 40 When the IG switch 45 is closed, the control device 40 repeatedly executes the control process at predetermined control cycles. At the beginning of closing the IG switch 45, the first to fourth switches SW1 to SW4 are closed, and the converter 12 is in an operating state.
  • step S10 it is determined whether or not an abnormality has occurred in either the first system ES1 or the second system ES2. Specifically, in step S10, it is determined whether or not an abnormality has occurred in the first system ES1. If a negative determination is made in step S10, it is determined in step S11 whether or not an abnormality has occurred in the second system ES2.
  • the process of step S11 corresponds to the "abnormality determination unit".
  • the abnormality is a power failure abnormality such as a ground fault or a disconnection.
  • the occurrence of an abnormality can be determined by the magnitude of each of the currents IA and IB detected by the first and second current detection units 27 and 28. For example, when a ground fault occurs in the first system ES1, the magnitude of the current IA in the first system detected by the first current detection unit 27 is equal to or larger than a predetermined current threshold value Is for determining the ground fault. Further, for example, when a ground fault occurs in the second system ES2, the magnitude of the inter-system current IB detected by the second current detection unit 28 becomes equal to or larger than the current threshold value Is. Therefore, it is possible to determine which system ES1 or ES2 the abnormality has occurred based on the magnitude of each of the currents IA and IB detected by the first and second current detection units 27 and 28.
  • step S11 If it is determined that no abnormality has occurred in any of the systems ES1 and ES2, a negative determination is made in step S11. In this case, the control process is terminated. As a result, redundant power supply to the first and second loads 34 and 36 by the converter 12 and the first and second storage batteries 14 and 16 is carried out, and the first and second loads 34 and 36 cooperate with each other. Implement one function required for operation control.
  • step S10 if an affirmative determination is made in step S10, first, in step S12, the first and second switches SW1 and SW2 are opened.
  • the first and second switches SW1 and SW2 are capable of high-speed switching operation, and due to the high-speed switching operation of the first and second switches SW1 and SW2, no abnormality has occurred with the first system ES1 in which an abnormality has occurred. It can be quickly insulated from the second system ES2.
  • step S13 a command to put the converter 12 in the operation stop state is output, and the process proceeds to step S14.
  • a negative surge voltage VS is generated in the inductance component ZA1 (hereinafter, simply the first system ES1) of the first system ES1 due to a sudden decrease in the current flowing from the converter 12 to the first system ES1. do. Therefore, in step S13, by controlling the state of the converter 12, the current flowing from the converter 12 to the first system ES1 is gradually reduced, and the voltage applied to the first and second switches SW1 and SW2 by the surge voltage VS becomes the first. 1. Make sure that the voltage is not lower than the negative withstand voltage Vth of the second switches SW1 and SW2.
  • step S14 the driver is notified via the notification unit 44 that an abnormality has occurred in either the first system ES1 or the second system ES2, and the control process is terminated.
  • step S11 it is first determined in step S20 whether or not the fourth switch SW4 is closed. If an affirmative determination is made in step S20, the process proceeds to step S21. On the other hand, if a negative determination is made in step S20, the process proceeds to step S23.
  • step S21 the first and second switches SW1 and SW2 are opened.
  • step S22 only the fourth switch SW4 of the relay switch SMR is opened, and the process proceeds to step S14.
  • the process of step S20 corresponds to the "state control unit”
  • the process of step S22 corresponds to the "suppressor unit”.
  • step S23 that is, when the fourth switch SW4 is opened in the previously executed control process, it is determined whether or not the predetermined opening condition for opening the third switch SW3 is satisfied.
  • the opening conditions are, for example, a condition that the elapsed time from the opening of the fourth switch SW4 is longer than the predetermined time threshold value Yth, and a condition that the temperature of the second storage battery 16 is higher than the predetermined temperature threshold value Tth. It is a condition.
  • step S23 If it is determined that the opening condition is not satisfied, a negative determination is made in step S23. In this case, the control process is terminated. On the other hand, if it is determined that the opening condition is satisfied, an affirmative determination is made in step S23. In this case, in step S24, the fourth switch SW4 is opened, that is, the relay switch SMR is opened, and the control process is terminated.
  • FIG. 3 shows an example of control processing.
  • FIG. 3 shows the transition between the load voltage VD and the current IC in the second system when a ground fault abnormality (hereinafter, simply a ground fault) occurs in the second system ES2 while the vehicle is running.
  • the load voltage VD indicates the voltage applied to the second load 36, specifically, the voltage of the connection point PB in the second system ES2. Therefore, the load voltage VD becomes the power supply voltage VA before the ground fault occurs in the second system ES2, and the load voltage VD becomes the surge voltage VS after the ground fault occurs in the second system ES2.
  • the load voltage VD is an example of the “applied voltage”.
  • FIG. 3 shows the transition of the open / closed state of the IG switch 45
  • (B) shows the transition of the open / closed state of the first switch SW1
  • (C) shows the transition of the open / closed state of the second switch SW2.
  • the transition is shown
  • (D) shows the transition of the open / closed state of the third switch SW3
  • (E) shows the transition of the open / closed state of the fourth switch SW4.
  • (F) shows the transition of the load voltage VD
  • (G) shows the transition of the current IC in the second system.
  • the first to fourth switches SW1 to SW4 are open, and the converter 12 switches to the operation stop state. Has been done. Therefore, during the open period of the IG switch 45, the load voltage VD and the current IC in the second system become zero.
  • the IG switch 45 When the IG switch 45 is closed at time t1, the first and second switches SW1 and SW2 are closed, and a command to switch the converter 12 to the operating state is output. As a result, the converter 12 is switched to the operating state, the load voltage VD rises to a predetermined operating voltage VM as the power supply voltage VA rises, and the vehicle can run.
  • the operating voltage VM is a voltage within the drive voltage range of the first and second loads 34 and 36.
  • the 3rd and 4th switches SW3 and SW4 are closed at time t1.
  • the second storage battery 16 is charged by the power supply from the converter 12. Since the current IC in the second system is the current flowing from the second storage battery 16 to the second system ES2, when the second storage battery 16 is charged, the current IC in the second system has a negative value. It becomes.
  • the inter-system current IB rises, and at the subsequent time t3, the inter-system current IB becomes equal to or higher than the current threshold value Is.
  • the first and second switches SW1 and SW2 are opened at time t3.
  • the opening and closing of the third and fourth switches SW3 and SW4 are controlled, and the current IC in the second system is limited.
  • a surge voltage VS is generated in the second system ES2 due to this current limitation.
  • the 3rd and 4th switches SW3 and SW4 are both opened at time t3 in order to suppress the over-discharging of the 2nd storage battery 16, the second storage battery 16 is seconded.
  • the current IC in the system decreases sharply.
  • the magnitude of the surge voltage VS generated in the second system ES2 is proportional to the decrease rate of the current flowing in the second system ES2.
  • the first and second switches SW1 and SW2 are opened in order to insulate the first system ES1 in which the abnormality has not occurred and the second system ES2 in which the abnormality has occurred due to the occurrence of the abnormality in the second system ES2.
  • the current IC in the second system is limited by controlling the opening and closing of the third and fourth switches SW3 and SW4, and the current thereof is limited.
  • An excessive decrease in the load voltage VD due to the surge voltage VS generated in the second system ES2 due to the limitation is suppressed.
  • By limiting the current IC in the second system over-discharging of the second storage battery 16 can be suppressed.
  • a surge voltage VS is generated in the second system ES2 due to this current limitation.
  • an excessive decrease in the load voltage VD due to the surge voltage VS is suppressed, so that the second system ES2 is accompanied by the current limitation.
  • the first and second switches SW1 and SW2 can be operated properly.
  • the electric power can be properly supplied to the first load 34.
  • the decrease rate of the current IC in the second system is alleviated by controlling the opening and closing of the third and fourth switches SW3 and SW4. ..
  • the magnitude of the surge voltage VS generated in the second system ES2 is proportional to the decrease rate of the current flowing in the second system ES2 including the current IC in the second system. Therefore, by relaxing the decrease rate of the current IC in the second system, the surge voltage VS generated in the second system ES2 can be suppressed, and an excessive decrease in the load voltage VD due to the surge voltage VS can be suppressed.
  • the fourth switch SW4 is opened and the third switch SW3 is closed.
  • the current IC in the second system flows through the third switch SW3 and the fourth parasitic diode DA4.
  • the rate of decrease in the current flowing through the second system ES2 is alleviated by the forward voltage VE of the fourth parasitic diode DA4, and an excessive decrease in the load voltage VD can be suppressed.
  • the duty ratio means the ratio of the closing time of the third switch SW3 to the specified cycle of the third switch SW3 whose opening and closing is controlled.
  • step S25 the duty ratio control of the third switch SW3 is performed, and the process proceeds to step S14.
  • the duty ratio is reduced as the elapsed time from the time t3 becomes longer, and the rate of decrease of the duty ratio is relaxed. That is, the duty ratio was gradually reduced. As a result, the rate of decrease in the current flowing through the second system ES2 is relaxed, and an excessive decrease in the load voltage VD can be suppressed.
  • This embodiment differs from the first embodiment in that a bidirectional Zener diode 22 connected in parallel to the relay switch SMR is provided.
  • the first path LC1 and the second path LC2 provided in parallel with each other are provided between the connection point PB and the second storage battery 16 in the second system ES2.
  • a relay switch SMR is provided in the first path LC1, and a bidirectional Zener diode 22 is provided in the second path LC2.
  • the relay switch SMR is shown in a simplified manner.
  • the bidirectional Zener diode 22 is an example of a "bidirectional diode".
  • the bidirectional Zener diode 22 includes a first Zener diode (hereinafter, first Zener) DT1 and a second Zener diode (hereinafter, second Zener) DT2, and the directions of the first and second Zener DT1 and DT2 are different.
  • the first and second Zener DT1 and DT2 are connected in series so as to be opposite to each other.
  • the first Zener DT1 is provided on the second storage battery 16 side with respect to the second Zener DT2, and the anode is arranged on the connection point PB side and the cathode is on the second storage battery 16 side.
  • the second Zener DT2 is arranged so that the anode is on the second storage battery 16 side and the cathode is on the connection point PB side. That is, the first Zener DT1 is arranged so that the direction from the connection point PB toward the second storage battery 16 is the forward direction.
  • the first and second Zener DT1 and DT2 have the same yield voltage VZ.
  • the yield voltage VZ of the first and second Zener DT1 and DT2 is higher than the negative withstand voltage Vth of the first and second switches SW1 and SW2 and the negative withstand voltage Vth of the third and fourth switches SW3 and SW4. It is set to be.
  • the negative withstand voltage Vth of the first and second switches SW1 and SW2 is referred to as the first negative withstand voltage Vth1
  • the negative withstand voltage Vth of the negative withstand voltage Vth of the third and fourth switches SW3 and SW4 is referred to as the second negative withstand voltage. It is called withstand voltage Vth2.
  • FIG. 6 shows a flowchart of the control process of the present embodiment.
  • the relay switch SMR is opened in the subsequent step S26.
  • the bidirectional Zener diode 22 is provided in the second path LC2 to prevent the load voltage VD from dropping beyond the negative withstand voltage Vth1 and Vth2 of the first to fourth switches SW1 to SW4. can do. The reason will be described with reference to FIG. 7.
  • FIG. 7 shows the transition between the load voltage VD and the current IC in the second system in the control process of the present embodiment. Note that (A) to (G) in FIG. 7 are the same as (A) to (G) in FIG. Further, the processing from time t1 to time t3 in FIG. 7 is the same as the processing from time t1 to time t3 in FIG. Therefore, duplicate explanations will be omitted.
  • the relay switch SMR is opened at this time t3, and the current IC in the second system is limited.
  • a negative surge voltage VS is generated in the second system ES2 due to this current limitation.
  • the surge voltage VS generated in the second system ES2 is higher than the breakdown voltage VZ. Therefore, the open relay switch SMR and the rectifying functions of the first and second Zener DT1 and DT2 stop the current IC in the second system. By stopping the current IC in the second system, over-discharging of the second storage battery 16 can be suppressed.
  • the surge voltage VS decreases with this current stop, and the load voltage VD decreases due to the surge voltage VS.
  • the load voltage VD becomes the first negative withstand voltage of the first and second switches SW1 and SW2 due to the rapid decrease of the current IC in the second system due to the current stop.
  • Vth1 the first system ES1 in which the ground fault has not occurred and the second system ES2 in which the ground fault has occurred cannot be insulated by the first and second switches SW1 and SW2.
  • the first Zener DT1 having a breakdown voltage VZ higher than the first negative withstand voltage Vth1 of the first and second switches SW1 and SW2 and the second negative withstand voltage Vth2 of the third and fourth switches SW3 and SW4 is used.
  • the relay switch SMR is opened and the inside of the second system is provided.
  • Limit the current IC On the other hand, when the surge voltage VS generated in the second system ES2 becomes lower than the breakdown voltage VZ, the limitation of the current IC in the second system is released by the first Zener DT1.
  • a bidirectional Zener diode 22 connected in parallel to the relay switch SMR is provided, and of the two Zener diodes constituting the bidirectional Zener diode 22, the connection point PB is connected to the second storage battery 16.
  • the breakdown voltage VZ of the first Zener DT1 whose forward direction is the forward direction is set to be higher than the negative withstand voltage Vth1 and Vth2 of the first to fourth switches SW1 to SW4. Therefore, when the first and second switches SW1 and SW2 are opened and the surge voltage VS generated in the second system ES2 is higher than the breakdown voltage VZ, the opened relay switch SMR and the first and second switches SMR and the first and second switches are opened.
  • the current IC in the second system is stopped by the rectifying function of the Zener DT1 and DT2.
  • the surge voltage VS generated in the second system ES2 becomes lower than the breakdown voltage VZ
  • the rectifying function of the first Zener DT1 is lost, so that the positive current IC in the second system is generated via the bidirectional Zener diode 22. It flows.
  • the load voltage VD is changed by the surge voltage VS to the negative withstand voltage Vth1 of the first to fourth switches SW1 to SW4. , It is possible to suppress the decrease beyond Vth2.
  • the bidirectional Zener diode may be provided for each of the third switch SW3 and the fourth switch SW4 included in the relay switch SMR.
  • the third path between the connection point PC between the second storage battery 16 and the relay switch SMR in the second internal path LA2 and the gate terminal of the third switch SW3.
  • An LC3 is provided, and a first bidirectional Zener diode 23 is provided in the third path LC3. That is, one end of the first bidirectional Zener diode 23 is connected to the drain terminal of the pair of main terminals of the third switch SW3, and the other end of the first bidirectional Zener diode 23 is the third switch SW3. It is connected to the gate terminal.
  • the gate terminal corresponds to the "open / close control terminal".
  • the first bidirectional Zener diode 23 includes a third Zener diode (hereinafter referred to as a third Zener) DT3 and a fourth Zener diode (hereinafter referred to as a fourth Zener) DT4, and the third and fourth Zener diodes DT3 and DT4.
  • the third and fourth Zener DT3 and DT4 are connected in series so that the directions are opposite to each other.
  • the third Zener DT3 is provided on the connection point PC side with respect to the fourth Zener DT4, and the anode is arranged on the third switch SW3 side and the cathode is on the connection point PC side.
  • the fourth Zener DT4 is arranged so that the anode is on the connection point PC side and the cathode is on the third switch SW3 side.
  • a fourth path LC4 is provided between the connection point PD between the relay switch SMR and the connection point PB in the second in-system path LA2 and the gate terminal of the fourth switch SW4, and the fourth path LC4 is provided.
  • the second bidirectional Zener diode 24 includes a fifth Zener diode (hereinafter referred to as a fifth Zener) DT5 and a sixth Zener diode (hereinafter referred to as a sixth Zener) DT6, and the fifth and sixth Zener DT5 and DT6.
  • the fifth and sixth Zener DT5 and DT6 are connected in series so that the directions are opposite to each other.
  • the fifth Zener DT5 is provided on the fourth switch SW4 side with respect to the sixth Zener DT6, and the anode is arranged on the connection point PD side and the cathode is arranged on the fourth switch SW4 side.
  • the sixth Zener DT6 is arranged so that the anode is on the fourth switch SW4 side and the cathode is on the connection point PD side.
  • the third to sixth Zener DT3 to DT6 have the same yield voltage VZ, so that the yield voltage VZ is higher than the negative withstand voltage Vth1 and Vth2 of the first to fourth switches SW1 to SW4. Is set to.
  • the control process of this modification is equivalent to the control process of the second embodiment. That is, as shown in FIG. 7, when the first and second switches SW1 and SW2 are opened at time t3, the third and fourth switches SW3 and SW4 are opened at this time t3, and the inside of the second system is opened.
  • the current IC is limited.
  • the rectifying functions of the third to sixth Zener DT3 to DT6 are used to connect to the gate terminals of the third and fourth switches SW3 and SW4. The applied voltage is suppressed, and the third and fourth switches SW3 and SW4 are maintained in an open state.
  • the present embodiment is different from the first embodiment in that the switch unit 26 is provided on the second system ES2 side of the switch unit 20 in the connection path LB.
  • the switch unit 20 is referred to as a first switch unit 20
  • the switch unit 26 is referred to as a second switch unit 26.
  • the second switch unit 26 includes a fifth switch SW5.
  • the fifth switch SW5 corresponds to a "cutoff switch, first cutoff switch”.
  • a normally closed relay is used as the fifth switch SW5. Therefore, the fifth switch SW5 has a higher withstand voltage while having a slower switching speed than the first and second switches SW1 and SW2.
  • a negative surge voltage VS is generated in the second system ES2
  • the fifth switch SW5 has a negative withstand voltage lower than the peak value VP (see FIG. 11) of the surge voltage VS generated in the second system ES2.
  • the control device 40 generates a fifth switching signal SC5 in order to switch the fifth switch SW5, and outputs a command from the fifth switching signal SC5 to the fifth switch SW5. Then, in the control process, the load voltage VD is prevented from being applied to the first and second switches SW1 and SW2 by utilizing the high withstand voltage of the fifth switch SW5, so that the first and second switches due to the surge voltage VS are used.
  • the applied voltage VX of the switches SW1 and SW2 is not lower than the first negative withstand voltage Vth1 of the first and second switches SW1 and SW2.
  • FIG. 10 shows a flowchart of the control process of the present embodiment.
  • the same processes as those shown in FIG. 2 above are given the same step numbers for convenience, and the description thereof will be omitted.
  • step S11 if an affirmative determination is made in step S11, it is determined in step S30 whether or not the fifth switch SW5 is open. If a negative determination is made in step S30, the first and second switches SW1 and SW2 are opened in step S21, and the process proceeds to step S31.
  • step S31 a command to open the fifth switch SW5 is output, and the process proceeds to step S14.
  • the fifth switch SW5 since the switching speed of the fifth switch SW5 is slower than that of the first and second switches SW1 and SW2, the fifth switch SW5 is not opened immediately after the command output like the first and second switches SW1 and SW2. It is released after a predetermined delay time YD (see FIG. 11) has elapsed.
  • step S30 determines whether the delay time YD elapses after the command to open the fifth switch SW5 is output. If an affirmative determination is made in step S30, that is, when the delay time YD elapses after the command to open the fifth switch SW5 is output, the third and fourth switches SW3 and SW4 are released in step S32 to perform control processing. finish.
  • FIG. 11 shows the transition between the applied voltage VX and the current IC in the second system in the control process of the present embodiment.
  • the applied voltage VX indicates the voltage applied to the terminal PE on the second system ES2 side in the first switch unit 20.
  • FIG. 11 shows the transition of the open / closed state of the fifth switch SW5
  • (G) shows the transition of the applied voltage VX and the load voltage VD
  • (H) shows the transition of the current IC in the second system. Show the transition.
  • the applied voltage VX is shown by a solid line
  • the load voltage VD is shown by a broken line. Note that (A) to (E) in FIG. 11 are the same as (A) to (E) in FIG. Further, the processing from time t1 to time t3 in FIG. 11 is the same as the processing from time t1 to time t3 in FIG. Therefore, duplicate explanations will be omitted.
  • the first and second switches SW1 and SW2 are opened, while the third and fourth switches SW3 and SW4 are maintained in a closed state. Therefore, the current IC in the second system continues to flow, and the surge voltage VS does not occur in the second system ES2. Further, since the fifth switch SW5 is maintained in the closed state, the applied voltage VX is maintained at a voltage equal to the load voltage VD.
  • the applied voltage VX becomes a voltage different from the load voltage VD, and specifically becomes zero.
  • the third and fourth switches SW3 and SW4 are maintained in the closed state, the surge voltage VS does not occur in the second system ES2.
  • the current IC in the second system is stopped.
  • the current IC in the second system By stopping the current IC in the second system, over-discharging of the second storage battery 16 can be suppressed.
  • a negative surge voltage VS is generated with this current stop, and the load voltage VD is lowered by the surge voltage VS.
  • the fifth switch SW5 is opened prior to the decrease in the load voltage VD.
  • the fifth switch SW5 has a high withstand voltage. Therefore, even if the load voltage VD becomes lower than the first negative withstand voltage Vth1 of the first and second switches SW1 and SW2, it is suppressed that the load voltage VD is applied to the first and second switches SW1 and SW2. Therefore, it is possible to prevent the applied voltage VX from becoming lower than the first negative withstand voltage Vth1 of the first and second switches SW1 and SW2.
  • the first and second switches SW1 and SW2 are opened in order to insulate the first system ES1 in which the abnormality has not occurred and the second system ES2 in which the abnormality has occurred due to the occurrence of the abnormality in the second system ES2.
  • high speed is required for the first and second switches SW1 and SW2 in order to quickly insulate the first system ES1 in which the abnormality has not occurred and the second system ES2 in which the abnormality has occurred.
  • the first and second switches SW1 and SW2 have high withstand voltage in addition to high speed, it is considered that they can withstand the surge voltage VS generated in the second system ES2.
  • a switch having high speed and high withstand voltage is used as the first and second switches SW1 and SW22
  • the fifth switch SW5 which has a higher withstand voltage than the first and second switches SW1 and SW2, is provided on the second system ES2 side of the first and second switches SW1 and SW2. prepare. Then, when the first and second switches SW1 and SW2 are opened, the third and fourth switches SW3 and SW4 are opened after the fifth switch SW5 is opened. In this case, the first and second switches SW1 and SW2 need only have high speed and do not need to have high withstand voltage, so that the cost burden of the power supply system 100 can be reduced.
  • the fifth switch SW5 is opened before the third and fourth switches SW3 and SW4 are opened, so that the third and fourth switches are opened. Even if a surge voltage VS is generated in the second system ES2 due to the opening of SW3 and SW4, the fifth switch SW5 having high withstand voltage causes an excessive decrease in the applied voltage VX of the first and second switches SW1 and SW2. It is suppressed. Therefore, it is possible to suppress an excessive decrease in the applied voltage VX of the first and second switches SW1 and SW2 while limiting the current IC in the second system.
  • High withstand voltage relays may be provided in the connection path LB and the second in-system path LA2, respectively.
  • the third switch portion 29 is provided between the connection point PB and the relay switch SMR in the second system internal path LA2.
  • the third switch unit 29 includes a sixth switch SW6.
  • the sixth switch SW6 corresponds to the "second cutoff switch".
  • a normally closed relay is used as the sixth switch SW6. Therefore, the sixth switch SW6 has a higher withstand voltage while having a slower switching speed than the third and fourth switches SW3 and SW4.
  • a negative surge voltage VS is generated in the second system ES2
  • the sixth switch SW6 has a negative withstand voltage lower than the peak value VP (see FIG. 14) of the surge voltage VS generated in the second system ES2.
  • the control device 40 generates a sixth switching signal SC6 in order to switch the sixth switch SW6, and outputs a command from the sixth switching signal SC6 to the sixth switch SW6. Then, in the control process, the load voltage VD is prevented from being applied to the third and fourth switches SW3 and SW4 by utilizing the high withstand voltage of the sixth switch SW6, so that the third and fourth switches due to the surge voltage VS are used.
  • the applied voltage VY of the switches SW3 and SW4 is not lower than the second negative withstand voltage Vth2 of the third and fourth switches SW3 and SW4.
  • FIG. 13 shows a flowchart of the control process of this modification.
  • the same processes as those shown in FIG. 10 above are given the same step numbers for convenience, and the description thereof will be omitted.
  • step S11 it is determined in step S40 whether or not the sixth switch SW6 is open. If a negative determination is made in step S40, the process proceeds to step S30. In step S30, it is determined whether or not the fifth switch SW5 is open. If a negative determination is made in step S30, a command for opening the first and second switches SW1 and SW2 in step S21 and opening the fifth switch SW5 in step S31 is output.
  • step S30 if an affirmative determination is made in step S30, that is, when the delay time YD elapses after the command to open the fifth switch SW5 is output, the command to open the sixth switch SW6 is output in step S41 to perform the control process. finish.
  • the 6th switch SW6 since the switching speed of the 6th switch SW6 is slower than that of the 3rd and 4th switches SW3 and SW4, the 6th switch SW6 is not opened immediately after the command output like the 3rd and 4th switches SW3 and SW4. It is released after the predetermined delay time YD has elapsed.
  • the delay time YD of the fifth switch SW5 is referred to as the first delay time YD1
  • the delay time YD of the sixth switch SW6 is referred to as the second delay time YD2 (see FIG. 14).
  • step S40 determines whether the second delay time YD2 elapses after the command to open the sixth switch SW6 is output. If an affirmative determination is made in step S40, that is, when the second delay time YD2 elapses after the command to open the sixth switch SW6 is output, the third and fourth switches SW3 and SW4 are opened and controlled in step S32. End the process.
  • FIG. 14 shows the transition between the applied voltage VY and the current IC in the second system in the control process of the present embodiment.
  • the applied voltage VY indicates the voltage applied to the terminal PF on the second load 36 side in the relay switch SMR.
  • FIG. 14 shows the transition of the open / closed state of the sixth switch SW6,
  • H shows the transition of the applied voltage VY and the load voltage VD, and
  • I shows the transition of the current IC in the second system. Show the transition.
  • the applied voltage VY is shown by a solid line
  • the load voltage VD is shown by a broken line.
  • (A) to (F) in FIG. 14 are the same as (A) to (F) in FIG.
  • the processing from time t1 to time t3 in FIG. 14 is the same as the processing from time t1 to time t3 in FIG. Therefore, duplicate explanations will be omitted.
  • a command to open the sixth switch SW6 is output.
  • the sixth switch SW6 is opened at the time t33 when the second delay time YD2 has elapsed from the time t32.
  • the third and fourth switches SW3 and SW4 are maintained in the closed state.
  • the third and fourth switches SW3 and SW4 are opened.
  • the first and second switches SW1 and SW2 are opened, while the third and fourth switches SW3 and SW4 are maintained in a closed state. Therefore, the current IC in the second system continues to flow, and the surge voltage VS does not occur in the second system ES2. Further, since the sixth switch SW6 is maintained in the closed state, the applied voltage VY is maintained at a voltage equal to the load voltage VD.
  • the sixth switch SW5 is opened at time t31, and the sixth switch SW6 is opened at time t33.
  • the applied voltage VY becomes a voltage different from the load voltage VD, and specifically becomes zero.
  • the current IC in the second system is stopped. By stopping the current IC in the second system, over-discharging of the second storage battery 16 can be suppressed.
  • a negative surge voltage VS is generated with this current stop, and the load voltage VD is lowered by the surge voltage VS.
  • the fifth and sixth switches SW5 and SW6 are opened prior to the decrease in the load voltage VD. Further, the fifth and sixth switches SW5 and SW6 have high withstand voltage. Therefore, even if the load voltage VD becomes lower than the first negative withstand voltage Vth1 of the first and second switches SW1 and SW2, it is suppressed that the load voltage VD is applied to the first and second switches SW1 and SW2. Therefore, it is possible to prevent the applied voltage VX from becoming lower than the first negative withstand voltage Vth1 of the first and second switches SW1 and SW2.
  • the fifth is higher withstand voltage than the first and second switches SW1 and SW2 on the second system ES2 side and the first and second switches SW1 and SW2.
  • the sixth switch SW6, which has a higher withstand voltage than the third and fourth switches SW3 and SW4, is provided between the connection point PB in the second system internal path LA2 and the third and fourth switches SW3 and SW4. Is provided. Then, when the first and second switches SW1 and SW2 are opened, the sixth switch SW6 is opened after the fifth switch SW5 is opened and before the third and fourth switches SW3 and SW4 are opened. I tried to do it.
  • connection point PG between the connection point PB and the relay switch SMR in the path LA2 in the second system and the grounding member GND that outputs the grounding voltage as the reference voltage.
  • the grounded path LD is provided with a seventh Zener diode (hereinafter referred to as a seventh Zener) DT7, which is different from the first embodiment.
  • the connection point PB is referred to as a first connection point PB
  • the connection point PG is referred to as a second connection point PG.
  • the ground voltage is higher than the negative withstand voltage Vth1 and Vth2 of the first to fourth switches SW1 to SW4, and in the present embodiment, the grounding member GND corresponds to the "reference voltage member".
  • the seventh Zener DT7 is arranged so that the direction from the grounding member GND toward the second connection point PG is the forward direction, that is, the anode is on the grounding member GND side and the cathode is on the second connection point PG side. .. Further, the yield voltage VZ of the 7th Zener DT7 is set to be lower than the positive withstand voltage Vth3 which is the withstand voltage on the positive voltage side of the 1st to 4th switches SW1 to SW4.
  • the control process of the present embodiment is equivalent to the control process of the second embodiment. That is, as shown in FIG. 6, in the control process, when the first and second switches SW1 and SW2 are opened in step S21, the relay switch SMR is opened in the subsequent step S26.
  • the 7th Zener DT7 is provided in the ground path LD, the load voltage VD rises beyond the positive withstand voltage Vth3 of the 1st to 4th switches SW1 to SW4, or the 1st to 4th switches. It is possible to suppress the decrease beyond the negative withstand voltage Vth1 and Vth2 of SW1 to SW4. The reason will be described with reference to FIG.
  • FIG. 16 shows the transition between the load voltage VD and the ground current ID in the control process of the present embodiment.
  • the ground current ID indicates a current flowing from the ground member GND to the second connection point PG via the ground path LD.
  • FIG. 16 shows the transition of the ground current ID.
  • (A) to (G) in FIG. 11 are the same as (A) to (G) in FIG.
  • FIGS. 16F and 16H each value when a positive surge voltage VS is generated in the second system ES2 is shown by a solid line, and when a negative surge voltage VS is generated in the second system ES2.
  • Each value of is indicated by a broken line.
  • the process from time t1 to time t3 in FIG. 16 is the same as the process from time t1 to time t3 in FIG. Therefore, duplicate explanations will be omitted.
  • a seventh Zener DT7 is provided between the second connection point PG and the ground contact member GND so that the direction from the ground contact member GND toward the second connection point PG is the forward direction.
  • the breakdown voltage VZ of the 7th Zener DT7 is set to be lower than the positive withstand voltage Vth3 of the 1st to 4th switches SW1 to SW4.
  • the rectifying function of the 7th Zener DT7 is lost, so that the applied voltages VX and XY of the 1st to 4th switches SW1 to SW4 are the 7th Zener. It is maintained at the breakdown voltage VZ of the DT7, and it is possible to prevent the applied voltages VX and XY from rising beyond the positive withstand voltage Vth3 of the first to fourth switches SW1 to SW4.
  • the ground voltage of the ground member GND is set to a voltage higher than the negative withstand voltage Vth1 and Vth2 of the first to fourth switches SW1 to SW4, when a negative surge voltage VS occurs in the second system ES2.
  • the rectifying function of the 7th Zener DT7 keeps the applied voltages VXX and XY of the 1st to 4th switches SW1 to SW4 at the ground voltage, and the applied voltages VX and XY are negative of the 1st to 4th switches SW1 to SW4. It is possible to suppress the decrease beyond the withstand voltage Vth1 and Vth2.
  • Each load 34, 36 may be, for example, the following device.
  • each of the first and second loads 34 and 36 is, for example, a three-phase permanent magnet synchronous motor and a three-phase inverter device.
  • each of the first and second loads 34 and 36 is, for example, an ABS actuator that can independently adjust the brake hydraulic pressure during braking.
  • each of the first and second loads 34 and 36 is, for example, a millimeter wave radar.
  • the loads 34 and 36 do not necessarily have to be a combination having the same configuration, and may be a combination that realizes the same function with devices of different types. Further, the first and second loads 34 and 36 may not be different loads but may be the same load. That is, the first and second loads 34 and 36 may be the same load that receives power from both the first in-system path LA1 and the second in-system path LA2.
  • the first power supply is not limited to the converter, but may be an alternator. Further, the first power supply may not have a converter, and may have, for example, only the first storage battery 14.
  • opening of the inter-system switch and the opening / closing control of the in-system switch are simultaneously performed, but the present invention is not limited to this.
  • opening / closing control of the in-system switch may be performed after a predetermined period after opening the inter-system switch.
  • a negative surge voltage is generated in the second system ES2
  • a positive surge voltage may be generated in the second system ES2.
  • a diode that is connected in parallel to the switch in the second system and has a forward direction from the connection point to the second power supply is provided, and when the switch between the systems is opened, the switch in the second system is opened. It is preferable that the switch in the first system is closed.
  • the duty ratio control of the third switch SW3 in the duty ratio control of the third switch SW3, an example in which the duty ratio is reduced as the elapsed time from the time t3 becomes longer is shown, but the present invention is not limited to this.
  • the duty ratio may be fixed to a value smaller than 1 regardless of the elapsed time from the time t3.
  • the bidirectional Zener diode 22 is used as the bidirectional diode, but the present invention is not limited to this, and the second Zener DT2 of the bidirectional Zener diodes 22 does not have to be a Zener diode. ..
  • a Zener diode having a breakdown voltage lower than the positive withstand voltage of the inter-system switch and the in-system switch is provided, and when the inter-system switch is opened, the surge voltage generated in the second system is lower than the breakdown voltage. Then, the switch in the system is opened to limit the current flowing from the second power supply to the second system, and when the surge voltage generated in the second system becomes higher than the breakdown voltage, the Zener diode causes the second power supply and the second system. It is preferable to remove the current limitation between them.
  • a bidirectional diode is composed of two diodes connected in series so that the forward directions are opposite to each other, and the bidirectional diode is connected in parallel to a switch in the system and is a bidirectional diode.
  • the diode whose forward direction is from the second power source to the connection point is preferably a Zener diode.
  • the cutoff switch is not limited to the relay, and may be a semiconductor switch such as a MOSFET as long as it has a higher withstand voltage than the intersystem switch.
  • the power supply system 100 is applied to a vehicle capable of traveling by manual driving and automatic driving, but the present invention is not limited to this. It may be applied to a vehicle that can only be driven by automatic driving, such as a fully autonomous vehicle, or may be applied to a vehicle that can only be driven by manual driving.
  • the loads 34 and 36 of the other system ES1 and ES2 in which the abnormality has not occurred are applied. It may be used to stop the running of the vehicle by automatic driving, or to stop the vehicle after moving it to a safe place.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Power Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Transportation (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

第1電源(10,12)から第1通電経路(LA1)を介して電気負荷(32)に電力を供給する第1系統(ES1)と、第2電源(16)から第2通電経路(LA2)を介して電気負荷に電力を供給する第2系統(ES2)と、接続経路(LB)に設けられた系統間スイッチ(SW1,SW2)と、を有する電源システム(100)であり、第2通電経路における接続経路との接続点(PB)と第2電源との間に系統内スイッチ(SMR)を備え、系統間スイッチ及び系統内スイッチを閉鎖した状態において第2系統で異常が発生したことを判定し、異常が発生したと判定された場合に系統間スイッチを開放し、系統間スイッチを開放する場合に、系統内スイッチの開閉を制御することにより第2電源から第2系統に流れる電流を制限するとともに、この電流制限に伴って第2系統に発生するサージ電圧による系統間スイッチの印加電圧の過剰な低下を抑制する。

Description

電源システム 関連出願の相互参照
 本出願は、2020年10月27日に出願された日本出願番号2020-180039号に基づくもので、ここにその記載内容を援用する。
 本開示は、電源システムに関する。
 近年、例えば車両に適用され、この車両の各種装置に電力を供給する電源システムが知られている。この電源システムでは、車両の運転時に、例えば電動ブレーキ装置や電動ステアリング装置など、車両の運転に必要な機能を実施する電気負荷に電力を供給する系統で異常が発生し、これによりその機能が失われてしまうと、車両の運転を継続することができない。車両の運転中における異常発生時でも、その機能が失われないようにするために、電気負荷に電力を供給する電源として第1電源及び第2電源を有する装置が知られている。
 この装置に適用される電源システムとして、例えば特許文献1では、電気負荷として第1負荷及び第2負荷を有し、第1通電経路を介して第1電源から第1負荷に電力を供給する第1系統と、第2通電経路を介して第2電源から第2負荷に電力を供給する第2系統と、を有するものが知られている。この電源システムでは、各通電経路を接続する接続経路に系統間スイッチが設けられており、系統間スイッチは、コントローラにより一方の系統で異常が発生したと判定された場合に開放される。これにより、異常が発生していない他方の系統では、電源から電気負荷への電力供給を確保し、電気負荷の動作を継続することが可能となる。
特許第5488046号公報
 上記電源システムにおいて、第2通電経路における接続経路との接続点と第2電源との間に系統内スイッチを設けることが考えられる。かかる構成では、いずれの系統でも異常が発生していない場合、系統間スイッチ及び系統内スイッチが閉鎖され、電気負荷に対して、第1電源及び第2電源による冗長的な電力供給が可能となる。一方、例えば第2系統での異常発生に伴い系統間スイッチが開放されると、第2電源の過放電を抑制するために系統内スイッチが開放されるが、第2系統に流れる電流の急激な減少により例えば第2系統に負のサージ電圧が発生し、このサージ電圧が系統間スイッチの負耐圧よりも低くなると、異常が発生していない第1系統と異常が発生した第2系統とを系統間スイッチにより絶縁することができず、第1系統において電気負荷が適正に作動しないことが懸念される。
 本開示は、上記課題を解決するためになされたものであり、その目的は、複数の電源系統を有する電源システムにおいて電気負荷への電力供給を適正に実施できる電源システムを提供することにある。
 上記課題を解決するための第1の手段は、第1電源から第1通電経路を介して電気負荷に電力を供給する第1系統と、第2電源から第2通電経路を介して前記電気負荷に電力を供給する第2系統と、前記第1通電経路と前記第2通電経路とを接続する接続経路に設けられた系統間スイッチと、を有する電源システムであって、前記第2通電経路における前記接続経路との接続点と前記第2電源との間に設けられた系統内スイッチと、前記系統間スイッチ及び前記系統内スイッチを閉鎖した状態において前記第2系統で異常が発生したことを判定する異常判定部と、前記異常判定部により異常が発生したと判定された場合に前記系統間スイッチを開放する状態制御部と、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチの開閉を制御することにより前記第2電源から前記第2系統に流れる電流を制限するとともに、この電流制限に伴って前記第2系統に発生するサージ電圧による前記系統間スイッチの印加電圧の過剰な低下を抑制する抑制部と、を備える。
 上記構成によれば、第1電源から第1通電経路を介して電気負荷に電力を供給する第1系統と第2電源から第2通電経路を介して電気負荷に電力を供給する第2系統とが設けられている。そのため、電気負荷に対して、第1電源及び第2電源による冗長的な電力供給が可能となる。また、第1,第2通電経路を互いに接続する接続経路に系統間スイッチが設けられている。そのため、いずれか一方の系統で異常が発生したと判定された場合には、系統間スイッチを開放することで、異常が発生していない他方の系統の電源からの電力供給により電気負荷の動作を継続することが可能となっている。
 ここで、第2通電経路における接続経路との接続点と第2電源との間には系統内スイッチが設けられており、第2系統での異常発生に伴い系統間スイッチが開放されると、第2電源の過放電を抑制するために系統内スイッチが開放されるが、第2電源から第2系統に流れる電流の急激な減少により例えば負のサージ電圧が発生する。この場合、発生した負のサージ電圧が系統間スイッチの負耐圧よりも低くなると、系統間スイッチにより第1系統と第2系統とを絶縁することができず、第1系統において電気負荷への電力供給を適正に実施できないことが懸念される。
 この点、上記構成では、系統間スイッチが開放される場合に、系統内スイッチの開閉を制御することにより第2電源から第2系統に流れる電流を制限するとともに、その電流制限に伴って第2系統に発生するサージ電圧による系統間スイッチの印加電圧の過剰な低下を抑制するようにした。第2系統での異常発生に伴い第2電源から第2系統に流れる電流が制限されることで、第2電源の過放電を抑制することができる。この電流制限に伴って第2系統にサージ電圧が発生するが、サージ電圧による系統間スイッチの印加電圧の過剰な低下が抑制されるため、電流制限に伴って第2系統にサージ電圧が発生した場合でも、系統間スイッチを適正に作動させることができる。これにより、第2系統での異常発生において電気負荷への電力供給を適正に実施することができる。
 第2の手段では、前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチの開閉を制御することにより前記第2電源から前記第2系統に流れる電流の減少速度を緩和する。
 第2系統に発生するサージ電圧の大きさは、第2系統に流れる電流の減少速度に比例する。上記構成では、第2電源から第2系統に流れる電流を制限する際に、系統内スイッチの開閉を制御することにより第2電源から第2系統に流れる電流の減少速度が緩和されるようにした。これにより、第2系統に発生するサージ電圧が抑制され、サージ電圧による系統間スイッチの印加電圧の過剰な低下を抑制することができる。
 第3の手段では、前記系統内スイッチは、直列に接続された第1系統内スイッチと第2系統内スイッチとを有しており、前記第1系統内スイッチに並列接続され、前記第2電源から前記接続点に向かう方向を順方向とするダイオードを備え、前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記第1系統内スイッチを開状態とするとともに前記第2系統内スイッチを閉状態とする。
 上記構成では、系統間スイッチが開放される場合に、第2系統に負のサージ電圧が発生すると、第2電源から第2系統に電流が流れ、その電流がダイオード及び第2系統内スイッチを介して流れる。この場合、ダイオードの順方向電圧により第2系統に流れる電流の減少速度が緩和され、系統間スイッチの印加電圧の過剰な低下を抑制することができる。
 第4の手段では、前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチのデューティー比を徐々に減少させる。
 上記構成では、系統間スイッチが開放される場合に、系統内スイッチのデューティー比を徐々に減少させる。これにより、第2系統に流れる電流の減少速度が緩和され、系統間スイッチの印加電圧の過剰な低下を抑制することができる。
 第5の手段では、前記制御部は、前記系統間スイッチ及び前記系統内スイッチの負耐圧よりも高い降伏電圧を有するツェナーダイオードを備え、前記状態制御部により前記系統間スイッチを開放する場合に、前記第2系統に発生するサージ電圧が前記降伏電圧よりも高いと、前記系統内スイッチを開放して前記第2電源から前記第2系統に流れる電流を制限し、前記第2系統に発生するサージ電圧が前記降伏電圧よりも低くなると、前記ツェナーダイオードにより前記第2電源と前記第2系統との間における電流の制限を解除する。
 第2系統に発生するサージ電圧は、第2電源から第2系統に流れる電流を制限することで発生し、第2電源と第2系統との間における電流の制限を解除することで低下が抑制される。上記構成では、系統間スイッチ及び系統内スイッチの負耐圧よりも高い降伏電圧を有するツェナーダイオードを備えており、系統間スイッチが開放される場合に、第2系統に発生するサージ電圧が降伏電圧よりも高いと、系統内スイッチを開放して第2電源から第2系統に流れる電流を制限する。一方、第2系統に発生するサージ電圧が降伏電圧よりも低くなると、ツェナーダイオードにより第2電源と第2系統との間における電流の制限を解除するようにした。これにより、第2系統に負のサージ電圧が発生した場合に、そのサージ電圧が系統間スイッチ及び系統内スイッチの負耐圧まで低下する前にサージ電圧の低下を抑制することができ、サージ電圧により系統間スイッチ及び系統間スイッチの印加電圧がこれらのスイッチの負耐圧を超えて低下することを抑制することができる。
 第6の手段では、順方向が互いに逆向きとなるように直列接続された2つのダイオードにより双方向ダイオードが構成されており、前記双方向ダイオードは、前記系統内スイッチに並列接続されており、前記双方向ダイオードを構成する2つのダイオードのうち、前記接続点から前記第2電源に向かう方向を順方向とするダイオードは、前記ツェナーダイオードである。
 上記構成では、系統内スイッチに並列接続された双方向ダイオードが設けられており、この双方向ダイオードを構成する2つのダイオードのうち、接続点から第2電源に向かう方向を順方向とするダイオードを、ツェナーダイオードにより構成するようにした。そのため、系統間スイッチが開放される場合に、第2系統に発生するサージ電圧が降伏電圧よりも高いと、開放された系統内スイッチ、及び双方向ダイオードの整流機能により、第2電源から第2系統に流れる電流が停止される。一方、第2系統に発生するサージ電圧が降伏電圧よりも低くなると、双方向ダイオードのうち、ツェナーダイオードの整流機能が失われることにより双方向ダイオードを介して第2電源から第2系統に電流が流れる。これにより、第2系統に負のサージ電圧が発生した場合に、そのサージ電圧の低下が抑止され、サージ電圧により系統間スイッチの印加電圧が系統内スイッチの負耐圧を超えて低下することを抑制することができる。
 第7の手段では、順方向が互いに逆向きとなるように直列接続された2つの前記ツェナーダイオードにより双方向ツェナーダイオードが構成されており、前記双方向ツェナーダイオードの一端は、前記系統内スイッチの一対の主端子のうちの一方の主端子に接続されており、前記双方向ツェナーダイオードの他端は、前記系統内スイッチの開閉制御端子に接続されている。
 上記構成では、2つのツェナーダイオードにより双方向ツェナーダイオードが設けられており、この双方向ツェナーダイオードの一端が、系統内スイッチの一対の主端子のうちの一方の主端子に接続され、双方向ツェナーダイオードの他端が、系統内スイッチの開閉制御端子に接続されるようにした。そのため、系統間スイッチが開放される場合に、第2系統に発生するサージ電圧が降伏電圧よりも高いと、双方向ツェナーダイオードの整流機能により、系統内スイッチが開放された状態に維持される。一方、第2系統に発生するサージ電圧が降伏電圧よりも低くなると、一方のツェナーダイオードの整流機能が失われることにより系統内スイッチが閉鎖され、系統内スイッチを介して第2系統から第2電源に電流が流れる。これにより、第2系統に負のサージ電圧が発生した場合に、そのサージ電圧の低下が抑止され、サージ電圧により系統間スイッチの印加電圧が系統内スイッチの耐圧を超えて低下することを抑制することができる。
 第8の手段では、前記接続経路において前記系統間スイッチよりも前記第2系統側に設けられ、前記系統間スイッチよりも高耐圧である遮断スイッチを備え、前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記遮断スイッチを開放した後に前記系統内スイッチを開放する。
 第2系統で異常が発生した場合に、異常が発生していない第1系統と異常が発生した第2系統とを素早く絶縁するために、系統間スイッチには高速性が要求される。系統間スイッチが高速性に加え高耐圧性を有していれば、第2系統に発生するサージ電圧に耐えることができるとも考えられる。しかし、系統間スイッチとして高速性及び高耐圧性を有するスイッチを使用する場合には、電源システムのコスト負担が大きくなることが懸念される。
 この点、上記構成では、接続経路において系統間スイッチよりも第2系統側に、系統間スイッチよりも高耐圧である遮断スイッチを設け、系統間スイッチが開放される場合に、遮断スイッチを開放した後に系統内スイッチを開放するようにした。この場合、系統間スイッチは高速性を有すればよく、高耐圧性を有する必要がないため、電源システムのコスト負担を軽減することができる。また、系統間スイッチが開放される場合に、系統内スイッチが開放される前に遮断スイッチを開放するようにしたため、系統内スイッチの開放に伴って第2系統にサージ電圧が発生しても、高耐圧性を有する遮断スイッチにより系統間スイッチの印加電圧の過剰な低下が抑制される。そのため、第2電源から第2系統に流れる電流を制限しつつ、系統間スイッチの印加電圧の過剰な低下を抑制することができる。
 第9の手段では、前記遮断スイッチは、第1遮断スイッチであり、前記第2通電経路における前記接続点と前記系統内スイッチとの間に設けられ、前記系統内スイッチよりも高耐圧である第2遮断スイッチを備え、前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記第1遮断スイッチを開放した後であり、且つ前記系統内スイッチを開放する前に前記第2遮断スイッチを開放する。
 上記構成では、接続経路において系統間スイッチよりも第2系統側に、系統間スイッチよりも高耐圧である第1遮断スイッチを設けるとともに、第2通電経路における接続点と系統内スイッチとの間に、系統内スイッチよりも高耐圧である第2遮断スイッチを設ける。そして、系統間スイッチが開放される場合に、第1遮断スイッチを開放した後であり、且つ系統内スイッチが開放される前に第2遮断スイッチを閉鎖するようにした。この場合、第2遮断スイッチの開放に伴って第2系統にサージ電圧が発生しても、高耐圧性を有する第1遮断スイッチにより系統間スイッチの印加電圧の過剰な低下が抑制される。また、高耐圧性を有する第2遮断スイッチにより系統内スイッチの印加電圧の過剰な低下が抑制される。そのため、第2電源から第2系統に流れる電流を制限しつつ、系統間スイッチ及び系統内スイッチの印加電圧の過剰な低下を抑制することができる。
 第10の手段では、前記接続点は第1接続点であり、前記抑制部は、前記第2通電経路における前記第1接続点と前記系統内スイッチとの間の第2接続点と、所定の基準電圧を出力する基準電圧部材との間に接続され、前記基準電圧部材から前記第2接続点に向かう方向を順方向とし、且つ前記系統間スイッチ及び前記系統内スイッチの正耐圧よりも低い降伏電圧を有するツェナーダイオードを備え、前記基準電圧は、前記系統間スイッチ及び前記系統内スイッチの負耐圧よりも高い電圧に設定されており、前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチを開放する。
 上記構成では、第2接続点と基準電圧部材との間に、基準電圧部材から第2接続点に向かう方向を順方向とするツェナーダイオードを設け、このツェナーダイオードの降伏電圧を系統間スイッチ及び系統内スイッチの正耐圧よりも低くなるようにした。これにより、第2系統に正のサージ電圧が発生した場合に、ツェナーダイオードの整流機能が失われることにより系統間スイッチ及び系統内スイッチの印加電圧がツェナーダイオードの降伏電圧に維持され、当該印加電圧がこれらのスイッチの正耐圧を超えて上昇することを抑制することができる。また、基準電圧部材の基準電圧を、系統間スイッチ及び系統内スイッチの負耐圧よりも高い電圧に設定するようにした。これにより、第2系統に負のサージ電圧が発生した場合に、ツェナーダイオードの整流機能により系統間スイッチ及び系統内スイッチの印加電圧が基準電圧に維持され、当該印加電圧がこれらのスイッチの負耐圧を超えて低下することを抑制することができる。
 本開示についての上記目的およびその他の目的、特徴や利点は、添付の図面を参照しながら下記の詳細な記述により、より明確になる。その図面は、
図1は、第1実施形態の電源システムの全体構成図であり、 図2は、第1実施形態の制御処理の手順を示すフローチャートであり、 図3は、第1実施形態の制御処理の一例を示すタイムチャートであり、 図4は、第1実施形態の変形例における制御処理の手順を示すフローチャートであり、 図5は、第2実施形態の電源システムの全体構成図であり、 図6は、第2実施形態の制御処理の手順を示すフローチャートであり、 図7は、第2実施形態の制御処理の一例を示すタイムチャートであり、 図8は、第1実施形態の変形例における電源システムの全体構成図であり、 図9は、第3実施形態の電源システムの全体構成図であり、 図10は、第3実施形態の制御処理の手順を示すフローチャートであり、 図11は、第3実施形態の制御処理の一例を示すタイムチャートであり、 図12は、第3実施形態の変形例における電源システムの全体構成図であり、 図13は、第3実施形態の変形例における制御処理の手順を示すフローチャートであり、 図14は、第3実施形態の変形例における制御処理の一例を示すタイムチャートであり、 図15は、第4実施形態の電源システムの全体構成図であり、 図16は、第4実施形態の制御処理の一例を示すタイムチャートである。
 (第1実施形態)
 以下、本開示に係る電源システムを車載の電源システム100として具体化した実施形態について、図面を参照しつつ説明する。
 図1に示すように、電源システム100は、一般負荷30及び特定負荷32に電力を供給するシステムである。電源システム100は、高圧蓄電池10と、DCDCコンバータ(以下、コンバータ)12と、第1蓄電池14と、第2蓄電池16と、スイッチ部20と、リレースイッチSMR(システムメインリレースイッチ)と、制御装置40と、を備えている。
 高圧蓄電池10は、第1,第2蓄電池14,16よりも高い定格電圧(例えば数百V)を有しており、例えばリチウムイオン蓄電池である。コンバータ12は、高圧蓄電池10から供給される電力を電源電圧VAの電力に変換して、一般負荷30及び特定負荷32に供給する電圧生成部である。本実施形態では、電源電圧VAは、一般負荷30及び特定負荷32の駆動を可能にする電圧である。
 一般負荷30は、移動体としての車両において運転制御に用いられない電気負荷(以下、単に負荷)であり、例えばエアコン、オーディオ装置、パワーウィンドウ等である。
 一方、特定負荷32は、車両の運転制御に用いられる少なくとも1つの機能を実施する負荷であり、例えば車両の操舵を制御する電動パワーステアリング装置50、車輪に制動力を付与する電動ブレーキ装置51、車両周囲の状況を監視する走行制御装置52等である。なお、本実施形態において、特定負荷32が「電気負荷」に相当する。
 そのため、これらの特定負荷32に異常が発生し、その機能の全てが失われると、運転制御を行うことができない。そのため、特定負荷32では、異常が発生した場合でもその機能の全てが失われないようにするため、機能毎に冗長に設けられた第1負荷34と第2負荷36とを有している。具体的には、電動パワーステアリング装置50は、第1ステアリングモータ50Aと第2ステアリングモータ50Bとを有している。電動ブレーキ装置51は、第1ブレーキ装置51Aと第2ブレーキ装置51Bとを有している。走行制御装置52は、カメラ52Aとレーザレーダ52Bとを有している。第1ステアリングモータ50Aと第1ブレーキ装置51Aとカメラ52Aとが、第1負荷34に相当し、第2ステアリングモータ50Bと第2ブレーキ装置51Bとレーザレーダ52Bとが、第2負荷36に相当する。
 第1負荷34と第2負荷36とは、併せて1つの機能を実現するものであるが、それぞれ単独でもその機能の一部を実現可能なものである。例えば電動パワーステアリング装置50では、第1ステアリングモータ50Aと第2ステアリングモータ50Bとにより車両の自由な操舵が可能であり、操舵速度や操舵範囲等に一定の制限がある中で、各ステアリングモータ50A,50Bにより車両の操舵が可能である。
 各特定負荷32は、手動運転において、ドライバによる制御を支援する機能を実現する。また、各特定負荷32は、車両の走行や停止などの挙動を自動で制御する自動運転において、自動運転に必要な機能を実現する。そのため、特定負荷32は、車両の運転に必要な少なくとも1つの機能を実施する負荷ともいうことができる。
 第1負荷34は、第1系統内経路LA1を介してコンバータ12に接続されており、コンバータ12から第1系統内経路LA1を介して第1負荷34に電力が供給される。そして、この第1系統内経路LA1に第1蓄電池14及び一般負荷30が接続されている。第1蓄電池14は、例えば鉛蓄電池である。本実施形態では、第1系統内経路LA1により接続されたコンバータ12、第1蓄電池14、一般負荷30及び第1負荷34により、第1系統ES1が構成されている。第1系統内経路LA1には、第1系統ES1のインダクタンス成分ZA1が示されている。なお、本実施形態において、第1系統内経路LA1が「第1通電経路」に相当し、高圧蓄電池10及びコンバータ12が「第1電源」に相当する。
 また、第2負荷36は、第2系統内経路LA2を介して第2蓄電池16に接続されており、第2蓄電池16から第2系統内経路LA2を介して第2負荷36に電力が供給される。第2蓄電池16は、例えばリチウムイオン蓄電池である。本実施形態では、第2系統内経路LA2により接続された第2蓄電池16及び第2負荷36により、第2系統ES2が構成されている。第2系統内経路LA2には、第2系統ES2のインダクタンス成分ZA2が示されている。なお、本実施形態において、第2系統内経路LA2が「第2通電経路」に相当し、第2蓄電池16が「第2電源」に相当する。
 スイッチ部20は、第1系統内経路LA1と第2系統内経路LA2とを接続する接続経路LBに設けられている。接続経路LBの一端は、接続点PAにおいて第1系統内経路LA1に接続されており、接続経路LBの他端は、接続点PBにおいて第2系統内経路LA2と接続されている。スイッチ部20は、直列接続された第1スイッチSW1と第2スイッチSW2とを備えている。スイッチ部20において、第1スイッチSW1は、第2スイッチSW2よりも第1系統ES1側に設けられている。なお、本実施形態において、第1スイッチSW1及び第2スイッチSW2が「系統間スイッチ」に相当する。
 本実施形態では、第1,第2スイッチSW1,SW2として、NチャネルMOSFET(以下、単にMOSFET)が用いられている。そのため、第1スイッチSW1には第1寄生ダイオードDA1が並列接続されており、第2スイッチSW2には第2寄生ダイオードDA2が並列接続されている。本実施形態では、第1,第2寄生ダイオードDA1,DA2の向きが互いに逆向きとなるように、第1,第2スイッチSW1,SW2が直列接続されている。詳細には、第1寄生ダイオードDA1は、アノードを第2系統ES2側、カソードを第1系統ES1側となるように配置されている。また、第2寄生ダイオードDA2は、アノードを第1系統ES1側、カソードを第2系統ES2側となるように配置されている。
 第1系統内経路LA1には、第1電流検出部27が設けられており、接続経路LBには、第2電流検出部28が設けられている。第1電流検出部27は、第1系統内経路LA1のうち接続点PAと第1負荷34との間の部分に設けられており、当該部分に流れる第1系統内電流IAの大きさ及び向きを検出する。第2電流検出部28は、接続経路LBのうちスイッチ部20よりも第1系統ES1側の部分に設けられており、当該部分に流れる系統間電流IBの大きさ及び向きを検出する。
 リレースイッチSMRは、第2系統内経路LA2における接続点PBと第2蓄電池16との間の部分に設けられており、第2系統内経路LA2における当該部分を開放又は閉鎖する。リレースイッチSMRの開閉により、第2蓄電池16から第2系統ES2に流れる電流が制御される。
 制御装置40は、第1,第2電流検出部27,28の検出値に基づいて、第1,第2スイッチSW1,SW2を切替操作すべく、第1,第2切替信号SC1,SC2を生成し、第1,第2切替信号SC1,SC2による指令を第1,第2スイッチSW1,SW2に出力する。また、制御装置40は、第1,第2電流検出部27,28の検出値に基づいて、リレースイッチSMRを切替操作する。さらに、制御装置40は、コンバータ12を動作制御すべく、制御信号SDを生成し、制御信号SDによる指令をコンバータ12に出力する。制御信号SDにより、コンバータ12の動作状態と動作停止状態とが切り替えられる。
 また、制御装置40は、報知部44と、IGスイッチ45と、入力部46とに接続されており、これらを制御する。報知部44は、視覚または聴覚的にドライバに報知する装置であり、例えば車室内に設置されたディスプレイやスピーカである。IGスイッチ45は、車両の起動スイッチである。制御装置40は、IGスイッチ45の開放又は閉鎖を監視する。入力部46は、ドライバの操作を受け付ける装置であり、例えばハンドル、レバー、ボタン、ペダル、音声入力装置である。
 制御装置40は、上述した特定負荷32を用いて車両を手動運転及び自動運転する。制御装置40は、CPU、ROM、RAM、フラッシュメモリ等からなる周知のマイクロコンピュータを備えている。CPUは、ROM内の演算プログラムや制御データを参照して、手動運転及び自動運転するための種々の機能を実現する。
 なお、手動運転とは、入力部46を用いたドライバの操作によって車両を運転制御する状態を表す。また、自動運転とは、ドライバの操作によらず制御装置40による制御内容で車両を運転制御する状態を表す。具体的には、自動運転とは、米国運輸省道路交通安全局(NHTSA)によって定められたレベル0からレベル5までの自動運転レベルのうち、レベル3以上の自動運転のことをいう。レベル3は、制御装置40が、走行環境を観測しつつ、ハンドル操作と加減速との両方を制御するレベルである。
 ところで、第2系統ES2での異常発生に伴い第1,第2スイッチSW1,SW2が開放されると、第2系統ES2において、第2蓄電池16の過放電を抑制するためにリレースイッチSMRが開放される。しかし、リレースイッチSMRの開放に伴って第2蓄電池16から第2系統ES2に流れる電流である第2系統内電流ICが急激に減少すると、例えば第2系統ES2のインダクタンス成分ZA2(以下、単に第2系統ES2)に負のサージ電圧VSが発生する。そして、このサージ電圧VSが第1,第2スイッチSW1,SW2の負電圧側の耐圧である負耐圧Vthよりも低くなると、第1,第2スイッチSW1,SW2により異常が発生していない第1系統ES1と異常が発生した第2系統ES2とを絶縁することができず、第1系統ES1において第1負荷34が適正に作動しないことが懸念される。
 本実施形態では、制御処理において、第1,第2スイッチSW1,SW2が開放される場合に、リレースイッチSMRの開閉を制御することにより第2系統内電流ICを制限するとともに、この電流制限に伴って第2系統ES2に発生するサージ電圧VSによる第1,第2スイッチSW1,SW2の印加電圧の過剰な低下を抑制するようにした。具体的には、第1,第2スイッチSW1,SW2が開放された場合に、リレースイッチSMRの開閉を制御することにより第2系統内電流ICを減少させつつその減少速度を緩和し、サージ電圧VSによる第1,第2スイッチSW1,SW2の印加電圧が第1,第2スイッチSW1,SW2の負耐圧Vthよりも低くならないようにした。
 リレースイッチSMRは、直列接続された第3スイッチSW3と第4スイッチSW4とを備えている。リレースイッチSMRにおいて、第3スイッチSW3は、第4スイッチSW4よりも第2蓄電池16側に設けられている。なお、本実施形態において、リレースイッチSMRが「系統内スイッチ」に相当し、第3スイッチSW3が「第2系統内スイッチ」に相当し、第4スイッチSW4が「第1系統内スイッチ」に相当する。
 本実施形態では、第3,第4スイッチSW3,SW4として、MOSFETが用いられている。そのため、第3スイッチSW3には第3寄生ダイオードDA3が並列接続されており、第4スイッチSW4には第4寄生ダイオードDA4が並列接続されている。本実施形態では、第3,第4寄生ダイオードDA3,DA4の向きが互いに逆向きとなるように、第3,第4スイッチSW3,SW4が直列接続されている。詳細には、第3寄生ダイオードDA3は、アノードを接続点PB側、カソードを第2蓄電池16側となるように配置されている。また、第4寄生ダイオードDA4は、アノードを第2蓄電池16側、カソードを接続点PB側となるように配置されている。つまり、第4寄生ダイオードDA4は、第2蓄電池16から接続点PBに向かう向きを順方向とするように配置されている。
 制御装置40は、第3,第4スイッチSW3,SW4を切替操作すべく、第3,第4切替信号SC3,SC4を生成し、第3,第4切替信号SC3,SC4による指令を第3,第4スイッチSW3,SW4に出力する。そして、制御処理では、第1,第2スイッチSW1,SW2が開放された場合に、リレースイッチSMRの開閉制御として、第3スイッチSW3を閉鎖するとともに、第4スイッチSW4を開放するようにした。
 この場合、第2系統内電流ICは、第3スイッチSW3及び第4寄生ダイオードDA4を介して流れ、第4寄生ダイオードDA4が有する順方向電圧VEにより第2系統内電流ICが制限される。これにより、第2蓄電池16の過放電を抑制することができる。この電流制限に伴って第2系統ES2にサージ電圧VSが発生するが、第4寄生ダイオードDA4による第2系統内電流ICの制限効果は小さいため、上記制限に伴う第2系統内電流ICの減少速度は緩和される。そのため、電流制限に伴って第2系統ES2にサージ電圧VSが発生した場合でも、第3,第4スイッチSW3,SW4を適正に作動させることができる。これにより、第2系統ES2での異常発生において第1負荷34への電力供給を適正に実施することができる。
 図2に、本実施形態の制御処理のフローチャートを示す。制御装置40は、IGスイッチ45が閉鎖されると、所定の制御周期毎に制御処理を繰り返し実施する。なお、IGスイッチ45の閉鎖当初において、第1~第4スイッチSW1~SW4は閉鎖されており、コンバータ12は動作状態とされている。
 制御処理を開始すると、ステップS10,S11において、第1系統ES1及び第2系統ES2のいずれか一方で異常が発生したか否かを判定する。具体的には、ステップS10において、第1系統ES1に異常が発生したか否かを判定する。ステップS10で否定判定すると、ステップS11において、第2系統ES2に異常が発生したか否かを判定する。なお、本実施形態において、ステップS11の処理が「異常判定部」に相当する。また、本実施形態において、異常は、地絡や断線等の電源失陥異常である。
 なお、異常の発生は、第1,第2電流検出部27,28で検出される各電流IA,IBの大きさにより判定することができる。例えば第1系統ES1で地絡が発生した場合、第1電流検出部27で検出される第1系統内電流IAの大きさは、地絡判定のための所定の電流閾値Ith以上となる。また例えば第2系統ES2で地絡が発生した場合、第2電流検出部28で検出される系統間電流IBの大きさは、電流閾値Ith以上となる。したがって、第1,第2電流検出部27,28で検出される各電流IA,IBの大きさにより、どちらの系統ES1,ES2で異常が発生したかを判定することができる。
 いずれの系統ES1,ES2でも異常が発生していないと判定された場合、ステップS11で否定判定する。この場合、制御処理を終了する。これにより、コンバータ12及び第1,第2蓄電池14,16による第1,第2負荷34,36への冗長的な電力供給が実施され、第1,第2負荷34,36は協働して運転制御に必要な1つの機能を実施する。
 一方、いずれか一方の系統ES1,ES2で異常が発生したと判定された場合、異常が発生した系統側への電力供給を停止させるとともに、異常が発生していない系統の電気負荷への電力供給を継続させる処理を実施する。
 具体的には、ステップS10で肯定判定すると、まずステップS12において、第1,第2スイッチSW1,SW2を開放する。第1,第2スイッチSW1,SW2は、高速スイッチング動作が可能であり、この第1,第2スイッチSW1,SW2の高速スイッチング動作により、異常が発生した第1系統ES1と異常が発生していない第2系統ES2とを素早く絶縁することができる。
 続くステップS13では、コンバータ12を動作停止状態とする指令を出力し、ステップS14に進む。コンバータ12を動作停止状態とすると、コンバータ12から第1系統ES1に流れる電流の急激な減少により第1系統ES1のインダクタンス成分ZA1(以下、単に第1系統ES1)に例えば負のサージ電圧VSが発生する。そこで、ステップS13では、コンバータ12の状態を制御することにより、コンバータ12から第1系統ES1に流れる電流を徐々に減少させ、サージ電圧VSによる第1,第2スイッチSW1,SW2の印加電圧が第1,第2スイッチSW1,SW2の負耐圧Vthよりも低くならないようにする。
 ステップS14では、報知部44を介して、ドライバに第1系統ES1及び第2系統ES2のいずれか一方で異常が発生したことをドライバに知らせ、制御処理を終了する。
 また、ステップS11で肯定判定すると、まずステップS20において、第4スイッチSW4が閉鎖されているか否かを判定する。ステップS20で肯定判定すると、ステップS21に進む。一方、ステップS20で否定判定すると、ステップS23に進む。
 ステップS21では、第1,第2スイッチSW1,SW2を開放する。続くステップS22では、リレースイッチSMRのうち第4スイッチSW4のみを開放し、ステップS14に進む。本実施形態では、第1,第2スイッチSW1,SW2を開放すると、第2系統ES2に負のサージ電圧VSが発生し、このサージ電圧VSにより、第2系統内電流ICは、第3スイッチSW3及び第4寄生ダイオードDA4を介して流れる。なお、本実施形態において、ステップS20の処理が「状態制御部」に相当し、ステップS22の処理が「抑制部」に相当する。
 一方、ステップS23では、つまり、以前に実施された制御処理において第4スイッチSW4が開放されている場合、第3スイッチSW3を開放する所定の開放条件が成立したか否かを判定する。開放条件は、例えば第4スイッチSW4が開放されてからの経過時間が所定の時間閾値Ythよりも長くなったとの条件や、第2蓄電池16の温度が所定の温度閾値Tthよりも高くなったとの条件である。
 開放条件が成立していないと判定された場合、ステップS23で否定判定する。この場合、制御処理を終了する。一方、開放条件が成立していると判定された場合、ステップS23で肯定判定する。この場合、ステップS24において、第4スイッチSW4を開放し、つまり、リレースイッチSMRを開放し、制御処理を終了する。
 続いて、図3に、制御処理の一例を示す。図3は、車両走行中に第2系統ES2で地絡異常(以下、単に地絡)が発生した場合における負荷電圧VDと第2系統内電流ICとの推移を示す。ここで負荷電圧VDは、第2負荷36に印加される電圧を示し、具体的には第2系統ES2における接続点PBの電圧を示す。そのため、第2系統ES2で地絡が発生する前において、負荷電圧VDは電源電圧VAとなり、第2系統ES2で地絡が発生した後において、負荷電圧VDはサージ電圧VSとなる。なお、本実施形態において、負荷電圧VDは「印加電圧」の一例である。
 図3において、(A)は、IGスイッチ45の開閉状態の推移を示し、(B)は、第1スイッチSW1の開閉状態の推移を示し、(C)は、第2スイッチSW2の開閉状態の推移を示し、(D)は、第3スイッチSW3の開閉状態の推移を示し、(E)は、第4スイッチSW4の開閉状態の推移を示す。また、(F)は、負荷電圧VDの推移を示し、(G)は、第2系統内電流ICの推移を示す。
 図3に示すように、時刻t1までのIGスイッチ45の開期間、つまり電源システム100の休止状態において、第1~第4スイッチSW1~SW4が開放されており、コンバータ12が動作停止状態に切り替えられている。そのため、IGスイッチ45の開期間では、負荷電圧VD及び第2系統内電流ICがゼロとなる。
 時刻t1にIGスイッチ45が閉鎖されると、第1,第2スイッチSW1,SW2が閉鎖されるとともに、コンバータ12を動作状態に切り替える指令が出力される。これにより、コンバータ12が動作状態に切り替えられ、電源電圧VAの上昇に伴い負荷電圧VDが所定の動作電圧VMまで上昇し、車両の走行が可能となる。ここで動作電圧VMは、第1,第2負荷34,36の駆動電圧範囲内の電圧である。
 また、時刻t1に第3,第4スイッチSW3,SW4が閉鎖される。これにより、コンバータ12からの電力供給により第2蓄電池16が充電される。なお、第2系統内電流ICは、第2蓄電池16から第2系統ES2に流れる電流とされているため、第2蓄電池16が充電される場合には、第2系統内電流ICは負の値となる。
 車両の走行中に、第1系統ES1及び第2系統ES2のいずれか一方で地絡が発生したか否かが判定される。いずれの系統ES1,ES2でも地絡が発生していないと判定された場合、第1~第4スイッチSW1~SW4が閉鎖された状態に維持される。これにより、コンバータ12及び第1蓄電池14のそれぞれから第1,第2負荷34,36に電力供給が可能となる。コンバータ12からの電力供給により、長時間の自動運転時にも継続的な電力供給が可能となり、第1蓄電池14からの電力供給により、電圧変動の少ない電力供給が可能となる。その結果、時刻t1から時刻t2までの期間では、第1負荷34と第2負荷36とを用いた手動運転及び自動運転が行われる。
 いずれか一方の系統ES1,ES2で地絡が発生したと判定された場合、第1~第4スイッチSW1~SW4の開閉が制御される。図3では、時刻t2に第2系統ES2で地絡が発生する。これにより、負荷電圧VDが低下する。
 また、系統間電流IBが上昇し、その後の時刻t3に、系統間電流IBが電流閾値Ith以上となる。これにより、第2系統ES2で地絡が発生したと判定される。この場合、時刻t3に、第1,第2スイッチSW1,SW2が開放される。これにより、地絡が発生していない第1系統ES1と地絡が発生した第2系統ES2とを絶縁することができ、第1系統ES1において、第1負荷34への電力供給を適正に実施することができる。
 また、この時刻t3に、第2蓄電池16の過放電を抑制するために、第3,第4スイッチSW3,SW4の開閉が制御され、第2系統内電流ICが制限される。この電流制限に伴って第2系統ES2にサージ電圧VSが発生する。図3(D),(G)に破線で示すように、第2蓄電池16の過放電を抑制するために、時刻t3に第3,第4スイッチSW3,SW4が共に開放されると、第2系統内電流ICが急激に減少する。第2系統ES2に発生するサージ電圧VSの大きさは、第2系統ES2に流れる電流の減少速度に比例する。そのため、第2系統内電流ICが急激に減少すると、図3(F)に破線で示すように、負荷電圧VDが第1,第2スイッチSW1,SW2の負耐圧Vthよりも低くなり、第1,第2スイッチSW1,SW2により地絡が発生していない第1系統ES1と地絡が発生した第2系統ES2とを絶縁することができない。
 そこで、本実施形態では、図3(C),(D)に実線で示すように、時刻t3にリレースイッチSMRのうち第4スイッチSW4のみが閉鎖される。そのため、第2系統内電流ICは、第3スイッチSW3及び第4寄生ダイオードDA4を介して流れ、第4寄生ダイオードDA4が有する順方向電圧VEにより第2系統内電流ICが制限される。これにより、第2蓄電池16の過放電を抑制することができる。
 一方、第4寄生ダイオードDA4による第2系統内電流ICの制限効果は小さいため、上記制限に伴い第2系統内電流ICは減少するが、その減少速度が緩和される(図3(G)の実線参照)。これにより、サージ電圧VSの過剰な低下が抑制され、図3(F)に実線で示すように、負荷電圧VDが第1,第2スイッチSW1,SW2の負耐圧Vthよりも低くなることを抑制することができる。
 その後、時刻t4に、第3スイッチSW3の開放条件が成立すると、第3スイッチSW3が開放される。
 以上詳述した本実施形態によれば、以下の効果が得られるようになる。
 ・第2系統ES2での異常発生に伴い、異常が発生していない第1系統ES1と異常が発生した第2系統ES2とを絶縁するために、第1,第2スイッチSW1,SW2が開放される。本実施形態では、第1,第2スイッチSW1,SW2が開放される場合に、第3,第4スイッチSW3,SW4の開閉を制御することにより第2系統内電流ICを制限するとともに、その電流制限に伴って第2系統ES2に発生するサージ電圧VSによる負荷電圧VDの過剰な低下を抑制するようにした。第2系統内電流ICが制限されることで、第2蓄電池16の過放電を抑制することができる。この電流制限に伴って第2系統ES2にサージ電圧VSが発生するが、本実施形態では、サージ電圧VSによる負荷電圧VDの過剰な低下が抑制されるため、電流制限に伴って第2系統ES2にサージ電圧VSが発生した場合でも、第1,第2スイッチSW1,SW2を適正に作動させることができる。これにより、第1系統ES1において、第1負荷34への電力供給を適正に実施することができる。
 ・本実施形態では、第2系統内電流ICを制限する際に、第3,第4スイッチSW3,SW4の開閉を制御することにより第2系統内電流ICの減少速度が緩和されるようにした。第2系統ES2に発生するサージ電圧VSの大きさは、第2系統内電流ICを含む第2系統ES2に流れる電流の減少速度に比例する。そのため、第2系統内電流ICの減少速度が緩和されることで、第2系統ES2に発生するサージ電圧VSが抑制され、サージ電圧VSによる負荷電圧VDの過剰な低下を抑制することができる。
 ・具体的には、第1,第2スイッチSW1,SW2が開放される場合に、第4スイッチSW4を開状態とするとともに第3スイッチSW3を閉状態とするようにした。この場合、第2系統ES2に負のサージ電圧VSが発生すると、第2系統内電流ICは、第3スイッチSW3及び第4寄生ダイオードDA4を介して流れる。これにより、第4寄生ダイオードDA4の順方向電圧VEにより第2系統ES2に流れる電流の減少速度が緩和され、負荷電圧VDの過剰な低下を抑制することができる。
 (第1実施形態の変形例)
 時刻t3から時刻t4までの期間において、第3スイッチSW3のデューティー比を制御することで、第2系統内電流ICの減少速度を緩和してもよい。ここでデューティー比は、開閉が制御される第3スイッチSW3の規定周期に対する第3スイッチSW3の閉鎖時間の比率を意味する。
 図4に示すように、本変形例の制御処理では、ステップS22で第4スイッチSW4が開放されると、ステップS25に進む。ステップS25では、第3スイッチSW3のデューティー比制御を実施し、ステップS14に進む。第3スイッチSW3のデューティー比制御では、時刻t3からの経過時間が長くなるほどデューティー比を減少させるとともに、デューティー比の減少速度を緩和するようにした。つまり、デューティー比を徐々に減少させるようにした。これにより、第2系統ES2に流れる電流の減少速度が緩和され、負荷電圧VDの過剰な低下を抑制することができる。
 (第2実施形態)
 以下、第2実施形態について、第1実施形態との相違点を中心に図5~図7を参照しつつ説明する。
 本実施形態では、リレースイッチSMRに並列接続された双方向ツェナーダイオード22が設けられる点で、第1実施形態と異なる。図5に示すように、本実施形態では、第2系統ES2における接続点PBと第2蓄電池16との間に、互いに並列に設けられた第1経路LC1及び第2経路LC2が設けられており、この第1経路LC1にリレースイッチSMRが設けられており、第2経路LC2に双方向ツェナーダイオード22が設けられている。なお、図5では、リレースイッチSMRが簡略化して示されている。本実施形態において、双方向ツェナーダイオード22が「双方向ダイオード」の一例である。
 双方向ツェナーダイオード22は、第1ツェナーダイオード(以下、第1ツェナー)DT1と第2ツェナーダイオード(以下、第2ツェナー)DT2とを備えており、第1,第2ツェナーDT1,DT2の向きが互いに逆向きとなるように、第1,第2ツェナーDT1,DT2が直列接続されている。詳細には、第1ツェナーDT1は、第2ツェナーDT2よりも第2蓄電池16側に設けられており、アノードを接続点PB側、カソードを第2蓄電池16側となるように配置されている。また、第2ツェナーDT2は、アノードを第2蓄電池16側、カソードを接続点PB側となるように配置されている。つまり、第1ツェナーDT1は、接続点PBから第2蓄電池16に向かう向きを順方向とするように配置されている。
 第1,第2ツェナーDT1,DT2は、同一の降伏電圧VZを有している。本実施形態では、第1,第2ツェナーDT1,DT2の降伏電圧VZが、第1,第2スイッチSW1,SW2の負耐圧Vth及び第3,第4スイッチSW3,SW4の負耐圧Vthよりも高くなるように設定されている。以下では、区別のために第1,第2スイッチSW1,SW2の負耐圧Vthを第1負耐圧Vth1と呼び、第3,第4スイッチSW3,SW4の負耐圧Vthの負耐圧Vthを第2負耐圧Vth2と呼ぶ。
 図6に、本実施形態の制御処理のフローチャートを示す。図6に示すように、本実施形態の制御処理では、ステップS21で第1,第2スイッチSW1,SW2が開放される場合に、続くステップS26において、リレースイッチSMRが開放される。本実施形態では、第2経路LC2に双方向ツェナーダイオード22が設けられていることで、負荷電圧VDが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2を超えて低下することを抑制することができる。その理由を、図7を用いて説明する。
 図7に、本実施形態の制御処理における負荷電圧VDと第2系統内電流ICとの推移を示す。なお、図7における(A)~(G)は、図3における(A)~(G)と同一である。また、図7における時刻t1から時刻t3までの処理は、図3における時刻t1から時刻t3までの処理と同一である。そのため、重複した説明を省略する。
 図7に示すように、時刻t3に、第1,第2スイッチSW1,SW2が開放されると、この時刻t3に、リレースイッチSMRが開放され、第2系統内電流ICが制限される。本実施形態では、この電流制限に伴って第2系統ES2に負のサージ電圧VSが発生する。時刻t3から時刻t11までの期間では、第2系統ES2に発生するサージ電圧VSが降伏電圧VZよりも高い。そのため、開放されたリレースイッチSMR及び第1,第2ツェナーDT1,DT2の整流機能により、第2系統内電流ICが停止される。第2系統内電流ICが停止されることで、第2蓄電池16の過放電を抑制することができる。
 一方、この電流停止に伴ってサージ電圧VSが低下し、サージ電圧VSにより負荷電圧VDが低下する。図7(F),(G)に破線で示すように、電流停止に伴う第2系統内電流ICの急激な減少により、負荷電圧VDが第1,第2スイッチSW1,SW2の第1負耐圧Vth1よりも低くなると、第1,第2スイッチSW1,SW2により地絡が発生していない第1系統ES1と地絡が発生した第2系統ES2とを絶縁することができない。また、電流停止に伴う第2系統内電流ICの急激な減少により、負荷電圧VDが第3,第4スイッチSW3,SW4の第2負耐圧Vth2よりも低くなると、第3,第4スイッチSW3,SW4により第2蓄電池16の過放電を抑制することができない。
 本実施形態では、時刻t11に、サージ電圧VSが降伏電圧VZよりも低くなると、第1,第2ツェナーDT1,DT2のうち、第1ツェナーDT1の整流機能が失われることにより双方向ツェナーダイオード22を介して正の第2系統内電流IC、つまり第2蓄電池16から第2系統ES2に電流が流れる(図7(G)の実線参照)。これにより、図7(F)に実線で示すように、負荷電圧VDが降伏電圧VZに維持されてサージ電圧VSの低下が抑制され、負荷電圧VDが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2よりも低くなることを抑制することができる。
 その後、時刻t12に、サージ電圧VSが降伏電圧VZよりも高くなると、第1,第2ツェナーDT1,DT2の整流機能により再び第2系統内電流ICが停止される。
 以上詳述した本実施形態によれば、以下の効果が得られるようになる。
 ・本実施形態では、第1,第2スイッチSW1,SW2の第1負耐圧Vth1及び第3,第4スイッチSW3,SW4の第2負耐圧Vth2よりも高い降伏電圧VZを有する第1ツェナーDT1を備えており、第1,第2スイッチSW1,SW2が開放される場合に、第2系統ES2に発生するサージ電圧VSが降伏電圧VZよりも高いと、リレースイッチSMRを開放して第2系統内電流ICを制限する。一方、第2系統ES2に発生するサージ電圧VSが降伏電圧VZよりも低くなると、第1ツェナーDT1により第2系統内電流ICの制限を解除するようにした。これにより、第2系統ES2に負のサージ電圧VSが発生した場合に、そのサージ電圧VSが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2まで低下する前にサージ電圧VSの低下を抑制することができ、サージ電圧VSにより負荷電圧VDが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2を超えて低下することを抑制することができる。
 ・具体的には、リレースイッチSMRに並列接続された双方向ツェナーダイオード22が設けられており、この双方向ツェナーダイオード22を構成する2つのツェナーダイオードのうち、接続点PBから第2蓄電池16に向かう方向を順方向とする第1ツェナーDT1の降伏電圧VZを第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2よりも高くするようにした。そのため、第1,第2スイッチSW1,SW2が開放される場合に、第2系統ES2に発生するサージ電圧VSが降伏電圧VZよりも高いと、開放されたリレースイッチSMR、及び第1,第2ツェナーDT1,DT2の整流機能により第2系統内電流ICが停止される。一方、第2系統ES2に発生するサージ電圧VSが降伏電圧VZよりも低くなると、第1ツェナーDT1の整流機能が失われることにより双方向ツェナーダイオード22を介して正の第2系統内電流ICが流れる。これにより、第2系統ES2に負のサージ電圧VSが発生した場合に、そのサージ電圧VSの低下が抑止され、サージ電圧VSにより負荷電圧VDが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2を超えて低下することを抑制することができる。
 (第2実施形態の変形例)
 双方向ツェナーダイオードは、リレースイッチSMRが備える第3スイッチSW3及び第4スイッチSW4に対して、それぞれ設けられていてもよい。図8に示すように、本変形例では、第2系統内経路LA2における第2蓄電池16とリレースイッチSMRとの間の接続点PCと、第3スイッチSW3のゲート端子との間に第3経路LC3が設けられており、この第3経路LC3に第1双方向ツェナーダイオード23が設けられている。つまり、第1双方向ツェナーダイオード23の一端は、第3スイッチSW3の一対の主端子のうちのドレイン端子に接続されており、第1双方向ツェナーダイオード23の他端は、第3スイッチSW3のゲート端子に接続されている。なお、本実施形態において、ゲート端子が「開閉制御端子」に相当する。
 第1双方向ツェナーダイオード23は、第3ツェナーダイオード(以下、第3ツェナー)DT3と第4ツェナーダイオード(以下、第4ツェナー)DT4とを備えており、第3,第4ツェナーDT3,DT4の向きが互いに逆向きとなるように、第3,第4ツェナーDT3,DT4が直列接続されている。詳細には、第3ツェナーDT3は、第4ツェナーDT4よりも接続点PC側に設けられており、アノードを第3スイッチSW3側、カソードを接続点PC側となるように配置されている。また、第4ツェナーDT4は、アノードを接続点PC側、カソードを第3スイッチSW3側となるように配置されている。
 また、第2系統内経路LA2におけるリレースイッチSMRと接続点PBの間の接続点PDと、第4スイッチSW4のゲート端子との間に第4経路LC4が設けられており、この第4経路LC4に第2双方向ツェナーダイオード24が設けられている。つまり、第2双方向ツェナーダイオード24の一端は、第4スイッチSW4の一対の主端子のうちのドレイン端子に接続されており、第2双方向ツェナーダイオード24の他端は、第4スイッチSW4のゲート端子に接続されている。
 第2双方向ツェナーダイオード24は、第5ツェナーダイオード(以下、第5ツェナー)DT5と第6ツェナーダイオード(以下、第6ツェナー)DT6とを備えており、第5,第6ツェナーDT5,DT6の向きが互いに逆向きとなるように、第5,第6ツェナーDT5,DT6が直列接続されている。詳細には、第5ツェナーDT5は、第6ツェナーDT6よりも第4スイッチSW4側に設けられており、アノードを接続点PD側、カソードを第4スイッチSW4側となるように配置されている。また、第6ツェナーDT6は、アノードを第4スイッチSW4側、カソードを接続点PD側となるように配置されている。なお、第3~第6ツェナーDT3~DT6は、同一の降伏電圧VZを有しており、その降伏電圧VZが、第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2よりも高くなるように設定されている。
 本変形例の制御処理は、第2実施形態の制御処理に等しい。つまり、図7に示すように、時刻t3に、第1,第2スイッチSW1,SW2が開放されると、この時刻t3に、第3,第4スイッチSW3,SW4が開放され、第2系統内電流ICが制限される。そして、第2系統ES2に発生するサージ電圧VSが降伏電圧VZよりも高い場合には、第3~第6ツェナーDT3~DT6の整流機能により、第3,第4スイッチSW3,SW4のゲート端子に印加される電圧が抑制され、第3,第4スイッチSW3,SW4が開放された状態に維持される。
 一方、サージ電圧VSが降伏電圧VZよりも低くなると、第3~第6ツェナーDT3~DT6のうち、第3ツェナーDT3の整流機能が失われることにより第3スイッチSW3のゲート端子に印加される電圧が上昇し、第3スイッチSW3が閉鎖される。これにより、第3スイッチSW3及び第4寄生ダイオードDA4を介して正の第2系統内電流ICが流れる。その結果、サージ電圧VSの低下が抑止され、サージ電圧VSにより負荷電圧VDが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2を超えて低下することを抑制することができる。
 (第3実施形態)
 以下、第3実施形態について、第1実施形態との相違点を中心に図9~図11を参照しつつ説明する。
 図9に示すように、本実施形態では、接続経路LBにおいてスイッチ部20よりも第2系統ES2側にスイッチ部26が設けられる点で、第1実施形態と異なる。以下、区別のために、スイッチ部20を第1スイッチ部20と呼び、スイッチ部26を第2スイッチ部26と呼ぶ。第2スイッチ部26は、第5スイッチSW5を備えている。なお、本実施形態において、第5スイッチSW5が「遮断スイッチ、第1遮断スイッチ」に相当する。
 本実施形態では、第5スイッチSW5として、常閉式のリレーが用いられている。そのため、第5スイッチSW5は、第1,第2スイッチSW1,SW2に比べてスイッチング速度が遅い一方、高耐圧性を有する。本実施形態では、第2系統ES2に負のサージ電圧VSが発生し、第5スイッチSW5は、第2系統ES2に発生するサージ電圧VSのピーク値VP(図11参照)よりも低い負耐圧を有する。
 制御装置40は、第5スイッチSW5を切替操作すべく、第5切替信号SC5を生成し、第5切替信号SC5による指令を第5スイッチSW5に出力する。そして、制御処理では、第5スイッチSW5の高耐圧性を利用して、負荷電圧VDが第1,第2スイッチSW1,SW2に印加されないようにすることで、サージ電圧VSによる第1,第2スイッチSW1,SW2の印加電圧VXが第1,第2スイッチSW1,SW2の第1負耐圧Vth1よりも低くならないようにした。
 図10に本実施形態の制御処理のフローチャートを示す。図10において、先の図2に示した処理と同一の処理については、便宜上、同一のステップ番号を付して説明を省略する。
 本実施形態の制御処理では、ステップS11で肯定判定すると、ステップS30において、第5スイッチSW5が開放されているか否かを判定する。ステップS30で否定判定すると、ステップS21で第1,第2スイッチSW1,SW2を開放し、ステップS31に進む。
 ステップS31では、第5スイッチSW5を開放する指令を出力し、ステップS14に進む。上述したように、第5スイッチSW5は、第1,第2スイッチSW1,SW2に比べてスイッチング速度が遅いため、第1,第2スイッチSW1,SW2のように指令出力後すぐに開放されず、所定の遅延時間YD(図11参照)が経過した後に開放される。
 一方、ステップS30で肯定判定すると、つまり、第5スイッチSW5を開放する指令が出力されてから遅延時間YDが経過すると、ステップS32で第3,第4スイッチSW3,SW4を開放し、制御処理を終了する。
 図11に、本実施形態の制御処理における印加電圧VXと第2系統内電流ICとの推移を示す。ここで印加電圧VXは、第1スイッチ部20における第2系統ES2側の端子PEに印加される電圧を示す。
 図11において、(F)は、第5スイッチSW5の開閉状態の推移を示し、(G)は、印加電圧VX及び負荷電圧VDの推移を示し、(H)は、第2系統内電流ICの推移を示す。図11(G)では、印加電圧VXが実線で示されており、負荷電圧VDが破線で示されている。なお、図11における(A)~(E)は、図3における(A)~(E)と同一である。また、図11における時刻t1から時刻t3までの処理は、図3における時刻t1から時刻t3までの処理と同一である。そのため、重複した説明を省略する。
 図11に示すように、時刻t3に、第1,第2スイッチSW1,SW2が開放されると、この時刻t3に、第5スイッチSW5を開放する指令が出力される。これにより、時刻t3から遅延時間YDが経過した時刻t21に第5スイッチSW5が開放される。一方、時刻t3において、第3,第4スイッチSW3,SW4は閉鎖された状態に維持される。そして、第5スイッチSW5が開放された後の時刻t22に、第3,第4スイッチSW3,SW4が開放される。
 時刻t3から時刻t21の期間では、第1,第2スイッチSW1,SW2が開放される一方、第3,第4スイッチSW3,SW4は閉鎖された状態に維持される。そのため、第2系統内電流ICは流れ続け、第2系統ES2にサージ電圧VSは発生しない。また、第5スイッチSW5は閉鎖された状態に維持されるため、印加電圧VXは負荷電圧VDと等しい電圧に維持される。
 時刻t21に第5スイッチSW5が開放されると、印加電圧VXは負荷電圧VDと異なる電圧となり、具体的にはゼロとなる。一方、第3,第4スイッチSW3,SW4は閉鎖された状態に維持されているため、第2系統ES2にサージ電圧VSは発生しない。
 その後、時刻t22に第3,第4スイッチSW3,SW4が開放されると、第2系統内電流ICが停止される。第2系統内電流ICが停止されることで、第2蓄電池16の過放電を抑制することができる。一方、この電流停止に伴って負のサージ電圧VSが発生し、サージ電圧VSにより負荷電圧VDが低下する。本実施形態では、負荷電圧VDの低下に先立って第5スイッチSW5が開放されている。また、第5スイッチSW5が高耐圧性を有している。そのため、負荷電圧VDが第1,第2スイッチSW1,SW2の第1負耐圧Vth1よりも低くなったとしても、その負荷電圧VDが第1,第2スイッチSW1,SW2に印加されることが抑制され、印加電圧VXが第1,第2スイッチSW1,SW2の第1負耐圧Vth1よりも低くなることを抑制することができる。
 以上詳述した本実施形態によれば、以下の効果が得られるようになる。
 ・第2系統ES2での異常発生に伴い、異常が発生していない第1系統ES1と異常が発生した第2系統ES2とを絶縁するために、第1,第2スイッチSW1,SW2が開放される。この場合、異常が発生していない第1系統ES1と異常が発生した第2系統ES2とを素早く絶縁するために、第1,第2スイッチSW1,SW2には高速性が要求される。第1,第2スイッチSW1,SW2が高速性に加え高耐圧性を有していれば、第2系統ES2に発生するサージ電圧VSに耐えることができるとも考えられる。しかし、第1,第2スイッチSW1,SW2として高速性及び高耐圧性を有するスイッチを使用する場合には、電源システム100のコスト負担が大きくなることが懸念される。
 この点、本実施形態では、接続経路LBにおいて第1,第2スイッチSW1,SW2よりも第2系統ES2側に、第1,第2スイッチSW1,SW2よりも高耐圧である第5スイッチSW5を設ける。そして、第1,第2スイッチSW1,SW2が開放される場合に、第5スイッチSW5を開放した後に第3,第4スイッチSW3,SW4を開放するようにした。この場合、第1,第2スイッチSW1,SW2は高速性を有すればよく、高耐圧性を有する必要がないため、電源システム100のコスト負担を軽減することができる。また、第1,第2スイッチSW1,SW2が開放される場合に、第3,第4スイッチSW3,SW4が開放される前に第5スイッチSW5を開放するようにしたため、第3,第4スイッチSW3,SW4の開放に伴って第2系統ES2にサージ電圧VSが発生しても、高耐圧性を有する第5スイッチSW5により第1,第2スイッチSW1,SW2の印加電圧VXの過剰な低下が抑制される。そのため、第2系統内電流ICを制限しつつ、第1,第2スイッチSW1,SW2の印加電圧VXの過剰な低下を抑制することができる。
 (第3実施形態の変形例)
 高耐圧性のリレーは、接続経路LB及び第2系統内経路LA2にそれぞれ設けられていてもよい。図12に示すように、本変形例では、第2系統内経路LA2において接続点PBとリレースイッチSMRとの間に第3スイッチ部29が設けられている。第3スイッチ部29は、第6スイッチSW6を備えている。なお、本実施形態において、第6スイッチSW6が「第2遮断スイッチ」に相当する。
 本変形例では、第6スイッチSW6として、常閉式のリレーが用いられている。そのため、第6スイッチSW6は、第3,第4スイッチSW3,SW4に比べてスイッチング速度が遅い一方、高耐圧性を有する。本実施形態では、第2系統ES2に負のサージ電圧VSが発生し、第6スイッチSW6は、第2系統ES2に発生するサージ電圧VSのピーク値VP(図14参照)よりも低い負耐圧を有する。
 制御装置40は、第6スイッチSW6を切替操作すべく、第6切替信号SC6を生成し、第6切替信号SC6による指令を第6スイッチSW6に出力する。そして、制御処理では、第6スイッチSW6の高耐圧性を利用して、負荷電圧VDが第3,第4スイッチSW3,SW4に印加されないようにすることで、サージ電圧VSによる第3,第4スイッチSW3,SW4の印加電圧VYが第3,第4スイッチSW3,SW4の第2負耐圧Vth2よりも低くならないようにした。
 図13に本変形例の制御処理のフローチャートを示す。図13において、先の図10に示した処理と同一の処理については、便宜上、同一のステップ番号を付して説明を省略する。
 本実施形態の制御処理では、ステップS11で肯定判定すると、ステップS40において、第6スイッチSW6が開放されているか否かを判定する。ステップS40で否定判定すると、ステップS30に進む。ステップS30では、第5スイッチSW5が開放されているか否かを判定する。ステップS30で否定判定すると、ステップS21で第1,第2スイッチSW1,SW2を開放し、ステップS31で第5スイッチSW5を開放する指令を出力する。
 一方、ステップS30で肯定判定すると、つまり、第5スイッチSW5を開放する指令が出力されてから遅延時間YDが経過すると、ステップS41において、第6スイッチSW6を開放する指令を出力し、制御処理を終了する。上述したように、第6スイッチSW6は、第3,第4スイッチSW3,SW4に比べてスイッチング速度が遅いため、第3,第4スイッチSW3,SW4のように指令出力後すぐに開放されず、所定の遅延時間YDが経過した後に開放される。以下では、区別のために第5スイッチSW5の遅延時間YDを第1遅延時間YD1と呼び、第6スイッチSW6の遅延時間YDを第2遅延時間YD2と呼ぶ(図14参照)。
 また、ステップS40で肯定判定すると、つまり、第6スイッチSW6を開放する指令が出力されてから第2遅延時間YD2が経過すると、ステップS32で第3,第4スイッチSW3,SW4を開放し、制御処理を終了する。
 図14に、本実施形態の制御処理における印加電圧VYと第2系統内電流ICとの推移を示す。ここで印加電圧VYは、リレースイッチSMRにおける第2負荷36側の端子PFに印加される電圧を示す。
 図14において、(G)は、第6スイッチSW6の開閉状態の推移を示し、(H)は、印加電圧VY及び負荷電圧VDの推移を示し、(I)は、第2系統内電流ICの推移を示す。図14(H)では、印加電圧VYが実線で示されており、負荷電圧VDが破線で示されている。なお、図14における(A)~(F)は、図11における(A)~(F)と同一である。また、図14における時刻t1から時刻t3までの処理は、図11における時刻t1から時刻t3までの処理と同一である。そのため、重複した説明を省略する。
 図14に示すように、時刻t3に、第1,第2スイッチSW1,SW2が開放されると、この時刻t3に、第5スイッチSW5を開放する指令が出力される。これにより、時刻t3から第1遅延時間YD1が経過した時刻t31に第5スイッチSW5が開放される。
 また、第5スイッチSW5が開放された後の時刻t32に、第6スイッチSW6を開放する指令が出力される。これにより、時刻t32から第2遅延時間YD2が経過した時刻t33に第6スイッチSW6が開放される。一方、時刻t3において、第3,第4スイッチSW3,SW4は閉鎖された状態に維持される。そして、第6スイッチSW6が開放された後の時刻t34に、第3,第4スイッチSW3,SW4が開放される。
 時刻t3から時刻t33の期間では、第1,第2スイッチSW1,SW2が開放される一方、第3,第4スイッチSW3,SW4は閉鎖された状態に維持される。そのため、第2系統内電流ICは流れ続け、第2系統ES2にサージ電圧VSは発生しない。また、第6スイッチSW6は閉鎖された状態に維持されるため、印加電圧VYは負荷電圧VDと等しい電圧に維持される。
 時刻t31に第6スイッチSW5が開放され、時刻t33に第6スイッチSW6が開放される。第6スイッチSW6が開放されることにより、印加電圧VYは負荷電圧VDと異なる電圧となり、具体的にはゼロとなる。また、第2系統内電流ICが停止される。第2系統内電流ICが停止されることで、第2蓄電池16の過放電を抑制することができる。一方、この電流停止に伴って負のサージ電圧VSが発生し、サージ電圧VSにより負荷電圧VDが低下する。
 本実施形態では、負荷電圧VDの低下に先立って第5,第6スイッチSW5,SW6が開放されている。また、第5,第6スイッチSW5,SW6が高耐圧性を有している。そのため、負荷電圧VDが第1,第2スイッチSW1,SW2の第1負耐圧Vth1よりも低くなったとしても、その負荷電圧VDが第1,第2スイッチSW1,SW2に印加されることが抑制され、印加電圧VXが第1,第2スイッチSW1,SW2の第1負耐圧Vth1よりも低くなることを抑制することができる。また、負荷電圧VDが第3,第4スイッチSW3,SW4の第2負耐圧Vth2よりも低くなったとしても、その負荷電圧VDが第3,第4スイッチSW3,SW4に印加されることが抑制され、印加電圧VYが第3,第4スイッチSW3,SW4の第2負耐圧Vth2よりも低くなることを抑制することができる。
 以上詳述した本変形例によれば、接続経路LBにおいて第1,第2スイッチSW1,SW2よりも第2系統ES2側に、第1,第2スイッチSW1,SW2よりも高耐圧である第5スイッチSW5を設けるとともに、第2系統内経路LA2における接続点PBと第3,第4スイッチSW3,SW4との間に、第3,第4スイッチSW3,SW4よりも高耐圧である第6スイッチSW6を設ける。そして、第1,第2スイッチSW1,SW2が開放される場合に、第5スイッチSW5を開放した後であり、且つ第3,第4スイッチSW3,SW4を開放する前に第6スイッチSW6を開放するようにした。
 この場合、第6スイッチSW6の開放に伴って第2系統ES2にサージ電圧VSが発生しても、高耐圧性を有する第5スイッチSW5により第1,第2スイッチSW1,SW2の印加電圧VXの過剰な低下が抑制される。また、高耐圧性を有する第6スイッチSW6により第3,第4スイッチSW3,SW4の印加電圧VYの過剰な低下が抑制される。そのため、第2系統内電流ICを制限しつつ、第1~第4スイッチSW1~SW4の印加電圧VX,VYの過剰な低下を抑制することができる。
 (第4実施形態)
 以下、第4実施形態について、第1実施形態との相違点を中心に図15,図16を参照しつつ説明する。
 図15に示すように、本実施形態では、第2系統内経路LA2における接続点PBとリレースイッチSMRとの間の接続点PGと、基準電圧としての接地電圧を出力する接地部材GNDとの間に接地経路LDが設けられており、この接地経路LDに第7ツェナーダイオード(以下、第7ツェナー)DT7が設けられている点で、第1実施形態と異なる。以下、区別のために、接続点PBを第1接続点PBと呼び、接続点PGを第2接続点PGと呼ぶ。なお、接地電圧は、第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2よりも高く、本実施形態において、接地部材GNDが「基準電圧部材」に相当する。
 第7ツェナーDT7は、接地部材GNDから第2接続点PGに向かう方向を順方向とするように、つまりアノードを接地部材GND側、カソードを第2接続点PG側となるように配置されている。また、第7ツェナーDT7の降伏電圧VZは、第1~第4スイッチSW1~SW4の正電圧側の耐圧である正耐圧Vth3よりも低くなるように設定されている。
 本実施形態の制御処理は、第2実施形態の制御処理に等しい。つまり、図6に示すように、制御処理において、ステップS21で第1,第2スイッチSW1,SW2が開放される場合に、続くステップS26において、リレースイッチSMRが開放される。本実施形態では、接地経路LDに第7ツェナーDT7が設けられていることで、負荷電圧VDが第1~第4スイッチSW1~SW4の正耐圧Vth3を超えて上昇、又は第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2を超えて低下することを抑制することができる。その理由を、図16を用いて説明する。
 図16に、本実施形態の制御処理における負荷電圧VDと接地電流IDとの推移を示す。ここで接地電流IDは、接地経路LDを介して接地部材GNDから第2接続点PGに流れる電流を示す。
 図16において、(H)は、接地電流IDの推移を示す。図11における(A)~(G)は、図3における(A)~(G)と同一である。図16(F),(H)では、第2系統ES2に正のサージ電圧VSが発生した場合の各値が実線で示されており、第2系統ES2に負のサージ電圧VSが発生した場合の各値が破線で示されている。なお、図16における時刻t1から時刻t3までの処理は、図3における時刻t1から時刻t3までの処理と同一である。そのため、重複した説明を省略する。
 図16に示すように、時刻t3に、第1,第2スイッチSW1,SW2が開放されると、この時刻t3に、リレースイッチSMRが開放され、第2系統内電流ICが制限される。この電流制限に伴って第2系統ES2にサージ電圧VSが発生する。
 図16(F),(H)に破線で示すように、第2系統ES2に負のサージ電圧VSが発生した場合、負荷電圧VDが低下する。そして、時刻t41に負荷電圧VDが接地電圧よりも低くなると、第7ツェナーDT7の整流機能により、接地部材GNDから第2系統ES2に正の接地電流IDが流れる(図16(H)の破線参照)。これにより、図16(F)に破線で示すように、負荷電圧VDが接地電圧に維持されてサージ電圧VSの低下が抑制され、負荷電圧VDが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2よりも低くなることを抑制することができる。
 また、図16(F),(H)に実線で示すように、第2系統ES2に正のサージ電圧VSが発生した場合、負荷電圧VDが上昇する。そして、時刻t42に負荷電圧VDが降伏電圧VZよりも高くなると、第7ツェナーDT7の整流機能が失われることにより第7ツェナーDT7を介して負の接地電流IDが流れる(図16(H)の実践参照)。これにより、図16(F)に実線で示すように、負荷電圧VDが降伏電圧VZに維持されてサージ電圧VSの上昇が抑止され、サージ電圧VSにより負荷電圧VDが第1~第4スイッチSW1~SW4の正耐圧Vth3を超えて上昇することを抑制することができる。
 その後、時刻t43に、サージ電圧VSが降伏電圧VWよりも低くなると、第7ツェナーDT7の整流機能により再び接地電流IDが停止される。
 以上詳述した本実施形態によれば、第2接続点PGと接地部材GNDとの間に、接地部材GNDから第2接続点PGに向かう方向を順方向とする第7ツェナーDT7を設け、この第7ツェナーDT7の降伏電圧VZを第1~第4スイッチSW1~SW4の正耐圧Vth3よりも低くなるようにした。これにより、第2系統ES2に正のサージ電圧VSが発生した場合に、第7ツェナーDT7の整流機能が失われることにより第1~第4スイッチSW1~SW4の印加電圧VX,XYが第7ツェナーDT7の降伏電圧VZに維持され、当該印加電圧VX,XYが第1~第4スイッチSW1~SW4の正耐圧Vth3を超えて上昇することを抑制することができる。
 また、接地部材GNDの接地電圧は、第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2よりも高い電圧に設定されているため、第2系統ES2に負のサージ電圧VSが発生した場合に、第7ツェナーDT7の整流機能により第1~第4スイッチSW1~SW4の印加電圧VX,XYが接地電圧に維持され、当該印加電圧VX,XYが第1~第4スイッチSW1~SW4の負耐圧Vth1,Vth2を超えて低下することを抑制することができる。
 (その他の実施形態)
 本開示は上記実施形態の記載内容に限定されず、次のように実施されてもよい。
 ・各負荷34,36は、例えば以下の装置であってもよい。
 車両に走行用動力を付与する走行用モータとその駆動回路であってもよい。この場合、第1,第2負荷34,36のそれぞれは、例えば3相の永久磁石同期モータと3相インバータ装置である。
 制動時の車輪のロックを防止するアンチロックブレーキ装置であってもよい。この場合、第1,第2負荷34,36のそれぞれは、例えば制動時のブレーキ油圧を独立に調整できるABSアクチュエータである。
 自車両の前を走行する前走車を検出し、前走車が検知された場合には前走車との車間距離を一定に維持し、前走車が検知されなくなった場合には自車両を予め設定された車速で走行させるクルーズコントロール装置であってもよい。この場合、第1,第2負荷34,36のそれぞれは、例えばミリ波レーダである。
 ・各負荷34,36は、必ずしも同じ構成の組合せである必要がなく、同等の機能を異なる形式の機器で実現する組合せであってもよい。また、第1,第2負荷34,36は、それぞれが異なる負荷ではなく、同一の負荷であってもよい。つまり、第1,第2負荷34,36が、第1系統内経路LA1及び第2系統内経路LA2の両方から電力供給を受ける同一の負荷であってもよい。
 ・第1電源は、コンバータに限られず、オルタネータであってもよい。また、第1電源は、コンバータを有していなくてもよく、例えば第1蓄電池14のみを有していてもよい。
 ・上記実施形態では、第2系統ES2で異常が発生した場合に、系統間スイッチの開放と系統内スイッチの開閉制御とが同時に実施される例を示したが、これに限られない。例えば、系統間スイッチを開放してから所定期間後に系統内スイッチの開閉制御を実施するようにしてもよい。
 ・上記第1実施形態では、第2系統ES2に負のサージ電圧が発生する例を示したが、第2系統ES2に正のサージ電圧が発生することもある。この場合には、第2系統内スイッチに並列接続され、接続点から第2電源に向かう方向を順方向とするダイオードを備え、系統間スイッチを開放する場合に、第2系統内スイッチを開状態とするとともに第1系統内スイッチを閉状態とすることが好ましい。
 ・上記第1実施形態の変形例では、第3スイッチSW3のデューティー比制御において、時刻t3からの経過時間が長くなるほどデューティー比を減少させる例を示したが、これに限られない。例えば、時刻t3からの経過時間に関わらず、デューティー比を1よりも小さい値に固定するようにしてもよい。
 ・上記第2実施形態では、双方向ダイオードとして双方向ツェナーダイオード22を用いる例を示したが、これに限られず、双方向ツェナーダイオード22のうちの第2ツェナーDT2はツェナーダイオードでなくてもよい。
 ・上記第2実施形態では、第2系統ES2に負のサージ電圧が発生する例を示したが、第2系統ES2に正のサージ電圧が発生することもある。この場合には、系統間スイッチ及び系統内スイッチの正耐圧よりも低い降伏電圧を有するツェナーダイオードを備え、系統間スイッチを開放する場合に、第2系統に発生するサージ電圧が降伏電圧よりも低いと、系統内スイッチを開放して第2電源から第2系統に流れる電流を制限し、第2系統に発生するサージ電圧が降伏電圧よりも高くなると、ツェナーダイオードにより第2電源と第2系統との間における電流の制限を解除することが好ましい。
 具体的には、順方向が互いに逆向きとなるように直列接続された2つのダイオードにより双方向ダイオードが構成されており、双方向ダイオードは、系統内スイッチに並列接続されており、双方向ダイオードを構成する2つのダイオードのうち、第2電源から接続点に向かう方向を順方向とするダイオードが、ツェナーダイオードであることが好ましい。
 ・上記第2実施形態の変形例では、第3スイッチSW3及び第4スイッチSW4に対して、それぞれ双方向ツェナーダイオードが設けられる例を示したか、第3スイッチSW3に対する第1双方向ツェナーダイオード23は必ずしも設けられる必要がない。
 ・上記第3実施形態では、第2系統ES2に負のサージ電圧が発生する例を示したが、第2系統ES2に正のサージ電圧が発生することもある。上記第3実施形態では、第2系統ES2に正のサージ電圧が発生した場合においても、第2電源から第2系統に流れる電流を制限しつつ、系統間スイッチの印加電圧の過剰な低下を抑制することができる。
 ・上記第3実施形態において、遮断スイッチはリレーに限られず、系統間スイッチよりも高耐圧であればMOSFETなどの半導体スイッチであってもよい。
 ・上記実施形態では、電源システム100が、手動運転及び自動運転による走行が可能な車両に適用される例を示したが、これに限られない。完全自動運転車など自動運転による走行のみが可能な車両に適用されてもよければ、手動運転による走行のみが可能な車両に適用されてもよい。
 例えば自動運転による走行のみが可能な車両に適用された場合、いずれか一方の系統ES1,ES2での異常が発生したときには、異常が発生していない他方の系統ES1,ES2の負荷34,36を用いて、自動運転により車両の走行を停止させる、又は安全な場所に移動させた後に車両を停止させる処理が実施されてもよい。
 本開示は、実施例に準拠して記述されたが、本開示は当該実施例や構造に限定されるものではないと理解される。本開示は、様々な変形例や均等範囲内の変形をも包含する。加えて、様々な組み合わせや形態、さらには、それらに一要素のみ、それ以上、あるいはそれ以下、を含む他の組み合わせや形態をも、本開示の範疇や思想範囲に入るものである。

Claims (10)

  1.  第1電源(10,12)から第1通電経路(LA1)を介して電気負荷(32)に電力を供給する第1系統(ES1)と、
     第2電源(16)から第2通電経路(LA2)を介して前記電気負荷に電力を供給する第2系統(ES2)と、
     前記第1通電経路と前記第2通電経路とを接続する接続経路(LB)に設けられた系統間スイッチ(SW1,SW2)と、を有する電源システム(100)であって、
     前記第2通電経路における前記接続経路との接続点(PB)と前記第2電源との間に設けられた系統内スイッチ(SMR)と、
     前記系統間スイッチ及び前記系統内スイッチを閉鎖した状態において前記第2系統で異常が発生したことを判定する異常判定部と、
     前記異常判定部により異常が発生したと判定された場合に前記系統間スイッチを開放する状態制御部と、
     前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチの開閉を制御することにより前記第2電源から前記第2系統に流れる電流を制限するとともに、この電流制限に伴って前記第2系統に発生するサージ電圧による前記系統間スイッチの印加電圧の過剰な低下を抑制する抑制部と、を備える電源システム。
  2.  前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチの開閉を制御することにより前記第2電源から前記第2系統に流れる電流の減少速度を緩和する請求項1に記載の電源システム。
  3.  前記系統内スイッチは、直列に接続された第1系統内スイッチ(SW4)と第2系統内スイッチ(SW3)とを有しており、
     前記第1系統内スイッチに並列接続され、前記第2電源から前記接続点に向かう方向を順方向とするダイオード(DA4)を備え、
     前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記第1系統内スイッチを開状態とするとともに前記第2系統内スイッチを閉状態とする請求項2に記載の電源システム。
  4.  前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチのデューティー比を徐々に減少させる請求項2に記載の電源システム。
  5.  前記抑制部は、
     前記系統間スイッチ及び前記系統内スイッチの負耐圧よりも高い降伏電圧を有するツェナーダイオード(DT1,DT3,DT4)を備え、
     前記状態制御部により前記系統間スイッチを開放する場合に、前記第2系統に発生するサージ電圧が前記降伏電圧よりも高いと、前記系統内スイッチを開放して前記第2電源から前記第2系統に流れる電流を制限し、前記第2系統に発生するサージ電圧が前記降伏電圧よりも低くなると、前記ツェナーダイオードにより前記第2電源と前記第2系統との間における電流の制限を解除する請求項1に記載の電源システム。
  6.  順方向が互いに逆向きとなるように直列接続された2つのダイオードにより双方向ダイオード(22)が構成されており、
     前記双方向ダイオードは、前記系統内スイッチに並列接続されており、
     前記双方向ダイオードを構成する2つのダイオードのうち、前記接続点から前記第2電源に向かう方向を順方向とするダイオード(DT1)は、前記ツェナーダイオードである請求項5に記載の電源システム。
  7.  順方向が互いに逆向きとなるように直列接続された2つの前記ツェナーダイオード(DT3,DT4)により双方向ツェナーダイオード(23)が構成されており、
     前記双方向ツェナーダイオードの一端は、前記系統内スイッチの一対の主端子のうちの一方の主端子に接続されており、
     前記双方向ツェナーダイオードの他端は、前記系統内スイッチの開閉制御端子に接続されている請求項5に記載の電源システム。
  8.  前記接続経路において前記系統間スイッチよりも前記第2系統側に設けられ、前記系統間スイッチよりも高耐圧である遮断スイッチ(SW5)を備え、
     前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記遮断スイッチを開放した後に前記系統内スイッチを開放する請求項1に記載の電源システム。
  9.  前記遮断スイッチは、第1遮断スイッチ(SW5)であり、
     前記第2通電経路における前記接続点と前記系統内スイッチとの間に設けられ、前記系統内スイッチよりも高耐圧である第2遮断スイッチ(SW6)を備え、
     前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記第1遮断スイッチを開放した後であり、且つ前記系統内スイッチを開放する前に前記第2遮断スイッチを開放する請求項8に記載の電源システム。
  10.  前記接続点は第1接続点であり、
     前記抑制部は、前記第2通電経路における前記第1接続点と前記系統内スイッチとの間の第2接続点と、所定の基準電圧を出力する基準電圧部材(GND)との間に接続され、前記基準電圧部材から前記第2接続点に向かう方向を順方向とし、且つ前記系統間スイッチ及び前記系統内スイッチの正耐圧よりも低い降伏電圧を有するツェナーダイオード(DT7)を備え、
     前記基準電圧は、前記系統間スイッチ及び前記系統内スイッチの負耐圧よりも高い電圧に設定されており、
     前記抑制部は、前記状態制御部により前記系統間スイッチを開放する場合に、前記系統内スイッチを開放する請求項1に記載の電源システム。
PCT/JP2021/037131 2020-10-27 2021-10-07 電源システム WO2022091737A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202180073192.7A CN116507521A (zh) 2020-10-27 2021-10-07 电源系统
US18/131,501 US20230283066A1 (en) 2020-10-27 2023-04-06 Power supply system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020180039A JP7392629B2 (ja) 2020-10-27 2020-10-27 電源システム
JP2020-180039 2020-10-27

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/131,501 Continuation US20230283066A1 (en) 2020-10-27 2023-04-06 Power supply system

Publications (1)

Publication Number Publication Date
WO2022091737A1 true WO2022091737A1 (ja) 2022-05-05

Family

ID=81382413

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/037131 WO2022091737A1 (ja) 2020-10-27 2021-10-07 電源システム

Country Status (4)

Country Link
US (1) US20230283066A1 (ja)
JP (1) JP7392629B2 (ja)
CN (1) CN116507521A (ja)
WO (1) WO2022091737A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016103907A (ja) * 2014-11-28 2016-06-02 富士通テン株式会社 車両用電源装置
JP2017196922A (ja) * 2016-04-25 2017-11-02 株式会社オートネットワーク技術研究所 車載電源用のスイッチ装置および車載用電源システム
JP2019135897A (ja) * 2018-02-05 2019-08-15 株式会社デンソーテン 電源制御装置および電源制御方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016103907A (ja) * 2014-11-28 2016-06-02 富士通テン株式会社 車両用電源装置
JP2017196922A (ja) * 2016-04-25 2017-11-02 株式会社オートネットワーク技術研究所 車載電源用のスイッチ装置および車載用電源システム
JP2019135897A (ja) * 2018-02-05 2019-08-15 株式会社デンソーテン 電源制御装置および電源制御方法

Also Published As

Publication number Publication date
CN116507521A (zh) 2023-07-28
US20230283066A1 (en) 2023-09-07
JP2022070774A (ja) 2022-05-13
JP7392629B2 (ja) 2023-12-06

Similar Documents

Publication Publication Date Title
US11312239B2 (en) Power source system
WO2021230129A1 (ja) 電源システム
US9732823B2 (en) Electromagnetic damper
US11949260B2 (en) Power supply system
US20230104265A1 (en) Power system
US20230075428A1 (en) Control apparatus and power supply system
US11505144B2 (en) Power supply system
WO2022091737A1 (ja) 電源システム
US11919420B2 (en) Power supply system
JP7363754B2 (ja) 電源システム
WO2022044780A1 (ja) 電源システム
JP7276291B2 (ja) 電源システム
JP2023007922A (ja) 電源システム
JP7415874B2 (ja) 電源システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21885856

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 202180073192.7

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21885856

Country of ref document: EP

Kind code of ref document: A1