WO2021174980A1 - Maintenance task allocation method, system and apparatus, and storage medium - Google Patents
Maintenance task allocation method, system and apparatus, and storage medium Download PDFInfo
- Publication number
- WO2021174980A1 WO2021174980A1 PCT/CN2020/140973 CN2020140973W WO2021174980A1 WO 2021174980 A1 WO2021174980 A1 WO 2021174980A1 CN 2020140973 W CN2020140973 W CN 2020140973W WO 2021174980 A1 WO2021174980 A1 WO 2021174980A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- maintenance
- machine
- task
- task list
- offset rate
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
Definitions
- the present invention relates to the field of task distribution, in particular to a maintenance task distribution method, system, device and storage medium.
- the purpose of the present invention is to provide a maintenance task allocation method, system, device and storage medium, so that the system can automatically allocate maintenance tasks to matching groups of maintenance personnel.
- the first technical solution adopted by the present invention is: a maintenance task distribution method, including the following steps:
- step of calculating the machine matching offset rate according to the machine state signal and generating the task list specifically includes:
- a task list is generated.
- calculation parameters include the actual duration, the standard duration, the number of actions in the wrong sequence, and the total number of actions, and the machine matching offset rate is calculated by the following formula:
- the A is the actual duration
- the B is the standard duration
- the C is the number of actions in the wrong sequence
- the D is the total number of actions
- N is the total number of actions issued by the machine in one cycle
- Z Match the offset rate for the machine.
- step of generating a task list according to the machine state signal, calculation parameters and machine matching offset rate specifically includes:
- the filling of the calculated parameters and the machine matching offset rate into the recalled preset template also includes the maintenance records and repair methods before the equipment is recalled.
- the step of matching and assigning tasks according to the content of the task list and the information of the maintenance personnel it also includes entering the information of the engineers and classifying the engineers according to preset rules.
- the second technical solution adopted by the present invention is: a maintenance task distribution system, including:
- Acquisition module used to collect machine state signals
- the calculation module is used to calculate the machine matching offset rate according to the machine state signal and generate a task list
- the allocation module is used to match and allocate tasks according to the content of the task list and the information of the maintenance personnel.
- the knowledge base module is used to upload the maintenance report after completing the task and update the skill base and work experience of the maintenance personnel.
- a maintenance task distribution device including:
- At least one processor At least one processor
- At least one memory for storing at least one program
- the at least one processor When the at least one program is executed by the at least one processor, the at least one processor implements the maintenance task distribution method described above.
- the fourth technical solution adopted by the present invention is: a storage medium in which instructions executable by a processor are stored, characterized in that: the instructions executable by the processor are used to realize the aforementioned A method of allocating maintenance tasks.
- the present invention detects the state of the machine by collecting the machine state signal in real time, and after judging the failure of the machine equipment, it generates a task list and assigns the task list to a matching group of maintenance personnel. It is conducive to the targeted allocation of equipment maintenance tasks for enterprises and reduces resource waste.
- Figure 1 is a flow chart of the steps of a maintenance task distribution method of the present invention
- Figure 2 is a structural block diagram of a maintenance task distribution system of the present invention.
- each equipment is maintained by professional engineers.
- the system detects the abnormality of the equipment parameters, determines whether the equipment is malfunctioning, generates a maintenance order and assigns it to the matched group of maintenance personnel, and then the maintenance personnel take the initiative to take the task.
- the present invention provides a maintenance task distribution method, which includes the following steps:
- a sensor or a built-in signal receiver can be used to receive various parameters of the device and the signal sent by the device.
- the device will continue to generate signals during operation, and each signal will appear and last for a period of time according to the predetermined time point.
- Matching offset rate duration offset rate + action number offset rate.
- Duration deviation rate the absolute value of the difference between the actual duration and the standard duration divided by the standard duration multiplied by a percentage
- the number of actions deviation rate the number of actions with an error sequence divided by the total number of actions multiplied by a percentage Percent
- the maintenance personnel's information includes the maintenance personnel's skill base, work experience, and the equipment field that they are good at.
- the step of calculating the machine matching offset rate according to the equipment parameters and generating a task list specifically includes:
- a task list is generated.
- the device can be simplified to monitor the device, obtain the signal generated by the device in real time, and obtain and calculate the matching offset rate of the device based on the signal. When the matching offset rate exceeds the preset value, a task list is generated. Send to the task list library.
- the calculation parameters include the actual duration, the standard duration, the number of actions in the wrong sequence, and the total number of actions, and the machine matching offset rate is calculated by the following formula:
- the A is the actual duration
- the B is the standard duration
- the C is the number of actions in the wrong sequence
- the D is the total number of actions
- N is the total number of actions issued by the machine in one cycle
- Z Match the offset rate for the machine.
- the automatic order generation program is triggered.
- the fixed ratio can be continuously adjusted according to the settings as the system is used, and strive to be able to truly reflect the status of the equipment, and accept manual intervention and adjustment. .
- the step of generating the task list according to the machine state signal, the calculation parameter and the machine matching offset rate specifically includes:
- the preset template pre-designs the task list template and presets the template into the system. After receiving the instruction to trigger the generation of the task list, it automatically fills in the relevant content according to the rules of the template.
- Task lists, preset templates are conducive to quickly generate task lists, and further improve the speed of maintenance task assignment.
- the filling in the calculated parameters and the machine matching offset rate into the recalled preset template also includes recalling the maintenance records and repair methods of the equipment;
- the step of matching and assigning tasks according to the content of the task list and the information of the maintenance personnel it also includes entering the information of the maintenance personnel and classifying the maintenance personnel according to preset rules.
- each maintenance person collects his field of expertise and work experience into the system.
- the present invention matches the sequence of qualified maintenance personnel according to the field of expertise of the order and assigns a task list for this part of the engineers, and enters the information of the maintenance personnel in advance and classifies them.
- the classification rules can be classified according to equipment groups, which can be specifically divided into welding process equipment maintenance group, robot maintenance group, conveying equipment maintenance group, screwing equipment maintenance group, etc.
- the enterprise system cyclically monitors the various parameters of all machines and all equipment.
- a maintenance order is automatically formed and the maintenance order is sent to
- the corresponding maintenance personnel enter the information into the system in advance. For example, if the maintenance personnel c in group A has experience in handling such failure phenomena, the system will automatically assign the maintenance order to the maintenance personnel c and perform maintenance, and the system recognizes The task order is marked once it is assigned, and other maintenance personnel are not allowed to grab the order, preventing the same task from being assigned to different people, and ending the allocation process. After the maintenance is completed, such maintenance experience will also be added to the professional maintenance project case of maintenance personnel c In, the experience information of maintenance personnel c is enriched, so that the system can allocate maintenance tasks more accurately.
- a maintenance task distribution system includes:
- Acquisition module used to collect machine state signals
- the calculation module is used to calculate the machine matching offset rate according to the machine state signal and generate a task list
- Assignment module used to match and assign tasks according to the content of the task list and the information of the maintenance personnel
- the knowledge base module is used to upload the maintenance report after completing the task and update the skill base and work experience of the maintenance personnel.
- the calculation module further includes:
- the comparison sub-module is used to compare the machine state signal with the preset signal to obtain the calculation parameters
- the offset rate sub-module is used to calculate the matching offset rate of the machine according to the calculation parameters
- the task list sub-module is used to generate a task list according to the machine status signal, calculation parameters and machine matching offset rate.
- the distribution module further includes:
- Entry sub-module used to enter the information of maintenance personnel
- Classification sub-module used for maintenance personnel to classify according to preset rules
- a maintenance task distribution device :
- At least one processor At least one processor
- At least one memory for storing at least one program
- the at least one processor When the at least one program is executed by the at least one processor, the at least one processor implements the maintenance task distribution method described above.
- a storage medium storing instructions executable by a processor, wherein the instructions executable by the processor are used to implement the above-mentioned maintenance task distribution method when executed by the processor.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A maintenance task allocation method, system and apparatus, and a storage medium, the method comprising: collecting a machine status signal; calculating a machine matching offset ratio according to the machine status signal, and generating a task list; and matching and allocating a task according to the content of the task list and information of maintenance staff. The system comprises: a collection module, a calculation module, and an allocation module. The apparatus comprises a memory and a processor used for executing the described maintenance task allocation method. The present invention can achieve the targeted allocation of a maintenance task for a device by a company and can be widely applied in the field of task allocation.
Description
本发明涉及任务分配领域,尤其涉及一种维修任务分配方法、系统、装置及存储介质。The present invention relates to the field of task distribution, in particular to a maintenance task distribution method, system, device and storage medium.
设备管理服务中,针对机器设备的维修和保养是必不可少的环节,目前设备管理中的维修、检修、保养等各项项目基本都是基于主管领导分配任务的模式,在一些大型企业维修管理系统中,该模式容易出现人为失误,如将设备维护分配给不属于该设备的维修人员,维修人员完成维修任务的主动性不高,这样容易造成资源浪费,维修成本过高。In equipment management services, the repair and maintenance of machinery and equipment is an indispensable link. At present, various items such as repair, overhaul and maintenance in equipment management are basically based on the mode of assignment of tasks by supervisors. In some large enterprises, maintenance management In the system, this mode is prone to human error. For example, if equipment maintenance is assigned to maintenance personnel who do not belong to the equipment, the maintenance personnel are not proactive in completing the maintenance tasks, which is likely to cause waste of resources and excessive maintenance costs.
发明内容Summary of the invention
为了解决上述技术问题,本发明的目的是提供一种维修任务分配方法、系统、装置及存储介质,使系统自动将维修任务分配到匹配的维修人员群组。In order to solve the above technical problems, the purpose of the present invention is to provide a maintenance task allocation method, system, device and storage medium, so that the system can automatically allocate maintenance tasks to matching groups of maintenance personnel.
本发明所采用的第一技术方案是:一种维修任务分配方法,包括以下步骤:The first technical solution adopted by the present invention is: a maintenance task distribution method, including the following steps:
采集机器状态信号;Collect machine status signals;
根据机器状态信号计算出机器匹配偏移率并生成任务单;Calculate the machine matching offset rate according to the machine state signal and generate a task list;
根据任务单的内容与维修人员的信息进行匹配并分配任务。Match and assign tasks according to the content of the task list and the information of the maintenance personnel.
进一步,还包括:Further, it also includes:
完成任务后上传维修报告并更新该维修人员的技能库和工作经验;After completing the task, upload the maintenance report and update the skill base and work experience of the maintenance personnel;
进一步,所述根据机器状态信号计算出机器匹配偏移率并生成任务单这一步骤,其具体包括:Further, the step of calculating the machine matching offset rate according to the machine state signal and generating the task list specifically includes:
将机器状态信号与预设信号进行比对,得到计算参数;Compare the machine state signal with the preset signal to obtain the calculation parameters;
根据计算参数计算出机器匹配偏移率;Calculate the machine matching offset rate according to the calculation parameters;
根据机器状态信号、计算参数和机器匹配偏移率生成任务单。According to the machine status signal, calculation parameters and machine matching deviation rate, a task list is generated.
进一步,所述计算参数包括实际持续时长、标准持续时长、错误时序的动作个数和动作个数总数,所述机器匹配偏移率通过下列公式计算:Further, the calculation parameters include the actual duration, the standard duration, the number of actions in the wrong sequence, and the total number of actions, and the machine matching offset rate is calculated by the following formula:
所述A为实际持续时长,所述B为标准持续时长,所述C为错误时序的动作个数,所述 D为动作个数总数,N为该机器在一个循环周期发出的动作总数,Z为机器匹配偏移率。The A is the actual duration, the B is the standard duration, the C is the number of actions in the wrong sequence, the D is the total number of actions, N is the total number of actions issued by the machine in one cycle, Z Match the offset rate for the machine.
进一步,所述根据机器状态信号、计算参数和机器匹配偏移率生成任务单这一步骤,其具体包括:Further, the step of generating a task list according to the machine state signal, calculation parameters and machine matching offset rate specifically includes:
根据机器状态信号调出预设模板;Call out the preset template according to the machine state signal;
将计算参数和机器匹配偏移率填入到调出的预设模板,生成任务单。Fill in the calculated parameters and the machine matching offset rate into the recalled preset template to generate a task list.
进一步,所述将计算参数和机器匹配偏移率填入到调出的预设模板还包括调出该设备之前的维护记录和维修方法。Further, the filling of the calculated parameters and the machine matching offset rate into the recalled preset template also includes the maintenance records and repair methods before the equipment is recalled.
进一步,所述根据任务单的内容与维修人员的信息进行匹配并分配任务这一步骤之前,还包括录入工程师的信息,并将工程师按预设规则分类。Further, before the step of matching and assigning tasks according to the content of the task list and the information of the maintenance personnel, it also includes entering the information of the engineers and classifying the engineers according to preset rules.
本发明所采用的第二技术方案是:一种维修任务分配系统,包括:The second technical solution adopted by the present invention is: a maintenance task distribution system, including:
采集模块,用于采集机器状态信号;Acquisition module, used to collect machine state signals;
计算模块,用于根据机器状态信号计算出机器匹配偏移率,并生成任务单;The calculation module is used to calculate the machine matching offset rate according to the machine state signal and generate a task list;
分配模块,用于根据任务单的内容与维修人员的信息进行匹配并分配任务。The allocation module is used to match and allocate tasks according to the content of the task list and the information of the maintenance personnel.
知识库模块,用于完成任务后上传维修报告并更新该维修人员的技能库和工作经验。The knowledge base module is used to upload the maintenance report after completing the task and update the skill base and work experience of the maintenance personnel.
本发明所采用的第三技术方案是:一种维修任务分配装置,包括:The third technical solution adopted by the present invention is: a maintenance task distribution device, including:
至少一个处理器;At least one processor;
至少一个存储器,用于存储至少一个程序;At least one memory for storing at least one program;
当所述至少一个程序被所述至少一个处理器执行,使得所述至少一个处理器实现如上所述所述一种维修任务分配方法。When the at least one program is executed by the at least one processor, the at least one processor implements the maintenance task distribution method described above.
本发明所采用的第四技术方案是:一种存储介质,其中存储有处理器可执行的指令,其特征在于:所述处理器可执行的指令在由处理器执行时用于实现如上所述一种维修任务分配方法。The fourth technical solution adopted by the present invention is: a storage medium in which instructions executable by a processor are stored, characterized in that: the instructions executable by the processor are used to realize the aforementioned A method of allocating maintenance tasks.
本发明方法、系统、装置及存储介质的有益效果是:本发明通过实时采集机器状态信号检测机器状态,在判断机器设备故障后,生成任务单并将任务单分配给匹配的维修人员群组,有利于企业对设备的维修任务进行有针对性分配,减少资源浪费。The beneficial effects of the method, system, device and storage medium of the present invention are: the present invention detects the state of the machine by collecting the machine state signal in real time, and after judging the failure of the machine equipment, it generates a task list and assigns the task list to a matching group of maintenance personnel. It is conducive to the targeted allocation of equipment maintenance tasks for enterprises and reduces resource waste.
图1是本发明一种维修任务分配方法的步骤流程图;Figure 1 is a flow chart of the steps of a maintenance task distribution method of the present invention;
图2是本发明一种维修任务分配系统的结构框图。Figure 2 is a structural block diagram of a maintenance task distribution system of the present invention.
下面结合附图和具体实施例对本发明做进一步的详细说明。对于以下实施例中的步骤编 号,其仅为了便于阐述说明而设置,对步骤之间的顺序不做任何限定,实施例中的各步骤的执行顺序均可根据本领域技术人员的理解来进行适应性调整。The present invention will be further described in detail below with reference to the drawings and specific embodiments. For the step numbers in the following embodiments, they are set only for ease of elaboration, and there is no limitation on the order between the steps. The execution order of the steps in the embodiments can be adapted according to the understanding of those skilled in the art. Sexual adjustment.
在一些大型企业中,具有各种各样的生产设备,每个设备都是有专业的工程师进行维护。当生产线出现停机的时候,我们需要快速判断是哪个类型的设备出现问题,同时找到匹配的工程师过来维修,通过使用本方法,提前录入各个维修人员的信息并按照预设规则如按设备列表分类,系统检测到设备参数出现异常,判断设备是否发生故障,生成维修订单并分配给匹配到的维修人员群组,后由维修人员主动抢接任务。In some large enterprises, there are a variety of production equipment, and each equipment is maintained by professional engineers. When the production line is down, we need to quickly determine which type of equipment has a problem, and at the same time find a matching engineer to repair it. By using this method, enter the information of each maintenance personnel in advance and follow the preset rules such as sorting by equipment list. The system detects the abnormality of the equipment parameters, determines whether the equipment is malfunctioning, generates a maintenance order and assigns it to the matched group of maintenance personnel, and then the maintenance personnel take the initiative to take the task.
如图1所示,本发明提供了一种维修任务分配方法,该方法包括以下步骤:As shown in Figure 1, the present invention provides a maintenance task distribution method, which includes the following steps:
S101、采集机器状态信号。S101. Collect a machine state signal.
具体地,可采用传感器或内置信号接收器用以接收设备的各个参数、设备发出的信号。Specifically, a sensor or a built-in signal receiver can be used to receive various parameters of the device and the signal sent by the device.
S102、根据机器状态信号计算出机器匹配偏移率,并生成任务单;S102: Calculate the machine matching offset rate according to the machine state signal, and generate a task list;
S103、根据任务单的内容与维修人员的信息进行匹配并分配任务。S103: Match the content of the task list with the information of the maintenance personnel and assign tasks.
具体地,设备在工作中会持续产生信号,各个信号会根据预先确定是时间点出现并持续一段时间,当一个信号出现的时间点不对或出现持续的时长与系统中定义的标准值有偏差时,测算匹配率偏移率。匹配偏移率=时长偏移率+动作个数偏移率。时长偏移率=实际持续时长与标准持续时长的差值的绝对值除以标准持续时长乘以百分百,动作个数偏移率=出现错误时序的动作个数除以动作总数乘以百分百,所述维修人员的信息包括维修人员的技能库、工作经验和擅长的设备领域。Specifically, the device will continue to generate signals during operation, and each signal will appear and last for a period of time according to the predetermined time point. When a signal appears at an incorrect time point or the duration of occurrence deviates from the standard value defined in the system , Calculate the offset rate of the matching rate. Matching offset rate = duration offset rate + action number offset rate. Duration deviation rate = the absolute value of the difference between the actual duration and the standard duration divided by the standard duration multiplied by a percentage, and the number of actions deviation rate = the number of actions with an error sequence divided by the total number of actions multiplied by a percentage Percent, the maintenance personnel's information includes the maintenance personnel's skill base, work experience, and the equipment field that they are good at.
进一步作为本方法的优选实施例,还包括:Further as a preferred embodiment of this method, it also includes:
完成任务后上传维修报告并更新该维修人员的技能库和工作经验。After completing the task, upload the maintenance report and update the skill base and work experience of the maintenance personnel.
具体地,完成任务后上传维修报告同时在维修人员信息系统中将该次维修记录到对应维修人员的信息表中,这样有利于下次快速识别生成任务单和分配的任务单给对应的维修人员,有助于提高分配效率。Specifically, after completing the task, upload the maintenance report and record the maintenance in the information table of the corresponding maintenance personnel in the maintenance personnel information system, which will help to quickly identify the next time the task list is generated and the assigned task list to the corresponding maintenance personnel. , Help to improve the efficiency of distribution.
进一步作为本方法的优选实施例,所述根据设备参数计算出机器匹配偏移率,并生成任务单这一步骤,其具体包括:Further as a preferred embodiment of the method, the step of calculating the machine matching offset rate according to the equipment parameters and generating a task list specifically includes:
将机器状态信号与预设信号进行比对,得到计算参数;Compare the machine state signal with the preset signal to obtain the calculation parameters;
根据计算参数计算出机器匹配偏移率;Calculate the machine matching offset rate according to the calculation parameters;
根据机器状态信号、计算参数和机器匹配偏移率生成任务单。According to the machine status signal, calculation parameters and machine matching deviation rate, a task list is generated.
具体地,可以简化为,对设备进行监控,实时获取设备在工作中产生的信号,并根据该信号获取测算出设备的匹配偏移率,当匹配偏移率超过预设值,生成任务单并发送到任务单 库。Specifically, it can be simplified to monitor the device, obtain the signal generated by the device in real time, and obtain and calculate the matching offset rate of the device based on the signal. When the matching offset rate exceeds the preset value, a task list is generated. Send to the task list library.
进一步作为本方法的优选实施例,所述计算参数包括实际持续时长、标准持续时长、错误时序的动作个数和动作个数总数,所述机器匹配偏移率通过下列公式计算:Further as a preferred embodiment of the method, the calculation parameters include the actual duration, the standard duration, the number of actions in the wrong sequence, and the total number of actions, and the machine matching offset rate is calculated by the following formula:
所述A为实际持续时长,所述B为标准持续时长,所述C为错误时序的动作个数,所述D为动作个数总数,N为该机器在一个循环周期发出的动作总数,Z为机器匹配偏移率。The A is the actual duration, the B is the standard duration, the C is the number of actions in the wrong sequence, the D is the total number of actions, N is the total number of actions issued by the machine in one cycle, Z Match the offset rate for the machine.
具体地,当出现匹配偏移率大于一定固定比例时触发订单自动生成程序,同时,该固定比率随着系统的使用可以根据设置不断调整适应,力求能够真实反应设备状态,并接受人工干预和调整。Specifically, when the matching deviation rate is greater than a certain fixed ratio, the automatic order generation program is triggered. At the same time, the fixed ratio can be continuously adjusted according to the settings as the system is used, and strive to be able to truly reflect the status of the equipment, and accept manual intervention and adjustment. .
进一步作为本方法优选实施例,所述根据机器状态信号、计算参数和机器匹配偏移率生成任务单这一步骤,其具体包括:Further as a preferred embodiment of the method, the step of generating the task list according to the machine state signal, the calculation parameter and the machine matching offset rate specifically includes:
根据机器状态信号调出预设模板;Call out the preset template according to the machine state signal;
将计算参数和机器匹配偏移率填入到调出的预设模板,生成任务单。Fill in the calculated parameters and the machine matching offset rate into the recalled preset template to generate a task list.
具体地,所述预设模板根据故障设备、故障机器分类,预先设计任务单模板并将模板预置到系统中,收到触发生成任务单的指令后,自动按照模板的规则填入相关内容生成任务单,预设模板有利于快速生成任务单,进一步提高维修任务分配的速度。Specifically, according to the classification of the faulty equipment and the faulty machine, the preset template pre-designs the task list template and presets the template into the system. After receiving the instruction to trigger the generation of the task list, it automatically fills in the relevant content according to the rules of the template. Task lists, preset templates are conducive to quickly generate task lists, and further improve the speed of maintenance task assignment.
进一步作为本方法优选实施例,所述将计算参数和机器匹配偏移率填入到调出的预设模板还包括调出该设备之前的维护记录和维修方法;Further as a preferred embodiment of the method, the filling in the calculated parameters and the machine matching offset rate into the recalled preset template also includes recalling the maintenance records and repair methods of the equipment;
具体地,调出该设备的之前维护记录和维护方法,并填入到任务单中,有助于分配给有相关经验的维修人员,以及维修人员能查看维修记录,有助于维修人员有针对性的对设备进行维修,提高维修效率。Specifically, call up the previous maintenance records and maintenance methods of the equipment and fill them in the task list, which is helpful to assign to maintenance personnel with relevant experience, and the maintenance personnel can view the maintenance records, which helps the maintenance personnel to be targeted Repair the equipment in a timely manner to improve maintenance efficiency.
进一步作为本方法优选实施例,所述根据任务单的内容与维修人员的信息进行匹配并分配任务这一步骤之前,还包括录入维修人员的信息,并将维修人员按预设规则分类。Further as a preferred embodiment of the method, before the step of matching and assigning tasks according to the content of the task list and the information of the maintenance personnel, it also includes entering the information of the maintenance personnel and classifying the maintenance personnel according to preset rules.
具体地,每个维修人员将自己擅长的领域和工作经验收集进系统,本发明根据该单的专业领域匹配合格的维修人员序列并针对此部分工程师分配任务单,提前录入维修人员的信息并分类,其中分类规则可以按照设备组分类,具体可分为焊接工艺设备维护组、机器人维护组、输送设备维护组、打螺钉设备维护组等。Specifically, each maintenance person collects his field of expertise and work experience into the system. The present invention matches the sequence of qualified maintenance personnel according to the field of expertise of the order and assigns a task list for this part of the engineers, and enters the information of the maintenance personnel in advance and classifies them. , The classification rules can be classified according to equipment groups, which can be specifically divided into welding process equipment maintenance group, robot maintenance group, conveying equipment maintenance group, screwing equipment maintenance group, etc.
本发明的具体实施例如下:The specific embodiments of the present invention are as follows:
企业系统循环对所有机器、所有设备的各个参数进行监控,当监控到关键参数m异常(与m标准值存在差异),当差异数据超过预设值则自动形成维修订单,并将维修订单发送给对应维修人员,所述对应维修人员预先将信息录入系统,比如A组内的维修人员c对这样的故障现象有处理经验,系统就自动将维修订单分配给维修人员c并进行维修,系统识别到该任务单被分配后即标记,不允许其他维修人员抢单,防止分配同一任务给不同人,并结束分配流程,维修完成后,这样的维修经验也会添加到维修人员c的职业维修项目案例中,丰富维修人员c的经验信息,便于系统更精确的分配维修任务。The enterprise system cyclically monitors the various parameters of all machines and all equipment. When the monitoring of the key parameter m is abnormal (different from the standard value of m), when the difference data exceeds the preset value, a maintenance order is automatically formed and the maintenance order is sent to Corresponding to the maintenance personnel, the corresponding maintenance personnel enter the information into the system in advance. For example, if the maintenance personnel c in group A has experience in handling such failure phenomena, the system will automatically assign the maintenance order to the maintenance personnel c and perform maintenance, and the system recognizes The task order is marked once it is assigned, and other maintenance personnel are not allowed to grab the order, preventing the same task from being assigned to different people, and ending the allocation process. After the maintenance is completed, such maintenance experience will also be added to the professional maintenance project case of maintenance personnel c In, the experience information of maintenance personnel c is enriched, so that the system can allocate maintenance tasks more accurately.
如图2所示,一种维修任务分配系统,包括:As shown in Figure 2, a maintenance task distribution system includes:
采集模块,用于采集机器状态信号;Acquisition module, used to collect machine state signals;
计算模块,用于根据机器状态信号计算出机器匹配偏移率,并生成任务单;The calculation module is used to calculate the machine matching offset rate according to the machine state signal and generate a task list;
分配模块,用于根据任务单的内容与维修人员的信息进行匹配并分配任务;Assignment module, used to match and assign tasks according to the content of the task list and the information of the maintenance personnel;
知识库模块,用于完成任务后上传维修报告并更新该维修人员的技能库和工作经验。The knowledge base module is used to upload the maintenance report after completing the task and update the skill base and work experience of the maintenance personnel.
进一步作为本系统的优选实施例,所述计算模块还包括:Further as a preferred embodiment of the system, the calculation module further includes:
比对子模块,用于将机器状态信号与预设信号进行比对,得到计算参数;The comparison sub-module is used to compare the machine state signal with the preset signal to obtain the calculation parameters;
偏移率子模块,用于根据计算参数计算出机器匹配偏移率;The offset rate sub-module is used to calculate the matching offset rate of the machine according to the calculation parameters;
任务单子模块,用于根据机器状态信号、计算参数和机器匹配偏移率生成任务单。The task list sub-module is used to generate a task list according to the machine status signal, calculation parameters and machine matching offset rate.
进一步作为本系统的优选实施例,所述分配模块还包括:Further as a preferred embodiment of the system, the distribution module further includes:
录入子模块,用于录入维修人员的信息;Entry sub-module, used to enter the information of maintenance personnel;
分类子模块,用于维修人员按预设规则分类;Classification sub-module, used for maintenance personnel to classify according to preset rules;
上述方法实施例中的内容均适用于本系统实施例中,本系统实施例所具体实现的功能与上述方法实施例相同,并且达到的有益效果与上述方法实施例所达到的有益效果也相同。The contents in the above method embodiments are all applicable to this system embodiment, and the specific functions implemented by this system embodiment are the same as the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
一种维修任务分配装置:A maintenance task distribution device:
至少一个处理器;At least one processor;
至少一个存储器,用于存储至少一个程序;At least one memory for storing at least one program;
当所述至少一个程序被所述至少一个处理器执行,使得所述至少一个处理器实现如上所述一种维修任务分配方法。When the at least one program is executed by the at least one processor, the at least one processor implements the maintenance task distribution method described above.
上述方法实施例中的内容均适用于本装置实施例中,本装置实施例所具体实现的功能与上述方法实施例相同,并且达到的有益效果与上述方法实施例所达到的有益效果也相同。The contents in the above method embodiments are all applicable to the device embodiments, and the specific functions implemented by the device embodiments are the same as the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
一种存储介质,其中存储有处理器可执行的指令,其特征在于:所述处理器可执行的指令在由处理器执行时用于实现如上所述一种维修任务分配方法。A storage medium storing instructions executable by a processor, wherein the instructions executable by the processor are used to implement the above-mentioned maintenance task distribution method when executed by the processor.
上述方法实施例中的内容均适用于本存储介质实施例中,本存储介质实施例所具体实现的功能与上述方法实施例相同,并且达到的有益效果与上述方法实施例所达到的有益效果也相同。The contents in the above method embodiments are all applicable to this storage medium embodiment. The specific functions implemented by this storage medium embodiment are the same as the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments. same.
以上是对本发明的较佳实施进行了具体说明,但本发明创造并不限于所述实施例,熟悉本领域的技术人员在不违背本发明精神的前提下还可做作出种种的等同变形或替换,这些等同的变形或替换均包含在本申请权利要求所限定的范围内。The above is a detailed description of the preferred implementation of the present invention, but the invention is not limited to the described embodiments. Those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of the present invention. These equivalent modifications or replacements are all included in the scope defined by the claims of this application.
Claims (10)
- 一种维修任务分配方法,其特征在于,包括:A method for allocating maintenance tasks, which is characterized in that it includes:采集机器状态信号;Collect machine status signals;根据机器状态信号计算出机器匹配偏移率并生成任务单;Calculate the machine matching offset rate according to the machine state signal and generate a task list;根据任务单的内容与维修人员的信息进行匹配并分配任务。Match and assign tasks according to the content of the task list and the information of the maintenance personnel.
- 根据权利要求1所述的一种维修任务分配方法,其特征在于,还包括:The method for allocating maintenance tasks according to claim 1, further comprising:完成任务后上传维修报告并更新该维修人员的技能库和工作经验。After completing the task, upload the maintenance report and update the skill base and work experience of the maintenance personnel.
- 根据权利要求1所述的一种维修任务分配方法,其特征在于,所述根据机器状态信号计算出机器匹配偏移率并生成任务单这一步骤,其具体包括:The maintenance task distribution method according to claim 1, wherein the step of calculating the machine matching offset rate according to the machine state signal and generating a task list specifically includes:将机器状态信号与预设信号进行比对,得到计算参数;Compare the machine state signal with the preset signal to obtain the calculation parameters;根据计算参数计算出机器匹配偏移率;Calculate the machine matching offset rate according to the calculation parameters;根据机器状态信号、计算参数和机器匹配偏移率生成任务单。According to the machine status signal, calculation parameters and machine matching deviation rate, a task list is generated.
- 根据权利要求3所述的一种维修任务分配方法,其特征在于,所述计算参数包括实际持续时长、标准持续时长、错误时序的动作个数和动作个数总数,所述机器匹配偏移率通过下列公式计算:The maintenance task distribution method according to claim 3, wherein the calculation parameters include the actual duration, the standard duration, the number of actions in the wrong sequence, and the total number of actions, and the machine matching offset rate Calculated by the following formula:所述A为实际持续时长,所述B为标准持续时长,所述C为错误时序的动作个数,所述D为动作个数总数,N为该机器在一个循环周期发出的动作总数,Z为机器匹配偏移率。The A is the actual duration, the B is the standard duration, the C is the number of actions in the wrong sequence, the D is the total number of actions, N is the total number of actions issued by the machine in one cycle, Z Match the offset rate for the machine.
- 根据权利要求3所述的一种维修任务分配方法,其特征在于,所述根据机器状态信号、计算参数和机器匹配偏移率生成任务单这一步骤,其具体包括:The maintenance task distribution method according to claim 3, wherein the step of generating a task list according to the machine state signal, the calculation parameter and the machine matching offset rate specifically includes:根据机器状态信号调出预设模板;Call out the preset template according to the machine state signal;将计算参数和机器匹配偏移率填入到调出的预设模板,生成任务单。Fill in the calculated parameters and the machine matching offset rate into the recalled preset template to generate a task list.
- 根据权利要求5所述的一种维修任务分配方法,其特征在于,所述将计算参数和机器匹配偏移率填入到调出的预设模板还包括调出该机器之前的维护记录和维修方法。A maintenance task distribution method according to claim 5, characterized in that said filling the calculated parameters and the machine matching offset rate into the recalled preset template further comprises recalling the maintenance records and repairs before the machine method.
- 根据权利要求1所述的一种维修任务分配方法,其特征在于:所述根据任务单的内容与维修人员的信息进行匹配并分配任务这一步骤之前,还包括录入维修人员的信息,并将维修人员按预设规则分类。The method for assigning maintenance tasks according to claim 1, characterized in that: before the step of matching and assigning tasks according to the content of the task list and the information of the maintenance personnel, it also includes entering the information of the maintenance personnel and adding Maintenance personnel are classified according to preset rules.
- 一种维修任务分配系统,其特征在于,包括:A maintenance task distribution system is characterized in that it includes:采集模块,用于采集机器状态信号;Acquisition module, used to collect machine state signals;计算模块,用于根据机器状态信号计算出机器匹配偏移率,并生成任务单;The calculation module is used to calculate the machine matching offset rate according to the machine state signal and generate a task list;分配模块,用于根据任务单的内容与维修人员的信息进行匹配并分配任务;Assignment module, used to match and assign tasks according to the content of the task list and the information of the maintenance personnel;知识库模块,用于完成任务后上传维修报告并更新该维修人员的技能库和工作经验。The knowledge base module is used to upload the maintenance report after completing the task and update the skill base and work experience of the maintenance personnel.
- 一种维修任务分配装置,其特征在于,还包括:A maintenance task distribution device is characterized in that it further includes:至少一个处理器;At least one processor;至少一个存储器,用于存储至少一个程序;At least one memory for storing at least one program;当所述至少一个程序被所述至少一个处理器执行,使得所述至少一个处理器实现如权利要求1-7任一项所述一种维修任务分配方法。When the at least one program is executed by the at least one processor, the at least one processor implements the maintenance task distribution method according to any one of claims 1-7.
- 一种存储介质,其中存储有处理器可执行的指令,其特征在于:所述处理器可执行的指令在由处理器执行时用于实现如权利要求1-7任一项所述一种维修任务分配方法。A storage medium storing instructions executable by a processor, characterized in that: the instructions executable by the processor are used to implement the maintenance as described in any one of claims 1-7 when executed by the processor Task allocation method.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010141708.4A CN111489050A (en) | 2020-03-04 | 2020-03-04 | Maintenance task allocation method, system, device and storage medium |
CN202010141708.4 | 2020-03-04 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2021174980A1 true WO2021174980A1 (en) | 2021-09-10 |
Family
ID=71791320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2020/140973 WO2021174980A1 (en) | 2020-03-04 | 2020-12-29 | Maintenance task allocation method, system and apparatus, and storage medium |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN111489050A (en) |
WO (1) | WO2021174980A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114065964A (en) * | 2021-11-10 | 2022-02-18 | 红塔烟草(集团)有限责任公司 | Maintenance management method, system and computer equipment based on multiple items |
CN114492870A (en) * | 2022-01-26 | 2022-05-13 | 北京和利时系统集成有限公司 | Fault processing method, device and system for rail transit signal equipment |
CN115464467A (en) * | 2022-10-08 | 2022-12-13 | 安徽省正大金属制品有限公司 | Secondary waste monitoring system for circular steel nail machining production |
CN116109120A (en) * | 2023-04-17 | 2023-05-12 | 厦门微亚智能科技有限公司 | Industrial equipment management sharing system and management sharing method thereof |
CN116415802A (en) * | 2023-06-12 | 2023-07-11 | 广州极能信息技术有限公司 | Power plant operation management method, electronic device, and computer storage medium |
CN117852844A (en) * | 2024-03-07 | 2024-04-09 | 中国人民解放军海军工程大学 | Method, system, device and storage medium for distributing equipment repair tasks |
CN118096132A (en) * | 2024-04-24 | 2024-05-28 | 广州技客信息科技有限公司 | Public energy consumption equipment operation and maintenance management system suitable for intelligent park |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111489050A (en) * | 2020-03-04 | 2020-08-04 | 广州明珞汽车装备有限公司 | Maintenance task allocation method, system, device and storage medium |
CN113487053A (en) * | 2021-09-08 | 2021-10-08 | 深圳市信润富联数字科技有限公司 | Maintenance service method, device, equipment and computer readable storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101553737A (en) * | 2005-07-12 | 2009-10-07 | 联合设备技术公司 | Method and apparatus for parameter adjustment, testing, and configuration |
CN105512812A (en) * | 2015-12-02 | 2016-04-20 | 中广核工程有限公司 | Nuclear power plant equipment fault early warning analysis method and system based on dynamic simulation model |
CN106777603A (en) * | 2016-12-02 | 2017-05-31 | 国网江苏省电力公司镇江供电公司 | Relay protection device of intelligent substation life-span prediction method |
CN107390636A (en) * | 2017-08-28 | 2017-11-24 | 德阳杰创科技有限公司 | A kind of numerical control device operational monitoring method and maintaining method and system |
CN107657379A (en) * | 2017-09-26 | 2018-02-02 | 广州平云小匠科技有限公司 | Task preferentially distributing method, device and system |
CN109325601A (en) * | 2018-08-21 | 2019-02-12 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management method |
CN111489050A (en) * | 2020-03-04 | 2020-08-04 | 广州明珞汽车装备有限公司 | Maintenance task allocation method, system, device and storage medium |
-
2020
- 2020-03-04 CN CN202010141708.4A patent/CN111489050A/en active Pending
- 2020-12-29 WO PCT/CN2020/140973 patent/WO2021174980A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101553737A (en) * | 2005-07-12 | 2009-10-07 | 联合设备技术公司 | Method and apparatus for parameter adjustment, testing, and configuration |
CN105512812A (en) * | 2015-12-02 | 2016-04-20 | 中广核工程有限公司 | Nuclear power plant equipment fault early warning analysis method and system based on dynamic simulation model |
CN106777603A (en) * | 2016-12-02 | 2017-05-31 | 国网江苏省电力公司镇江供电公司 | Relay protection device of intelligent substation life-span prediction method |
CN107390636A (en) * | 2017-08-28 | 2017-11-24 | 德阳杰创科技有限公司 | A kind of numerical control device operational monitoring method and maintaining method and system |
CN107657379A (en) * | 2017-09-26 | 2018-02-02 | 广州平云小匠科技有限公司 | Task preferentially distributing method, device and system |
CN109325601A (en) * | 2018-08-21 | 2019-02-12 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management method |
CN111489050A (en) * | 2020-03-04 | 2020-08-04 | 广州明珞汽车装备有限公司 | Maintenance task allocation method, system, device and storage medium |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114065964A (en) * | 2021-11-10 | 2022-02-18 | 红塔烟草(集团)有限责任公司 | Maintenance management method, system and computer equipment based on multiple items |
CN114492870A (en) * | 2022-01-26 | 2022-05-13 | 北京和利时系统集成有限公司 | Fault processing method, device and system for rail transit signal equipment |
CN115464467A (en) * | 2022-10-08 | 2022-12-13 | 安徽省正大金属制品有限公司 | Secondary waste monitoring system for circular steel nail machining production |
CN116109120A (en) * | 2023-04-17 | 2023-05-12 | 厦门微亚智能科技有限公司 | Industrial equipment management sharing system and management sharing method thereof |
CN116415802A (en) * | 2023-06-12 | 2023-07-11 | 广州极能信息技术有限公司 | Power plant operation management method, electronic device, and computer storage medium |
CN117852844A (en) * | 2024-03-07 | 2024-04-09 | 中国人民解放军海军工程大学 | Method, system, device and storage medium for distributing equipment repair tasks |
CN117852844B (en) * | 2024-03-07 | 2024-05-28 | 中国人民解放军海军工程大学 | Method, system, device and storage medium for distributing equipment repair tasks |
CN118096132A (en) * | 2024-04-24 | 2024-05-28 | 广州技客信息科技有限公司 | Public energy consumption equipment operation and maintenance management system suitable for intelligent park |
Also Published As
Publication number | Publication date |
---|---|
CN111489050A (en) | 2020-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021174980A1 (en) | Maintenance task allocation method, system and apparatus, and storage medium | |
CN107273688B (en) | Method and system for monitoring equipment service life and health degree based on original fault data | |
CN110493025B (en) | Fault root cause diagnosis method and device based on multilayer digraphs | |
WO2020143327A1 (en) | Big data-based computer room inspection method and related device | |
CN105447681B (en) | Physical and chemical detection control and information management system | |
US10409639B2 (en) | Task scheduling system with a work breakdown structure and method suitable for mobile health | |
CN105653322B (en) | The processing method of O&M server and server event | |
CN108710362A (en) | A kind of CNC Machine Network diagnostic method based on industry internet platform | |
CN116992346A (en) | Enterprise production data processing system based on artificial intelligence big data analysis | |
CN106125702A (en) | A kind of enterprise's energy efficiency management system and management-control method thereof | |
CN112801313A (en) | Fully mechanized mining face fault judgment method based on big data technology | |
CN109409780A (en) | Changing process method, device, computer equipment and storage medium | |
CN116861189A (en) | Method for constructing equipment fault diagnosis maintenance knowledge base based on large language model | |
CN117950380B (en) | MES-driven station terminal production process control system and method | |
CN116757607A (en) | Factory production management system of GPGPU platform | |
CN114756394A (en) | Intelligent diagnosis system for quality of full-link production data | |
CN117520184A (en) | Test system for developing computer software | |
CN112395298A (en) | Data consistency management system based on data layering thought | |
CN117172482A (en) | Door and window production adjusting method and system based on order tracking | |
CN116414973A (en) | Automatic monitoring method and system for nuclear power plant operation technical specifications | |
CN112446798B (en) | Intelligent LED packaging system based on industrial Internet | |
CN113360628A (en) | Network repair event layered maintenance method and system based on problem knowledge base | |
CN205942428U (en) | Energy efficiency management system of enterprise | |
TWM630907U (en) | Support system for real-time and continuous improvement of decision | |
CN116151806B (en) | Management system and management device for equipment maintenance service |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20923557 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20923557 Country of ref document: EP Kind code of ref document: A1 |