WO2021237472A1 - Smart-grid-based support and installation apparatus and method for 5g base station - Google Patents
Smart-grid-based support and installation apparatus and method for 5g base station Download PDFInfo
- Publication number
- WO2021237472A1 WO2021237472A1 PCT/CN2020/092403 CN2020092403W WO2021237472A1 WO 2021237472 A1 WO2021237472 A1 WO 2021237472A1 CN 2020092403 W CN2020092403 W CN 2020092403W WO 2021237472 A1 WO2021237472 A1 WO 2021237472A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wall
- base station
- rod
- installation
- mounting
- Prior art date
Links
- 238000009434 installation Methods 0.000 title claims abstract description 69
- 238000000034 method Methods 0.000 title claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 5
- 238000012423 maintenance Methods 0.000 claims description 9
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000010295 mobile communication Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/12—Supports; Mounting means
Definitions
- the present invention relates to the technical field of 5g base station equipment, in particular to a support installation device and method for 5g base stations based on smart grid.
- a base station is a public mobile communication base station. With the continuous development of society and technology, mobile communication base stations are gradually being promoted. When the existing 5g base station equipment is installed, the equipment is generally installed on the top of the outer wall of the mounting frame. However, This will cause the installer to climb to the top of the mounting frame for installation, causing installation troubles and low installation efficiency, and the equipment installed on the top of the mounting frame is not convenient for maintenance personnel to perform later maintenance. For this reason, we proposed A support installation device and method for a 5g base station based on a smart grid.
- the object of the present invention is to provide a support installation device and method for a 5g base station based on a smart grid to solve the above-mentioned problems in the background art.
- a smart grid-based support installation device for 5g base stations including a mounting plate, the top left outer wall of the mounting plate is fixedly connected to the mounting rod, and the right bottom of the mounting rod A reinforcing rod is fixedly installed between the outer wall and the right outer wall at the top of the mounting plate, a mounting sleeve is slidably installed on the top of the outer wall of the mounting rod, and a base station equipment body is provided on the left outer wall of the mounting sleeve.
- the inner cavity of the mounting rod is provided with a mounting groove
- a screw is provided between the inner walls of the upper and lower sides of the mounting groove
- a screw sleeve is sleeved on the top of the outer wall of the screw
- the left outer wall of the screw sleeve is connected to the left of the mounting sleeve.
- a sliding block is fixedly installed between the side inner walls
- a sliding groove is provided at the connection part of the mounting rod and the sliding block
- a gear is sleeved on the bottom end of the outer wall of the screw rod
- a servo motor is fixedly installed on the outer wall of the top of the mounting plate.
- the left output end of the servo motor is fixedly connected with the direction changing gear, and the left outer wall of the direction changing gear meshes with the right outer wall of the gear.
- the top outer wall of the mounting plate is fixedly connected to a telescopic device
- the telescopic device includes a support rod fixedly connected to the top outer wall of the mounting plate, a movable rod is slidably installed in the inner cavity of the support rod, and the top end of the movable rod penetrates the servo
- a spring is fixedly installed between the supporting rod and the moving rod.
- the outer walls of the left and right sides of the moving rod are fixedly installed with pull rods. The end of the pull rod away from the moving rod penetrates the supporting rod.
- Fixing blocks are fixedly installed on the outer walls of the left and right sides, and fixing grooves matching the fixing blocks are opened on the inner walls of the left and right sides of the support rod.
- a connecting block is fixedly installed on the right outer wall of the base station equipment body, a connecting groove matching the connecting block is opened on the left outer wall of the top of the mounting sleeve, and the connecting block is inserted into the inner cavity of the connecting groove,
- the width of the cross section of the connecting block gradually increases from left to right, the top outer wall of the mounting sleeve is slidably connected to the baffle, and the bottom outer wall of the baffle is in contact with the outer wall of the top of the connecting block.
- the mounting sleeve includes a left sub-block and a right sub-block, two sets of bolts are fixedly installed on the right outer wall of the left sub-block, the right end of the bolt penetrates the right sub-block, and a nut is sleeved on the outer wall of the bolt, and The left outer wall of the nut fits with the right outer wall of the right sub-block, the mounting rod includes a rod body, the front outer wall of the rod body is provided with a mounting opening, and the inner cavity of the mounting opening is provided with a cover plate, and the mounting sleeve is sleeved on the rod body and the cover On the outer wall of the board.
- the upper and lower outer walls of the rear of the cover plate are fixedly installed with positioning blocks, and the inner wall of the rear side of the installation port is provided with a positioning slot matching the positioning block, and the positioning block is inserted into the inner cavity of the positioning slot.
- a slot is formed on the outer wall on the right side of the mounting plate, and a storage box is slidably installed on the right side of the slot inner cavity.
- a method for supporting and installing a 5g base station based on a smart grid includes the following steps:
- the servo motor drives the direction-changing gear, gear and screw to rotate, so that the screw sleeve carries the slider and the base station equipment body to slide up or down on the outer wall of the mounting rod, so that the staff will not install the base station equipment body. It is necessary to climb to the height of the installation pole, and there is no need to climb when repairing the base station equipment body, so as to avoid the inconvenient movement of the staff on the top of the installation pole and affect the efficiency, and increase the safety and convenience of installation and maintenance;
- Figure 1 is a schematic diagram of the structure of the present invention
- Figure 2 is an enlarged schematic diagram of structure A of the present invention.
- Figure 3 is an enlarged schematic diagram of structure B of the present invention.
- Figure 4 is a schematic diagram of the structure of the telescopic device of the present invention.
- Figure 5 is a schematic top view of the connection between the mounting rod and the mounting sleeve of the present invention.
- Fig. 6 is a schematic diagram of the left structure of the mounting rod of the present invention.
- a support installation device for a 5g base station based on a smart grid please refer to Figure 1, including a mounting plate 1, and the mounting plate 1 and the installation area are fixedly connected by fixing bolts or other means;
- the mounting plate 1 is provided with a slot 15 on the right outer wall.
- a storage box 16 is slidably installed on the right side of the inner cavity of the slot 15. Pull the storage box 16 to the right to open the right side of the storage box 16 Remove the inner cavity of the slot 15, add weight objects, such as stones or iron blocks, into the inner cavity of the storage box 16, and then insert the storage box 16 into the inner cavity of the slot 15 to the left.
- the installation and fixing stability of the mounting plate 1 prevents the mounting rod 2 from tilting or turning over, so that the base station equipment body 4 is installed stably;
- the top left outer wall of the mounting plate 1 is fixedly connected with the mounting rod 2.
- a reinforcing rod is fixedly installed between the bottom outer wall of the right bottom of the mounting rod 2 and the top right outer wall of the mounting plate 1, and the mounting rod 2 is carried out through the reinforcing rod. Support to ensure the stability of the installation pole 2;
- the top of the outer wall of the mounting rod 2 is slidingly installed with a mounting sleeve 3, and the left outer wall of the mounting sleeve 3 is provided with a base station equipment body 4.
- the base station equipment body 4 refers to 5g base station equipment, which will be connected with external cables. Form a 5g mobile communication base station;
- the inner cavity of the mounting rod 2 is provided with a mounting groove 5
- the mounting groove 5 is provided with a screw 6 between the inner walls of the upper and lower sides, and the inner wall of the upper and lower sides of the mounting groove 5 is opened with holes, the screw 6 The two ends are inserted into the cavity of the opening, so that the screw 6 will not move up and down, but can only rotate.
- the top of the outer wall of the screw 6 is sleeved with a screw sleeve 8, the inner wall of the screw sleeve 8 has threads, and the screw 6 rotates so that the screw sleeve 8 Move up or down, a sliding block 9 is fixedly installed between the left outer wall of the screw sleeve 8 and the left inner wall of the mounting sleeve 3, and the connecting part of the mounting rod 2 and the sliding block 9 is provided with a sliding groove, so that the sliding block 9 is installed with it
- the sleeve 3 can move up or down on the outer wall of the mounting rod 2.
- the bottom end of the outer wall of the screw 6 is sleeved with a gear 12, and the top outer wall of the mounting plate 1 is fixedly installed with a servo motor 7.
- the servo motor 7 can rotate forward and backward, and the servo motor 7
- the left output end is fixedly connected with the changing gear 13
- the output shaft of the servo motor 7 is fixedly connected with the changing gear 13
- the left outer wall of the changing gear 13 meshes with the right outer wall of the gear 12, and the servo motor 7 works forward.
- the top outer wall of the mounting plate 1 is fixedly connected to the telescopic device 14.
- the telescopic device 14 includes a support rod 141 fixedly connected to the top outer wall of the mounting plate 1, and a movable rod is slidably installed in the inner cavity of the support rod 141 142.
- the moving rod 142 can move up and down in the inner cavity of the support rod 141, but will not completely move out of the inner cavity of the support rod 141.
- the top end of the moving rod 142 passes through the left output end of the servo motor 7, and the top end of the moving rod 142 passes through the servo
- the output shaft of the motor 7 prevents the output shaft of the servo motor 7 from rotating automatically, ensuring that the screw 6 does not rotate automatically, so that the position of the base station equipment body 4 does not automatically move, so that the base station equipment body 4 is installed stably and the servo motor 7 stops After work, when the moving rod 142 does not correspond to the output shaft of the servo motor 7, the output shaft can be rotated so that the moving rod 142 can pass through the output shaft upwards.
- a spring 143 is fixedly installed between the support rod 141 and the moving rod 142.
- the outer walls of the left and right sides of the moving rod 142 are fixedly installed with pull rods 144.
- the connecting part of 144 is provided with a guide groove.
- Pull rod 144 can be moved up and down with movable rod 142.
- the outer walls of the left and right sides of movable rod 142 are fixedly installed with fixed blocks 145.
- the sections of the fixed block 145 and the fixed groove are both arc-shaped, so that the fixed block 145 can easily enter and exit the fixed groove. Pull the pull rod 144 downward to make the moving rod 142 move down and out of the output shaft of the servo motor 7.
- the servo motor 7 can work and rotate normally, and the moving rod 142 moves down, so that the fixed block 145 enters the inner cavity of the fixed groove, and the moving rod 142 is fixed so that the moving rod 142 will not automatically reset with the output of the servo motor 7 Shaft contact to ensure normal operation of the servo motor 7;
- a connecting block 10 is fixedly installed on the right outer wall of the base station equipment body 4, and the top left outer wall of the mounting sleeve 3 is provided with a connecting slot 11 matching the connecting block 10, and the connecting block 10 is inserted into the connecting slot In the inner cavity of 11, the width of the cross section of the connecting block 10 gradually increases from left to right, the connecting block 10 can only be moved upward from the inner cavity of the connecting groove 11, and the base station equipment body 4 is leaned to the left side of the mounting sleeve 3.
- the baffle 17 can slide horizontally at the top wall of the mounting sleeve 3, and the bottom outer wall of the baffle 17 is connected with The outer wall of the top of the block 10 fits so that the connecting block 10 will not automatically move up and down in the inner cavity of the connecting groove 11, avoiding large vibrations during the installation of the base station equipment body 4, and making the installation of the base station equipment body 4 stable.
- the mounting sleeve 3 includes a left sub-block 31 and a right sub-block 33.
- Two sets of bolts 32 are fixedly installed on the outer wall of the left sub-block 31, and the right end of the bolt 32 penetrates the right sub-block 33.
- a nut is sleeved on the outer wall of the bolt 32, remove the nut from the outer wall of the bolt 32 to disconnect the left sub-block 31 and the right sub-block 33, so that the mounting sleeve 3 can be divided into the left sub-block 31 and the right sub-block 33, It is used to remove the mounting sleeve 3 from the outer wall of the mounting rod 2, so that the cover plate 22 loses the fixing force, so that the cover plate 22 can be removed from the inner cavity of the mounting port, and the inner cavity for the mounting groove 5 is opened, and The inner cavity of the hole is also opened, so that the screw 6 can be moved forward from the inner cavity of the installation groove 5, which facilitates the replacement of the damaged screw 6 and ensures that the support and installation device of the base station equipment body 4 can continue to be used.
- the installation rod 2 includes a rod body 21.
- the mounting sleeve 3 is sleeved on the outer wall of the rod body 21 and the cover plate 22;
- the outer walls of the upper and lower sides of the rear of the cover 22 are fixedly installed with positioning blocks 18, and the inner wall of the rear side of the installation port is provided with a positioning groove matching the positioning block 18, and the positioning block 18 is inserted in the positioning groove In the inner cavity, it is ensured that the cover plate 22 will not automatically move in the inner cavity of the installation port, so that the connection between the rod body 21 and the cover plate 22 is stable;
- components such as the left sub-block 31, the right sub-block 33 and the cover plate 22 are added, so that the screw 6 can be taken out from the inner cavity of the mounting groove 5, and the screw 6 that has been damaged after long-term use can be replaced. It is ensured that the support installation device of the base station equipment body 4 can continue to be used, and the service life of the device is guaranteed.
- a method for supporting and installing a 5g base station based on a smart grid includes the following steps:
Landscapes
- Telephone Set Structure (AREA)
Abstract
Description
Claims (8)
- 一种基于智能电网的5g基站用支撑安装装置,包括安装板(1),其特征在于:所述安装板(1)顶部左侧外壁与安装杆(2)固定连接,所述安装杆(2)右侧底部外壁与安装板(1)顶部右侧外壁之间固定安装有加强杆,所述安装杆(2)外壁顶端滑动安装有安装套(3),所述安装套(3)左侧外壁设置有基站设备本体(4)。A support installation device for a 5g base station based on a smart grid, comprising a mounting plate (1), characterized in that: the top left outer wall of the mounting plate (1) is fixedly connected to the mounting rod (2), and the mounting rod (2) ) A reinforcing rod is fixedly installed between the bottom outer wall of the right side and the top right outer wall of the mounting plate (1). The top of the outer wall of the mounting rod (2) is slidingly installed with a mounting sleeve (3). The left side of the mounting sleeve (3) The outer wall is provided with a base station equipment body (4).
- 根据权利要求1所述的一种基于智能电网的5g基站用支撑安装装置,其特征在于:所述安装杆(2)内腔开设有安装槽(5),所述安装槽(5)上下两侧内壁之间设置有螺杆(6),所述螺杆(6)外壁顶端套接有螺套(8),所述螺套(8)左侧外壁与安装套(3)左侧内壁之间固定安装有滑块(9),所述安装杆(2)与滑块(9)的连接部位开设有滑槽,所述螺杆(6)外壁底端套接有齿轮(12),所述安装板(1)顶部外壁固定安装有伺服电机(7),所述伺服电机(7)左侧输出端与变向齿轮(13)固定连接,且变向齿轮(13)左侧外壁与齿轮(12)右侧外壁相啮合。The support installation device for 5g base stations based on smart grid according to claim 1, characterized in that: the inner cavity of the installation rod (2) is provided with an installation slot (5), and the installation slot (5) has two upper and lower sides. A screw (6) is arranged between the side inner walls, the top of the outer wall of the screw (6) is sleeved with a screw sleeve (8), and the left outer wall of the screw sleeve (8) is fixed between the left inner wall of the mounting sleeve (3) A sliding block (9) is installed, a sliding groove is provided at the connection part of the mounting rod (2) and the sliding block (9), the bottom end of the outer wall of the screw (6) is sleeved with a gear (12), and the mounting plate (1) A servo motor (7) is fixedly installed on the outer wall of the top, and the left output end of the servo motor (7) is fixedly connected with the reversing gear (13), and the left outer wall of the reversing gear (13) is connected to the gear (12) The right outer wall engages.
- 根据权利要求2所述的一种基于智能电网的5g基站用支撑安装装置,其特征在于:所述安装板(1)顶部外壁与伸缩装置(14)固定连接,所述伸缩装置(14)包括与安装板(1)顶部外壁固定连接的支撑杆(141),所述支撑杆(141)内腔滑动安装有移动杆(142),所述移动杆(142)顶端贯穿伺服电机(7)左侧输出端,所述支撑杆(141)与移动杆(142)之间固定安装有弹簧(143),所述移动杆(142)左右两侧外壁均固定安装有拉杆(144),所述拉杆(144)远离移动杆(142)的一端贯穿支撑杆(141),所述移动杆(142)左右两侧外壁均固定安装有固定块(145),所述支撑杆(141)左右两侧内壁均开设有与固定块(145)相匹配的固定槽。The support installation device for 5g base stations based on smart grid according to claim 2, characterized in that: the top outer wall of the mounting plate (1) is fixedly connected with the expansion device (14), and the expansion device (14) comprises A support rod (141) fixedly connected to the top outer wall of the mounting plate (1), a movable rod (142) is slidably installed in the inner cavity of the support rod (141), and the top end of the movable rod (142) penetrates the left side of the servo motor (7) At the side output end, a spring (143) is fixedly installed between the support rod (141) and the moving rod (142), and the moving rod (142) is fixedly installed with pull rods (144) on the left and right outer walls of the moving rod (142). (144) The end far away from the moving rod (142) penetrates the support rod (141), the outer walls on the left and right sides of the moving rod (142) are fixedly installed with fixed blocks (145), and the inner walls on the left and right sides of the support rod (141) Both are provided with fixing grooves matched with the fixing block (145).
- 根据权利要求1所述的一种基于智能电网的5g基站用支撑安装装置,其特征在于:所述基站设备本体(4)右侧外壁固定安装有连接块(10),所述安装套(3)顶部左侧外壁开设有与连接块(10)相匹配的连接槽(11), 所述连接块(10)插接在连接槽(11)的内腔中,所述连接块(10)横截面的宽度从左到右逐渐增加,所述安装套(3)顶部外壁与挡板(17)滑动连接,所述挡板(17)底部外壁与连接块(10)顶部外壁相贴合。A support installation device for 5g base stations based on smart grid according to claim 1, characterized in that: the right outer wall of the base station equipment body (4) is fixedly installed with a connecting block (10), and the mounting sleeve (3) ) The top left outer wall is provided with a connecting groove (11) matching the connecting block (10), the connecting block (10) is inserted into the inner cavity of the connecting groove (11), and the connecting block (10) is horizontally The width of the cross section gradually increases from left to right, the top outer wall of the mounting sleeve (3) is slidably connected with the baffle (17), and the bottom outer wall of the baffle (17) is attached to the top outer wall of the connecting block (10).
- 根据权利要求1所述的一种基于智能电网的5g基站用支撑安装装置,其特征在于:所述安装套(3)包括左分块(31)与右分块(33),所述左分块(31)右侧外壁固定安装有两组螺栓(32),所述螺栓(32)右端贯穿右分块(33),所述螺栓(32)外壁套接有螺母,且螺母左侧外壁与右分块(33)右侧外壁相贴合,所述安装杆(2)包括杆体(21),所述杆体(21)前侧外壁开设有安装口,且安装口内腔设置有盖板(22),所述安装套(3)套在杆体(21)与盖板(22)的外壁上。The support installation device for 5g base stations based on smart grid according to claim 1, characterized in that: the installation sleeve (3) includes a left sub-block (31) and a right sub-block (33), and the left sub-block (33) Two sets of bolts (32) are fixedly installed on the right outer wall of the block (31), the right end of the bolts (32) penetrates the right sub-block (33), the outer wall of the bolt (32) is sleeved with a nut, and the left outer wall of the nut is connected to the The right side wall of the right sub-block (33) is attached to the right side outer wall. The mounting rod (2) includes a rod body (21). ), the mounting sleeve (3) is sleeved on the outer wall of the rod body (21) and the cover plate (22).
- 根据权利要求5所述的一种基于智能电网的5g基站用支撑安装装置,其特征在于:所述盖板(22)后部上下两侧外壁均固定安装有定位块(18),且安装口后侧内壁开设有与定位块(18)相匹配的定位槽,且定位块(18)插接在定位槽的内腔中。The 5g base station support installation device based on smart grid according to claim 5, characterized in that: the upper and lower outer walls of the rear part of the cover plate (22) are fixedly installed with positioning blocks (18), and the installation port A positioning groove matching the positioning block (18) is opened on the inner wall of the rear side, and the positioning block (18) is inserted into the inner cavity of the positioning groove.
- 根据权利要求1所述的一种基于智能电网的5g基站用支撑安装装置,其特征在于:所述安装板(1)右侧外壁开设有开槽(15),所述开槽(15)内腔右侧滑动安装有收放箱(16)。A support installation device for 5g base stations based on smart grid according to claim 1, characterized in that: the right outer wall of the mounting plate (1) is provided with a slot (15), and a slot (15) is formed in the slot (15). A storage box (16) is slidably installed on the right side of the cavity.
- 根据权利要求1-7任意一项所述的一种基于智能电网的5g基站用支撑安装装置的方法,其特征在于:包括以下步骤:A method for supporting and installing a 5g base station based on a smart grid according to any one of claims 1-7, characterized in that it comprises the following steps:S1:将基站设备本体(4)靠到安装套(3)的左侧,向下移动基站设备本体(4),将连接块(10)插入到连接槽(11)的内腔中,将基站设备本体(4)安装到安装套(3)的左侧;S1: Lean the base station equipment body (4) to the left side of the mounting sleeve (3), move the base station equipment body (4) downwards, insert the connecting block (10) into the cavity of the connecting slot (11), and place the base station Install the equipment body (4) to the left side of the mounting sleeve (3);S2:通过伺服电机(7)工作转动,使变向齿轮(13)带着齿轮(12)与螺杆(6)转动,使螺套(8)向上移动,带着滑块(9)与基站设备本体(4)向上移动,基站设备本体(4)移到预定高度后,伺服电机(7)停止工作;S2: Through the rotation of the servo motor (7), the direction-changing gear (13) is rotated with the gear (12) and the screw (6), and the screw sleeve (8) is moved upward, with the slider (9) and the base station equipment The main body (4) moves upward, and after the base station equipment main body (4) moves to a predetermined height, the servo motor (7) stops working;S3:检修时,伺服电机(7)工作,带着变向齿轮(13)按照安装时相反的方向转动,使螺套(8)带着滑块(9)与基站设备本体(4)向下移动,将基站设备本体(4)移到安装杆(2)的左侧下方,对基站设备本体(4)进行检修,完成检修后,按照安装的方式,将基站设备本体(4)移到安装杆(2)的左侧上方。S3: During maintenance, the servo motor (7) works, with the changing gear (13) rotating in the opposite direction during installation, so that the screw sleeve (8) with the sliding block (9) and the base station equipment body (4) downward Move, move the base station equipment main body (4) to the lower left side of the mounting rod (2), and overhaul the base station equipment main body (4). After the maintenance is completed, move the base station equipment main body (4) to the installation according to the installation method The upper left side of the rod (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2020/092403 WO2021237472A1 (en) | 2020-05-26 | 2020-05-26 | Smart-grid-based support and installation apparatus and method for 5g base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2020/092403 WO2021237472A1 (en) | 2020-05-26 | 2020-05-26 | Smart-grid-based support and installation apparatus and method for 5g base station |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2021237472A1 true WO2021237472A1 (en) | 2021-12-02 |
Family
ID=78745236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2020/092403 WO2021237472A1 (en) | 2020-05-26 | 2020-05-26 | Smart-grid-based support and installation apparatus and method for 5g base station |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2021237472A1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114222212A (en) * | 2021-12-15 | 2022-03-22 | 福建省恒锦天成科技有限公司 | Intelligent human-computer interaction high-pitch early warning system based on high-voltage line |
CN114482672A (en) * | 2022-02-14 | 2022-05-13 | 维也耐(南通)通讯科技有限公司 | Cement pier attached holding pole device with safety protection structure |
CN114554757A (en) * | 2022-02-19 | 2022-05-27 | 武汉瑞玛医疗器械有限公司 | Smart sickbed and breathing oxygen supply walking-aid home-care monitoring integrated device |
CN114709781A (en) * | 2022-04-19 | 2022-07-05 | 中国大唐集团科学技术研究院有限公司西北电力试验研究院 | Deicing bird repelling equipment for intelligent protection of power equipment |
CN114710898A (en) * | 2022-03-03 | 2022-07-05 | 北京翊慧科技发展有限公司 | Digital intelligent networking sampling mobile device |
CN114843746A (en) * | 2022-05-25 | 2022-08-02 | 黑龙江龙廷信息技术有限公司 | Integrated antenna of little basic station integration of 5G |
CN114909571A (en) * | 2022-04-08 | 2022-08-16 | 淄博智科电气科技有限公司 | Adjusting structure and automatic control device |
CN116887066A (en) * | 2023-08-04 | 2023-10-13 | 广州云禾信息科技有限公司 | Communication base station securing device |
CN117913500A (en) * | 2024-03-20 | 2024-04-19 | 泰兴市东盛通讯器材有限公司 | Antenna device convenient to assemble |
CN118190101A (en) * | 2024-05-15 | 2024-06-14 | 沈阳忠艺商贸有限公司 | Intelligent water meter for building |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017129059A1 (en) * | 2016-01-28 | 2017-08-03 | 华为技术有限公司 | Antenna adjustment system and base station |
CN109930893A (en) * | 2017-12-16 | 2019-06-25 | 高焕云 | A kind of fixation device of communication base station |
CN210074159U (en) * | 2019-04-15 | 2020-02-14 | 南京铁道职业技术学院 | Novel 4G antenna |
CN210430073U (en) * | 2019-11-27 | 2020-04-28 | 深圳市齐远兴电子有限公司 | Be applied to base station antenna structure of 5G communication |
-
2020
- 2020-05-26 WO PCT/CN2020/092403 patent/WO2021237472A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017129059A1 (en) * | 2016-01-28 | 2017-08-03 | 华为技术有限公司 | Antenna adjustment system and base station |
CN109930893A (en) * | 2017-12-16 | 2019-06-25 | 高焕云 | A kind of fixation device of communication base station |
CN210074159U (en) * | 2019-04-15 | 2020-02-14 | 南京铁道职业技术学院 | Novel 4G antenna |
CN210430073U (en) * | 2019-11-27 | 2020-04-28 | 深圳市齐远兴电子有限公司 | Be applied to base station antenna structure of 5G communication |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114222212A (en) * | 2021-12-15 | 2022-03-22 | 福建省恒锦天成科技有限公司 | Intelligent human-computer interaction high-pitch early warning system based on high-voltage line |
CN114482672A (en) * | 2022-02-14 | 2022-05-13 | 维也耐(南通)通讯科技有限公司 | Cement pier attached holding pole device with safety protection structure |
CN114554757A (en) * | 2022-02-19 | 2022-05-27 | 武汉瑞玛医疗器械有限公司 | Smart sickbed and breathing oxygen supply walking-aid home-care monitoring integrated device |
CN114554757B (en) * | 2022-02-19 | 2023-10-13 | 武汉瑞玛医疗器械有限公司 | Intelligent sickbed and breathing oxygen supply assisting home care and monitoring integrated device |
CN114710898B (en) * | 2022-03-03 | 2024-02-06 | 广东共享信息技术有限公司 | Digital intelligent networking sampling mobile device |
CN114710898A (en) * | 2022-03-03 | 2022-07-05 | 北京翊慧科技发展有限公司 | Digital intelligent networking sampling mobile device |
CN114909571B (en) * | 2022-04-08 | 2023-08-29 | 淄博智科电气科技有限公司 | Adjusting structure and automatic control device |
CN114909571A (en) * | 2022-04-08 | 2022-08-16 | 淄博智科电气科技有限公司 | Adjusting structure and automatic control device |
CN114709781B (en) * | 2022-04-19 | 2023-05-26 | 中国大唐集团科学技术研究院有限公司西北电力试验研究院 | Deicing bird-repellent equipment for intelligent protection of power equipment |
CN114709781A (en) * | 2022-04-19 | 2022-07-05 | 中国大唐集团科学技术研究院有限公司西北电力试验研究院 | Deicing bird repelling equipment for intelligent protection of power equipment |
CN114843746A (en) * | 2022-05-25 | 2022-08-02 | 黑龙江龙廷信息技术有限公司 | Integrated antenna of little basic station integration of 5G |
CN116887066A (en) * | 2023-08-04 | 2023-10-13 | 广州云禾信息科技有限公司 | Communication base station securing device |
CN116887066B (en) * | 2023-08-04 | 2024-04-26 | 智美云创(广东)技术有限公司 | Communication base station securing device |
CN117913500A (en) * | 2024-03-20 | 2024-04-19 | 泰兴市东盛通讯器材有限公司 | Antenna device convenient to assemble |
CN117913500B (en) * | 2024-03-20 | 2024-05-28 | 泰兴市东盛通讯器材有限公司 | Antenna device convenient to assemble |
CN118190101A (en) * | 2024-05-15 | 2024-06-14 | 沈阳忠艺商贸有限公司 | Intelligent water meter for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021237472A1 (en) | Smart-grid-based support and installation apparatus and method for 5g base station | |
WO2021243494A1 (en) | Support and installation apparatus and method for facilitating quick installation of 5g base station | |
CN215402810U (en) | Based on multi-direction platform adjusting device of electric automatization | |
CN116345924A (en) | Photovoltaic inverter convenient for internal overhaul and element replacement | |
CN218926033U (en) | Battery tab bending device | |
CN109244910B (en) | Assembling tool for switch cabinet | |
CN113824081B (en) | Outdoor cable distribution box | |
CN218040268U (en) | Switch board with dustproof construction | |
CN211930011U (en) | Supporting device convenient to maintain and used for box-type substation | |
CN211574628U (en) | Visual management and control integrated device for electric power engineering on-site supervision | |
CN213876508U (en) | Engineering quality supervision service device for building | |
CN212380795U (en) | Outdoor electric automatization block terminal convenient to installation | |
CN211428805U (en) | Cable erecting device for building electromechanical installation | |
CN220078554U (en) | Electric power construction operation platform based on green building construction technology | |
CN208015092U (en) | A kind of ring main unit being provided with lifting wheel mechanism | |
CN217362319U (en) | Automatic fixing and clamping equipment for production of low-voltage power distribution cabinet | |
CN219086592U (en) | High-performance power distribution cabinet | |
CN111010068A (en) | Spliced solar photovoltaic equipment | |
CN220553721U (en) | Capacitor cabinet | |
CN211555623U (en) | Dry-type transformer with axial-flow type cooling structure | |
CN212008661U (en) | Novel electrical detection device of thermal power plant | |
CN214479186U (en) | Cable support frame for power engineering | |
CN216747845U (en) | Multifunctional novel electric energy metering box | |
CN220021961U (en) | Intelligent metering box with waterproof structure | |
CN213980114U (en) | Novel stereo garage canopy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20938208 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20938208 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20938208 Country of ref document: EP Kind code of ref document: A1 |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 26.06.2023) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20938208 Country of ref document: EP Kind code of ref document: A1 |