WO2022013074A1 - Loading bridge arrangement, loading bridge controller and method for operating a loading bridge - Google Patents

Loading bridge arrangement, loading bridge controller and method for operating a loading bridge Download PDF

Info

Publication number
WO2022013074A1
WO2022013074A1 PCT/EP2021/069073 EP2021069073W WO2022013074A1 WO 2022013074 A1 WO2022013074 A1 WO 2022013074A1 EP 2021069073 W EP2021069073 W EP 2021069073W WO 2022013074 A1 WO2022013074 A1 WO 2022013074A1
Authority
WO
WIPO (PCT)
Prior art keywords
dock leveler
dock
actuating element
control
movement
Prior art date
Application number
PCT/EP2021/069073
Other languages
German (de)
French (fr)
Inventor
Michael Sanke
Original Assignee
Hörmann KG Antriebstechnik
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hörmann KG Antriebstechnik filed Critical Hörmann KG Antriebstechnik
Publication of WO2022013074A1 publication Critical patent/WO2022013074A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/28Loading ramps; Loading docks
    • B65G69/287Constructional features of deck or surround
    • B65G69/2876Safety or protection means, e.g. skirts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2207/00Indexing codes relating to constructional details, configuration and additional features of a handling device, e.g. Conveyors
    • B65G2207/40Safety features of loads, equipment or persons

Definitions

  • the invention relates to a dock leveler control, a dock leveler arrangement and a method for operating such.
  • [1] shows different dock levellers with dock leveler drives.
  • [2] shows dock leveler controls for such dock levellers.
  • [3] shows dock leveler arrangements that have at least one or more combinations of such a dock leveler and an associated dock leveler control. In some of the loading bridge arrangements, several such loading bridges with loading bridge controls are structurally arranged next to one another.
  • the invention has set itself the task of dock leveler arrangements from [1],
  • the invention provides a dock leveler control for controlling a dock leveler, the dock leveler control being designed such that a command to start at least one predetermined movement of the dock leveler is only issued when an actuating element is actuated for a predetermined minimum actuation time.
  • the invention provides a dock leveler arrangement comprising a dock leveler with a dock leveler drive for driving a movement of the dock leveler and a dock leveler controller for controlling the movement of the dock leveler, the dock leveler controller having a user interface with an actuating element for issuing a control command, on which the Movement of the dock leveler is started, the dock leveler controller being designed such that at least one predetermined movement of the dock leveler is initiated only when the actuating element is actuated for a predetermined minimum actuation time.
  • the minimum actuation time is 2 s to 10 s, preferably 2.5 s to 4.5 s and particularly preferably 3 s.
  • the actuator is an autoreturn actuator for initiating an autoreturn movement of the dock leveler, a lift actuator for raising the dock leveler, or a lip actuator for actuating a lip of the dock leveler.
  • the dock leveler control has a number of different adjustable function modes, with one or more function modes in which at least one predetermined movement of the dock leveler is only initiated when the actuating element is actuated for the predetermined minimum actuation time, can be selected by pre-programming or setting, or can be set manually or automatically is.
  • a warning signal output device for outputting an acoustic and/or visual warning signal, the dock leveler control being set up to actuate the warning signal output device to output a visual or acoustic warning signal during or during the actuation of the actuating element. It is preferred that the warning signal output device is designed to output a visual warning signal to a person located in a loading space of a vehicle docked on the loading bridge. In particular, an optical warning signal output device is arranged in an interior space of a loading point, e.g. in a dock leveler lock. In one embodiment, it is provided that a charging light is designed to illuminate the area of the charging point to emit a visual warning signal, e.g. by flashing and/or by changing color or the like, or is equipped with an additional warning signal lamp such as a flashing light.
  • a plurality of dock levellers are provided, each with actuating elements assigned to the dock leveller, the warning signal output device being designed to output warning signals assigned to the individual dock levellers when the assigned actuating element is actuated.
  • the invention provides a method for operating a dock leveler arrangement which has at least one dock leveler with dock leveler drive that can be controlled by a dock leveler controller, comprising actuating an actuating element for a predetermined minimum actuation period in order to start movement of the dock leveler.
  • the method preferably includes automatic delivery of a pre-warning signal to a person located in the area of a vehicle standing on the dock leveler when or during the actuation of the actuation element for the minimum actuation time.
  • the method is preferably designed to operate a dock leveler control that has at least a first and a second dock leveler and a first actuating element for starting a movement of the first dock leveler and a second actuating element for starting a movement of the second dock leveler, with the actuating element for starting the movement must be actuated at least for the minimum actuation time and wherein a first pre-warning signal is emitted when the first actuating element is actuated and a second pre-warning signal is emitted when the second actuating element is actuated.
  • the invention provides a computer program product comprising machine-readable control instructions which, when loaded into the dock leveler controller of the dock leveler arrangement according to any one of claims 1 to 6, cause the dock leveler arrangement to carry out the method according to any one of claims 7 to 9.
  • Embodiments of the invention differ in particular by an additional function or device of the dock leveler control such that potentially dangerous movements of the dock leveler for personnel on or in the vehicle to be loaded or unloaded can only be started by a long operation of the corresponding actuating element.
  • a pre-warning signal can be given.
  • Embodiments of the invention relate to a long button press on dock levellers.
  • embodiments of the invention include a Setup or a step of a long press with pre-warning to command execution in a dock leveler controller.
  • a long button press (preferably 3 seconds) can be programmed on the controller.
  • the button must be pressed for 3 seconds before the move command is executed.
  • a warning signal can be output during the actuation period, e.g. during the 3 seconds.
  • the embodiments of the present invention can be preferably accomplished by changing the hardware or software of those shown in references [1], [2] to [3]. Loading bridges, loading bridge controls and loading bridge arrangement are obtained.
  • a yellow warning signal for the loading employee e.g. via a connected signal light, especially traffic light, more especially LED traffic light in the loading area. This signals to him that the dock leveler is about to start moving. This would also ensure that the operator does not accidentally operate the control of the wrong dock leveler, since the controls and dock levellers are often lined up on site, so it is not always easy to see at first glance whether the control is on the left or the right Loading bridge operated. This has also resulted in serious accidents in the past. This can be combined by issuing the clear warning signal assigned to the respective loading bridge.
  • a yellow LED warning light in the lid keyboard could also be used to signal to the operator on the controller that a movement or command execution is due in a short time.
  • Acoustic warning signals parallel to the flashing frequency of the warning light are also conceivable, as are exclusively acoustic signals.
  • FIG. 1 shows a perspective view of a dock leveler arrangement with a first and a second dock leveler from the outside, the first dock leveler being controllable by a first dock leveler control and the second dock leveler being controllable by a second dock leveler control;
  • Fig. 2 is a perspective view of an embodiment of
  • Loading bridge control for controlling the respective loading bridges from FIG. 1 ;
  • FIG. 3 shows schematic representations of three steps for placing the first or second loading bridge of the loading bridge arrangement from FIG. 1 onto a vehicle to be loaded or unloaded;
  • FIG. 4 shows a schematic representation of five steps for returning the respective dock leveler of the dock leveler arrangement of FIG. 1;
  • FIG. 5 shows a further exemplary embodiment of a dock leveler arrangement with a first dock leveler and a second dock leveler and associated dock leveler controls in each case;
  • Fig. 6 is a perspective view of one of the dock leveler controls of Fig.
  • FIG. 7 shows a schematic view of different steps for placing one of the loading bridges of the loading bridge arrangement from FIG. 5 onto a vehicle to be loaded or unloaded;
  • Fig. 8 is a schematic representation of five steps for returning the dock leveler of Fig. 7 to its rest position.
  • the dock leveler assembly 10 has a first dock leveler 12.1 at a first loading point 14.1 of a building and a second dock leveler 12.2. at a second loading point 14.2 of the building. Furthermore, the dock leveler arrangement 10 has a first dock leveler controller 16.1 for controlling the first dock leveler 12.1 and a second dock leveler controller 16.2 for controlling the second dock leveler 12.2. The dock leveler controls 16.1.
  • FIG. 1 shows an outside view of the building, since the dock leveler controls 16.1, 16.2 are located inside the building.
  • the dock leveler controls 16.1, 16.2 are designed as shown in FIG.
  • the dock leveler arrangement 10 has a first warning signal output device 18.1 assigned to the first dock leveler 12.1 and controlled by the first dock leveler control 16.1 and a second warning signal output device 18.2 assigned to the second dock leveler 12.2 and controlled by the second dock leveler control 16.2.
  • the warning signal output devices 18.1, 18.2 each have an acoustic signal transmitter 46 (not shown in detail in FIG.
  • the traffic light 20.1, 20.2 is arranged in such a way that it can also be seen from the inside of a vehicle docked at the loading point Vehicle 40 can be seen.
  • the warning signal output device 18.1, 18.2 can contain a flashing light or charging light (not shown - for more details see [3]) visible through the loading opening of the loading point.
  • the charging light can be used to illuminate the charging point and the interior of the vehicle 40 during the charging process and can also have an optical warning function, such as a flashing function, in order to emit the warning signal.
  • the warning signal output device 18.1, 18.2 can also have a signal lamp arranged, for example, inside a loading house (not shown, see [3] for more details).
  • the platform 24 can be raised by means of a hydraulic drive having a pump motor and lowered by actuating solenoid valves.
  • the folding lip 26 is hinged to the front edge of the platform 24 so that it can be folded and can also be raised via the hydraulic drive and lowered via solenoid valves.
  • the dock leveler control 16.1, 16.2 is set up to control the hydraulic drive and the solenoid valves according to stored sequence programs.
  • the first embodiment of the dock leveler control 16.1, 16.2 has a first and second actuating element 28.1, 28.2 for actuating the dock leveler.
  • the first actuator 28.1 is a bridge run button 30 and the second actuator 28.2 is an auto-return button 32.
  • the dock leveler controller 16.1, 16.2 has a user information device 34 for outputting information to the user 42, herez. B. in the form of a two-digit seven-segment display 36 on.
  • the embodiment of the dock leveler control 16.1, 16.2 shown in FIG. 2 also has an optional third actuating element in the form of a dock shelter button 38 for actuating a dock shelter that is not shown in detail here.
  • FIG. 3 shows, the dock leveler control 16.1, 16.2 is set up by appropriate programming using a computer program product, which is loaded into a microprocessor, not shown, of the dock leveler control 16.1, 16.2, the associated dock leveler 12.1, 12.2 on a vehicle 40, such as in particular trucks, which go to the appropriate loading point
  • 16.1, 16.2 are designed to move the associated dock leveler 12.1, 12.2 from the position resting on the vehicle into the rest position according to pre-programmed sequence programs, with the individual steps being shown in FIG.
  • Fig. 3 shows the individual steps in the "Place loading bridge” process.
  • an operator 42 presses and holds the bridge run button 30 as shown in step 1 of FIG.
  • the platform 24 moves up to the highest position.
  • a pressure switch responds there.
  • the folding lip 26 is then extended, as shown in step 2 of FIG.
  • the bridge run button 30 is released.
  • the dock leveler control 16.1, 16.2 switches off the hydraulic pump and controls a solenoid valve for lowering.
  • the platform 24 lowers onto the bed 44 of the vehicle 40 as shown in step 3 of FIG. In this final position shown in FIG. 3 , the platform lowering solenoid valve 24 remains open, allowing the platform 24 to move with the vehicle 40 .
  • the vehicle 40 is unloaded or loaded by the operator 42.
  • This drives z. B. with an industrial truck on the vehicle 40 and then moves out again over the dock leveler 12.1, 12.2 from the vehicle 40.
  • the operator 42 is now in the vehicle 40 with the industrial truck and the platform 24 is raised without the operator 42 noticing, this can lead to accidents.
  • Such a situation could e.g. B. by accidental actuation of one of the actuators 28.1, 28.2 by another person who may want to operate the other dock leveler 12.2 at the other loading point 14.1, 14.2 and thus accidentally actuates the actuator 28.1, 28.2.
  • the dock leveler control 16.1, 16.2 contains a program that can be selected and activated.
  • the program can be automatically activated by the placement process shown in FIG. With this safety program, a movement of the dock leveler 12.1, 12.2 is only started when the actuating element 28.1, 28.2 is continuously actuated for a predetermined actuating period. For example, the actuating element 28.1, 28.2 must be kept pressed for at least 2.5 s, preferably 3 s, before the movement of the dock leveler 12.1, 12.2 to be actuated by the actuating element 28.1, 28.2 begins.
  • step 3 of Fig. 3 which is marked with 1 in Fig. 4, back to its rest position
  • step 2 keep it pressed for a longer period of time, here more than 3 s.
  • the length of the longer period of actuation is set in such a way that the corresponding function is not initiated by accidental actuation, but that it is clear that the actuation is intentional.
  • the yellow light Y of the assigned traffic light 20.1, 20.2 is actuated to flash.
  • an acoustic signal 48 is emitted by the associated warning signal output device 18.1, 18.2 by means of the acoustic signal transmitter 46.
  • the acoustic signals 48 of the different warning signal output devices 18.1, 18.2 preferably differ. As can be seen from Fig.
  • the traffic light 20.1, 20.2 can also be seen from inside the vehicle 40, so that an operator 42 located on the loading area 44 is warned of an incipient movement of the dock leveler 12.1, 12.2.
  • the loading bridge control 16.1, 16.2 controls the assigned loading bridges 12.1, 12.2 in such a way that the platform 24 moves upwards and at the same time the folding lip 26 is folded in. When the folding lip 26 is fully folded in, the platform 24 lowers to the rest position.
  • 5-8 show a second embodiment of a loading bridge arrangement 10 with corresponding loading bridges 12.1, 12.2, loading bridge control 16.1, 16.2 and warning signal output device 18.1, 18.2.
  • the main difference here is that the dock levellers 12.1, 12.2 are not designed as hinged lip dock levellers, but as telescopic dock levellers 50 with the platform 24 and a telescopic lip 52.
  • the assigned dock leveler control 16.1, 16.2, which is shown in FIG. 6, has four actuating elements 28.1-28.4 for controlling the dock leveler 12.1, 12.2, with the first and second actuating element 28.1, in addition to the bridge run button 30 and the autoreturn button 32, being 28.2 a lip-forward button 54 and a lip-back button 56 third actuating element 28.3, as a fourth actuating element 28.4 are present.
  • the loading bridge 12.1, 12.2 is placed. onto the loading area 44 of the vehicle 40 by continuously pressing the bridge run button 30 (step 1) to raise, simultaneously pressing the lip advance button 54 to advance the feed lip 52 (step 2) and releasing the buttons 54, 30 ( Step 3) to lower.
  • This process in turn activates the security program, after which a subsequent movement of the dock leveler 12.1, 12.2, in particular a raising of the platform 24, only begins after a long press of the button.
  • the operator 52 must again - step 2 - hold down the autoreturn button 323 s before the platform 40 rises from the support position shown as step 1 .
  • the platform 24 is raised and the feed lip 52 is automatically retracted, then, when the feed lip is fully retracted, the loading bridge 12.1, 12.2 is lowered to the rest position - step 5.
  • the actuating elements 28.1, 28.2, 28.3, 28.4 can also be provided on a movable operating unit 58 of the dock leveler control 16.1, 16.2.

Abstract

A loading bridge controller (16.1, 16.2) is designed in such a way that a command for starting at least one predetermined movement of the loading bridge (12.1, 12.2) is output only upon actuation of an actuating element (28.1, 28.2, 28.3, 28.4) for a predetermined minimum actuation period.

Description

Ladebrückenanordnung, Ladebrückensteuerung und Verfahren zum Dock leveler arrangement, dock leveler control and method for
Betreiben einer Ladebrücke Operating a loading bridge
Die Erfindung betrifft eine Ladebrückensteuerung, eine Ladebrückenanordnung und ein Verfahren zum Betreiben einer solchen. The invention relates to a dock leveler control, a dock leveler arrangement and a method for operating such.
Zum technologischen Hintergrund wird auf die folgenden Literaturstellen verwiesen: For the technological background, reference is made to the following references:
[1] „Anleitung für Montage, Betrieb und Wartung HLS2 / HTL2“, Firmendruckschrift der Hörmann KG Verkaufsgesellschaft mit dem Druckvermerk 11058527 / 09.2017 aus September 2017, heruntergeladen aus dem Internet am 16.07.2020 [1] "Instructions for installation, operation and maintenance HLS2 / HTL2", company publication of Hörmann KG Vertriebsgesellschaft with the print note 11058527 / 09.2017 from September 2017, downloaded from the Internet on 07/16/2020
[2] „Anleitung für Montage, Betrieb und Wartung - Steuerung für Ladebrücken- 460 S - 460 T“ Firmendruckschrift der Hörmann KG Verkaufsgesellschaft mit dem Druckvermerk TR25E652-A, heruntergeladen aus dem Internet am 16.07.2020 [2] "Instructions for assembly, operation and maintenance - control for dock levellers - 460 S - 460 T" company publication of Hörmann KG Vertriebsgesellschaft with the print note TR25E652-A, downloaded from the Internet on July 16, 2020
[3] „Verladetechnik“, Firmendruckschrift der Hörmann KG Verkaufsgesellschaft mit dem Druckvermerk Stand 05.2019 / Druck 05.2019 / HF 86278 DE / PDF, heruntergeladen aus dem Internet am 16.07.2020 [3] "Loading technology", company brochure from Hörmann KG Vertriebsgesellschaft with the printer's note as of 05.2019 / print 05.2019 / HF 86278 DE / PDF, downloaded from the Internet on 16.07.2020
[1] zeigt unterschiedliche Ladebrücken mit Ladebrückenantrieb. [2] zeigt Ladebrückensteuerungen für derartige Ladebrücken. [3] zeigt Ladebrückenanordnungen, die wenigstens eine oder mehrere Kombinationen aus einer derartigen Ladebrücke und einer zugeordneten Ladebrückensteuerung aufweisen. Bei einigen der Ladebrückenanordnungen sind mehrere derartige Ladebrücken mit Ladebrückensteuerungen baulich nebeneinander angeordnet. [1] shows different dock levellers with dock leveler drives. [2] shows dock leveler controls for such dock levellers. [3] shows dock leveler arrangements that have at least one or more combinations of such a dock leveler and an associated dock leveler control. In some of the loading bridge arrangements, several such loading bridges with loading bridge controls are structurally arranged next to one another.
Die Erfindung hat sich zur Aufgabe gestellt, Ladebrückenanordnungen der aus [1],The invention has set itself the task of dock leveler arrangements from [1],
[2] und [3] bekannten Art, die Teil der hiesigen Offenbarung darstellen, derart zu verbessern, dass trotz einfachem Aufbau und unkomplizierter Bedienung Unfallrisiken verringert werden. [2] and [3] known art, which form part of the present disclosure, such to improve that accident risks are reduced despite simple construction and uncomplicated operation.
Diese Aufgabe wird durch eine Ladebrückensteuerung, eine Ladebrückenanordnung und ein Betriebsverfahren nach den unabhängigen Ansprüchen gelöst. This object is achieved by a dock leveler control, a dock leveler arrangement and an operating method according to the independent claims.
Vorteilhafte Ausgestaltungen sind Gegenstand der Unteransprüche. Advantageous configurations are the subject matter of the dependent claims.
Die Erfindung schafft gemäß einem Aspekt davon eine Ladebrückensteuerung zum Steuern einer Ladebrücke, wobei die Ladebrückensteuerung derart ausgebildet ist, dass ein Befehl zum Starten mindestens einer vorbestimmten Bewegung der Ladebrücke erst bei Betätigen eines Betätigungselements über eine vorbestimmte Mindestbetätigungsdauer abgegeben wird. According to one aspect, the invention provides a dock leveler control for controlling a dock leveler, the dock leveler control being designed such that a command to start at least one predetermined movement of the dock leveler is only issued when an actuating element is actuated for a predetermined minimum actuation time.
Die Erfindung schafft gemäß einem weiteren Aspekt davon eine Ladebrückenanordnung umfassend eine Ladebrücke mit einem Ladebrückenantrieb zum Antreiben einer Bewegung der Ladebrücke und eine Ladebrückensteuerung zum Steuern der Bewegung der Ladebrücke, wobei die Ladebrückensteuerung eine Benutzerschnittstelle mit einem Betätigungselement zur Abgabe eines Steuerbefehls aufweist, auf den hin die Bewegung der Ladebrücke gestartet wird, wobei die Ladebrückensteuerung derart ausgebildet ist, dass mindestens eine vorbestimmte Bewegung der Ladebrücke erst bei Betätigen des Betätigungselements über eine vorbestimmte Mindestbetätigungsdauer initiiert. According to a further aspect thereof, the invention provides a dock leveler arrangement comprising a dock leveler with a dock leveler drive for driving a movement of the dock leveler and a dock leveler controller for controlling the movement of the dock leveler, the dock leveler controller having a user interface with an actuating element for issuing a control command, on which the Movement of the dock leveler is started, the dock leveler controller being designed such that at least one predetermined movement of the dock leveler is initiated only when the actuating element is actuated for a predetermined minimum actuation time.
Es ist bevorzugt, dass die Mindestbetätigungsdauer 2 s bis 10 s, vorzugsweise 2,5 s bis 4,5 s und besonders bevorzugt 3 s beträgt. It is preferred that the minimum actuation time is 2 s to 10 s, preferably 2.5 s to 4.5 s and particularly preferably 3 s.
Es ist bevorzugt, dass das Betätigungselement ein Autoreturn-Betätigungselement zur Initiieren einer Autoreturn-Bewegung der Ladebrücke, ein Hebe- Betätigungselement zum Anheben der Ladebrücke oder ein Lippenbetätigungselement zum Betätigen einer Lippe der Ladebrücke ist. Es ist bevorzugt, dass die Ladebrückensteuerung mehrere einstellbare unterschiedliche Funktionsmodi hat, wobei ein Funktionsmodus oder mehrere Funktionsmodi, in dem wenigstens eine vorbestimmte Bewegung der Ladebrücke erst bei Betätigen des Betätigungselements über die vorbestimmte Mindestbetätigungsdauer initiiert wird, durch Vorprogrammierung oder Einstellung auswählbar oder manuell oder automatisch einstellbar ist. It is preferred that the actuator is an autoreturn actuator for initiating an autoreturn movement of the dock leveler, a lift actuator for raising the dock leveler, or a lip actuator for actuating a lip of the dock leveler. It is preferred that the dock leveler control has a number of different adjustable function modes, with one or more function modes in which at least one predetermined movement of the dock leveler is only initiated when the actuating element is actuated for the predetermined minimum actuation time, can be selected by pre-programming or setting, or can be set manually or automatically is.
Es ist bevorzugt, dass eine Warnsignalausgabeeinrichtung zum Ausgeben eines akustischen und/oder optischen Warnsignals vorgesehen ist, wobei die Ladebrückensteuerung dazu eingerichtet ist, während oder im Verlauf der Betätigung des Betätigungselements die Warnsignalausgabeeinrichtung zum Abgeben eines optischen oder akustischen Warnsignals anzusteuern. Es ist bevorzugt, dass die Warnsignalausgabeeinrichtung zum Ausgeben eines optischen Warnsignals an eine in einem Laderaum eines an der Ladebrücke angedockten Fahrzeugs befindliche Person ausgebildet ist. Insbesondere ist eine optische Warnsignalausgabeeinrichtung in einem Innenraum einer Ladestelle, z.B. in einer Ladebrückenschleuse angeordnet. Bei einer Ausgestaltung ist vorgesehen, dass eine Ladeleuchte zum Ausleuchten des Bereichs der Ladestelle zum Ausgeben eines optischen Warnsignals, z.B. durch Blinken und/oder durch Farbwechsel oder dergleichen, ausgebildet ist oder mit einer zusätzlichen Warnsignallampe wie bspw. einem Blinklicht ausgestattet ist. It is preferred that a warning signal output device is provided for outputting an acoustic and/or visual warning signal, the dock leveler control being set up to actuate the warning signal output device to output a visual or acoustic warning signal during or during the actuation of the actuating element. It is preferred that the warning signal output device is designed to output a visual warning signal to a person located in a loading space of a vehicle docked on the loading bridge. In particular, an optical warning signal output device is arranged in an interior space of a loading point, e.g. in a dock leveler lock. In one embodiment, it is provided that a charging light is designed to illuminate the area of the charging point to emit a visual warning signal, e.g. by flashing and/or by changing color or the like, or is equipped with an additional warning signal lamp such as a flashing light.
Es ist bevorzugt, dass mehrere Ladebrücken mit jeweils den Ladebrücke zugeordneten Betätigungselementen vorgesehen sind, wobei die Warnsignalausgabeeinrichtung zum Ausgeben von den einzelnen Ladebrücken zugeordneten Warnsignalen bei Betätigung des zugeordneten Betätigungselements ausgebildet ist. It is preferred that a plurality of dock levellers are provided, each with actuating elements assigned to the dock leveller, the warning signal output device being designed to output warning signals assigned to the individual dock levellers when the assigned actuating element is actuated.
Gemäß einem weiteren Aspekt schafft die Erfindung ein Verfahren zum Betreiben einer Ladebrückenanordnung, die wenigstens eine mittels einer Ladebrückensteuerung ansteuerbare Ladebrücke mit Ladebrückenantrieb aufweist, umfassend Betätigen eines Betätigungselements über eine vorbestimmte Mindestbetätigungsdauer, um eine Bewegung der Ladebrücke zu starten. Vorzugsweise umfasst das Verfahren automatische Abgabe eines Vorwarnsignals an eine im Bereich eines an der Ladebrücke stehenden Fahrzeugs befindliche Person bei oder im Verlauf der Betätigung des Betätigungselements über die Mindestbetätigungsdauer. According to a further aspect, the invention provides a method for operating a dock leveler arrangement which has at least one dock leveler with dock leveler drive that can be controlled by a dock leveler controller, comprising actuating an actuating element for a predetermined minimum actuation period in order to start movement of the dock leveler. The method preferably includes automatic delivery of a pre-warning signal to a person located in the area of a vehicle standing on the dock leveler when or during the actuation of the actuation element for the minimum actuation time.
Vorzugsweise ist das Verfahren zum Betreiben einer Ladebrückensteuerung, die wenigstens eine erste und eine zweite Ladebrücke und ein erstes Betätigungselement zum Starten einer Bewegung der ersten Ladebrücke und ein zweites Betätigungselement zu Starten einer Bewegung der zweiten Ladebrücke aufweist, ausgebildet, wobei zum Starten der Bewegung das Betätigungselement zumindest über die Mindestbetätigungsdauer betätigt werden muss und wobei bei Betätigung des ersten Betätigungselements ein erstes Vorwarnsignal und bei Betätigung des zweiten Betätigungselements ein zweites Vorwarnsignal abgegeben wird. The method is preferably designed to operate a dock leveler control that has at least a first and a second dock leveler and a first actuating element for starting a movement of the first dock leveler and a second actuating element for starting a movement of the second dock leveler, with the actuating element for starting the movement must be actuated at least for the minimum actuation time and wherein a first pre-warning signal is emitted when the first actuating element is actuated and a second pre-warning signal is emitted when the second actuating element is actuated.
Gemäß einem weiteren Aspekt schafft die Erfindung ein Com puterprogramm produkt, umfassend maschinenlesbare Steueranweisungen, die, wenn in die Ladebrückensteuerung der Ladebrückenanordnung nach einem der Ansprüche 1 bis 6 geladen, die Ladebrückenanordnung veranlassen, das Verfahren nach einem der Ansprüche 7 bis 9 durchzuführen. According to a further aspect, the invention provides a computer program product comprising machine-readable control instructions which, when loaded into the dock leveler controller of the dock leveler arrangement according to any one of claims 1 to 6, cause the dock leveler arrangement to carry out the method according to any one of claims 7 to 9.
Beispiele für die Ladebrückensteuerung, die Ladebrückenantriebe und die Ladebrückensteuerungen sind in den Literaturstellten [1], [2] und [3] gezeigt. Ausgestaltungen der Erfindung unterscheiden sich insbesondere durch eine zusätzliche Funktion oder Einrichtung der Ladebrückensteuerung derart, dass für Personal am oder im zu beladenden oder auszuladenden Fahrzeug potentiell gefährliche Bewegungen der Ladebrücke erst durch eine lange Betätigung des entsprechenden Betätigungselements gestartet werden können. Optional kann ein Vorwarnsignal abgegeben werden. Examples of the dock leveler control, the dock leveler drives and the dock leveler controls are shown in references [1], [2] and [3]. Embodiments of the invention differ in particular by an additional function or device of the dock leveler control such that potentially dangerous movements of the dock leveler for personnel on or in the vehicle to be loaded or unloaded can only be started by a long operation of the corresponding actuating element. Optionally, a pre-warning signal can be given.
Ausführungsbeispiele der Erfindung betreffen einen langen Tastendruck bei Ladebrücken. Insbesondere umfassen Ausführungsformen der Erfindung eine Einrichtung oder einen Schritt eines langer Tastendrucks mit Vorwarnung zur Befehlsausführung bei einer Ladebrückensteuerung. Embodiments of the invention relate to a long button press on dock levellers. In particular, embodiments of the invention include a Setup or a step of a long press with pre-warning to command execution in a dock leveler controller.
In der Verladetechnik kann es zu schweren Unfällen kommen, wenn die Ladebrücke z.B. beim Herausfahren eines Ladepersonals aus dem Auflieger versehentlich von einem Dritten betätigt und angehoben wird. Beispielsweise wäre es denkbar, dass ein Ladearbeiter, der die Verladung vorgenommen hat, auf einem Hubwagen stehend rückwärts in eine hochstehende Kante der Ladebrücke fährt und sich dabei im schlimmsten Fall beide Knöchel zertrümmert. Dies kann z. B. dann passieren, wenn ein Dritter kurzzeitig und aus Versehen eine Taste der Ladebrückensteuerung betätigt. Eine Lösung für solche Fälle könnte sein, dass man z. B. über einen Schlüsselschalter eine Benutzerschnittstelle, z.B. die Deckeltastatur der Ladebrückensteuerung, während des Verladevorgangs sperrt. Diese Lösung hätte aber die Nachteile, dass der Schlüsseltaster zusätzlichen apparativen Aufwand und Institutionen bedeutet und zum anderen der Schlüssel auch immer dann vorhanden sein, wenn er benötigt wird. Außerdem kann das Sperren der Tastatur leicht vom Ladearbeiter vergessen werden. In loading technology, serious accidents can occur if the dock leveler is accidentally actuated and raised by a third party, e.g. when loading personnel drive out of the trailer. For example, it is conceivable that a loading worker who has carried out the loading, standing on a lift truck, drives backwards into a raised edge of the dock leveler and, in the worst case, smashes both ankles. This can e.g. This can happen, for example, if a third party accidentally presses a button on the dock leveler control for a short time. A solution for such cases could be that e.g. g. via a key switch, locks a user interface, e.g. the lid keyboard of the dock leveler control, during the loading process. However, this solution would have the disadvantages that the key switch means additional expenditure on equipment and institutions and, on the other hand, the key should always be available when it is needed. Also, locking the keyboard can easily be forgotten by the loading worker.
Um eine versehentliche Fehlbedienung zu verhindern, kann bei bevorzugten Ausgestaltungen der Erfindung ein langer Tastendruck (vorzugsweise 3 Sek.) an der Steuerung programmiert werden. Die Taste muss in diesem Fall für 3 Sek. gedrückt gehalten werden, bevor es zur Ausführung des Fahrbefehls kommt. Optional kann während der Betätigungsdauer, z.B. während der 3 Sek., ein Warnsignal ausgegeben werden. In preferred embodiments of the invention, in order to prevent accidental incorrect operation, a long button press (preferably 3 seconds) can be programmed on the controller. In this case, the button must be pressed for 3 seconds before the move command is executed. Optionally, a warning signal can be output during the actuation period, e.g. during the 3 seconds.
Man benötigt keinen Schlüsselschalter o. ä., da es sich um eine rein softwareseitige Lösung handelt. You don't need a key switch or similar, as it is a purely software-based solution.
Versehentliche Fehlbedienungen werden verhindert, da ein langer Tastendruck kein Versehen ist. Accidental operating errors are prevented, since a long button press is not an accident.
Die erfindungsgemäßen Ausgestaltungen können vorzugsweise durch Änderung der Hardware oder Software der in den Literaturstellen [1], [2] bis [3] gezeigten Ladebrücken, Ladebrückensteuerungen und Ladebrückenanordnung erhalten werden. The embodiments of the present invention can be preferably accomplished by changing the hardware or software of those shown in references [1], [2] to [3]. Loading bridges, loading bridge controls and loading bridge arrangement are obtained.
Man kann für die Zeit des langen Tastendrucks, z.B. über 3 Sek., also bevor sich die Ladebrücke in Bewegung setzt, zusätzlich z.B. über eine angeschlossene Signalleuchte, insbesondere Ampel, mehr insbesondere LED-Ampel im Ladebereich ein gelbes Warnsignal für den verladenden Mitarbeiter aussenden. Hierdurch wird für Ihn signalisiert, dass sich die Ladebrücke gleich in Bewegung setzen wird. Hierdurch wäre auch gewährleistet, dass der Bediener nicht aus Versehen die Steuerung der falschen Ladebrücke betätigt, da die Steuerungen und Ladebrücken bauseits häufig aneinander gereiht sind, so dann man nicht immer leicht und auf den ersten Blick erkennen kann, ob die Steuerung die linke oder rechte Ladebrücke bedient. Auch hierdurch kam es in der Vergangenheit schon zu schweren Unfällen. Dies lässt sich durch Abgabe des der jeweiligen Ladebrücke zugeordneten eindeutigen Warnsignals verbinden. Zusätzlich könnte man dem Bediener an der Steuerung ebenfalls über ein gelbes LED-Warnlicht in der Deckeltastatur die in kurzer Zeit anstehende Bewegung bzw. Befehlsausführung signalisieren. Auch akustische Warnsignale parallel zur Blinkfrequenz der Warnleuchte sind ebenso denkbar, wie ausschließlich akustische Signale. For the time of the long button press, e.g. more than 3 seconds, i.e. before the dock leveler starts moving, you can also send out a yellow warning signal for the loading employee, e.g. via a connected signal light, especially traffic light, more especially LED traffic light in the loading area. This signals to him that the dock leveler is about to start moving. This would also ensure that the operator does not accidentally operate the control of the wrong dock leveler, since the controls and dock levellers are often lined up on site, so it is not always easy to see at first glance whether the control is on the left or the right Loading bridge operated. This has also resulted in serious accidents in the past. This can be combined by issuing the clear warning signal assigned to the respective loading bridge. In addition, a yellow LED warning light in the lid keyboard could also be used to signal to the operator on the controller that a movement or command execution is due in a short time. Acoustic warning signals parallel to the flashing frequency of the warning light are also conceivable, as are exclusively acoustic signals.
Ausführungsbeispiele der Erfindung werden nachfolgend anhand der beigefügten Figuren näher erläutert. Darin zeigt: Exemplary embodiments of the invention are explained in more detail below with reference to the accompanying figures. It shows:
Fig. 1 eine perspektivische Ansicht einer Ladebrückenanordnung mit einer ersten und einer zweiten Ladebrücke von außen, wobei die erste Ladebrücke durch eine erste Ladebrückensteuerung ansteuerbar ist und die zweite Ladebrücke durch eine zweite Ladebrückensteuerung ansteuerbar ist; 1 shows a perspective view of a dock leveler arrangement with a first and a second dock leveler from the outside, the first dock leveler being controllable by a first dock leveler control and the second dock leveler being controllable by a second dock leveler control;
Fig. 2 eine perspektivische Ansicht eines Ausführungsbeispiels derFig. 2 is a perspective view of an embodiment of
Ladebrückensteuerung für die Ansteuerung der jeweiligen Ladebrücken von Fig. 1 ; Loading bridge control for controlling the respective loading bridges from FIG. 1 ;
Fig. 3 schematische Darstellungen von drei Schritten zum Auflegen der ersten oder zweiten Ladebrücke der Ladebrückenanordnung von Fig. 1 auf ein zu be- oder entladendes Fahrzeug; Fig. 4 eine schematische Darstellung von fünf Schritten zum Zurückführen der jeweiligen Ladebrücke der Ladebrückenanordnung von Fig. 1; FIG. 3 shows schematic representations of three steps for placing the first or second loading bridge of the loading bridge arrangement from FIG. 1 onto a vehicle to be loaded or unloaded; FIG. 4 shows a schematic representation of five steps for returning the respective dock leveler of the dock leveler arrangement of FIG. 1;
Fig. 5 ein weiteres Ausführungsbeispiel einer Ladebrückenanordnung mit einer ersten Ladebrücke und einer zweiten Ladebrücke und jeweils zugeordneten Ladebrückensteuerungen; 5 shows a further exemplary embodiment of a dock leveler arrangement with a first dock leveler and a second dock leveler and associated dock leveler controls in each case;
Fig. 6 eine perspektivische Ansicht einer der Ladebrückensteuerungen von Fig. Fig. 6 is a perspective view of one of the dock leveler controls of Fig.
5; 5;
Fig. 7 eine schematische Ansicht von unterschiedlichen Schritten zum Auflegen einer der Ladebrücken der Ladebrückenanordnung von Fig. 5 auf ein zu be- oder entladendes Fahrzeug; FIG. 7 shows a schematic view of different steps for placing one of the loading bridges of the loading bridge arrangement from FIG. 5 onto a vehicle to be loaded or unloaded;
Fig. 8 eine schematische Darstellung von fünf Schritten zum Zurückführen der Ladebrücke von Fig. 7 in ihre Ruhestellung. Fig. 8 is a schematic representation of five steps for returning the dock leveler of Fig. 7 to its rest position.
In Fig. 1 ist eine schematische Darstellung einer Ladebrückenanordnung 10 gezeigt. Die Ladebrückenanordnung 10 weist eine erste Ladebrücke 12.1 an einer ersten Ladestelle 14.1 eines Gebäudes und eine zweite Ladebrücke 12.2. an einer zweiten Ladestelle 14.2 des Gebäudes auf. Weiter weist die Ladebrückenanordnung 10 eine erste Ladebrückensteuerung 16.1 zum Steuern der ersten Ladebrücke 12.1 und eine zweite Ladebrückensteuerung 16.2 zum Steuern der zweiten Ladebrücke 12.2 auf. Die Ladebrückensteuerungen 16.1.1 shows a schematic representation of a dock leveler arrangement 10 . The dock leveler assembly 10 has a first dock leveler 12.1 at a first loading point 14.1 of a building and a second dock leveler 12.2. at a second loading point 14.2 of the building. Furthermore, the dock leveler arrangement 10 has a first dock leveler controller 16.1 for controlling the first dock leveler 12.1 and a second dock leveler controller 16.2 for controlling the second dock leveler 12.2. The dock leveler controls 16.1.
16.2 sind in Fig. 1, die eine Außenansicht des Gebäudes darstellt, nur schematisch durch gestrichelte Rechtecke dargestellt, da sich die Ladebrückensteuerungen 16.1, 16.2 im Innenraum des Gebäudes befinden. Die Ladebrückensteuerungen 16.1, 16.2 sind so ausgebildet, wie dies in Fig. 2 dargestellt ist. Weiter weist die Ladebrückenanordnung 10 eine der ersten Ladebrücke 12.1 zugeordnete und durch die erste Ladebrückensteuerung 16.1 angesteuerte erste Warnsignalausgabeeinrichtung 18.1 und eine der zweiten Ladebrücke 12.2 zugeordnete und durch die zweite Ladebrückensteuerung 16.2 angesteuerte zweite Warnsignalausgabeeinrichtung 18.2 auf. Die Warnsignalausgabeeinrichtungen 18.1, 18.2 weisen jeweils einen in Fig. 1 nicht näher dargestellten akustischen Signalgeber 46 und eine Lichtzeichenanlage in Form einer Ampel 20.1, 20.2 auf, wobei jede der Ampeln 20.1, 20.2 ein Rotlicht R, ein Gelblicht Y und ein Grünlicht G aufweist. Die Ampel 20.1 , 20.2 ist so angeordnet, dass sie auch von Inneren eines an die Ladestelle angedockten Fahrzeugs 40 zu sehen ist. Alternativ oder zusätzlich kann die Warnsignalausgabeeinrichtung 18.1, 18.2 eine durch die Ladeöffnung der Ladestelle hindurch sichtbare Blinkleuchte oder Ladeleuchte (nicht dargestellt - für nähere Einzelheiten wird auf [3] verwiesen) enthalten. Die Ladeleuchte kann zum Ausleuchten der Ladestelle und des Innenraums des Fahrzeugs 40 beim Ladevorgang dienen und zusätzlich eine optische Warnfunktion, wie z.B. eine Blinkfunktion, haben, um das Warnsignal auszugeben. Die Warnsignalausgabeeinrichtung 18.1, 18.2 kann auch eine z.B. im Inneren einer Vorsatzschleuse (nicht dargestellt, siehe [3] für nähere Einzelheiten) angeordnete Signallampe aufweisen. 16.2 are shown only schematically by dashed rectangles in FIG. 1, which shows an outside view of the building, since the dock leveler controls 16.1, 16.2 are located inside the building. The dock leveler controls 16.1, 16.2 are designed as shown in FIG. Furthermore, the dock leveler arrangement 10 has a first warning signal output device 18.1 assigned to the first dock leveler 12.1 and controlled by the first dock leveler control 16.1 and a second warning signal output device 18.2 assigned to the second dock leveler 12.2 and controlled by the second dock leveler control 16.2. The warning signal output devices 18.1, 18.2 each have an acoustic signal transmitter 46 (not shown in detail in FIG. 1) and a traffic light system in the form of a traffic light 20.1, 20.2, each of the traffic lights 20.1, 20.2 having a red light R, a yellow light Y and a green light G. The traffic light 20.1, 20.2 is arranged in such a way that it can also be seen from the inside of a vehicle docked at the loading point Vehicle 40 can be seen. Alternatively or additionally, the warning signal output device 18.1, 18.2 can contain a flashing light or charging light (not shown - for more details see [3]) visible through the loading opening of the loading point. The charging light can be used to illuminate the charging point and the interior of the vehicle 40 during the charging process and can also have an optical warning function, such as a flashing function, in order to emit the warning signal. The warning signal output device 18.1, 18.2 can also have a signal lamp arranged, for example, inside a loading house (not shown, see [3] for more details).
Die Ladebrücken 12.1, 12.2 der in Fig. 1 dargestellten ersten Ausführungsform der Ladebrückenanordnung 10 sind als hydraulische Klappkeilladebrücken 22 mit einer Plattform 24 und einer Klapplippe 26 ausgebildet. Die Plattform 24 ist mittels eines einem Pumpenmotor aufweisenden Hydraulikantriebs anhebbar und durch Betätigung von Magnetventilen absenkbar. Die Klapplippe 26 ist an der Vorderkante der Plattform 24 klappbar angelenkt und lässt sich ebenfalls über den Hydraulikantrieb heben und über Magnetventile senken. Die Ladebrückensteuerung 16.1, 16.2 ist dazu eingerichtet, den Hydraulikantrieb und die Magnetventile gemäß gespeicherter Ablaufprogramme anzusteuern. The dock levellers 12.1, 12.2 of the first embodiment of the dock leveler arrangement 10 shown in FIG. The platform 24 can be raised by means of a hydraulic drive having a pump motor and lowered by actuating solenoid valves. The folding lip 26 is hinged to the front edge of the platform 24 so that it can be folded and can also be raised via the hydraulic drive and lowered via solenoid valves. The dock leveler control 16.1, 16.2 is set up to control the hydraulic drive and the solenoid valves according to stored sequence programs.
Wie Fig. 2 zeigt, weist die erste Ausführungsform der Ladebrückensteuerung 16.1 , 16.2 ein erstes und zweites Betätigungselement 28.1 , 28.2 zur Ladebrückenbetätigung auf. Das erste Betätigungselement 28.1 ist eine Brückenlauf-Taste 30 und das zweite Betätigungselement 28.2 ist eine Autoreturn- Taste 32. Weiter weist die Ladebrückensteuerung 16.1, 16.2 eine Benutzerinformationseinrichtung 34 zur Ausgabe einer Information an den Benutzer 42, hierz. B. in Form einer zweistelligen Siebensegmentanzeige 36 auf. Die in Fig. 2 dargestellte Ausführungsform der Ladebrückensteuerung 16.1, 16.2 weist noch ein optionales drittes Betätigungselement in Form einer Torabdichtungstaste 38 zum Betätigen einer hier nicht näher dargestellten Torabdichtung auf. Wie Fig. 3 zeigt, ist die Ladebrückensteuerung 16.1, 16.2 durch entsprechende Programmierung mittels eines Com puterprogramm produkts, welches in einen nicht dargestellten Mikroprozessor der Ladebrückensteuerung 16.1, 16.2 geladen ist, dazu eingerichtet, die zugeordnete Ladebrücke 12.1, 12.2 auf ein Fahrzeug 40, wie in insbesondere Lastkraftwagen, welches an die entsprechende LadestelleAs shown in FIG. 2, the first embodiment of the dock leveler control 16.1, 16.2 has a first and second actuating element 28.1, 28.2 for actuating the dock leveler. The first actuator 28.1 is a bridge run button 30 and the second actuator 28.2 is an auto-return button 32. Next, the dock leveler controller 16.1, 16.2 has a user information device 34 for outputting information to the user 42, herez. B. in the form of a two-digit seven-segment display 36 on. The embodiment of the dock leveler control 16.1, 16.2 shown in FIG. 2 also has an optional third actuating element in the form of a dock shelter button 38 for actuating a dock shelter that is not shown in detail here. As Fig. 3 shows, the dock leveler control 16.1, 16.2 is set up by appropriate programming using a computer program product, which is loaded into a microprocessor, not shown, of the dock leveler control 16.1, 16.2, the associated dock leveler 12.1, 12.2 on a vehicle 40, such as in particular trucks, which go to the appropriate loading point
14.1, 14.2 herangefahren ist, abzulegen. Weiter ist die Ladebrückensteuerung14.1, 14.2 has approached to take off. Next is the dock leveler control
16.1, 16.2 dazu ausgebildet, die zugeordnete Ladebrücke 12.1, 12.2 aus der auf dem Fahrzeug auflegenden Stellung gemäß vorprogrammierter Ablaufprogramme in die Ruhestellung zu überführen, wobei die einzelnen Schritte in Fig. 4 dargestellt sind. 16.1, 16.2 are designed to move the associated dock leveler 12.1, 12.2 from the position resting on the vehicle into the rest position according to pre-programmed sequence programs, with the individual steps being shown in FIG.
Fig. 3 zeigt die einzelnen Schritte beim Vorgang „Ladebrücke platzieren“. Zum Platzieren der Plattform 24 auf der Ladefläche des Fahrzeugs 40 drückt eine Bedienperson 42 die Brückenlauf-Taste 30 und hält diese gedrückt, wie dies in Schritt 1 von Fig. 3 dargestellt ist. Die Plattform 24 fährt nach oben bis zu der höchsten Position. Dort spricht ein Überdruckschalter an. Daraufhin wird die Klapplippe 26 ausgefahren, wie dies in Schritt 2 von Fig. 3 dargestellt ist. Anschließend wird die Brückenlauf-Taste 30 losgelassen. Die Ladebrückensteuerung 16.1, 16.2 schaltet die Hydraulikpumpe ab und steuert ein Magnetventil zum Absenken an. Die Plattform 24 senkt auf die Ladefläche 44 des Fahrzeugs 40 ab, wie dies in Schritt 3 von Fig. 3 dargestellt ist. In dieser letzten in Fig. 3 gezeigten Position bleibt das Magnetventil zum Senken der Plattform 24 offen, sodass sich die Plattform 24 zusammen mit dem Fahrzeug 40 bewegen kann. In dieser Position erfolgt das Entladen oder Beladen des Fahrzeugs 40 durch die Bedienperson 42. Diese fährt z. B. mit einem Flurförderfahrzeug auf das Fahrzeug 40 und fährt anschließend wieder über die Ladebrücke 12.1, 12.2 aus dem Fahrzeug 40 heraus. Wenn sich nun die Bedienperson 42 mit dem Flurförderfahrzeug in dem Fahrzeug 40 befindet und sich die Plattform 24 unbemerkt von der Bedienperson 42 anhebt, kann dies zu Unfällen führen. Eine solche Situation könnte z. B. durch versehentliches Betätigen eines der Betätigungselemente 28.1, 28.2 durch eine weitere Person eintreten, die vielleicht die jeweils andere Ladebrücke 12.2 an der anderen Ladestelle 14.1, 14.2 bedienen will und somit das Betätigungselement 28.1, 28.2 versehentlich betätigt. Aus diesem Grund enthält die Ladebrückensteuerung 16.1, 16.2 ein auswählbar aktivierbares Programm. Ist die Funktion vorgesehen, kann das Programm durch den in Fig. 3 dargestellten Platzierungsvorgang automatisch aktiviert werden. Mit diesem Sicherungsprogramm wird eine Bewegung der Ladebrücke 12.1, 12.2 erst dann begonnen, wenn das Betätigungselement 28.1, 28.2 über eine vorbestimmte Betätigungsdauer hinweg andauernd betätigt wird. Beispielsweise muss das Betätigungselement 28.1 , 28.2 zumindest 2,5 s, vorzugsweise 3 s, gedrückt gehalten werden, bevor die durch das Betätigungselement 28.1, 28.2 zu betätigende Bewegung der Ladebrücke 12.1, 12.2 beginnt. Fig. 3 shows the individual steps in the "Place loading bridge" process. To place the platform 24 on the bed of the vehicle 40, an operator 42 presses and holds the bridge run button 30 as shown in step 1 of FIG. The platform 24 moves up to the highest position. A pressure switch responds there. The folding lip 26 is then extended, as shown in step 2 of FIG. Then the bridge run button 30 is released. The dock leveler control 16.1, 16.2 switches off the hydraulic pump and controls a solenoid valve for lowering. The platform 24 lowers onto the bed 44 of the vehicle 40 as shown in step 3 of FIG. In this final position shown in FIG. 3 , the platform lowering solenoid valve 24 remains open, allowing the platform 24 to move with the vehicle 40 . In this position, the vehicle 40 is unloaded or loaded by the operator 42. This drives z. B. with an industrial truck on the vehicle 40 and then moves out again over the dock leveler 12.1, 12.2 from the vehicle 40. If the operator 42 is now in the vehicle 40 with the industrial truck and the platform 24 is raised without the operator 42 noticing, this can lead to accidents. Such a situation could e.g. B. by accidental actuation of one of the actuators 28.1, 28.2 by another person who may want to operate the other dock leveler 12.2 at the other loading point 14.1, 14.2 and thus accidentally actuates the actuator 28.1, 28.2. For this reason, the dock leveler control 16.1, 16.2 contains a program that can be selected and activated. If the function is provided, the program can be automatically activated by the placement process shown in FIG. With this safety program, a movement of the dock leveler 12.1, 12.2 is only started when the actuating element 28.1, 28.2 is continuously actuated for a predetermined actuating period. For example, the actuating element 28.1, 28.2 must be kept pressed for at least 2.5 s, preferably 3 s, before the movement of the dock leveler 12.1, 12.2 to be actuated by the actuating element 28.1, 28.2 begins.
Dies wird im Folgenden anhand der Darstellung von Fig. 4 erläutert. Will eine Bedienperson 42 die Ladebrücke 12.1, 12.2 aus der in Fig. 3 in Schritt 3 dargestellten Auflageposition, die in Fig. 4 mit 1 gekennzeichnet ist, in ihre Ruhestellung zurückbewegen, muss sie gemäß Fig. 4, Schritt 2 die Autoreturn- Taste 32 über eine längere Betätigungszeit hinweg gedrückt halten, hier über 3 s. Die Länge der längere Betätigungszeit wird so eingestellt, dass die entsprechende Funktion nicht durch eine versehentliche Betätigung initiiert wird, sondern dass klar ist, dass die Betätigung gewollt ist. Wie in Schritt 3 von Fig. 4 angegeben wird außerdem das Gelblich Y der zugeordneten Ampel 20.1 , 20.2 blinkend betätigt. Außerdem wird durch die zugeordnete Warnsignalausgabeeinrichtung 18.1, 18.2 mittels dem akustischen Signalgeber 46 ein akustisches Signal 48 abgegeben. Vorzugsweise unterscheiden sich die akustischen Signale 48 der unterschiedlichen Warnsignalausgabeeinrichtungen 18.1, 18.2. Wie man aus Fig. This is explained below with reference to the illustration in FIG. 4 . If an operator 42 wants to move the dock leveler 12.1, 12.2 from the support position shown in step 3 of Fig. 3, which is marked with 1 in Fig. 4, back to its rest position, he must press the autoreturn button 32 according to Fig. 4, step 2 keep it pressed for a longer period of time, here more than 3 s. The length of the longer period of actuation is set in such a way that the corresponding function is not initiated by accidental actuation, but that it is clear that the actuation is intentional. As indicated in step 3 of FIG. 4, the yellow light Y of the assigned traffic light 20.1, 20.2 is actuated to flash. In addition, an acoustic signal 48 is emitted by the associated warning signal output device 18.1, 18.2 by means of the acoustic signal transmitter 46. The acoustic signals 48 of the different warning signal output devices 18.1, 18.2 preferably differ. As can be seen from Fig.
1 erkennen kann, ist die Ampel 20.1 , 20.2 auch vom Inneren des Fahrzeugs 40 aus erkennbar, sodass eine sich auf der Ladefläche 44 befindliche Bedienperson 42 vor einer beginnenden Bewegung der Ladebrücke 12.1, 12.2 gewarnt wird. 1, the traffic light 20.1, 20.2 can also be seen from inside the vehicle 40, so that an operator 42 located on the loading area 44 is warned of an incipient movement of the dock leveler 12.1, 12.2.
Durch den 3 s andauernden Tastendruck der Autoreturn-Taste 32 wird ein Rückführprogramm in der Ladebrückensteuerung 16.1, 16.2 gestartet. Die Ladebrückensteuerung 16.1, 16.2 steuert die zugeordneten Ladebrücken 12.1, 12.2 so an, dass die Plattform 24 aufwärts fährt und gleichzeitig die Klapplippe 26 eingeklappt wird. Bei vollständig eingeklappter Klapplippe 26 senkt die Plattform 24 in die Ruheposition ab. In den Fig. 5 - 8 ist eine zweite Ausführungsform einer Ladebrückenanordnung 10 mit entsprechenden Ladebrücken 12.1, 12.2, Ladebrückensteuerung 16.1, 16.2 und Warnsignalausgabeeinrichtung 18.1, 18.2 gezeigt. Unterschiedlich hierbei ist im Wesentlichen, dass die Ladebrücken 12.1, 12.2 nicht als Klappkeilladebrücken, sondern als Vorschubladebrücken 50 mit der Plattform 24 und einer Vorschublippe 52 ausgebildet sind. Die zugeordnete Ladebrückensteuerung 16.1, 16.2, die in Fig. 6 dargestellt ist, weist zum Ansteuern der Ladebrücke 12.1, 12.2 vier Betätigungselemente 28.1 - 28.4 auf, wobei neben der Brückenlauf-Taste 30 und der Autoreturn-Taste 32 als ersten und zweiten Betätigungselement 28.1 , 28.2 noch eine Lippe-Vorfahren-Taste 54 und eine Lippe-Rückfahren-Taste 56 drittes Betätigungselement 28.3, als viertes Betätigungselement 28.4 vorhanden sind. By pressing the autoreturn button 32 for 3 seconds, a return program is started in the dock leveler control 16.1, 16.2. The loading bridge control 16.1, 16.2 controls the assigned loading bridges 12.1, 12.2 in such a way that the platform 24 moves upwards and at the same time the folding lip 26 is folded in. When the folding lip 26 is fully folded in, the platform 24 lowers to the rest position. 5-8 show a second embodiment of a loading bridge arrangement 10 with corresponding loading bridges 12.1, 12.2, loading bridge control 16.1, 16.2 and warning signal output device 18.1, 18.2. The main difference here is that the dock levellers 12.1, 12.2 are not designed as hinged lip dock levellers, but as telescopic dock levellers 50 with the platform 24 and a telescopic lip 52. The assigned dock leveler control 16.1, 16.2, which is shown in FIG. 6, has four actuating elements 28.1-28.4 for controlling the dock leveler 12.1, 12.2, with the first and second actuating element 28.1, in addition to the bridge run button 30 and the autoreturn button 32, being 28.2 a lip-forward button 54 and a lip-back button 56 third actuating element 28.3, as a fourth actuating element 28.4 are present.
Gemäß Fig. 7 erfolgt das Auflegen der Ladebrücke 12.1, 12.2. auf die Ladefläche 44 des Fahrzeugs 40 durch andauerndes Betätigen der B rücken lauf-Taste 30 (Schritt 1) zum Hochfahren, gleichzeitiges Betätigen der Lippe-Vorfahren-Taste 54 zum Vorfahren der Vorschublippe 52 (Schritt 2) und Loslassen der Tasten 54, 30 (Schritt 3) zum Absenken. Durch diesen Vorgang wird wiederum das Sicherungsprogramm aktiviert, wonach eine anschließende Bewegung der Ladebrücke 12.1, 12.2, insbesondere ein Anheben der Plattform 24, erst nach einem langen Tastendruck beginnt. In dem Beispiel von Fig. 8 muss die Bedienperson 52 wiederum - Schritt 2 - die Autoreturn-Taste 323 s gedrückt halten, bevor die Plattform 40 sich aus der als Schritt 1 gezeigten Auflagestellung heraus anhebt. Während dieser Zeit vor dem Anheben gibt die Warnsignalausgabeeinrichtung 18.1 , 18.2 - Schritt 3 - wiederum das optische Warnsignal - Gelblicht-Blinken der Ampel 20.1 , 20.2 - und/oder das akustische Warnsignal 48 aus. Anschließend wird wie bei Schritt 4 von Fig. 8 angegeben, die Plattform 24 angehoben und die Vorschublippe 52 automatisiert eingefahren, anschließend, wenn die Vorschublippe vollständig eingefahren ist, senkt die Ladebrücke 12.1, 12.2 auf die Ruhestellung hinab - Schritt 5. According to FIG. 7, the loading bridge 12.1, 12.2 is placed. onto the loading area 44 of the vehicle 40 by continuously pressing the bridge run button 30 (step 1) to raise, simultaneously pressing the lip advance button 54 to advance the feed lip 52 (step 2) and releasing the buttons 54, 30 ( Step 3) to lower. This process in turn activates the security program, after which a subsequent movement of the dock leveler 12.1, 12.2, in particular a raising of the platform 24, only begins after a long press of the button. In the example of FIG. 8 , the operator 52 must again - step 2 - hold down the autoreturn button 323 s before the platform 40 rises from the support position shown as step 1 . During this time before the lifting, the warning signal output device 18.1, 18.2--step 3--in turn outputs the optical warning signal--yellow light flashing of the traffic light 20.1, 20.2--and/or the acoustic warning signal 48. Then, as indicated in step 4 of FIG. 8, the platform 24 is raised and the feed lip 52 is automatically retracted, then, when the feed lip is fully retracted, the loading bridge 12.1, 12.2 is lowered to the rest position - step 5.
Wie in Fig. 5 gezeigt, können die Betätigungselemente 28.1, 28.2, 28.3, 28.4 auch an einer beweglichen Bedienungseinheit 58 der Ladebrückensteuerung 16.1, 16.2 vorgesehen sein. Bezugszeichenliste: As shown in FIG. 5, the actuating elements 28.1, 28.2, 28.3, 28.4 can also be provided on a movable operating unit 58 of the dock leveler control 16.1, 16.2. Reference list:
10 Ladebrückenanordnung 10 dock leveler arrangement
12.1 erste Ladebrücke 12.1 first loading bridge
12.2 zweite Ladebrücke 12.2 second loading bridge
14.1 erste Ladestelle 14.1 First loading point
14.2 zweite Ladestelle 14.2 second loading point
16.1 erste Ladebrückensteuerung 16.1 first dock leveler control
16.2 zweite Ladebrückensteuerung 16.2 second dock leveler control
18.1 erste Warnsignalausgabeeinrichtung18.1 first warning signal output device
18.2 zweite Warnsignalausgabeeinrichtung18.2 second warning signal output device
20.1 erste Ampel 20.1 first traffic light
20.2 zweite Ampel 20.2 second traffic light
22 Klappkeilladebrücke 24 Plattform 26 Klapplippe 22 Hinged lip loading bridge 24 Platform 26 Hinged lip
28.1 erstes Betätigungselement 28.1 first actuating element
28.2 zweites Betätigungselement 28.2 second actuating element
28.3 drittes Betätigungselement 28.3 third actuating element
28.4 viertes Betätigungselement 30 Brückenlauf-Taste 28.4 fourth actuator 30 bridge run button
32 Autoreturn-Taste 34 Benutzerinformationseinrichtung 36 Siebensegmentanzeige 38 Torabdichtungs-Taste 40 Fahrzeug 42 Bedienperson 44 Ladefläche 46 akustischer Signalgeber 48 akustisches Signal 50 Vorschubladebrücken 52 Vorschublippe 54 Lippe-Vorfahren-Taste 56 Lippe-Rückfahren-Taste 58 Bedieneinheit R Rotlicht32 auto-return button 34 user information device 36 seven-segment display 38 dock shelter button 40 vehicle 42 operator 44 loading surface 46 acoustic signal transmitter 48 acoustic signal 50 telescopic lip bridges 52 telescopic lip 54 lip advance button 56 lip reverse button 58 control unit R red light
Y GelblichtY yellow light
G Grünlicht G green light

Claims

Ansprüche: Expectations:
1. Ladebrückensteuerung (16.1, 16.2) zum Steuern einer Ladebrücke (12.1, 12.2), wobei die Ladebrückensteuerung (16.1, 16.2) derart ausgebildet ist, dass ein Befehl zum Starten mindestens einer vorbestimmten Bewegung der Ladebrücke (12.1, 12.2) erst bei Betätigen eines Betätigungselements (28.1, 28.2, 28.3, 28.4) über eine vorbestimmte Mindestbetätigungsdauer abgegeben wird. 1. Dock leveler controller (16.1, 16.2) for controlling a dock leveler (12.1, 12.2), the dock leveler controller (16.1, 16.2) being designed in such a way that a command to start at least one predetermined movement of the dock leveler (12.1, 12.2) is only given when a Actuating element (28.1, 28.2, 28.3, 28.4) is released over a predetermined minimum actuation period.
2. Ladebrückensteuerung (16.1, 16.2) nach Anspruch 1, dadurch gekennzeichnet, dass die Mindestbetätigungsdauer 2 s bis 10 s, vorzugsweise 2,5 s bis 4,5 s und besonders bevorzugt 3 s beträgt. 2. Dock leveler control (16.1, 16.2) according to claim 1, characterized in that the minimum actuation time is 2 s to 10 s, preferably 2.5 s to 4.5 s and particularly preferably 3 s.
3. Ladebrückensteuerung (16.1, 16.2) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das Betätigungselement (28.1, 28.2, 28.3, 28.4) ein Autoreturn- Betätigungselement (32) zur Initiieren einer Autoreturn-Bewegung der Ladebrücke (12.1, 12.2), ein Hebe-Betätigungselement (30) zum Anheben der Ladebrücke (12.1, 12.2) oder ein Lippenbetätigungselement (54, 56) zum Betätigen einer Lippe der Ladebrücke (12.1, 12.2) ist. 3. Dock leveler control (16.1, 16.2) according to claim 1 or 2, characterized in that the actuating element (28.1, 28.2, 28.3, 28.4) has an auto-return actuating element (32) for initiating an auto-return movement of the dock leveler (12.1, 12.2), a lifting actuator (30) for raising the dock leveler (12.1, 12.2) or a lip actuator (54, 56) for actuating a lip of the dock leveler (12.1, 12.2).
4. Ladebrückensteuerung (16.1 , 16.2) nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass die Ladebrückensteuerung (16.1, 16.2) mehrere einstellbare unterschiedliche Funktionsmodi hat, wobei ein Funktionsmodus oder mehrere Funktionsmodi, in dem wenigstens eine vorbestimmte Bewegung der Ladebrücke (12.1; 12.2) erst bei Betätigen des Betätigungselements (28.1, 28.2, 28.3, 28.4) über die vorbestimmte Mindestbetätigungsdauer initiiert wird, durch Vorprogrammierung oder Einstellung auswählbar oder manuell oder automatisch einstellbar ist. 4. Dock leveler control (16.1, 16.2) according to one of the preceding claims, characterized in that the dock leveler control (16.1, 16.2) has a plurality of adjustable different functional modes, one functional mode or a plurality of functional modes in which at least one predetermined movement of the dock leveler (12.1; 12.2 ) is only initiated when the actuating element (28.1, 28.2, 28.3, 28.4) is actuated for the predetermined minimum actuating time, can be selected by pre-programming or setting, or can be set manually or automatically.
5. Ladebrückenanordnung (10) umfassend eine Ladebrücke (12.1, 12.2) mit einem Ladebrückenantrieb zum Antreiben einer Bewegung der Ladebrücke (12.1, 12.2) und eine Ladebrückensteuerung (16.1, 16.2) zum Steuern der Bewegung der Ladebrücke (12.1, 12.2), wobei die Ladebrückensteuerung (16.1, 16.2) eine Benutzerschnittstelle mit einem Betätigungselement (28.1, 28.2, 28.3, 28.4) zur Abgabe eines Steuerbefehls aufweist, auf den hin die Bewegung der Ladebrücke (12.1, 12.2) gestartet wird, wobei die Ladebrückensteuerung (16.1, 16.2) derart ausgebildet ist, dass mindestens eine vorbestimmte Bewegung der Ladebrücke (12.1, 12.2) erst bei Betätigen des Betätigungselements (28.1 , 28.2, 28.3, 28.4) über eine vorbestimmte Mindestbetätigungsdauer initiiert. 5. Dock leveler arrangement (10) comprising a dock leveler (12.1, 12.2) with a dock leveler drive for driving a movement of the dock leveler (12.1, 12.2) and a dock leveler controller (16.1, 16.2) for controlling the movement of the dock leveler (12.1, 12.2), wherein the Dock leveler controller (16.1, 16.2) has a user interface with an actuating element (28.1, 28.2, 28.3, 28.4) for issuing a control command, upon which the movement of the dock leveler (12.1, 12.2) is started, the dock leveler controller (16.1, 16.2) being such is designed such that at least one predetermined movement of the dock leveler (12.1, 12.2) is only initiated when the actuating element (28.1, 28.2, 28.3, 28.4) is actuated over a predetermined minimum actuating period.
6. Ladebrückenanordnung (10) nach Anspruch 5, dadurch gekennzeichnet, dass die Ladebrückensteuerung (16.1, 16.2) nach einem der Ansprüche 1 bis 4 ausgebildet ist. 6. Dock leveler arrangement (10) according to claim 5, characterized in that the dock leveler control (16.1, 16.2) is designed according to one of claims 1 to 4.
7. Ladebrückensteuerungsanordnung nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass eine Warnsignalausgabeeinrichtung (18.1, 18.2) zum Ausgeben eines akustischen und/oder optischen Warnsignals vorgesehen ist, wobei die Ladebrückensteuerung (16.1, 16.2) dazu eingerichtet ist, während oder im Verlauf der Betätigung des Betätigungselements (28.1, 28.2, 28.3, 28.4) die Warnsignalausgabeeinrichtung (18.1, 18.2) zum Abgeben eines optischen oder akustischen Warnsignals anzusteuern. 7. Dock leveler control arrangement according to one of the preceding claims, characterized in that a warning signal output device (18.1, 18.2) is provided for outputting an acoustic and/or visual warning signal, the dock leveler control (16.1, 16.2) being set up for this purpose during or in the course of actuation of the actuating element (28.1, 28.2, 28.3, 28.4) to control the warning signal output device (18.1, 18.2) to emit an optical or acoustic warning signal.
8. Ladebrückenanordnung (10) nach Anspruch 5, dadurch gekennzeichnet, dass mehrere Ladebrücken (12.1, 12.2) mit jeweils den Ladebrücken (12.1, 12.2) zugeordneten Betätigungselementen (28.1, 28.2, 28.3, 28.4) vorgesehen sind, wobei die Warnsignalausgabeeinrichtung (18.1, 18.2) zum Ausgeben von den einzelnen Ladebrücken (12.1, 12.2) zugeordneten Warnsignalen bei Betätigung des zugeordneten Betätigungselements (28.1, 28.2, 28.3, 28.4) ausgebildet ist. 8. Dock leveler arrangement (10) according to Claim 5, characterized in that a plurality of dock levellers (12.1, 12.2) are provided, each with actuating elements (28.1, 28.2, 28.3, 28.4) assigned to the dock levellers (12.1, 12.2), the warning signal output device (18.1, 18.2) is designed to emit warning signals assigned to the individual dock levellers (12.1, 12.2) when the assigned actuating element (28.1, 28.2, 28.3, 28.4) is actuated.
9. Verfahren zum Betreiben einer Ladebrückenanordnung (10), die wenigstens eine mittels einer Ladebrückensteuerung (16.1, 16.2) ansteuerbare Ladebrücke (12.1, 12.2) mit Ladebrückenantrieb aufweist, umfassend Betätigen eines Betätigungselements (28.1, 28.2, 28.3, 28.4) über eine vorbestimmte Mindestbetätigungsdauer, um eine Bewegung der Ladebrücke (12.1, 12.2) zu starten. 9. Method for operating a dock leveler arrangement (10), which has at least one dock leveler (12.1, 12.2) with a dock leveler drive, which can be controlled by means of a dock leveler control (16.1, 16.2), comprising actuating an actuating element (28.1, 28.2, 28.3, 28.4) for a predetermined minimum actuating period to start a movement of the dock leveler (12.1, 12.2).
10. Verfahren nach Anspruch 9, gekennzeichnet durch automatische Abgabe eines Vorwarnsignals an eine im Bereich eines an der Ladebrücke (12.1 , 12.2) stehenden Fahrzeugs (40) befindliche Person bei oder im Verlauf der Betätigung des Betätigungselements (28.1, 28.2, 28.3, 28.4) über die Mindestbetätigungsdauer. 10. The method according to claim 9, characterized by automatic emission of a pre-warning signal to a person located in the area of a vehicle (40) standing on the dock leveler (12.1, 12.2) when or during the actuation of the actuating element (28.1, 28.2, 28.3, 28.4) over the minimum duration of operation.
11. Verfahren nach Anspruch 10 zum Betreiben einer Ladebrückensteuerung (16.1, 16.2), die wenigstens eine erste und eine zweite Ladebrücke (12.1, 12.2) und ein erstes Betätigungselement (28.1) zum Starten einer Bewegung der ersten Ladebrücke (12.1) und ein zweites Betätigungselement (28.2) zu Starten einer Bewegung der zweiten Ladebrücke (12.2) aufweist, wobei zum Starten der Bewegung das Betätigungselement (28.1, 28.2, 28.3, 28.4) zumindest über die Mindestbetätigungsdauer betätigt werden muss und wobei bei Betätigung des ersten Betätigungselements (28.1) ein erstes Vorwarnsignal und bei Betätigung des zweiten Betätigungselements (28.2) ein zweites Vorwarnsignal abgegeben wird. 11. The method according to claim 10 for operating a dock leveler control (16.1, 16.2), which has at least a first and a second dock leveler (12.1, 12.2) and a first actuating element (28.1) for starting a movement of the first dock leveler (12.1) and a second actuating element (28.2) for starting a movement of the second dock leveler (12.2), wherein to start the movement the actuating element (28.1, 28.2, 28.3, 28.4) must be actuated for at least the minimum actuating time and wherein when the first actuating element (28.1) is actuated, a first pre-warning signal and when the second actuating element (28.2) is actuated, a second pre-warning signal is emitted.
12. Com puterprogramm produkt, umfassend maschinenlesbare Steueranweisungen, die, wenn in die Ladebrückensteuerung (16.1, 16.2) der Ladebrückenanordnung (10) nach einem der Ansprüche 5 bis 7 geladen, die Ladebrückenanordnung (10) veranlassen, das Verfahren nach einem der Ansprüche 8 bis 11 durchzuführen. 12. Computer program product, comprising machine-readable control instructions which, when loaded into the dock leveler controller (16.1, 16.2) of the dock leveler arrangement (10) according to one of claims 5 to 7, cause the dock leveler arrangement (10) to carry out the method according to one of claims 8 to 11 to perform.
PCT/EP2021/069073 2020-07-17 2021-07-08 Loading bridge arrangement, loading bridge controller and method for operating a loading bridge WO2022013074A1 (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
DE102020119030.1 2020-07-17
DE102020119030 2020-07-17
DE102020119562.1 2020-07-24
DE102020119562 2020-07-24
DE102020122464.8A DE102020122464A1 (en) 2020-07-17 2020-08-27 Dock leveler arrangement, dock leveler control and method for operating a dock leveler
DE102020122464.8 2020-08-27

Publications (1)

Publication Number Publication Date
WO2022013074A1 true WO2022013074A1 (en) 2022-01-20

Family

ID=79020921

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2021/069073 WO2022013074A1 (en) 2020-07-17 2021-07-08 Loading bridge arrangement, loading bridge controller and method for operating a loading bridge

Country Status (2)

Country Link
DE (1) DE102020122464A1 (en)
WO (1) WO2022013074A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9404382U1 (en) * 1994-03-17 1994-05-11 Dewert Antriebs Systemtech Furniture drive
US20030197622A1 (en) * 2002-04-18 2003-10-23 United Dominion Industires, Inc. Master control panel for loading dock equipment
US20110203059A1 (en) * 2010-02-22 2011-08-25 4Front Engineered Solutions, Inc. Loading dock lighting systems having warning features
EP3611119A1 (en) * 2018-08-14 2020-02-19 Hörmann KG Antriebstechnik Feed charging bridge and method for operating the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9404382U1 (en) * 1994-03-17 1994-05-11 Dewert Antriebs Systemtech Furniture drive
US20030197622A1 (en) * 2002-04-18 2003-10-23 United Dominion Industires, Inc. Master control panel for loading dock equipment
US20110203059A1 (en) * 2010-02-22 2011-08-25 4Front Engineered Solutions, Inc. Loading dock lighting systems having warning features
EP3611119A1 (en) * 2018-08-14 2020-02-19 Hörmann KG Antriebstechnik Feed charging bridge and method for operating the same

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"Anleitung für Montage, Betrieb und Wartung - Steuerung für Ladebrücken- 460 S - 460 T", FIRMENDRUCKSCHRIFT DER HÖRMANN KG VERKAUFSGESELLSCHAFT MIT DEM DRUCKVERMERK TR25E652-A, 16 July 2020 (2020-07-16)
"Anleitung für Montage, Betrieb und Wartung HLS2 / HTL2", FIRMENDRUCKSCHRIFT DER HÖRMANN KG VERKAUFSGESELLSCHAFT MIT DEM DRUCKVERMERK 11058527 / 09.2017, September 2017 (2017-09-01)
"Verladetechnik", FIRMENDRUCKSCHRIFT DER HÖRMANN KG VERKAUFSGESELLSCHAFT MIT DEM DRUCKVERMERK STAND 05.2019 / DRUCK 05.2019 / HF 86278 DE / PDF, 16 July 2020 (2020-07-16)

Also Published As

Publication number Publication date
DE102020122464A1 (en) 2022-01-20

Similar Documents

Publication Publication Date Title
DE112005003713B4 (en) Elevator system control responsive to shaft access detection
DE4219705C2 (en) Rotary printing press
EP0482298A1 (en) Procedure and device for the execution of a levelling operation for a body, in particular a vehicle element
WO2015113084A1 (en) Crane controller
DE102006022304A1 (en) Method for the decentralized control of a processing machine, in particular a laser processing machine
EP2380833A1 (en) Tyre deflector for guiding a lorry
DE10217903C1 (en) Safety work station, for microbiological samples, has working chamber surrounded by housing and safety monitoring system having processor which couples measured data determined during operation of work station
EP2688824A1 (en) Elevator comprising a car that is movable in the maintenance mode
DE3826788C2 (en)
DE102009046329A1 (en) Device and method for setting up a lifting unit for lifting vehicles
EP3611119B1 (en) Feed charging bridge and method for operating the same
WO2022013074A1 (en) Loading bridge arrangement, loading bridge controller and method for operating a loading bridge
EP3916156B1 (en) Road finisher with operating unit
EP0773136B1 (en) Tailgate lift and procedure for its control
EP3266732B1 (en) Feed loading bridge and method for connecting the load area of a transport vehicle to a feed loading bridge
DE102012220274A1 (en) Rail vehicle with a lifting platform in the entry area
DE19637907C2 (en) Electro-hydraulic roof lift system
EP3165492A1 (en) Elevator car
DE102008011637A1 (en) Upward tiltable rear flap's opening position adjusting device for motor vehicle, has actuating element adjusting from initial position into actuating position, where actuation of element causes storage of momentary opening position
DE3916048A1 (en) Vehicular lifting platform actuated by three switch pedals - is lowered or raised by signals from decoder of foot movement from outer to central pedal
DE102006002384A1 (en) Glass bottles holding load e.g. palette, securing method, involves providing of form-fit and force-fit safety in working process, where palette base is pressed on loading area
DE19644076C2 (en) Method for controlling a tail lift and tail lift
EP0640542B1 (en) Spring system for holddown mechanism for a dock board
DE102018128760A1 (en) FEED LOADING BRIDGE AND METHOD FOR OPERATING THE SAME
EP0867595A2 (en) Apparatus for controlling the movement of a turntable ladder

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21745265

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21745265

Country of ref document: EP

Kind code of ref document: A1